Loading...
HomeMy WebLinkAbout05.a. Award contract to Pacific Infrastructure Corporation for San Ramon Pumping Station Upgrades, District Project 6003J.Q. Central Contra Costa Sanitary District ' BOARD OF DIRECTORS POSITION PAPER Board Meeting Date: April 5, 2012 subject: AWARD A CONSTRUCTION CONTRACT AND AUTHORIZE THE GENERAL MANAGER TO EXECUTE CONTRACT DOCUMENTS SUBJECT TO SUBMITTAL REQUIREMENTS WITH PACIFIC INFRASTRUCTURE CORPORATION FOR THE CONSTRUCTION OF THE SAN RAMON PUMPING STATION UPGRADES, DISTRICT PROJECT 6003 Submitted By: Initiating Dept. /Div.: Nathaniel Morales, Assistant Engineer Engineering /Capital Projects REVIEWED AND RECOMMENDED FOR BOARD ACTION: N. Morales G. Rathunde A. Antkowiak, Ann E. Farrell, General Manager ISSUE: On March 20, 2012, seven sealed bids were received and opened for the construction of the San Ramon Pumping Station Upgrades, District Project 6003. The Board of Directors must award the contract or reject bids within 50 days of the bid opening. Authorize the General Manager to execute the contract documents subject to SUBMITTAL requirements. RECOMMENDATION: Award a construction contract to Pacific Infrastructure Corporation; and authorize the General Manager to execute the Contract Documents subject to favorable review of insurance certificates, bond submittals, appropriate Contractor license, and any other required submittals (SUBMITTALS). FINANCIAL IMPACTS: Approximately $402,000 including design, bid price, contingency, and construction management. ALTERNATIVES /CONSIDERATIONS: Reject all bids, which is not recommended. BACKGROUND: In 2001, the Board approved San Ramon Pumping Stations Renovations Project, DP 5460, to accommodate the development of Dougherty Valley. The project work included installation of four large pumps. During construction, two small pumps were installed in place of two larger pumps, to better serve the initial stage of Dougherty Valley development. Due to the development over the past nine years, pumping station flows have increased beyond the capacity of the small pumps, as expected. This project will replace one of N: \PESUP \Position Papers \Morales \6003- PP Award.doc Page 1 of 6 POSITION PAPER Board Meeting Date: April 5, 2012 Subject: AWARD A CONSTRUCTION CONTRACT AND AUTHORIZE THE GENERAL MANAGER TO EXECUTE CONTRACT DOCUMENTS SUBJECT TO SUBMITTAL REQUIREMENTS WITH PACIFIC INFRASTRUCTURE CORPORATION FOR THE CONSTRUCTION OF THE SAN RAMON PUMPING STATION UPGRADES, DISTRICT PROJECT 6003 the two smaller pumps with a larger pump. The project work area is shown in Attachment 1. District staff prepared the plans and specifications for the project. The Engineer's estimate for construction of the San Ramon Pumping Station Upgrades, District Project 6003 is $310,000. This project was advertised on February 17 and 22, 2012. Seven sealed bids ranging from $270,000 to $290,500 were received and publicly opened on March 20, 2012. The Engineering Department conducted a technical and commercial review of the bids and determined that Pacific Infrastructure Corporation is the lowest responsive bidder with a bid amount of $270,000. A summary of bids received is shown in Attachment 2. The District will perform construction management and will provide contract administration, inspection, office engineering, and submittal review. The funds required to complete this project, as shown in Attachment 3, are $352,000. The total cost of San Ramon Pumping Station Upgrades, District Project 6003, is anticipated to be $402,000. This project is included in the fiscal year (FY) 2011 -12 Capital Improvement Budget (CIB) on pages CS -78 and CS -79. Staff has conducted a cash -flow analysis of the Collection System Program budget and concluded that adequate funds are available for this project. The environmental impacts of construction and operation of the pumping station to accommodate Dougherty Valley area development were addressed in the County' s 1996 Final Subsequent Environmental Impact Report, Windemere Phase I and Gale Ranch Phase II. The Board of Directors reviewed this Environmental Impact Report during its deliberations regarding annexation of the Windemere property in June 1997 and established its independent finding that the environmental impacts of providing wastewater utility service will be reduced to less- than - significant levels through implementation of the mitigation measures required of the project by Contra Costa County. At its May 24, 2001 meeting, the District Board of Directors approved the San Ramon Pumping Renovations Project, which included portions of the proposed project. A Notice of Determination was filed in compliance with the California Environmental Quality Act (CEQA). RECOMMENDED BOARD ACTION: Staff recommends the following: N:\PESUP \Position Papers \Morales \6003- PP Award.doc Page 2 of 6 POSITION PAPER Board Meeting Date: April 5, 2012 Subject: AWARD A CONSTRUCTION CONTRACT AND AUTHORIZE THE GENERAL MANAGER TO EXECUTE CONTRACT DOCUMENTS SUBJECT TO SUBMITTAL REQUIREMENTS WITH PACIFIC INFRASTRUCTURE CORPORATION FOR THE CONSTRUCTION OF THE SAN RAMON PUMPING STATION UPGRADES, DISTRICT PROJECT 6003 Award a construction contract in the amount of $270,000 for the construction of the San Ramon Pumping Station Upgrades, District Project 6003, to Pacific Infrastructure Corporation, the lowest responsive bidder, 2. Authorize the General Manager to execute the Contract Documents subject to SUBMITTAL requirements; NAPESUP \Position Papers \Morales \6003- PP Award.doc Page 3 of 6 I ATTACHMENT 1 SAN RAMON PUMPING STATION UPGRADES DISTRICT PROJECT 6003 GALIFORNIA HIGH SC1400L �0 PUMPING STATION 9925 Mancios Drive 20D FEET I± W14 RAM014 Puts.TO STATION Lansnam PL Central Contra Costa Attachment Sanitary District SAN RAMON 1 Aork-ft", I PUMPING STATION LOCATION I Page 4 of 6 ATTACHMENT 2 SAN RAMON PUMPING STATION UPGRADES DISTRICT PROJECT 6003 SUMMARY OF BIDS PROJECT NO.: 6003 DATE: MARCH 20, 2012 PROJECT NAME: SAN RAMON PUMPING STATION UPGRADES PROJECT LOCATION: SAN RAMON PUMPING STATION, SAN RAMON NO. OF ADDENDA: 1 ENGINEER EST.: $310,000 NO. BIDDER BID PRICE 1 Pacific Infrastructure $270,000 Corporation Pleasanton, CA 94566 2 GSE Construction Company, $277,200 Inc. Livermore, CA 94551 3 D. W. Nicholson Corporation $278,200 Hayward, CA 94545 4 Pacific Mechanical $282,000 Corporation Concord, CA 94524 5 Pump Repair Service $284,500 Company San Francisco, CA 94134 6 Redwood Engineering $289,000 Construction Redwood City, CA 94063 7 Aztec Consultants, Inc. $290,500 San Ramon, CA 94583 BIDS OPENED BY /s/ Donna Anderson DATE March 20, 2012 NAPESUP \Position Papers \Morales \6003- PP Award.doc Page 5 of 6 ATTACHMENT 3 SAN RAMON PUMPING STATION UPGRADES DISTRICT PROJECT 6003 POST -BID / PRECONSTRUCTION ESTIMATE No. Item Description Amounts % Construction Cost 1. CONSTRUCTION a. Construction Contract $270,000 b. Contingency at 15% $41,000 SUBTOTAL - CONSTRUCTION COST $311,000 100% 2. CONSTRUCTION MANAGEMENT a. District Forces - Inspection $28,000 - Construction Management $20,000 SUBTOTAL - CONSTRUCTION MANAGEMENT $48,000 15% 3. PREBID EXPENDITURES a. Engineering $43,000 14% SUBTOTAL - PREBID EXPENDITURES $43,00 0 14% 4. TOTAL PROJECT COST $402,000 5. FUNDS AUTHORIZED TO DATE $50,000 6. ADDITIONAL ALLOCATION NEEDED TO COMPLETE PROJECT (Line 4 - Line 5) $352,000 NAPESUP \Position Papers \Morales \6003- PP Award.doc Page 6 of 6