HomeMy WebLinkAbout05.a. Award contract for Primary Structures Demolition Project, DP 7255Central Contra Costa Sanitary District
BOARD OF DIRECTORS
POSITION PAPER
Board Meeting Date: October 20, 2011
subject: AWARD A CONSTRUCTION CONTRACT TO PANTANO EXCAVATING,
INC.; AUTHORIZE THE GENERAL MANAGER TO EXECUTE CONTRACT
DOCUMENTS SUBJECT TO SUBMITTAL REQUIREMENTS; AND AUTHORIZE AN
AMENDMENT AGREEMENT WITH COMPLETE PROJECT SOLUTIONS, INC. FOR
THE CONSTRUCTION OF THE PRIMARY STRUCTURES DEMOLITION
PROJECT, DISTRICT PROJECT 7255
Submitted By: Initiating Dept. /Div.:
Clint T. Shima, Assistant Engineer Engineering / Capital Projects
REVIEWED AND RECOMMENDED FOR BOARD ACTION:
e� L-� A. &46oak (�&? - A� 6
C. Shima A. Antkowiak lecki A. Farrell James M. elly,
General M nager
ISSUE: On September 27, 2011, 6 sealed bids were received and opened for the
construction of the Primary Structures Demolition Project, District Project 7255. The
Board of Directors must award the contract or reject bids within 50 days of the bid
opening. Authorize the General Manager to execute the contract documents subject to
SUBMITTAL requirements. Authorize the General Manager to execute an amendment
to the Professional Engineering Services Agreement over $50,000.
RECOMMENDATION: Find that the project is exempt from the California
Environmental Quality Act (CEQA); award a construction contract, and authorize the
General Manager to execute the Contract Documents subject to favorable review of
insurance certificates, bond submittals, appropriate Contractor license, and any other
required submittals (SUBMITTALS); and authorize the General Manager to execute an
amendment to the Professional Engineering Services Agreement with
Complete Project Solutions, Inc. (CPS).
FINANCIAL IMPACTS: Approximately $1,480,000, including design, bid price,
contingency, and construction management.
ALTERNATIVES /CONSIDERATIONS: Reject all bids, which is not recommended.
BACKGROUND: The original primary sedimentation tanks, constructed in 1948 and
1957, have been out of service and abandoned for decades. This project will safely
remove these tanks and backfill those areas. The lime storage building and silos,
located to the east of the Headquarters Office Building, were constructed in 1974 to
store lime used in the primary sedimentation process. This lime facility has not been
used in over 20 years and will also be demolished under this project. Additionally, the
project will remove various abandoned piping and equipment throughout the treatment
plant and slurry seal paved areas needing rehabilitation. The project work includes
N:\PESUP \Position Pape rs \Shima \7255- pp- awa rd. doc Page 1 of 6
POSITION PAPER
Board Meeting Date: October 20, 2011
subject: AWARD A CONSTRUCTION CONTRACT TO PANTANO EXCAVATING,
INC.; AUTHORIZE THE GENERAL MANAGER TO EXECUTE CONTRACT
DOCUMENTS SUBJECT TO SUBMITTAL REQUIREMENTS; AND AUTHORIZE AN
AMENDMENT AGREEMENT WITH COMPLETE PROJECT SOLUTIONS, INC. FOR
THE CONSTRUCTION OF THE PRIMARY STRUCTURES DEMOLITION
PROJECT, DISTRICT PROJECT 7255
mitigation of asbestos containing material (siding on the lime silos enclosure) and lead -
based paint (painted handrails in the old primaries). Attachment 1 shows the locations
of the project work.
In 2008, District staff executed a Professional Engineering Services Agreement with
CPS to prepare design drawings and specifications to demolish the abandoned primary
tanks. CPS and District staff prepared the plans and specifications for the project. The
Engineer's estimate for construction of the Primary Structures Demolition Project,
District Project 7255, is $1,400,000. This project was advertised on
September 2 and 9, 2011. Six sealed bids, ranging from $929,000 to $1,443,600, were
received and publicly opened on September 27, 2011. Engineering Department staff
conducted a technical and commercial review of the bids and determined that Pantano
Excavating, Inc. is the lowest responsive bidder, with a bid amount of $929,000.
A summary of bids received is shown in Attachment 2.
District staff will perform construction management, contract administration, inspection,
survey, office engineering, and submittal review. CPS has performed satisfactorily
during the design phase of this project and staff recommends retaining CPS to provide
construction support services during construction of this project. The construction
supports services include reviewing shop drawings and submittals, responding to
design questions, evaluating change order requests, and performing site visits to verify
compliance with the design intent. Staff has negotiated an amendment to the
Professional Engineering Service Agreement with CPS in the amount of $30,000. This
will bring the total contract cost for design and construction support services to $75,000.
In addition to CPS, staff will retain a consultant specializing in asbestos and lead paint
removal to assist in technical support/inspection.
The funds required to complete this project, as shown in Attachment 3, are $1,325,000.
The total cost of the Primary Structures Demolition Project, District Project 7255, is
anticipated to be $1,480,000. This project is included in the fiscal year (FY) 2011 -2012
Capital Improvement Budget (CIB) on pages TP -43 and TP -44. Staff has conducted a
cash -flow analysis of the Treatment Plant Program budget and concluded that
adequate funds are available for this project.
Staff has concluded that this project is exempt from the California Environmental
Quality Act (CEQA) under District CEQA Guidelines, Section 15301, since it involves
minor alterations to an existing public facility involving negligible or no expansion of use.
NAPESUP \Position Papers \Shima \7255 -pp- award.doc Page 2 of 6
POSITION PAPER
Board Meeting Date: October 20, 2011
subject: AWARD A CONSTRUCTION CONTRACT TO PANTANO EXCAVATING,
INC.; AUTHORIZE THE GENERAL MANAGER TO EXECUTE CONTRACT
DOCUMENTS SUBJECT TO SUBMITTAL REQUIREMENTS; AND AUTHORIZE AN
AMENDMENT AGREEMENT WITH COMPLETE PROJECT SOLUTIONS, INC. FOR
THE CONSTRUCTION OF THE PRIMARY STRUCTURES DEMOLITION
PROJECT, DISTRICT PROJECT 7255
Approval of this project will establish the Board of Directors' independent finding that
this project is exempt from CEQA.
RECOMMENDED BOARD ACTION: Staff recommends the following:
1. Find that the project is exempt from CEQA,
2. Award a construction contract in the amount of $929,000 for the construction of
the Primary Structures Demolition Project, District Project 7255, to
Pantano Excavating, Inc., the lowest responsive bidder,
3. Authorize the General Manager to execute the Contract Documents subject to
SUBMITTAL requirements, and
4. Authorize the General Manager to execute an amendment to an existing
Professional Service Agreement with CPS in the amount of $30,000 to review
shop drawings and submittals, respond to design questions, evaluate change
order requests, and perform site visits to verify compliance with the design intent.
NAPESUP \Position Papers \Shima \7255 -pp- award.doc Page 3 of 6
N
Q
O
0�0 150 300
FEET -.F pRlrr
O f e�S
HOB 1 i
PROJECT AREA 2
Sedimentation Tanks
(Demolition)
011
O
PROJECT AREA 1
Lime Storage Bins
(Demolition)
PROJECT AREA 3
Tunnels
(Remove old grit lines)
PROJECT AREA 6
Solids Conditioning
Building
l (Remove old blower)
r
sce
//��u /
$0,
o F
�r G
o e /
se ISO
�a
PROJECT AREA 7 n ��
HHWCF and PROJECT AREA 4
N 4737 Imhoff Place East and West Galleries
(Slurry seal) (Demolition)
E
u
Central Contra Costa PRIMARY STRUCTURES DEMOLITION Attachment
Y Sanitary District PROJECT
' District Project 7255 1
Project Locations
Page 4 of 6
ATTACHMENT 2
PRIMARY STRUCTURES DEMOLITION PROJECT
DISTRICT PROJECT NO. 7255
SUMMARY OF BIDS
PROJECT NO.: 7255 DATE /TIME: SEPTEMBER 27,2011/2:00 PM
PROJECT NAME: PRIMARY STRUCTURES DEMOLITION PROJECT
PROJECT MANAGER: CLINT T. SHIMA
PROJECT LOCATION: MARTINEZ, CALIFORNIA ENGINEER EST.: $1,400,000
NO.
BIDDER
BID PRICE
1
Pantano Excavating, Inc.
$929,000
Manteca, CA 95337
2
Clauss Construction
$972,000
Lakeside, CA 92040
3
Aztec Consultants
$1,315, 300
San Ramon, CA 94583
4
PARC Services, Inc.
$1,327,000
Livermore, CA 94551
5
Evans Brothers, Inc.
$1,371,000
Livermore, CA 94550
6
Trinet Construction, Inc.
$1,443,600
San Francisco, CA 94124
BIDS OPENED BY /s/ Elaine Boehme
DATE September 27, 2011
NAPESUP \Position Pape rs \Shima \7255- pp- awa rd. doc Page 5 of 6
ATTACHMENT 3
PRIMARY STRUCTURES DEMOLITION PROJECT
DISTRICT PROJECT NO. 7255
POST - BID / PRECONSTRUCTION ESTIMATE
No.
Item Description
Amounts
% Construction Cost
1
CONSTRUCTION
a. Construction Contract
$929,000
b. Contingency at 20%
$186,000
SUBTOTAL - CONSTRUCTION COST
$1,115,000
100%
2
CONSTRUCTION MANAGEMENT
a. District Forces
Inspection
$70,000
- Construction Management
$65,000
- Plant Construction Support
$15,00 0
b. Consultant/CPS Inc
$30,000
c. Hazardous Materials Inspection
$20,000
d. Specialty Testing
$10,000
SUBTOTAL - CONSTRUCTION MANAGEMENT
$210,000
19%
3
PREBID EXPENDITURES
a. District Forces
$110,000
b. Consultant Design
$45,000
SUBTOTAL - PREBID EXPENDITURE,
$155,00 0
14%
4
TOTAL PROJECT COST
$1,480,000
5
FUNDS AUTHORIZED TO DATE
$155,000
6
ADDITIONAL ALLOCATION NEEDED TO COMPLET
PROJECT (Line 4 - Line 5;
$1,325,000
Page 6 of 6