HomeMy WebLinkAbout06.b. Award contract re Treatment Plant Protective Coatings (Phase 4), DP 7247Central Contra Costa Sanitary District 6
1 BOARD OF DIRECTORS •
POSITION PAPER
f
Board Meeting Date: May 5, 2011
subject: AWARD A CONSTRUCTION CONTRACT AND AUTHORIZE THE
GENERAL MANAGER TO EXECUTE CONTRACT DOCUMENTS SUBJECT TO
SUBMITTAL REQUIREMENTS WITH EURO STYLE MANAGEMENT, INC. FOR
THE CONSTRUCTION OF THE TREATMENT PLANT PROTECTIVE COATINGS,
PHASE 4, DISTRICT PROJECT NO. 7247
Submitted By: Initiating Dept. /Div.:
Gary Rathunde, Associate Engineer Engineering /Capital Projects
REVIEWED AND RECOMMENDED FOR BOARD ACTION:
C47- G. Rathunde A. Antkowiak ecki A. Farrell a es M. Kelly,
eneral Manager
ISSUE: On April 12, 2011, seven sealed bids were received and opened for the
construction of the Treatment Plant Protective Coatings, Phase 4,
District Project No. 7247. The Board of Directors must award the contract or reject bids
within 50 days of the bid opening. Authorize the General Manager to execute the
contract documents subject to SUBMITTAL requirements.
RECOMMENDATION: Find that the project is exempt from the California
Environmental Quality Act (CEQA); award a construction contract; and authorize the
General Manager to execute the Contract Documents subject to favorable review of
insurance certificates, bond submittals, appropriate Contractor license, and any other
required submittals (SUBMITTALS).
FINANCIAL IMPACTS: Approximately $846,000 including design, bid price,
contingency, and construction management.
ALTERNATIVES /CONSIDERATIONS: Reject all bids, which is not recommended.
BACKGROUND: The first three phases of this project applied protective coatings to
structures, vessels, piping, and equipment throughout the treatment plant with visibly
deteriorating coatings that were in need of surface rehabilitation.
On June 18, 2009, a technical services agreement had been approved by the Board to
retain the services of KTA - Tator, Inc. to perform an evaluation to determine the status
of the protective coatings on the components around the treatment plant.
Recommendations from the KTA -Tator evaluation were incorporated into this Phase 4
project. This project will apply protective coatings to treatment plant components, such
as the headwork's bar screens, fuel oil storage tanks, piping and structural supports in
the basement of the pump and blower building, structural steel and piping at clear well,
N: \PESUP \Position Papers \Rathunde \7247_Award.doc Page 1 of 5
POSITION PAPER
Board Meeting Date: May 5, 2011
subject: AWARD A CONSTRUCTION CONTRACT AND AUTHORIZE THE
GENERAL MANAGER TO EXECUTE CONTRACT DOCUMENTS SUBJECT TO
SUBMITTAL REQUIREMENTS WITH EURO STYLE MANAGEMENT, INC. FOR
THE CONSTRUCTION OF THE TREATMENT PLANT PROTECTIVE COATINGS,
PHASE 4, DISTRICT PROJECT NO. 7247
carbide lime tanks, and the crane on top of sludge storage tanks. Attachment 1 shows
the locations of all the project work.
District staff prepared the plans and specifications for the project. The Engineer's
estimate for construction of the Treatment Plant Protective Coatings, Phase 4 is
$775,000. This project was advertised on March 18, 2011. Seven (7) sealed bids,
ranging from $543,000 to $1,073,000 were received and publicly opened on
April 12, 2011. The Engineering Department conducted a technical and commercial
review of the bids and determined that Euro Style Management, Inc. is the lowest
responsive bidder with a bid amount of $543,000. Despite cost increases in fuel and oil
products in the past few months, staff continues to receive favorable bids. A summary
of bids received is shown in Attachment 2.
The District will administer the construction contract and will provide contract
administration, inspection, survey, office engineering, and submittal review. The funds
required to complete this project, as shown in Attachment 3, are $621,000. The total
cost of Treatment Plant Protective Coatings, Phase 4 is anticipated to be $846,000.
This project is included in the fiscal year (FY) 2010 -11 Capital Improvement Budget
(CIB) on pages 80 and 81. Staff has, conducted a cash -flow analysis of the Treatment
Plant Program budget and concluded that adequate funds are available for this project.
Staff has concluded that this project is exempt from the California Environmental
Quality Act (CEQA) under District CEQA Guidelines Section 15301 since it involves
minor alterations to existing public facilities. Approval of this project will establish the
Board of Directors' independent finding that this project is exempt from CEQA.
RECOMMENDED BOARD ACTION: Staff recommends the following:
Find that the project is exempt from CEQA,
2. Award a construction contract in the amount of $543,000 for the construction of
the Treatment Plant Protective Coatings, Phase 4, District Project No. 7247 to
Euro Style Management, Inc., the lowest responsive bidder, and
3. Authorize the General Manager to execute the Contract Documents subject to
SUBMITTAL requirements.
NAPESUP \Position Papers \Rathunde \7247_Award.doc Page 2 of 5
` O
`F o
N C
0 200 400
FEET
Ev
PROJECT AREA 8
Clearwell
Outlet Structure
PROJECT AREA 8
Clearwell
Inlet Structure
PROJECT AREA 7
Fuel Oil
Storage Tanks
PROJECT AREA 9 /
UV Basins
{.� PROJECT AREA 10��
o Tunnels T7 /T8
P" s PROJECT AREA 6 PROJECT AREA 1
Pump & Blower CoGen Gas Compressor
Building h
r PROJECT AREA 2
s� Ash Filter Structure
PROJECT AREA 4
N P Lime Tanks
arehou e
p °v
HOB 4 PROJECT AREA 5
nnex
N °$ Sludge Storage
Tank Crane
w / PROJECT AREA 3
Headworks
:V
Central Contra Costa TREATMENT PLANT PROTECTIVE COATINGS, Attachment
Y Sanitary District PHASE 4
District Project 7247 1
Q Project Location
N: \PESUP \Position Papers \Rathunde \7247_Award.doc Page 3 of 5
I_�il_�yaul
TREATMENT PLANT PROTECTIVE COATINGS, PHASE 4
DISTRICT PROJECT 7247
SUMMARY OF BIDS
PROJECT NO.: 7247 NO. OF ADDENDA: 1 DATE /TIME: APRIL 12,2011/2.00 PM
PROJECT NAME: TREATMENT PLANT PROTECTIVE COATINGS, PHASE 4
PROJECT MANAGER: GARY RATHUNDE
PROJECT LOCATION: 5019 IMHOFF PLACE MARTINEZ CALIFORNIA
ENGINEER EST.: $775,000
NO.
BIDDER
BID PRICE
1
Euro Style Management, Inc.
543,000
North Highlands, CA 95660
2
Hansen Painting & Decorating
670 910
Sacramento, CA 95822
'
3
Bayview Painting Construction
750,275
Burlingame, CA 94010
4
Jeffco Painting & Coating
797,500
Vallejo, CA 94592
5
F. D. Thomas, Inc.
850,000
Central Point, OR 97502
6
Cor -Ray Painting Company
968,000
Santa Fe Springs, CA 90670
7
CAM Painting, Inc.
1,073,000
Frazier Park, CA 93225
BIDS OPENED BY /s/ Elaine Boehme
DATE April 12. 2011
NAPESUP \Position Papers \Rathunde \7247_Award.doc Page 4 of 5
ATTACHMENT 3
TREATMENT PLANT PROTECTIVE COATINGS, PHASE 4,
DISTRICT PROJECT 7247
POST - BID /PRE- CONSTRUCTION ESTIMATE
No.
Item Description
Amounts
% Construction Cost
1
CONSTRUCTION
a. Construction Contract
$543,000
b. Contingency at 15%
$82,000
SUBTOTAL - CONSTRUCTION COST
$625,000
100%
2
CONSTRUCTION MANAGEMENT
a. District Forces
- Construction Management & Engineering
$75,000
- Operations Department Support
$10,000
b. Special Inspection
$10.000
SUBTOTAL - CONSTRUCTION MANAGEMENT
$95,000
15%
3
PREBID EXPENDITURES
a. District Forces
$65,358
b. Consultants
$60,642
SUBTOTAL - PREBID EXPENDITURES
$126,000
20%
4
TOTAL PROJECT COST
$846,000
5
FUNDS AUTHORIZED TO DATE
$225,000
6
ADDITIONAL ALLOCATION NEEDED TO COMPLETE PROJECT
(Line 4 - Line 5)
621 000
NAPESUP \Position Papers \Rathunde \7247_Award.doc Page 5 of 5