Loading...
HomeMy WebLinkAbout07.a. Award contract to Golden Bay Fence Plus Iron Works, Inc. for perimeter fencing, DP 7282Central Contra Costa Sanitary District BOARD OF DIRECTORS 7a. POSITION PAPER Board Meeting Date: June 2, 2011 Subject: AWARD A CONSTRUCTION CONTRACT AND AUTHORIZE THE GENERAL MANAGER TO EXECUTE CONTRACT DOCUMENTS SUBJECT TO SUBMITTAL REQUIREMENTS WITH GOLDEN BAY FENCE PLUS IRON WORKS, INC. FOR THE CONSTRUCTION OF PERIMETER FENCING, DISTRICT PROJECT NO. 7282 Submitted By: Initiating Dept. /Div.: Dana Lawson, Associate Engineer Engineering / Capital Projects REVIEWED AND RECOMMENDED FOR BOARD ACTION: Xq _ D. Lawson tTr B. Than A. Antkowiak A. Farrell ames M elly, General Manager ISSUE: On May 17, 2011, eight sealed bids were received and opened for the construction of the Perimeter Fencing, District Project No. 7282. The Board of Directors must award the contract or reject bids within 50 days of the bid opening. Authorize the General Manager to execute the contract documents subject to SUBMITTAL requirements. RECOMMENDATION: Find that the project is exempt from the California Environmental Quality Act (CEQA), award a construction contract, and authorize the General Manager to execute the Contract Documents subject to favorable review of insurance certificates, bond submittals, appropriate Contractor license, and any other required submittals (SUBMITTALS). FINANCIAL IMPACTS: Approximately $165,000, including design, bid price, contingency, and construction management. ALTERNATIVES /CONSIDERATIONS: Reject all bids, which is not recommended. BACKGROUND: This project will replace 5,200 feet of 6 -foot tall fence to 8 -foot tall fence along Walnut and Grayson Creeks, where the levee road was raised, to increase treatment plant security. Overall, the District has over 20,000 feet of fencing, most of which is 6 -foot tall chain -link and was installed in the 1970s. District staff prepared the plans and specifications for the project. The Engineer's estimate for construction of Perimeter Fencing is $225,000. This project was advertised on April 27 and May 4, 2011. Eight (8) sealed bids ranging from $110,605 to $165,805.50 were received and publicly opened on May 17, 2011. The Engineering Department conducted a technical and commercial review of the bids and determined N: \PESUP \Position Papers \Lawson \7282_Award.doc Page 1 of 4 POSITION PAPER Board Meeting Date: June 2, 2011 subject: AWARD A CONSTRUCTION CONTRACT AND AUTHORIZE THE GENERAL MANAGER TO EXECUTE CONTRACT DOCUMENTS SUBJECT TO SUBMITTAL REQUIREMENTS WITH GOLDEN BAY FENCE PLUS IRON WORKS, INC. FOR THE CONSTRUCTION OF PERIMETER FENCING, DISTRICT PROJECT NO. 7282 that Golden Bay Fence Plus Iron Works, Inc. is the lowest responsive bidder with a bid amount of $110,605. A summary of bids received is shown in Attachment 1. The District will administer the construction contract and will provide contract administration, inspection, and submittal review. The funds required to complete this project, as shown in Attachment 2, are $135,000. The total cost of Perimeter Fencing is anticipated to be $165,000. This project is included in the fiscal year (FY) 2010 -11 Capital Improvement Budget (CIB) on pages TP -37 to 38. Staff has conducted a cash -flow analysis of the Treatment Plant Program budget and concluded that adequate funds are available for this project. Staff has concluded that this project is exempt from the California Environmental Quality Act (CEQA) under District CEQA Guidelines Section 15302 since it involves replacement of existing fencing at the same location and with the same purpose as the fencing being replaced. Approval of this project will establish the Board of Directors' independent finding that this project is exempt from CEQA. RECOMMENDED BOARD ACTION: Staff recommends the following: 1. Find that the project is exempt from CEQA, 2. Award a construction contract in the amount of $110,605 for the construction of the Perimeter Fencing, District Project No. 7282, to Golden Bay Fence Plus Iron Works, Inc., the lowest responsive bidder, and 3. Authorize the General Manager to execute the Contract Documents subject to SUBMITTAL requirements. NAPESUP \Position Papers \Lawson \7282_Award.doc Page 2 of 4 ATTACHMENT 1 PERIMETER FENCING DISTRICT PROJECT 7282 SUMMARY OF BIDS PROJECT NO.: 7282 NO. OF ADDENDA: 2 DATE/TIME: MAY 17,2011/2:00 PM PROJECT NAME: PERIMETER FENCING PROJECT MANAGER: DANA LAWSON PROJECT LOCATION: 5019 IMHOFF PLACE, MARTINEZ, CALIFORNIA ENGINEER EST.: $225,000 NO. BIDDER BID PRICE 1 Golden Bay Fence Plus Iron Works, Inc. $110,605.00 Stockton, CA 95206 2 Alta Fence Company $117,876.90 Martinez, CA 94553 3 Ahlborn Fence and Steel $121,395.00 Santa Rosa, CA 95403 4 Woida Ent. Inc. dba Arrow Fencing $130,370.00 Calpella, CA 95418 5 Tri -City Fence Company, Inc. $143,942.00 Vallejo, CA 94591 6 Crusader Fence Company, Inc. $146,000.00 Vallejo, CA 94591 7 AAA Fence company, Inc. $149,605.00 Santa Clara, CA 95050 8 FenceCorp, Inc. $165,805.50 Sacramento, CA 95929 BIDS OPENED BY /s/ Elaine Boehme DATE: May 17, 2011 NAPESUP \Position Papers \Lawson \7282_Award.doc Page 3 of 4 ATTACHMENT 2 PERIMETER FENCING DISTRICT PROJECT NO. 7282 POST -BID / PRECONSTRUCTION ESTIMATE No. Item Description Amounts % Construction Cost 1 CONSTRUCTION 1 a. Construction Contract $ 110,605 I b. Contingency at 15% $ 16,395 SUBTOTAL - CONSTRUCTION COST $ 127,000 100% 2 CONSTRUCTION MANAGEMENT - Project Management $ 2,000 - Inspection $ 9,000 SUBTOTAL - CONSTRUCTION MANAGEMENT $ 11,000 9% 3. PREBID EXPENDITURES a. Engineering $ 27,000 SUBTOTAL - PREBID EXPENDITURES $ 27,000 21% 4. TOTAL PROJECT COST $ 165,000 130% 5. FUNDS AUTHORIZED TO DATE $ 30,000 6 ADDITIONAL ALLOCATION NEEDED TO COMPLETE PROJECT Line 4 - Line 5 $ 135,000 N: \PESUP \Position Papers \Lawson \7282_Award.doc age 4 Of 4