Loading...
HomeMy WebLinkAbout06.a. Award contract for Walnut Creek Sewer Renos, Phase 8, DP 5992Central Contra Costa Sanitary District ' BOARD OF DIRECTORS • POSITION PAPER Board Meeting Date: July 7, 2011 Subject: AWARD A CONSTRUCTION CONTRACT AND AUTHORIZE THE GENERAL MANAGER TO EXECUTE CONTRACT DOCUMENTS SUBJECT TO SUBMITTAL REQUIREMENTS WITH K. J. WOODS, INC. FOR THE CONSTRUCTION OF THE WALNUT CREEK SEWER RENOVATION, PHASE 8, DISTRICT PROJECT NO. 5992 Submitted By: Initiating Dept. /Div.: Tom Godsey, Associate Engineer Engineering /Capital Projects REVIEWED AND RECOMMENDED FOR BOARD ACTION: _ c-3 f `A. Hernandez T. Godsey A. Rozul A. Farrell James M4gelly, General Manager ISSUE: On June 9, 2011, seven sealed bids were received and opened for the construction of the Walnut Creek Sewer Renovation, Phase 8, District Project No. 5992. The Board of Directors must award the contract or reject bids within 50 days of the bid opening. Authorize the General Manager to execute the contract documents subject to SUBMITTAL requirements. RECOMMENDATION: Find that the project is exempt from the California Environmental Quality Act (CEQA), award a construction contract, and authorize the General Manager to execute the Contract Documents subject to favorable review of insurance certificates, bond submittals, appropriate Contractor license, and any other required submittals (SUBMITTALS). FINANCIAL IMPACTS: Approximately $2,082,000, including design, bid price, contingency, and construction management. ALTERNATIVES /CONSIDERATIONS: Reject all bids, which is not recommended. BACKGROUND: As part of its Sewer System Management Plan (SSMP), the District is required to renovate deteriorating sewers, with the ultimate goal of reducing sanitary sewer overflows, as mandated by the San Francisco Bay Regional Water Quality Control Board. This project is the eighth phase of sewer renovation in Walnut Creek (see Attachment 1). The Walnut Creek Sewer Renovation, Phase 8, will renovate 10,000 linear feet of 6 -inch through 12 -inch sewer lines in 35 pipe segments in public streets and private easements in the city of Walnut Creek. Additionally, four manholes will be constructed on the Clyde force main for maintenance access. Construction of the sewers in easements will involve close cooperation with customers for site access and restoration. N: \PESUP \Cbradley \POSITION PAPERS \Godsey \5992 - Award PP WC Sewer Reno Ph 8.doc Page 1 of 6 POSITION PAPER Board Meeting Date: July 7, 2011 subject: AWARD A CONSTRUCTION CONTRACT AND AUTHORIZE THE GENERAL MANAGER TO EXECUTE CONTRACT DOCUMENTS SUBJECT TO SUBMITTAL REQUIREMENTS WITH K. J. WOODS, INC. FOR THE CONSTRUCTION OF THE WALNUT CREEK SEWER RENOVATION, PHASE 8, DISTRICT PROJECT NO. 5992 District staff prepared the plans and specifications for the project. The Engineer's estimate for construction of the Walnut Creek Sewer Renovation, Phase 8, is $1,700,000. This project was advertised on May 20 and May 27, 2011. Seven sealed bids, ranging from $1,338,000 to $1,993,078, were received and publicly opened on June 15, 2011. The Engineering Department conducted a technical and commercial review of the bids and determined that K. J. Woods, Inc. is the lowest responsive bidder with a bid amount of $1,338,000. A summary of bids received is shown in Attachment 2. The District will administer the construction contract and will provide contract administration, inspection, survey, office engineering, and submittal review. The funds required to complete this project, as shown in Attachment 3, are $1,681,700. The total cost of the Walnut Creek Sewer Renovation, Phase 8, is anticipated to be $2,081,700. This project is included in the fiscal year (FY) 2010 -11 Capital Improvement Budget (CIB) on page 28. Staff has conducted a cash -flow analysis of the Collection System Program budget and concluded that adequate funds are available for this project. Staff has concluded that this project is exempt from the California Quality Act (CEQA) under CCCSD CEQA Guidelines Section 15302, because it involves replacement of existing sewer facilities at substantially the same locations and with the same purpose and level of activity as the facilities being replaced. Any capacity increases are for non - growth inducing, wet weather purposes. This project also is exempt under District CEQA Guidelines Section 15061(b)(3), since it can be seen with certainty that there is no possibility that the activity in question may have a significant effect on the environment. This certainty is based on the District's past experience with numerous sewer construction projects of this nature, the relatively short distances involved, and the District's mitigating construction specifications. These specifications are standardized general and special conditions that are made part of the project bid documents to address environmental considerations, such as protecting trees and riparian areas, as well as compliance with applicable federal, state, county, district, municipal, and local laws, ordinances, orders, and regulations. Approval of this project will establish the Board of Directors' independent finding that this project is exempt from CEQA. WPESUP\Cbradley\POSITION PAPERS \Godsey \5992 - Award PP WC Sewer Reno Ph 8.doc Page 2 of 6 POSITION PAPER Board Meeting Date: July 7, 2011 Subject: AWARD A CONSTRUCTION CONTRACT AND AUTHORIZE THE GENERAL MANAGER TO EXECUTE CONTRACT DOCUMENTS SUBJECT TO SUBMITTAL REQUIREMENTS WITH K. J. WOODS, INC. FOR THE CONSTRUCTION OF THE WALNUT CREEK SEWER RENOVATION, PHASE 8, DISTRICT PROJECT NO. 5992 RECOMMENDED BOARD ACTION: Staff recommends the following: 1. Find that the project is exempt from CEQA, 2. Award a construction contract in the amount of $1,338,000 for the construction of the Walnut Creek Sewer Renovation, Phase 8, District Project No. 5992, to K. J. Woods, Inc., the lowest responsive bidder, and 3. Authorize the General Manager to execute the Contract Documents subject to SUBMITTAL requirements. N: \PESUP \Cbradley \POSITION PAPERS \Godsey \5992 - Award PP WC Sewer Reno Ph 8.doc Page 3 of 6 IJ� �, - I v-__ L� N AFAYETfE \y 24 N 0 c 0 112 1 N MILE 0 LEGEND: N Q j PROJECT LOCATION 0 Y Central Contra Costa Sanitary District i A kNi .:i CLYDE 0 �X � z 680 WALNUT CREEK SEWER RENOVATION PHASE 8 - PROJECT LOCATIONS Attachment 1 Page �, -of 6 ATTACHMENT 2 WALNUT CREEK SEWER RENOVATION, PHASE 8 DISTRICT PROJECT 5992 SUMMARY OF BIDS PROJECT NO.: 5992 DATE: JUNE 15, 2011 PROJECT NAME: WALNUT CREEK SEWER RENOVATION PHASE 8 PROJECT LOCATION: WALNUT CREEK NO. OF ADDENDA: 2 ENGINEER EST.: $1,700,000 NO. BIDDER BID PRICE 1 K. J. Woods Construction, Inc. $1,338,000 San Francisco, CA 94124 2 Mountain Cascade, Inc. $1,533,490 Livermore, CA 94550 3 California Trenchless, Inc. $1,548,768 Hayward, CA 94545 4 McNamara & Smallman Construction, Inc. $1,577,701 Livermore, CA 94550 5 J. W. Ebert Corporation $1,581,625 San Jose, CA 95112 6 J &M, Inc. $1,914,318 Livermore, CA 94550 7 Carone and Company, Inc. $1,993,078 Concord, CA 94520 BIDS OPENED BY /s/ Donna Anderson DATE June 15, 2011 WPESUP\Cbradley\POSITION PAPERS \Godsey \5992 - Award PP WC Sewer Reno Ph 8.doc Page 5 of 6 ATTACHMENT 3 WALNUT CREEK SEWER RENOVATION, PHASE 8 DISTRICT PROJECT NO. 5992 POST -BID I PRECONSTRUCTION ESTIMATE No. Item Description Amounts % Construction Cost 1. CONSTRUCTION a. Construction Contract $1,338,000 b. Contingency at 15% $200,700 c. Permit $10,000 SUBTOTAL - CONSTRUCTION COST $1,548,700 100% 2. CONSTRUCTION MANAGEMENT a. District Forces - Inspection $100,000 - Construction Management $40,000 - Public Relations $15,000 b. Consultants - Material Testing $20,000 - Geotechnical and Arborist $10,000 SUBTOTAL - CONSTRUCTION MANAGEMENT $185,000 12% 3. PREBID EXPENDITURES a. Engineering $267,000 16.5% b. Survey $62,000 4% c. Right of Way $19,000 1% SUBTOTAL - PREBID EXPENDITURES $348,000 22% 4. TOTAL PROJECT COST $2,081,700 5. FUNDS AUTHORIZED TO DATE $400,000 6. ADDITIONAL ALLOCATION NEEDED TO COMPLETE PROJECT (Line 4 - Line 5 ) $1 681 700 N:\PESUP\Cbradley \POSITION PAPERS \Godsey\5992 -Award PP WC Sewer Reno Ph 8.doc Page 6 of 6