Loading...
HomeMy WebLinkAbout07.a.1) Update on Collection System Operations Facility, DP 82087a.1) Central Contra Costa Sanitary District September 8, 2011 File: 8208.51.5.14 TO: HONORABLE BOARD OF DIRECTORS n VIA: JAMES M. KELLY, GENERAL MANAGER` 0 ANN E. FARRELL, DIRECTOR OF ENGINEERING FROM: ALEX ROZUL, SIONAL CAPITAL PROJECTS DIVISION MANAGER; SUBJECT: CSOD ADMINISTRATION, CREW, AND WAREHOUSE FACILITY, CONSTRUCTION UPDATE, DISTRICT PROJECT 8208 Some time over the Labor Day weekend, there was a break -in at the CSO construction site. The temporary lock on a warehouse door was beaten open and various portable tools, extension cords, and electrical wires were found gathered together at the entrance to the warehouse. Inside the building at the warehouse mezzanine, a temporary water bib was found open and flooded the warehouse floor. The Bobo Construction superintendent reviewed the incident with the various sub contractors, and it appears nothing was stolen. Water damage appears to be limited to the ground floor - the mezzanine, warehouse, tool room and janitor's closet. Some drywall and insulation were wet, and boxes of lockers stored in the warehouse were saturated. The full extent of the water damage is still under investigation. The cleanup and repair are not expected to delay ongoing construction. Based on the last construction schedule update, the Contractor is 50 calendar days behind schedule. Construction activity continues throughout the building, as well as in the middle and lower yards concurrently. The building drywall installation /finishing, interior wall paint, and site asphalt paving are complete. Ongoing construction activities include installation of the building elevator, plumbing fixtures, casework, and lighting. Staff continues to work with the Contractor to track progress, adjust construction activities, and find ways to catch up on the schedule. /jf NAPESUP \CONST \District Projects \8208 \13D memo CSOD Schedule 9 -8 -11 r.doc