HomeMy WebLinkAbout08/06/2009 AGENDA BACKUPCentral Contra Costa Sanitary District
' BOARD OF DIRECTORS
POSITION PAPER
Board Meeting Date: August 6, 2009 No.: 3.d. Consent Calendar
TypeorAction: AUTHORIZE PUBLIC NOTICE
Subject. AUTHORIZE A PUBLIC NOTICE TO INDICATE AVAILABILITY OF
DOCUMENTATION IN SUPPORT OF THE DISTRICT'S APPROPRIATIONS LIMIT
Submitted By. Initiating Dept. /Div.:
Debbie Ratcliff, Controller Administrative / Finance & Accounting
REVIEWED AND RECOMMENDED FOR BOARD ACTION:
D. Ratcli *X Ff M/9 raves
ISSUE: The Central Contra Costa Sanitary District is required to establish its
appropriations limit in accordance with Article XIII B of the California Constitution.
RECOMMENDATION: Authorize a public notice advertising that documentation used
in the determination of the appropriations limit shall be available fifteen days prior to the
Board Meeting to be held on September 3, 2009, at which the appropriations limit for
the Sewer Construction Fund for the fiscal year of 2009 -2010 will be established.
FINANCIAL IMPACTS: None
ALTERNATIVES /CONSIDERATIONS: The appropriations limit can be calculated
using the California per capita personal income percentage change of .62% or the.local
assessment roll due to local non - residential construction of -259 %.
BACKGROUND: Proposition 4 was approved on November 6, 1979, and was
incorporated in the California Constitution as Article XIII B. As amended, Article XIII B
imposes a limit on the rate of growth in governmental spending. Specifically, this limits
the spending of tax revenue plus interest. It limits appropriations of state and local
governments to the appropriations of the 1978 -1979 base year adjusted in each
subsequent year for changes in the California per capita personal income from the
preceding year or the percentage change in the local assessment roll from the
preceding year due to the addition of local nonresidential new construction.
Article XIII B requires government agencies to establish their appropriations limit by
resolution each year at a regularly scheduled meeting. Notice to the public of
availability of documentation in support of the appropriations limit must be given fifteen
days prior to adoption. The appropriations limit is open to challenge within 45 days of
the effective date of the resolution.
N:\ADMINSUP \ADMIN \POSPAPER\Authorize Public Notice 08- 06- 09.doc Page 1 of 3
POSITION PAPER
Board Meeting Date: August 6, 2009
subject: AUTHORIZE A PUBLIC NOTICE TO INDICATE AVAILABILITY OF
DOCUMENTATION IN SUPPORT OF THE DISTRICT'S APPROPRIATIONS LIMIT
Methodology:
The appropriations limit is increased annually by a factor comprised of the
change in population combined with either the change in California per capita
personal income or the change in the local assessment roll due to local
nonresidential construction. The Board is to select between the per capita
personal income or the change in the local assessment roll due to local
nonresidential construction by a recorded vote.
The change in the local assessment roll for the 2009 -2010 fiscal year has been
reported by the County Assessor to be - 259 %. The California per capita
personal income percentage change is .62 %. The change in the California per
capita personal income percentage is being used in the calculation of the 2009-
2010 appropriations limit since it is the larger of the two (2) factors. Last fiscal
year's appropriations limit was calculated to be $72,428,338. The appropriations
limit for 2009 -2010 is calculated to be $78,814,305. This limit is set on the
District's proceeds of taxes. The District receives approximately $12 million in
taxes which is well below the limit.
RECOMMENDED BOARD ACTION: Authorize a public notice advertising that
documentation used in the determination of the appropriations limit shall be available
fifteen days prior to the Board Meeting to be held on September 3, 2009, at which the
appropriations limit for the Sewer Construction Fund (tax revenue plus interest) for the
fiscal year of 2009 -2010 will be established.
N:W DMINSUP�ADMIN\POSPAPERWuthorize Public Notice 08- 06- 09.doc Page 2 of 3
Central Contra Costa Sanitary District
' BOARD OF DIRECTORS
POSITION PAPER
Board Meeting Date: August 6, 2009 No.: 3 .e. Consent Calendar
Type of Action: APPROVE PROGRAM CONTINUANCE
Subject: APPROVE CONTINUANCE OF EMPLOYEE COMPUTER HARDWARE
PURCHASE ASSISTANCE PROGRAM
Submitted By: Initiating Dept. /Div.:
Mark Greenawalt. IT Administrator Administrative / IT
REVIEWED AND RECOMMENDED FOR BOARD ACTION:
i
M. Greenawalt D
James M. ally,
General anager
ISSUE: Board approval is required for continuance of the District's Employee
Computer Hardware Purchase Assistance Program.
RECOMMENDATION: Approve the continuance of the Employee Computer Hardware
Purchase Assistance Program effective August 6, 2009.
FINANCIAL IMPACTS: Currently $7,759 is invested in computer loans to District
employees.
ALTERNATIVES /CONSIDERATIONS: The Employee Computer Hardware Purchase
Assistance Program could be reduced or eliminated, however, this is not recommended
by staff.
BACKGROUND: The District's Employee Computer Hardware Purchase Assistance
Program was initially approved by the Board effective July 1, 1995, with a condition for
Board review every two years. In 2003, the Board requested that staff change this to
an annual review. Both the employees and the District benefit from this program. On
the one hand, the program provides employees with a low cost resource to purchase a
home computer. On the other hand, it benefits the District by providing an opportunity
for employees to enhance their computer skills. The utilization of computers continues
to increase at the District and there are now few staff positions that do not use a
computer in some facet of their job.
Over one hundred District employees have taken advantage of this program since its
inception in 1996. The revolving loan fund of $70,000 currently has $7,759 in
outstanding loans with a $62,241 balance available for new loans as of June 30, 2009.
In the past year, 7 loans have been extended for a total dollar amount of $8,795. The
program is proposed to continue to operate from the same approved funds and retain
the same basic structure.
N:\ ADMINSUP\ADMIN \POSPAPER\Approve Employee Computer Purchase Program 08- 06- 2009.doc Page 1 of 2
POSITION PAPER
Board Meeting Date: August 6, 2009
subject: APPROVE CONTINUANCE OF EMPLOYEE COMPUTER HARDWARE
PURCHASE ASSISTANCE PROGRAM
Program Overview
The District will charge participants at the LAIF interest rate, and will get the same rate
of return as it would if the loan fund were invested rather than extended to employees.
The program will continue to be administered by the Accounting Section.
The minimum loan amount is $600.
Only one loan can be outstanding at any time per employee for a maximum of
$2,000.
Purchased computers must be compatible with current District standards, and
will require the review of the IT Administrator.
Peripherals and software purchased with computers are covered by this program
(i.e. printers, disk drives, etc.).
As computer systems continue to change in this fast paced industry, employees will
want to take advantage of newer technology. Continuing the District's Employee
Computer Hardware Purchase Assistance Program would allow employees to take
advantage of new technology. It will also allow employees who desire to improve their
computer skills and have not taken advantage of this program to do so.
The Computer Hardware Purchase Assistance Program was reviewed with the Finance
Committee on August 3, 2009. Staff recommends that this program be continued and
will report to the Board every year via Position Paper.
RECOMMENDED BOARD ACTION: Approve the continuance of the Employee
Computer Hardware Purchase Assistance Program effective August 6, 2009, for a one -
year period.
N: \HDMINSUPVADMIMPOSPAPER\Approve Employee Computer Purchase Program 08- 06- 2009.doc Page 2 of 2
Central Contra Costa Sanitary District
' BOARD OF DIRECTORS
POSITION PAPER
Board Meeting Date: AUGUST 6, 2009 No.: 3.f. Consent Calendar
Type of Action: ADOPT RESOLUTIONS
subject: ADOPT RESOLUTIONS ACCEPTING A GRANT OF EASEMENT AND
AUTHORIZING EXECUTION OF A QUITCLAIM DEED TO THE PROPERTY OWNER
AT 1619 MARY DRIVE, PLEASANT HILL (DISTRICT PROJECT 4985 — PARCELS
32 AND R -32 *)
Submitted By: Initiating Dept. /Div.:
Ricardo Hernandez, Senior Right of Way Agent Engineering /Environmental Services
REVIEWED AND RECOMMENDED FOR BOARD ACTION:
R. Hernandez S. lund C. Swanson
mes M elly,
eneral anager
ISSUE: A resolution ofThe Board of Directors is required to accept or quitclaim
easements and to authorize staff to record documents.
RECOMMENDATION: Adopt resolutions accepting a grant of easement and
authorizing execution of a quitclaim deed, and authorizing staff to record the documents
with the Contra Costa County Recorder.
FINANCIAL IMPACTS: $500 was paid to the property owner for the permanent
easement exchange (grant of new easement and quitclaim of existing easement)
ALTERNATIVES /CONSIDERATIONS: None.
BACKGROUND: The Pleasant Hill Relief
Interceptor was built in phases from 1996 through
2005. Portions of the alignment were changed
during construction to accommodate micro -
tunneling. Staff is now proceeding to modify the
right of way alignment to match the as -built
pipeline alignment by obtaining new easements
and quitclaiming the old easements. Eleven
easements on Ruth Drive, Harriet Drive, and Mary
Drive will be obtained to accommodate the new
alignment. Eight property owners have signed
the new grants of easements (including the
subject owner). Additional easement exchanges
will be submitted for Board approval once the
subsequent grants of easements are obtained
from the remaining three property owners.
CENLEa A�
680Pp qty
cA
CHILPANCINGO
e 242
o
PLEASAw
HILL
BLVD�S
a
4 SRE 0y�
680
o
< 3 a t
r VICINITY MAP
N: \ENVRSEC \Position Papers \Hernandez R\2009W985 PHRI PP Accept Esmnts Paper Final 08- 06- 09_1.doc Page 1 of 2
POSITION PAPER
Board Meeting Date: August 6, 2009
Subject: ADOPT RESOLUTIONS ACCEPTING A GRANT OF EASEMENT AND
AUTHORIZING EXECUTION OF A QUITCLAIM DEED TO THE PROPERTY
OWNER AT 1619 MARY DRIVE, PLEASANT HILL (DISTRICT PROJECT 4985 —
PARCELS 32 AND R -32')
The quitclaim deed will extinguish CCCSD's existing easement (location where the
sewer was not installed as designed) and the grant of easement will provide CCCSD
with recorded land rights of the as -built location of the sewer.
RECOMMENDED BOARD ACTION: Adopt resolutions accepting a grant of easement
from Jeffrey Paul Leonard, and authorizing the President of the Board of Directors and
the Secretary of the District to execute a Quitclaim Deed to the same and authorizing
staff to record the documents with the Contra Costa County Recorder.
'Easement parcel numbers are for internal job log use only.
N: \ENVRSEMPosition Papers \Hernandez R0009 \4985 PHRI PP Accept Esmnts Paper Final 08- 06- 09_l.doc 'Page 2 of 2
Central Contra Costa Sanitary District
' BOARD OF DIRECTORS
POSITION PAPER
Board Meeting Date: August 6, 2009 No.: 3.g. Consent Calendar
Type or Action: ADOPT RESOLUTION
Subject: ADOPT A RESOLUTION ACCEPTING AN OFFER OF DEDICATION FROM
MARDEL LLC FOR AN EASEMENT IN THE TOWN OF DANVILLE SHOWN ON THE MAP
OF SUBDIVISION 7960, AND AUTHORIZING STAFF TO RECORD THE RESOLUTION
WITH THE CONTRA COSTA COUNTY RECORDER (JOB 5854, PARCEL 1')
Submitted By: _ Initiating Dept. /Div.:
Pat Camorongan, Engineering Assistant III Engineering /Environmental Services
REVIEWED AND RECOMMENDED FOR BOARD ACTIO
P. Camorongan J. amoto -Mills C. Swanson James M. elly.
General MAnager
ISSUE: A resolution of the Board of Directors is required to accept offers of dedication,
and to authorize staff to record documents.
RECOMMENDATION: Adopt a resolution accepting an offer of dedication for an
easement in the town of Danville, and authorizing staff to record the resolution with the
Contra Costa County Recorder.
FINANCIAL IMPACTS: The new easement was acquired at no cost to the District.
ALTERNATIVES /CONSIDERATIONS: None.
BACKGROUND: The Board of Directors regularly
accepts easements by resolution. The
recommended resolution will accept an easement
shown on the map of Subdivision 7960 required
for a recent sewer extension off Cross Bridge
Road in the town of Danville. Staff has reviewed
the subdivision map and determined that it is in
compliance with District standards.
RECOMMENDED BOARD ACTION: Adopt
a resolution accepting an offer of dedication for an
easement in the town of Danville from Mardel
LLC, as shown on the map of Subdivision 7960,
and authorizing staff to record the resolution with
the Contra Costa County Recorder.
*Easement parcel numbers are for internal job log use only.
N:\ENVRSEC \Position Papers \Camorongan \PP 5854 Offer of Dedication Mardel Final 8- 6- 09.doc
CROSS BRIDGE
SITE
DANnlbflddff
VICINITY MAP
NT.S.
Central Contra Costa Sanitary District
' BOARD OF DIRECTORS
POSITION PAPER
Board Meeting Date: August 6, 2009 No.: 3;h. Consent Calendar
Type of Action: ADOPT RESOLUTION
Subject: ADOPT A RESOLUTION ACCEPTING AN OFFER OF DEDICATION FROM
TALAMARK DEVELOPMENT, INC., FOR EASEMENTS IN THE TOWN OF
DANVILLE SHOWN ON THE MAP OF SUBDIVISION 9078, AND AUTHORIZING
STAFF TO RECORD THE RESOLUTION WITH THE CONTRA COSTA COUNTY
RECORDER (JOB 6444 — PARCELS 2 THROUGH 6')
Submitted By: Initiating Dept. /Div.:
Pat Camorongan, Engineering Assistant III Engineering /Environmental Services
REVIEWED AND RECOMMENDED FOR BOARD ACTION: ITION:
P. Camorongan . -AFa James . Kelly, Gneral anage
r
ISSUE: A resolution of the Board of Directors is required to accept offers of dedication
and to authorize staff to record documents.
RECOMMENDATION: Adopt a resolution accepting an offer of dedication for
easements in the town of Danville, and authorizing staff to record the resolution with the
Contra Costa County Recorder.
FINANCIAL IMPACTS: The new easements were acquired at no cost to the District.
ALTERNATIVES /CONSIDERATIONS: None.
BACKGROUND: The Board of Directors
regularly accept easements by resolution.
The recommended resolution will accept
easements shown on the map of
Subdivision 9078 required for a recent
sewer extension off Old Blackhawk Road
in the town of Danville. Staff has reviewed
the subdivision map, and determined it is
in compliance with District standards.
RECOMMENDED BOARD ACTION:
Adopt a resolution accepting an offer of
dedication from Talamark Development,
Inc., for easements in the town of Danville
DAnMWILE
VICINITY MAP
NTS.
shown on the map of Subdivision 9078,
and authorizing staff to record the resolution with the Contra Costa County Recorder.
'Easement parcel numbers are for internal job log use only.
N: \ENVRSEC \Position Papers \Camorongan \PP 6444 OD Talamark Final 8- 6- 09.doc
Central Contra Costa Sanitary District
' BOARD OF DIRECTORS
POSITION PAPER
Board Meeting Date: August 6, 2009 No.: 3.i. Consent Calendar
Type of Action: ADOPT RESOLUTION
Subject: ADOPT A RESOLUTION ACCEPTING AN OFFER OF DEDICATION FROM THE
WINDEMERE BLC LAND COMPANY LLC FOR AN EASEMENT IN THE CITY OF SAN
RAMON SHOWN ON THE MAP OF SUBDIVISION 8508, AND AUTHORIZING STAFF TO
RECORD THE RESOLUTION WITH THE CONTRA COSTA COUNTY RECORDER (JOB
5852, PARCEL 1 *)
Submitted By: Initiating Dept /Div.:
Pat Camorongan, Engineering Assistant III Engineering /Environmental Services
REVIEWED AND RECOMMENDED FOR BOARD ACTION:
P.P. Caan J. y moto Mills A- Fart511 ames M. wly
enera
Manager
ISSUE: A resolution of the Board of Directors is required to accept offers of dedication,
and to authorize staff to record documents.
RECOMMENDATION: Adopt a resolution accepting an offer of dedication for an
easement in the city of San Ramon, and authorizing staff to record the resolution with
the Contra Costa County Recorder.
FINANCIAL IMPACTS: The new easement was acquired at no cost to the District.
ALTERNATIVES /CONSIDERATIONS: None.
BACKGROUND: The Board of Directors
regularly accepts easements by resolution.
The recommended resolution will accept an
easement shown on the map of Subdivision
8508 required for a recent sewer extension
off Albion Road in the city of San Ramon.
Staff has reviewed the subdivision map and
determined that it is in compliance with
District standards.
RECOMMENDED BOARD ACTION: Adopt
a resolution accepting an offer of dedication
for an easement in the city of San Ramon
from Windemere BLC Land Company LLC,
as shown on the map of Subdivision 8508,
and authorizing staff to record the resolution
with the Contra Costa County Recorder.
'Easement parcel numbers are for internal job log use only.
p
H
r
Y�i i G ON R0
qa
SITE
RAW 16V
VICINITY MAP4'
xrs
N: \ENVRSEC \Position Papers \Camorongan \5852_PP Offer of Dedication Windemere Final 8- 6- 09.doc
Central Contra Costa Sanitary District
' BOARD OF DIRECTORS
POSITION PAPER
Board Meeting Date: August 6, 2009 No.: 3. j . Consent Calendar
Type of Action: ADOPT RESOLUTION
Subject: ADOPT A RESOLUTION ACCEPTING AN OFFER OF DEDICATION FROM THE
BERTOLERO DEVELOPMENT CORPORATION, INC., FOR AN EASEMENT IN THE TOWN
OF DANVILLE SHOWN ON THE MAP OF MINOR SUBDIVISION MS 851 -2004, AND
AUTHORIZING STAFF TO RECORD THE RESOLUTION WITH THE CONTRA COSTA
COUNTY RECORDER (JOB 5871, PARCEL 1 ")
Submitted By: Initiating Dept. /Div.:
Pat Camorongan, Engineering Assistant III Engineering /Environmental Services
REVIEWED AND RECOMMENDED FOR BOARD ACTT
P. Camorongan J. M mot' -Mills C. Swanson ames ally
General anager
ISSUE: A resolution of the Board of Directors is required to accept offers of dedication,
and to authorize staff to record documents.
RECOMMENDATION: Adopt a resolution accepting an offer of dedication for an
easement in the town of Danville, and authorizing staff to record the resolution with the
Contra Costa County Recorder.
FINANCIAL IMPACTS: The new easement was acquired at no cost to the District.
ALTERNATIVES /CONSIDERATIONS: None.
BACKGROUND: The Board of Directors regularly
accepts easements by resolution. The
recommended resolution will accept an easement
shown on the map of minor subdivision MS 851-
2004 required for a recent sewer extension off
Camino Ramon in the town of Danville. Staff has
reviewed the subdivision map and determined
that it is in compliance with District standards.
RECOMMENDED BOARD ACTION: Adopt a
resolution accepting an offer of dedication for
an easement in the town of Danville from
Bertolero Development Corporation, Inc., formerly
known as Navlet's, Inc., as shown on the map of
minor subdivision MS 851 -2004, and authorizing
staff to record the resolution with the Contra
Costa County Recorder.
'Easement parcel numbers are for internal job log use only.
1
1 `rry Dwero RD
AND
r
650 qo
SYCAMORE �
CAMNO RAMON
SITE
m�
VICINITY MAP
N TS.
N:\ENVRSEC \Position Papers \Camorongan \PP 5871 OD Bertolero Final 8- 6- 09.doc
Central Contra Costa Sanitary District
' BOARD OF DIRECTORS
POSITION PAPER
Board Meeting Date: August 6, 2009 No.: 3.k. Consent Calendar
Type of Action: CONFIRM PUBLICATION
subject: ADOPT A RESOLUTION CONFIRMING PUBLICATION OF A SUMMARY OF
DISTRICT ORDINANCE NO. 256 (UNCODIFIED) - ESTABLISHING
REIMBURSEMENT FEES APPLICABLE TO PROPERTIES THAT CONNECT TO
JOB 5684 (CRESTVIEW COURT, ORINDA) STANDARD SEWER FACILITIES; JOB
5855 (CANON DRIVE, ORINDA) SPECIAL SEWER FACILITIES; JOB 6435
(RAMON COURT, DANVILLE) STANDARD SEWER FACILITIES; AND JOB 6453
(CHERRY LANE, WALNUT CREEK) STANDARD SEWER FACILITIES
Submitted By: Initiating Dept. /Div,: Administrative Department
Elaine R. Boehme
Secretary of the District
REVIEWED AND RECOMMENDED FOR BOARD ACTION:
James Kelly,
Genera anager
ISSUE: Section 6490 of the Health and Safety Code of the State of California provides
that District ordinances shall be published once in a newspaper of general circulation
within the District, and provides that an Order of the Board of Directors of the District to
the effect that the ordinance has been published shall constitute conclusive evidence
that publication has been properly made.
RECOMMENDATION: Adopt a resolution confirming the publication of a summary of
District Ordinance No. 256.
FINANCIAL IMPACTS: None.
ALTERNATIVES /CONSIDERATIONS: Establishes presumption that the ordinance
was correctly published and therefore would be deemed procedurally valid by a court.
BACKGROUND: A summary of District Ordinance No. 256 (Uncodified) which was
adopted by the Board at the meeting of June 18, 2009, and which establishes
reimbursement fees applicable to properties that connect to Job 5684 (Crestview Court,
Orinda) Standard Sewer Facilities; Job 5855 (Canon Drive, Orinda) Special Sewer
Facilities; Job 6435 (Ramon Court, Danville) Standard Sewer Facilities; and Job 6453
(Cherry Lane, Walnut Creek) Standard Sewer Facilities, was published in the Contra
Costa Times on June 18, 2009. Proof of publication is attached.
RECOMMENDED BOARD ACTION: Adopt a resolution confirming the publication of a
summary of District Ordinance No. 256.
Page 1 of 3
RESOLUTION NO. 2009-
RESOLUTION CONFIRMING PUBLICATION OF
A SUMMARY OF'DISTRICT ORDINANCE NO. 256 (UNCODIFIED)
ESTABLISHING REIMBURSEMENT FEES APPLICABLE TO PROPERTIES THAT
CONNECT TO JOB 5684 (CRESTVIEW COURT, ORINDA) STANDARD SEWER
FACILITIES; JOB 5855 (CANON DRIVE, ORINDA) SPECIAL SEWER FACILITIES;
JOB 6435 (RAMON COURT, DANVILLE) STANDARD SEWER FACILITIES; AND JOB
6453 (CHERRY LANE, WALNUT CREEK) STANDARD SEWER FACILITIES
WHEREAS, Section 6490 of the Health and Safety Code of the State of
California provides that District ordinances shall be published once in a newspaper of
general circulation within the District, and provides that an Order of the Board of
Directors of the District to the effect that the Ordinance has been published shall
constitute conclusive evidence that publication has been properly made.
NOW, THEREFORE, be it resolved by the Board of Directors of the Central
Contra Costa Sanitary District as follows:
THAT a summary of District Ordinance No. 256 (Uncodified) which was adopted
on June 18, 2009, and which Establishes Reimbursement Fees Applicable to
Properties that Connect to Job 5684 (Crestview Court, Orinda) Standard Sewer
Facilities; Job 5855 (Canon Drive, Orinda) Special Sewer Facilities; Job 6435 (Ramon
Court, Danville) Standard Sewer Facilities; and Job 6453 (Cherry Lane, Walnut Creek)
Standard Sewer Facilities, has been properly published once since its adoption in a
newspaper of general circulation within Contra Costa County.
PASSED AND ADOPTED by the Central Contra Costa Sanitary District Board of
Directors this 6t" day of August, 2009 by the following vote:
AYES:
Members:
NOES:
Members:
ABSENT:
Members:
James A. Nejedly
President of the Board of Directors,
Central Contra Costa Sanitary District,
COUNTERSIGNED: County of Contra Costa, State of California
Elaine R. Boehme
Secretary of the Central Contra Costa
Sanitary District, County of Contra
Costa, State of California
Approved as to Form:
Kenton L. Alm
District Counsel
tntWosta Times
P 0 Box 4147
Walnut Creek, CA 94596
(925)935 -2525
Central CC Sanitary
Ann/Acets Payable,5019 Imhoff Pl.
Martinez CA 94553 -4316
PROOF OF :PUBLICATION
FILE NO.
In the matter of
Ordinance 256
I am a citizen of the United States and a resident of the County
aforesaid; I am over the age of eighteen years, and not a party to or
interested in the above- entitled matter.
I am the Principal Legal Clerk of the Contra Costa Times, a
newspaper of general circulation, printed and published at 2640
Shadelands Drive in the City of Walnut Creek, County of Contra
Costa, 94598
And which newspaper has been adjudged a newspaper of general
circulation by the Superior Court of the County of Contra Costa,
State of California, under the date of October 22, 1934. Case
Number 19764.
The notice, of which the annexed is a printed copy (set in type not
small than nonpareil), has been published.in each regular and entire
issue of said newspaper and not in any supplement thereof on the
following dates, to -wit:
613012009
I certify (or declare) under the penalty of perjury
that the foregoing is true and correct.
Executed at Walnut Creek, California.
On this 30 day of June, 2009
Signature
Legal No.
SUMMARyor
DidNANCEN&M
Adopted:
June 18, 2009
AVES:Membem:Hockett.
Gill. Meneslnl,
Ne, d
NM%embers•None
ABSENT:Membem:None
s/s James A. Nele0lyy
President of the Disble[
Board of the
Central Contra Costa
Sanitary District.
County of Contra Costa,
State or Cellfomle
COLIWERS1ONE4
's/s Elaine R Boehme
Secretary of the Central
Contra Caste
Sanitary District, County
of Contra
Costs, State of Ca ifor.
me
s/s rroveo as to FUnrr.
Kenton L Alm
Kenton L Alm
District Counsel
ADC"3191R16
June 306 2009
0003191516
Central Contra Costa Sanitary District
' BOARD OF DIRECTORS
POSITION PAPER
Board Meeting Date: August 6, 2009 No.: 3.1. Consent Calendar
Type of Action: ACCEPT CONTRACT WORK/AUTHORIZE FILING OF THE NOTICE
OF COMPLETION
Subject: ACCEPT THE CONTRACT WORK FOR THE MARTINEZ SEWER
RENOVATIONS, PHASE 2, DISTRICT PROJECT 5979, AND AUTHORIZE FILING
OF THE NOTICE OF COMPLETION
Submitted By: Initiating Dept /Div.:
Michael J. Penny, Associate Engineer Engineering / Capital Projects
REVIEWED AND RECOMMENDED FOR BOARD ACTION:
it l
M. Penny A. Mesta ts y cki A. Farr I /James M. Ke y,
eneral Ma ger
ISSUE: Construction has been completed on the Martinez Sewer Renovations,
Phase 2, District Project 5979, and the work is now ready for acceptance.
RECOMMENDATION: Accept the contract work for the Martinez Sewer Renovations,
Phase 2, District Project 5979,, and authorize filing of the Notice of Completion.
FINANCIAL IMPACTS: None related to this action.
ALTERNATIVES /CONSIDERATIONS: Not applicable. Filing the Notice of Completion
is advisable under the California Civil Code, Section 3093.
BACKGROUND: The Martinez Sewer Renovations, Phase 2, project included
renovating approximately 6,000 feet of 6 -inch sewer pipe in Martinez. The sewers were
replaced by open -cut construction.
On July 3, 2008, the Board of Directors authorized the award of a contract for the
construction of the project to William G. McCullough Company. The Notice to Proceed
was issued on August 4, 2008. The work was substantially completed on June 19,
2009. The remaining items of work consist of minor punch -list items, which do not
affect the project acceptance.
Immediately upon acceptance, the Contractor is relieved of the duty of maintaining and
protecting the Contract work. Guaranty and warranty periods required by the Contract
and the statutory period for filing of liens and Stop Notices start on the date of
acceptance by the Board of Directors. Final payment to the Contractor is made after
expiration of the statutory period for filing of liens and Stop Notices, provided no liens or
Stop Notices have been filed, and provided the punch -list items have been completed.
N: \PESUP \Cbradley \POSITION PAPERS \Penny \5979 Accept Contract Work PP.doc Page 1 of 2
POSITION PAPER
Board Meeting Date: August 6, 2009
subject. ACCEPT THE CONTRACT WORK FOR THE MARTINEZ SEWER
RENOVATIONS, PHASE 2, DISTRICT PROJECT 5979, AND AUTHORIZE FILING
-OF THE NOTICE OF COMPLETION
The total authorized budget for the project is $2,178,000. The budget includes the cost
of engineering design, construction management and inspection, testing services, and
contractor services. An accounting of the project costs will be provided to the Board at
the time of project closeout. It is appropriate to accept the contract work at this time.
RECOMMENDED BOARD ACTION: Accept the contract work for the Martinez Sewer
Renovations, Phase 2, District Project 5979, and authorize filing of the Notice of
Completion.
N: \PESUP \Cbradley \POSITION PAPERS \Penny \5979 Accept Contract Work PP.doc Page 2 of 2
4.a. Hearings
CENTRAL CONTRA COSTA SANITARY DISTRICT
PUBLIC HEARING TO RECEIVE COMMENTS ON DIRECTING
THAT THE 2009 -10 ASSESSMENTS FOR ALHAMBRA VALLEY ASSESSMENT
DISTRICTS BE COLLECTED ON THE CONTRA COSTA COUNTY TAX ROLL
SUGGESTED AGENDA
August 6, 2009
Request staff report
Public hearing on placing 2009 -10 assessments for Alhambra Valley
Assessment Districts on the Contra Costa County Tax Roll
A. Open public hearing
B. Receive public comment
C. Close public hearing
III. Consider adoption of a resolution directing that the 2009 -10 assessments
for Alhambra Valley Assessment Districts be collected on the Contra
Costa County Tax Roll
NAENVRSEMPosition Papers\ Leavitt\ 2009 \PP- Hearing09- 10AVADS- TaxRoll Final 6- 6- 09.doc
Central Contra Costa Sanitary District
' BOARD OF DIRECTORS
POSITION PAPER
Board Meeting Date: August 6, 2009 No.: 4.a. Hearings
Type of Action: CONDUCT PUBLIC HEARING; ADOPT RESOLUTION
Subject: CONDUCT A PUBLIC HEARING AND ADOPT A RESOLUTION DIRECTING
THAT THE 2009 -10 ASSESSMENTS FOR ALHAMBRA VALLEY ASSESSMENT
DISTRICTS BE COLLECTED ON THE CONTRA COSTA COUNTY TAX ROLL
Submitted By: Initiating Dept. /Div.:
Russell Leavitt, Engineering Assistant III Engineering /Environmental Services
REVIEWED AND RECOMMENDED FOR BOARD ACTION:
R. Leavitt C. Swanson James elly,
General anager
ISSUE: The Board of Directors' authorization by resolution is needed to place charges
on the Contra Costa County tax roll.
RECOMMENDATION: Conduct a public hearing and adopt a resolution directing that
the 2009 -10 assessments for the Alhambra Valley Assessment Districts be collected on
the Contra Costa County tax roll.
FINANCIAL IMPACTS: This action will provide for collection of $197,036.34 in
2009 -10 assessments from properties participating in Alhambra Valley Assessment
Districts.
ALTERNATIVES /CONSIDERATIONS: Not applicable.
BACKGROUND: Some of the property owners who are voluntarily participating in
Alhambra Valley Assessment Districts have agreed to pay for sewer improvements over
a fifteen -year period. These properties are referenced in Exhibit "A" attached to the
resolution.
Payments are to be collected by placing assessments on each property owner's tax bill.
A resolution of the Board is needed to place assessments for Alhambra Valley
Assessment Districts on the Contra Costa County tax roll.
RECOMMENDED BOARD ACTION: Conduct a public hearing and adopt a resolution
directing that the 2009 -10 assessments for the Alhambra Valley Assessment Districts
be collected on the Contra Costa County tax roll.
N: \ENVRSEC \Position Papers\ Leavitt\ 2009 \PP- Hearing09- 10AVADS- TaxRoll Final 8- 6- 09.doc Page 1 of 1
RESOLUTION NO. 2009-
A RESOLUTION DIRECTING THAT THE 2009 -10 ASSESSMENTS
FOR ALHAMBRA VALLEY ASSESSMENT DISTRICTS
BE COLLECTED ON THE CONTRA COSTA COUNTY TAX ROLL
WHEREAS, the Central Contra Costa Sanitary District ( CCCSD) has entered into
written agreements with certain property owners who have formed Alhambra Valley
Assessment Districts to pay for sewer improvements over a fifteen -year period; and
WHEREAS, the CCCSD Code provides that CCCSD may elect to collect current
charges and delinquent charges on the tax roll as provided by Section 5470 and
following, of the California Health and Safety Code; and
WHEREAS, it is considered economical and efficient to collect the assessments for the
Alhambra Valley Assessment Districts for the 2009 -10 fiscal year on the Contra Costa
County tax roll;
NOW, therefore, be it resolved by the Board of Directors of the CCCSD that the
2009 -10 assessments for Alhambra Valley Assessment Districts, as listed in Exhibit "A"
attached hereto and by this reference made a part hereof, are to be collected on the
Contra Costa County Tax Roll.
Passed and adopted this 6th day of August 2009, by the CCCSD Board of Directors by
the following vote:
AYES:
Members:
NOES:
Members:
ABSENT:
Members:
James A. Nejedly
President of the Board of Directors
Central Contra Costa Sanitary District
County of Contra Costa, State of California
COUNTERSIGNED:
Elaine R. Boehme
Secretary of the Central Contra Costa Sanitary District
County of Contra Costa, State of California
Approved as to form:
Kenton L. Alm
Counsel for the District
EXHIBIT A — PAGE 1 OF 2
AVAD 2007 -1: Trunk Sewer
AVAD 2007 -2: Gordon /Millthwait
Assessor's Parcel
Number
Amount
Assessor's Parcel
Number
_
Amount
366 - 102 -012 -7
$2,745.54
367 - 123 -005 -4
2,514.22
366 - 102 -011 -9
$2,745.54
367- 123 -004 -7
2,514.22
366- 102 -009 -3
$2,745.54
367 - 123 -003 -9
2,514.22
366- 102 -007 -7
$2,745.54
367- 112 -003 -2
1,893.02
366 - 102 -006 -9
$2,745.54
367- 130 -012 -1
2,514.22
366- 102 -001 -0
$2,745.54
367- 111 -005 -8
2,514.22
366 - 070 -006 -7
$2,745.54
367- 111 -003 -3
2,514.22
366- 070 -005 -9
$2,745.54
367 - 111 -002 -5
2,514.22
366 - 070 -003 -4
$2,094.34
367- 111 -001 -7
2,514.22
366- 052 -005 -1
$2,745.54
367- 122 -001 -4
2,514.22
366- 052 -004 -4
$2,745.54
367- 100 -019 -2
2,514.22
366- 040 -014 -8
$2,094.34
367- 100 -018 -4
2,514.22
366- 040 -004 -9
$2,745.54
367 - 100 -017 -6
2,514.22
366- 040 -009 -8
$2,745.54
367- 100 -016 -8
2,514.22
366 - 030 -018 -1
$2,745.54
367 - 100 -015 -0
2,514.22
366- 020 -010 -0
$2,745.54
367- 100 -013 -5
2,514.22
366 - 020 -009 -2
$3,356.76
367- 100 -012 -7
2,514.22
367- 130 -004 -8
$2,745.54
367 - 100 -011 -9
816.30
367 - 130 -024 -6
$2,745.54
367 - 100 -009 -3
2,514.22
366 - 051 -001 -1
$2,745.54
367- 100 -004 -4
2,514.22
366 - 080 -006 -5
$2,745.54
367- 100 -003 -6
2,514.22
366- 080 -004 -0
$2,745.54
367- 100 -002 -8
2,514.22
366- 080 -003 -2
$2,745.54
367 - 121 -004 -9
2,514.22
366 - 080 -001 -6
$2,745.54
367- 121 -002 -3
2,514.22
366-101 -001 -1
$2,745.54
367- 130 -013 -9
2,514.22
Total 25 parcels
$67,947.32
Total 25 parcels
$60,536.38
AD 2007 -3: Reliez
Assessor's Parcel
Number
366 - 020 -001 -9
366- 020 -002 -7
Jww -w I V -V V 1- 1
366- 010 -009 -4
366 - 010 -003 -7
365 - 150 -080 -7
Total 8 oa,
BIT A — PAGE 2 OF 2
AVAD 20074: Monteira.
Amount Assessor's Parcel Amount
Number
746.54
567.98
366 - 020 -016 -7 $2,733.92
366- 020 -015 -9 $2,733.92
567.98 I 366- 020 -012 -6
567.98 366 - 020 -011 -8
567.98 Total 4 oai
567.98
567.98
,722.40
AVAD 2007 -6: Quail
Assessor's Parcel
Number
Amount
367- 150 -013 -4
$3,546.34
367- 150 -010 -0
$3,546.34
365 - 100 -015 -4
$4,034.80
365- 110 -022 -8
$4,686.02
365 - 110 -021 -0
$4,686.02
365- 120 -003 -6
$4,197.56
365- 120 -004 -4
$4,197.56
Total 7 Parcels
$28,894.64
$10,935.68
Total Count:1 69
Total Amount:1 $197.036.42
Lt,,&%
2009 -10 Assessments for
Alhambra Valley Assessment
Districts
Public Hearing for placing
2009 -10 assessments
on the Contra Costa County Tax, Roll
Curtis Swanson
August 6, 2009
Alhambra Valley Assessment
District (AVAD),Assessments
❑ 5 active AVADs.
❑ 20 property owners paid off their AVAD
assessment in full by July 24, 2009;
$570,000 collected.
❑ 69 property owners have chosen to start
financing some or all of their AVAD
assessment; $1.96 million owed.
❑ $197,036 in assessment payments to be
collected this year on the tax roll.
2009 -10 C.C. County Tax Roll
MMMMMMMr-
• Public Hearing required to place
2009 -10 AVAD assessments on the
property tax roll.
• CCCSD must submit these charges to
the County by August 10, 2009.
z
4.b. Hearings
PUBLIC HEARING TO CONSIDER AN ORDINANCE
ADJUSTING BOARD MEMBER COMPENSATION
SUGGESTED AGENDA
August 6, 2009
1. Request Staff Report
2. Open Hearing
a. Invite comments from public
b. Close Hearing
3. Board Discussion -
4. Board Action (refer to Position Paper)
N:WDMINSUP\ADMIN \DIST- SEC \Miscellaneous \Public Hearing consider Ord adj Board compensation - Aug 2009.doc
Central Contra Costa Sanitary District
' BOARD OF DIRECTORS
POSITION PAPER
Board Meeting Date: August 6, 2009 No.: 4. b. Hearings
Type of Action: ADOPT ORDINANCE
subject: PUBLIC HEARING TO CONSIDER ADOPTING AN ORDINANCE
ADJUSTING BOARD MEMBER COMPENSATION
Submitted By: Elaine R. Boehme Initiating Dept /Div.: Administration
Secretary of the District
REVIEWED AND RECOMMENDED FOR BOARD ACTION:
x� r
D. Ratcliff E. Boehme K. Alm
James M ally,
General anager
ISSUE: The Board requested staff to prepare information on Board Member
compensation for Board consideration.
RECOMMENDATION: Determine whether the Board wishes to revise the current
compensation of $221 per day of service. If an adjustment is desired, adopt an
ordinance (Attachment A) amending the Board Member compensation.
FINANCIAL IMPACTS: If any revisions are made to the compensation, there may be a
resulting change in Board Member compensation. The maximum increase permissible
under Health and Safety Code Section 6489 and Water Code Section 20202 would
increase the compensation by 10 %, or $22 to $243 per day of service, not to exceed six
days per calendar month. If the maximum increase were taken and all Board Members
attended the maximum permitted six meetings per month, the maximum budget impact
would be an additional $7,920 per year.
ALTERNATIVES /CONSIDERATIONS: The Board may decide it does not wish to
amend Board Member compensation. The Board may decide to increase
compensation by an amount less than the permitted 5 % per year.
BACKGROUND: In 2000, SB 1559 provided for increasing Board Member
compensation above the previous $100 per day of service. The chart below shows
historical changes to Board Member compensation.
Year
Board Compensation
per Meeting
1987
$100
2000
$170
2007
$221
N:\ADMINSUP\ADMIN \DIST- SEC \Position Papers \PP - Board Compensation Increase Public Hearing 8- 09.doc
Page 1 of 2
POSITION PAPER
Board Meeting Date: August 6, 2009
subject: PUBLIC HEARING TO CONSIDER ADOPTING AN ORDINANCE
ADJUSTING BOARD MEMBER COMPENSATION
Health and Safety Code Section 6489 states that the Board may, by ordinance adopted
pursuant to Water Code Section 20202, increase its compensation above the $100 per
day permitted by the Health and Safety Code. The compensation may be increased by
up to 5% per calendar year. The Board may approve up to a 10% increase in
compensation to capture the increase not taken in 2008 and the 5% increase for 2009.
Board Members' compensation is limited to no more than six days' service per calendar
month. If the annual increases are approved, they cannot be compounded for each
prior year.
If the Board today adopts an ordinance amending the compensation, it will take effect
on October 5, 2009, in accordance with Water Code Section 20204, which states that
the ordinance cannot be effective until 60 days after its passage.
RECOMMENDED BOARD ACTION:
Determine whether or not the Board wishes to change the Board Member
compensation, and by what amount.
If an amendment to the compensation is desired, adopt an ordinance amending the
Board Member compensation by an amount up to 10 %, to be effective October 5, 2009.
N:\ADMINSUP\ADMIN \DIST- SEC \Position Papers \PP - Board Compensation Increase Public Hearing 8- 09.doc
Page 2 of 2
ATTACHMENT A
ORDINANCE NO. 2009-
AN ORDINANCE OF THE CENTRAL CONTRA COSTA
SANITARY DISTRICT AMENDING DISTRICT CODE SECTION 2.04.030,
COMPENSATION OF BOARD MEMBERS
WHEREAS, California Health and Safety Code Section 6489 states that the
Board of Directors may, by ordinance adopted pursuant to Water Code Section 20202,
increase its compensation above the $100 per day permitted by the Health and Safety
Code; and
WHEREAS, the Water Code permits a compensation increase of up to five per
cent each calendar year; and
WHEREAS, the Health and Safety Code limits Board Member compensation to
no more than six days' service in a calendar month; and
WHEREAS, the Board of Directors of the Central Contra Costa Sanitary District
last adjusted its compensation in February 2007, raising it to $221 per meeting; and
WHEREAS, since no adjustments were made since that time, the Board may
approve an increase of up to ten per cent to capture the permitted five per cent
increase not taken in 2008 and the five per cent increase for 2009; and
WHEREAS, any such increase shall not be effective for at least sixty days from
the date of final passage.
NOW, THEREFORE, the Board of Directors of the Central Contra Costa
Sanitary District does ordain as follows:
Section 1. That Section 2.04.030 of the District Code is hereby repealed and
that a new Section 2.04.030 is hereby adopted as follows.
A. Beginning on October 5, 2009 and continuing until the ordinance
codified in this section is modified or repealed, the compensation for
Directors of the Central Contra Costa Sanitary District is increased
from the current $221 approved on February 15, 2007 to $ ? ?? per
day of service, effective sixty days after adoption of this ordinance
and as set forth by Section 6489 of the Health and Safety Code and
Section 20202 of the California Water Code. Compensation shall
not be for more than a total of six days of any calendar month.
Section 2.
This ordinance shall be a general regulation of the District and shall be published
in the Contra Costa Times and San Ramon Valley Times, a newspaper of general
N:\ADMINSUP\ ADMIN \DIST- SEC\Ordinances\Board Compensation Ordinance 09.DOC
ATTACHMENT A
circulation, published and circulated within the Central Contra Costa Sanitary District.
This ordinance shall be effective on October 5, 2009, not less than sixty days after its
passage and adoption by the Board of Directors.
PASSED AND ADOPTED by the Board of Directors of the Central Contra Costa
Sanitary District on the 6th day of August 2009, by the following vote:
AYES -: Members:
NOES: Members:
ABSENT: Members:
Countersigned:
Elaine R. Boehme, CIVIC
Secretary of the Central Contra
Costa Sanitary District, County
of Contra Costa, State of California
Approved as to Form:
Kenton L. Alm
District Counsel
James A. Nejedly
President of the Board of Directors
Central Contra Costa Sanitary District
County of Contra Costa, State of California
N:\ADMINSUP\ADMIN \DIST- SEC \Ordinances\Board Compensafion Ordinance 09.DOC
Central Contra Costa Sanitary District
' BOARD OF DIRECTORS
POSITION PAPER
Board Meeting Date: August 6, 2009 No.: 6.a. Bids and Awards
Type or Action: AWARD CONSTRUCTION CONTRACT /AUTHORIZE EXECUTION
OF CONTRACT DOCUMENTS
Subject: AWARD A CONSTRUCTION CONTRACT AND AUTHORIZE THE
GENERAL MANAGER TO EXECUTE CONTRACT DOCUMENTS SUBJECT TO
SUBMITTAL REQUIREMENTS WITH McNAMARA & SMALLMAN
CONSTRUCTION, INC. FOR THE CONSTRUCTION OF THE PLEASANT HILL
SEWER RENOVATIONS, PHASE 1, DISTRICT PROJECT NO. 5961
Submitted By: Initiating Dept. /Div.:
Alexandr Mestetsky, Associate Engineer Engineering / Capital Projects
REVIEWED AND RECOMMENDED FOR BOARD ACTION:
w A. Mestetsky / - - - -- —_ mes M. $elly,
1610neral
ISSUE: On July 27, 2009, eight (8) sealed bids were received and opened for the
construction of the Pleasant Hill Sewer Renovations, Phase 1, District Project 5961.
The Board of Directors must award the contract or reject bids within 50 days of the bid
opening. Authorize the General Manager to execute the contract documents subject to
SUBMITTAL requirements.
RECOMMENDATION: Find that the project is exempt from the California
Environmental Quality Act (CEQA), award a construction contract, and authorize the
General Manager to execute the Contract Documents subject to favorable review of
insurance certificates, bond submittals, appropriate Contractor license, and any other
required submittals (SUBMITTALS).
FINANCIAL IMPACTS: Approximately $582,000, including design, bid price,
contingency, and construction management.
ALTERNATIVES /CONSIDERATIONS: Reject all bids, which is not recommended.
BACKGROUND: Pleasant Hill Sewer Renovations, Phase 1, will renovate 2,500 linear
feet of 6- and 8 -inch sewer lines in Pleasant Hill. This project is the first phase of
approximately five in Pleasant Hill (see Attachment 1). Construction of the sewers in
easements will involve close cooperation with customers for site access and
restoration. As part of its Sewer System Management Plan (SSMP), the District is
required to renovate deteriorating sewers, with the ultimate goal of reducing sanitary
overflows, as mandated by the San Francisco Bay Regional Water Quality Control
Board.
NAPESUMCbradley\POSITION PAPERS \Mestetsky \5961- Award PP.doc Page 1 of 5
POSITION PAPER
Board Meeting Date: August 6, 2009
subper: AWARD A CONSTRUCTION CONTRACT AND AUTHORIZE THE
GENERAL MANAGER TO EXECUTE CONTRACT DOCUMENTS SUBJECT TO
SUBMITTAL REQUIREMENTS WITH McNAMARA & SMALLMAN
CONSTRUCTION, INC. FOR THE CONSTRUCTION OF THE PLEASANT HILL
SEWER RENOVATIONS, PHASE 1, DISTRICT PROJECT NO. 5961
District staff prepared the plans and specifications for the project. The Engineer's
estimate for construction of the Pleasant Hill Sewer Renovations, Phase 1,
District Project No. 5961, is $400,000. This project was advertised on June 30 and
July 6, 2009. Eight (8) sealed bids ranging from $287,201 to $545,060 were received
and publicly opened on July 27, 2009. The Engineering Department conducted a
technical and commercial review of the bids and determined that McNamara and
Smallman Construction, Inc. is the lowest responsive bidder with a bid amount of
$287,201. A summary of bids received is shown in Attachment 2.
The District will administer the construction contract and will provide contract
administration, inspection, survey, office. engineering, and submittal review. The funds
required to complete this project, as shown in Attachment 3, are $432,000. The total
cost of the Pleasant Hill Sewer Renovations, Phase 1, is anticipated to be $582,000.
This project is included in the fiscal year (FY) 2009 -10 Capital Improvement Budget
(CIB) on pages CS -29. Staff has conducted a cash -flow analysis of the Collection
System Program budget and concluded that adequate funds are available for this
project.
Staff has concluded that this project is exempt from the California Environmental
Quality Act (CEQA) under District CEQA Guidelines, Section 15302, since it involves
replacement of existing facilities at the same location and with same purpose and level
of activity as the facilities being replaced. Authorization of the construction contract for
this project will establish the Board of Directors' independent finding that the project is
exempt from CEQA.
RECOMMENDED BOARD ACTION: Find that the project is exempt from CEQA,
award a construction contract in the amount of $287,201 for the construction of the
Pleasant Hill Sewer Renovations, Phase 1, District Project No. 5961, to McNamara and
Smallman Construction, Inc., the lowest responsive bidder, and authorize the General
Manager to execute the Contract Documents subject to SUBMITTAL requirements.
NAPESUP\Cbradley \POSITION PAPERS \Mestetsky \5961- Award PP.doc Page 2 of 5
4 24
680
RELIEZ VALLEY RD
0
PROJECT �fPJP
LOCATION G 1
P
680 N
24 0 8®
FEET
ENTER
AVE
a
N
2�
m
O
0 \
Q
AREA MAP
J
QQI
Central Contra Costa
Sanitary District
11
,
Prepared by Engineering Support Seepc
PLEASANT HILL SEWER RENOVATION
PHASE 1 - LOCATION MAP
Page 3 of 5
m
ATTACHMENT I
1
ATTACHMENT
PLEASANT HILL SEWER RENOVATIONS, PHASE 1
DISTRICT PROJECT 5961
SUMMARY OF BIDS
PROJECT NO.: 5961 DATE: JULY 27, 2009
PROJECT NAME: PLEASANT HILL SEWER RENOVATIONS, PHASE 1
PROJECT LOCATION: PLEASANT HILL, CALIFORNIA
NO. OF ADDENDA: 2
ENGINEER EST.: $400,000
NO.
BIDDER
BID PRICE
1
McNamara & Smallman Construction, Inc.
$287,201
1756 Holmes Street
Livermore, CA 94550
925 - 606 -7190
2
Ranger Pipelines, Inc.
$291,990
1790 Yosemite Avenue
San Francisco, CA 94124
415 - 822 -3700
3
W.R. Forde Associates
$297,791
984 Hensley Street
Richmond California 94801
510 -215 -9338
4
MBA Pipelines
$342,702
16 Hermosa Court
Danville, CA 94526
925- 648 -2400
5
K. J. Woods Construction
$364,000
2625 Judah Street, #2
San Francisco, CA 94122
415- 759 -0506
6
Pfister Excavating, Inc.
$516,097
1500 Green Island Road
American Canyon, CA 94503
707 - 643 -7715
7
J & M, Inc.
$536,219
6700 National Drive
Livermore, CA 94550
925 - 724 -0300
8
Platinum Pipeline, Inc.
$545,060
11501 Dublin Boulevard, Suite 200
Dublin, California 94568
925 - 829 -6565
BIDS OPENED BY /s/ Elaine Boehme
DATE July 27, 2009
N: \PESUP \Cbradley \POSITION PAPERSWestetsky \5961 -Award PP.doc Page 4 of 5
M
H
Z
W
S
U
Q
Q
w
U)
Q
2
a
vi
Z
O
F-
Q
O
Z
W
If
af
w
W
CO
J
J_
F-
Z
Q
U)
Q
W
J
a
O
W
O
O
Z
F-
U
W
O
a
F-
U
Of
F-
(1)
r-
W
F-
Q
w
W
Z
O
F
U
7
d'
F-
y
Z
O
U
W
w
IL
I
w
m
F-
y
O
IL
Y
0
O
U
c
0
0
o
0
O
O
_
M
00
N
M
Cl)
U)
C
O
U
a
O
O
O
O
O
O
O
O
O
N
O
N
00
LO
CO
i0
V
EA
fA
EA
O
O
O
N
O
O
O
O
O
O
0
In
r-
O
O
co
n
V
E
co
69
Q
69
69
M
0
O
O
O
00
O
O
O
O
rn
0
O
00
O
O
00
O
N
I--
O
0
0
0
O
O
O
O
O
I-
r
O
OLf�
Lf
LO
M
N
M
Lf
00
UO
N
V
�
69
64
EA
N
69
,
N
EA
69
U3
EA
69
Z
w
2
W
U
0
w
z
W
U)
af
0
c
F
c
c
Z
Z
n
d
CC
O
Z
LLI
_O
O
W
p
v
F-
Z
E~
d
W
W
a)
N
v
U
W
a)
U
x
F-
c
G
@
_
O
Q
w
Q
Z
v
°
W
m
-O
p
Z
E
C
N
F-
(:I
N
01
C
H
y
O
p
F-
Z
N
c
m
Z
~
U
m
Z
w
o
0'
W
N
a
W
c
T
O
Q
m
C
'-
N
Co
T
O
p
UO
O
U
U
i
s
.2
2
.2
c
U
~
c�
@
d
U
N
�
Z
'�
c
Z
O
O
=
aN
c
L
p
.`
F
J
a
O
01
J
LL
U
2
m�
N
J
Z
N
J
O
W
w
C
<
-
N
U
Q
W
O
T
Q
W
Q
F-
~
N
Q
N
a
C
.O
N
2
J
LU
`y
O
j
in
C
CO
CO
m
N
o
_
0
j
Q
J
0
0
C7
Z
a
U
U
a
m
U
a
U
m
o
w
U
m
a
Q
O
W
F—
2
to
m-0
(3
Z)
U)
m
-0
I_-O
U)
ZO
U)
U
F-
Z
O
U
w
O-
U
U
a
a
Q
c
r
N
Cl)
a
u)
m
Z
N
c
O
U
D
N
c
O
U
3
O
T
a)
E
Q)
X
m
O
a�
m
U
n.
_T
c
m
t
m
O
U
c
O
U
7
cC
O
U
O
m
01
m
c
N
U
O
O_
m
Q)
(D
LO
`0
Ln
a)
m
m
a-
0
9
a
a
m
a
N
T
m
m
w
a
a
Z
O
H
N
T
U
a
w
o_
Central Contra Costa Sanitary District
' BOARD OF DIRECTORS
POSITION PAPER
Board Meeting Date: August 6, 2009 No.: 6.b. Bids and Awards
Type of Action: AWARD CONSTRUCTION CONTRACT /AUTHORIZE EXECUTION OF
CONTRACT DOCUMENTS
subject: AWARD A CONSTRUCTION CONTRACT AND AUTHORIZE THE GENERAL
MANAGER TO EXECUTE CONTRACT DOCUMENTS SUBJECT TO SUBMITTAL
REQUIREMENTS WITH RANGER PIPELINES, INC. FOR THE CONSTRUCTION OF THE
WALNUT CREEK SEWER RENOVATIONS, PHASE 7, DISTRICT PROJECT 5974
Submitted By: Initiating Dept. /Div.:
Tom Godsey, Associate Engineer Engineering / Capital Projects
REVIEWED AND RECOMMENDED FOR BOARD ACTION:
T. Gods
T. k. A Farigil
ames M991—Y,
General ager
ISSUE: On July 23, 2009, six (6) sealed bids were received and opened for the construction
of the Walnut Creek Sewer Renovation Phase 7, District Project 5974. The Board of
Directors must award the contract or reject bids within 50 days of the bid opening. Authorize
the General Manager to execute the contract documents subject to SUBMITTAL
requirements.
RECOMMENDATION: Find that the project is exempt from the California Environmental
Quality Act (CEQA), award a construction contract to Ranger Pipelines, Inc.; authorize the
General Manager to execute the Contract Documents subject to favorable review of
insurance certificates, bond submittals, appropriate Contractor license, and any other required
submittals (SUBMITTALS).
FINANCIAL IMPACTS: Approximately $2,597,000, including design, bid price, contingency,
and construction management.
ALTERNATIVES /CONSIDERATIONS: Reject all bids, which is not recommended.
BACKGROUND: This project is the seventh phase of sewer renovation in Walnut Creek (see
Attachment 1). The Walnut Creek Sewer Renovation Phase 7 project will renovate 11,000
linear feet of 6 -, 8 -, and 15- inch sewer lines by open cut, pipe- bursting and guided bore
methods in public rights -of -way in Walnut Creek. As part of its Sewer System Management
Plan (SSMP), the District is required to renovate deteriorating sewers, with the ultimate goal
of reducing sanitary overflows, as mandated by the San Francisco Bay Regional Water
Quality Control Board.
N: \PESUP \Cbradley \POSITION PAPERS \Godsey \5974 -Award PP WC7.doc Page 1 of 5
POSITION PAPER
Board Meeting Date: August 6, 2009
subject.. AWARD A CONSTRUCTION CONTRACT AND AUTHORIZE THE
GENERAL MANAGER TO EXECUTE CONTRACT DOCUMENTS SUBJECT TO
SUBMITTAL REQUIREMENTS WITH RANGER PIPELINES, INC. FOR THE
CONSTRUCTION OF THE WALNUT CREEK SEWER RENOVATIONS, PHASE 7,
DISTRICT PROJECT 5974
District staff prepared the plans and specifications for the project. The Engineer's estimate
for construction of the Walnut Creek Sewer Renovation Phase 7, District Project 5974 is
$1,800,000. This project was advertised on July 3 and 9, 2009. Six sealed bids ranging from
$1,588,118 to $2,487,131 were received and publicly opened on July 23, 2009.
The Engineering Department conducted a technical and commercial review of the bids and
determined that Ranger Pipelines, Inc. is the lowest responsive bidder with a bid amount of
$1,588,118. A summary of bids received is shown in Attachment 2.
The District will perform construction management and will provide contract administration,
inspection, survey, office engineering, and submittal review.
The funds required to complete this project, as shown in Attachment 3, are $2,222,000. The
total cost of Walnut Creek Sewer Renovation Phase 7, District Project 5974 is anticipated to
be $2,597,000.
This project is included in the fiscal year (FY) 2009 -10 Capital Improvement Budget (CIB) on
page 33. Staff has conducted a cash -flow analysis of the Collection System Program budget
and concluded that adequate funds are available for this project
Staff has concluded that this project is exempt from the California Environmental Quality Act
(CEQA) under District CEQA Guidelines Section 15302 since it involves replacement
of existing public facilities on the same sites and with substantially the same purpose and
level of activity as the facility being replaced. Approval of this project will establish the Board
of Directors' independent finding that this project is exempt from CEQA.
RECOMMENDED BOARD ACTION: Find that the project is exempt from CEQA, award a
construction contract in the amount of $1,588,118 for the construction of the Walnut Creek
Sewer Renovation Phase 7, District Project 5974, to Ranger Pipelines, Inc., the lowest
responsive bidder, and authorize the General Manager to execute the Contract Documents
subject to SUBMITTAL requirements.
N: \PESUP \Cbradley \POSITION PAPERS \Godsey \5974 -Award PP WC7.doc Page 2 of 5
ATTACHMENT
WALNUT CREEK SEWER RENOVATION PHASE 7
DISTRICT PROJECT NO. 5974
LOCATION MAP
O a IRST VE
n� 650
GEARY Q-� �0 5
SECOND AVE
p ¢ z
2
j pz
m JJ
24 / THIRD m AVE
6 o PROJECT y
a 5000 10000
� LOCATION
o soo 1000 2
AREA MAP FEET
ZG
o �%
2
y
f f /
J m °
LINCOLN AVE —
- TA �FR AVE 1
��Jp yy� LY
' 8L0 N
MT p \P 9y m
r F O
F
0
500 ,aaa DG�Qf�T
0
FEET oq DRAFT
x Central Contra Costa Attach sent
Sanitary District WALNUT CREEK SEWER RENOVATION
' PHASE 7 — LOCATION MAP 1
N: \PESUP \Cbradley \POSITION PAPERS \Godsey \5974 WC_7- PP Award by SM 8- 6- 09.doc Page 3 of 5
ATTACHMENT 2
WALNUT CREEK SEWER RENOVATION PHASE 7
DISTRICT PROJECT 5974
SUMMARY OF BIDS
PROJECT NO.: 5974
DATE: JULY 23, 2009
PROJECT NAME: WALNUT CREEK SEWER RENOVATION PHASE 7
PROJECT LOCATION: WALNUT CREEK, CA ENGINEER EST.: $ 1,800,000
BIDDER
BID PRICE
Ranger Pipelines, Inc.
$1,588,118
P.O. Box 24109
San Francisco, CA 94124
415- 822 -3700
California Trenchless
$1,797,435
2283 Dunn Road
Hayward, CA 94545
510 - 782 -5335
McGuire and Hester
$2,169,769
9009 Railroad Avenue
Oakland, CA 94603
510 - 632 -7676
K. J. Woods Construction, Inc.
$2,278,000
2625 Judah Street #2
San Francisco, CA 94122
415 - 759 -0506
Argonaut Construction
$2,420,440
1300 Carroll Avenue
San Francisco, CA 94124
415 - 822 -5200
McNamara & Smallman Construction, Inc.
$2,487,131
1756 Homes Street
Livermore CA 94550
925 - 606 -7190
BIDS OPENED BY /s/ Elaine R. Boehme DATE 7/23/09 SHEET NO. 1 OF 1
NAPESUP\Cbradley\POSITION PAPERS \Godsey\5974 -Award PP WC7.doc Page 4 of 5
CO)
F
Z
W
Q
s
pl-
W W
Q ~
= Q
CL ?
Z r y
W
'O z
>O�
O z F
U
F
Q W a.
W 0
W a t0>
y v W
W a
LU
ix N O
U G m
H
Z y
J O
Q a
0
0
U
c
0
u
0
O
W
N
V
N
c
O
U
e
°0
00
0
0
h
N
CD
Ln
M
N
4a
O
O
O
O
to
O
O
O
O
C
r
Lti
0
LO
V
h
o
ao
N
r
Cl)
y�
y�
co
0
00
00
00
0N0
0
O
O O
O
ao
0
C
C
0
0
0
0 0
a0
a0
O
O
O
O
N
O
r O
co
co
CO)
Cl)
0
N
N
N
to
W
N
6
w
c
U
N
W
v
w
o
F
z
a
LU
O
LU
U
N
Z
y
O
H
Q
O
C
Q
LU
O
d
a
..
w
m
a
z
F
E
C
Z
F-
Q
U
`u
O
W
m
a
0
0
O
w
w
z
v
m
d`
H
p
z
LU
z
A
0
e
j
w
M
'n
L
7
N
•
a
0
z
E
N
0
C
O)
C
W
d
o
0
Q
C
0
c
a7
F
7
O
w
F
y
F
U
m
y
Z
Q
u7
c
O
n
a
m
u
y
U
w
0
O
0
Q-
o
>,
y
U
o
U
01
y
H
'C
Z
Q
m
U
W
U J
0
°-
c
0
U
U
Z
z
o
2
L
3
0
U
oa
O
m
O
w
a
H°
c
aa)i
O
z
3
a
O
m
o
0
w
Q
U
.
d
Q
a
d Y
d
O
F
J J
o
E
U
IL
z
X
Q
m
d
U
F
Q
0
c
n
J
O W
d
j
W
m
W
f
fa
ZO
CO
ZO
y
a
ai
v
m
F
z
00
m
K
OF
U
U
a
y
LL
Q a.
z
N
M
a
N
V)
h
m
4!
m
a
Central Contra Costa Sanitary District
' BOARD OF DIRECTORS
POSITION PAPER
Board Meeting Date: August 6, 2009 No.: 6.c. Bids and Awards
Type of Action: AWARD A SERVICE CONTRACT /AUTHORIZE EXECUTION OF
CONTRACT DOCUMENTS
subject: AWARD A SERVICE CONTRACT AND AUTHORIZE THE GENERAL
MANAGER TO EXECUTE CONTRACT DOCUMENTS SUBJECT TO SUBMITTAL
REQUIREMENTS WITH ROTO- ROOTER PLUMBING SERVICES FOR THE
TELEVISION INSPECTION OF SANITARY SEWERS - PHASE 6, DISTRICT
PROJECT NO. 5547
Submitted By: Initiating Dept /Div.:
Tom Godsey, Associate Engineer Engineering / Capital Projects
REVIEWED AND RECOMMENDED FOR BOARD ACTION: /
T. GodKey A. Antkowiak Vannes M. K ,
General Manager
ISSUE: On July 27, 2009, three (3) sealed bids were received and opened for the
Television Inspection of Sanitary Sewers — Phase 6, District Project No. 5547. The
Board of Directors must award the service contract or reject bids within 50 days of the
bid opening. Authorize the General Manager to execute the contract documents
subject to SUBMITTAL requirements.
RECOMMENDATION: Find that the.project is exempt from the California
Environmental Quality Act (CEQA), award a service contract, and authorize the General
Manager to execute the Contract Documents subject to favorable review of insurance
certificates, bond submittals, appropriate Contractor license, and any other required
submittals (SUBMITTALS).
FINANCIAL IMPACTS: Approximately $823,000, including design, bid price,
contingency, and contract administration.
ALTERNATIVES /CONSIDERATIONS: Reject all bids, which is not recommended.
BACKGROUND: In 2002, the District began the Sewer TV Inspection Program. The
intention of this program was to assess the condition of the collection system by
televising every sewer in the District. There have been five (5) phases contracted to
date that attempted inspection of all the sewers in Orinda, Walnut Creek, Lafayette,
Pleasant Hill, Martinez, Danville, Alamo, and Moraga. The sixth phase of work will
inspect 1,070,000 feet of sewers in San Ramon, Pacheco, and North Concord. As part
of its Sewer System Management Plan (SSMP), the District is required to evaluate the
condition of its sewer mains, with the ultimate goal of reducing sanitary overflows, as
mandated by the San Francisco Bay Regional Water Quality Control Board.
N: \PESUP \Cbradley \POSITION PAPERS \Godsey\5547 Award PP Phase 6.doc - Page 1 of 4
POSITION PAPER
Board Meeting Date: August 6, 2009
subject: AWARD A SERVICE CONTRACT AND AUTHORIZE THE GENERAL
MANAGER TO EXECUTE CONTRACT DOCUMENTS SUBJECT TO SUBMITTAL
REQUIREMENTS WITH ROTO- ROOTER PLUMBING SERVICES FOR THE
TELEVISION INSPECTION OF SANITARY SEWERS - PHASE 6, DISTRICT
PROJECT NO. 5547
With the completion of Phase 6 of the television inspection program, coupled with the
ongoing mini -cam effort, District staff will have evaluated all 1,500 miles of its gravity
collection system. At the November Capital Budget Workshop, staff will discuss the
results to date and make recommendations pertaining to future TV inspection efforts.
District staff prepared the plans and specifications for the project. The Engineer's
estimate for the Television Inspection of Sanitary Sewers — Phase 6 is $875,000. This
project was advertised on July 10 and 15, 2009. Three (3) sealed bids ranging from
$688,134.17 to $1,020,590.56 were received and publicly opened on July 27, 2009.
The Engineering Department conducted a technical and commercial review of the bids
and determined that Roto- Rooter Plumbing Services is the lowest responsive bidder
with a bid amount of $688,134.17. A summary of bids received is shown in
Attachment 1.
The District will administer the service contract and will provide contract administration,
prepare releases, and review the closed circuit television inspection submittals. The
funds required to complete this project, as shown in Attachment 2, are $793,000. The
total cost of Television Inspection of Sanitary Sewers — Phase 6 is anticipated to be
$823,000.
This project is included in the fiscal year (FY) 2009 -10 Capital Improvement Budget
(CIB) on pages CS -38 and CS -39. Staff has conducted a cash -flow analysis of the
Collection System Program budget and concluded that adequate funds are available for
this project.
Staff has concluded that this project is exempt from the California Environmental
Quality Act (CEQA) under District CEQA Guidelines Section 15262, since it will provide
information for design of sewer improvements and will not have a legally binding effect
on later activities. Authorization of the award of the contract for this project will
establish the Board of Directors' independent finding that the project is exempt from
CEQA.
RECOMMENDED BOARD ACTION: Find that the project is exempt from CEQA,
award a service contract in the amount of $688,134.17 for the Television Inspection of
Sanitary Sewers — Phase 6, District Project No. 5547, to Roto- Rooter Plumbing
Services, the lowest responsive bidder, and authorize the General Manager to execute
the Contract Documents subject to SUBMITTAL requirements.
WPESUMbradley \POSITION PAPERS \Godsey \5547 Award PP Phase 6.doc Page 2 of 4
ATTACHMENT
Central Contra Costa Sanitary District
TELEVISION INSPECTION OF SANITARY SEWERS — PHASE 6
DISTRICT PROJECT 5547
SUMMARY OF BIDS
PROJECT NO.: 5547 -PHASE 6
DATEITIME: JULY 27, 2009 / 2:00 PM
PROJECT NAME: TELEVISION INSPECTION OF SANITARY SEWERS — PHASE 6
PROJECT MANAGER: TOM GODSEY .
PROJECT LOCATIONS: SAN RAMON, PACHECO, AND NORTH CONCORD
ENGINEER EST.: $875,000
NO.
BIDDER
BID PRICE
Roto- Rooter Plumbing
$688,134.17
195 Mason Circle
Concord, CA 94520
925 - 798 -2122
2
Coastline Water Resources
$948,025.66
1300 National Drive #120
Sacramento, CA 95834
916- 923 -3437
3
Quality Pipe Services
$1,020,590.56
12656 East Jamison Place #10
Englewood, CO 80112
303 - 662 -8014
BIDS OPENED BY Elaine Boehme
DATE Jul 27, 2009
NAPESUP\Cbradley \POSITION PAPERS \Godsey \5547 Award PP Phase 6.doc Page 3 of 4
ATTACHMENT
TELEVISION INSPECTION OF SANITARY SEWERS, PHASE 6
DISTRICT PROJECT NO. 5547
POST -BID / PREWORK ESTIMATE
No.
Item Description
Amounts
% Contract Cost
1
CONTRACT COST
$688,134
2
PERMITS
$30,000
SUBTOTAL- CONTRACT AND PERMITS
$718,134
100%
3
CONTRACT ADMINISTRATION/ INSPECTION
$74,866
14%
4
PREBID EXPENDITURES
$30,000
4%
5
TOTAL PROJECT COST
$823,000
6
FUNDS AUTHORIZED TO DATE
$30,000
7
ADDITIONAL ALLOCATION NEEDED
$793,000
N: \PESUP\Cbradley \POSITION PAPERS \Godsey \5547 Award PP Phase 6.doc Page 4 Of 4
Central Contra Costa Sanitary District
' BOARD OF DIRECTORS
POSITION PAPER
Board Meeting Date: August 6, 2009 No.: 6.d. Bids and Awards
Type of Action: AUTHORIZE AWARD OF CONTRACT
subject: AWARD A CONTRACT AND AUTHORIZE THE GENERAL MANAGER TO
PURCHASE UNINTERUPTABLE POWER SUPPLY (UPS) ELECTRICAL BACKUP
SYSTEM WITH POWER SYSTEMS ENGINEERING FOR THE TREATMENT
PLANT EQUIPMENT REPLACEMENT PROJECT, DISTRICT PROJECT 7265
Submitted By: Initiating Dept. /Div.:
Stephanie King, Purchasing & Administration /Purchasing and Materials
Materials Manager
REVIEWED AND RECOMMENDED FOR BOARD ACTION:
. Newkirk S. Kin raves James
ZI General
ISSUE: On April 30, 2009, four (4) sealed bids were received and opened for the
purchase of an uninterruptible power supply (UPS) electrical backup system as a
replacement for the existing UPS unit at the Headworks which has reached the end of
its useful life from the Treatment Plant Equipment Replacement Project, District Project
No. 7265. The Board of Directors must authorize all District project contracts which are
greater than $15,000.
RECOMMENDATION: Staff recommends that the Board of Directors authorize the
General Manager to award a contract for the purchase of an uninterruptible power
supply (UPS) electrical backup system for the Treatment Plant Equipment Replacement
Project, DP 7265, to the lowest responsive bidder, Power Systems Engineering, for a
Toshiba UPS system at a price of $33,172.91 from and by competitive bid and subject
to submittal requirements.
FINANCIAL IMPACTS: The total cost to purchase this equipment is $33,172.91.
ALTERNATIVES /CONSIDERATIONS: Reject all bids, which is not recommended.
BACKGROUND:
This new UPS system will be located in the Headworks and is to replace the existing
UPS that has reached the end of its useful life. This equipment will be funded from the
Treatment Plant Equipment Replacement Project, District Project No. 7265. The
project was advertised on April 6 and 11, 2009. Four (4) sealed bids were received and
publicly opened on April 30, 2009. Bids ranged from $33,172.91 to $40,660.73. A
technical and commercial review of the bids indicates that Power Systems Engineering
is responsive and responsible, with the low bid amount of $33,172.91.
H: \DRAFT Position Paper Purchase of UPS.doc Page 1 of 2
POSITION PAPER
Board Meeting Date: August 6, 2009
subject. AWARD A CONTRACT AND AUTHORIZE THE GENERAL MANAGER TO
PURCHASE UNINTERUPTABLE POWER SUPPLY (UPS) ELECTRICAL BACKUP
SYSTEM WITH POWER SYSTEMS ENGINEERING FOR THE TREATMENT
PLANT EQUIPMENT REPLACEMENT PROJECT, DISTRICT PROJECT 7265
Staff has concluded that this project is exempt from the California Environmental
Quality Act (CEQA) under CCCSD CEQA Guidelines Section 15302 since it involves
reconstruction of an existing facility at substantially the same location and with the
same purpose and level of activity as the facility being replaced. Approval of this
project will establish the Board of Directors' independent finding that this project is
exempt from CEQA.
RECOMMENDED BOARD ACTION: Award of a purchase to Power Systems
Engineering, the lowest responsive bidder, in the amount of $33,172.91 for the
purchase of an uninterruptible power supply (UPS) electrical backup system from the
Treatment Plant Equipment Replacement Project, District Project No. 7265, and
authorize the General Manager to award the contract, subject to submittal
requirements.
HADRAFT Position Paper Purchase of UPS.doc Page 2 of 2
Central Contra Costa Sanitary District
July 30, 2009
TO: HONORABLE MEMBERS OF THE BOARD
FROM: JIM KELLY, GENERAL MANAGER Pa7-
SUBJECT: DRAFT "WILL- SERVE" LETTER FOR CONCORD NAVAL WEAPONS
STATION (AGENDA ITEM 7.a.1)
As the Board is aware, Contra Costa Water District (CCWD) has requested that the
District provide it with a commitment to supply recycled water for use at the Concord
Naval Weapons Station. CCWD seeks a commitment at this time as at some time in
the near future Concord will request CCWD to provide a water supply assessment
document to address the general availability and means of water supply to the new
development. Staff has reviewed this request and determined that the District can not
enter into a binding agreement or commitment until other prerequisites have occurred
including such actions as CEQA compliance for the proposed Base Closure Plan.
However, the Board has made clear its commitment to maximize the use of recycled
water. Accordingly, the attached letter has been developed to formally state the
District's clear intention to cooperate with the City of Concord and CCWD in order to
supply recycled water to the Concord Naval Weapons Station Redevelopment Area in a
cost effective and environmentally sound manner, subject to certain practical and legal
considerations as indicated in the letter.
The attached "Will Serve" Letter has been drafted and reviewed by the Recycled Water
Committee. The attached draft includes the Committee's comments. Staff is seeking
Board input and authorization on behalf of the District Board to send the letter to the
City of Concord and CCWD. Staff suggests the letter be from the Board President to
emphasize the District's commitment to providing recycled water to the future
development on the Concord Naval Weapons Station.
CSO /H: \General Manager's Directory\Memos\2009 \Wil1 Serve Letter Cover Memo 8-6.doc
FA
1
July 16, 2009
Central Contra
Mr. Joseph L. Campbell
President, Board of Directors
Contra Costa Water District
1331 Concord Avenue
P.O. Box H2O
Concord, CA 94524
E DRAFT
Sanitary District
Mayor Laura Hoffmeister
City of Concord
1950 Parkside Drive
Concord, CA 94519
Dear President Campbell and Mayor Hoffmeister:
PHONE.: (925) 228 -9500
FAX. (925) 676 -7211
www.ceatralsaii.org
JAMES M. KFLLY
General Manager
KENTON L. ALM
Counsel for the District
(5 10) 808 -1000
ELAINE R. BOEHME
Secretary of the District
CCCSD'S PROVISION OF RECYCLED WATER TO THE CONCORD COMMUNITY
REUSE PROJECT
This letter is in response to a request from the Contra Costa Water District (CCWD)
for commitment from the Central Contra Costa Sanitary District ( CCCSD) for the
supply of recycled water to the Concord Community Reuse Project (CCRP), also
known as the Concord Naval Weapons Station (CNWS) Project. Water recycling is
an integral part of CCCSD's mission to protect public health and the environment
through maximizing use of this valuable resource. CCCSD is committed to recycling
high - quality water meeting all regulatory requirements in ways that enhance the
regional water supply. CCCSD is willing and able to serve recycled water to the
CCRP.
CCCSD is expressing its willingness and ability to supply the needed recycled water
in the form of this "will serve" letter. It is CCCSD's understanding that the exact
amount of recycled water needed for the CCRP has not yet been determined but that
current estimates, as contained in the June 2009 Administrative Draft of the
Environmental Impact Report, are up to 3,000 acre feet of recycled water per year for
irrigation purposes, and CCWD indicates it could be as much as 6,000 acre feet per
year. It is CCCSD's intention to supply, or make available, recycled water in sufficient
quantity to meet the needs of the CCRP as determined by the City of Concord, up to
the 6,000 acre feet per year.
The State Water Resources Control Board has granted CCCSD the authority to
provide up to 26,120 acre feet of recycled water per year for irrigation and industrial
purposes. There are no water transfer or entitlement costs associated with making
use of water made available by this grant. CCCSD currently only supplies
BOARD OF DIRECTORS
JAMES A. NEJEDLY, President • MICHAEL R. WGILL, President Pro Tem • BARBARA D. HOCKETT • GERALD R. LUCEY • MARIO M. MENESINI
eRecycled Paper
President Campbell and Mayor Hoffmeister
July 16, 2009 ME DRAFT
Page 2
approximately 700 acre feet of recycled water annually; accordingly, it has sufficient
recycled water supply available to meet even the highest demand estimates for the
project.
Delivery of recycled water to the CCRP would require construction of a pipeline
connecting CCCSD's facility to the CCRP and potentially construction of a reservoir or
other facilities on the CCRP property.. Expansion and renovation of CCCSD's existing
tertiary treatment facility would also be required. The specific needs and associated
costs for additional recycled water facilities depend on refinement of recycled water
demands of the CCRP as determined by future planning and legal considerations. All
projects and related construction activities require separate environmental and
technical analysis and project -level approval by CCCSD and possibly other agencies
in the future. However, sufficient time and basic resources are available to meet the
current base reuse development schedule, as we understand it.
In addition to the construction of any necessary capital improvements, CCCSD's
ability to provide recycled water to the CCRP will be subject to certain future actions
of the City of Concord, the Reuse Commission, and potentially other governmental
entities, as well as other financial and institutional agreements, as documented in the
Attachment to this letter.
CCCSD is committed to supporting the use of recycled water in the CCRP in the most
.cost- effective and environmentally -sound manner. CCCSD stands ready to work with
;the City of Concord, the Base Reuse Commission and CCWD to provide recycled
water consistent with future approvals and environmental review. Given the
importance to CCCSD of providing recycled water services to the CCRP, our Board of
Directors has reviewed this matter and authorized sending this letter as confirmation
of its clear intention to supply recycled water upon successfully addressing the
conditions set forth above.
If you have any questions, feel free to contact James M. Kelly, General Manager at
(925) 228 -9500.
Sincerely,
James A. Nejedly
President, Board of Directors
cc: Daniel E. Keen, City Manager, City of Concord
Michael W. Wright, Reuse Project Director, City of Concord
Walter J. Bishop, General Manager, CCWD
Jerry Brown, Assistant General Manager, CCWD
President Campbell and Mayor Hoffmeister
July 16, 2009
Page 3
ATTACHMENT
CCCSD's ability to commit to the supply of recycled water to the Concord Community
Reuse Project is dependent upon the actions noted below:
1. The City of Concord, the Federal authorities and either CCCSD or CCWD must
complete necessary environmental review including the use of recycled water in
accordance with the California Environmental Quality Act ( "CEQA ") and National
Environmental Protection Act ( "NEPA ").
2. The City of Concord, along with other applicable planning entities, must
determine the basic recycled water flow rates, uses, system demands and
requirements, such as any requirements for backup water supply, storage, fire
uses, etc.
3. Mechanisms must be in place to ensure that all CCCSD cost of recycled water,
including the treatment and delivery infrastructure, cost of regulatory compliance,
as well as other direct costs, if any, associated with the use of recycled water is
borne by the new users and /or developers of the CCRP.
4. A formal agreement between CCCSD and CCWD, or CCCSD and the City of
Concord, as to the supply of recycled water to CCRP by CCWD or CCCSD may
be required as a condition prior to obtaining service. Other service agreements
.will be necessary with the parties that are to receive recycled water service.
5. :Unforeseen circumstances, and any changes in local, state, or federal law
adversely affecting CCCSD's ability to supply recycled water to the CCRP, if any,
will have to be addressed.
7.a.2)
Central Contra Costa Sanitary District
July 30, 2009
TO: BOARD OF DIRECTORS
VIA: JAMES M. KELLY, GENERAL MANAGER
FROM: TAD PILECKI, CAPITAL PROJECTS DIVISION MANAGER I
SUBJECT: STATUS UPDATE ON CASA'S PROPOSED LEGISLATION FOR PRIVATE
SEWER LATERALS (PSL)
In preparation for the upcoming CASA Annual Conference in San Diego on August
12 -15, 2009, staff has prepared the following summary on the status of CASA's proposed
legislation pertaining to PSLs:
• Scheduled PSL discussions at CASA's upcoming conference
• Feedback from the League of Cities on Proposed PSL legislation
• Feedback from the Association of Counties on Proposed PSL legislation
• Feedback from the Rural Counties on Proposed PSL legislation
• Lessons learned from Padilla Bill
• PSL conference calls and activities
• Agencies opposing PSL legislation
Detailed back -up information is provided in the attachments. In summary, opposition to a PSL
bill has increased and the PSL Task force is considering options to legislation. The PSL Task
Force plans to have a recommended course of action for the CASA Board at CASA's annual
meeting in August.
CASA's 54 Annual Conference: The issue of PSLs will be discussed at the following venues
at the conference:
• Executive Board Meeting, Wednesday August 12 from 2 to 5 PM
Outreach update from Michael Dillon
Present PSL Task Force Recommendation
Receive Board direction on next steps
• . PSL Task Force Meeting, Friday, August 14 from 8 to 9 AM
- Update on response from Executive Board
- Discuss approach for next steps
• General Membership Meeting, Friday, August 14 from 11:30 to 12:00
- Outreach update
Update on response from Board
N: \PES U P \PI LEC KI\2009\PS L -U pdate. d oc
PSL Update
Page 2
July 30, 2009
League of Cities: Dave Williams (EBMUD) and Michael Dillon (CASA Lobbyist) presented
the proposed PSL ordinance issue to the League of Cities Transportation, Communication and
Public Works Committee ( TCPWC) on Friday June 26. The committee took a straw vote (no
quorum present) that recommended conceptual support of the legislation, pending review of
the actual language. On July 17, the League of Cities Executive Board considered the
TCPWC's recommendation and took no action. District sources indicate that the Executive
Committee supports, in concept, that the PSL issue needs to be addressed, but felt that it
should be done at the local level and not through state -wide legislation. The TCPWC will
reconsider the issue at its next meeting in late January 2010 and any recommendation will be
considered by the Executive Board in February 2010, if CASA is still proposing legislation.
(See Attachment 1 for additional details).
California State Association of Counties (CSAC): No formal presentation was made to the
CSAC, but CSAC staff did outline CASA's proposed PSL ordinance in their July Legislative
Bulletin with a request for comment. Both Los Angeles and Lassen Counties had contacted
CSAC with concerns pertaining to the proposed PSL ordinance. No counties expressed
support for the proposed ordinance. CSAC hopes to get more responses before CASA's
August Conference, but their CSAC's lobbyist did state that she was not sure if "they have a
dog in this fight." (See Attachment 1 and 2 for additional details).
Regional Council of Rural Counties (RCRC): No formal presentation was made to the
RCRC, but just like CSAC, RCRC staff request input from their membership in their weekly
newsletter known as "The Barbed Wire." No comments have been received to date. Michael
Dillon felt that most of the rural counties will be exempt from the proposed legislation because
of their small size. (See Attachment 1 and 3 for additional details).
Lessons Learned from the Padilla Bill (SIB 407): CASA's PSL Task force has been tracking
the progress of this bill since it is very similar in concept to the proposed PSL ordinance.
Michael Dillon prepared a brief write -up on how the Padilla Bill has been transformed from an
original point of sale requirement into a fairly weak requirement for replacement of
noncompliant fixtures in all single family home by 2017 and disclosure of noncompliant fixtures
at point of sale by 2011. (See Attachment 1, third page, for additional details). In an analysis
to CASA's PSL Task Force, he said that if CASA's proposed PSL ordinance followed a path
similar to the Padilla Bill (which he feels is very likely) that the resulting legislation may be a
vague bill with few teeth and extended deadlines. .
CASA's PSL Task Force Conference Call: The PSL Task Force conducted a conference
call meeting on July 23, 2009. The key points discussed at the meeting were:
- Michael Dillon provided an update on the outreach effort.
- Discussed the likely fate of the proposed ordinance in light of the Padilla
Bill experience.
- Potential impacts of a divided CASA on the PSL issue.
- Discussed what recommendation the Task Force should make to CASA's
Executive Committee.
NAPES UP \PI LEC K I \2009\PS L- Update.doc
PSL Update
Page 3
July 30, 2009
Decided to schedule one more conference call on August 4 to discuss
the following three options after which an email vote of the Task Force
members will be taken. (See Attachment 4 for additional details).
Option 1 - Proceed on current course knowing that the resulting
bill may be vague with few teeth and extended deadlines.
Option 2 - Restructure the proposed ordinance by abandoning the
point of sale and mandatory ordinance language.
Option 3 — Do not proceed with legislation; instead develop model
local ordinance and tools for implementation.
Agencies that have submitted Letter to CASA Opposing the Proposed PSL Ordinance:
• Central Contra Costa Sanitary District
• Union Sanitary District
• Oro Loma Sanitary District
• West County Wastewater District
• Leucadia Wastewater District
• Fairfield- Suisun Sewer District
/jf
Attachments
N: \PE S U P \P I LECKI\2009 \PSL -U pdate. d oc
i
Agenda Item 7.a.2
PRIVATE SEWER LATERAL
LEGISLATION
BOARD UPDATE
August 6th, 2009
AGENDA
• CASA's Outreach Program
• Padilla Bill
• PSL Task Force Meetings
• CASA's Annual Conference
1
CASA'S OUTREACH PROGRAM
• League of Cities
- Communication, Transportation and
Public Works Committee
- Executive Committee
• California State Association of Counties
• Regional Council of Rural Counties
FATE OF PADILLA BILL
• Bill Similar in Concept to CASA's
Proposed PSL Legislation (Water
Conservation Fixtures).
• Transformed From Point of Sale
Requirement to a Date in the Future.
• Bill is Vague with Few Teeth and
Extended Deadlines.
1
`;
1
r
r
i
PSL TASK FORCE MEETINGS
• July 23,d Meeting
- Outreach Effort
- Padilla Bill
- Impacts of a Divided CASA
- Likely Fate of Bill
- Discussed What Recommendation the
PSL Task Force Should Give the
Executive Board.
PSL TASK FORCE MEETINGS
• Task Force Recommendation Options:
- Option 1: Stay the course knowing the
bill may be vague with few teeth and
extended deadlines.
- Option 2: Restructure the proposed
legislation by abandoning the point of sale
and mandatory ordinance language.
- Option 3: Do not proceed with
legislation; develop model local ordinance
and tools for implementation.
c1
PSL TASK FORCE MEETINGS
August 4th Meeting:
- Agreed on Options to Vote on
- Votes by Task Force Members Need to be
Cast By 8/7; Results will be Available Next
Week and Shared with the Executive
Board on Wednesday
LETTERS OF OPPOSITION
• Central Contra Costa Sanitary District
• Union Sanitary District
• Oro Loma Sanitary District
• West County Wastewater District
• Leucadia Wastewater District
• Fairfield- Suisun Sewer District
• Modoc County Health Services
Environmental Health Department
0
i
Cv
r
CASA's ANNUAL CONFERENCE
Issue of Private Sewer Laterals Will Be
Discussed in Three Forums
- Executive Board Meeting (Wednesday -
Open Meeting)
- PSL Task Force Meeting (Friday)
- General Membership Meeting (Friday)
QUESTIONS
5
July 14, 2009
CALF91#9 ASSOC ARN of SWAM# ARMS
1215 K Street, Suite 2290, Sacramento, CA 95814 PH: (916) 446 -0388 — FX: (916) 231 -2141 www.cwaweb.org
To: CASA Executive Board
CC: PSL Task Force
From: Mike Dillon, Lobbyist
VIA ELECTRONIC MAIL
RE: PSL Presentation to League of Cities Transportation, Communications, and
Public Works Committee
I. Executive Board Direction
At the May Executive Board meeting, the Board directed me to share'with the League of
Cities, California State Association of Counties, and the Regional Council of Rural
Counties, that CASA was considering possible legislation regarding inspection of Private
Sewer Laterals (PSLs) at the time the property is sold. Subsequently, I provided CASA's
draft legislation to these organizations, and asked for their comments for purposes of
reporting back to the Executive Board at the August conference. The Board also
suggested that Dave Williams, and /or any member of the PSL Task Force, attend any of
the meetings with me, to provide technical assistance.
II. Presentation to League of Cities
On Friday, June 26th, Dave Williams and I met with the League of Cities Transportation,
Communications, and Public Works Committee, which consisted of about 30 people,
including elected officials, and appointed department leadership, and one city attorney.
After a brief introduction, and a description of CASA's membership, we noted the time and
effort the PSL Task Force had put in to developing the background material and the draft
legislative proposal. Dave made a formal presentation, using the attached PowerPoint.
The presentation lasted about fifteen minutes, with questions and answers following. In
addition to explaining the need for the proposed PSL legislation, Dave did a good job
trying to raise the issues expressed by the Central Contra Costa Sanitary District, and
several of our CASA members who are opposed to CASA's proposal. The CCCSD letter,
along with the task force fact sheet and the draft legislation, was sent to the committee by
members of the League's staff earlier in the week. During the presentation, we mentioned
that the League's support of the draft legislation would be an important consideration in
CASA's determination whether or not to go forward with the introduction of a bill next year.
At the conclusion of the presentation, there were a number of questions and comments.
One council member asked, for example, what percentage of 181 was attributable to
homes and businesses, versus the Public Agencies' own systems. One mayor felt that in
his city (Sunnyvale), FOG was the greater problem, and that requiring inspections at point
of sale, would take 100 years to correct any problems. Another person suggested that a
better approach would be to address the PSL problem by increasing the monthly billing,
with the agency taking the responsibility. One person who had just experienced a problem
with her sewer lateral in the purchase of an older house emphasized the proposed
legislation contained "opt -out provisions." Lastly, the city attorney for Pacifica stated that
their wastewater agency had implemented a loan structure program, and that they had
previously tried point of sale, and "the realtors killed it." She strongly supported the
proposed legislation. Somewhat to Dave and my surprise, when the chair asked for a
consensus vote at the conclusion of the discussion, it appeared that on a vote of about 14-
2 showing of hands, a "support, in concept" position on the proposed legislation was taken.
However, in a subsequent conversation, the League of Cities lobbyist, Jennifer Whiting,
indicated that the League's Board of Directors would make the final determination as to a
position. Fortunately, the Board is meeting this Thursday and Friday, and Jennifer said
she would get back to me on Monday with any actions that were taken. Finally, it is
important to note that the League, like most organizations in Sacramento, do not take
formal positions on legislation until the bills have actually been introduced in the
Legislature.
III. California State Association of Counties (CSAC) — Request for Comment
There was not a formal opportunity for Dave or me, or any member of the PSL Task Force
to make a presentation to one of CSAC's Committees. However, Karen Keene, CSAC's
Lobbyist, whom I have kept apprised of CASA's activities on the PSL issue since last
October, initially shared the draft legislation, background material, and CCCSD opposition
letter with their flood control and water resources committee to determine the extent of
CSAC's interest. Since it was a small committee of Deputy Directors of Public Works, I
asked if she would share it with a broader group. Karen was kind enough to outline
CASA's proposal in their July Legislative Bulletin, with a request for comment (see
attached). Karen will be sharing with me any comments that are received in the next few
weeks.
IV. Regional Council of Rural Counties (RCRC) — Request for Comment
RCRC, whose membership consists of 31 mostly rural counties, did not have an
appropriate venue to make a formal presentation. Kathy Mannion, the Association's
Lobbyist, whom I have also kept informed of CASA's activities, has also asked for
comment from her members in their weekly newsletter, called "The Barbed Wire" (see
attached). Kathy will be getting back to me with comments as appropriate.
V. Lessons Learned from SB 407 Padilla
Similar to the approach envisioned in CASA's proposed PSL legislation, SB 407 Padilla,
as introduced earlier this year, required that all residential and commercial properties built
before 1994 would be required to have all plumbing fixtures that "are not water - conserving
plumbing fixtures" replaced prior to the time of sale or transfer by the property owner.
Senator Padilla, along with the co- sponsors ACWA and Metropolitan Water District
(MWD), argued before legislative committees that, in light of California's drought
conditions, numerous efforts had to be undertaken to save and conserve water supplies.
The bill was strongly opposed by the California Association of Realtors and the California
Business Properties Association. In order to gain passage in the initial policy committee,
Senator Padilla was forced to remove the disclosure requirements in the bill. Despite this
amendment, opposition continued, and as amended for the fourth time on July 1, the bill
now would:
1) Establish requirements for residential and commercial property built before January 1,
1994, for replacing plumbing fixtures that are not water conserving.
2) After January 1, 2014, require, for all building alterations or improvements to single -
family residential property, that water - conserving plumbing fixtures replace other non-
compliant plumbing fixtures as a condition for issuance of a certificate of final completion,
etc.
3) Before January 1, 2017, all non - compliant plumbing fixtures in any single - family
residential property shall be replaced by the property owner with water - conserving
plumbing fixtures.
4) Before January 1, 2019, all non compliant plumbing fixtures in multi - family residential
real property and commercial real property shall be replaced with water - conserving
plumbing fixtures.
5) After January 1, 2014, similar provisions to the above would apply to multi - family
residential and commercial properties.
6) After January 1, 2011, a seller or transferor of single - family residential property, multi-
family residential property, or commercial property must disclose to a purchaser or
transferee, in writing, the specific requirements for replacing plumbing fixtures, and
whether the real property includes non - compliant plumbing.
Article from CSAC Legislative Bulletin ()
July 10, 2009
Agriculture and Natural Resources
For more Information, contact Karen Keene at 916/327 -7500, ext. 511, or e-mail
kkeene@counties.org or Cara Martinson at 915/327 -7500, ext. 504, or email
cmarti nson (acounties.ora.
Private Sewer Laterals
Proposed Legislation — Request Comment
The California Association of Sanitation Agencies (CASA) is considering the possible introduction of
legislation regarding the Inspection of private sewer laterals (PSLs) at the time of the sale of a home.
A private sewer lateral (or private lateral) is the pipe that transports wastewater from a building to
the public sewer main In the street.
The proposed legislation would require sanitation agencies to adopt ordinances that mandate
property owners to obtain a compliance certificate through Inspection, testing, repair, or replacement
of their private laterals. New and existing ordinances would be required to meet minimum
requirements defined by the legislation, but agencies will have the discretion to adopt a more
stringent ordinance. Each agency will determine how best to structure Its own PSL ordinance and
certification program, what standards PSLs must meet, and how to fund any required resources
needed to Implement the program. Agencies will not be required to perform inspection, testing,
repair, or replacement. The cost of work to obtain certification will be paid by the property owner.
Very small sanitation agencies, and those that can show that private laterals in their service areas
have no significant detrimental impact, would be excluded from the legislative requirements.
CASA has requested that CSAC seek comments from the counties regarding this proposal. Counties
interested in providing input on the proposal may visit the CSAC Web site to review the actual
language and white paper. CSAC staff would like to know if counties are supportive of the proposal
or if they have concerns. Please submit your comments to Karen Keene, CSAC Legislative
Representative, by July 27.
Energy
AB 222 (Adams) — Support
As Amended on July 8, 2009
AB 222, by Assembly Member Anthony Adams, passed out of the Senate Energy Committee this
week. This bill would update the Integrated Waste Management Act of 1989 to incorporate changes
that will enable and expedite the production of advanced, non -food derived biofuels, green power,
and other bio -based products from biomass. CSAC supports this bill because it will help California
achieve the goals of Its Renewable Portfolio Standard, Low Carbon Fuel Standard and Bioenergy
Action Plan and aid local governments in achieving higher solid waste diversion rates. The bill is set
for hearing on July 13 in the Senate Environmental Quality Committee.
AB 262 (Bass) — Support
As Amended on April 14, 2009
AB 262, by Assembly Speaker Karen Bass, was passed out the Senate Energy Committee this week.
CSAC has received Indication from the author that this bill will be gutted and no longer contain Its
current provisions. However, language included in AB 262 has been Incorporated into a budget trailer
bill and will make the necessary changes to conform to the statute governing the Energy Efficiency
and Conservation Block Grant Program (EECBG) to the federal American Recovery and Reinvestment
Act (ARRA) guidelines, and provide a necessary fix to an eligibility issue that currently excludes 13
counties from the EECBG Program. Furthermore, the California Energy Commission (CEC) has
released their draft guidelines for the EECBG program, and It specifies eligibility criteria that include
the previously excluded 13 counties. To view a copy of the guidelines, visit the CEC Web pace.
ARRA — EECBG Program
Workshops
The CEC has announced several more workshops around the state to Invite stakeholder input on the
development of the EECBG guidelines. To see more information about the workshops, which will be
held next week in San Diego, Ripon and Santa Ana, visit the CEC Web pace.
AB 64 (Krekorian) — Oppose
As Amended on June 23, 2009
AB 64, by Assembly Member Paul Krekorlan, passed out of the Senate Energy Committee this week
by a narrow margin. This bill would Increase California's Renewable Portfolio Standard (RPS) to
require all retail sellers of electricity and all Publicly Owned Utilities (POUs) to procure at least 33%
of electricity delivered to their retail customers from renewable resources by 2020. The bill would
also establish the Energy Planning and Infrastructure Coordinating (EPIC) committee to develop a
strategic plan to Identify and rank renewable energy development zones, along with the needed
transmission and distribution necessary to access those zones.
CSAC has joined with the League of California Cities (League) In opposing a provision in the bill that
would transfer the responsibility of siting renewable energy facilities between 5 megawatts and 50
megawatts from local governments to the newly created Energy Planning and Infrastructure
Coordinating committee. CSAC and the League have indicated to the author that this siting authority
has long been the purview of local governments and we do not believe this authority should be taken
away. This bill now moves to the Senate Appropriations Committee.
Fire
SB 505 ( Kehoe) — Oppose
As Amended on June 1, 2009
SB 505, by Senator Christine Kehoe, passed out of the Assembly Natural Resources Committee on
July 6. This bill would amend the general plan safety element requirements for state responsibility
areas (SRA) and very high fire hazard severity zones. It would also attempt to strengthen the
development review process under California Environmental Quality Act (CEQA) by expanding the
Initial study checklist to address fire hazard Impacts of projects. CSAC, along with the Regional
Council of Rural Counties (RCRC), is opposed to this bill because of the potential Implementation
costs, which will be in the thousands of dollars depending on the amount of public outreach,
controversy, and environmental review. Counties Impacted by this measure are urged to provide
CSAC staff with anticipated cost estimates associated with the bill's implementation. SB 505 now
moves to the Assembly Appropriations Committee.
Solid Waste
SB 25 (Padilla) — Oppose
As Amended on July 28, 2009
SB 25, by Senator Alex Padilla, was held in the Assembly Natural Resources Committee this week.
This bill would have increased the solid waste diversion mandate on local governments to 60% by
January 1, 2015, with a state -wide goal of 75% diversion by 2020.
Pubished by CSAC
Powemd by IMN
THE BARBED WIRE
Llpdotei for the week 01 1one 22 -20, 2009
COUNTY INPUT REQUESTED...
Action Needed to Defeat Suction Dredge Mining Moratorium
RCRC continues to strongly oppose SB 670 (Wiggins, D -Santa Rosa), which would prohibit suction dredge mining until
the Department of Fish and Game (DFG) completed a new Environmental Impact Report (EIR) and adopted new
regulations relating to suction dredge mining. Currently, the bill is in the Assembly Appropriations Committee.
To help with these efforts RCRC is requesting that counties submit data regarding how much revenue is generated by
mining claims in your county for 2009 and any previous (3 or more) years for which you have data. As this revenue is
taxable at a rate of 1 percent of the assessed value, these mining activities generate needed funds for many counties.
RCRC has joined with others stakeholders to oppose SB 670, and it will be helpful to our efforts to quantify the financial
impact the proposed moratorium will have on counties.
Please send this information to, and for additional details or questions, please contact RCRC Legislative Advocate,
Cyndi Hillery, chillerv(a )rorcnetoro.
CASA Requesting Feedback on Private Sewer Laterals
The California Association of Sanitation Agencies (CASA) is requesting feedback from RCRC and other local
government associations on proposed legislation dealing with private sewer laterals. A private sewer lateral is the pipe
that transports wastewater from a building to the public sewer main in the street. The State Water Resources Control
Board requires sanitation agencies to maintain pubic sewer lines, but there is no statewide program that mandates the
maintenance of private laterals.
CASA is proposing statewide legislation that would require public sanitation agencies to adopt ordinances that mandate
the maintenance of private laterals. The proposed legislation recommends a set of minimum standards for the
inspection, testing, repair, or replacement of private laterals. The ordinances would mandate property owners to obtain
a compliance certificate through inspection, testing, repair, or replacement of their private laterals. The cost of work to
obtain certification would be paid by the property owner.
A sanitation agency ordinance would mandate property owners to obtain a compliance certificate, at a minimum, under
two conditions: 1) If a private lateral is determined by the sanitation agency to pose a nuisance or threat to public health;
2) Upon sale or transfer of their property.
The CASA fact sheet on the proposed legislation can be accessed at:
hffp://www.rcrcnet.org/pub/barbedWre/2009/BWCASAfactsheet.pd
The CASA proposed draft language can be accessed at:
hftp://www.rcrcnet.oLq/pub/barbedWre/2009/BWCASAlegislation.pd f
RCRC is requesting comments on the CASA proposal from member counties. Please provide your comments to Kathy
Mannion at (916) 4474806 or kmannion @rcrcnet.org.
FEDERAL UPDATE...
House Transportation Committee Begins Work on Highway Bill
This week, amid a flurry of pre- recess activities in Congress, the House Transportation and Infrastructure Committee
released its blueprint for the next highway and transit authorization act. The bill, entitled simply, the Surface
Transportation Authorization Act of 2009, was not formally introduced in the House of Representatives, but did get
official consideration and unanimous approval by the Subcommittee on Highways and Transit. The bill does not contain
any overall dollar amounts, funding formulas, or project earmarks.
Committee Chairman James Oberstar (D- Minn.) announced that he plans to move forward with consideration of the bill
by the full Transportation and Infrastructure Committee in late July. However, that type of progress is contingent upon a
funding deal with the House Ways and Means Committee and the White House. Oberstar has stated the bill could total
more than $450 billion over six years. SAFETEA LU, which expires in September, provided a total of $286 billion.
The Obama Administration came under heavy fire at the mark -up by Democrats and Republicans alike for announcing
their desire for Congress to enact an 18 month extension of the current law and work on the highway bill after the 2010
elections. Subcommittee Chairman Peter DeFazio (D -Ore.) said, "An 18 month delay is not acceptable." Full
Committee Ranking Member John Mica (R -Fla.) added, "We need to move forward... this is our jobs bill, our true
stimulus bill."
The Obama Administration has also been very clear that they strongly oppose an increase in the federal gasoline tax,
currently 18.3 cents per gallon. Additionally, they are opposed to moving the financing of the Highway Trust Fund (HTF)
to a vehicle miles traveled fee scheme. Currently the HTF is again on its way to bankruptcy and will not be able to
support the existing program without at least a $5 -6 billion bailout by August. Last year, the HTF needed an infusion of
$8 billion in emergency funding to remain solvent.
The legislation, which is more than 775 pages in length, follows the outline released by Oberstar a few weeks ago. The
bill would attempt to collapse over 100 separate funding categories into four major highway formula programs: .
• Critical Asset Preservation — includes the National Highways System, Interstate and bridge programs;
• Highway Safety Improvement Program (in which he included rural road safety);
• Surface Transportation Program; and
• Congestion Mitigation and Air Quality Program
Additionally, the Oberstar proposal would create a new Freight Transportation Formula program, and Metropolitan
Mobility and Access program for metro areas over 500,000 in population. RCRC staff is reviewing the bill and will
provide more details to members in the comings weeks. Details of the Surface Transportation Authorization Act of 2009
can be found at: http: / /transportation.house.gov/
Senate Committee Approves Controversial "Waters of the U.S." Legislation; Filibuster Expected
On June 18th, the Senate Environment and Public Works Committee, on a strict party line vote, approved the
controversial Clean Water Restoration Act (S. 787). The legislation, sponsored by Senator Russ Feingold (D- Wisc.),
attempts to clarify federal jurisdiction over the nation's water under the Clean Water Act (CWA). Proponents contend
that conflicting Supreme Court decisions have caused confusion and different interpretations of the role of the federal
government regulating the nation's waterways.
Specifically, S. 787 would remove the word "navigable" from the CWA, and would further define "Waters of the United
States" to include all water subject to the ebb and flow of the tide, the territorial seas, and all interstate and intrastate
waters and their tributaries, including lakes, rivers, streams (including intermittent streams), mudflats, sandflats,
wetlands, sloughs, prairie potholes, wet meadows, playa lakes, natural ponds, and a impoundment of the foregoing, to
the fullest extent that these waters, or activities affecting these waters, are subject to the legislative power of Congress
under the Constitution.
The EPW Committee adopted an amendment by Senator Max Baucus (D- Mont.) that was proposed as a compromise on
the bill. The Baucus amendment clarifies that the CWA's jurisdiction would reflect the state of the law in 2001, a date
prior to the two major Supreme Court cases in question. Additionally, the Baucus amendment included exclusions for
existing converted cropland and waste treatment systems.
However, the amendment did not sway any committee Republicans to vote for the legislation. In fact, upon committee
passage of the bill, Senator Mike Crapo (R- Idaho), immediately placed a hold on S. 787, essentially halting Senate floor
consideration of the measure. To move the bill in the future, 60 votes would be needed.
A summary of the CWRA Compromise Amendment can be viewed at:
httD:// www. rcrcnet .or(]/Dub/barbedWre /2009/BW CWRA.odf
Please contact Melissa White, RCRC Federal Affairs Coordinator, at (916) 4474806, with any questions.
REGULATORY UPDATE...
Climate Action Reserve to Consider Updated Forest Project Protocol
The California Climate Action Reserve (CAR) announced Thursday that its Board will consider approving the CAR
Forest Project Protocol Version 3.0 at 1:00 p.m. on Wednesday, July 1 at the CaIEPA Building in Sacramento. The
update was requested by the California Air Resources Board (ARB) after stakeholders, including RCRC, expressed
concern about the limited scope of projects included in the Protocol and the requirement that lands be placed in a
conservation easement before landowners could use the Protocol for carbon accounting. ARB asked for the revisions in
December 2007.
While the final draft addressed many stakeholder concerns, the Protocol still considers woody material harvested for use
in the energy sector as an emission, rather than taking the entire life -cycle into account. CAR representatives insisted
that the Protocol will be revised in the future once the energy sector protocol is developed, but landowners that use the
protocol to account their carbon will be penalized until that time.
If the CAR Board approves the amended Protocol, it will then be considered for endorsement by ARB. The final draft
Forest Project Protocol, Version 3.0 and related documents can be viewed on the CAR website:
hfD:// www. climateactionreserve.org/how -it- works /protocols/ adopted - protocols /forest/forest- Droiect- protocol- update/
For more information on the CAR Forest Project Protocol, contact Staci Heaton at (916) 4474806 or
sheatonorcrcnet.ora.
ANNOUNCEMENTS...
Will Kempton to Depart Caltrans
This week, California Department of Transportation (Caltrans) Director Will Kempton announced he is leaving state
service at the end of July, He is expected to move south to head the Orange County Transportation Authority. Kempton
was appointed Director of Caltrans by Governor Schwarzenegger in November 2004.
In a statement the Governor commended Kempton's service to the state, stating, "Will has been an incredible driving
force behind rebuilding California's infrastructure and especially instrumental in quickly moving federal stimulus dollars
out the door to transportation projects around the state," said Schwarzenegger. Additionally, the Governor announced
that he will appoint Caltrans Deputy Director Randell Iwasaki to succeed Kempton starting August 1, 2009. Iwasaki has
been with Caltrans for over 26 years.
U.S. EPA Announces Grants for "Climate Showcase Communities"
The U.S. Environmental Protection Agency (EPA) has announced $10 million in grants to local and tribal governments to
establish and implement climate change initiatives that will help reduce greenhouse gas emissions. EPA expects to
award approximately 30 cooperative agreements ranging from $100,000 to $500,000, with approximately 5 percent of
the funds being set aside for tribal governments. Proposals are due by July 22, 2009 at 4 p.m. EDT. Visit EPA's website
for more information:
hftp: / /epa.gov /cleanenergy /energy- programs /state- and - local /showcase html
Federal Agencies Conducting Mandatory Seminars for ARRA State Revolving Fund Recipients
The Office of the Inspector General. and U.S. EPA are conducting seminars throughout California to provide information and
suggestions to help monitor the use of stimulus funds, and to inform funding recipients of the potential for fraud, waste, and
abuse in the State Revolving Fund (SRF) programs. The seminars are mandatory for recipients of ARRA SRF funding.
Additional information may be accessed here: hftp: / /www.rcrcnet.oEg/ pub /barbedwire /2009 /BWOIGtrainingworkshops Ddf
RETI Phase 2A Draft Report Comment Deadline Extended Until July 10
The Renewable Energy Transmission Initiative (RETI) Phase 2A Draft Report (Report) regarding a statewide
transmission plan to access priority Competitive Renewable Energy Zones (CREZ) was released the first part of June,
with a June 26 deadline for public comment. The comment deadline has been extended until July 10, 2009, and should
be sent to Clare Laufenberg Gallardo at claufenb@energv.state.ca.us or mailed to Ms. Gallardo, California Energy
Commission, 1516 Ninth Street, Sacramento, CA 95814. The Report and additional information may be accessed at
hftp: / /www.energy.ca.gov /reti /documents /index.html
Department of Water Resources Schedules Preseason Flood Coordination Meetings
The Department of Water Resources has scheduled a number of Preseason Flood Coordination Meetings throughout
California to provide an overview of future weather and water conditions in the state. Additional information may be
accessed here hftp: / /www.rcrcnet.org/ pub /barbedwire /2009 /BWFlood.pdf
PSL Task Force,
The following message is being sent on behalf of Dave Williams:
During our last Task Force conference call, held on July 23rd, the participants in the call
discussed recent outreach events and alternative approaches for next steps. During
our call, Mike Dillon provided helpful insight on the likely fate of the proposed bill, if it
were introduced in the Legislature, by summarizing recent changes to SB 407 (Padilla
water conserving fixtures bill) and discussing the impact of the divided views of CASA
members regarding the desirability of the legislation. Please see the attached memo
from Mike for more info on how this bill has been transformed from an original point -of-
sale requirement into a fairly weak requirement for replacement of noncompliant fixtures
in all single family homes by 2017 and disclosure of noncompliant fixtures at point of
sale by 2011.
The Task Force also had an extended conversation about what sort of recommendation
the Task Force should make to the CASA Board during the August Executive Board
meeting. Three options for a recommendation were developed on the call, as shown
below. It was determined that a full vote of the Task Force members was needed if the
Task Force would be making a recommendation on this critical issue to the CASA Board
on one of the options. Since not all members were represented on the call, it was
decided to hold another conference call prior to a Task Force vote. Our next call will be
held on Tuesday, August 4th, 9 -10am. Prior to the call, please review the proposed
alternatives below. On the call, we will be discussing any needed modifications to the
options. After the call, an e-mail will be sent to all 40+ members of the Task Force asking
them to vote on the options.
Option 1: Proceed with sponsoring the draft legislation as is. Based upon potential
opposition both external and internal to CASA, Mike Dillon felt it is likely that, during the
legislative debate, the bill may follow a course similar to that of SB 407: i.e. "watered
down" to remove point -of -sale and mandatory ordinance requirements. Task Force
members should understand that the end result of a legislative effort may be a vague bill
with few teeth and extended deadlines.
Option 2: Abandon the point -of -sale and mandatory ordinance language now and go
directly to development of alternative PSL legislation that may have a higher chance of
being successful in the Legislature yet provides some benefit to CASA member
agencies. For this option, additional time (beyond the end of 2009) may be required to
discuss alternatives and develop the new draft legislative language.
Option 3: Do not proceed with legislation. Instead, the Task Force would develop a
compilation of successful California PSL ordinances /programs and provide model
ordinance tools that can be used by agencies seeking to implement PSL
ordinances /programs on their own.
Please review these options and be prepared to discuss on the August 4th call. If
you are unable to participate in the call, please provide any comments on the
options by e-mail to Heidi Oriol (horiol(d)ebmud.com) by Monday, August 3.
Thank you for your support on this effort,
Dave
7, a . Y)
Central Contra Costa Sanitary District
July 31, 2009
TO: BOARD OF DIRECTORS
VIA: JAMES M. KELLY, GENERAL MANAGER
FROM: TAD PILECKI, CAPITAL PROJECTS DIVISION MANAGER(e)
SUBJECT: STATUS UPDATE ON THE CSOD ADMINISTRATION, CREW AND
WAREHOUSE FACILITY, DP 8208
Following is a brief update on the status of the subject CSOD Facility:
• The City of Walnut Creek finished their reviews of the Building and Site Development
Plans and provided their comments to the District on July 17 and 21 respectively.
• District Staff plans to address the City's Comments and resubmit the package for a
second review by the week of August 24.
• EBMUD, PG &E and Consolidated Fire have been concurrently reviewing the plans and
specifications.
• The District has received from its consultant an updated Engineer's Construction Cost
Estimate for the Improvements at $13 Million.
• At the August 6 Board Meeting, staff will seek the Board's concurrence to advertise the
project. Pending favorable bids, staff will ask the Board to consider award of the project
and to initiate sale of the bonds in October or November.
• Attached for the Board's information are the results of a recent bid opening for a
Police /Fire Facility in Winters, California. This facility is similar in nature to the District's
project. The plans, specifications and Engineer's Estimate were prepared by the same
team that is working on the District's Project. The Engineer's Estimate for the facility
was $10.45 Million. Seventeen bids were received with the low bid at $6,366,000,
thirty -nine percent below the engineer's estimate. Bid results similar to this would be
very favorable for the District's new CSOD Improvements.
/jf
N: \PESUP \PILECKI\2009 \CSO Update.doc
m
0
°o
°o
°o
°o
°o
°o
°o
°C
o
g
o
o
O
n
N
N
O
N
l!1
r�
00
O
O
O
0
W
N
O
O
O
W
O
o
n
n
lO
v
n
r0
N
m
o
r"
m
Sa30lin8 N8
x
x
X
x
x
X
X
x
ca
a'
.-i
oc
ni
e6
M
o
W
i/f
l/?
W
t!f
to
N
to
N
N
vT
n
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
W
r4
01
N
O
d'
'4
00
.--I
00
'+
01
N
M
to
d'
I�
N
00
t`
M
M
r
m
n
m
N.
N
V
N
N
OD
M
N
f�
N3llV MS
x
x
x
x.
x
x
X
x
m
m
c
N
c
c
w
r�
C
N
n
pl
to
N
O
l0
t\
Ql
V1
W
C�
tR
W
to
tJ1
t/T
t/f
N
N
tl}
v?
N
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
o
O
pO
O
O
O
p
O
pO
O
8
0
N0119nN1SNON 090fl
X
X
X
X
X
X
X
X
"0
O
o
ui
o f
00
O
v i
�o
O
vi
ui
vi
o
to
n
m
to
N
V1
d'
n
t0
V
�D
m
th
t/f
aR
H
to
t/T
of
N
N
v1
O
O
O
O
O
O
O
O
O
O
0
0
C
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
s2imiin8 scr
x
x
x
x
x
x
x
x
O
o
N
N
Ci
a
ry
O
kO
ri
rl
1
m
ro
ry
LO
"
N
m
rn
a
00
rn
V
✓}
H
to
to
N
N
to
4/f
aA
to
N
�
N
v1
O
O
O
O
O
O
O
O
O
O
0
0
O
O
O
O
O
O
O
O
O
O
O
O
o
O
O
g
C:,
O
O
O
O
O
O
o
CD
O
O
O
O
O
O
O
O
O
O
o
30VNV219 9G
x
x
x
x
x
x
x
x
�^
M
e0
vi
N
a
vi
Lr
G
Lr
vi
ry
x
kO
n
o
ct
0
Oi
ao
v,
�D
NY
N
H
N
tM1
Vf
t/f
V1
N
th
N
U
�
O
0
0
0
0
0
0
0
0
0
0
0
C
0
0
0
0
0
0
0
0
0
0
0
NOaDmUSN09
°
°~
''
00
O
M
N
V
N
n
C
x
x
x
x
x
x
m
N
w
V
tG
00
01
N
Ol
N
r-
cr
1HDINN-3A338
N
v°i
"
w
v
tmif
tmi>
tmis
v�
v.
O
O
O
O
O
O
O
O
O
O
0
C
0
0
0
0
0
0
0
0
D
0
O
pp
O
O
N
N
n
M
01
N
O
O
O
O
w
a0
Ol
O
C)
01
H
N
O
O
°
O
m
n
.-t
-1
v
N
M
o
o
NOiiDn8iSNOJ 30310
x
x
x
x
x
x
x
x
W
O
r/1
l0
N
v/f
m
VT
t�/T
V4
tN/1.
VT
tom/}
VAT
t�/T
tai}
•�iT
�
•r1
�
w
W
w
W
W
W
W
W
W
w
w
o
a
a
a
a
a
a
a
a
a
a
a
•� '—' o
..
o
z
z
z
z
z
z
z
z
z
z
z
F+y V1
�
rY0
O
W
W
W
W
W
W
W
W
W
W
W
G,,✓ N
E
J
J
J
J
J
J
J
J
J
J
J
��
_
O
a
j
ti
ry
❑
O
O
O
❑
❑
❑❑
❑
❑❑
,,,_
O
O
O
f9
LO
m.
m
m
m
m
m
m
m
m
C
W
W
W
W
W
W
W
W
W
W
W
U
p
m
j
U
•�
—
O
C
d
7
3
D
U
'C
d
OCO
N
OC1
O
O
u
=1
51
51
DIM
x'
o<
-o
a
w
w
w
w
w
w
w
w
w
w
w
m
m
m
z
W❑
a¢
c
❑❑
010101010
0
a
0
o
m
0
m
O
N
S
S
S
G
O
O
O
O
O
O
m
O
O
0)
00
w
"
M
O
N
N
N
N
O
m
00
V1
l0
m
w
W
Ui
N
N
N
O
N
00
2i30N38'1N311V
x
x
x
x
x
x
x
x
a
K
m
w
vi
o
a
ri
a
r-
o
co
Q
n
M
N
N
m
m
n
m
Q
ui
1A
N
N
N
N
N
t/1.
V1.
V}
to
W
O
O
O
6
O
O
O
O
O
O
O
O
o
O
O
O
O
O
O
G
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
c
Q
o
Cl
v
o
o
611
N
o
0
0
NOLL7nNiSNO� N3021
x
x
x
x
x
x
x
x
C�
N
N
01
Q
O
a
O
n
�D
�O
Vi
00
00
N
m
M
1�
lA
01
00
�l1
�O
V?
V1
V1
1R
U?
Vf
V1
N
4A
N
C
O
O
O
O
O
O
O
O
O
O
O
o
O
O
O
O
O
O
O
O
O
O
O
o
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
rn
O
O
O
O
O
O
c
o
0
0
0
c
0
0
0
0
0
0
NOliDn'diSNO� N3ilV
x
x
x
x
x
x
x
x
Oi
N
N
rl
tp
N
l0
m
l0
M
H
lD
Q
1p
4!1
N
M
M
u1
l0
a-I
If1
t/T
VT
+/}
14
N
N
Vf
SA
aA
Vt
r
VT
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
CJ
O
O
O
O
O
O
O
O
Sri
�
o
ry
�
o0
0
0o
m
n
ao
00
N
NOIiJn2IiSNOD GISO
x
x
x
x
x
x
x
x
O
m
`0
`o
Lr
^
Q
m
-e
Q
N
^
a
`n
Q
m
m
e0
rl
n
ri
m
Q
ui
ri
�G
ri
ry
an
v}
vt
+n
yr
v}
w
�n
w
yr
+n
r
M
°o
°o
°o
o
°o
S
S
o
o
o
c
o
0
c
0
0
0
0
0
c
0
0
0
0
0
0
0
0
0
0
0
c
c
0
c
0
0
0
0
0
0
0
0
A11351-N3i? VO
x
x
x
x
x
x
x
x
O
M
Q
4!1
L!1
W
N
N
m
I�
G
00
1�
m
M
W
i/}
00
4A
01
Ol
m
V1
Vt
O
L1
V}
Vr
h
V}
Vf
t?
N
Vf.
°
o
S
o
S
S
S
o
S
S
o
o
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
O
O
O
O
O
O
O
O
O
O
O
c
Noli3naiSNODAaVODA
x
x
x
x
x
x
x
x
00
v
a
0
0
0)
n
co
J'�
M
I�
t0
W
N
l0
Llt
00
1p
VI
l0
O
W
N
W
to
N
W
N
to
N
N
v ^.
O
O
o
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
ry
Lri
Q
V1
M
00
(�
N
M
N
Q
O
N
o
N
N
m
O
r
I
V7
O
m
NOIiDnHiSNOD NNVMS
x
x
x
x
x
x
x
x
O
00
00
°
N
N
01
N
Q
N
Q
O
m
R
00
V1
C
rl
m
Vl
Vf
ti
l/}
th
N
tM1
.-�
N
VF
V}
V}
N
VF
V/
• ^I
O
w
W
W
W
W
W
W
W
W
W
W
I
Cc,
r
r
r
r
r
r
r
r
r
r
r
'
�-- o
a
a
a
a
a
a
a
a
a
a
a
Z
Z
Z
Z
Z
Z
Z
Z
Z
Z
Z
u
r
r
r
r
r
r
r
r
r
r
r
N
E=
u
a
a
a
a
a
a
a
a
a
a
a
_
0
0
0
0
0
0
0
0
0
0
0
0
m
m
m
o7
m
m
m
m
Cf
O]
o]
E
E
w
W
w
w
W
W
W
W
W
W
W
V��11 1"1
v
o
m
u
O
>
>
>
>
>
>
>
>
>
>
9
o
o
v
=4�
G
G
G
G
G
G
G
G
G
mLW
a
v
-mac
✓,
O
C
O
0
0
0
0
a
w
W
W
W
W
W
W
W
W
W
W
E
m
m
Z
w
0
Q
a
m
❑
0
0
0
0
0
0
0
0
0
0
m
O
N
m
`o
m
0
0
0
0
0
0
0
0
0
O
M
Qt
O
LA
01
N
tD
N
N
m
o
N
m
0 o
w
a
v
NOS'8 d31VlS
x
x
x
x
x
x
x
x
Vl
C
0
0
0
0
0
0
0
0
0
0
0
O
O
O
0
0
0
0
0
0
0
0
0
O
0
0
0
0
0
0
0
0
0
0
0
S'dOiD KNOJ
0
c
0
o
0
C
0
C
0
C
0
C
0
C
0
0
0
O
0
o
0
0
0
o
x
x
x
x
x
x
x
`y
N
M
m
I�
O
M
N
M
lG
T
lVIM302139Nf10A
r
n
oo
n
o
n
v
o
n
n
+n
.n
0
0
0
o
o
O
O
c
0
0
0
0
c
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
o
0
0
0
$
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
C
0
s2ociim NOJZ
x
x
x
x
x
x
x
x
°
o
m
vi
�
ui
m
m
v
vi
v
m
N
I�
n
r1
M
M
l0
i�
M
tl1
n
N
V}
V}
N
VT
V?
V}
V?
Lf
VT
VT
1
�
• r•�
• !�1 '✓J Q\
0
H
W
H
N
W
N
M
W
H
V
W
H
V1
W
H
t0
W
H
I�
W
H
W
W
H
01
W
F
W
H
.ti
W H
��
�
U
a
a
a
a
a
a
a
a
a
a
a
•.� ^' o
=
o
..
z
z
z
z
z
z
z
z
z
z
z
jp
W
W
h+i � V a.) J
-o
O
W
W
W
W
W
W
W
W
W
� N
�
J
J
J
J
J
J
J
a
J
a
J
a
J
a
J
a
..� �
�e
O
a
O
„�
ti
N
O
❑
❑
❑
❑
❑
❑
❑
❑
O
❑
O0
00
m
m
m
m
m
m
m
m
m
m
m
ti
v
m
�:
O
E
E
>
>
>
>
>
>
>
>
>
>
>
•�
.r+
�
g
o
v
°�'a
n
G
G
G
G
G
G
GG
G
G
G
(�
:2
,O
O
X
W
d
m
m
Z
04"
Q
Q
n
O❑❑❑❑❑❑❑
0
❑
0
m
`o
m
Agenda Item 7.a.5)
Board Meeting of August 6, 2009
Written Announcements:
Staff Meetings /Events
a) Round Hill Estates North Meeting
District staff and Legal Counsel met with the Round Hill Estates North
Home Owners Association Board of Directors at their regular meeting on
July 28, 2009, to discuss the poorly- maintained drainage culverts and
small slides on District easements. Failure to address these issues in a
timely manner makes it difficult for CSO to maintain the sewer, difficult to
respond to an emergency, and ultimately could threaten the sewer in the
easement. Four of the seven directors were present. Information on
these issues was presented to those present including pictures of the
problems, a map indicating locations, and a sample of draft letters to be
sent to homeowners. There was a cordial discussion with members of the
HOA Board. They asked to be copied on correspondence sent to
homeowners and had useful input on the draft letters.
The next step will be to send a general letter to all homes with a sewer on
a slope bench (approximately 100) advising them of the presence of the
sewer and the need to maintain the bench. We will include the District
pamphlet "There's a Public Sewer Line On or Near Your Property" and a
copy of information on the proper maintenance of the slope benches as
found on the Round Hill Estates North web site.
Thereafter, targeted letters will be sent to approximately 28 homes that
have issues, as well as to the HOA. These will include pictures of the
problems as well as the pamphlet and slope maintenance information
included in the first mailing. The responsible parties will be asked to take
action to correct the problem(s) prior to October 15, 2009, before the next
rain season. A form with a return envelope will be included asking for a
response within 30 days as to what action is proposed.
b) A -Line Project Ribbon Cutting
The ribbon - cutting marking the completion of the A -Line Project will be
held on Wednesday, August 26, 2009, at 10 a.m. at the Concord Pump
Station located at 2050 Waterworld Parkway. Refreshments will be served
and tours of the Flow Meter Vault will be available.
c) Pleasant Hill Sewer Renovation Project (Phase 1)
Workshop
The District hosted a public meeting on Thursday, July 30, 2009 at the
City of Pleasant Hill's Community Room for the Pleasant Hill Sewer
Renovation Project, Phase 1. Forty -four invitations were mailed but none
of the affected residents attended. The project will renovate 2,500 feet of
six and eight -inch sewer mains in Pleasant Hill using open cut, pipe -
bursting, and CIPP techniques.
Financial
d) Avalon Connection Fee Payment Received
On July 17, 2009, Avalon Bay Communities paid connection fees totaling
$2,259,025.15 for 422 apartments and about 50,000 square feet of retail
space in three buildings in the Pleasant Hill Transit Village Project
adjacent to the BART station. The fees included $2,131,988.83 in
Capacity Fees and $123,057.32 in Sewer Service Charges.
Project Updates
e) Solids Handing Improvements Proiect, DP 7260
On July 20, 2009, during excavation work for the foundation of the sludge
truck loading facility, the contractor, Manito Construction, Inc., discovered
that the soils at the site appeared to be contaminated with a petroleum
material. Staff brought in AEI Consultants to examine the soils and collect
samples. The soil analysis has confirmed that the soil contains the black,
oily, petroliferous materials found during past subsurface construction
work on the treatment plant site.
In order to avoid delay claims, staff has directed Manito Construction, Inc
to retain a subcontractor qualified to handle this type of material.
Approximately 500 cubic yards of material has been removed from the
excavation and stock piled at the site. The total cost to stockpile and then
consolidate the contaminated material might exceed $50,000. In the
event that the total cost exceeds staff's authorization limit, staff will
request the Board's authorization to execute a change order with Manito
Construction, Inc. for this work. Staff has informed the Department of
Toxic Substances Control (DTSC) of this discovery and is waiting for
permission to consolidate the materials on site.
General Updates
f) City of Concord Retirements that Relate to the District
City of Concord employees Qamar Khan, Public Works Director; Bruce
Good, Infrastructure Manager; and Mark Boehme, Senior Assistant City
Attorney, have announced that they will be retiring effective August 31,
2009. Qamar and Bruce have worked closely with District staff for many
years, most recently on the almost complete A -Line Relief Interceptor
Phase 2A/Concord Inter -tie Project. Sixty -four City employees will be
retiring by the end of August. Attached is a news release on the issue.
g) Pretreatment Compliance Inspection Findings Report
A Pretreatment Compliance Inspection (PCI) was conducted on February
25 and 26, 2009 by the United States Environmental Protection Agency
and the Regional Water Quality Control Board's contractor Tetra Tech,
Inc. The PCI report was received on June 23, 2009 and the District
responded to the findings on July 28, 2009. A summary memo along with
the PCI report and the District's response are attached for the Board's
information.
Agenda Item 7.a.5)
Board Meeting of August 6, 2009
Additional Written Announcements:
Project Updates
h) , Temporary Relocation of Permit Counter Operations
The permit counter will be closed for construction beginning Monday, August 10,
2009, and is scheduled to re -open on Monday, August 31, 2009. During the
closure period, permit operations will be temporarily moved to the First Floor
Conference Room (not the Board Room as previously reported).
Ajezridalf4n 7. a, -f
FOR IMMEDIATE RELEASE
Concord's early retirement program helps solve
budget shortfall
Concord, CA (July 24, 2009) The City of Concord will say good -bye to 64 employees
in August as a result of an early retirement program designed to help the City
manage its budget shortfall and minimize lay -offs. The City has 479 full time
employees; the retirements represent over 13% of the City's workforce.
Those who accepted the offer will receive 7% of their base salary annually in addition
to their California Public Employees Retirement System (CalPERS) retirement benefit.
As is the case in most California cities, a sharp reduction in sales and property tax
revenue has created a budget shortfall. Concord's $80 million general fund is faced
with a $13.5 million structural deficit. The state is expected to take another $2.5
million of the City's money in property tax revenues to balance its own budget,
magnifying the shortfall.
In June, the City Council passed the fiscal year 2009 -2010 City budget and 10 -Year
Financial Plan, which went into effect July 1. The early retirement program, along
with employee compensation and benefits reductions, operational changes, use of
reserves, and the elimination of 42 positions through layoffs, were assumed in the
budget projections.
The early retirements are projected to save the City $1 million this fiscal year (2009-
10) in salaries and benefits, and $2.9 million annually in fiscal years 2010 -11
through 2013 -14. In 2014 -15, when the funding for the program has been paid off,
the savings will be $3.9 million a year. These projections assume no more than 50%
of the retiree positions are re- filled.
"We are about to become a much leaner organization," said City Manager Dan Keen.
"The City is losing 1,316 years of experience and expertise as these dedicated
employees walk out the door. We are sad to see them go. But in this extreme
budget situation, we are pleased to have found a way to reduce the City's work force
that minimizes impacts to employees and our community.
Keen is reviewing staffing needs with all departments in light of the retirements.
Those positions being vacated that need to be re- filled in order to provide essential
services may allow employees on the layoff list to transfer to a vacant position,
reducing the number of layoffs.
The City Council has voluntarily reduced its monthly stipend by 10% while the City
Manager and Executive Team voluntarily took a 9% pay and benefit reduction.
In addition, all managers have accepted an almost 7% pay and benefit reduction and
all confidential employees have accepted a 5% reduction in pay.
These reductions in pay and benefits equate to approximately $640,000 in savings to
the General Fund. One element of achieving this savings requires employees to take
13 unpaid furlough days spread over the next twelve months. The first furlough day
will be on August 14. .
The City is currently negotiating with all represented bargaining units and is hoping
to obtain additional salary savings from each of these groups. Local One, which
represents 190 City employees, has entered a tentative agreement with the City.
Their members will be voting on it prior to Monday's Council meeting, where the
Council Members will be asked to act on the proposal.
For more information about the City's budget, visit www.cityofconcord.org, and
select "Budget Update" from the News and Events box or call Ron Buck, the City's
Budget Officer at (925) 671 -3155. For more information on the early retirement
program, call the Assistant City Manager, Valerie Barone, at (925) 671 -3461.
- 30 -
CONTACT: Leslye Asera
Community Relations Manager
(925) 671 -3272, lasera @ci.concord.ca.us
www.cityofconcord.org
1950 Parkside Drive, MS 1A
Concord, CA 94519
f
Concord
/k9a �TP%n� Q_,d'vq
Central Contra Costa Sanitary District
July 31, 2009
TO: BOARD OF DIRECTORS
VIA: JIM KELLY, GENERAL MANAGER g
ANN FARRELL DIRECTOR OF ENGINE RINGA q-
FROM: TIM POTTER; NVIRONMENTAL COMPLIANCE SUPERINTENDENT
SUBJECT: PRETREATMENT COMPLIANCE INSPECTION OF CCCSD
The District's Source Control Program is periodically evaluated by the SF Bay Regional
Water Quality Control Board ( RWQCB), U.S. Environmental Protection Agency (EPA) or a
contractor working for these agencies (e.g. Tetra Tech, Inc.) in order to assess compliance
with the federal pretreatment standards. These standards are established under the Clean
Water Act and are found in 40 CFR Part 403. Two levels of evaluation are performed:
Pretreatment Compliance Audit (PCA) and Pretreatment Compliance Inspection (PCI). In
general, a PCA is a more comprehensive evaluation than a PCI and involves a review of
an agency's sewer use ordinance (e.g. the District's Source Control Ordinance). The
objective is to evaluate approved pretreatment programs at least annually at the PCI level
and complete a PCA approximately once every five years.
Enclosed is the report completed by Tetra Tech for the PCI completed in February 2009
and the District's response to the PCI findings. The Tetra Tech inspection team was
experienced but was new to evaluating the District's Source Control Program. During the
PCI and subsequent discussions, Tetra Tech staff stated that the District's pretreatment
and pollution prevention programs are well -run and better than most of the programs they
have evaluated in California and across the country. At one point, the lead Tetra Tech
inspector stated that he would recommend the District's program for a national
pretreatment award if the EPA had continued with this award program. He did state that
he was going to recommend to the EPA and RWQCB that the PCI for 2010 be waived for
the District so that the Tetra Tech resources could be directed to programs with a greater
need for oversight. In spite of the positive verbal statements, Tetra Tech findings in the
PCI report included five relatively minor requirements and recommendations to which the
District had to respond. The one requirement regarding determination of Significant Non -
Compliance (SNC) for our regulated businesses reflected our efforts to work with them to
achieve compliance without having to classify them as being in SNC.
Please let me know if I can provide additional information on the evaluation process in
general or the specific content of the attached documents.
TPlmvp
Enclosures
NAENVRSRV\Source Contro1\Board \2009 \PCI MEMO.doc
, 3
California Regional Water. Quality Control Board
Linda S. Adams
Secretaryjor
bu,irunmenm( Proteclun
San Francisco Bay Region
1515 Clay Street, Suite 1400, Oakland, California 94612
(510) 622 -2300 • Fax (510) 622-2460
filip: / /www, watcfboads. ca, gov /san ltwicis'cobay
June 23, 2009
CWIQS Place ID 213875
Tim Potter
Environmental Compliance Superintendent
Central Contra Costa Sanitary District
5019 Imhoff Place
Martinez, CA 94553
SUBJECT: 2009 Pretreatment Compliance Inspection (PCI) Report
Dear Mr. Potter:
Amdd Schur. n ,r
Gowmo,
RECEIVED
JUN Z 3 2009
CCCSD SOURCE CONTROL
Enclosed is the PCI report for the Central Contra Costa Sanitary District's Pretreatment Program. Tetra
Tech Inc., a U.S. Environmental Protection Agency (USEPA) contractor, conducted the PCI of the
District's Pretreatment Program on February 25-26, 2009. The PCI report contains several required and
recommended actions that can assist in improving the District's Pretreatment Program.
By August 7, 2009, please provide a response to the required and recommended actions. If you have any
questions, please contact Michael Chee at (5 10) 622 -2333 or a -mail address mchee @waterboards.ca.gov.
You may also contact Jenny Chen of the State Water Resources Control Board at (916) 341 -5570 or e-
mail address hjchen @waterboards.ca.gov.
Sincerely,
!yw"'1 Jam✓
[/ Lila Tang
Chief NPDES Wastewater Division
Enclosure: 2009 PCI report
Preserving, enhancing, and restoring the San Francisco Bay Area's waters for over 50 years
Ca Regded Pope,
Pretreatment Compliance Inspection
Discharger:
Location:
Contacts:
Inspection Dates:
Inspected By:
Summary Report
Central Contra Costa Sanitary District
NPDES No. CA0007648
Contra Costa County
5019 Imhoff Place, Martinez, CA
Tim Potter, Environmental Compliance Superintendent
Steve Linsley, Senior Environmental Compliance Inspector
Jeff Skinner, Environmental Compliance Inspector II
February 25 -26, 2009
Chuck Durham, Tetra Tech, Inc.
Christy Williams, Tetra Tech, Inc.
PCI Summary Report
Contents
1. Executive Summary ..................................................................... ..............................1
2.
Introduction .................................................................................. ..............................1
2.1 Size of Program .................................................................... ...............................
l
3.
Pretreatment Program Modifications ........................................ ..............................2
4.
Legal Authority ............................................................................. ..............................2
5.
Nondomestic Discharger Characterization ................................ ..............................2
6.
Control Mechanisms .................................................................... ..............................2
7.
Application of Pretreatment Standards and Requirements ..... ..............................3
8.
Compliance Monitoring ............................................................... ..............................3
8.1 Compliance Sampling ............................................................ ..............................3
8.2 Compliance Inspections ......................................................... ..............................4
8.3 Nondomestic Discharger Site Visits Conducted During the Inspection ..............4
8.4 Requesting, Receiving, and Analyzing Reports .................... ..............................5
8.5 Slug Discharge Control Plans ................................................ ..............................5
9.
Enforcement .................................................................................. ..............................6
9.1 Enforcement Response Plan .................................................. ..............................6
9.2 Significant Noncompliance Determination ........................... ..............................6
10.
Summary of Requirements and Recommendations .................. ..............................7
10.1 Requirements ..................................................................... ..............................7
10.2 Recommendations ............................................................. ..............................7
Central Contra Costa Sanitary District
PCI Summary Report
Attachments
Attachment A
Water Enrorcement National Database (WENDB) Worksheet
Attachment B
Reportable Noncompliance (RNC) Worksheet
Attachment C
Nondomestic Discharger Site Visit Data Sheets
Central Contra Costa Sanitary District IV
PCI Summary Report
1. Executive Summary
The Central Contra Costa Sanitary District's (District's) staff manages a pretreatment program
that consists of 381 permitted nondomestic dischargers. Twenty -three of the dischargers are
classified as significant industrial users (SIUs) as defined at Title 40 of the Codc of Federal
Regulations (CFR), section 403.3(v). Two of the SIUs are categorical industrial users (CIUs)
subject to federal categorical requirements.
During an inspection of the District's program, the inspectors found several deficiencies. The file
review and inspection interview revealed that sampling and analysis issues had been occurring at
Varian Associates since 2005; however, District personnel had not noticed them until April 2008
when a new inspector took over the facility. The District issued a verbal warning to Varian.
Associates for failing to conduct adequate monitoring and analysis since 2005; however, verbal
warnings are not authorized in the District's ERP. Finally, the District is using inappropriate data
to calculate SNC.
2. Introduction
The San Francisco Bay Regional Water Quality Control Board (Water Board) with assistance
from Tetra Tech, Inc., conducted a Pretreatment Compliance Inspection (PCI or inspection) of the
District on February 25 -26, 2009. The previous pretreatment compliance audit of the District's
Pretreatment program had been performed in January 2008. This inspection report describes the
primary concerns generated by the recent PCI
The PCI consisted of three parts: an interview of the District's pretreatment coordinator, a review
of the pretreatment program files, and site visits to two permitted industries. The interview
included a discussion with the pretreatment staff regarding the program in general, the District's
compliance sampling and inspection procedures and their frequency, and enforcement issues.
The file review consisted of examining the following dischargers:
• Systron Donner Automotive Division (CIU subject to 40 CFR 433.17)
• Varian Associates, Inc., (noncategorical SIU with a zero - discharging process subject to
40 CFR 433.17)
These dischargers were also inspected as part of this PCI. The inspectors from Tetra Tech
accompanied the District's inspectors to both facilities. This report summarizes the overall
findings of the inspection and describes those program elements that are not consistent with
federal pretreatment program requirements. In addition, the report provides recommendations to
enhance the effectiveness of program implementation and enforcement.
2.1 Size of Program
The District's staff manages a pretreatment program that consists of 381 permitted nondomestic
dischargers. Twenty -three of the dischargers are classified as SIUs as defined at 40 CFR
403.3(v). Two of the SIUs are CIUs subject to federal categorical requirements.
Of the remaining 358 permitted nondomestic dischargers, 303 arc dental facilities. The
remaining 55 consist of 5 zero - discharging C[Us not deemed significant by the District, facilities
classified as Class III facilities (businesses that require minimal oversight, such as groundwater
dischargers, radiator shops, and dry cleaners), and special discharge permittees. The District also
has begun a fats, oils and grease (FOG) inspection program.
Central Contra Costa Sanitary District
PCI Summary Report
The District also permits three waste haulers to bring septage that originates from Contra Costa
County. Samples are collected and randomly analyzed. Loads are certified with manifests.
3. Pretreatment Program Modifications
The federal pretreatment regulations at 40 CFR 403.18 require publicly owned treatment works
(POTWs) to notify the Water Board of any modifications it intends to make to its pretreatment
program.
The District updated its sewer use ordinance (SUO) in October 2008 to address the comments
made as a result of the 2008 PCA. Such modifications are considered nonsubstantial. The
District notified the Water Board of these changes in September 2008. The District will be
updating its enforcement response plan (ERP) and the memorandum of understanding (MOU)
with the cities of Concord and Clayton in 2009.
4. Legal Authority
The regulation at 40 CFR 403.8(1) requires that every POTW subject to the national pretreatment
program have the necessary legal authority to apply and enforce section 307(b) and (c) and
section 402(b)(8) of the Clean Water Act.
The District has service agreements with the cities of Concord and Clayton. Concord maintains
the collection systems for itself and Clayton. The District implements and enforces the
pretreatment program in both cities, and their ordinances defer to the District's SUO for legal
authority. As noted in Section 3, the District plans to update the MOUs with these two cities in
2009.
5. Nondomestic Discharger Characterization
The federal pretreatment regulations at 40 CFR 403.8(f)(2) require that POTWs develop and
implement procedures to identify and locate industrial users that might be subject to the local
pretreatment program. These procedures must also include proper categorization of all SIUs as
defined at 40 CFR 403.3(v). On the basis of the files reviewed, the District has correctly
classified its nondomestic dischargers and has procedures in place to adequately identify
industrial users subject to pretreatment program oversight.
The District's procedures for characterizing nondomestic dischargers were found to be adequate.
The District works closely with each of the cities that discharge to its sewer system. When a new
discharger applies for a building permit or a permit to modify an existing building, these
applications are forwarded to the Environmental Compliance Program for review. In addition,
District personnel conduct routine surveys throughout the District's service area to identify new
dischargers.
Control Mechanisms
To ensure compliance with applicable pretreatment standards, the federal pretreatment
regulations at 40 CFR 403.8(f)(1)(iii) require POTWs to control the discharges from nondomestic
dischargers by using control mechanisms (permits or other similar means). The control
mechanisms must include, at a minimum, the following:
• Statement of duration (in no case more than 5 years)
• Statement of nontransferability
• Effluent limits, including best management practices, based on applicable pretreatment
standards
Central Contra Costa Sanitary District
PCI Summary Report
• Self- monitoring, sampling, reporting, and record- keeping requirements
• Statement of penalties
• Compliance schedules (if applicable)
• Required resampling within 30 days after noticing a violation
• Slug control requirements (if necessary)
• Notification requirements
- Notice of slug loadings
Notification of spills, bypasses, or upsets
- Notification of significant change in discharge
Notification within 24 hours after noticing a violation
Permits for CIUs must also properly use the combined wastestreant formula, properly convert
mass -based limits to concentration -based limits, and properly apply production -based limits (if
applicable) and must include a prohibition on dilution as a substitute for treatment.
The Varian Associates permit does not contain the categorical discharge limits that would apply if
the facility were to begin discharging categorical wastestreams. The inspection team
recommends that the District include all applicable limits in any regulated facility permit, even if
the facility is not discharging the regulated wastestream.
1. Application of Pretreatment Standards and Requirements
The federal pretreatment regulations at 40 CFR 403.8(f)(I) require the District to have the legal
authority to require compliance with applicable pretreatment standards and requirements, and to
ensure compliance with these standards and requirements through the use of control mechanisms
such as permits.
The District correctly classified all the nondomestic users whose files were reviewed. In addition,
on the basis of the files reviewed, the District is requiring compliance with all applicable
pretreatment standards and requirements from its SIUs with the exception described in Section
8.4.
8. Compliance Monitoring
The federal pretreatment regulations at 40 CFR 403.8(f)(2)(v) require that a POTW develop and
implement an inspection and monitoring program to determine, independent of information
supplied by nondomestic dischargers, compliance or noncompliance with applicable pretreatment
standards and requirements. Furthermore, 40 CFR 403.8(f)(2)(vii) requires POTWs to investigate
instances of noncompliance and enforce the regulations as necessary.
8.1 Compliance Sampling
The federal pretreatment regulations at 40 CFR 403.8(f)(2)(v) require that all SIUs be sampled at
least once a year unless the POTW has authorized a CiU to forego sampling of a pollutant
regulated by federal pretreatment requirements. In such a case, the POTW must sample for the
waived pollutant(s) at least once during the permit term [40 CFR 403.8(0(2)(v)(A)].
The District's compliance sampling procedures and frequency are adequate. The District
conducts at least annual compliance monitoring events at all SIUs and is in compliance with
federal pretreatment regulations.
Central Contra Costa Sanitary District
PCI Summary Report
8.2 Compliance inspections
The federal pretreatment regulations at 40 CFR 403.8(f)(2)(v) require that all STUB be inspected
at least once a year unless a discharger is subject to the reduced reporting requirements under 40
CFR 403.12(e)(3). In such a case, the POTW must inspect the discharger at least once every 2
years (40 CFR 403.8(f)(2)(v)(C)).
The District's compliance inspection frequencies were found to be adequate. The District
conducts compliance inspections at least annually at its SIU's.
8.3 Nondomestic Discharger Site Visits Conducted During the Inspection
The Tetra Tech inspectors along with District personnel inspected two of the permitted
nondomestic dischargers as part of the PCI. The Tetra Tech inspectors noted the following
during the nondomestic discharger site visits:
•
Varian Associates. The facility manufactures, assembles, and tests Arcon auto -
samplers, gas chromatography /mass spectrometers (GCMS), and nuclear magnetic
resonance (NMR) machines.
NMR Processes: The facility produces a probe insert by plating copper with
palladium (40 CFR 433). The copper is etched with a phosphoric acid before being
rinsed and plated. The inserts are very small, and the plating process is performed on
a bench -scale only. The rinse water is contained under a fume hood, then stored in a
barrel in the laboratory until it is disposed of. The containers have secondary
containment and are properly labeled. No floor drains or sinks are in the laboratory.
The remaining processes used to manufacture the NMR machines are dry. The probe
inserts are cleaned and put into the probes. The probes are then cleaned with bleach
and enzyme soap using swabs. No drains or sinks are in this area. The probes are
tested with salt water blanks and tested at the NMR magnet farm on -site. The
consoles to run the NMR magnets are also assembled on -site using only dry
processes.
GCMS Processes: No categorical processes are used in the production of the GCMS
machines. Before assembly, the metal parts received from other locations are
cleaned in an ultrasonic bath. The parts are cleaned in a solution of methanol,
isopropyl alcohol, or soap. The pans are placed in metal trays or buckets, which then
sit in a bath of water in the ultrasonic cleaners. The bath water is noncontact and is
emptied into the sink in the room every few weeks. The cleaning solutions are
disposed of as hazardous waste. The facility recently installed a dishwasher to test
and see if the parts could be cleaned automatically. Before discharging, the facility
sampled the discharge, and the results met all local limits. The cleaned parts are then
baked in an oven to remove any residue before assembly. All assembly is done with
screws. No soldering is done. The GCMS machines are testing for quality control
before leaving the facility. The samples are evaporated in the process; therefore, there
is no discharge.
Arcon Auto - Sampler Processes: The auto - samplers are assembled on -site. The
quality assurance testing process produces a small amount of discharge; however,
this process water is disposed of as hazardous waste.
The facility ceased discharging categorical process water in July 2008. The process
water is now collected and disposed of as hazardous waste. No deficiencies were
noted during the site visit.
Central Contra Costa Sanitary District
PCI Summary Report
Systron Danner Autanolive Division. The facility has two divisions —the Inertial
Division, which produces quartz tuning forks (sensors) for gyroscopes in airplanes,
and the Automotive Division which produces stabilization systems for automobiles.
The wafers are laser scribed (placing an ID number on each part) and checked for
thickness. They then are cleaned using sulfuric acid and pre- etched using sulfuric
acid and hydrogen peroxide. The wafers then go into an evaporator for 1.5 hours.
The evaporation process includes dropping pressure while the temperature is raised.
Then chrome and gold strikes are initiated, each takes approximately 40 minutes.
From the evaporator, the wafers go to the photolithography process. This process
involves having a positive or negative film applied, and then placing the part between
two patterns to determine chemical application. The part is then exposed to
ultraviolet light to apply the pattern to the part. The parts are then dried and moved
to the nugget room where they are die - mounted so that an epoxy and forks can be
applied to the base (cube). Gold wire is attached to contact points, and then the forks
go through laser balancing to ensure perfect balance via laser trimming. Finally, a
cap is welded onto the base to cover the fork (this process occurs inside a helium
vacuum tank to insure no moisture gets into the part).
Rinse waters from quartz slicing, the etching process, and the plating process are
discharged from the facility. All wastestreams in the facility are piped into a
collection system. Waste is batch treated (300 gallons per batch). Treatment consists
adding sodium hydroxide to raise the pH in stage 1. The waste pump line has a
second pH meter that checks to see if the reading is consistent with the first pH
monitoring point. If it is not consistent, the waste is automatically diverted into a
holding tank and pumped to the initial treatment tank. If the reading is consistent, the
waste is discharged to the sewer. The facility discharges approximately 16,000-
17,000 gallons per day via multiple batch discharges. No deficiencies were noted
during the site visit.
8.4 Requesting, Receiving, and Analyzing Reports
The federal pretreatment regulations at 40 CFR 403.8(f)(2)(iv) require the District to request,
receive, and analyze all reports submitted by SIUs. In addition, the SIU reports must contain the
information required at 40 CFR 403.12.
The District's Periodic Compliance Report (PCR) Review and Analysis Checklist for Varian
Associates, dated April 22, 2008, indicates that the facility's March 2008 sampling event did not
include data for cadmium or nickel. In addition, the checklist states that the wrong methods
(solid waste methods) were being used to sample for all metals by the facility. The checklist also
indicates that this was a historical problem. The file review and PCI interview revealed that these
sampling and analysis issues had been occurring since 2005; however, District personnel did not
note them until April 2008 when a new inspector took over the facility. Because the District had
not noted or enforced such issues for such a long time, the District gave the facility a verbal
warning and informed it of proper the sampling procedures. The inspection team commends the
District for accurately documenting the historic nature of the noncompliance and acting quickly
to correct the issue once it was noted. (The subsequent sampling events were conducted
correctly.) However, the District is required to ensure that all reports submitted by the SIUs
comply with 40 CFR 403.12.
8.5 Slug Discharge Control Plans
The federal pretreatment regulations at 40 CFR 403.8(0(2)(vi) require the District to evaluate
each SIU by October 14, 2006, or within one year of becoming an SIU, to determine whether the
SIU needs to develop and implement a slug discharge control plan. A slug discharge is any
Central Contra Costa Sanitary District
PCI Summary Report
discharge of a nonroutine, episodic nature, including an accidental spill or noncustomary batch
discharge [40 CFR 403.8(f)(2xvi)). The regulations also require an SIU to notify the POTW
immediately of any changes at the SIU's facility that affect the potential for a slug discharge.
The District's procedures for requiring slug discharge control plans were found to be compliant
with the minimum federal requirements. The District requires all S[Us to develop slug discharge
control plans and update them every 2 years.
9. Enforcement
The regulations at 40 CFR 403.8(f)(5) require the District to develop and implement an ERP.
This plan must contain detailed procedures indicating how the District will investigate and
respond to instances of industrial user noncompliance.
In 2008 the District placed Diablo Valley College and St Mary's College in significant
noncompliance (SNC) for mercury violations from discharges from the schools' chemistry
laboratories. The SNC notice was scheduled to be published in the Contra Costa Times in
February 2009. Fifty -eight percent of the SIUs were in compliance with all pretreatment
standards and reporting requirements in 2008.
9.1 Enforcement Response Plan .
The District's ERP does not include a definition of SNC, which has been revised under the
streamlining regulations. The inspectors recommend that the District revise the ERP to include a
definition of SNC that meets the minimum criteria listed in 40 CFR 403.8(0(2)(vii).
As noted in Section 8.4, the District issued a verbal warning to Varian Associates for failing to
conduct adequate monitoring and analysis since 2005; however, verbal warnings are not
authorized in the District's ERP. The District is required to either discontinue the use of verbal
warnings or update the ERP to authorize the use of verbal warnings and define their applicability.
9.2 Significant Noncompliance Determination
During the interview, the Environmental Compliance Superintendent indicated that the District
was allowing resamples to be conducted in the subsequent quarter (or year) to count in the
calculation of SNC in the quarter with the original violation. For example, if a violation occurred
in December 2008 and the resample occurred in January 2009, the District was including the
January resample in the calculation of SNC for the fourth quarter of 2008 and for the annual SNC
assessment for 2008. This is incorrect in two ways —the District is required to calculate SNC at
the end of each fixed quarter of a pretreatment year using data from the previous 6 months, and
the District is required to summarize the compliance status at the end of the pretreatment year (the
District uses a calendar year) using the previous 15 months of data and report such compliance
status.
Per the preamble to the Streamlining the General Pretreatment Regulations for Existing and New
Sources of Pollution Final Rules and Regulations [published in the Federal Register: October 14,
2005 (Volume 70, Number 198)) (Final Streamlining Rule Preamble), the U.S. Environmental
Protection Agency (EPA) memoranda of 1991 and 1992 form the basis of EPA's policy that SNC
for industrial users should be calculated on a rolling quarter basis. For details, sec the September
9, 1991, memorandum from Michael B. Cook, Director of EPA's Office of Wastewater
Enforcement and Compliance to Water Management Division Directors, Regions 1 -10 and
approved Pretreatment State coordinators, Application and Use of the Regulatory Definition of
Significant Noncompliance for Industrial Users
(htip7,1/w%vw.epa.gov/iivdes/ptibs/application use regulatory pdD, and the January 17, 1992,
Central Contra Costa Sanitary District
PCI Summary Report
memorandum from Mark B. Charles, Chief of RCRA and Pretreatment Enforcement Section, to
the Regional Pretreatment Coordinators, Regions 1 -10, Determining Industrial User Significant
Noncompliance —One Page Summary (htty�H%vww em cov /npdes /pubs /industrial user ndf). The
term rolling quarters, under EPA's national policy, refers to an approach that requires the control
authority to evaluate an industrial user's compliance status at the end of each quarter by using
data from the previous 6 -month period. The 1991 memo states that these quarters are to be a
fixed length and be based on the pretreatment year established by the POTW as the period of
reporting for the annual report. Pretreatment year is defined in the Proposed Streamlining Rule
Preamble [published in the Federal Register: July 22, 1999 (Volume 64, Number 140)] (Proposed
Streamlining Rule Preamble).
Put simply, when determining SNC for a specific quarter and pretreatment year, the POTW is
allowed to look back only, not forward, for data to use in the calculation. On the basis of the
notice of publication for 2008, the District uses a calendar year as the pretreatment year with the
fixed quarters of January– March, April –June, July– September, and October– December.
Therefore, the District is required to determine SNC at the end of each quarter, using only the
previous 6 months' data. In addition, the District is required to use data from the appropriate 15
months (e.g., data from October 2007 through December of 2008) to determine the facilities in
SNC for the pretreatment year.
10. Summary of Requirements and Recommendations
Listed below are the primary requirements and recommendations resulting from the inspection of
the District's pretreatment program. For more specific information pertaining to each comment,
see the cited sections of the report.
10.1 Requirements
1. The file review and PCI interview revealed that sampling and analysis issues had been
occurring at Varian Associates since 2005; however, District personnel had not noticed
them until April 2008 when a new inspector took over the facility. The District is
required to ensure that all reports submitted by the SIUs comply with 40 CFR 403.12.
(Section 8.4, Requesting, Receiving, and Analyzing Reports)
2. The District issued a verbal warning to Varian Associates for failing to conduct adequate
monitoring and analysis since 2005; however, verbal warnings are not authorized in the
District's ERP. The District is required to either discontinue the use of verbal warnings
or update its ERP to authorize the use of verbal warnings and define their applicability.
(Section 9. 1, Enforcement Response Plan)
3. The District is using inappropriate data to calculate SNC. The District is required to
determine SNC at the end of established, fixed quarters, using only the previous 6
months' data. In addition, the District is required to use data from the appropriate 15
months to determine the facilities in SNC for the pretreatment year. (Section 9.2,
Significant Noncompliance Determination)
10.2 Recommendations
I . The Varian Associates, permit does not contain the categorical discharge limits that
would apply if the facility were to begin discharging categorical wastestreams. The
inspection team recommends that that District include all applicable limits in any
regulated facility permit, even if the facility is not discharging the regulated wastestream.
(Section 6, Control Mechanisms)
Central Contra Costa Sanitary District
PCI Summary Report
2. The District's ERP does not include a definition of SNC, which has been revised under
the streamlining regulations. The inspectors recommend that the District revise the ERP
to include a definition of SNC that meets the minimum criteria listed in 40 CFR
403.8(f)(2)(vii). (Section 9.1 Enforcement Response Plan)
Central Contra Costa Sanitary District
ATTACHMENT
ICIS WENDB DATA ENTRY WORKSHEET
PRETREATMENT COMPLIANCE INSPECTIONSIAUDITS
► TYPE OF COMPLIANCE MONITORING: PCI
► NAME OF PRETREATMENT PROGRAM: Central Contra Costa Sanitary District
► CONTROLLING AUTHORITY NPDES ID: CA0007648
START DATE OF INSPECTION ............................ 02/25/2009
1 ► END DATE OF INSPECTION ............................ 02/26/2009
LEAD INSPECTOR (Name, Company, Phone, E -mail (if available]):
Christy Williams, Tetra Tech, 540- 576 -9970
ACCOMPANYING INSPECTOR(s) (Name, Company, Phone, E-mall (if available]):
Chuck Durham, Tetra Tech
SIGNIFICANT INDUSTRIAL USERS (SIUs)
ChristyWilliams
PCI CHECKLIST
REFERENCE
PCA CHECKLIST
REFERENCE
DATA
P. SIUs' :
11.B.2.a
I.C.4.a
23
► SIUs Without Control Mechanism:
II.C.1.c
j I.D.1 and ILA
0
► SIUs Not Inspected:
II.E.2.c
I I.F.2.c
0
► SIUs Not Sampled:
II.E.2.b
I.F.2.b i
0
► SIUs in SNC with Pretreatment Standards" :
II.F.3.a
I.F.3.a
2
► SIUs in SNC with Reporting Requirements:
I
II.F.3.a
I.F.3.a
0
Slue in SNC with Pretreatment Schedule:
' I.F.3.a
0
SIUs in SNC Published in Newspaper:
I.G.4; 11.0.7
2
Criminal Suits Filed Against SIUs:
II.F.1
( j
0
CATEGORICAL INDUSTRIAL USERS (CIUs)
I. CIUs:
I.C.4.a
2
OTHER INFORNIAT10N
Pass- Throughllnlerference Indicator
(none. Yes. or No) i
I.G.6
None
DEFICIENCIES
tj
4
Control Mechanism Deficiencies
(No or Yes)
I.D.1;II.A.4
No
Inadequacy of Sampling and Inspections
(No or Yes)
ILC and j
I Site Visit Sheets ;
No
Adequacy of Pretreatment Resources
(Yes or No)
LI
NO
FOOTNOTES:
► denotes required information
The number of SIUs entered into PCS is based on the CA's definition of "Significant Industrial User."
AS DEFINED IN EPA's 1986 Pretreatment Compliance Monitoring and Enforcement Guidance.
DATA ENTRY WORKSHEET
COMPLETED BY:
ChristyWilliams
DATE: 05/27I2009
TITLE:
Environmental Planner
TELEPHONE NO.: 5540 -576 -9970
Form Version 12/19/2008 Page 1 of 1
ATTACHMENT B
RNC DATA ENTRY WORKSHEET
RNC DATA ENTRY WORKSHEET
INSTRUCTIONS: Enter the data provided by the specific checklist questions that are referenced.
CA name Central Contra Costa Sanitary District
NPDES number CA0007648
Date of inspection February 25 — 26, 2009
Date entered into PCS
NA Failure to enforce against pass through and/or interference
NA Failure to submit required reports within 30 days
NA Failure to meet compliance schedule milestone date within 90 days
NA Failure to issue /reissue control mechanisms to 90% of SIUs within 6 months
NA Failure to inspect or sample 80% of SIUs within the last 12 months
Y Failure to enforce pretreatment standards and reporting requirements
Other (specify)
Level
Checklist
Reference
I
II.F.6.b &9
I
Att. A.A.3
I
Att. A.A.4
II
II.C.1.b &2
11
II.E.2
11
II.F.2
II
SNC
N CA in SNC for violation of any Level I criterion
N CA in SNC for violation of two or more Level II criterion
For more information on RNC, please refer to EPA's 1990 Guidance for Reporting and Evaluating POTW Noncompliance with
Pretreatment Implementation Requirements
RNC WORKSHEET COMPLETED BY: Christy Williams DATE: 05/27/09
TITLE: Environmental Planner TELEPHONE: 5540 -576 -9970
ATTACHMENT C
SITE VISIT DATA SHEET
INSTRUCTIONS: Record observations made during the IU site visit. Provide as much detail as possible.
Name of industry: S stron Donner Automotive Division
Address of industry: 2700 S stron Drive, Concord, CA 94518 -1399
Date of visit: 2/26/09
Time of visit: 8:30 am
Name of inspectors:
Chuck Durham, Tetra Tech, Inc.
Ernesto Rodriguez, Central Contra Costa Sanitary District
Provide the names and titles of industry representative(s)
Name
Title
David Polvi
Environmental Compliance Manager
IU Permit Number: Not Applicable (N /A)
Exp. Date: 8/31/10
IU Classification: CIU subject to
40 CFR 433.17
Inspection Type /Purpose
Y
Scheduled
Unscheduled
PCA
PCI
New Company
Compliant
Please provide the following documentation:
1. Nature of operation:
The facility has two divisions — the Inertial Division which produces quartz tuning forks (sensors) for
gyroscopes in airplanes and the Automotive Division which produces sensors for stabilization systems in
automobiles.
2. Number of
462
Number of 3
Hours of operation:
24 hours aday / 5
employee s:
shifts:
da s a week
3. Water source: Contra Costa Water District
4. Wastestream flow(s) discharged to the POTW: Rinse water from quartz slicing, etching process and
plating process.
Sanitary:
Not Determined
Process:
16,000- 17,000 (gpd)
Combined:
(ND)
ND
5. Describe any significant changes in process or flow: The facility anticipates a 12 -15 month shutdown
beginning in March -April of 2010 for automotive productions lines. Military production lines will remain in
operation during that time.
6. Type of pretreatment system (Describe): All wastestreams in the facility are piped into collection
system. Waste is batch treated (300 - gallons per batch). Treatment consists of sodium hydroxide addition
to raise pH in Stage 1. The waste pump line has a 2 n pH meter that checks to see if reading is consistent
with 1" pH monitoring point. If not, the waste is automatically diverted into holding tank and pumped to
initial treatment tank. If reading is consistent, waste is discharged to sewer. Facility discharges
approximately 16, 000 - 17,000 d via multi le batch discharges
Continuous flow I X
Batch Combined
7. Condition /o eration of pretreatment system:
X I
Good
Fair
I
I Poor
SITE VISIT DATA SHEET (Continued)
8. Process area description (identify raw materials and processes used): The wafers are laser scribed
(placing an ID # on each part) and checked for thickness. They then are pre - cleaned using sulfuric acid
and pre- etched using sulfuric acid and hydrogen peroxide. The wafers then go into an evaporator for 1.5
hours. The evaporation process includes dropping pressure while the temperature is raised. Then chrome
and gold strikes are initiated, each takes approximately 40 minutes. From the evaporator, the wafers go to
the photolithography process. This process involves having a positive or negative film applied, then
placing the part between two patterns to determine chemical application. The part is then exposed to
ultra - violet light to apply the pattern to the part. The parts are then dried and moved to the nugget room
where they are 'die- mounted' so that an epoxy and forks can be applied to the base (cube). Gold wire is
attached to contact points, then the forks go through laser balancing to insure perfect balance via laser
trimming. Finally, a cap is welded onto the base to cover the fork (this process occurs inside a helium
vacuum tank to insure no moisture gets into the part).
9. Condition/operation of process area:
X
I Good
Fair
Poor
General housekeeping:
X
Good
Fair
Poor.
10. Chemical storage area (identify the chemicals that are maintained on site and how they are stored):
�hemicals are stored in self- contained buildings (5 -bays, each individually locked and self- contained)
outside of the main building. Chemicals include gold etch, chrome etch, sulfuric acid hydrogen peroxide,
Developer Microstrip, and ammonium fluoride. Sodium hydroxide is stored in 300 - gallon totes; Microstrip
comes in 5- gallon bottles; all other chemicals are shipped in 1- gallon bottles. The bottles are moved, as
needed, into hallway for installation into chemical distribution system.
Any floor drains? No
Any spill control measures? Yes
General housekeeping: I X
I Good
Fair
Poor
11. Are hazardous waste drummed and labeled? Yes
12. Does the IU have hazardous waste manifests? Yes
Any problems associated with hazardous waste: None. Facility has a hazardous waste pick up every
week by General Environmental Management
13. Solid waste production: scrap metals, paper, plastics, cardboard
Solid waste disposal method(s): All solid waste is hauled off -site. Scrap metal is picked up by J & B
and hauled to Santa Cruz for recyclinq. 2 -3 barrels per month are disposed of in this manner.
Fnterprises
ast pick -up was on 2/24/09 (see attached manifest).
14. Description of sample location: Monitoring pit (covered) on northwest corner of premises.
Sampling method/technique: 24 -hour flow-proportional com osite
15. Evaluation of self-monitoring data: I LYes X I No N/A
If yes, was self- monitoring adequate: (N /A)
16. Who performs the self- monitoring analysis? Not determined.
Notes:
SITE VISIT DATA SHEET
INSTRUCTIONS: Record observations made during the IU site visit. Provide as much detail as possible.
Name of industry: Varian Associates
Address of industry: 2700 Mitchell Drive, Walnut Creek, CA 94598
Date of visit: 02/26/09 Time of visit: 9:30 AM
Name of inspectors:
Jeremy Talarico, Central Contra Costa Sanitary District
Christy Williams, Tetra Tech, Inc.
Provide the names and titles of industry representative(s)
Name
Title
Dan Peixoto
Environmental, Health & Safety Coordinator
IU Permit Number: None
Exp. Date: 10/31/09
IU Classification:
Noncategorical SIU; 40 CFR
433 process is zero-discharge
Inspection Type /Purpose
X
Scheduled
Unscheduled
PCA
X
PCI
New Company
Complaint
Please provide the following_ documentation:
1. Nature of operation: .
The facility manufactures, assembles and tests Arcon auto - samplers, gas chromatographs/ mass
spectrometers (GCMS), and nuclear ma netic resonance (NMR) machines.
2. Number of
em to ees:
=50
Number of
shifts:
2
Hours of operation:
7:30 AM — 10:30
PM, M - F
3. Water source:
Not determined.
4. Wastestream flow(s) discharged to the POTW:
The facility discharges process flows from machine processes, laboratory research and development
activities, and instrument testing. The facilit has an electro latin process line which is zero discharge.
Sanitary:
d
Process: d
Combined:
d
5. Describe any significant changes in processor flow:
The facility ceased discharging categorical process water in July 2008. The process water is now
collected and disposed of as hazardous waste.
6. Type of pretreatment system (Describe):
The facility does not treat the process water prior to discharge.
=Continuous flow I
Batch Combined
7. Condition/operation of pretreatment system:
I
I Good
I
I Poor
SITE VISIT DATA SHEET (Continued)
8. Process area description (identify raw materials and processes used):
NMR Processes:
The facility produces a probe insert by plating copper with palladium (40 CFR 433). The copper is etched
with a phosphoric acid prior to being rinsed and plated. The inserts are very small and the plating process
is performed on a bench -scale only. The rinse water is contained under a fume hood, then stored in a
barrel in the laboratory until it is disposed of. The containers have secondary containment and are
properly labeled. No floor drains or sinks are in the laboratory. The remaining processes used to
manufacture the NMR machines are dry. The probe inserts are cleaned and put into the probes. The
probes are then cleaned with bleach and enzyme soap using swabs. No drains or sinks are located in this
area. The probes are tested with salt water blanks and tested at the NMR "magnet farm" on -site. The
consoles to run the NMR magnets are also assembled on -site using only dry processes.
GCMS Processes:
No categorical processes are used in the production of the GCMS machines. Prior to assembly, the metal
parts received from other locations are cleaned in an ultrasonic bath. The parts are cleaned in a solution
of methanol, iso- propyl alcohol or soap. The parts are placed in metal trays or buckets which then sit in a
bath of water in the ultrasonic cleaners. The bath water is non - contact and is emptied into the sink located
in the room every few weeks. The cleaning solutions are disposed of as hazardous waste. The facility
recently installed a dishwasher to test and see if the parts could be cleaned automatically. Prior to
discharging the facility sampled the discharge and the results met all local limits. The cleaned parts are
then baked in an oven to remove any residue prior to assembly. All assembly is done with screws. No
soldering is done. The GCMS machines are testing for quality control before leaving the facility. The
samples are evaporated in the process; therefore, there is no discharge.
Arcon Auto - Sampler Processes:
The auto - samplers are assembled on -site. The quality assurance testing process produces a small
amount of discharge; however, this process water is disposed of as hazardous waste.
9. Condition/operation of process area:
X
Good
Fair
Poor
General housekeeping:
X
Good
Fair
Poor
10. Chemical storage area (identify the chemicals that are maintained on site and how they are stored):
The chemicals used in the plating process as well as the cleaning process are stored in the laboratories in
small containers. No bulk storage occurs at the facility.
Any floor drains? No. Any spill control measures? Yes.
General housekeeping. X I Good Fair Poor
11. Are hazardous waste drummed and labeled? Yes.
12. Does the IU have hazardous waste manifests? Yes.
Any problems associated with hazardous waste: None noted during the site visit. Clean Harbors
disposes of all liquid waste as well as contaminated swabs.
13. Solid waste production: Metals, glass and cardboard is recycled.
Solid waste disposal method(s): See above.
SITE VISIT DATA SHEET (Continued)
14. Description of sample location: Manholes located outside of the buildings.
Sampling method /technique: Prior to April 2008, the facility had not been sampling for all required
local limit parameters or using the correct analytical methods for metals. The facility was notified of this
error through a verbal warning on April 22, 2008. Samples have been collected and analyzed correctly
since that time.
15. Evaluation of self-monitoring data:
X Yes No
N/A
If yes, was self- monitoring adequate:
16. Who performs the self- monitoring analysis?
Jonas and Associates; CERC Analytical
Notes:
M FILE
), Central Contra Costa Sanitary District
July 28, 2009
Lila Tang, Chief NPDES Wastewater Division
San Francisco Bay Regional Water Quality Control Board
1515 Clay Street, Suite 1400
Oakland, CA 94612
Dear Ms. Tang:
RESPONSE TO PRETREATMENT COMPLIANCE INSPECTION FINDINGS
FAX: (925) 372-7635
JAMES M. KELLY
Ganeel Manager
KENTON L. ALM
Counsel for the Distnd
(510) 808-2000
ELAINE R. SOEHME
secretary 01 the Dlatrkt
The Central Contra Costa Sanitary District (District) received your letter dated June 23,
2009 transmitting the report of the Pretreatment Compliance Inspection (PCI) completed by
Tetra Tech on February 25 -26, 2009. The report identifies three Requirements and two
Recommendations in the findings from this PCI. The findings are presented below verbatim
from the PCI report with acronyms spelled out in parentheses. The District's response
follows each finding for ease of reference.
Requirements
1. "The file review and PCI interview revealed that sampling and analysis issues had been
occurring at Varian Associates since 2005; however, District personnel had not noticed
them until April 2008 when a new inspector took over the facility. This District is required to
ensure that all reports submitted by the SIUs (Significant Industrial Users) comply with 40
CFR 403.12. (Section 8.4, Requesting, Receiving and Analyzing Reports)."
The District acknowledges that there was an oversight of the Varian Associates (Varian)
compliance sampling program where this SIU used solid waste analytical methods instead
of wastewater methods, and that cadmium and nickel were omitted from the analyses
performed. The self- monitoring analytical results of Industrial Users (IUs) are submitted to
the District using the Periodic Compliance Reports (PCRs) as required in the IU Permit
issued to the facility, The District developed a resource, a PCR checklist, designed to avoid
the type of oversight that occurred with the Varian compliance sampling program. The PCR
checklist facilitates the inspectors' review of the PCR to ensure they are complete and to
record the details of the review. Unfortunately, the inspector previously assigned did not
complete the PCR checklist for the Varian PCRs so the oversight continued for several
years until the facility was reassigned to a new inspector who observed and responded to
the situation. The inspector responsible for the oversight was counseled on his actions for
not using the PCR checklist and not observing the issues associated with the Varian
compliance sampling program. This inspector does use the PCR checklist as indicated by
the PCI file review of Systron- Donner that he is currently assigned. All Source Control staff
were reminded of the importance of using the PCR checklist when reviewing PCRs to avoid
this type of problem reoccurring, and potentially going undetected for an extended time.
® Neci Ced
NAENVRSRV\Source Control \PotteALeners 20MSFBRWOCB Resp to Pretreat Compliance Findings 7- 28- 09.doc
San Francisco Bay Regional Water Quality Control Board
July 28, 2009
Page 2
2. "The District issued a verbal warning to Varian Associates for failing to conduct adequate
monitoring and analysis since 2005; however, verbal warnings are not authorized in the
District's ERP (Enforcement Response Plan). The District is required to either discontinue
the use of verbal warnings or update its ERP to authorize the use of verbal warnings and
define their applicability. (Section 9.1, Enforcement Response Plan)."
The District's ERP does authorize the use of verbal warnings; verbal warnings are included
in the ERP definitions (page 3) and are included in the list of ministerial actions available to
District Source Control staff to enforce the Source Control Ordinance (page 4). The verbal
warning issued to Varian was effective in prompting the corrective actions necessary for the
compliance sampling issues to be addressed by their next scheduled sampling event. The
ERP text does not clarify the situations when verbal warnings will be used instead of the
other enforcement options available. The ERP text will be updated to include criteria that will
clarify when verbal warnings are to be used as an effective component of the District's ERP.
3. "The District is using inappropriate data to calculate SNC (Significant Non - Compliance).
The District is required to determine SNC at the end of established, fixed quarters, using
only the previous 6 months' data. In addition, the District is required to use data from the
appropriate 15 months to determine the facilities in SNC for the pretreatment year. (Section
9.2, Significant Noncompliance Determination)."
The District does determine SNC status of its regulated IUs at the end of established, fixed
quarters using the established U.S. EPA policy of rolling quarters. During the interview with
the Tetra Tech inspection team, we discussed a possible scenario where the District would
consider using data submitted by a SIU that might not fit the rolling quarter policy of the U.S.
EPA, but would technically meet the regulatory definition of SNC as it relates to Chronic and
Technical Review Criteria violations. The scenario discussed involved a situation where a
SIU conducted compliance re- sampling in response to a violation that subjects them to the
SNC criteria but the compliance re- sampling hypothetically occurred a few days into the
following calendar quarter. We informed the Tetra Tech inspection team that this situation
had not actually occurred but that we would consider using the compliance sampling results
provided that the data was received in advance of the final SNC determination being made
and recorded in the Pretreatment reports. After follow -up discussions with the Tetra Tech
inspection team and U.S. EPA Region 9 Pretreatment Coordinator, Keith Silva, the District
agrees not to use compliance re- sampling data received for sampling dates that occur in a
subsequent calendar quarter to the violation date(s) to remain consistent with the
established U.S. EPA policy regarding rolling quarters.
Recommendations
t. "The Varian Associates permit does not contain the categorical discharge limits that
would apply if the facility were to begin discharging categorical wastestreams. The
inspection team recommends that the District include all applicable limits in any regulated
facility permit, even if the facility is not discharging the regulated wastestream. (Section 6,
Control Mechanism)."
As stated to the Tetra Tech inspection team during this PC[ and previous PCAs and PCIs,
the District does not consider it appropriate to include the federal categorical standards in
permits where the process activity that would be subject to federal categorical standards is
N: fENVRSRV\Source ControlTottertLetters 20091SF8RWQC8 Reso to Pretreat Comoliance Findinas 7- 2e- 09.doc
San Francisco Bay Regional Water Quality Control Board
July 28, 2009
Page 3
actually zero discharge to the sanitary sewer. The District works closely with the permitted
[Us to understand the permit conditions and in particular, the significance of the zero
discharge for potentially categorically regulated wastestreams. A decision by an IU to begin
discharging wastewater that is subject to zero discharge standards is significant and would
result in reclassification and major permit modifications, including providing the applicable
federal categorical standards.
Federal regulations and guidelines do not classify zero dischargers as Categorical IUs. The
memo issued by U.S. EPA on this subject identified that the federal categorical standards
do not apply to an IU if they do not discharge categorically regulated wastewater. According
to the U.S. EPA memo, a control mechanism (e.g. permit) is recommended, but not
required, in order to ensure that the Control Authority (e.g. POTW Pretreatment Program)
has the ability to verify the zero discharge status of these facilities. The District has operated
the zero discharge permit program for IUs with potentially categorically regulated processes
since this U.S. EPA guidance was provided.
2. "The District's ERP does not have a definition of SNC, which has been revised under the
streamlining regulations. The inspectors recommend that the District revise the ERP to
include a definition of SNC that meets the minimum criteria listed in 40 CFR 403.8(f)(2)(vii).
(Section 9.1, Enforcement Response Plan)."
The District's ERP does not include a definition of SNC. The District's sewer use ordinance
(SUO) does include a definition of SNC and the SNC criteria have been updated to reflect
the pretreatment streamlining regulations. The SUO provisions are an integral part of the
District's ERP. During the ERP update project identified above, the District will include a
definition of SNC that will reference the applicable sections of the District's SUO.
Please let me know if you have any questions about the information presented in response
to your letter and the PCI Report. I look forward to working with you and the staff from the
RWQCB, U.S. EPA, and contractors to make changes to the District's Pretreatment
Program to ensure that protection of water quality is achieved. Please contact me at 925-
229 -7380 or by email at tpotter @centralsan.org, if you would like to discuss the content of
this response.
Sincerely,
Uxu��)
imo
Tthy Potter
Environmental Compliance Superintendent
TP /mvp
cc: Michael Chee, SF Bay RWQCB
Keith Silva, U.S. EPA Region 9
Jenny Chen, SWRCB
Jim Kelly
Ann Farrell
Kent Alm
N: \ENVRSRV\Source ControhPotte6l-etters 200g\SF8RWQCB Resp to Pretreat Compliance Findings 7- 28- 0g.doc
Central Contra Costa Sanitary District
Board Meeting
August 6, 2009
Board Member McGill
Item 7.d.1)
FUTURE MEETINGS AND CONFERENCES WITH PAID
EXPENSES AND /OR STIPEND
Will attend the Mayors' Conference in Concord, CA,
August 6, 2009
Will attend Contra Costa Council
District 10 Candidates Forum,
August 7, 2009
Will attend CASA Conference
August 12 thru 15, 2009
Will attend the Mayors' Conference
September 3, 2009
C
MEETINGS AND CONFERENCES THAT EXPENSES
AND /OR STIPEND WAS PAID
Committee Meetings
Capital Projects
August 4, 2009
Item 7.d.2 Announcements
Attended Contra Costa Council Board Meeting
July 17, 2009
Attended Contra Costa Council Water Task Force Meeting
July 21, 2009
Will attend:
Democratic Party Picnic BBQ
August 8, 2009
Contra Costa Council Water Task Force Meeting
August 18, 2009
HBANC Eastern Division Board
August 25, 2009
Central Contra Costa Sanitary District
' BOARD OF DIRECTORS
POSITION PAPER
Board Meeting Date: August 6, 2009 No.: 8.a. Engineering
Type of Action: AUTHORIZE GENERAL MANAGER TO EXECUTE CONTRACT
subject: AUTHORIZE THE GENERAL MANAGER TO SIGN THE CONTRACT WITH
CONTRA COSTA CLEAN WATER PROGRAM ALLOWING SOURCE CONTROL TO
CONTINUE CONDUCTING STORM WATER INSPECTION SERVICES
Submitted By:
Initiating Dept. /Div.:
Tim Potter,
Engineering /Environmental Services
Environmental Compliance Superintendent
REVIEWED AND RECOMMENDED FOR BOARD ACTION:
T. Potter a II K. Alm
ames Ke
eneral Ma ager
ISSUE: The current contract with the Contra Costa Clean Water Program (CWP)
expired on June 30, 2009. A contract renewal has been drafted to allow continuing the
interagency partnership of the District's Source Control Section providing storm water
inspection services for 9 of the cities in the District's service area.
RECOMMENDATION: Authorize the General Manager to execute the contract with the
CWP for the District to conduct storm water inspections in the central county cities.
FINANCIAL IMPACTS: The proposed contract provides for full reimbursement of staff
incurred cost including overhead charges. The fiscal year 2009 -10 budget for
completing these CWP inspection services is $202,095. Two contingently funded
Environmental Compliance Inspector positions work in the Source Control Section to
support the services provided under this contract.
ALTERNATIVES /CONSIDERATIONS: Decline to continue participation in County
CWP as currently organized. This alternative is not recommended. Conducting
combined inspections under this contract increases the efficiency of both programs.
Failure to participate in this program will result in loss of these efficiencies with
increased costs per inspection for both the District's current Source Control inspections
and the cities' storm water program. It would also result in more inspections of
businesses as each program would conduct a separate inspection.
BACKGROUND: The District's Source Control Section has successfully completed
storm water inspections since 1997. Conducting storm water inspections is required
under the Clean Water Act and the storm water National Pollutant Discharge Elimination
System permit issued to Contra Costa County. This requirement extends to many other
counties and cities in California and across the country. The inspection services
contract benefits the District, the cities, and the CWP with efficiencies by enabling
combined pretreatment and storm water inspections. Benefits to the District include:
Page 1 of 2
POSITION PAPER
Board Meeting Date: August 6, 2009
subject: AUTHORIZE THE GENERAL MANAGER TO SIGN THE CONTRACT WITH
CONTRA COSTA CLEAN WATER PROGRAM ALLOWING SOURCE CONTROL TO
CONTINUE CONDUCTING STORM WATER INSPECTION SERVICES
• Combined pretreatment and storm water inspections enable efficient evaluations
of business' wastewater management reducing the cost per inspection for both
programs.
• Combined inspections improve customer service to the affected businesses
since they are only inspected by one agency rather than two.
• The SF Bay Regional Water Quality Control Board and the U.S. Environmental
Protection Agency have recognized the interagency partnership agreement
established by this contract as a model watershed protection strategy.
• The Local Agency Formation Commission promotes interagency partnerships to
achieve efficiencies in government programs and this cooperative program is
consistent with those objectives.
The CWP and the participating cities value the services provided by the District under
this contract. Delta Diablo Sanitation Services and East Bay Municipal Utilities District
intend to continue providing services to the participating east and west county cities.
During a prior audit of the CWP by the RWQCB and their contractors, the District's
inspection services were identified as "top notch" by RWQCB staff.
Systems similar to a consulting business are set up to fully recovery the District's costs.
Source Control staff track their time spent on the storm water activities, including
administrative functions. To calculate the charges for these services, the billable wages
are multiplied by the District's overhead multiplier that covers both benefits and
administrative overhead. Two Environmental Compliance Inspector positions are
contingent upon maintaining the funding provided under this contract. Using the fiscal
year 2009 -10 budget, the revenues under this contract cover 70% of the District's costs
(salary plus benefits) for the two contingently funded inspectors and this appropriately
reflects the proportionate amount of employee time spend on these contract activities.
District Counsel has reviewed the draft contract with County Counsel's office. District
Counsel's recommendations have been incorporated to expand the indemnification
language and to clarify that formal enforcement actions are the responsibility of the
cities participating in this contract. The contract being considered is formatted without
an expiration date; however, it requires review by program staff every 2 years. The
District and other parties can elect to withdraw at any time upon 180 days notice.
RECOMMENDED BOARD ACTION: Authorize the General Manager to execute the
contract with the Contra Costa Clean Water Program allowing Source Control Section to
continue conducting storm water inspections in 9 of the central county cities.
Page 2 of 2
Central Contra Costa Sanitary District
' BOARD OF DIRECTORS
POSITION PAPER
Board Meeting Date: August 6, 2009
No.: 8.b. Engineering
Type of Action: AUTHORIZE GENERAL MANAGER TO EXECUTE AGREEMENT
Subject: AUTHORIZE THE GENERAL MANAGER TO SIGN A TRANSITION
AGREEMENT WITH CITY OF WALNUT CREEK FOR SOURCE CONTROL TO
CONDUCT STORM WATER INSPECTION AND TRANSITION SERVICES FOR 90
DAYS
Submitted By:
Tim Potter,
Environmental Compliance Superintendent
REVIEWED AND RECOMMENDED FOR BOARD ACTION:
T. Potter ell K. Alm
Initiating Dept. /Div.:
Engineering /Environmental Services
General
ISSUE: The City of Walnut Creek notified the District that it will be withdrawing from the
service agreement with the Contra Costa Clean Water Program (CWP). This agreement
expired on June 30, 2009 and renewal of this agreement is pending. The District needs
to be compensated for work that is completed during the transition period while the city
assumes responsibility for work conducted by the District since 1997.
RECOMMENDATION: Authorize the General Manager to sign a transition agreement
with the City of Walnut Creek for the Source Control Section to conduct storm water
inspection and transition services for 90 days.
FINANCIAL IMPACTS: This agreement with the City of Walnut Creek will provide for
indemnification and full reimbursement of the District's costs to provide the services.
ALTERNATIVES /CONSIDERATIONS: Do not provide transition support to the City of
Walnut Creek or do so without a contract. Neither alternative is recommended.
BACKGROUND: The District's Source Control Section has provided storm water
inspection services for the City of Walnut Creek and the other central county cities since
1997. The City of Walnut Creek notified the District that it did not intend to renew
services under the CWP agreement due to an analysis of the workload of its current
staff that demonstrated excess capacity existed and so the City intends to internalize
the workload previously conducted by the District under the CWP agreement.
The costs for the transition associated with a municipality withdrawing from the CWP
agreement are intended to be covered by the budget and billing procedures established
in the CWP agreement in effect at the time the withdrawal occurs. Since renewal of the
current CWP agreement did not occur prior to the expiration date of July 1, 2009 and
the District and the City of Walnut Creek would like to provide for a smooth transition,
N: \ENVRSEC \Position Papers \Potter\2009 \PP Interim Agreement with WC 8- 6- 09.130C
POSITION PAPER
Board Meeting Date: August 6, 2009
subject.. AUTHORIZE THE GENERAL MANAGER TO SIGN A TRANSITION
AGREEMENT WITH CITY OF WALNUT CREEK FOR SOURCE CONTROL TO
CONDUCT STORM WATER INSPECTION AND TRANSITION SERVICES FOR 90
DAYS
while ensuring the District's costs associated with supporting this transition are
recovered, the proposed extension agreement will reference the prior CWP agreement
that was effective from 7/1/03 through 6/30/09 to establish standards for workload
planning, payment, and indemnification.
The services to be conducted during the 90 days of this transition agreement include
conducting inspections while the City develops its inspectors' skills and capacity,
resolving pending enforcement actions, and transferring applicable files /data. The
District is available to provide the City of Walnut Creek with the field services and data
management required during this transition.
RECOMMENDED BOARD ACTION: Authorize the General Manager to sign a
transition agreement with the City of Walnut Creek for Source Control to conduct storm
water inspection and transition services for 90 days.
N1ENVRSEC \Position Papers \Potter\2009 \PP Interim Agreement with WC 8- 6- 09.DOC
Agenda Item 9.a
GRAYSON CREEK REW
EMERGENCY REPAIR UPDATE
DP 7278
August 6, 2009
STATUS OF
PERMANENT REPAIR
• Permits
• Construction activities /schedule
• Needed Board actions
1
PERMITS
• Obtained Encroachment Permits from Flood
Control District and Contra Costa County
• US Army Corps of Engineers stated that work is
out of their jurisdiction — No Permit Required
• SF Water Quality Control Board — No official
response yet, but they indicated they would not
hold up construction
• Department of Fish and Game to provide
approval for work — Expected week of Aug 17
SCHEDULE AND ACTIVITIES
• Anchor locations on bridge deck are marked
• X -ray testing to locate rebar scheduled for
this week
• Pipe is being fabricated
• Working on recovering costs above $250,000
from our Property Loss Insurance Policy
2
RECOMMENDATIONS
• Authorize the General Manager under
Public Contract Code 22050 (b) to
continue with emergency repairs on the
recycled water pipeline at Grayson Creek.
in Martinez
BASIS FOR RECOMMENDATION
• Need to complete repair this construction
season to remove temporary pipeline from
bridge
• REW service and public safety concerns
• Must proceed on emergency basis to
complete construction this year (October 15
deadline in Flood Control Permit)
• Ready to proceed
3
RECOMMENDATIONS
• Approve a change order with Manito
Construction (Item 9.b)
QUESTIONS ??
0
Central Contra Costa Sanitary District
' BOARD OF DIRECTORS
- POSITION PAPER
Board Meeting Date: August 6, 2009 No.: 9. b. Emergency Situations Requiring
Board= Action
Type of Action: AUTHORIZE CONSTRUCTION CHANGE ORDER
Subject: AUTHORIZE THE GENERAL MANAGER TO EXECUTE A CONTRACT
CHANGE ORDER WITH MANITO CONSTRUCTION, INC. FOR THE EMERGENCY
REPAIR OF THE RECYCLED WATER LINE, THE GRAYSON CREEK REW
EMERGENCY REPAIR PROJECT, DP 7278
Submitted By: Initiating Dept. /Div.:
Gary Rathunde, Assistant Engineer Engineering / Capital Projects
REVIEWED AND RECOMMENDED FOR BOARD ACTION:
ISSUE: Authorization by the Board of Directors is required for the General Manager to
execute a construction contract change order in an amount greater than $50,000.
RECOMMENDATION: Authorize the General Manager to execute a change order in
the amount of $206,500.
FINANCIAL IMPACTS: The total cost impact of the change order is $206,500.
ALTERNATIVES /CONSIDERATIONS: Do not authorize the change order, which is not
recommended.
BACKGROUND: On May 21, 2009, the Board declared the failure of the recycled
water pipeline over Grayson Creek an emergency and authorized the General Manager
to continue the repairs on the pipeline pursuant to Public Contract Code 22050(b). A
temporary 24 -inch HDPE bypass pipeline was installed along the shoulder of the bridge
to put the recycled water system back into service.
The Engineering Department, with assistance from Complete Project Solutions, Inc.,
prepared a scope of work, design drawings, and specifications for the pipeline repair
work. These documents and a request for proposal letter were sent to four current
contractors. On June 22, 2009, three proposals ranging from $204,218 to $298,422
were received.
Staff reviewed the proposals and notified the Board on July 2, 2009, that the
construction work would be awarded to Manito Construction, Inc. ( Manito), the second
lowest bidder. Manito's proposed construction method is to access the under side of
the bridge deck utilizing equipment stationed on the bridge surface, thereby eliminating
the need to have construction equipment in the creek channel. This construction
M \PESUP \Position Papers \Rathunde \7278 CO.doc Page 1 of 2
+Ke
M.
. Rathunde B
T. ecki
A.A. F
K. Alm,
District Counsel
J mes
eneral M
ISSUE: Authorization by the Board of Directors is required for the General Manager to
execute a construction contract change order in an amount greater than $50,000.
RECOMMENDATION: Authorize the General Manager to execute a change order in
the amount of $206,500.
FINANCIAL IMPACTS: The total cost impact of the change order is $206,500.
ALTERNATIVES /CONSIDERATIONS: Do not authorize the change order, which is not
recommended.
BACKGROUND: On May 21, 2009, the Board declared the failure of the recycled
water pipeline over Grayson Creek an emergency and authorized the General Manager
to continue the repairs on the pipeline pursuant to Public Contract Code 22050(b). A
temporary 24 -inch HDPE bypass pipeline was installed along the shoulder of the bridge
to put the recycled water system back into service.
The Engineering Department, with assistance from Complete Project Solutions, Inc.,
prepared a scope of work, design drawings, and specifications for the pipeline repair
work. These documents and a request for proposal letter were sent to four current
contractors. On June 22, 2009, three proposals ranging from $204,218 to $298,422
were received.
Staff reviewed the proposals and notified the Board on July 2, 2009, that the
construction work would be awarded to Manito Construction, Inc. ( Manito), the second
lowest bidder. Manito's proposed construction method is to access the under side of
the bridge deck utilizing equipment stationed on the bridge surface, thereby eliminating
the need to have construction equipment in the creek channel. This construction
M \PESUP \Position Papers \Rathunde \7278 CO.doc Page 1 of 2
POSITION PAPER
Board Meeting Date: August 6, 2009
Subject. AUTHORIZE THE GENERAL MANAGER TO EXECUTE A CONTRACT
CHANGE ORDER WITH MANITO CONSTRUCTION, INC. FOR THE EMERGENCY
REPAIR OF THE RECYCLED WATER LINE, THE GRAYSON CREEK REW
EMERGENCY REPAIR PROJECT, DP 7278
approach should be favorably reviewed by permitting agencies, so construction can be
completed by the October 1, 2009, and before the start of the wet weather season.
The Board awarded Manito Construction, Inc. the Solids Handling Improvements
Project, DP 7260, on May 21, 2009. A change order in the amount of $206,500 will be
issued to Manito Construction, Inc. for the emergency repair of the recycled water line.
As a Board - declared emergency action, this project is statutorily exempt from the
California Environmental Quality Act (CEQA) under CEQA Statute Section 21080(b)(2),
since it involves emergency repairs to a public service facility necessary to maintain
service.
RECOMMENDED BOARD ACTION: Authorize the General Manager to execute a
change order in the amount of $206,500 with Manito Construction, Inc.
N:\PESUP \Position Papers \Rathunde \7278 CO.doc Page 2 of 2