Loading...
HomeMy WebLinkAbout06.a. (Handout)6.a. (Handn Item No. 6.a. 2012 CIPP SLIPLINING PROJECT i•11a:]:,�� Board Meeting July 5, 2012 Wesley Adams - Assistant Engineer Central Contra Costa Sanitary District Project History • Pipelines identified through District -wide television inspection program • Pipelines were light -to- moderately corroded and placed on crown spraying cycle • Large and medium diameter reinforced concrete and corrugated metal pipes were selected for renovation Project Scope • Renovate 13,000 feet of 18 -inch to 42 -inch by CIPP and Spiral -Wound construction methods • Four Sites - M5 line on Shell Refinery property and along Marina Vista Road in Martinez - South Main Street from Newell Avenue south to Castle Hill Road in Walnut Creek - Lancaster Road from Westwood Court to Orchard Lane in Walnut Creek - CCCSD Treatment Plant property from Junction Structure 3 to HEADWORKS Project Photos ® .> q ter 07 s51(t 88.a Pt 2 CI PP_ Process FIGURE T FIGURE 2 RESIN No -Dig Technology IMPREGNA TUBE INVERSION TL FELT E BE • I G l.VWHOLE • Corrosion -Proof • Capacity is 'DMIAGED NVER - minimally reduced PIPE B F FIGURE 3 BOILER AND PUAV Bid Status • Received one responsive bid - June 20, 2012 - SAK Construction - Bid amount: $4,875,718 - Engineer's Estimate: $2,600,000 • Bid Disadvantages: - Three (3) Spiral -Wound Contractors in California - Project and scheduling constraints - Walnut Creek traffic and work hours constraints - Bypass requirements and limitations =a Recommendations • Reject all bids received for construction of the 2012 CIPP Sliplining Project, DP 8405 • Redesign portions of the project and rebid early next year Questions am M5 Site Map MARnNEZ J M5 PLEAwRHt1 CONOOM WAYEfIE WALWT CRM H e,b r LI., C)