Time Line
• Scheduled semi- annual maintenance
• Started March 27, shutdown 9:00 AM
• Thursday March 29, 2012, startup
— Incident at 4:49 PM
— Exhaust System fuel build up
Flexible connection
� � 1 • Iii
.4
Status
• Root Cause Analysis (RCA)
— Underway
— Engaged all parties
• Engineer working in parallel to RCA
— Structural evaluation of building
— Design for support and repairs
— Control system upgrade