Loading...
HomeMy WebLinkAbout06.a.1) Additional Written Announcements (Handout)�.a. z r Meeting f November 1 (�/QridOGtt� Board eet g o , 2012 Additional Written Announcements: Treatment Plant c) Pacific Gas & Electric Company (PG &E) Scheduled Outage on October 27, 2012 On Saturday, October 27th, during a planned service interruption to install wildlife barriers on the electrical feeders to the Treatment Plant, the plant was operated in "island- mode," completely separated from PG &E. For approximately six hours, starting at approximately 7 a.m., the plant electrical load was carried by the recently- restored cogeneration system, with the standby generators available as backup. The barriers will prevent wildlife from possibly coming into contact with the electrical feeders and causing a fault or injuring the wildlife. Out -of -State Travel d) Update on District Staff Travel Out of State to Evaluate Nutrient Removal Processes It was previously announced that two District employees would be traveling out of state to visit various wastewater treatment plants that are conducting pilot scale and full scale nutrient removal studies. Senior Engineer Dana Lawson and Assistant Engineer Samantha Engelage were scheduled to travel to Sturbridge, Massachusetts; Arlington, Virginia; Hampton Roads Sanitation District in Virginia Beach, Virginia; and DC Water in Washington, DC from October 30, 2012 to November 8, 2012. However, due to safety and flight interruption concerns regarding Hurricane Sandy, the first part of the trip was cancelled. Staff will no longer be able to visit Sturbridge, Massachusetts or Arlington, Virginia. Instead, staff will leave on November 4 and travel to Hampton Roads Sanitation District and DC Water, returning November 8, 2012.