HomeMy WebLinkAbout06.a. (Handout)6.a.
(Handn
Item No. 6.a.
2012 CIPP SLIPLINING
PROJECT
i•11a:]:,��
Board Meeting
July 5, 2012
Wesley Adams - Assistant Engineer
Central Contra Costa Sanitary District
Project History
• Pipelines identified through District -wide
television inspection program
• Pipelines were light -to- moderately corroded
and placed on crown spraying cycle
• Large and medium diameter reinforced
concrete and corrugated metal pipes were
selected for renovation
Project Scope
• Renovate 13,000 feet of 18 -inch to 42 -inch by
CIPP and Spiral -Wound construction methods
• Four Sites
- M5 line on Shell Refinery property and along
Marina Vista Road in Martinez
- South Main Street from Newell Avenue south to
Castle Hill Road in Walnut Creek
- Lancaster Road from Westwood Court to
Orchard Lane in Walnut Creek
- CCCSD Treatment Plant property from Junction
Structure 3 to HEADWORKS
Project Photos
® .> q ter 07 s51(t
88.a Pt
2
CI PP_ Process
FIGURE T FIGURE 2
RESIN No -Dig Technology
IMPREGNA TUBE INVERSION TL
FELT E BE •
I
G l.VWHOLE
• Corrosion -Proof
• Capacity is
'DMIAGED NVER - minimally reduced
PIPE B F
FIGURE 3
BOILER AND
PUAV
Bid Status
• Received one responsive bid - June 20, 2012
- SAK Construction
- Bid amount: $4,875,718
- Engineer's Estimate: $2,600,000
• Bid Disadvantages:
- Three (3) Spiral -Wound Contractors in California
- Project and scheduling constraints
- Walnut Creek traffic and work hours constraints
- Bypass requirements and limitations
=a
Recommendations
• Reject all bids received for construction of
the 2012 CIPP Sliplining Project, DP 8405
• Redesign portions of the project and rebid
early next year
Questions
am
M5 Site Map
MARnNEZ J M5
PLEAwRHt1
CONOOM
WAYEfIE
WALWT
CRM
H
e,b
r
LI.,