HomeMy WebLinkAbout03.f. Accept contract work for Treatment Plant Elevator Modernization, DP 7281Central Contra Costa Sanitary District ' BOARD OF DIRECTORS • POSITION PAPER Board Meeting Date: December 15, 2011 Subject: ACCEPT THE CONTRACT WORK FOR THE TREATMENT PLANT ELEVATOR MODERNIZATION, DISTRICT PROJECT 7281, AND AUTHORIZE FILING OF THE NOTICE OF COMPLETION Submitted By: Initiating Dept. /Div.: Clint Shima, Assistant Engineer Engineering /Capital Projects REVIEWED AND RECOMMENDED FOR BOARD ACTION: A. aAaq��Lk r;- I 4-_P� (�w _(�l &,/ - C. Shima A. Antkowiak cki A. Farrell Jam . Kelly, Gene I Manager ISSUE: Construction has been completed on the Treatment Plant Elevator Modernization, District Project 7281, and the work is now ready for acceptance. RECOMMENDATION: Accept the contract work for the Treatment Plant Elevator Modernization, District Project 7281, and authorize filing of the Notice of Completion. FINANCIAL IMPACTS: None related to this action. ALTERNATIVES /CONSIDERATIONS: Not applicable. Filing the Notice of Completion is advisable under the California Civil Code, Section 3093. BACKGROUND: The existing elevators on the treatment plant site were installed in 1975. The District's elevator maintenance company, National Elevator, is frequently called out for unscheduled maintenance. For example, the Solids Conditioning Building (SBC) passenger elevator had 16 unscheduled call -outs in 2009, whereas in 2004 it only had 2 unscheduled call -outs. This is in addition to the regular monthly maintenance visits. These elevators are critical for operation and maintenance activities within the building. The project upgraded the electronics and controls; replaced drives for both the passenger and freight elevators in the SCB; replaced door operators; replaced stopping and slow down devices and guide shoes; replaced hoist and governor ropes and chains; and brought the electrical /communication /fire systems up to code. The door sensor on the HOB passenger elevator was also replaced. On November 4, 2010, the Board of Directors authorized the award of a contract for the construction of the project to Elevator Technology. The Notice to Proceed was issued on January 25, 2011. The work was substantially completed on October 15, 2011. The remaining items of work consist of minor punch -list items, which do not affect the project acceptance. N: \PESUP \Position Papers \Shima \7281 - Accept, NOC.doc Page 1 of 2 POSITION PAPER Board Meeting Date: December 15, 2011 Subject: ACCEPT THE CONTRACT WORK FOR THE TREATMENT PLANT ELEVATOR MODERNIZATION, DISTRICT PROJECT 7281, AND AUTHORIZE FILING OF THE NOTICE OF COMPLETION Immediately upon acceptance, the Contractor is relieved of the duty of maintaining and protecting the Contract work. Guaranty and warranty periods required by the Contract and the statutory period for filing of liens and Stop Notices start on the date of acceptance by the Board of Directors. Final payment to the Contractor is made after expiration of the statutory period for filing of liens and Stop Notices, provided no liens or Stop Notices have been filed, and provided the punch -list items have been completed. The total authorized budget for the project is $511,000. The budget includes the cost of engineering design, construction management and inspection, technical consulting services, change orders, and contractor services. An accounting of the project costs will be provided to the Board at the time of project closeout. It is appropriate to accept the contract work at this time. RECOMMENDED BOARD ACTION: Accept the contract work for the Treatment Plant Elevator Modernization, District Project 7281, and authorize filing of the Notice of Completion. WPESUP \Position Papers \Shima \7281 - Accept, NOC.doc Page 2 of 2