Loading...
HomeMy WebLinkAbout06.a. (Handout)(gandoO Item 6.a. Annual Report of Sanitary Sewer Overflows Curtis W. Swanson Collection System Operations Department February 16, 2012 Central Contra Costa Sanitary District 2011 Sanitary Sewer Overflows ➢37 overflows — lowest in CCCSD history ➢14% reduction in number of overflows when compared to 2010; 41% reduction in number of overflows when compared to 2009 ➢2.5 overflows per 100 miles ➢ No pumping station or wet - weather capacity overflows 1 Overflow Quantities Size of SSO (gallons) Number in 2011 Number in 2010 Greater than or equal to 1,000 1 2 Between 100 and 999 9 13 Between 10 and 99 17 21 Less than 10 10 7 Total overflow volume 10,264 gallons 1 21,611 gallons ME Overflows Comparison 1999-2011 NambW d &Vwf m 200 lot - - Lowest in 143 141 Central 150 138 -123 - - . San 1b0 107 history! 100 i - - -- - -- -------- - -- -- 73--- 81 - - -86 - - --- -- 43 37 - -I 50 - - -- - -- - - -- - -- - --- --- -� - - -- - - - - -- -� - - �-- 1 - 0 rt +—+ 1999 2000 2001 2002 2003 2004 2005 2008 2007 2008 2009 2010 2011 L Comparative Data for 2011 From State Database ➢ Statewide (CIWQS as of 02115112) ■ 5,005 overflows and total volume of 28,059,798 gallons ■ Average of 5.3 overflows per 100 miles ■ Average volume of 5,600 gallons per SSO for the year ➢ Region 2 — Bay Area (CIWQS as of 02115112) ■ 1,579 overflows and total volume of 17,498,684 gallons ■ Average of 9.0 overflows per 100 miles ■ Average volume of 11,000 gallons per SSO for the year Overflow Causes Cause of SSO Number in 2011 Number in 2010 Roots 22 34 Grease 3 4 Debris (rags, rock, paper) 9 5 All other 3 0 K, 2011 Geographical Trends Walnut Creek 8 Pleasant Hill 4 Orinde 10 Martinez 4 Leteyette 9 Diablo 1 Danville 1 Concord 1 Alamo 1 0 2 4 e B 10 12 Nufnber of Overkwe 2011 Overview ➢ 56 days without a single overflow during 2011 (27 days in 2010) ➢ "Quality Cleaning" philosophy and follow up with CCTV quality assurance ➢ Increased scheduled cleaning frequencies where significant material was removed ➢ Cleaned 4,242,243 feet of sewers - M-0- I 'I'm 0 Overview ➢ New TV contract is focused on sewers in Lamorinda area. ➢ "Smart Cover" device successfully prevented an overflow in Clyde area ➢ Engineering continued projects to rehabilitate sewers — more focus on lines with overflows and sewer lines on frequent cleaning cycles. —M--E Recommendation ➢Accept 2011 Sanitary Sewer Overflows Report BCD_ 41 Questions? ME 0