HomeMy WebLinkAbout4/3/2008 AGENDA BACKUPCentral Contra Costa Sanitary District
' BOARD OF DIRECTORS
POSITION PAPER
Board Meeting Date: April 3, 2008 No.: 3.d. Consent Calendar
Type of Action: SET HEARING DATE
subject: ESTABLISH MAY 1, 2008 AS THE DATE FOR A PUBLIC HEARING TO
CONSIDER THE ESTABLISHMENT OF GORDO N/M I LLTHWAIT ALHAMBRA
VALLEY ASSESSMENT DISTRICT NO. 2007 -2
Submitted By: Initiating Dept /Div.:
Russell B. Leavitt, Engineering Assistant III Engineering /Environmental Services
REVIEWED AND RECOMMENDED FOR BOARD ACTION:
VY
R. Leavitt C. Swanson A. Farrell K. Alm #ames M. elly
eneral Manager
ISSUE: A public hearing is required to establish the Gordon /Millthwait Alhambra Valley
Assessment District (AVAD) No. 2007 -2. A public hearing is also required to create an
assessment district pursuant to the procedure adopted under Proposition 218, which
amended the California Constitution, Article XIII D, Section 4.
RECOMMENDATION: Establish May 1, 2008 as the date for a public hearing regarding
Gordon /Millthwait AVAD No. 2007 -2 pursuant to California Constitution, Article XIII D,
Section 4, and Streets and Highways Code, Sections 5898.20 and 5898.24.
FINANCIAL IMPACTS: There are minor costs for publishing a legal notice advertising
the public hearing and for staff preparation and attendance. These costs will eventually
be paid by the AVAD participants.
ALTERNATIVES /CONSIDERATIONS:
1. Select a later date for the public meeting - This would delay the AVAD
proceedings. since the holding of a public hearing is required by law.
2. No action by the Board - No action will delay the AVAD proceedings until a
different public hearing date is set since the holding of a public hearing is
required by law.
BACKGROUND: On December 6, 2007, the Board of Directors adopted a resolution of
intention to create Gordon /Millthwait AVAD No. 2007 -2 for the purpose of installing
sewer improvements on Alhambra Valley Road, Gordon Way, Millican Court, and
Millthwait Drive in unincorporated Martinez (see Attachment 1). The proposed
Gordon /Millthwait AVAD No. 2007 -2 complies with the AVAD policy approved at the
November 2, 2006 Board of Directors meeting. Forty -five properties could be served by
a Gordon /Millthwait public sewer. As required by Proposition 218, an Engineer's Report
estimating assessments for properties within the AVAD has been prepared and
N: \ENVRSEC \Position Papers \Leavitt\2008 \PP Set Public Hearing Gordon Millthwait AVAD 2007 -2 4- 3- 08.doc Page 1 of 2
POSITION PAPER
Board Meeting Date: April 3, 2008
subject: ESTABLISH MAY 1, 2008 AS THE DATE FOR A PUBLIC HEARING TO
CONSIDER THE ESTABLISHMENT OF GORDON /MILLTHWAIT ALHAMBRA
VALLEY ASSESSMENT DISTRICT NO. 2007 -2
distributed. It is now appropriate to schedule a public hearing to offer interested parties
the opportunity to comment on the proposed assessments and related issues. A
resolution has been prepared and is attached, which, if adopted, will set the date of the
public hearing for May 1, 2008.
RECOMMENDED BOARD ACTION: Establish May 1, 2008 as the date for a public
hearing regarding Gordon /Millthwait AVAD No. 2007 -2 pursuant to California
Constitution, Article XIII D, Section 4, and Streets and Highways Code, Sections
5898.20 and 5898.24.
NAENVRSEMPosition Papers \Leavitt\2008 \PP Set Public Hearing Gordon Millthwait AVAD 2007 -2 4- 3- 08.doc Page 2 of 2
ATTACHMENT 1
RESOLUTION NO. 2008-
RESOLUTION SETTING HEARING OF PROTESTS ON
GORDON /MILLTHWAIT ALHAMBRA VALLEY ASSESSMENT DISTRICT
(AVAD NO. 2007-2)
WHEREAS, on December 6, 2007, this Board of Directors adopted Resolution
2007 -183 expressing the intent of the District to proceed with the Gordon /Millthwait
Alhambra Valley Assessment District (AVAD) No. 2007 -2 for the purpose of installing
sewer improvements on Alhambra Valley Road, Gordon Way, Millican Court, and
Millthwait Drive in unincorporated Martinez, CA; and
WHEREAS, at the direction of this Board of Directors, Curtis W. Swanson,
Environmental Services Division Manager, as Engineer of Work for improvement
proceedings for Gordon /Millthwait AVAD No. 2007 -2, Central Contra Costa Sanitary
District, Contra Costa County, California, has prepared a report described in Section
5898.22 of the Streets and Highways Code (Municipal Improvement Act of 1911); and
WHEREAS owners of each affected parcel will be provided written notice of the
proposed assessment and ballot to indicate approval or opposition of the assessment
pursuant to the procedures required by California Constitution Article XIII D, Section 4,
as amended by Proposition 218;
NOW, THEREFORE, the Board of Directors of the Central Contra Costa Sanitary
District resolves:
1. This Board sets 2 PM on May 1, 2008 at the Meeting Room of the Board
of Directors, 5019 Imhoff Place, Martinez, California, as the time and place
N: \ENVRSEC \Position Papers \Leavitt \2008 \Res AVAD 2007 -2 Gordon Millthwait Set Hearing 4- 3- 08.doc
for hearing protests to the proposed improvements and the creation of the
proposed Alhambra Valley Assessment District and assessment.
2. The Secretary of the District is directed to publish and mail the notices of
improvement required by the Municipal Improvement Act of 1911, and to
file affidavits of compliance
PASSED AND ADOPTED this 3rd day of April, 2008, by the Board of Directors
of the Central Contra Costa Sanitary District by the following votes:
AYES: Members:
NOES: Members:
ABSENT: Members:
Gerald R. Lucey
President of the Board of Directors
Central Contra Costa Sanitary District
County of Contra Costa, State of California
COUNTERSIGNED:
Elaine R. Boehme
Secretary, Central Contra Costa Sanitary District
County of Contra Costa, State of California
APPROVED AS TO FORM:
Kenton L. Alm
District Counsel
N: \ENVRSEC \Position Papers \Leavitt\2008 \Res AVAD 2007 -2 Gordon Millthwait Set Hearing 4- 3- 08.doc
Central Contra Costa Sanitary District
' BOARD OF DIRECTORS
POSITION PAPER
Board Meeting Date: April 3, 2008 No.: 3.e. Consent Calendar
Type of Action: Human Resources
Subject: AUTHORIZE MEDICAL LEAVE OF ABSENCE WITHOUT PAY
FOR VEHICLE AND EQUIPMENT SERVICE WORKER PHILIP
NOTARMASO THROUGH MAY 18, 2008
Submitted By: William E. Brennan, Initiating Dept/Div.: Collection System
Director of Collection Operations /Fleet Services
System Operations
REVIEWED AND RECOMMENDED FOR BOARD ACTION:
,6
B. Brennan C. Fre as roes M. K ly,
general Ma ager
ISSUE: Board of Directors' authorization is required for a medical leave of absence
without pay in excess of 30 days.
RECOMMENDATION: Authorize medical leave of absence without pay for Vehicle and
Equipment Service Worker Philip Notarmaso.
FINANCIAL IMPACTS: Minimal
ALTERNATIVES /CONSIDERATIONS: Deny medical leave of absence without pay.
BACKGROUND: Vehicle and Equipment Service Worker Philip Notarmaso has been
off of work since January 7, 2008, due to a non - work - related injury. Mr. Notarmaso
applied for, was granted, and used 12 weeks of Family Medical Leave. We request
authorization to grant medical leave without pay for Mr. Notarmaso through May 18,
2008. Mr. Notarmaso's status will be reviewed at that time, and further Board action will
be requested if appropriate.
RECOMMENDED BOARD ACTION: Authorize medical leave of absence without pay
for Vehicle and Equipment Service Worker Philip Notarmaso through May 18, 2008.
CSOX:000UME- 1 \jlopez \LOCALS -1 \Temp \Notarmaso Leave ofAbsence.doc
Central Contra Costa Sanitary District
' BOARD OF DIRECTORS
POSITION PAPER
Board Meeting Date: April 3, 2008 No.: 3J. Consent Calendar
Type of Action: FINANCE
subject: AUTHORIZE GENERAL MANAGER TO EXECUTE A CONTRACT FOR
TEMPORARY SERVICES FOR $60,000 TO PROVIDE DISTRICT COMPUTER
NETWORK SUPPORT SERVICES
Submitted By: Randall M. Musgraves, Initiating Dept./Div.: Administration
Director of Administration
REVIEWED AND RECOMMENDED FOR BOARD ACTION:
161&*Wusgraes � �n
Debbie cli James M. Wy,
General Manager
ISSUE: Board authorization is required to execute contracts exceeding $25,000.
RECOMMENDATION: Authorize the General Manager to execute a contract for
District computer network support services not to exceed $60,000.
FINANCIAL IMPACTS: The Information Technology budget will be exceeded by
approximately $60,000.
ALTERNATIVES /CONSIDERATIONS: Deny the request with the result of delaying
projects.
BACKGROUND: The Network Coordinator in the Information Technology (IT) Section
has been absent from the District for much of the past year due to several medical
leaves of absence. The Network Coordinator is a one - person classification and is
critical to providing support and maintenance of the file servers for the District. Staff
has attempted to fill in for the Coordinator in his absence; however, multiple projects
have fallen behind schedule as a result. Consequently, staff is requesting authorization
to contract services to assist IT through the end of this fiscal year. The Human
Resources Committee reviewed this request at its March 13, 2008 meeting, and
recommended it for full Board consideration.
RECOMMENDED BOARD ACTION: Authorize the General Manager to execute a
contract for District computer network support services not to exceed $60,000.
H:\Administrative Director's Directory\Position Paper Drafts \network coord pos ppr 3- 25- 08.doc
Central Contra Costa Sanitary District
' BOARD OF DIRECTORS
POSITION PAPER
Board Meeting Date: April 3, 2008 No.: 3.g. Consent Calendar
Type of Action: HUMAN RESOURCES
subject: DENY APPEAL OF UNION AND ADOPT THE ARBITRATOR'S
RECOMMENDATION IN THE KINNON PROMOTIONAL GREIVANCE
Submitted By: Cathryn Freitas, H. R. Initiating Dept./Div.: Administration /H. R.
Manager
REVIEWED AND RECOMMENDED FOR BOARD ACTION:
lee-�
C. Freitas WM raves mes M.
ISSUE: In accordance with the grievance procedure in the current Memorandum of
Understanding (M.O.U.) between the District and the Employees' Association, Public
Employees' Union, Local One, the Board of Directors may adopt, reject or modify the
recommendation of an appointed neutral third party (arbitrator) in grievance matters.
RECOMMENDATION: Adopt the arbitrator's recommendation to deny the appeal of
the Union in the grievance regarding the District's decision promote an employee other
than the grievant.
FINANCIAL IMPACTS: None.
ALTERNATIVES /CONSIDERATIONS: Reject or modify the arbitrator's
recommendation.
BACKGROUND: On October 5, 2006, the Board directed staff to secure the services
of an arbitrator in the Step Four appeal of the Union in a grievance regarding the
promotion of one internal employee over another. The Union, on behalf of Source
Control Inspector Kiley Kinnon, filed a grievance that the District made its promotional
hiring decision not on the qualifications of the candidates, but discriminated against Mr.
Kinnon based on his race.
Gerald McKay was the arbitrator selected by the parties. He heard the case on October
12, 2007 and December 12, 2007. Labor Counsel Allison Woodall, Esq., represented
the District. In summary, the arbitrator found that the preponderance of the evidence
did not support the Union's case.
This recommendation was reviewed by the Board's Human Resources Committee on
April 1, 2008. The Hearing Officer's decision has been forwarded to the Board under
separate cover.
CADocuments and Settings \cfreitas \My Documents\kinnon promo gry pos ppr 3- 21- 08.doc
POSITION PAPER
Board Meeting Date: April 3, 2008
subject. DENY APPEAL OF UNION AND ADOPT THE ARBITRATOR'S
RECOMMENDATION IN THE KINNON PROMOTIONAL GREIVANCE
RECOMMENDED BOARD ACTION: Adopt the arbitrator's recommendation to deny
the appeal of the Union in the grievance regarding the District's decision to promote an
employee other than the grievant.
CADocuments and SettingsWreitas\My DocumentsWinnon promo gry pos ppr 3- 21- 08.doc
4.a. Hearings
HEARING TO RECEIVE COMMENTS ON AND CONSIDER ADOPTION OF THE
PROPOSED ADDITION OF SECTION 6.20.400 TO THE DISTRICT CODE
(REIMBURSEMENT FEES FOR DISTRICT - INSTALLED FACILITIES)
SUGGESTED AGENDA
April 3, 2008
I. Request Staff Report
II. Hearing
A. Open Hearing
B. Receive comments from affected property owners
C. Receive comments from other interested parties
D. Close Hearing
III. Discussion
IV. Recommended Actions:
A. Consider adopting the proposed addition Section 6.20.400 to the District Code
(Reimbursement fees for District - installed facilities)
NAENVRSEC \Position Papers \Swanson\2008\Agenda for Hearing Reimb Fees 4- 3- 08.doc
Central Contra Costa Sanitary District
' BOARD OF DIRECTORS
POSITION PAPER
Board Meeting Date: April 3, 2008 No.: 4.a. Hearings
Type of Action: CONDUCT PUBLIC HEARING; ADOPT ORDINANCE
Subject: CONDUCT A PUBLIC HEARING AND CONSIDER ADOPTION OF AN
ORDINANCE TO ADD SECTION 6.20.400 TO THE DISTRICT CODE
Submitted By: Initiating Dept /Div.:
Curtis W. Swanson, Division Manager Engineering /Environmental Services
REVIE D AND RECOMMENDED FOR BOARD ACTION:
C. Swanson
A. Farrell
K. Alm
mes M. Ily
eneral Ma ager
ISSUE: The Board must conduct a public hearing prior to considering the addition of
Section 6.20.400 to the District Code (reimbursement fees for District - installed facilities).
RECOMMENDATION: After conducting a public hearing to receive comments, adopt
the ordinance incorporating the proposed Section 6.20.400 to the District Code
(reimbursement fees for District - installed facilities) with an effective date of seven (7)
days after publication of the ordinance or ordinance summary.
FINANCIAL IMPACTS: The District will not incur any direct expenses for implementing
the proposed addition to the District Code. The proposed addition will allow the District
to establish reimbursement fees for District — installed sewer facilities such as the
Alhambra Valley Trunk Sewer Project.
ALTERNATIVES /CONSIDERATIONS: The alternative to this action is to not adopt or
defer adoption of the proposed Section 6.20.400 to the District Code.
BACKGROUND: Title 6 of the District Code, entitled Fees and Charges, establishes
the authority, process and categories of fees charged for sewer and other services
provided by the District. One of the categories of fees that the District may charge is
reimbursement fees. The reimbursement fee program allows for the District to require
that initial installers of public sewer facilities to provide capacity for the ultimate tributary
service area, and provides for the fair and equitable distribution of costs of public sewer
facilities amongst initial and future users. The District collects reimbursement fees from
future customers when they connect to the sewer system and these fees are paid to
installers of sewer facilities to reimburse them for a portion of their installation costs.
The Board of Directors approves all reimbursement fees.
The current rules and processes in the District Code for reimbursement fees are
specifically for private installers of public sewer facilities (i.e. developers, property
owners, and homeowners).
N: \ENVRSEC \Position Papers \Swanson\2008 \PP Conduct Hearing Amendmens to Dist Code Title 6.20 4- 3- 08.doc
POSITION PAPER
Board Meeting Date: April 3, 2008
subject: CONDUCT A PUBLIC HEARING AND CONSIDER ADOPTION OF AN
ORDINANCE TO ADD SECTION 6.20.400 TO THE DISTRICT CODE
The proposed addition to the District Code are rules and processes for establishing
reimbursement fees for public sewer facilities installed by the District. The principal
differences between the proposed rules and reimbursement fee rules for private
installers are:
• Reimbursement fees would be increased annually to account for investment
earnings for the public funds used to install the sewer facilities.
• Reimbursement fees would not be decreased to account for depreciation of the
sewer facilities.
• There is no set time limit for reimbursement fees for District - installed sewer
facilities. Fees approved by the Board would be collected indefinitely until the
District has recovered all of sewer project costs plus investment opportunity
costs.
The District has not been an installer of public sewer facilities, as defined in the District
Code, until the recent extension of a public trunk sewer into the Alhambra Valley. The
proposed rules will allow the establishment of reimbursement fees so that the District
may recover the costs associated with the Alhambra Valley Trunk Sewer Project.
The proposed ordinance to include proposed provisions to the District Code for
reimbursement fees for District - installed facilities is attached.
RECOMMENDED BOARD ACTION: After conducting a public hearing to receive
comments, adopt the ordinance incorporating the proposed Section 6.20.400 to the
District Code (reimbursement fees for District - installed facilities) with an effective date of
seven (7) days after publication of the ordinance or ordinance summary.
N: \ENVRSEC \Position Papers \Swanson\2008 \PP Conduct Hearing Amendmens to Dist Code Title 6.20 4- 3- 08.doc
ORDINANCE NO.
AN ORDINANCE TO ADD SECTION 6.20.400 REGARDING CUSTOMER
REIMBURSEMENT OF DISTRICT INSTALLATION COSTS TO THE
CENTRAL CONTRA COSTA SANITARY DISTRICT CODE
WHEREAS, the Board of Directors of Central Contra Costa Sanitary District
( "Board ") has set April 3, 2008 at 2:00 PM as the date and time for a public hearing to
receive comments on and consider adoption of a proposed ordinance to add Section
6.20.400 to the District Code regarding customer reimbursement of District installation
costs;
WHEREAS, at the time and place for which notice was given, the Board
conducted a public hearing on the proposed ordinance and all interested parties were
given an opportunity to be heard, and thereupon, the hearing was closed;
WHEREAS, the Board has duly considered all of the testimony, documents and
comments submitted at the public hearing;
WHEREAS, The Board has determined that it is in the best interest of the health
and safety of District property owners to adopt an Ordinance to add Section 6.20.400 to
the District Code regarding customer reimbursement of District installation costs.
NOW THEREFORE, Board of Directors does ordain as follows:
Section 1. Section 6.20.400 shall be added to the District Code as follows:
6.20.400 Customer reimbursement of District installation costs.
In certain cases, the public interest and public safety may require the District itself to
design and construct public sewage facilities for an existing or proposed development.
In order to comply with applicable law concerning use of District revenues, the District
shall adopt a reimbursement fee structure to provide for full reimbursement of any and
all costs associated with installation of local street sewers. Reimbursement fees to
reimburse the District for other sewer facilities may also be imposed. Reimbursement
fees for District costs shall be calculated in a manner that provides for full
reimbursement to the District for all direct and indirect project costs, including but not
limited to those for planning and pre- design studies, surveying, acquisition of right -of-
way, design, bidding, construction contracts, inspection, contract administration and
financing. Such reimbursement fees shall be deposited in revenue accounts
established separately for each District Project where reimbursement of costs to the
District is applicable under this Section. Annual statements for these revenue accounts
shall demonstrate that the required full reimbursement is being achieved. The Board of
Directors shall establish the terms and conditions applicable to the reimbursement fees
for particular District - installed facilities, including provisions for expiration, in the
Ordinance setting such fees.
Section 2. Severability
1. If any provision of this Ordinance or application thereof to any person or
circumstance is held invalid by a court of competent jurisdiction, the remainder of the
Ordinance, including the application of such part or provision to other persons or
circumstances shall not be affected thereby and shall continue in full force and effect.
To this end, provisions of this Ordinance are severable.
2. The Board hereby declares that it would have passed each section, subsection,
subdivision, paragraph, sentence, clause, or phrase hereof irrespective of the fact that
any one or more section, subsection, subdivision, paragraph, sentence, clause, or
phrase is held unconstitutional, invalid or unenforceable.
Section 3. Effective Date
Upon passage and publication of this Ordinance or summary thereof, pursuant to Cal.
Health & Safety Code §§ 6490 and 6491.3, this Ordinance shall take effect seven (7)
days after publication.
PASSED AND ADOPTED this 3rd day of April 2008 by the following vote:
AYES: Members:
NOES: Members:
ABSENT: Members:
Gerald Lucey, President of the Board of Directors
Central Contra Costa Sanitary District
County of Contra Costa, State of California
COUNTERSIGNED:
Elaine Boehme, Secretary
Central Contra Costa Sanitary District
County of Contra Costa, State of California
APPROVED AS TO FORM:
Kenton L. Alm
District Counsel
Item 4.a
Proposed Addition to
District Code
Title 6 Section 6.20.400
Curtis Swanson
April 3, 2008
Background
Reimbursement Fees
Reimbursement fees provide for sharing
of costs of sewers.
Already have rules for reimbursements
fees for sewers installed by developers
and individuals.
There are no rules for reimbursement
fees for sewers installed by the District.
Proposed Section 6.20.400
Would establish a process & rules for
reimbursement fees for District - installed
sewer facilities.
Differences from existing rules:
Increase fees annually for anticipated
investment earnings
No depreciation
No time limit
Why Amend Code Now?
Driving force is the Alhambra Valley
Trunk Sewer Project.
District reserves were used for the
Alhambra Valley sewers.
Want system in place to recover District
costs as soon as possible.
2
Central Contra Costa Sanitary District
' BOARD OF DIRECTORS
POSITION PAPER
Board Meeting Date: April 3, 2008 No.: 6.a. Bids and Awards
Type of Action: CONSIDER BID PROTEST /AUTHORIZE AWARD OF CONSTRUCTION
CONTRACT /AUTHORIZE EXECUTION OF CONTRACT DOCUMENTS AND
AMENDMENT TO PROFESSIONAL SERVICES AGREEMENT
subject: CONSIDER HSR INC. BID PROTEST /AUTHORIZE AWARD OF A
CONSTRUCTION CONTRACT; AUTHORIZE THE GENERAL MANAGER TO
EXECUTE CONTRACT DOCUMENTS WITH LISTER CONSTRUCTION INC.; AND
AUTHORIZE AN AMENDMENT TO A PROFESSIONAL SERVICES AGREEMENT
WITH CALPO, HOM & DONG ARCHITECTS FOR THE CONSTRUCTION OF
TREATMENT PLANT SITE IMPROVEMENTS, DISTRICT PROJECT 7251
Submitted By: Initiating Dept. /Div.:
Craig H. Mizutani, Associate Engineer Engineering / Capital Projects
REVIEWED AND RECOMMENDED FOR BOARD ACTION:
A- AOM--- 044 00-'e4
lt,,K/utan A. Antkowiak T. i A. Farrell K. Alm mes M elly,
keneral anager
ISSUE: On March 4, 2008, thirteen sealed bids were received and opened for the
construction of the Treatment Plant Site Improvements, District Project 7251. On
March 6, 2008, a timely bid protest was received. As part of its deliberations, the Board
needs to consider the merits of any timely bid protests. The Board of Directors must
award the contract or reject bids within 50 days of the bid opening.
RECOMMENDATION: Reject the bid protest; award a construction contract; authorize
the General Manager to execute the Contract Documents and authorize the General
Manager to execute an amendment to the Professional Engineering Services
Agreement with Calpo, Hom & Dong Architects (CHD).
FINANCIAL IMPACTS: Approximately $2,421,000, including design, bid price,
contingency, and construction management if awarded to Lister Construction Inc.
Approximately $40,000 more if awarded to HSR Inc.
ALTERNATIVES /CONSIDERATIONS: Accept the protest and award to the second low
bidder HSR Inc., which is not recommended. Reject all bids, which is also not
recommended.
BACKGROUND: The Plant Site Improvements Project restores, repairs, replaces,
improves and maintains treatment plant infrastructure including pavement, handicap
access, drainage, communications, fencing, and gates. This project includes 20 areas
at the treatment plant, Household Hazardous Waste Collection Facility, and Martinez
Pumping Station (see Attachment 1).
Page 1 of 19
N: \PESUP \Position Papers \Mizutani \7251 R Award Construction Contract.doc
POSITION PAPER
Board Meeting Date: April 3, 2008
subject: CONSIDER HSR INC. BID PROTEST /AUTHORIZE AWARD OF A
CONSTRUCTION CONTRACT; AUTHORIZE THE GENERAL MANAGER TO
EXECUTE CONTRACT DOCUMENTS WITH LISTER CONSTRUCTION INC.; AND
AUTHORIZE AN AMENDMENT TO A PROFESSIONAL SERVICES AGREEMENT
WITH CALPO, HOM & DONG ARCHITECTS FOR THE CONSTRUCTION OF
TREATMENT PLANT SITE IMPROVEMENTS, DISTRICT PROJECT 7251
The work includes the following:
♦ Replacing worn, deteriorated asphalt and re- grading areas that create hazards
to traffic.
♦ Sealing and striping of existing asphalt surfaces throughout the plant and
parking lots.
♦ Correcting the routing of storm drains that currently drain off -site.
♦ Paving of existing gravel areas around the South clarifiers to improve access
and maintenance.
♦ Improving drainage at the Bioassay trailer, HOB parking lot, and other areas at
the treatment plant.
♦ Replacing the pond fence.
♦ Replacing the gates at: the main treatment plant entrance, the Imhoff Drive
entrance, and the Martinez Pumping Station. New motorized operators will be
installed at all three locations.
♦ Addition of permeable paving west of substation 16 and south of the primary
sedimentation tanks.
♦ Providing provisions for future security cameras and access at the Martinez
Pumping Station and treatment plant.
♦ Modifying parking areas at the HOB, POB, Lab, and Annex for Americans with
Disabilities Act (ADA) compliance.
♦ Installing a conduit path for installation of fiber optic cable for connection to
AT &T service.
District staff prepared the plans and specifications for the majority of the project. Calpo,
Hom & Dong Architects (CHD) prepared the plans and specifications for the ADA work.
The Engineer's estimate for construction of the project is $2,200,000. This project was
advertised on January 2 and January 9, 2008. Thirteen sealed bids ranging from
$1,584,000 to $2,105,300 were received and publicly opened on March 4, 2008. A
summary of bids received is shown in Attachment 2. The Engineering Department
conducted a technical and commercial review of the bids. The apparent low bidder is
Lister Construction Inc. (Lister). Staff has also reviewed the bid submitted by HSR Inc.,
the second low bidder, and determined its bid to be responsive.
On March 6, 2008, the second -low- bidder, HSR Inc. (HSR), submitted a timely bid
protest claiming the bid submitted by Lister contained material defects (Attachment 3).
N: \PESUP \Position Pape rs \Mizutani \7251 R Award Construction Contract.doc Page 2 of 19
POSITION PAPER
Board Meeting Date: April 3, 2008
subject: CONSIDER HSR INC. BID PROTEST /AUTHORIZE AWARD OF A
CONSTRUCTION CONTRACT; AUTHORIZE THE GENERAL MANAGER TO
EXECUTE CONTRACT DOCUMENTS WITH LISTER CONSTRUCTION INC.; AND
AUTHORIZE AN AMENDMENT TO A PROFESSIONAL SERVICES AGREEMENT
WITH CALPO, HOM & DONG ARCHITECTS FOR THE CONSTRUCTION OF
TREATMENT PLANT SITE IMPROVEMENTS, DISTRICT PROJECT 7251
These defects were identified as:
1) The Bidder's Bond form was signed by the bidder, but the Acknowledgement of
Principal's Signature was not notarized.
2) Lister did not list a subcontractor for the motorized gate operator work. HSR claimed
that since Lister did not list a subcontractor, they must perform the work themselves.
The Contract Documents require the gate operators to be installed by factory
authorized technicians. HSR claimed that Lister was not factory authorized and could
not perform the work, thus making their bid non - responsive.
3) HSR claimed that Lister does not possess the required contractor's license to install
handrail and that a qualified subcontractor should have been listed on the bid forms.
Lister responded to the bid protest in their letter dated March 12, 2008 (Attachment 4).
District Staff and Legal Counsel have reviewed HSR's bid protest and Lister's response.
Based on the information provided, staff has determined the following (by item):
1) Lack of acknowledgement by a notary is not considered a material defect in the bid.
2) Lister has stated they can meet the requirements of the Contract Documents. The
operators will be installed by a second tier subcontractor performing work for the listed
electrical subcontractor.
3) Lister has both Class A and Class B contractor's licenses which are appropriate for
this work.
Therefore, staff has determined that the bid submitted by Lister is responsive and Lister
is the lowest responsive bidder with a bid amount of $1,584,000. A letter stating staff's
determination was sent to HSR Inc. on March 17, 2008 (Attachment 5). In accordance
with the Contract Documents, the Board has the ultimate authority to determine
whether a bid is responsive or not and to waive any non - material irregularities in bids
received; staff seeks the Board's concurrence with staff's determination.
District staff will provide contract administration, inspection, survey, office engineering,
and will coordinate review of submittals. District staff will also perform the majority of the
shop drawing review and construction support services for this project. Staff
recommends that CHD provide civil construction support related to the ADA work.
Construction support services include reviewing shop drawings and submittals,
N: \PESUP \Position Papers \Mizutani \7251 R Award Construction Contract.doc
Page 3 of 19
POSITION PAPER
Board Meeting Date: April 3, 2008
Subject: CONSIDER HSR INC. BID PROTEST /AUTHORIZE AWARD OF A
CONSTRUCTION CONTRACT; AUTHORIZE THE GENERAL MANAGER TO
EXECUTE CONTRACT DOCUMENTS WITH LISTER CONSTRUCTION INC.; AND
AUTHORIZE AN AMENDMENT TO A PROFESSIONAL SERVICES AGREEMENT
WITH CALPO, HOM & DONG ARCHITECTS FOR THE CONSTRUCTION OF
TREATMENT PLANT SITE IMPROVEMENTS, DISTRICT PROJECT 7251
responding to design questions, evaluating change order requests, and performing site
visits to verify compliance with the design intent. CHD was selected because they
prepared the plans and specifications for the ADA modifications. With Board
concurrence, staff proposes to negotiate a $10,000 amendment with CHD for
construction support service. This will increase the agreement cost ceiling to $60,000.
The funds required to complete this project, as shown in Attachment 6, are $2,174,000.
The total cost of the Treatment Plant Site Improvements is anticipated to be $2,421,000.
This project is included in the FY 2007 -08 Capital Improvement Budget (CIB) on
pages 89 and 90. The scope of the project has been expanded to address several
necessary projects, such as ADA improvements, fiber optics and drainage, as well as to
take advantage of a favorable bid climate. This change in planned expenditure was
reviewed by the Capital Projects Committee and determined to be within the General
Manager's authority. Staff has conducted a cash -flow analysis of the Treatment Plant
Program and concluded that adequate funds are available for this project.
Staff has concluded that this project is exempt from the California Environmental
Quality Act (CEQA) under District CEQA Guidelines Section 15301 since it involves
minor alterations to existing public facilities. Approval of this project will establish the
Board of Directors' independent finding that this project is exempt from CEQA.
RECOMMENDED BOARD ACTION: Reject the bid protest and authorize award of a
construction contract in the amount of $1,584,000 for the construction of the Treatment
Plant Site Improvements, District Project 7251, to Lister Construction, Inc., the lowest
responsive bidder; authorize the General Manager to execute the Contract Documents;
and authorize a Professional Services Agreement with Calpo, Hom & Dong Architects.
N: \PESUP \Position Pape rs \Mizutani \7251 R Award Construction Contract.doc Page 4 of 19
TABLE OF CONTENTS (ATTACHMENTS)
N: \PESUP \Position Papers \Mizutani \7251 R Award Construction Contract.doc Page 5 of 19
ATTACHMENT 1
Location Map
ATTACHMENT 2
Summary of Bids
ATTACHMENT 3
Bid Protest Letter from HSR Inc.
ATTACHMENT 4
Lister Response to Bid Protest Letter
ATTACHMENT 5
Letter to HSR Inc.
ATTACHMENT 6
Post - Bid / Pre - Construction Estimate
N: \PESUP \Position Papers \Mizutani \7251 R Award Construction Contract.doc Page 5 of 19
i
1
N IQ
ME PROJECT AREAS
NOTES:
• SLURRY SEALING THROUGHOUT PLANT.
• MARTINEZ PUMPING STATION NOT SHOWN.
• IMHOFF DRIVE GATE NOT SHOWN.
Central Contra Costa Attachment
Sanitary District TREATMENT PLANT SITE IMPROVEMENTS
District Project 7251 .�
Project Locations
Page 6 of 19
PROJECT NO.: 7251
ATTACHMENT 2
TREATMENT PLANT SITE IMPROVEMENTS
DISTRICT PROJECT 7251
SUMMARY OF BIDS
DATE: MARCH 4, 2008
PROJECT NAME: TREATMENT PLANT SITE IMPROVEMENTS
PROJECT LOCATION: MARTINEZ, CALIFORNIA ENGINEER EST.: $2,200,000
BIDDER
BID PRICE
Lister Construction, Inc.
896 Aldridge Road, Suite B
$1,584,000
Vacaville, CA 95688
HSR, Inc.
530 Aldo Avenue
$1,621,021
Santa Clara, CA 95054
William G. McCullough Construction
2625 East 18th Street
$1,703,235
Antioch, CA 94531 -2119
J. A. Gonsalves and Son Construction, Inc.
1100 Soscol Ferry Road
$1,772,050
Napa, CA 94558
Hess Construction Co. Inc.
4484 Hess Drive
$1,778,000
American Canyon, CA 94503
GradeTech, Inc.
PO Box 1728, San Ramon 94583
$1,838,800
10250 Crow Canyon Road
Castro Valley, CA 94552
McGuire & Hester
9009 Railroad Avenue
$1,897,409
Oakland, CA 94603
ProVen Management, Inc.
706 Sansom Street
$1,899,000
San Francisco, CA 95111
Beebe Corporation
6101 Sky Creek Drive
$1,904,590.95
Sacramento, CA 95828
Ghilotti Bros., Inc.
525 Jacoby Street
$1,944,000
San Rafael, CA 94901
Ghilotti Construction Company, Inc.
246 Ghilotti Avenue
$1,973,480
Santa Rosa, CA 95407
Sposeto Engineering, Inc.
4301 Betten Court Way
$1,988,500
Union City, CA 94587
Bay Cities Paving and Grading, Inc.
5029 Forni Drive
$2,105,300
Concord, CA 94520
BIDS OPENED BY Elaine R. Boehme DATE March 4, 2008
N: \PESUP \Position Pape rs \Mizutani \7251 R Award Construction Contract.doc
SHEET NO. 1 OF 1
Page 7 of 19
ims �A
r! lip 71 ATTACHMENT 3
4
IC'Nea c�Kgucceau�g �e.ukactaut � �U.AI�I��.1�r.. Santa (I;ira. (�:A 9i11� 1 i 111, i �f�_'- �l�)ib ; 11)211 �f,, ')t)�' i fI (tiLR 't. '4W.3
March 6, 2008
Board of Directors
Central Contra Costa Sanitary District
5019 Imhoff Place
Martinez, Ca.
Re: Central Contra Costa Sanitary District — Project 7251
Protest of Bid Filed by Lister Construction
Mr. James M. Kelly:
MAR 1 12008
HSR Inc. submitted a proposal for the above project on March 4, 2008 per the plans and
specifications. Please accept this letter as a formal protest regarding the proposal
submitted by Lister Construction the apparent low bidder.
The Lister Proposal does not comply with the specifications in at least three areas:
The specifications for the project stipulate that the principal needs to sign the
bidder's bond (Form DP 7251 — Volume 2 — Page 11) and have his or her
signature notarized. In addition the specifications require bonding company to
notarize its signature (form DP7251 — Volume 2 — Page 12) as well. While the
Lister proposal does include the notarized signature of the bonding company it
does not include the notarized signature of the principal (Lister Construction)
required on Page 11. This is a material defect in their proposal and the lack of
notary should render their bid non - responsive. Such material defects in a
proposal would serve to allow the offending firm to void its contract at its own
choosing at any time it would seem beneficial to do so during the contract period
or even the warranty after completion. Additionally, if a major defect arose
requiring the bonding company to step in and complete the work or cover the
defects in construction they also would have a defense because the proposal is
not complete and accurate and contains such a material defect.
2. The apparent low bidder did not list a subcontractor for the electronic gate work
required on several of the project sites. Section 02836 Paragraph 1.4 E states
"system shall be installed by a factory- authorized contractor, with technicians
specifically trained in this system." The electronic gate work is well in excess of
'/z of 1 % of the project (copies of subcontractor proposals attached) which either
requires that a subcontractor be listed for the work or it must be self - performed.
The non - listing of a subcontractor for this specialty item of work requires Lister to
self - perform these services. However Lister is not a "factory- authorized
contractor" and due to this cannot self - perform the work. Their only option here
would be to attempt to add a subcontractor who could meet the specifications.
The specifications are clear that subcontractors cannot be added after the bid
InUTK
�.
Page 8 of 19
submittal. This aspect even further supports the fact that the Lister bid is non-
responsive to your specifications.
For information HSR listed the Door Company, a factory certified contractor in
this type of installation and AAA Fence for the other fencing required for the
project. The Lister proposal included Calco Fencing for fencing (proposal
attached) which specifically excludes the electronic gate work because they are
not a factory certified installer.
3. Additionally the apparent low bidder did not list anyone for the installation of hand
railing required on several of the projects. HSR listed the lowest responsive
subcontractor Bay Area Metals for this work. The Bay Area proposal (copy
attached) was $ 68,000 which greatly exceeds '/2 of 1 % of the contract amount.
Again the specifications require them either to list a subcontractor or self perform
this work. A review of the license classifications held by Lister Construction
indicates that they do not have a license classification for handrail work.
Secondarily and maybe even more importantly The Lister proposal bid Item 10 at
$9000.00. The subcontractor proposal for railing on this site is $17,805.00.
From this number it is clear that they did not include the subcontractor costs for
railing at this site and if they state that they did then their bid is substantially
unbalanced as it relates to this site which again by specification could render
their proposal non - responsive.
HSR Inc. does not take the filing of a bid protest lightly nor do we make it a standard
practice to do so. However all of the above listed issues are material defects in the
Lister proposal and should upon review be cause for the rejection of their proposal. We
ask that you review our protest and respond with any questions or concerns you might
have in as timely a manner as possible.
Thank you in advance for your consideration into this matter.
Sincerely
HSR Inc.
R. Keith Dorsa
President
Cc. Lister Construction
896 Aldridge Road, Suite B
Vacaville, Ca. 95688
Page 9 of 19
I-I S R, IIVCORYOI2ATE:D G'I:NE:RAL ENC3iNI:E:RINC, F'.NVIRONME:NTAL, DEMOLITION. CONCRETE: CR.CISHIIVG'
3
JQ
z 2� �s
ic r
c�
�y
i
e�
�i
9'
�C )
t,
7
}
Page 10 of 19
o
�
�
�
m
Page 10 of 19
----------
AY AREA WELDING & MAUMNANCE
P. O. Box 5303
Richmond, CA 94805
(510) 233 -3485 Fax: (510) 236 -5621
LIC #499501
NAME /ADDRESS
ESTIMATOR
Estimate
DATE
ESTIMATE NO.
3/4/2008
08804
PROJECT
Treatment Plant Site Improvements
DESCRIPTION
QTY
COST
TOTAL
Treatment Plant Site Improv. District Project. No. 7251
ITEM 10: Fabricate & Install aluminum three rail railings.
173,805.00
17,805.00
Core drilling, shop drawings.
Exclusions: remove old rails, patching holes, concrete
work
ITEM 12: Sheet 18; Detail 10: Bulkhead, galvanize
1,975.00
1,975.00
F.O.B.
ITEM 13: Sheet 20; Detail 18 dt 19: 6 Sign post F.O.B.
1,780.00
1,780.00
ITEM 21: Sheet A18-2 and A18 -5: Handrails, steps and
33,150.00
33,150.00
ramps. Core drilling, shop drawing,
Exclusions: paint, setting can's and concrete
4 - H.C. Detail 23 and 9 - H.C. Detail 24;galvanize only
13,290.00
1.3,290.00
F.O.B
Estimate is good for 30 days from date of Estimate:
ACCEPTANCE OF ESTIMATE:
BY:
TITLE:
DATE:
Please sign and fax back if Estimate is accepted
TOTAL $68,000.00
Page 11 of 19
CALCO FENCE,INC, BID PROPOSAL
P.O. BOX 1127 - LIVEIR.MORE, CA- 94351 -11127
(925) 449-5081 FAX - (925) 449-51 77
LICENSE NO. 458341 CLASSIFICATION C -13
SIGNATORY TO IRONWORKER AND LABORER UNIONS
SMALL BUSINESS ENTERPRISE
CERTIFIED LSE WITH ALAMEDA CO. TRANS. AUTHORITY *07-91013
BOND RATE - 2% - COST OF BOND 1' NOT INCLUDED IN PRICE LISTED BELOW
LIABILITY INSURANCE LIMITS - $1 MIL EACH OCCURANCE / $1 MIL PERSONAL
INJURY / $2MIL PRODUCT ASS / $2MIL GENERAL ABCs- / $1 MIL AUTO
PROJECT NAME: TREATMENT PLANT SITE IMPROVEMENTS - CCCSD
DATE do TIME OF BIDE MAR. 4, 2008 2 PM
PROJECT LOCATION: MARTINEZ, CA.
ESTIMATOR: mum MILL
ADDENDUMS NOTED: 1,2 3
BID BREAKDOWN- PAGE ONE
Item 12 - Site 9 - South of South e - hain link fence work only - We will remove the existing
chain link fence, rails, fittings and gates from the existing posts, leave the posts in place, then return and
reinstall all materials on the some posts with no repairs figured in on the existing posts.
Exclusions - All other work under this item to be by others.
TOTAL - S 3,335.00 Three thousand three hundred thirty five
Item 13 - Site 10 - Gas Yard Area - We will supply and Install the two pipe bollards, painted and filled.
Exclusions: All other work under this item to be by others.
TOTAL - $ 380.00 Three hundred eighty
Item 17 - Site 14 - Pond Area Fence - Others to remove the existing fence and grade the area. We will
supply and install complete approx. 493 LF of IF high ornamental iron fence and one 8' wide single swing
gate with all posts and hardware.
Exclusions: Existing fence removed and hauled off by others and the area graded by others and
temporary fence and gates by others.
TOTAL - S 22,495.00 Twenty two thousand four hundred ninety five
Item 19 - Site 16 - Martinez Pumping Station Gate - Others to remove the existing facilities - We will dig
and set the new posts, install approx. 18 LF of chain fink fence and install one 20' wide slide gate with
the bolt down angle iron track.
Exclusions: Automation by others, ground track pad by others, existing facilities removed by others and
temporary fence and gates by others.
TOTAL - $ 4,895.00 Four thousand eight hundred ninety five
Item 20 - Site 17 - DAFT Area - We Oil supply and install complete two Tie Down posts with flanges,
anchor bolts and eyebolts.
Exclusions: Concrete pads by others and all other work on this site by others.
TOTAL - 3 315.00 Three hundred fifteen
TOTAL BD) PRICE. - SEE PAGE TWO FOR CONTINUATION
C�T'L*'
Page 12 of 19
VJf VJ! LV VU LJ•TJ JLJTT JI VVT
CALCO FENCES NC. BID PROPOSAL
P.O. BOX 1127 - LWER.WORE, CA. 44551 -1127
(92S) 449 -5081 FAX - 192S) 449-3177
LICENSE NO. 45B341 CLASSIFICATION 0 -13
SIGNATORY TO IRONWORKER AND LABORER UNIONS
SMALL BUSINESS ENTERPR19C
CERTIFIED L ®E WITH ALAMEDA CO. TRANS. AUTHORITY #07 -91 O1 7
BOND RATE - 2% - COST OP* BOND 19 NOT INCLUDED IN PRICE LISTED BELOW
LIAi1LITY INSURANCE LIMITS - S 1 MIL EACH OOCURANCE / $ 1 MIL PERSONAL
INJURY / $2MIL PRODUCT AGO / $ZMIL GENERAL AGO. / $1 MIL AUTO
PROJECT NAMEs TREATMENT PLANT SITE IMPROVEMENTS - CCCSD
DATE & TiME OF 181110: MAR. 4. 2008 2 PM
PROJECT LOCATIONs MARTINEZ, CA.
ESTERATOR: MUM E HILL
A.DDENDIJMS NOTED: 1,2,3
DID BREAKDOWN: PAGE TWO
Itemn 21 - Site 18 - Ornamental rion fence and gates at HHWCF Parking Lot - We will supply and install
complete 5 LF of 8' high ornamental iron fence and one 42" wide single swing gate with all posts and
hardware.
Exclusions: All other work under this Item to be by others.
TOTAL - $ 3,195,00 Three thousand one hundred ninety five
Item 22 - Site 19 - Main Entrance Fence /Gate - Existing fence and gates and facilities removed by
others - We wiN supply and Instal the new posts for the 10' high omamental iron fence and the fence
panels for approx. 33 LF of fence and we will core drill the existing wall and install the new posts for
the 7' high ornamental iron fence and the fence panels for approx. 74 LF of fence.
We will supply and install the 28' wide x 10' high double slide gate with V groove ground wheels and
the bolt down angle iron track. We will also supply and Install the 6 pipe bollards.
Exclusions: Automation by others, ground track pads by others, existing facilities removed by others, all
signs by others, all modifications of existing pads by others, field verification of electrical duct bank
depth by others.
TOTAL - $ 38,945.00 Thirty eight thousand nine hundred forty five
Item 23 - Site 20 - Imhoff Drive Entrance Gate - Existing gates and facilities removed by others and
temporary fence and gates supplied and installed by others - We will vacuum the new post footings and
install two new gate posts and one new 20' wide full cantilever chain link slide gate, ready for automation
by others. We will also supply and install 5 removable pipe bollards and 2 fixed pipe bollards, painted
and filled with concrete.
Exclusions: Automation by others, existing gates removed by others, temporary fence and gates by
others, existing facilities removed by others, signs by others.
TOTAL - $ 13,940.00 Thirteen thousand nine hundred forty
TOTAL BED PRICE - $87,500.00
EIGHTY SEVEN THOUSAND FIVE HUNDRED
C�-V Page 13 of 19
See
)4z. c A e,k
Dated 2008 Company Name
�opnn Nor
ACKNOWLE
State of California
County of
On
Public, personally appeared
:ipal (Authorized Signature)
less Address
E:
State
CAPACITY CLAIMED BY
SIGNER
a notary 11 INDIVIDUAL(S)
❑ CORPORATE OFFICER(S)
Name(s) of Signer(s) Title(s)
❑ PARTNER(S)
❑ personally known to me -OR- ❑ proved to me on basis of satisfactory ❑ ATTORNEY -IN -FACT
evidence to be the person(s) whose name(s) is/are subscribed to the within ❑ TRUSTEE(S)
Instrument and acknowledged to me that he /she/they executed the same In
his/her /their authorized capacity(ies) and that by his/her /their signature(s) on ❑ OTHER
the instrument, the person(s) or the entity upon behalf of which the Describe
person(s) acted, executed the instrument.
❑ SUBSCRIBING WITNESS (for
WITNESS my hand and official seal
Signature of Notary
SIGNER IS
REPRESENTING:
Name(s) of Person(s) or Entity(ies)
Page 14 of 19
ATTACHMENT 4
L I S T E R
CONSTRUCTION, INC.
CALIFORNIA STATE CONTRACTOR'S LICENSE NUMBER 630673
896 Aldridge Road, Suite 13, Vacaville, CA 95688 -1027
Office:(707)451 -2813 Fax:(707)450 -0291
March 12, 2008
Mr. Craig Mizutani Mai j 2 ZDQ$
Central Contra Costa Sanitary District
Martinez, CA
Irn n
RE: Response to Bid Protest
Treatment Plant Site Improvements Project 7251
This letter is prepared in response to your facsimile letter dated March 10, 2008 containing a bid
protest from HSR General Engineering. Our response to each concern is provided below.
1. A copy of the signature page with a notarized signature is attached.
2. The only electrical work on the project is associated with the gate work. Therefore, any
and all electrical work, including the gate operator work, will be contracted to our
electrical subcontractor, Anthony's Electric. Anthony's will in turn utilize a second tier
subcontractor for the gate operator work that meets the requirements of 02836 Paragraph
1.4E. Per public contract code, listing of second tier subcontractors is not required.
3. The work for the hand rails will be self performed by our own forces. Thus, it is not
necessary to list a subcontractor for this work. A metal shop will fabricate the hand rails
and they will be installed by Lister. In response to paragraph 2 of HSR's Item 3, we do
not intend on using the subcontractor that they listed for this work therefore any pricing
associated with HSR's subcontractors is irrelevant.
We trust that we have addressed each of the concerns identified above. Please let us know if we
can be of further assistance in award of the contract. We look forward to a successful project
with the district.
Sincerely,
Walter C. Lister
President
Page 15 of 19
Dated
2008 �.. ��e Q ► �� i�u< u T�1
Company Name
Principal (Authorized Signature)
Business ddress
4LLA U.rt �
City State
ACKNOWLEDGMENT OF PRINCIPAL'S SIGNATURE:
State of California ) SS
County of
on before nie _�.�..I chk C 09 ' a Notary
Public, personally appeared _ W -rA \2 r C. �.. \�� �e r•
Name(s) of Signer(s)
❑ personally known to me -OR- 0 proved to me on basis of satisfactory
evidence to be the person($) whose name(r) isfare subscribed to the within
instrurrmnt and acknowledged to me that he/sheAhey executed the same in
his/herAheir authorized capacitA4B) and that by hislpe AMW signatuneft on
the instrument, the person(*) or the entity upon behalf of which the
personWacted, executed the instrument.
WITNESS my hand and official seal
Si re of ry
LINDA Co T1
Commission N 1711J76
Nofory Public - CcNfornla
Solana, County
Corm. 8 s.lar►1 SDI i
DP 7251 — Volume 2 — Page 11
CAPACITY CLAIMED BY
SIGNER
❑ INDIVIDUAL(S)
�. CtPORATF�OFFICER(S)
Title(s)
❑ PARTNER(S)
❑ ATTORNEY -IN -FACT
❑ TRUSTEE(S)
❑ OTHER
❑ SUBSCRIBING WITNESS (for
_Ttyrrn �`Y l :c (t
SIGNER IS
REPRESENTING:
Name(s) of Person(s) or ErdMies)
�... a� r C o ,yA, .,4,\v \o,\
Page 16 of 19
ATTACHMENT 5
District
March 17, 2008
CERTIFIED MAIL NO
File: 7251.5.1.4
HSR Inc.
530 Aldo Avenue
Santa Clara, CA 95054
7007 0710 0004 6169 4215
Attn: Mr. R. Keith Dorsa, President
Dear Mr. Dorsa:
TREATMENT PLANT SITE IMPROVEMENTS, CENTRAL CONTRA COSTA
SANITARY DISTRICT PROJECT 7251, PROTEST OF BID
F': X: (925) 372-7,492
i.�/r.e.v K1LI.)
�rnrrd 1 buy. {prr
�um,�rl /w• lhr ! lllll•Ifl
,;lo, So.2000
l L IINI It Rnl'LIAIL
Se, rrlury nJ drr l )icnvcl
Thank you for your interest in Central Contra Costa Sanitary District's (District)
Project No. 7251 ( "Project "). We have received your letter of March 6, 2008, which
protests the bid submitted by Lister Construction for the Project. After careful review of
your letter with our District Counsel, we respectfully disagree with the positions set forth
in your letter and hereby deny your bid protest. Consequently, the Central Contra Costa
Sanitary District will recommend award of the contract for this Project to Lister
Construction, Inc. ( "Lister ").
In response to Item No. 1, the lack of acknowledgement by a notary on the bidder's
bond is not considered a material defect in the bid. California law permits the District to
treat such an omission as an immaterial discrepancy that does not affect the
responsiveness of the bid. We have received a signed and notarized copy of the
Acknowledgement of Principal's Signature from Lister.
In response to Item No. 2, Lister Construction has stated that they can meet the
requirements of the Contract Document regarding installation of the gate operators.
The operators will be installed by a second tier subcontractor performing work for
Anthony's Electric, the listed electrical subcontractor.
In response to Item No. 3, we disagree with your claim that Lister does not have the
required Contractor's license to perform the handrail work. The handrail, fabricated by
others, will be installed by Lister Construction. Lister has both Class A and Class B
contractor's licenses, which are appropriate for this work.
Page 17 of 19
A
L� '
HSR Inc.
Page 2
March 17, 2008
Based on the foregoing, the District has made a determination that the bid presented by
Lister is the lowest responsive bid. Accordingly, the District will recommend award of a
contract to Lister at the April 3, 2008 Board meeting. Thank you for your interest in
Central Contra Costa Sanitary District.
Please contact me if you have any questions.
Sincerely,
�. ti
Craig M tani
CHM:jf
cc: A. Antkowiak, A. Farrell, J. Kelly, T. Pilecki
Meyers Nave Riback Silver & Wilson
Page 18 of 19
N:',PESUP\Design \District Projects \7251 \HSR Ltr.doc
ATTACHMENT 6
TREATMENT PLANT SITE IMPROVEMENTS PROJECT
DISTRICT PROJECT 7251
POST - BID I PRE - CONSTRUCTION ESTIMATE
% of Estimated
No. Item Description Amount Construction
Cost
1 CONSTRUCTION
Page 19 of 19
N PESUP`Pcsiticn Papers'Mizutanr,1251 R Award Construction Contract.doc
a. Construction Contract
$1,584,000
b. Contingency at 20%
$317,000
TOTAL CONSTRUCTION
$1,901,000
100%
2
CONSTRUCTION MANAGEMENT
a. District Forces
- Construction Management and Inspection
$210,000
SUBTOTAL
$210,000
11%
b. Consultants
- Additional specialty inspection, if required
$10,000
- ADA consultant (Calpo, Hom & Dong Architects)
construction services
$10,000
SUBTOTAL
$20,000
1%
TOTAL CONSTRUCTION MANAGEMENT
$230,000
12%
3
TOTAL CONSTRUCTION PHASE COST
$2,131,000
112%
4
TOTAL PREBID EXPENDITURES
$290,000
15%
5
TOTAL DESIGN AND CONSTRUCTION MANAGEMENT COST
$520,000
27%
6
TOTAL ESTIMATED PROJECT COST
$2,421,000
127%
7
FUNDS AUTHORIZED TO DATE
$247,000
8
ADDITIONAL ALLOCATION NEEDED TO COMPLETE
PROJECT
$2,174,000
Page 19 of 19
N PESUP`Pcsiticn Papers'Mizutanr,1251 R Award Construction Contract.doc
Agenda Item 6a
Treatment Plant Site
Improvements Project, DP 7251
Bidding /Award
Board of Director's Meeting
April 3, 2008
Treatment Plant Site Improvements
Bid Background
• March 4, 2008 -13 bids received
• Engineer's estimate $2,200,000
• 13 Bids: 1,584,000 to $2,105,300
• Apparent low bidder, Lister Construction
• March 6, 2008 Bid protest received
• March 6, 2008 Project scope presented to
Board
Treatment Plant Site Improvements
Bid Protest
• March 6, 2008 - Bid protest by second low
bidder, HSR Inc.
1. Bidder's Bond signed but not notarized
2. No subcontractor listed for installation of
motorized operators for entry gates
3. No subcontractor listed for installation of
handrail
Treatment Plant Site Improvements
Bid Protest Response
• March 12, 2008 Response from Lister
Construction
• Bid Protest and response reviewed by
District Staff and Legal Counsel
1. Bidders' Bond signature: Not a material
defect
2. Installation of gate operators: By 2nd tier
subcontractor to listed electrical
subcontractor, thus not required to be listed
3. Handrail installation: Lister Construction
has both Class A and B licenses, appropriate
for the work
Treatment Plant Site Improvements
Construction Contract
• Bid protest is non - meritorious
• Appropriate to award construction
contract to Lister Construction
Item 7a.1.
Contra Costa Water District
Update
CCCSD Board Meeting
April 3, 2008
Recent CCWD Discussions
• Request for Special Discharge Permit
to accommodate CCWD pilot testing.
• Discussion of CCWD perspective on
recycled water in the Delta.
1
CCWD Prot Study
• Study of removal of emerging contaminants
from Delta source water using three
drinking water treatment technologies
• State funded project
• Partnership with EPA, AwwaRF, SCVWD,
ACWD and Alameda Zone 7
• Request for permission to discharge
effluent and waste streams from pilot study
to CCCSD sewer
CCWD Pilot Plant Initial Proposed Feed Concentrations of
Emerging Contaminants Found in Delta Source Water
Estimated
Maximum
Feed
Finished
Concentration
Concentration
Constituent
(u /L
u /L
Gemfibroal - Acidic Drug
1to5
1
Ibuprofen - Acidic Drug
1 to 5
5
Meprobamate - Neutral Drug
1 to 5
3.5
175_estradiol (E2) - Estrogen
1 to 5
1.5
Triclosan - Antibacterial Agent
1 to 5
0.25
Norrylphenol - Industrial Compound
1 to 5
5
Bisphenol A - Industrial Compound
1 to 5
5
lopromide - Industrial Compound
1 to 5
2.5
Sullamethoxazole - Antibiotic
1 to 5
1.5
HHCB (Galaxolide) - Synthetic Musk
1 t05
2
AHMI (Phantolide) - Synthetic Musk
1 to 5
5
Musk ketone - Synthetic Musk
1 to 5
5
Atenolol - Beta Blocker
1 to 5
5
Venlafaxine and O- desmethyl - SSRI.
1 to 5
5
Atraane - Pesticide
1 to 5
2.5
Currently evaluating reducing t is feed concertrations
to
minimize contaminants dischai
ged to the sew Dr.
2
Schematic Diagram of Three CCWD
Pilot Plant Treatment Trains
Peroxide
(Train z Only) GAC /Sand
Target Pilot
TRAINS Compounds (4.5 gpm)
tas
Plant
—toed
Water
Target
Compounds Ozone Pilot
(5 gpm)
TRAIN 3
Plant t__ ____________
Filtered _______________!
Water
rHollmFiber
Plant Filtration NF Pilot Plant
Train 7: Settled Water +Ozone + (GAC/Sand) Concentrate
Train Z: Plant +Peroxide 8 Ozone + Figrabon
Settled Water (GAC /Sand)
Train 3: Plant + NF
Filtered Water
3
Staff practiced due diligence...
• Contacted: Principals at BACWA; Bruce Wolfe,
Exec Off of RWQCB; Provessor Sedlak, UC
Berkeley; Bobbie Larson, CASA Regulatory
Affairs
• Key Questions
— Spiking with anything with permit limit No
— Would contaminants impact treatment No
— Are contaminants in our influent ?
— Will contaminants impact receiving H2O ?
— Is study important to advance science Yes
Staff recommends issuing SDP
with following requirements....
• Minimize concentrations of contaminants
to those needed for valid data (LOD issue)
• Cite contaminants selected as those
typically found in Delta source water
(ie. waste water data not available)
• Include cover letter citing CCCSD desire
to minimize discharge of emerging
contaminants to the sewer, but exception
made in this case to advance science.
4
Recent CCWD Discussions
• Request for Special Discharge Permit to
accommodate CCWD pilot testing.
• Discussion of CCWD perspective on
recycled water in the Delta.
CCWD Perspective on Recycled
Water in the Delta
• Central Contra Costa Sanitary District
(CCCSD) discharge already provides
beneficial use if left in place
• CCCSD Recycled Water does not always
create new water supply
• New demands provide the best potential to
look for opportunities for recycled water
expansion due to stranded costs
5
Water Recycling in the Delta
Delta outflow is needed to prevent seawater
intrusion into areas where freshwater must be
maintained to protect drinking water supplies.. +u -.
If treated wastewater is recycled and the -
amount discharged to the Delta is reduced,
then additional freshwater must be released
to maintain Delta outflow.
CCCSD Recycled Water
Benefits are Seasonal
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
Delta
Outflow
High Flow
Low Flow
Delta WQ
fth sill
Conditions
LV
Fill No -Fill
Fill: Release
Operations
Maximum Landscape Irrigation Demand
Irrigation
Demands
RW 'New
Water Benefit
None
WW Discharge
Delta Benefits
maxilmum
General representation — actual conditions and timing will vary
L!
New Demands Offer Greatest
Potential for Viable Project
• East County Industrial Reuse Project
is currently being studied (CCWD, CCCSD, DDSD,
ISD, Antioch, Pittsburg, PG &E, and Mirant)
• CCCSD could potentially serve new East
Cty industrial demand through exchange
— CCWD serves new industry with surface
water
— CCCSD serves existing use in Central
County with recycled water
— Delta Outflow impacts are mitigated
CCWD Conclusions
• Current discharge of treated wastewater by
CCCSD already provides beneficial use
• Benefits of expanded CCCSD REW to
CCWD are currently small due to
Duplication of Service (ie. stranded costs)
and Delta Outflow issues
• Best potential use of CCCSD REW is to
serve a new customer or to serve an
existing CCWD customer to free up supply
for an available new replacement customer
7
Staff recommends working with
CCWD to....
• Add scope to East County REW study to
investigate providing raw water to new
Power Plant in exchange for providing
REW water to existing refineries
• Notify CCWD of plan to investigate siting
new Power Plant on CCCSD property as
an alternative to East County site
• Verify water quality benefits of leaving
effluent in the Delta and obtain RWQCB
concurrence
M
Board Meeting of April 3, 2008
Announcements:
Agenda Item 7.a.2)
a) Vincler Communications Business and Technical Writing Class
On February 27 and February 28, 2008, the District held a 2 -day business
and technical writing class conducted by Vincler Communications. Twenty
District employees attended, including the General Manager and Director
of Administration. The class was customized to meet the needs of the
District, and attendees submitted pre -work and writing samples that were
critiqued by the teachers. The class evaluations unanimously rated the
class as outstanding and very worthwhile. We plan to conduct at least
one more such class, as well as a proof- reading and editing class for
administrative support staff.
b) Alhambra Valley Sewer Financing Informational Meeting
The District will conduct an informational meeting for residents and
property owners in the Alhambra Valley on Wednesday, April 9, 2008,
from 7:00 p.m. to 9:00 p.m. The meeting will be held in the Multi -Use
Room at John Swett Elementary School located at 4955 Alhambra Valley
Road in Martinez. The main topics of the meeting will be the proposed
reimbursement fees for direct and indirect connectors to the Alhambra
Valley Trunk Sewer, and financing sewer extensions and connections
under the Alhambra Valley Assessment District Program.
c) Kiewit Property Update
On March 20, 2008, County Quarry began accepting truckloads of clean -
fill onto the District -owned Kiewit property. Located directly across from
the County Quarry operation, the clean -fill operation hours are Monday
through Friday from 7:00 a.m. to 4:30 p.m., and opened on Saturday or
Sunday by appointment only. County Quarry expects 25 -50 trucks to
arrive daily during the dry weather season.
d) Vactor Update
The District was notified on March 24, 2008 that the truck for the Hydrovac
approved by the Board in the 2007 -2008 equipment budget was damaged
in transit from the truck assembly plant at Sarnia, Ontario, Canada, to the
Vactor factory in Streater, Illinois. It is our understanding that this truck
was the first truck along with two others that were being transported
"piggy- backed" on top of each other. Apparently, the driver's side rear
axle came off the truck that was earmarked for us striking our truck and
causing additional damage to the fuel tank, step, and battery box on the
driver's side of the truck.
Staff has demanded that a new truck be provided, the manufacturer has
countered with an offer to replace all items damage with new and to give
an additional year of bumper to bumper warranty on the truck.
The Vactor that was recently inspected by staff members was approved in
the 2006 -2007 equipment budget and is currently in Oakland having the
final touches put on prior to delivery.
e) Public Meeting for Walnut Creek Sewer Renovation (Phase 6)
DP 5972
The District hosted a public workshop on Tuesday, March 25 from 7:00 to
8:00 pm at the Walnut Creek City Hall. There were eight residential
properties represented at the meeting and the main topics discussed were
expected construction impacts and lateral replacement. This is the sixth
of 15 phases to renovate sewers in the residential areas of Walnut Creek.
Approximately 9,100 linear feet of 6- and 8 -inch sewer lines will be replace
in the Buena Vista School and Almond /Shuey areas. The sewer
renovation work in the Almond /Shuey area was accelerated to coordinate
with the City's paving plans for next year. The Phase 6 Renovation
project is currently out to bid with the Bid Opening scheduled for April 15,
2008.
f) Aeration Air Renovations, DP 7207
The Aeration Air Renovations Project will be advertised for bids on April 4
and 10, 2008.
The aeration basins have experienced air leaks from the floor of the air
plenum boxes for many years. District Project 6157, Aeration Air Leaks
Damage Assessment, was initiated in 2002 to investigate the condition of
various secondary piping systems, as well as, the condition of the air
plenum boxes and floor slabs under the aeration basins.
This Aeration Air Renovations Project continued the investigation into
potential repair methods to improve the reliability of the in -tank air delivery
system for the aeration process. Based on the outcome of last summer's
demonstration projects, the repairs of all air plenum boxes will be done
using a pressure grouting method. This would seal the cracking within the
structure's foundation slab in addition to filling any voids in the underlying
base rock to increase stability of the structure.
This summer the construction project would repair 160 air plenum boxes;
repair of the remaining 160 boxes is scheduled for the summer of 2009,
and is being bid as an alternative.
We plan to request award of this project at the May 15, 2008 Board
Meeting. Engineers Construction cost estimate is $3,200,000.
g) Contra Costa Green Business Program 10th Anniversary Event
The event will be held on Thursday, April 24, 2008, from 5:30 to 8:30 PM
at the Linsday Wildlife Museum. This is a free event. RSVPs are due by
April 11, 2008. A copy of the flyer is attached. Topics to be covered by the
key speakers are:
Exerting Your Influence as a Green Business
A Green Business Marketing Success Story
Tools to Market Yourself as Green
h) Staff Attendance at 2008 No -Dig Conference in Dallas, Texas
Assistant Engineer, Wesley Adams will attend the 2008 No -Dig
Conference in Dallas, Texas from April 27 through May 2, 2008. This
specialty conference provides an opportunity to learn about the latest
developments in the area of trenchless pipeline installation. Trenchless
construction methods are less disruptive to the public, very cost effective
and are used extensively in pipeline rehabilitation. New technologies
presented at this conference will provide the District with additional tools in
less disruptive pipeline renovation. Funds were included in the Fiscal
Year 2007 -08 Training and Conference budget to cover the costs of
attendance.
Agenda Item 7.a.2)
Board Meeting of April 3, 2008
Additional Announcements:
i) Vactor Update Photos
An update on the damage of the truck for the Hydrovac was provided in
the Board's April 3, 2008 written announcements. The attached photos
are for your additional reference to this item. Staff has informed the
vendor that they need to supply a new vehicle. The vendor has offered a
one -year extension to the vehicle warranty along with additional repairs,
as shown in the attached letter. Vendor has not been paid, and
discussions continue.
j) Grand Jury Tour Update
An update on the Grand Jury tour was provided in the Board's April 3,
2008 written announcements. A confirmation letter sent by Grand Jury
Foreperson Jerry R. Holcombe is attached.
k) Passing of Ken Hobbs
Sadly, Plant Operator II Ken Hobbs passed away last weekend after an
extended illness. The memorial service will be at 2:00 p.m. on Sunday,
April 6, 2008 on the U.S.S. Hornet. Ken volunteered many hours on the
U.S.S. Hornet, so they are holding a well - deserved service with full military
honors. Contact Secretary of the District Elaine Boehme at 925 - 229 -7303
if you would like more information
1) California Water Environmental Association Award
Collection Systems Field Superintendent Bill Echols was informed last
week that the District will receive the California Water Environmental
Association (CWEA) 2007 Large Collection System Award and Film Fast
Award Training. The awards will be presented at the CWEA's annual
conference on April 16th. Notification letters are attached.
m) Control Room Modifications Project Bid Protest
The District received a bid protest on the Control Room Modifications
Project, DP 7253. This matter will be heard by the Board at an upcoming
Board meeting.
w
r
I
o,
i
i
t �•
s
P � y
r �
r
�•! '� 9,� x a ��"� +�3 �[,�. •}:�I ..' Ri'Q f'#^,..13 Yom' Y ri -, � 6 �„�+�
"";'�P'�' +_"� 1."' a" ..r,.,p'FiN.. „ vim, 's-'nr'F,,''` n, + ?; <"'�.� ti�'•� i�'k ` yyyi/ ^•7�' a �' s tr=�+ ..1 �r�*i�!�+ -: w!! � ; "�� � ^ d, ,
�gr�a6 ~�s .a.a' •alb, •,q" r iA 1 r Mr �ii�� �{ � IJ:f r� w 4'Y '+ ii' �, 1 .�� :,
s`.�^� w �r��� , rf •i yJy�a.+. -p /ice vi ° rr ,.`k.. it °r� ` ,�_� � '`, 'i r ! i r �'� � ' ��rf. rl
�!�'", �. ±. S, rr-�"+ � ?4�'� � ieM".i".�'I.!laia*:3�'�s� .'.+i � _ e. ! x � i �Tc _ It`►' _.. _ " � (!.) _: "v . " .' • • ti r _ i '�.t
s
ST�RLII+><G'
T R a t K a
April 3 2008
Dan Rhoads
C 19 l Contra Coste
Place Soft" District
Martinez, CA 94563
7,a,Z
Mvormow
PSOrlinngg Truck Corporation
Glendoirs � $4-1 Phone
828-014 -8089
Fax
= Se�gTrucks
Starting Truck Corporation is very sorry that we sv psrienced an outer wheel bearing failure on
your unit (VIN 8AAB6839) in route b Vactor for ft Installation of your body Sterling Truck
Corporation agrees to the fo4bwing repair:
1. Replace battery boot and caner
2. Replace damaged b9UW
3. Replace driv W tank
4. Replace drkw-side stape
5.
8. Replace end housing
Replan left side hub assembly, axle shaft and brake shoes
7. Confirm that the frame is straight and the integrity was. not compromised as a result
of this beater failure.
Richard Faih, SW ft Truck Corporation District Servioa Manager, has surveyed the fkilsd unit.
Vft the wweption of the rear -and hcueft the damage was U.. to casuistic iiems{11ems #1
thru #4 above). Richard is conffderrt that the integrity of the frame has not been compromised.
Wre VA. however, cortMn that tiro frame is straight and true per our standard confirmation
procedures, Nthhe Dim trwe desires, Sterling Truck Corporation will pay fora represents"" of the
District 10 wfhrress tie hears teat rsted M item W.
Sterling Truck Corporation's frame warranty is 5 years 1 500000 miss and our standard base
warranty Is 1 year 1 100000 miles. In support of the repairs pnndouWy listed. SNN* g Truck
Corporation wS add one additional year of base warranty to this VIN at no chaega to the Dstric1
If there are any further questions, phase contact me at your convenience. Once again, we at
Starting Truck Corporation are very sorry that this failure occurred.
o 74
S"M Truck Corporator b 8 snbWftV d OSWPWTR10h* MM Mwflat LLC, a f MWw cap wy .
Grand Jury
March 20, 2008
Contra
Costa
County
Jim Kelly
General Manager
Central Contra Costa Sanitary District
5019 Imhoff Place
Martinez, CA 94553
Dear Mr. Kelly,
�. a, 0?-j)
725 Court Street
P.O. Box 911
Martinez, CA 94553 -0091
Thank you for accepting our invitation to take part in the orientation of the 2008-
2009 Contra Costa County Grand Jury, and for being so flexible as we sought a
mutually- convenient time for our field trip.
This letter confirms our visit to your headquarters on June 17, from 1:30 -3:00 PM.
Our group of 20 -25 will be arriving in private cars as close to the appointed hour as
possible.
The incoming grand jurors are looking forward to getting an overview of the
Sanitary District's many services, as well as your goals, objectives and challenges. I
know your visitors will be impressed with the follow -on tour. I certainly was when
I had the chance to see your operation two years ago as a grand jury "trainee." We
appreciate you taking time from your busy schedule to provide the group with your
unique perspective. Surely, it will make them even more effective grand jurors as
they begin their terms.
If you have any questions about your scheduled appearance, please contact Ann
Gardner, the grand jury secretary, at (925) 957 -5879, or you can reach me at (925)
938 -9137.
RKHolcombe
Foreperson, Contra Costa County Grand Jury
1
7.G.a.)
California
Water
Environment
Association
7677 Oakport Street, Suite 525,
Oakland, CA 94621 -1935
March 19, 2008
William Echols
Central Contra Costa Sanitary District
5019 Imhoff Place
Martinez, CA 94553
Dear William:
Congratulations on your agency being selected as CWEA's 2007 recipient of the
Collection S�stem, Over 500 Miles Award. Preparations are underway to honor you at
CWEA's 80 Annual Conference being held at the Sheraton Grand and Sacramento
Convention Center, April 13 -16, 2008. A plaque honoring your agency as the winner of
this category will be presented to you at the Awards Luncheon on Wednesday, April 16th
froml2- 1:30pm.
Additionally, your organization will be recognized and awarded a Certificate at the
Collection System Committee breakfast meeting at CWEA's 80th Annual Conference
being held at the Sheraton Grand and Sacramento Convention Center, April 15th, 2008.
Once again congratulations and 1 look forward to you attending the Award Luncheon.
You can register online by visiting the website at www.cwea.org or by using the
conference brochure that is enclosed.
Sincerely,
Kathy Suter
CWEA Membership & External Relations Board Chair
Enclosure
Protecting our water environment through education and training.
Menher as5o, ial5 n of :he `Hater Env;ronmpnt Fede a!;rn
C51
-�. a. a.
California
Water
Environment
Association
7577 Oakport Street, Suite 515,
Oakland, CA 94621 -1935
March 26, 2008
Bill Echols
,Central Contra Costa Sanitary District
5019 Imhoff Place
Martinez, CA 94553
Dear Bill:
Congratulations on being selected as CWEA's 2007 recipient of the Film Fest Award —
Training - Semiprofessional. Preparations are underway to honor you at CWEA's 80th
Annual Conference being held at the Sheraton Grand and Sacramento Convention
Center, April 13 -16, 2008. Your award will be presented to you at the Awards Luncheon
on Wednesday, April16th from 12- 1:30pm.
You will be recognized and awarded a Certificate at the Public Education Committee
breakfast meeting at CWEA's 80'h Annual Conference being held at the Sheraton Grand
and Sacramento Convention Center, April 15th, 2008. Additionally, your film, CSO
Cleaning Tools, will run in a continuous loop with other film winners Monday April 14th
through Wednesday April 16'h in the 2nd floor foyer of the Sheraton Grand from 8am to
5pm.
Once again congratulations and I look forward to you attending the Award Luncheon.
You can register online by visiting the website at www.cwea.org or by using the
conference brochure that is enclosed.
Sincerely,
Kathy Suter
CWEA Membership & External Relations Board Chair
Protecting our water environment through education and training.
Memi;er d�5oriatian of the Water Environment redecahor,
a . z) g)
You are invited to help celebrate...
The First Ten Years of the
Contra Costa Green Business Program
Leading the Way to a Greener Future
Come Celebrate! Come Network! Come Learn!
Contra Costa Green Business Program 10th Anniversary Event
Thursday, April 24, 2008
5:30 — 8:30 PM
Lindsay Wildlife Museum
1931 First Avenue
Walnut Creek, California
Directions: www.wildlife - museum.org /visit /directions.php
RSVP by Friday, April 11 to Contra Costa Hazardous Materials
925.646.2286 or amcmullen @hsd.cccounty.us
Sponsors:
PLATINUM LEVEL
GOLD LEVEL
SILVER LEVEL
Armanino McKenna LLP
Allied Waste Services
B & T Bookkeeping
Delta Diablo Sanitation District
City of Walnut Creek
Carollo Engineers
East Bay Business Times
InVision Communications
Central Costa Costa Sanitary District
PG &E
Lindsay Wildlife Museum
City of Pittsburg Public Works
The Mechanics Bank
Mt. Diablo Recycling
Contra Costa Water District
Fun Photo Guys
Bay Area Green Business Program
Environmental Values at Work 4jp�—
NETWORKING & REFRESHMENTS
5:30 - 6:30 PM
Eat abundant, scrumptious refreshments while networking with
other leaders & checking out our green vendors!
FORMAL PROGRAM
6:30 - 8:30 PM
Opening
Welcome - Mark DeSaulnier, California State Assembly
Partnership: The Program's Strength - Harriette Heibel, H2 Solutions
Premier Showing of Contra Costa Green Business Program Video
Recognition of Early Green Business Leaders
Keynote Speakers
Exerting Your Influence as a Green Business
Donald Simon, Esq., Partner, Wendel, Rosen, Black & Dean
A Green Business Marketing Success Story
Bruce Dean, Owner, CocoCopy in Antioch
Tools to Market Yourself as Green
Sonora Beam, Digital Hive Ecological Design
SPEAKER BIOS
DONALD SIMON
Donald Simon, a partner at the Oakland law firm of Wendel, Rosen, Black & Dean,
advises clients on a broad array of construction, business and litigation matters,
emphasizing green building, renewable energy and climate change. He is a frequent
national author, speaker and pragmatic strategist on environmental sustainability,
green building and the emerging green economy.
BRUCE DEAN
Before opening CocoCopy Business Print Center in Antioch, Bruce Dean was a well
known IT engineer, consultant and executive with some of the leaders in the computer
industry, and a recognized specialist in Office Automation and Quality Systems. He is a
strong proponent of combining good business management with sustainable systems
and environmental responsibility.
SONORA BEAM
Sonora Beam is the founder and Creative Director of Digital Hive EcoLogical Design,
a strategic design and marketing firm that specializes in promoting green and social
businesses. She leads workshops on creativity and business internationally, and is the
author of The Creative Entrepreneur, (Rockport Publishers, November 2008). She is a
graduate of Dominican University's Green MBA.
www.greenbiz.ca.gov
76664)
Central Contra Costa Sanitary District
March 27, 2008
TO: Honorable Members of the Board
19
FROM: Jim Kelly, General Manager
SUBJECT: Major Code Policy Consideration
At the March 6, 2008 Board Meeting, I recommended that staff and District counsel
prepare a summary of major policy considerations to facilitate the Board's review of
code revisions. You agreed with this recommendation.
Staff and counsel have summarized the major policy considerations for Titles 6 and 11;
the summary is attached for consideration.
Titles 6 and 11 will be agendized for comment at the April 3rd Board Meeting. The
remaining Titles, 7 and 9, are being scheduled for comment at the April 17th Board
Meeting; consideration for the Overflow Protection Device is tentatively scheduled for
the May 1St Board Meeting, and a memorandum summarizing the policy issues will be
provided to the Board as part of the agenda packet.
JMK:slc
Attachment
cc: Kent Alm
Elaine Boehme
C:\ DOCUME- 1\ ataliani \LOCALS-1 \Temp\2008 -04 -03 Major Code Change Consideration Memo.doc
Summary of Policy Issues in proposed revised CCCSD Code Titles 6 and 11
Title 6 FEES AND CHARGES
Chapter 6.12 Capacity Fee Program
Continues the District's practice of charging a single flat capacity fee for all types of
residential units.
Subsection 6.12.070 D. Relocated Business Credit.
This new provision allows a business owner who relocates the business within the District to
request the Board of Directors to grant a credit for Capacity Fees paid for the previous
location at the new location. If the business owner is a tenant at the previous location, all
parties with an interest in that property (i.e., the property owner, other tenants and lien
holders) must enter into a written agreement with the District concurring with the granting of
the credit. The agreement is necessary since wastewater utility capacity is considered part
of the asset value of the property.
Chapter 6.20 Reimbursement Fees
Subsection 6.20.040 A. Reimbursement fees and aareements.
In the past, reimbursement accounts were governed and administered by applying the
District Code without separate agreements with installers. The recommended provision
would require a written agreement between the installer and the District for all
reimbursement accounts.
Section 6.20.200 Funds and accounts.
In the past, the District communicated with installers holding reimbursement accounts only
when reimbursement fees had been collected and were available for disbursement. Since
this communication tended to be infrequent, finding installers was often difficult. The
recommended revision would provide annual account statements for each installer. The
statement would apprise them of the status of the account, and could be used to notice any
change in procedures and would allow an update of contact or other account holder
information.
Section 6.20.230 Expiration of reimbursement fees
When the Reimbursement Fee chapter of the Code was amended June 1, 1998, this section
was added to require that reimbursement fees established subsequent to that date
automatically expire twenty years after the date of the District's acceptance of the facilities.
Currently, reimbursement fees established prior to that code amendment expire at the end of
the facilities depreciation period (75 years for gravity sewers; 40 years for pumping facilities).
The recommended revision would require that all reimbursement fees established prior to
June 1, 1998 expire on June 1, 2018. This recommendation is likely to be opposed by
installers that would be affected by the shortened "sunset" date.
Section 6.20.400 Customer reimbursement of District installation costs.
It is recommended that this section be added to clarify that the public interest and public
safety may require that the District to install facilities for which reimbursement fees could be
collected. An example is the Alhambra Valley Trunk Sewer.
Chapter 6.24 Sewer Service Charges
Continues the District's practice of charging a single flat rate sewer service charge for all
types of residential units.
Title 11. Recycled Water
The Title was modified to address all uses our recycled water instead of only irrigation uses.
Section 11. 10.010 Policy Statement.
This section would establish the District policy, e.g. the District's policy is to promote use of
recycled water and to price it to be cost competitive with other local water supplies.
Central Contra Costa Sanitary District
' BOARD OF DIRECTORS
POSITION PAPER
Board Meeting Date: April 3, 2008
No.: 8.a. Engineering
Type of Action: PROVIDE DIRECTION TO STAFF ON COMMUNITY CAR WASH
EVENTS
Subject: CONSIDER ADDITION OF A PERMIT BY RULE TO THE SOURCE
CONTROL ORDINANCE, TITLE 10, TO ALLOW DISCHARGE OF COMMUNITY
CAR WASH WASTEWATER TO THE SANITARY SEWER WITH NO
NOTIFICATION
Submitted By:
Colleen Henry, Senior Source Control
Inspector
REVIEWED AND RECOMMENDED FOR BOARD ACTION:
Initiating DeptJDiv.:
Engineering /Environmental Services
CINc U. -
OM-
4t��A--
-&z6i
C. Henry T. Potter
A. Farr II
K. Alm
27jim K
eneral Manager
ISSUE: Tightening storm water regulations within the State of California are leading
Cities within the District's service area to prohibit community car wash wastewater from
discharging to the storm drain system. Current District Code requires community car
washes to get a Special Discharge Permit before its wastewater is discharged to the
District. The Board may wish to modify the Code to reduce the burden on community
car wash events that wish to discharge the waste wash water to District sewers.
RECOMMENDATION: Direct staff to prepare an amendment to the Source Control
Ordinance, Title 10, for Board consideration that would allow discharge from community
car wash events by Permit By Rule with no required notification of District staff, unless a
manhole must be used for discharge.
FINANCIAL IMPACTS: None.
ALTERNATIVES /CONSIDERATIONS: Alternative approaches have been included in
previous reports to the Board. In summary, alternatives evaluated included:
1. Issuing Special Discharge Permits for all community car wash events that
discharge to the sanitary sewer (process currently in the District Code).
2.a. Implementing a Permit By Rule that requires notification from the event
organizer and a response back from the District before they proceed with
the event
2.b. Implementing a Permit By Rule with simple notification from the event
organizer before they proceed with the event
2.c. Implementing a Permit By Rule with no required notification of District staff
NMDMINSUMADMINTOSPAPEMCar Wash DftPosPaper 4 -3 -08 aef.doc
POSITION PAPER
Board Meeting Date: April 3, 2008
Subject: CONSIDER ADDITION
CONTROL ORDINANCE, TITLE
CAR WASH WASTEWATER
NOTIFICATION
OF A PERMIT BY RULE TO THE SOURCE
10, TO ALLOW DISCHARGE OF COMMUNITY
TO THE SANITARY SEWER WITH NO
At the March 6, 2007 Board meeting, some members of the Board indicated a
preference for Alternative 2.c., implementing a Permit By Rule with no required
notification of District staff, except when a manhole must be used for discharge. Other
Board members preferred no oversight of car wash events. Both Alternative 2.c. and
no oversight would require a modification of the Source Control Ordinance. This
ordinance is reviewed by the Environmental Protection Agency (EPA) during routine
pretreatment program audits. Based on previous Source Control Ordinance reviews,
staff believes the EPA would not accept no oversight, and might accept the Permit By
Rule approach with no notification proposed in Alternative 2.c.
BACKGROUND:
Tightening storm water regulations within the State of California are leading Cities
within the District's service area to prohibit community car wash wastewater from
discharging to the storm drain system. The Cities and the County Clean Water
Program have requested that the District work with them to allow discharge of waste
wash water to District sewers. District staff recommends that the District facilitate the
continuation of community car wash events by adding a Permit By Rule provision to the
Source Control Ordinance for Alternative 2.c. Such a Code change would allow
protection of the sanitary sewer system while accommodating community car wash
events with no notification requirements. While staff recommends more oversight than
provided by Alternative 2.c., it would set District established best management
practices. Alternative 2.c. relies upon an established regulatory procedure (Permit by
Rule), so it is expected to be viewed favorably by the EPA.
Staff proposes Alternative 2.c. specify the following best management practices to
protect public health and the sanitary sewer system:
• Maximum flow rate of 25- gallons per minute to prevent sanitary sewer overflows
• Prohibition of solids entering sewer (i.e. rags) to prevent sanitary sewer
overflows
• Use of non - corrosive chemicals /soaps to protect sanitary sewer system
• Require no notification for a typical event. Event organizers would proceed with
discharge to a sanitary sewer inlet, such as a floor drain or a clean -out.
• If the only available discharge point was through a manhole, event organizers
would need to obtain a Special Discharge Permit to protect the safety of the
event participants.
NAADMINSUP\HDMIN \POSPAPER \Car Wash DftPosPaper 4 -3 -08 aef.doc
POSITION PAPER
Board Meeting Date: April 3, 2008
subject CONSIDER ADDITION OF A PERMIT BY RULE TO THE SOURCE
CONTROL ORDINANCE, TITLE 10, TO ALLOW DISCHARGE OF COMMUNITY
CAR WASH WASTEWATER TO THE SANITARY SEWER WITH NO
NOTIFICATION
Staff is currently working with the Contra Costa Clean Water Program to develop an
educational brochure to address storm water concerns associated with community car
wash events.
Alternatively, the Code could be changed to expressly exempt community car washes
from District oversight. Based on past experience with the EPA pretreatment audits,
staff does not believe the EPA would accept an exemption with no oversight. Best
management policies for discharge to our system would be established by the storm
water agency where the community car wash occurs.
Based on Board direction, staff will prepare purposed changes to Title 10 of the District
Code, which will be made as part of the current District Code update process.
RECOMMENDED BOARD ACTION: Direct staff to draft a Permit By Rule section for
the Source Control Ordinance, Title 10, that would allow discharge from community car
wash events with no required notification of District staff, unless a manhole must be
used for discharge.
NAADMINSUPWDMIMPOSPAPER \Car Wash DftPosPaper 4 -3 -08 aef.doc
Central Contra Costa Sanitary District
' BOARD OF DIRECTORS
POSITION PAPER
Board Meeting Date: April 3, 2008 No.: 8.b. Engineering
Type of Action: AUTHORIZE FUNDS
subject: APPROVE SUPPLEMENTAL AUTHORIZATION OF $380,000 TO THE
GENERAL IMPROVEMENTS PROGRAM OF THE FISCAL YEAR 2007 -08 CAPITAL
IMPROVEMENT BUDGET AND AUTHORIZE THE ALLOCATION OF $150,000 TO
THE IMHOFF TRIANGLE DEVELOPMENT PROJECT (DP 8225)
Submitted By: Initiating Dept. /Div.:
Earlene Millier, Engineering Assistant III Engineering / Environmental Services
REVIEWED AND RECOMMENDED FOR BOARD ACTION:
Q
E. Millier �G. Chesler C Swanson A. Farrell James M. ally
General M Hager
ISSUE: Approval by the Board of Directors is required for a supplemental authorization
to the Fiscal Year (FY) 2007 -08 General Improvements Program budget and for
allocation to the Imhoff Triangle Development project, which was not included in the
Capital Improvement Budget (CIB).
RECOMMENDATION: Approve a supplemental authorization of $380,000 from the
Sewer Construction Fund for the General Improvements Program of the FY 2007 -08
Capital Improvement Budget (CIB), and authorize the allocation of $150,000 of the
$380,000 to the Imhoff Triangle Development project.
FINANCIAL IMPACTS: This approval will allow work to begin on the new project,
Imhoff Triangle Development, and the supplemental authorization will allow two
currently planned projects to continue. There are sufficient funds in the Sewer
Construction Fund for this supplemental authorization.
ALTERNATIVES /CONSIDERATIONS: If this supplemental authorization is not
approved, certain work on two General Improvements Program projects will be delayed
until FY 2008 -09. If the allocation to the Imhoff Triangle Development project is not
approved, that project will be limited to spending only its $25,000 contingency allocation
in 2007 -08.
BACKGROUND: As part of the annual CIB adoption process, the Board of Directors
authorizes funding levels for each of the four capital programs: Treatment Plant,
Collection Systems, General Improvements, and Recycled Water. The Board
authorized $3,948,000 for the General Improvements Program for FY 2007 -08, which
re- authorized project carryover allocations and authorized new allocations for projects.
On September 6, 2007, the Board approved a supplemental authorization of $1,900,000
to the General Improvements program. Staff is requesting another supplemental
WENVRSEMPosition Papers \Millier\2008 \8225 PP Auth Funds CIB 2007 -08 & Imhoff Triangle 4- 3- 08.doc
POSITION PAPER
Board Meeting Date: April 3, 2008
subject APPROVE SUPPLEMENTAL AUTHORIZATION OF $380,000 TO THE
GENERAL IMPROVEMENTS PROGRAM OF THE FISCAL YEAR 2007 -08 CAPITAL
IMPROVEMENT BUDGET AND AUTHORIZE THE ALLOCATION OF $150,000 TO
THE IMHOFF TRIANGLE DEVELOPMENT PROJECT (DP 8225)
supplemental authorization in the amount of $380,000 to the General Improvements
program. The increased authorization will allow allocations for the following projects:
• District Easement Acquisition: Work on acquiring easements is proceeding, and
an allocation of $180,000 will be used for this on -going project. This project
purchases and upgrades easements primarily for Collection System Renovation
Program projects for which construction is completed, and the project closed,
before all of the easement work can be accomplished.
• Capital Improvement Budget and Plan: This project may need an additional
allocation of $50,000 before the end of 2007 -08 to manage CIB /CIP on -going
work.
• Imhoff Triangle Development: This project was not included in the 2007 -08 CIB,
and was recommended by the Real Estate Committee at its meeting of January
30, 2008. A contingency allocation of $25,000 is allowed for projects not
included in the CIB; allocations beyond this level must be approved by the
Board. The project needs to allocate $150,000 to pay for CEQA services,
permitting, engineering, and construction related to the rerouting or relocation of
the seasonal creek bed. The Board will consider CEQA documentation and
permitting requirements before the project would proceed to construction. This
work will allow the property to be marketed to prospective lessees.
Staff anticipates another new project in the General Improvements Program, ADA
Improvements, will need to have an allocation this fiscal year. This project will come
before the Board for approval and will also require a supplemental authorization to the
General Improvements Program.
This and other allocations for the General Improvements Program have been required
because this program has relatively few projects, and therefore, a small program
budget. Consequently, there is less flexibility to accommodate changes as projects
evolve through a fiscal year.
RECOMMENDED BOARD ACTION: Approve a supplemental authorization of
$380,000 from the Sewer Construction Fund for the Fiscal Year 2007 -08 General
Improvements Program, and authorize the allocation of $150,000 of the $380,000 to
the Imhoff Triangle Development project (DP 8225).
NAENVRSEC \Position Papers\Millier\2008 \8225 PP Auth Funds CIB 2007 -08 & Imhoff Triangle 4- 3- 08.doc
Central Contra Costa Sanitary District
' BOARD OF DIRECTORS
POSITION PAPER
Board Meeting Date: April 3, 2008 No.: 9.a. Human Rsources
Type of Action: APPROVE STAFFING PLAN
subject: APPROVE STAFFING PLAN FISCAL YEAR 2008 — 2009
Submitted ay: Cathryn Freitas, Human Initiating Dept/Div.: Administration /Human
Resources Manager Resources
REVIEWED AND RECOMMENDED FOR BOARD ACTION.
C. F itas
mes M. Kel ,
General Manager
ISSUE: The Human Resources Committee reviewed the staffing needs of the District
for Fiscal Year 2008 -2009 at its March 13, 2008, meeting. Accordingly, staff is
submitting the Staffing Plan for Board approval.
RECOMMENDATION: Approve the Staffing Plan for Fiscal Year 2008 -2009.
FINANCIAL IMPACTS: The proposed Staffing Plan would increase annual salary costs
by $131,459. The Staffing Plan reviewed by the Human Resources Committee
estimated the increase to be $331,139. The change is due to the co -op salaries, which
were inadvertently included in salary; however, co -op salaries remain the same as last
year.
ALTERNATIVES /CONSIDERATIONS: Modify or reject the proposed Staffing Plan.
BACKGROUND: Each department has reviewed its staffing requirements for Fiscal
Year 2008 — 2009. The Staffing Plan includes departmental overviews, personnel
actions taken during Fiscal Year 2007 — 2008 to -date, requested changes and their
justifications, new job classification descriptions, and organizational charts reflecting
proposed changes. There were 62 personnel actions during Fiscal Year 2007 — 2008.
The attached summary sheet highlights the effect of each department's staffing
requests on the number of total authorized positions in the District and the costs in
salaries and benefits. As shown in the summary, the total number of authorized regular
positions in the District will be one more than last year. Eight Co -op student positions
are requested which is the same as last year.
The salaries and wages in the 2008 — 2009 O & M Departmental Budgets will increase
from the previous year due to cost -of- living salary adjustments and any merit and
longevity increases scheduled in 2008 — 2009. Staff is recommending the salaries for
Co -ops remain at $24.00 an hour.
H: \BUDGET\Staffing Plan PP 2008.doc
POSITION PAPER
Board Meeting Date: April 3, 2008
Subject APPROVE STAFFING PLAN FISCAL YEAR 2008 -2009
District staff to meet and confer with the appropriate bargaining units on those items
that are applicable prior to the Board adopting the Staffing Plan.
Administration
None
Collection System Operations
Delete one Pumping Stations Superintendent (S -80, $7,397 — $8,962)
position and the job classification description, add one Field Operations
Superintendent (S -80, $7,397 — $8,962) position and modify the job
classification description, and reclassify Pumping Stations Superintendent
Steve Considine to Field Operations Superintendent.
Engineering
2. Pending further review and direction add one Engineering Support
Information System Analyst (S -72, $6,111 - $7,397) position.
3. Pending further review and direction by the Human Resources Committee
and Board, consider adding the Associate Engineer position to the District's
Advancement series for Engineers (Staff Engineer to Assistant Engineer to
Associate Engineer).
Plant Operations
4. Delete one Instrument Technician (G -69, $5,664 — $6,849) position and add
one Electrical Technician (G -69, $5,664 — $6,849) position.
Secretary of the District
None
5. Authorize the hiring of students to fill eight Co -op positions in 2008 — 2009.
RECOMMENDED BOARD ACTION:
Approve the Staffing Plan for Fiscal Year 2008 — 2009 herein identified by items 1 - 5.
HABUDGET\Staffing Plan PP 2008.doc
a
N Q
O
G al
Qy
y
O
O
V
W
W
CD
2
N
a
O
r2 O
N
QO co
J O
aN
0
z
M
LL
06
U)�
A
m
° V)
L
LO
co
LO
v
W)
d
R
O
oo 00
M
c+�
_ _
N N
O
r
N m
64 v
6%
64
6%
63 613
�A
V
co
co
D
N
N
a
m
LIT
~ co
W
pp
O
fl-
el
N
tD
N
CC
O
CD
�
N N
Q
O
v
cp
CL
N
N
CO
O
O
O
<C
N N
O
`p
O
CO
N
co
v�
—
o
U
/)
�
G D
O
O
co
N
Go
N N
+N.
0
U)
d
C14 04
� C
rl-
M
00 00
� �
�o
� �
64
0) w
o
co
m
M M
�-
CO CO
d 9 H4
EA b�
4
(A (n
U)
to
`°
O
to
Q �
Q >+
v
_
_
t0
c
N
c
U
N
c
CL
Q O
N
V`
!4
Q
w
C
N cn
>+
U
`
•L
C
/�
vJ
Li
(D (D
W
W
`3^
r cn
r
r
cm
11. W
U)
co
O
V
ya
Eo
�c
d
O
d
C U
E
U)
O
C
E
a
U) co
N
,�
N
C O
Q
N
N
O
8P
�j 0
w
a
H
Staffing Plan 2008 -2009
ADMINISTRATION DEPARTMENT
Department Overview The Administration Department consists of six divisions: Accounting
and Information Technology, Human Resources, Purchasing and
Materials Services, Safety and Risk Management, Communication
Services, and the Office of the Secretary of the District. The
department currently has 47 authorized positions and 45 filled
positions. It provides services to all other departments and the
general public.
Personnel Actions Since In August 2007, the Board adopted the new job classification
April 2007 description for Safety Officer and reclassified Operations Safety
Specialist Steve Laren to Safety Officer. He had been working
outside his classification for several months and the new job
classification description reflected his additional duties.
Name /Classification II Personnel Action II Effective Date
Suzette Crayton II new hire II 03/27/07
Executive Assistant
Chris Carpenter promotion 04/18/07
Community Affairs
Representative
Kathleen Ohlman new hire 06120/07
Public Information and
Production Assistant II
Shari Deutsch new hire 06/25/07
Safety and Risk
Management Administrator
George Solivar II new hire II 08/06/07
Network Technician
Steve Laren II reclassification II 08/10/07
Safety Officer
Steve Laren II resignation II 08/30/07
Safety Officer
Diane Hinson II new hire II 12/28/07
Safety Officer
H: \BUDGET\2008 ADM Staffingmpd
Requested by: Date: 77 ZooB
Recommended by the General Manager: ad-??Zal 44, Le:
H: \BUDGET\2003 ADM Staffing.wpd
Staffing Plan 2008 -2009
COLLECTION SYSTEM OPERATIONS DEPARTMENT
Department Overview The Collection System Operations Department (CSOD) is responsible
for the operation and maintenance of the District's 1,500 -mile
collection system and its reclaimed water distribution system. The
employees of CSOD are the primary responders in the event of
overflows and field emergencies, providing round - the -clock customer
service. The department is also responsible for the District's vehicle
and equipment fleet and mobile radio communication system. There
are currently 62 authorized positions and 61 filled positions.
Personnel Actions Since
Name /Classification
Personnel Action
Effective Date
March 2007
Alex Benavidez
new hire
03/07/07
Maintenance Crew Member I
Don Comstock
personnel
03/10/07
Maintenance Crew Member II
advancement
Greg Collins
personnel
03/13/07
Maintenance Crew Member II
advancement
Bob Brown
service retirement
03/14/07
Maintenance Crew Leader
Tim Rooney
service retirement
03/30/07
Maintenance Crew Leader
Leszek Szmidt
personnel
03/31/07
Maintenance Crew Member II
advancement
Dolly Flanders
personnel
05/19/07
Maintenance Coordinator II
advancement
Sean Sarras
personnel
06/29/07
Maintenance Crew Leader
advancement
Hamid Tehrani
personnel
06/29/07
Maintenance Crew Leader
advancement
H: \BUDGET\2003 ADM Staffingmpd
Personnel Actions Since
March 2007, Continued
Name /Classification
Anthony MacArthur
Personnel Action
Effective Date
07/09/07
trainee appointment
Pumping Stations Trainee
Paul Amaral
new hire
07/11/07
Maintenance Crew Member I
Michael Rosen
new hire
07/23/07
Maintenance Crew Member I
Dante Marchetti
promotion
07/31/07
Maintenance Supervisor
Jose Plascencia
personnel
09/20/07
Maintenance Crew Leader
advancement
Mary Bacon
10/29/07
Maintenance Coordinator I
new hire
Alex Benavidez
11/29/07
Construction Equipment
promotion
Operator
Requested Changes
Delete one Pumping Stations Superintendent (S -80, $7,397 - $8,962)
position and the job classification description, add one Field
Operations Superintendent (S -80, $7,397 - $8,962) position and
approve the modified job classification description, and reclassify
Pumping Stations Superintendent Steve Considine to Field Operations
Superintendent. This change will allow for greater flexibility at the
superintendent level providing an opportunity for cross training and
assisting with succession planning. There is no salary impact
associated with this recommendation.
Requested by: UV �Jw z . '� n rtc�.- Date: J
Recommended by the General Manager:°
H:IBUDGE112003 ADM Staffingmpd
CENTRAL CONTRA COSTA SANITARY DISTRICT
Effective: 10/18/05
Range: S -80
Respirator Class: 2
FIELD OPERATIONS SUPERINTENDENT
DEFINITION
Plan, organize, direct, control, and report on the activities of the Field Operations
Section Pumping Stations Operations Section, or Technical and Fleet Services
Section, as assigned; coordinate activities among the groups of the Section, within the
Division, the Department, and the District.
DISTINGUISHING CHARACTERISTICS
The use of respiratory equipment [including self- contained breathing apparatus
(S.C.B.A.)] may be required for this position. Therefore, the Field Operations
Superintendent will be required to be free of facial hair that would interfere with the use
of a respirator for annual fit tests and for any occasion, which requires the use of
respiratory equipment to comply with the District's respiratory program and Cal /OSHA
standards.
SUPERVISION RECEIVED AND EXERCISED
Receive general direction from the Director of Collection System Operations Division
Manager.
Exercise direction over supervisors within the Section and others as assigned.
EXAMPLES OF ESSENTIAL DUTIES - Duties may include, but are not limited to, the
following:
Plan, organize, direct, control, and report on activities and work relating to the
operation, preventive maintenance, repair and rehabilitation, and testing and inspection
of the sewer collection system and reclaimed water system, as assigned.
Plan, organize, direct, control, and report on activities and work relating to the operation
of information systems, the maintenance and repair of vehicles and equipment, and the
operation, maintenance, and repair of facilities, as assigned.
Plan organize direct control and report on activities and work relating to the operation
of all District pumping stations including the operation maintenance, and repair of
pumps electric motors diesel and gas engines air compressors hydraulic systems,
valves and associated instrumentation, as assigned.
CENTRAL CONTRA COSTA SANITARY DISTRICT
Field Operations Superintendent (Continued)
Review and prioritize daily work assignments and work reports; adjust planning
schedules as needed; advise supervisors of scheduling problems, priorities, and other
concerns regarding each section's activities.
Coordinate activities with other District Divisions and Departments; meet with public,
public agencies, utilities, and contractors to deal with field problems; participate in
meetings.
Establish Section goals, objectives, schedules, and work methods; recommend and
implement operating policies and procedures.
Develop effective preventive maintenance programs; monitor operations and
maintenance procedures and modify programs as required.
Administer Section's safety program with direction from Safety Sffesiat+ststaff and
Safety Committee; perform field inspections for safety conformance; direct
investigations of accidents /injuries and property damage; recommend appropriate
action including discipline and procedural changes.
Direct and participate in a variety of personnel actions including performance
evaluations, selections, dismissals, transfers, and disciplinary measures.
Develop and support the Section operating budget; participate in identifying personnel
and capital equipment needs; forecast of additional funds needed for vehicles,
equipment, materials, and supplies; administer the approved budget; monitor and
approve expenditures.
Be responsible for the administration, coordination, and reporting of all pumping
stations regulatory compliance matters, including the sulfide control chemical treatment
oroaram. as assianed.
Serve as an emergency backup to the primary on -call pumping station operator as
needed.
Analyze operating records and costs; prepare, maintain, and present routine reports
and other special reports as requested.
Serve as technical advisor to section personnel on difficult or unusual problems; direct
emergency repairs.
Conduct final field inspection for acceptance of new facilities, investigate quality control
problems, and identify and support the need for improvement projects.
2
CENTRAL CONTRA COSTA SANITARY DISTRICT
Field Operations Superintendent (Continued)
Plan, develop, and participate in employee development and training programs.
Perform related duties as required.
MINIMUM QUALIFICATIONS
Knowledge of:
Methods, materials, tools, and equipment used in the maintenance of sewer
collection systems, pumping stations, reclaimed water systems, vehicle
and equipment, and facilities.
Purposes and operating requirements of sewage pumping station facilities and
equipment.
Management control systems relating to planning, scheduling, workload,
productivity, and material control.
Use of personal computer for maintenance, administrative, and operational
functions including the remote operation and monitoring of the District's pumping
stations via the Supervisory Control and Data Acquisition (SCADA) system when
assigned to pumping stations.
Wastewater sampling and process control tests.
Operating indicators, system maintenance trends, and pumping stations,
collection system, and reclaimed water system construction and inspection
practices.
Operational characteristics of pipeline operations and maintenance.
Purpose and uses of a variety of equipment and tools used in collection system,
reclaimed water system, pumping stations, and vehicle and equipment
maintenance.
Principles of modern management, organization, supervision, training, and
budgeting.
Principles and techniques of fleet and equipment management.
Records and computerized data management systems.
K
CENTRAL CONTRA COSTA SANITARY DISTRICT
Field Operations Superintendent (Continued)
Safety hazards and appropriate precautions applicable to work assignments,
Cal /OSHA, and OSHA safety regulations.
Abili to:
On a continuous basis know and understand policies. Intermittently analyze,
identify, interpret, problem solve, remember, and explain daily and accident
reports and policies; and observe the field and personnel interaction.
Sit at desk and in meetings for long periods of time on a continuous basis.
Intermittently walk and stand at field sites, twist to reach equipment surrounding
desk, and perform simple grasping and fine manipulation; use telephone, and
write or use a keyboard to communicate through written means; lift or carry
weight of 25 pounds or less; and occasionally lift or carry weight of 80 pounds or
less: lift or carry weight of 40 pounds or less when assigned to pumping
stations. May be required to communicate via mobile communication device.
Plan, direct, and control the work of a large group of employees engaged in
collection system maintenance work.
Read, interpret, and supervise work from plans and specifications.
Prepare written and oral reports, letters, and memos.
Analyze operations, maintenance, and repair problems and develop sound and
effective solutions and courses of action.
Train and supervise assigned personnel.
When assigned to pumping stations manage the operation maintenance, and
repair of pumping station facilities and equipment including diesel and electrical
engines pumps generators and compressors and perform skilled mechanical
repair work on station equipment.
Establish and maintain cooperative relationships with those contacted in the
course of work.
Communicate clearly and concisely, both orally and in writing.
Utilize District's computer systems as needed to perform job duties.
Learn and observe all appropriate safety precautions as required by the District,
4
CENTRAL CONTRA COSTA SANITARY DISTRICT
Field Operations Superintendent (Continued)
including but not limited to, Cal /OSHA General Industrial Safety Orders, the
District's Respiratory Protection Program, and District Safety Directives.
Work shift on -call weekends and holidays as assigned
Special Physical Requirements:
May be required to enter confined space and /or respond in an emergency.
When required to wear respiratory protection equipment, must be able to wear
S.C.B.A. and perform confined space entry and emergency response duties in
protective clothing and equipment including S.C.B.A. weighing 32 pounds.
Experience and Education:
Any combination equivalent to experience and education that could likely provide
the required knowledge and abilities would be qualifying. A typical way to obtain
the knowledge and abilities would be:
Experience
Five years of progressively responsible experience in the maintenance, repair,
and inspection of wastewater collection, pumping station and reclaimed water
systems, at least two of which were in a supervisory capacity.
Education
Equivalent to the completion of the twelfth grade, supplemented by substantial
training in related maintenance, rehabilitation, and inspection work.
Licenses and Certificates:
Possession of a valid California Driver's License.
Licenses and Certificates: (When assigned to Field Operations Section)
Possession of a valid Class A California Driver's License is desirable.
Possession of a Grade III Collection System Maintenance Technologist
Certificate issued by the California Water Environment Control Association.
Possess ability to obtain a Grade IV certification within one year of appointment.
5
CENTRAL CONTRA COSTA SANITARY DISTRICT
Field Operations Superintendent (Continued)
If assigned to manage the reclaimed water system, possession of a State of
California Water Distribution Certification at a Grade I level or higher.
A
CENTRAL CONTRA COSTA SANITARY DISTRICT
Collection System Operations Department
Director of Collection
System Operations
1 M20 1
W. Brennan
Field Operations
Field Operations
Superintendent
Superintendent
1 SEO 1
1 Sao 1
S. Considine
B. Echols
Maintenance
Supervisor
4 S75 4
T. Gantt
Pumping Stations
P. Louis
Supervisor
D. Marchetti
2 S73 2
S. Sauter
Operations Safety
L. Gonzalez
Specialist
S. Larsen
Maintenance Crew Leader
1 S71 1
17 G65 17
D. Williams
D. Bartlett
R. Crouch R. Hodge R. Robinson
P. Binder
R. Galloway C. Johnsen S. Sarras
Pumping Stations
T. Butler
M. Goss J. Plascencia E. Silva
1
Operator 1 /11
R. Cleland
M. Gratis R. Powell H. Tehram
7 G59 -64 7
D. Turk
D. Freitas III*
Construction
S. Grubka II
Equipment Operator
C. Haisley II
4 G62 4
T. Hammett II
A. Benavidez C. Keith
G. Palmer II
T. Corum L. Hernandez
R. Sawyer III*
LEGEND
N. Steiner I
Maintenance Crew Member 1 /11
16 G53 -59 15
New
Staffing Plan July 2008
P. Amaral I
G. Collins II A. MacArthur I` R. Salva II
Change
62 Authorized Positions (left)
C. Aughtry I
D. Comstock 11 S. Maciel I L. Szmidt II
61 Filled Positions (right)
S, Bitle II
A. Harbaugh I D. Quintero II J. Walsh II
Delete
' Filled with Operator III at G68
W. Brooks II
K. Kirby I M. Rosen I Vacant
' Serving as a Pumping Stations Opr. Trainee
Administrative
Secretary
1 S60 1
Maintenance
Coordinator 1 /II
2 G47 -51 2
M. Bacon I
D. Flanders 11
Field Operations
Superintendent
1 S80 1
Vehicle & Equip.
Maint. Supervisor
1 S73 1
Vehicle & Equip.
Mechanic
2 G62 2
Vehicle & Equip.
Service Worker
1 G45 1
N. Wright
Staffing Plan 2008 -2009
ENGINEERING DEPARTMENT
Department Overview The Engineering Department is organized into two divisions — the
Capital Projects Division reflecting the "traditional' engineering
services of project design and construction management; and the
Environmental Services Division providing the functions of
household hazardous waste, inspection, recycled water, record
keeping, permits and regulations, rates, and customer services. The
department has 82 authorized positions of which 76 are filled.
Personnel Actions Since In December 2007, the Board approved adding one Secretary III
January 2007 position in the Environmental Services Division /Source Control
Section to support critical new programs.
Name /Classification 11 Personnel Action 11 Effective Date
James Kong (I personnel II 01/10/07
Assistant Engineer advancement
Loren Staggs personnel 01/17/07
Household Hazardous Waste advancement
Technician II
Michael Penny (I lateral transfer (I 01/18/07
Associate Engineer
Alan Weer I) personnel I) 01/24/07
Assistant Engineer advancement
Jackie Zayac service retirement 03/09/07
Community Affairs
Representative
Jesse Folks new hire 04/27/07
Sr. Household Hazardous
Waste Technician
Heath Culbreath II new hire II 04/30/07
Senior Engineering Assistant
Raffi Moughamian II personnel II 05/03/07
Assistant Engineer advancement
Zahra Sedaghatpour II resignation II 05/11/07
Source Control Inspector 1
Personnel Actions Since
January 2007, Continued
Name /Classification
Heath Culbreath
Personnel Action
Effective Date
resignation
05/15/07
Senior Engineering Assistant
George Harrington
new hire
05/16/07
Senior Engineering Assistant
Amy Hernandez
promotion
06/18/07
Senior Engineering Assistant
Stephanie Gronlund
new hire
07/18/07
Associate Engineer
James Olympia
promotion
08/06/07
Source Control Inspector I
Pat Camorongan
promotion
08/23/07
Engineering Assistant III
James Kong
resignation
09/28/07
Assistant Engineer
Steve Cavin
termination
01/07/08
Household Hazardous Waste
Technician II
Marie Pettersen
lateral transfer
01/16/08
Secretary III
Kiley Kinnon
termination
01/23/08
Source Control Inspector II
Georgiana McClease
resignation
01/23/08
Administrative Secretary
Mark Wenslawski
new hire
01/31/08
Staff Engineer
Requested Changes
Engineering Support Group in Capital Project Division — Add
one Engineering Support Information System Analyst (S -72, $6,111-
$7,397) position. Due to increasing demand for geographic data, a
second Engineering Support Information System Analyst position is
requested. This position will act as project coordinator for the new
Geographical Data Integration (GDI) system for the treatment plant
and pumping stations; creating a field version for the existing
collection system GDI; and a simplified version of GDI for the new
external website. In addition, this position will be responsible for
upgrading and maintaining on -going databases. This position will
improve customer service and reduce labor costs by expanding and
improving data access.
Engineering Career Path — Over the last eight years staff has
implemented a Staff Engineer development program to address the
lack of qualified candidates. This program has attracted 12 new hires
and two more are being recruited. Eleven of the twelve recruits
remain at the District with eight advancing to Assistant Engineer
positions through personnel advancements and one promoting to the
Associate Engineer through an open /promotional recruitment. Many
of the Assistant Engineers are registered engineers and are ready to
promote to an Associate Engineer position but currently, this can
only occur if there is an open position. Due to the shortage of
engineers, this pool of extremely productive and marketable
engineers is a target for aggressive recruitment from other agencies
and consultants. The District has made a significant investment in
these engineers, and in an effort to retain this talent, staff proposes
adding the Associate Engineer position to the District's Personnel
Advancement Policy and Procedures (Staff Engineer to Assistant
Engineer to Associate Engineer). This change would recognize the
Assistant Engineer's professional development, providing additional
challenges and compensation. Delta Diablo Sanitation District and
Union Sanitary District have adopted similar retention programs.
This program would also help in attracting new recruits.
The key components of the program would be:
• Possession of Professional Registration
• Five years of experience at the District (advanced engineering
degree counts for 1 year)
• Recommendation of Supervisor
• Good performance evaluations
• Passing a comprehensive examination
Individuals meeting the above criteria would advance to Associate
Engineer. The annual cost (salary only) of such a program,
assuming all Assistant Engineers became Associate Engineers is
approximately $112,000 per year.
Requested by: Date: 0-20-09'
Recommended by the General Manager:•
3
CENTRAL CONTRA COSTA SANITARY DISTRICT
Engineering Department - Capital Projects Division
Director of
Engineering
M20
A. Farrell
Capital Projects
Division Manager
1 M24 1
Land Surveyor Engineering 5uppor
Supervisor
1 S76 1 1 S76 1
E. Chariton B. Clement
Engineering Support
Assistant Info. Sys. Analyst
Land Surveyor 2 S72 1
3 G71 3
D. Drewes
K. Collins Vacant Engineering
T. Phillips Technician 1 /11
K. Weir
Staffing Plan July 2008
)IQ 42 Authorized Positions (left)
37 Filled Positions (right)
* Filled with Staff Engineer
** Filled with Associate Engineer
4 G54 -62 4
G. Anastasi- Rowlani
M. Bradshaw It
A. Schwitters II
L. Zou II
Engineering
Technician III
3 G66 2
C. VonStetten
M. Wall
Vacant
Senior
Engineer
1 S83 1
A. Antkowiak
Associate
Engineer
3 S79 3
D.Lawson
T. Godsey
S. Mestetsky
Assistant
Engineer
3 S73 3
ams
N. Morales
E. Lopez
Senior
Engineer
1 S83 1
A. Rozul
Associate
Engineer
2 S79 2
usam
P. Seitz
Assistant
Engineer
2 S73 2
N. Molina
M. Wenslawski
LEGEND
New
Change
® Delete
Sr. Engineering
Assistant
2 G72 2
D. Baldi
A. Hernandez
2 of 2
Principal
Engineer
1 S87 1
Senior
Engineer
1 S83 1
Associate
Engineer
2 S79 2
a un e
C. Mizutani
Assistant
Engineer
Sr. Engineering
4 S73 3
Assistant
D. Hefflefinger*
1 G72 1
N. Hodges
W. Griffiths
C. Shima
Vacant
Administrative
Secretary
1
S60 0
Vacant
Secretary III
2 G52
2
C. Bradley
J. Freier
Secretary 1 /II
1
G45-49 0
Vacant
Staffing Plan 2008 -2009
PLANT OPERATIONS DEPARTMENT
Department Overview The Plant Operations Department is organized into eight divisions:
Administration, Laboratory, Regulatory, Control Systems,
Maintenance, Operations, Process Control, and Maintenance
Engineering. The department currently has 88 authorized positions
and 82 filled positions. The department's mission is to treat
wastewater in an environmentally sound and cost - effective manner,
and to produce and distribute high - quality recycled water. The
success of plant operations is critical to the District accomplishing its
basic function of protecting public health.
Personnel Actions Since
Name /Classification
Personnel Action
Effective Date
March 2007
Roy Manes
personnel
03/16/07
Senior Plant Operator
advancement
Philip Huntsman
service retirement
03/16/07
Shift Supervisor
Steve Dominguez
resignation
04/25/07
Shift Supervisor
Dave Reindl
promotion
04/26/07
Senior Engineer
Frank Favalora
promotion
05/24/07
Shift Supervisor
Larry Shepardson
promotion
05/24/07
Shift Supervisor
Garland Harris
promotion
07/05/07
Plant Operator I
Robert Maroon
trainee
07/09/07
Plant Operator Trainee
appointment
Mark Lafferty
terminated
09/14/07
Maintenance Technician III,
Mechanical
George Fowler
service retirement
09/19/097
Shift Supervisor
Michael Tarantino
personnel
11/19/07
Senior Plant Operator
advancement
Personnel Actions Since
March 2007, Continued
Name /Classification
Personnel Action
Effective Date
Pete Trapp
personnel
11/19/07
Senior Plant Operator
advancement
Thomas Ford
new hire
11/28/07
Maintenance Technician III,
Mechanical
Wayne Rebstock
personnel
12/21/07
Plant Operator III
advancement
Johnnie Levingston
personnel
01/02/08
Plant Operator II
advancement
Phil Snyder
service retirement
01/04/08
Senior Chemist
Requested Changes
Delete one Instrument Technician (G69, $5,664 - $6,849) position
and add one Electrical Technician (G69, $5,664 - $6,849) position.
In order to ensure reliable pumping stations operations, one of the
treatment plant's Electrical Technicians is assigned to perform
preventive maintenance at the pumping stations, as well as,
troubleshoot and repair problems. The amount of time necessary to
address pumping stations needs has increased due to aging
equipment and the maintenance requirements of the newer, more
complex equipment, i.e., variable- frequency drives. More than 50
percent of an Electrical Technician's time is devoted to this work. In
addition, one Electrical Technician was reclassified to Maintenance
Planner and more than half of his time is spent planning and working
with Engineering staff on design, construction, and inspection of
electrical projects. He also continues to do some of the more
complex electrical work in the treatment plant. A temporary
electrician was used most of fiscal year 2007 — 2008 in order to meet
the electrical backlog. An additional Electrical Technician is
requested to meet the expanding electrical needs of the treatment
plant and pumping stations, as well as, maintain an acceptable work
backlog.
Requested by: Date: 17 n g
Recommended by the General Manager:
�
2
! �
)�
( e
CL
; ■
!D r .m
§r �� ° �� _
2 k) -2
}o \ /�j 0 \ 8
(4) 2 ƒj E-LI�o
- �
§0
.c
co
� %E
£CLk
|E�■ §;22 §6i 2i
«U) 2 ID
`) Ix ® a§
§\ £a �E
a� �2 u�
-i :9um
/&
Ifa« k�
|E� ■ 'A! { $ 23 7
�)mk g �cc
7!$& 2 §■ °$� o » [ $
/ \ �e § § §k §
j ■ S o
» q 7 v
\ § 0
_ ƒJ >
$
U _ , 2 #
' « ; § °
)E
N�u _
)) LL9)�
£t �oD>
2 Damao
o §w�
e �
\\� /�
$®
B#
e��%
))0)
ki
_2c
o
�)
))Rk
C -
#
of
I$
�■
a)oa�
�D
04
§§
§))
N
2/
)) LL9)�
£t �oD>
2 Damao
o §w�
e �
\\� /�
/ \,w
x
ki
_2c
o
�)
C -
#
§))
a 2'
CL
_/ -
\\
U)
CO -OP STUDENTS
STAFFING PLAN REQUESTS
2008 —2009
DEPARTMENT /DIVISION /SECTION
NUMBER OF
POSITIONS
FY 2007 -2008
NUMBER OF
POSITIONS
07/08 -12/08
NUMBER OF
POSITIONS
01/09-06/09
PLANT OPERATIONS DEPARTMENT
Plant Operations Division
Laboratory Section
1
1
1
Maintenance Engineering /Regulatory
0
1
1
ENGINEERING DEPARTMENT
Capital Projects Division
Design /Construction Groups
3
3
3
(1 student from DVC Cooperative Work
Experience Education)
Environmental Services Division
Planning Section
2
2
2
Development Services
1
1
1
TOTAL
8
8
8
COOP 08 -09.rtf
Central Contra Costa Sanitary District
' BOARD OF DIRECTORS
POSITION PAPER
Board Meeting Date: April 3, 2008 No.: 9.b. Human Resources
Type of Action: HUMAN RESOURCES
Subject: AUTHORIZATION TO HIRE SEASONAL EMPLOYEES
Submitted By: Cathryn Freitas, Initiating DeptJDiv.:
Human Resources Manager Administration /Human Resources
REVIEWED AND RECOMMENDED FOR BOARD ACTION:
O
C. Freitas R/Muwfaves 7ArnesM. Ke ,
General Manager
ISSUE: District staff has assessed its needs for seasonal employees in 2008.
RECOMMENDATION: Authorize the hiring of thirty -three students for seasonal
employment.
FINANCIAL IMPACTS: The proposed seasonal staffing will cost approximately
$362,180.
ALTERNATIVES /CONSIDERATIONS: Authorize hiring fewer students for seasonal
employment.
BACKGROUND: Each year, the District hires students during the summer months for
seasonal maintenance, vacation relief, cleanup, and special projects; and during the
school year or semester breaks for additional assistance. Authorization was given for
thirty student positions last year. Authorization is requested for thirty -three seasonal
positions in Fiscal Year 2008 -2009.
It is recommended that the hourly rates for seasonal employees remain the same as
last year:
Student Positions
Clerical
Laborer
Technical /Professional
Proposed Salary*
$13.00
$15.00
$18.00
"For every year a student returns, add $1.00 per hour to a maximum of three additional summers. For
example, a student clerical who has worked here for the past two summers would receive $15.00 per hour
this summer. The extra dollar an hour recognizes the experience and serves as an incentive for returning
students.
C: \Documents and Settings \dreitas\My Documents \SEASONAL HELP 2008 PP.doc Created on 2/8/2008 3:06 PM
POSITION PAPER
Board Meeting Date: April 3, 2008
subject. AUTHORIZATION TO HIRE SEASONAL EMPLOYEES
The Staffing Plan was reviewed and recommended by the Human Resources
Committee at their March 13, 2008, meeting. Department Directors will be prepared to
answer any questions regarding the following requests:
Administration
The Administration Department is requesting two summer student positions in 2008-
2009. This is the same number as last year. One position is located in Communication
Services for technical support and the other will work for Safety and Risk Management
locating and organizing District keys and providing clerical support.
Collection System Operations
The Collection System Operations Department is requesting two laborers at the
Pumping Stations and two laborers to assist the Construction and Locating Sections.
This is two fewer positions then last year.
Engineering
The Engineering Department requests authorization to hire eleven engineering
assistant summer student positions. This is five more than last year's request. Three
positions will be assigned to the District's Environmental Services Division assisting in
development services and collection system piping inventory and database work. Three
positions will be assigned to the Capital Projects Division. Two of these positions will be
assigned to the Collection System program and one to the Treatment Plant program.
They will be assisting with design and construction projects. The other five positions are
current spring co -ops that will continue through the summer in their present positions.
Plant Operations
The Plant Operations Department is requesting fifteen students this year, which is the
same number of positions as last year's request. Six of the summer student laborer
positions will provide vacation coverage in Buildings and Grounds and do seasonal
maintenance. The Plant is also requesting two relief positions in the Laboratory, one
Electrical Shop assistant, one clerical, one engineering assistant, one laborer to assist
the Mechanical Maintenance staff, one laborer to assist the Machine Shop staff, and
two web information assistants to help build the Plant Operations Department's
information site on the District's Intranet.
The Secretary of the District
The Secretary of the District is requesting one student to assist with records
management, large projects, switchboard backup, and vacation relief.
CADocuments and SettingsWreitaMy Documents \SEASONAL HELP 2008 PP.doc
POSITION PAPER
Board Meeting Date: April 3, 2008
subject. AUTHORIZATION TO HIRE SEASONAL EMPLOYEES
RECOMMENDED BOARD ACTION: Authorize the hiring of thirty -three students for
seasonal employment.
CADocuments and SettingsWreitasNy Documents \SEASONAL HELP 2008 PP.doc