Loading...
HomeMy WebLinkAbout04.e. Accept work for Wet Weather Bypass Improvements (DP 7241)Central Contra Costa Sanitary District e ' BOARD OF DIRECTORS • POSITION PAPER Board Meeting Date: September 1, 2011 Subject: ACCEPT THE CONTRACT WORK FOR THE WET WEATHER BYPASS IMPROVEMENTS PROJECT, DISTRICT PROJECT 7241, AND AUTHORIZE FILING OF THE NOTICE OF COMPLETION Submitted By: Initiating Dept. /Div,: Clint T. Shima, Assistant Engineer Engineering /Capital Projects REVIEWED AND RECOMMENDED FOR BOARD ACTION: 4aL=_ g-rT - cz C. Shima B. Than A. Rozul A. Farrell James . Kelly, General Manager ISSUE: Construction has been completed on the Wet Weather Bypass Improvements, District Project 7241, and the work is now ready for acceptance. RECOMMENDATION: Accept the contract work for the Wet Weather Bypass Improvements, District Project, District Project 7241, and authorize filing of the Notice of Completion. FINANCIAL IMPACTS: None related to this action. ALTERNATIVES /CONSIDERATIONS: Not applicable. Filing the Notice of Completion is advisable under the California Civil Code, Section 3093. BACKGROUND: The wet/dry weather bypass project improved the storage and discharge of flows during peak wet weather events and inspection /maintenance of the outfall during the summer months. The previous bypass point located in Basin C had insufficient capacity during dry- weather flows, which resulted in flooding of adjacent properties owned by others. This situation is further exacerbated during wet - weather events. The Wet Weather Bypass Improvements Project was constructed in two phases. The first phase of this project involved placing a preload fill to consolidate the soft, organic clay soils that underlie the site of the new bypass structure. The preload construction work was completed and accepted by the Board of Directors on November 6, 2008. The second phase of the project constructed improvements to the dry/wet weather discharge system, such as widening of existing bypass channels, constructing the gravity overflow structure, and constructing the box culvert to discharge directly to Walnut Creek. On June 17, 2010, the Board of Directors authorized the award of a contract for the construction of the project to Siteworks Construction, Inc. The Notice to Proceed was issued on July 14, 2010. The work was substantially completed on July 29, 2011. The NAPESUP \Position Papers \Shima \7241 - accept - pp.doc Page 1 of 2 POSITION PAPER Board Meeting Date: September 1, 2011 subject: ACCEPT THE CONTRACT WORK FOR THE WET WEATHER BYPASS IMPROVEMENTS, DISTRICT PROJECT 7241, AND AUTHORIZE FILING OF THE NOTICE OF COMPLETION remaining items of work consist of minor punch -list items, which do not affect the project acceptance. Immediately upon acceptance, the Contractor is relieved of the duty of maintaining and protecting the Contract work. Guaranty and warranty periods required by the Contract and the statutory period for filing of liens and Stop Notices start on the date of acceptance by the Board of Directors. Final payment to the Contractor is made after expiration of the statutory period for filing of liens and Stop Notices, provided no liens or Stop Notices have been filed, and provided the punch -list items have been completed. The total authorized budget for the project is $3,784,000. The budget includes the cost of engineering design, construction management and inspection, testing services, change orders, and contractor services. It is appropriate to accept the contract work at this time. RECOMMENDED BOARD ACTION: Accept the contract work for the Wet Weather Bypass Improvements, District Project 7241, and authorize filing of the Notice of Completion. NAPESUP \Position Papers \Shima \7241 - accept - pp.doc Page 2 of 2