Loading...
HomeMy WebLinkAbout04.e. Agreement Amendment with Cogent Energy, Inc.Central Contra Costa Sanitary District ' BOARD OF DIRECTORS POSITION PAPER Board Meeting Date April 21, 2011 Subject: AUTHORIZE THE GENERAL MANAGER TO EXECUTE AN AGREEMENT AMENDMENT WITH COGENT ENERGY, INC. IN THE AMOUNT OF $38,500 FOR THE CONSTRUCTION OF THE CSOD ADMINISTRATION, CREW, AND WAREHOUSE FACILITY, DISTRICT PROJECT NO. 8208 Submitted By: Initiating Dept. /Div.: Edgar Lopez, Assistant Engineer Engineering /Capital Projects REVIEWED AND RECOMMENDED FOR BOARD ACTION: 1 E. opez P. Seitz/ A. Rozul �.cki . Farrell 4&44(44 a � James/A. Kelly, General Manager ISSUE: The Board of Directors' authorization is required to amend consulting agreements beyond staff's authority. RECOMMENDATION: Authorize the General Manager to execute an amendment to an existing technical consulting services agreement. FINANCIAL IMPACTS: The cost ceiling on the existing agreement will be increased by $38,500. ALTERNATIVES /CONSIDERATIONS: The Board could decide not to authorize the General Manager to execute an amendment. This is not recommended since the project would lose LEED points. BACKGROUND: The new CSOD facility has been designed to achieve a LEED certification from the U.S. Green Building Council. LEED is an internationally recognized green building certification system, providing third party verification that a building is designed and built using strategies aimed at improving energy savings, water efficiency, CO2 emissions reduction, improved indoor environmental quality, and impacts related to these systems. The new building will include premium efficiency equipment and lighting, a high - efficiency hot water system that combines the building heating with solar and domestic hot water, light shading systems, preparing the facility for future photovoltaic (solar ready), and an HVAC energy management system. LEED grants points for enhanced commissioning of these products and systems. Enhanced commissioning consists of construction verification and post - installation inspections that confirm the systems were built as intended in the design and achieve their maximum efficiency. Vie, N: \PESUP \Cbradley \POSITION PAPERS \Lopez \8208 -PP for Cogent Amendment.doc Page 1 of 2 POSITION PAPER Board Meeting Date: April 21, 2011 subject: AUTHORIZE THE GENERAL MANAGER TO EXECUTE AN AGREEMENT AMENDMENT WITH COGENT ENERGY, INC. IN THE AMOUNT OF $38,500 FOR THE CONSTRUCTION OF THE CSOD ADMINISTRATION, CREW, AND WAREHOUSE FACILITY, DISTRICT PROJECT NO. 8208 During the development of the project plans and specifications, the District entered into an agreement with Cogent Energy, Inc. to provide design review and commissioning specifications. Cogent Energy was selected because they possess the necessary experience and capability to provide inspection services locally. The current agreement amount is $25,000. Due to their role in preparing the project specifications and their unique understanding of the project, staff recommends amending the existing agreement with Cogent Energy, Inc. to include providing enhanced commissioning services. Staff has negotiated a $38,500 increase to the existing contract, bringing the total agreement amount to $63,500. The environmental impacts of the CSOD Administration, Crew, and Warehouse Facility were addressed in the Collection System Operations (CSO) Facilities Improvements Project Mitigated Negative Declaration approved by the Board of Directors on December 21, 2007. Subsequently, a Notice of Determination was filed in compliance with the California Environmental Quality Act (CEQA). RECOMMENDED BOARD ACTION: Authorize the General Manager to execute an amendment to an existing technical consulting services agreement with Cogent Energy, Inc. in the amount of $38,500. WPESUP\Cbradley \POSITION PAPERS \Lopez \8208 -PP for Cogent Amendment.doc Page 2 of 2