HomeMy WebLinkAbout07.a. Award contract to Aztec Consultants, Inc. for Treatment Plant Piping Renovations, Phase 6, DP 7288Central Contra Costa Sanitary District BOARD OF DIRECTORS ' POSITION PAPER Board Meeting Date: June 16, 2011 Subject: AWARD A CONSTRUCTION CONTRACT AND AUTHORIZE THE GENERAL MANAGER TO EXECUTE CONTRACT DOCUMENTS SUBJECT TO SUBMITTAL REQUIREMENTS WITH AZTEC CONSULTANTS, INC. FOR THE CONSTRUCTION OF THE TREATMENT PLANT PIPING RENOVATIONS, PHASE 6, DISTRICT PROJECT NO. 7288 Submitted By: Initiating Dept. /Div.: Gary Rathunde, Associate Engineer Engineering /Capital Projects REVIEWED AND RECOMMENDED FOR BOARD ACTION: 6i=_ KTT ?a- i A a4k&_i' ik G. Rathunde B. Than A. Antkowiak A. Farrell mes M. K y, eneral Manager ISSUE: On June 1, 2011, six sealed bids were received and opened for the construction of the Treatment Plant Piping Renovations, Phase 6, District Project No. 7288. The Board of Directors must award the contract or reject bids within 50 days of the bid opening. Authorize the General Manager to execute the contract documents subject to SUBMITTAL requirements. RECOMMENDATION: Find that the project is exempt from the California Environmental Quality Act (CEQA); award a construction contract; and authorize the General Manager to execute the Contract Documents subject to favorable review of insurance certificates, bond submittals, appropriate Contractor license, and any other required submittals (SUBMITTALS). FINANCIAL IMPACTS: Approximately $2,253,000 including design, bid price, contingency, and construction management. ALTERNATIVES /CONSIDERATIONS: Reject all bids, which is not recommended. BACKGROUND: During the construction of the secondary treatment facilities in the early 1970s, numerous piping systems were installed throughout the treatment plant. These pipes carry the processed wastewater, sludge, steam, air, and other utility services between the various sections of the plant. These pipes have been in place for over thirty -five years and are showing signs of deterioration. Phase 6 of the Treatment Plant Piping Renovations Project will focus on replacing sections of the scrubber water piping at the seal tanks on the wet scrubbers and in the MXPESUMPosition Papers \Rathunde \7288_Award.doc Page 1 of 6 POSITION PAPER Board Meeting Date: June 16, 2011 Subject: AWARD A CONSTRUCTION CONTRACT AND AUTHORIZE THE GENERAL MANAGER TO EXECUTE CONTRACT DOCUMENTS SUBJECT TO SUBMITTAL REQUIREMENTS WITH AZTEC CONSULTANTS, INC. FOR THE CONSTRUCTION OF THE TREATMENT PLANT PIPING RENOVATIONS, PHASE 6, DISTRICT PROJECT NO. 7288 SCB plenum, replacing a section of the centrate pipe at the foam suppression tank, and replacing air supply pipelines and aeration air diffuser assemblies in pre aeration tanks, primary tank distribution channels, and primary tank effluent channels. In addition, the construction work will include installing baffles within one of the primary sedimentation tanks, installing day tanks at the standby power building generators, replacing a flow meter on an aeration blower, and removing pipe insulation, which contains asbestos, at various locations around the treatment plant. Attachment 1 shows the locations of all the project work. District staff prepared the plans and specifications for the project with the exception of the structural modifications required at the Primary Sedimentation Tanks (Area 3) and at Structure 1 (Area 6), which were prepared by Complete Project Solutions, Inc. (CPS). The Engineer's estimate for construction of the Treatment Plant Piping Renovations, Phase 6, is $1,540,000. This project was advertised on May 6, 2011. Six sealed bids, ranging from $1,578,000 to $1,820,000 were received and publicly opened on June 1, 2011. The Engineering Department conducted a technical and commercial review of the bids and determined that Aztec Consultants, Inc. is the lowest responsive bidder with a bid amount of $1,578,000. A summary of bids received is shown in Attachment 2. District staff will administer the construction contract and will provide contract administration, inspection, survey, office engineering, and submittal review. The funds required to complete this project, as shown in Attachment 3, are $1,593,000. The total cost of the Treatment Plant Piping Renovations, Phase 6, is anticipated to be $2,253,000. This project is included in the fiscal year (FY) 2010 -11 Capital Improvement Budget (CIB) on pages 74 and 75. Staff has conducted a cash -flow analysis of the Treatment Plant Program budget and concluded that adequate funds are available for this project. Staff has concluded that this project is exempt from the California Environmental . Quality Act (CEQA) under District CEQA Guidelines Section 15301 since it involves minor alterations to existing public facilities. Approval of this project will establish the Board of Directors' independent finding that this project is exempt from CEQA. NIPESUP \Position Papers \Rathunde \7288_Award.doc Page 2 of 6 POSITION PAPER Board Meeting Date: June 16, 2011 Subject: AWARD A CONSTRUCTION CONTRACT AND AUTHORIZE THE GENERAL MANAGER TO EXECUTE CONTRACT DOCUMENTS SUBJECT TO SUBMITTAL REQUIREMENTS WITH AZTEC CONSULTANTS, INC. FOR THE CONSTRUCTION OF THE TREATMENT PLANT PIPING RENOVATIONS, PHASE 6, DISTRICT PROJECT NO. 7288 RECOMMENDED BOARD ACTION: Staff recommends the following: Find that the project is exempt from CEQA, 2. Award a construction contract in the amount of $1,578,000 for the construction of the Treatment Plant Piping Renovations, Phase 6, District Project No. 7288 to Aztec Consultants, Inc., the lowest responsive bidder, and 3. Authorize the General Manager to execute the Contract Documents subject to SUBMITTAL requirements. NAPESUP \Position Papers \Rathunde \7288_Award.doc Page 3 of 6 FEEr PROJECT AREA 5 Pump & Blower Building rr STAGING AREA PROJECT AREA 2 — Solids Conditioning Building NAPESUPTosition Papers\Rathunde\728$ Award.doc Page 4 of 6 ATTACHMENT 2 TREATMENT PLANT PIPING RENOVATIONS, PHASE 6 DISTRICT PROJECT 7288 SUMMARY OF BIDS PROJECT NO.: 7288 NO. OF ADDENDA: 1 DATE/TIME: JUNE 1, 2011/2:00 PM PROJECT NAME: TREATMENT PLANT PIPING RENOVATIONS. PHASE 6 PROJECT MANAGER: GARY RATHUNDE PROJECT LOCATION: 5019 IMHOFF PLACE MARTINEZ CALIFORNIA ENGINEER EST.: $1,540,000 NO. BIDDER BID PRICE 1 Aztec Consultants 1,578,000 San Ramon, CA 94583 2 JMB Construction, Inc. 1 651 200 South San Francisco, CA 94080 ' 3 Manito Construction, Inc. 1,660,600 Pleasanton, CA 94566 4 Stanek Constructors 1 675 000 Escondido, CA 92029 ' 5 Monterey Mechanical Company 1 698 000 Oakland, CA 94621 ' 6 Pacific Mechanical Corporation 1,820,000 Concord, CA 94524 BIDS OPENED BY: /s/ Elaine Boehme DATE June 1, 2011 NAPESUP \Position Papers \Rathunde \7288_Award.doc Page 5 of 6 ATTACHMENT 3 TREATMENT PLANT PIPING RENOVATIONS, PHASE 6, DISTRICT PROJECT 7288 POST -BID /PRE- CONSTRUCTION ESTIMATE No. Item Description Amounts % Construction Cost 1 CONSTRUCTION a. Construction Contract $1,578,000 b. Contingency at 15% $ 237,000 SUBTOTAL - CONSTRUCTION COST $1,815,000 100% 2 CONSTRUCTION MANAGEMENT a. District Forces - Construction Management & Engineering $120,000 - Operations Department Support $30,000 b. Consultant - Complete Project Solutions (CPS) $10,000 c. Outside Services - Construction Inspection $120,000 SUBTOTAL - CONSTRUCTION MANAGEMENT $280,000 15% 3 PREBID EXPENDITURES a. District Forces /CPS $158,000 SUBTOTAL - PREBID EXPENDITURES - $158,000 9% 4 TOTAL PROJECT COST $2,253,000 5 FUNDS AUTHORIZED TO DATE $660,000 6 ADDITIONAL ALLOCATION NEEDED TO COMPLETE PROJECT Line 4 - Line 5 $1,593,000 N: \PESUP \Position Papers \Rathunde \7288 Award.doc Page 6 of 6