CENTRAL CONTRA COSTA SANITARY DISTRICT
Board Minutes of April 14, 2011
President Hockett reported on the April 7, 2011 Contra Costa Mayors' Conference
hosted by the City of San Ramon.
2
a.
CENTRAL CONTRA COSTA SANITARY DISTRICT
Board Minutes of April 14, 2011
4. CAPITAL PROJECTS BOARD WORKSHOP
Director of Engineering Ann Farrell stated that she would review the planned Fiscal Year
(FY) 2011 -12 Draft Capital Improvement Budget (CIB), selected FY 2011 -12 capital
projects, the proposed Draft Ten - Year Capital Improvement Plan;, (CIP), future
challenges facing the District in terms of capital projects, and the next steps in the capital
budgeting process. She also referenced the revised draft. Executive Summary which
explains the capital program and asked the Board to review it and provide any input
before it is finalized in June.
Estimated FY 2011 -12
Program Program Expenditures
Treatment Plant $ 7.1 million
Collection System 12.8 million
General Improvements 5.4 million
Recycled Water 0.6 million
TOTAL $25.9 million
"Ms. Farrell said staff i carefully reviewing what the future looks like in terms of sewage
treatment technology and evaluating how the District might position itself to participate in
emerging technologies. When originally constructed, the District's existing treatment
approach was state of the art, recovering /reusing energy during the incineration process
and recovering phosphorus by reusing ash from the incinerators. New technologies are
emerging that emphasize anaerobic treatment and resource recovery. Before making
- expensive renovations and improvements to the existing treatment plant, it is important
to properly weigh the District's current treatment approach against potential plant
modifications. This will involve taking a comprehensive look at how to sustainably treat
wastewater for the next 50 plus years, and incorporating findings of the greenhouse gas
(GHG) study of incineration versus anaerobic digestion. Staff is considering an
3
CENTRAL CONTRA COSTA SANITARY DISTRICT
Board Minutes of April 14, 2011
approach where consultants will be invited to develop and submit concepts for the
District's treatment plant of the future and a phased approach to get there. Ms. Farrell
said it is important to know where the District is headed in order to make the most
sensible investments in the current CIB and CIP.
Ms. Farrell said the District has built a comprehensive model to analyze its GHG
emissions under different scenarios for planning purposes. The base model simulates
GHG production and energy usage /cost under current operating conditions. Model
scenarios include switching to fluidized bed incinerators, making modifications to the
existing cogeneration system, progressing to a higher level of treatment (nitrification/
nutrient removal), and switching to anaerobic digesters. The model also takes into
account the costs of electrical power, natural gas, landfill gas and COZ allowances to test
the sensitivity of the different scenarios to energy prices. Member Williams commented
that he was pleased to see that digesters are incorporated into the model because there
are potential revenues from tipping fees and a possible resource recovery, program,
which would allow gas generation, potential renewable energy credits that ,could be sold
on the open market, and the sale of cap and trade offsets. ' `Doing so places the costs of
switching to anaerobic digestion on a plane that might be competitive with staying with
incineration. Ms. Farrell agreed and reiterated that one of the goals of the "plant of the
future" is to minimize net energy {usage.
With regard to planned renovations at the treatment plant, Ms. Farrell said staff is
performing condition assessments on the various plant components to determine the
likelihood of failure and /or the remaining life of the asset. A "similar approach is being
developed to assess the treatment plant mechanical equipment, including the
sedimentation tanks, scum spray system, tank baffles, and grit handling facilities.
Ms. Farrell also reviewed the status of the dry /wet weather bypass structure, which must
be in service before the Outfall Improvements Project can get underway; current
expectations are that the project will be delayed until mid 2012. Several abandoned
primary tanks are taking up valuable space on the treatment plant site and continue to
deteriorate, Arid the abandoned lime silo also should be removed. The Ten -Year CIP
includes a budgeted $1.3 million for demolition of the abandoned primary tanks and lime
silo in FY 2015 -16, but that project will most likely be accelerated due to delay of the
Outfall Project and a favorable bid climate for demolition work.
Ms. Ferrell concluded her remarks on the treatment plant program by stating that
$146 million (42 percent) of the $345 million Ten -Year CIP is dedicated to the treatment
plant, including $63 million (18 percent) for renovations and $71 million (20 percent) for
an ammonia removal project in response to new regulatory requirements. Ms. Farrell
briefly explained how ammonia removed through the "nitrification" process is converted
to nitrate. In order to accomplish this, the volume of the aeration basins will need to be
doubled; correspondingly, the demand for oxygen /aeration will also double. Staff is in
the process of examining other approaches that could require less tank space and /or
less power. In response to a question from Member Williams, Ms. Farrell said that
while this nitrification process could be expanded to achieve nutrient (nitrogen and
4
CENTRAL CONTRA COSTA SANITARY DISTRICT
Board Minutes of April 14, 2011
phosphorus) removal in the event it becomes mandated by future regulatory
requirements, the cost of doing so has not been included in the proposed Ten -Year CIP.
COLLECTION SYSTEM PROGRAM
Ms. Farrell presented a breakdown by project of the $12.8 million capital expenditures
proposed for the collection system program during FY 2011 -12. She noted that all 6 -, 8
and 10 -inch sewer mains in the District have been evaluated,via'televised inspection. To
date, over 30 miles of sewer mains have been fully renovated, with 53 miles remaining.
Renovation of the remaining sewer pipe is included in the capital budget for completion
over the next six to seven years at an estimated cost of roug ty $280 per foot. This
focused effort on pipe renovations has had a corollary effect on reducing sewer service
overflows within the District; the downward trend in overflows has been significant since
the piping renovation program began. Ms. Farrell concluded her remarks on the
collection system operation by stating that,$172'million (50 percent) of the $345 million
Ten -Year CIP is dedicated to the collection system program, including V26,million
(35 percent) for piping renovations, $14 million (4 percent) for pumping statl6h projects
and $20 million (6 percent) for eight high - priority capolty projects.
>LED WATER P
Ms. Farrell said that $310,000 of tho $55
in FY 2011 -12 is allocated to planning ac
Continued Expansion, and.$240,000 is a
Industrial Concepts Planning and the Co
water projects were excluded from the 1=
Irrigation Project and the Martinez Refin(
former, it appears that Title 16 funding is
options are being pursued. For either pr
District share of the construction cost i
0 budgeted fbr the recycled water program
fdr the Zone 1 Recycled Water
ited for planning other projects, including
d Naval Weapons Station. Two recycled
11 -12 CIB: the Concord Landscape
. ecycled Water Project. With :regard to the
unlikely; as to the latter, various funding
if State or Federal funding is received, the
included in the current budget.
The majority of the $5.4 million general improvements budget for the coming fiscal year
is dedicated to the completion of the Collection System Operations Department (CSOD)
Facility Improvements project ($2 million) in Walnut Creek. Construction is well
underway'yand compl6bon is anticipated in mid 2011. Ms. Farrell said $510,000 has
been allocated to b6gin seismic improvements at the Headquarters Office Building
(HOB) in Martinez. She presented a slide showing the proximity of the Concord Fault to
District facilities (less than a mile) and explained how this has impacted design criteria
for seismic upgrades of the HOB, the Solids Conditioning Building, the Pump and Blower
Building, and the Plant Operations Building. Staff has looked at the cost to replace each
of these buildings versus the cost of seismic upgrades and determined that it is far more
cost effective to perform seismic upgrades. A total of $12.7 million has been included in
the Ten -Year CIP for retrofitting various buildings over the next several years to provide
increased safety for personnel and the protection of plant processes.
5
CENTRAL CONTRA COSTA SANITARY DISTRICT
Board Minutes of April 14, 2011
Ms. Farrell concluded her presentation by reviewing the projected Sewer Construction
Fund revenues of $22,246,000 for FY 2011 -12, which takes into consideration the
proposed $30 rate increase. She noted that even with this increase, capital cash flow
estimates indicate that approximately $3.6 million will be drawn from the Sewer
Construction Fund in FY 2011 -12. Without the $30 rate increase, this drawdown would
be roughly $10 million.
She said staff will be comina back to the Board in June to m- n' -qider (1) adnntinn the