Loading...
HomeMy WebLinkAbout06/07/2007 AGENDA BACKUPCentral Contra Costa Sanitary District ' BOARD OF DIRECTORS POSITION PAPER im- Board Meeting Date: June 7, 2007 No.: 3.c. Consent Calendar Type of Action: ADOPT RESOLUTION subject: ADOPT A RESOLUTION AUTHORIZING EXECUTION AND RECORDING OF A QUITCLAIM DEED TO THOMAS P. O'TOOLE, SPECIAL TRUSTEE OF THE JOHN E. PESSIN 2006 LIVING TRUST FOR A PORTION OF A SEWER EASEMENT AT 5528 PACHECO BOULEVARD, PACHECO (JOB 2770 - PARCEL 6; APN 125 - 140 -024) Submitted By: Initiating Dept. /Div.: George Harrington Engineering /Environmental Services Senior Engineering Assistant REVIEWED AND RECOMMENDED FOR BOARD ACTION: V� Har ' gton J. Miyamoto -Mills C. Swanson A. arre James M. Kelly General Manager ISSUE: A resolution of the Board of Directors is required to quitclaim easements and record documents. RECOMMENDATION: Adopt a resolution authorizing execution of a Quitclaim Deed to Thomas P. O'Toole, Special Trustee of the John E. Pessin 2006 Living Trust, and authorize recording of the documents. FINANCIAL IMPACTS: None. ALTERNATIVES /CONSIDERATIONS: The property owner paid the required Quitclaim Fee to the District. BACKGROUND: The existing building located at 127 Aspen Drive, Pacheco predates the filing of the Subdivision Map for Tract 4856. A 20 -foot sanitary sewer easement was dedicated to the District on the filed map. An apparent error in locating the property line on the map resulted in an encroachment of the building at 127 Aspen Drive onto 5528 Pacheco Boulevard and the District's easement. Staff recommends that quitclaiming a relatively small portion of the easement would be appropriate to facilitate resolution of the encroachment (see Attachment 1). Staff has determined that the execution of the Quitclaim Deed will have minimal impact on the operation and maintenance of the sewer in the existing easement. RECOMMENDED BOARD ACTION: Adopt a resolution authorizing the President of the Board of Directors and the Secretary of the District to execute a Quitclaim Deed to Thomas P. O'Toole, Special Trustee of the John E. Pessin 2006 Living Trust, on behalf of the District, and authorizing recording of the documents with the Contra Costa County Recorder. N: \ENVRSEC \Position Papers \Harrington\2007 \PP 2770 Quitclaim O'Toole 6- 7- 07.doc �o P,y0$�O \\ Q \ 3 SITE \ \\ �J CENTER AVE ,\ LOCAT10f�� �\ N.T.S. LEGEND: NEW SEWER -�- EXISTING SEWER , M71 QUITCLAIMED EASEMENT ose oQ� CT 1 Central Contra Costa Sanitary District N 0 100 FEET QUITCLAIM PORTION IN EASEMENT JOB 2770 us 200 Q �� Drawing No. 1 Central Contra Costa Sanitary District ' BOARD OF DIRECTORS POSITION PAPER im- Board Meeting Date: JUNE 7, 2007 No.: 3.d. Consent Calendar Type of Action: ADOPT RESOLUTION subject: ADOPT A RESOLUTION ACCEPTING THREE GRANTS OF EASEMENT FROM MT. DIABLO UNIFIED SCHOOL DISTRICT (MDUSD) AND AUTHORIZING RECORDING OF THE DOCUMENTS (DISTRICT PROJECT 5170 - PARCELS 49, 49A, AND 50) Submitted By: Initiating Dept. /Div.: Molly Mullin, Engineering Assistant III Engineering /Environmental Services REVIEWED AND RECOMMENDED FOR BOARD ACTION: ul -� % M. Mullin J. Miyamoto Mills C. Swanson A. Farrell James M. Kelly General Manager ISSUE: A resolution of the Board of Directors is required to accept and record Grants of Easement. RECOMMENDATION: Adopt a resolution accepting three Grants of Easement and authorizing staff to record the documents with the Contra Costa County Recorder. FINANCIAL IMPACTS: The District paid the Mount Diablo Unified School District (MDUSD) a total of $55,808 for the three easements. The individual costs of the easements were $6,020, $24,072, and $25,716 for parcels 49, 49A, and 50 respectively. ALTERNATIVES /CONSIDERATIONS: None. BACKGROUND: Easements on MDUSD property were required for the Pleasant Hill Relief Interceptor and Recycled Water Projects. An easement purchase agreement was executed between CCCSD and the MDUSD on February 4, 1999, and recycled water easements were approved April 15, 1999. These easements were secured as part of District Project 4985 (Pleasant Hill Easement Acquisition Project). On February 27, 2007, the MDUSD Board approved Resolutions 06/07 -82, 06/07 -83 and 06/07 -84 authorizing the execution and conveyance of the Grants of Easement to CCCSD as shown on Attachments 1 and 2. RECOMMENDED BOARD ACTION: Adopt a resolution accepting three Grants of Easement from Mount Diablo Unified School District and authorizing staff to record the documents with the Contra Costa County Recorder. N: \ENVRSEC \Position Papers \Mullin\2007 \5170 PP Mt Diablo School Dist GOE 6- 7- 07.doc 0 BLVD N mv. 09ABL O MMOFOEDD i C�LC�G EHVARV SCHOOL o so 160 FEET NEW EASEMENT Y Central Contra Costa Attachment T Sanitary District MOUNT DIABLO UNIFIED DISTRICT DP 5170 - PARCELS 49 AND 49A 1 �� ILL o SITE m LID- �o L BOYD RD F�� ggp Ill^ N o LOCATION MAP N.T.S. z z J J O 0 U w U) w aC PARCEL ELF 40 2 U �'''' pQG3OC�d 4b�Q { APN 154- 170 -M N mv. 09ABL O MMOFOEDD i C�LC�G EHVARV SCHOOL o so 160 FEET NEW EASEMENT Y Central Contra Costa Attachment T Sanitary District MOUNT DIABLO UNIFIED DISTRICT DP 5170 - PARCELS 49 AND 49A 1 BLVD Z1 - -- }�� LE ANT - -- < Q `� ILL D o�J `r o SITE m z w F o OJ Y BOYD RD U fr Q � N U 0 LOCATION MAP N.T.S. THE N FARC IE —� so` MABLOO WOST °1 MY. DDABLOO MaMEDD EdEMENVARV SCHOOL DD OSYROC Ir SCHOOL APN 150 - 201-0144 � J o RD x z 1 o° , � 1 I w Lf I ' I I 1 0 80 ;EA o Q a E1 I I 1 °.'• e a NEENT 1 � Y Central Contra Costa Attachment Sanitary District ° MOUNT DIABLO UNIFIED DISTRICT ' DP 5170 — PARCEL 50 2 a M N Central Contra Costa Sanitary District ' BOARD OF DIRECTORS POSITION PAPER Board Meeting Date: JUNE 7, 2007 No.: 3.e. Consent Calendar Type of Action: ADOPT RESOLUTION subject: ADOPT A RESOLUTION ACCEPTING A GRANT OF EASEMENT FROM MT. DIABLO UNIFIED SCHOOL DISTRICT (MDUSD) AND AUTHORIZING RECORDING OF THE DOCUMENTS (DISTRICT PROJECT 5659 — PARCEL 2) Submitted By: Initiating Dept. /Div.: Molly Mullin, Engineering Assistant III Engineering /Environmental Services REVIEWED AND RECOMMENDED FOR BOARD ACTION: � �$ — b%— (�h — a&- M. Mullin J. Miyamoto Mills C. Swanson A. Farrell ames M. Kelly General Manager ISSUE: A resolution of the Board of Directors is required to accept and record Grants of Easement. RECOMMENDATION: Adopt a resolution accepting the Grant of Easement and authorizing staff to record the document with the Contra Costa County Recorder. FINANCIAL IMPACTS: The District paid $4100 to Mount Diablo Unified School District (MDUSD) for the easement. ALTERNATIVES /CONSIDERATIONS: None. BACKGROUND: An easement on MDUSD property was required for the Pleasant Hill Relief Interceptor and Recycled Water Projects. An easement purchase agreement was executed between CCCSD and the MDUSD on February 4, 1999, and recycled water easements were approved April 15, 1999. This easement was secured as part of District Project 4985 (Pleasant Hill Easement Acquisition Project). On February 27, 2007, the MDUSD Board approved a resolution authorizing the execution and conveyance of the Grant of Easement to CCCSD as shown on Attachment 1. RECOMMENDED BOARD ACTION: Adopt a resolution accepting a Grant of Easement from Mount Diablo Unified School District and authorizing staff to record the document with the Contra Costa County Recorder. N: \ENVRSEC \Position Papers \Mullin\2007 \5659 PP Mt Diablo Unified School Dist GOE 6- 7- 07.doc o EA' NT &2QU HILL BOYD RD a � a ROBE TA AVE sso o SITE N GEARY RD J LO ATIO MAP 00 N.T.S G�4. DOQC3dOO NJM�f�OC�D SCHOOL 0037MOC4 �Q. APN Q 149 -234 -008 PLfEL S1%H4 HELL RECREATOOK AHD �- W pQG3C3 DO�5�G3OC� H W Ir U N N Z Z x N 0 80 160 SANTA BARBARA FEET E d 0 0 O a RD NEW EASEMENT Y Central Contra Costa Attachment M Sanitary District MOUNT DIABLO UNIFIED SCHOOL DISTRICT a ' DP 5659 — PARCEL 2 1 N Central Contra Costa Sanitary District ' BOARD OF DIRECTORS POSITION PAPER Board Meeting Date: June 7, 2007 No.: 3.f. Consent Calendar Type of Action: ADOPT RESOLUTION Subject: ADOPT A RESOLUTION ACCEPTING AN OFFER OF DEDICATION FROM BERTOLERO DEVELOPMENT CORPORATION, ACCEPTING PUBLIC SEWER IMPROVEMENTS, AND AUTHORIZING RECORDING OF THE RESOLUTION WITH THE CONTRA COSTA COUNTY RECORDER (JOB 5473 - PARCEL 1; PLEASANT HILL) Submitted By: Initiating Dept. /Div.: Molly Mullin, Engineering Assistant III Engineering /Environmental Services REVIEWED AND RECOMMEND D FOR BOARD ACTION: M. Mullin J. Miyamoto -Mills C. Swanson A. Farrell ames M. Kelly y" General Manager ISSUE: A resolution of the Board of Directors is required to accept offers of dedication and public sewer improvements, and to authorize staff to record documents. RECOMMENDATION: Adopt a resolution accepting an offer of dedication and public sewer improvements, and authorizing staff to record the resolution with the Contra Costa County Recorder. FINANCIAL IMPACTS: This easement was acquired at no cost to the District. ALTERNATIVES /CONSIDERATIONS: None. BACKGROUND: The Board of Directors regularly accepts easements and public sewer improvements by resolution. The recommended resolution will accept an easement and sewers installed during a recent sewer extension off Astrid Drive in Pleasant Hill (as shown on Attachment 1). Staff has reviewed the easement documents, inspected the public sewer improvements, and determined that they are in compliance with District standards. RECOMMENDED BOARD ACTION: Adopt a resolution accepting an offer of dedication for an easement from the Bertolero Development Corporation, accepting public sewer improvements constructed within the easement, and authorizing recording of the resolution with the Contra Costa County Recorder. N: \ENVRSEC \Position Papers \Mullin\2007 \5473 PP Bertolero Offer Ded 6- 7- 07.doc Central Contra Costa Sanitary District ' BOARD OF DIRECTORS POSITION PAPER Board Meeting Date June 7, 2007 No.: 3.g. Consent Calendar Type of Action: ADOPT RESOLUTION subject: ADOPT A RESOLUTION ACCEPTING AN OFFER OF DEDICATION FROM WINDEMERE BLC LAND COMPANY, LLC FOR EASEMENTS SHOWN ON THE RECORDED FINAL MAP OF SUBDIVISION 7976 IN THE DOUGHERTY VALLEY AREA, ACCEPTING PUBLIC SEWER IMPROVEMENTS AND AUTHORIZING STAFF TO RECORD THE RESOLUTION WITH THE CONTRA COSTA COUNTY RECORDER (JOB 5488 — PARCELS 2A, 2B, 2C, 2D and 2E). Submitted By: Initiating DeptJDiv: Molly Mullin, Engineering Assistant III Engineering /Environmental Services REVIEWED AND RECOMMENDED FOR BOARD ACTION: QN�- P L � LV 0��- 4w--- ` M. Mullin n yamoto -Mills . Swanson A. Farrell ames M. Kelly r �! eneral Manager ISSUE: A resolution of the Board of Directors is required to accept offers of dedication and public sewer improvements, and to authorize staff to record documents. RECOMMENDATION: Adopt a resolution accepting offers of dedication and public sewer improvements, and authorizing staff to record the resolution with the Contra Costa County Recorder. FINANCIAL IMPACTS: These easements were acquired at no cost to the District. ALTERNATIVES /CONSIDERATIONS: None. BACKGROUND: The Board of Directors regularly accepts easements and public sewer improvements by resolution. The recommended resolution will accept easements shown on the recorded final map of Subdivision 7976 that are required for recent public sewer extensions off Bollinger Canyon Road in the Dougherty Valley area of San Ramon as shown on Attachments 1 to 5. Staff has reviewed the final subdivision map, inspected the public sewer improvements, and determined that they are in compliance with District standards. RECOMMENDED BOARD ACTION: Adopt a resolution accepting an offer of dedication from Windemere BLC Land Company, LLC for easements shown on the recorded final map of Subdivision 7976 in the Dougherty Valley area of San Ramon, accepting Job 5488 public sewer improvements, and authorizing staff to record the resolution with the Contra Costa County Recorder. WENVRSEQPosition Papers \Mullin\2007\5488 PP Windemere 2A -2E 6- 7- 07.doc i �qM /No r qs DANVILLE LAWRENCE RD C�Ov' N RD SAN RAMON Cr— SITE e� LOCATION MAP N. T. S. ' W G j) °v 1 v ;0 Z � G) BAROSSA DR n j 1 Z I O 1 Z � � li WINDEMERE v PARKWAY I i LEGEND: —{�— EXISTING SEWER NEW SEWER r7 SUBDIVISION BOUNDARY EASEMENT AREA - PARCEL 2A Central Contra Costa Attachment Sanitary District ACCEPT EASEMENT ' JOB 5488 - PARCEL 2A 1 LEGEND: -e- EXISTING SEWER NEW SEWER SUBDIVISION BOUNDARY EASEMENT AREA- PARCEI- 2B Central Contra Costa Sanitary District E/ KIN e SAN RAMON LOCATION MAP N. T. S. ,-k ACCEPT EASEMENT JOB 5488 - PARCEL 2B r" SITE N Attachment 4 I' fN� ~``ogMiNo rq �ssDANVILLE ,qq LAN/RENCE R r RD SITE SAN RAMON B LOCATION MAP N. T. S. ALBION RD r r ADELAIDE HILLS CT CgSF�� Cl� z ICU M r ` z z G) = D N 3 LEGEND: D e EXISTING SEWER _¢ NEW SEWER SUBDIVISION BOUNDARY WSW EASEMENT AREA - PARCEL 2C Central Contra Costa Attachment Sanitary District ACCEPT EASEMENT AMn JOB 5488 - PARCEL 2C 3 Tqs DANVILLE �. sy�gRq 1 LAWRENCE R l RD — SITE X04 LNG/ SAN RAMON 1 LOCATION MAP N. T. S. KENWICK DR w 7 Z O m o n � n HARCOURT WAY r� / N LEGEND: e-- EXISTING SEWER NEW SEWER SUBDIVISION BOUNDARY EASEMENT AREA -PARCEL 2D Central Contra Costa Attachment Sanitary District ACCEPT EASEMENT JOB 5488 - PARCEL 2D 4 �M1,0 TASSq DANVILLE ✓qRq L RENCE R N RD SITE SAN RAMON O� LOCATION MAP N. T. S. C O 2 � � � D Z m z O y x 2 n O LANGT ON �R 1 LEGEND: 1 r -e- EXISTING SEWER N ..Q. NEW SEWER SUBDIVISION BOUNDARY EASEMENT AREA - PARCEL 2E Central Contra Costa Attachment Sanitary District ACCEPT EASEMENT JOB 5488 - PARCEL 2E 5 Central Contra Costa Sanitary District ' BOARD OF DIRECTORS POSITION PAPER in- Board Meeting Date June 7, 2007 No.: 3.h. Consent Calendar Type of Action: ADOPT RESOLUTION Subject: ADOPT A RESOLUTION ACCEPTING AN OFFER OF DEDICATION FROM CENTEX HOMES FOR AN EASEMENT SHOWN ON THE RECORDED FINAL MAP OF SUBDIVISION 8158 IN THE DOUGHERTY VALLEY AREA, ACCEPTING PUBLIC SEWER IMPROVEMENTS, AND AUTHORIZING STAFF TO RECORD THE RESOLUTION WITH THE CONTRA COSTA COUNTY RECORDER (JOB 5494 - PARCEL 1) Submitted By: Initiating Dept /Div.: Molly Mullin, Engineering Assistant III Engineering /Environmental Services REVIEWED AND RECOMMENDED FOR BOARD ACTION. M. Mullin �J. iyamoto -Mills C. Swanson A. Farrell James M. Kelly General Manager ISSUE: A resolution of the Board of Directors is required to accept offers of dedication and public sewer improvements, and to authorize staff to record documents. RECOMMENDATION: Adopt a resolution accepting an offer of dedication and public sewer improvements, and authorizing staff to record the resolution with the Contra Costa County Recorder. FINANCIAL IMPACTS: This easement was acquired at no cost to the District. ALTERNATIVES /CONSIDERATIONS: None. BACKGROUND: The Board of Directors regularly accepts easements and public sewer improvements by resolution. The recommended resolution will accept an easement shown on the recorded final map of Subdivision 8158 that is required for a recent public sewer extension off Bollinger Canyon Road in the Dougherty Valley area of San Ramon (as shown on Attachment 1). Staff has reviewed the final subdivision map, inspected the public sewer improvements, and determined that they are in compliance with District standards. RECOMMENDED BOARD ACTION: Adopt a resolution accepting an offer of dedication from Centex Homes for an easement shown on the recorded final map of Subdivision 8158 in the Dougherty Valley area of San Ramon, accepting Job 5494 public sewer improvements, and authorizing staff to record the resolution with the Contra Costa County Recorder. N: \ENVRSEC \Position Papers \Mullin\2007 \5494 PP Centex 6- 7- 07.doc (DANVILLE LAW�EWCE RD RD SAN RAMON SITE \ • . �\��vv y \� 1♦ . ,\ .♦ \!, \A e\ 1 \♦ w .� > \ y. "'C' Central Contra Costa Sanitary District ACCEPT EASEMENTS Attachment S JOB 5494 - PARCEL 1 Central Contra Costa Sanitary District ' BOARD OF DIRECTORS POSITION PAPER Board Meeting Date June 7, 2007 No.: 3A. Consent Calendar Type of Action: ADOPT RESOLUTION subject: ADOPT A RESOLUTION ACCEPTING AN OFFER OF DEDICATION FROM WINDEMERE BLC LAND COMPANY, LLC. FOR AN EASEMENT SHOWN ON THE RECORDED FINAL MAP OF SUBDIVISION 7976 IN THE DOUGHERTY VALLEY AREA, ACCEPTING PUBLIC SEWER IMPROVEMENTS, AND AUTHORIZING STAFF TO RECORD THE RESOLUTION WITH THE CONTRA COSTA COUNTY RECORDER (JOB 5494 - PARCEL 2) Submitted By: Initiating Dept /Div.: Molly Mullin, Engineering Assistant III Engineering /Environmental Services REVIEWED AND RECOMMENDED FOR BOARD ACTION. � A — - � VL— V. Mullin J. Miyamoto -Mills C. Swanson A. Farrell Ja es M. Kelly General Manager ISSUE: A resolution of the Board of Directors is required to accept offers of dedication and public sewer improvements, and to authorize staff to record documents. RECOMMENDATION: Adopt a resolution accepting an offer of dedication and public sewer improvements, and authorizing staff to record the resolution with the Contra Costa County Recorder. FINANCIAL IMPACTS: This easement was acquired at no cost to the District. ALTERNATIVES /CONSIDERATIONS: None. BACKGROUND: The Board of Directors regularly accepts easements and public sewer improvements by resolution. The recommended resolution will accept an easement shown on the recorded final map of Subdivision 7976 that is required for a recent public sewer extension off Bollinger Canyon Road in the Dougherty Valley area of San Ramon (as shown on Attachment 1). Staff has reviewed the final subdivision map, inspected the public sewer improvements, and determined that they are in compliance with District standards. RECOMMENDED BOARD ACTION: Adopt a resolution accepting an offer of dedication from Windemere BLC Land Company, LLC, for an easement shown on the recorded final map of Subdivision 7976 in the Dougherty Valley area of San Ramon, accepting Job 5494 public sewer improvements, and authorizing staff to record the resolution with the Contra Costa County Recorder. N: \ENVRSEC \Position Papers \Mullin\2007 \5494 PP Windemere 6- 7- 07.doc �O O� 4� v If LEGEND: �- EXISTING SEWER -Q- NEW SEWER SUBDIVISION BOUNDARY EASEMENT AREA - PARCEL 2 Central Contra Costa Sanitary District DANVILLE R SAN RAMON SITE �9lCC�9 ��l t LOCATION MAP N. T. S. fo, <q � / 4N �o / �o / N / MGM I HARCOURT WAY J Attachment ACCEPT EASEMENT JOB 5494 - PARCEL 2 1 1 R Central Contra Costa Sanitary District ' BOARD OF DIRECTORS POSITION PAPER Board Meeting Date: June 7, 2007 No.: 3.j. Consent Calendar Type of Action: ADOPT RESOLUTION subject: ADOPT A RESOLUTION ACCEPTING AN OFFER OF DEDICATION FROM LEN - WINDEMERE VILLAGE 15, LLC FOR AN EASEMENT SHOWN ON THE RECORDED FINAL MAP OF SUBDIVISION 8154 IN THE DOUGHERTY VALLEY AREA, ACCEPTING PUBLIC SEWER IMPROVEMENTS, AND AUTHORIZING STAFF TO RECORD THE RESOLUTION WITH THE CONTRA COSTA COUNTY RECORDER (JOB 5500 — PARCEL 1) Submitted By: Initiating Dept. /Div.: Molly Mullin, Engineering Assistant III Engineering /Environmental Services REVIEWED AND RECOMMENDED FOR BOARD ACTION: Mullin �,t J. �ftaomotollls . Swanson A. Farrell James M. Kelly 'jam General Manager ISSUE: A resolution of the Board of Directors is required to accept offers of dedication and public sewer improvements, and to authorize staff to record documents. RECOMMENDATION: Adopt a resolution accepting an offer of dedication and public sewer improvements, and authorizing staff to record the resolution with the Contra Costa County Recorder. FINANCIAL IMPACTS: This easement was acquired at no cost to the District. ALTERNATIVES /CONSIDERATIONS: None. BACKGROUND: The Board of Directors regularly accepts easements and public sewer improvements by resolution. The recommended resolution will accept an easement shown on the recorded final map of Subdivision 8154 that is required for a recent public sewer extension off Bollinger Canyon Road, in the Dougherty Valley area of San Ramon (as shown on Attachment 1). Staff has reviewed the final subdivision map, inspected the public sewer improvements, and determined that they are in compliance with District standards. RECOMMENDED BOARD ACTION: Adopt a resolution accepting an offer of dedication from LEN - Windemere Village 15, LLC for an easement shown on the recorded final map of Subdivision 8154, in the Dougherty Valley area of San Ramon, accepting Job 5500 public sewer improvements, and authorizing staff to record the resolution with the Contra Costa County Recorder. N: \ENVRSEC \Position Papers \Mullin \2007 \5500 PP Len- Windemere Offer of Ded 6- 7- 07.doc 2 10 2 U C7 2 J O m LEGEND: -8- EXISTING SEWER NEW SEWER SUBDIVISION BOUNDARY EASEMENT AREA - PARCEL 1 Central Contra Costa Sanitary District 11 C; fQ ' J DANVILLE SAN RAMON LOCATION MAP N. T. S. rz SITE r LN I `HNGTON D_ ACCEPT EASEMENT JOB 5500 - PARCEL 1 r Attachment 1 Central Contra Costa Sanitary District ' BOARD OF DIRECTORS POSITION PAPER Board Meeting Date June 7, 2007 No.: 3.k. Consent Calendar Type of Action: ADOPT RESOLUTION subject: ADOPT A RESOLUTION ACCEPTING AN OFFER OF DEDICATION FROM GREYSTONE HOMES, INC. FOR AN EASEMENT SHOWN ON THE RECORDED FINAL MAP OF SUBDIVISION 8152 IN THE DOUGHERTY VALLEY AREA, ACCEPTING PUBLIC SEWER IMPROVEMENTS, AND AUTHORIZING STAFF TO RECORD THE RESOLUTION WITH THE CONTRA COSTA COUNTY RECORDER (JOB 5508 — PARCEL 1) Submitted By. Initiating Dept /Div: Molly Mullin, Engineering Assistant III Engineering /Environmental Services REVIEWED AND RECOMMENDED FOR BOARD ACTON: M. Mullin (� J. Miyamoto -Mills C. Swanson A. Farrell James M. Kelly N J General Manager ISSUE: A resolution of the Board of Directors is required to accept offers of dedication and public sewer improvements, and to authorize staff to record documents. RECOMMENDATION: Adopt a resolution accepting an offer of dedication and public sewer improvements, and authorizing staff to record the resolution with the Contra Costa County Recorder. FINANCIAL IMPACTS: This easement was acquired at no cost to the District. ALTERNATIVES /CONSIDERATIONS: None. BACKGROUND: The Board of Directors regularly accepts easements and public sewer improvements by resolution. The recommended resolution will accept an easement shown on the recorded final map of Subdivision 8152 that is required for a recent public sewer extension off Bollinger Canyon Road in the Dougherty Valley area of San Ramon (as shown on Attachment 1). Staff has reviewed the final subdivision map, inspected the public sewer improvements, and determined that they are in compliance with District standards. RECOMMENDED BOARD ACTION: Adopt a resolution accepting an offer of dedication from Greystone Homes, Inc. for an easement shown on the recorded final map of Subdivision 8152 in the Dougherty Valley area of San Ramon, accepting Job 5508 public sewer improvements, and authorizing staff to record the resolution with the Contra Costa County Recorder. N:\ENVRSEC \Position Papers \Mullin\2007 \5508 PP Greystone Homes 6- 7- 07.doc O r r^ Y, M X 0 z O z v DANVILLE LAINRE A� SAN RAMON SITE I �f ti LOCATION MAP N. T. S. 1 m1 � 0 'a cnl to m� 0 v 1 1 i 1 BAROSSA DR WINDEMERE PARKWAY LEGEND: --�- EXISTING SEWER -�. NEW SEWER SUBDIVISION BOUNDARY EASEMENT AREA- PARCEL 1 Central Contra Costa Sanitary District I. ACCEPT EASEMENT JOB 5508 - PARCEL 1 I Attachment 1 Central Contra Costa Sanitary District AL BOARD OF DIRECTORS POSITION PAPER Board Meeting Date: JUNE 7, 2007 No.: 3.1. Consent Calendar Type of Action: INFORMATIONAL Subject: ADVISE THE BOARD OF THE CLOSE OUT OF NINETEEN CAPITAL IMPROVEMENT PROJECTS Submitted By: Initiating Dept /Div.: Gail Chesler, Associate Engineer Engineering /Environmental Services EWE AND RECOMMENDED FOR BOARD ACTION: I G. Chesler . Swanson A. Far II �- mes M. Kelly eneral Manager ISSUE: Work has been completed on 19 capital improvement projects. The financial results are reported to the Board prior to closing the projects' accounts. RECOMMENDATION: This item is presented to the Board of Directors for information only. No action is necessary. FINANCIAL IMPACTS: As a result of the close out of these 19 projects, $558,722 is being returned to the Treatment Plant, Collection System, and General Improvements Programs. ALTERNATIVES /CONSIDERATIONS: No alternatives have been prepared. This is an informational position paper. BACKGROUND: Nineteen capital improvement projects have been completed and staff is closing out the project accounts effective June 30, 2007. Below is a summary of the allocated budgets and expenditures for the 19 projects by program. Attachment 1 contains a brief summary for each project. Attachment 2 summarizes the allocated budgets and expenditures for each project. Program Allocated Budget Expenditures* Under Spent (Overruns) Treatment Plant $1,572,000 $1,322,830 $249,170 Collection System $3,043,000 $2,776,997 $266,003 General Improvements $499,000 $455,451 $43,549 Totals $5,114,000 $4,555,278 $558,722 *Expenditures are estimated. While they include expenditures through May, some additional charges will occur during June prior to the end of the fiscal year on the 30tH RECOMMENDED BOARD ACTION: No action is necessary. N: \ENVRSEC \Position Papers \Chesler\2007 \PP 2007 Closeout of CIP Projects 6- 7- 07.DOC Attachment 1 Project Descriptions Treatment Plant Program DP 6119 $276K Odor Control Upgrades Project This project completed the projects recommended in the 1998 Odor Control Facilities Plan Updates as well as evaluated the need for additional odor control projects. Completed projects from the 1998 Odor Control Facilities Plan included installation of a headworks peroxide addition feedback control based on H2S concentration in the air space above the primary effluent channel and optimization of the spray nozzles on the headworks and primary sedimentation basin mist odor scrubbers. DP 7222 $552K Plant Equipment Replacement Much of the equipment in the treatment plant is reaching the end of its useful life. This project identified equipment requiring excessive maintenance activity, having a negative impact on plant processes or no longer supported by its manufacturer. New equipment selection was coordinated to simplify the number of spare parts kept on site and to maintain spare equipment for critical processes. Some of the critical pieces of equipment replaced under this project were the scrubber water pumps, primary sludge pumps, and primary scum pumps. DP 7224 $391K Solids Handling Facilities Plan This project reviewed and updated the last Solids Handling Facilities Plan, which was done in 1992. The project included estimating population growth through build -out and then determining if and when additional facilities will be needed. The most pressing short-term issue was processing dewatered sludge during non - routine operation (i.e. both Multiple Hearth Furnaces off - line). A design to solve this problem, which includes a dewatered track loading station, is currently underway. The project determined that the existing multiple hearth furnaces have approximately 20 years of usable life. DP 7236 $102K Permanent Composite Sampler Installation Installed two samplers that will improve the ability to monitor flows into the treatment plant. Samplers were placed on two pipelines that convey flows from the District's more industrial areas. Sampling can now be done to establish baseline parameters. Samples will be analyzed for toxic substances, which will help identify the source of toxic reactions in the activated sludge process of the treatment plant. DP 7243 $2K Treatment Plant Roof Improvements This project inspected the conditions of various roof structures and recommended improvements. Complaints have been received that a number of roof areas were leaking. After inspecting conditions, a technical memorandum was prepared to summarize the findings and recommend a course of action. Roofs identified as needing replacement will be included in upcoming capital improvements. Other roofs were identified as requiring maintenance or small repairs. Collection System Program DP 2988 $23K Happy Valley Pipe Support As part of a City of Lafayette project to replace the pedestrian bridge between Cambridge Drive and the Happy Valley Elementary School, Central San replaced the support system that attached the main sewer pipeline to the bridge. DP 4860 $53K Hall Drive Sewer Improvements, Phase 2 B Leakage from a broken sewer line caused land movement behind two residences on Hall Drive in Orinda. This project repaired the sewer line, paid for the preparation of right -of -way and legal documentation, and compensated the homeowners. DP 4988 $463K Collection System Corrosion Evaluation The project investigated large diameter concrete pipes at serious risk of corrosion. Pipes to be evaluation by closed- circuit television (CCTV) were located primarily by review of hydraulic model runs and as -built drawings. The CCTV portion of this project did locate quite a few reaches of corroded pipe and resulted in more than five additional projects including a near - emergency project for gravity sewer replacement between Lower Orinda Pumping Station and Orinda Crossroads Pumping Station. Other resulting projects included $6 million in lining projects for the M3, St. Mary's Road, and Minert/Arkell. Finally, a project was initiated to evaluate methods of controlling downstream sulfide corrosion at the District's pumping stations. DP 5285 $399K Pumping Stations Near Term Equip. & Piping Repl. This project replaced pumps and grinders at the Martinez, Sleepy Hollow, and Concord Industrial Pumping Stations, and piping and valves at the Moraga and Orinda Crossroads Pumping Stations. These improvements provide greater operational reliability and regulatory compliance. DP 5629 $2K Morello Court Main Sewer Completion When the developer of the subdivision at Morello Court in Pleasant Hill failed to compete sewer, water, and street work, Central San, the Contra Costa Water District, and the City of Pleasant Hill cooperated to demand that the project surety complete the project. The surety agreed to pay the full amount of bond posted as project security with each agency, and the work was completed using these funds. Collection System Operations Department staff completed the main sewer work. DP 5642 $297K Morello Pedestrian Bridge Repair The District worked in collaboration with the City of Martinez to replace the sewer pipes supported beneath two pedestrian bridges in Hidden Lakes Park, Martinez. The sewer was spot repaired and re- sloped at the same time to maximize flow. DP 5868 $101K Hall Drive Slide Reconstruction The reconstruction of the slope at 178 Hall Drive installed geocells and vegetated a slope that had slid in 2005 due to an overflow at a manhole. DP 5897 $950K 2006 -07 Development Sewerage Project This project was used to properly account for District staff time and other direct costs associated with planning, design review, and inspection of main sewer extensions installed by developers and individuals and contributed to CCCSD for public use. These costs are recovered through plan review and inspection rates, fees, and charges. DP 5924 $361K San Ramon Force Main Landscape Mitigation The project provided landscape planting at four of the entrances to the Iron Horse Trail Corridor impacted by the District's force main project. District staff negotiated an agreement with DERWA to assume a portion of the landscape mitigation cost by providing four water meters at no cost to the District. The City of San Ramon assumed ownership of the landscaping and is providing long -term maintenance. DP 5934 $56K Lancaster Road Trunk Sewer Repair While performing work on the Sewer TV Inspection Project (DP 5547), a defect was observed in the sewer extension from Lancaster Road, Walnut Creek, to underneath Highway 680. Further review of the sewer TV inspection video revealed that a support pier for the Caltrans sound wall was driven through the trunk sewer. In January 2006, the District installed a temporary pipe to span the void and maintain dry weather flow. District staff continued to work with Caltrans staff to prepare a design to remove the pier, revise the support for the sound wall, and repair the pipe. In November 2006, Caltrans bid the project and awarded a contract to McGuire and Hester for the repair work. District staff assisted with project submittals, construction inspection, and post - construction CCTV to ensure compliance with the contract specifications. The trunk sewer repair was completed in February 2007. DP 5945 $72K Diesel Engine Compliance for Pumping Stations This project produced the stationary diesel engine compliance plan required by BAAQMD. This included a detailed compilation of data about every stationary diesel engine at each pumping station and how each stationary diesel engine would comply with the new diesel Air Toxic Control Measure for Particulate Matter. The compliance plan was completed and submitted to BAAQMD on time. General Improvements Program DP 8172 $371 K General Security Access The following work was completed under this project: • Completed a comprehensive security audit which generated recommendations for internal and external security improvements; • Installed a keyless entry system on the Headquarters Office Building, Collection System Operations Building, and the Plant Operations Building; • Upgraded and expanded the TV surveillance system at the Treatment Plant, Household Hazardous Waste Collection Facility, CSO, and HOB; • Installed two new monitoring cameras; one at the Filter Plant and one at Sub - Station 33; • Converted existing analog cameras to digital; • Replaced Sub - Station 82 card reader, panel and monitoring points and door card reader to upgrade system components to connect to the District's network system; • Installed new panel, monitoring points, and card reader at Warehouse/Mechanical Maintenance Building. DP 8188 $42K District Property Safety Improvements The project replaced thirty feet of leaking gas pipe at the Annex (Old Animal Shelter) prior to temporarily moving staff into the facility. DP 8220 $43K HOB Improvements Program This project provided funding for the construction of the Headquarters Office Building Improvements Program. Expenditures included the purchase of office furniture to replace outdated and worn out furniture and furniture that was no longer in compliance with ergonomic standards. ATTACHMENT 2 CAPITAL PROJECTS TO BE CLOSED OUT TREATMENT PLANT PROGRAM DISTRICT PROJECT NO. PROJECT TITLE ALLOCATED BUDGET EXPENDITURES* UNDERRUN (OVERRUNS) 6119 Odor Control Upgrades 293,000 276,217 16,783 7222 Plant Equip. Replacement 604,000 551,637 52,363 7224 Solids Handling Facilities Plan 500,000 391,054 108,946 7236 Permanent Composite Sampler Installation 150,000 102,150 47,850 7243 Treatment Plant Roof Imprvs. 25,000 1,772 23,228 Program Totals $1,572,000 $1,322,830 $2491170 COLLECTION SYSTEM PROGRAM DISTRICT PROJECT PROJECT TITLE ALLOCATED EXPENDITURES* UNDERRUN NO. BUDGET OVERRUNS 2988 Happy Valley Pipe Support 40,000 23,326 16,674 4860 Hall Drive Sewer Improvements 67,000 52,563 14,437 4988 Collection System Corrosion 522,000 462,665 59,335 Evaluation 5285 Pumping Stations Near Term 399,500 399,500 0 Equip. & Piping Replacement 5629 Morello Court Main Sewer 15,000 2,175 12,825 Completion 5642 Morello Pedestrian Bridge 325,000 296,616 28,384 Repair 5868 Hall Drive Slide Reconstruction 137,500 101,498 36,002 5897 2006 -07 Development 1,040,000 950,000 90,000 Sewerage 5934 Lancaster Road Trunk Sewer 56,000 56,000 0 Repair 5924 San Ramon Force Main 361,000 361,000 0 Landsca a Mitigation 5945 Diesel Engine Compliance for 80,000 71,654 8,346 Pumpinq Stations Program Totals $3,043,000 $2,776,997 $266,003 NAENVRSEC \Position Papers \Ches1er\2007\Attach 2 to PP Re 07 CIP Closeouts 6- 7- 07.doc GENERAL IMPROVEMENTS PROGRAM DISTRICT PROJECT PROJECT TITLE ALLOCATED EXPENDITURES* UNDERRUN NO. BUDGET OVERRUNS 8172 General Security Access 374,000 370,535 3,465 8198 District Property Safety 45,000 42,041 2,959 Improvements 8220 HOB Improvements Program 80,000 42,875 37,125 Program Totals $499,000 $455,451 $43,549 * Expenditures are estimated. While they include expenditures through May, some additional charges will occur during June prior to the end of the fiscal year on the 30th. N: \ENVRSEC \Position Papers \Ches1er\2007Wttach 2 to PP Re 07 CIP Closeouts 6- 7- 07.doc Central Contra Costa Sanitary District ' BOARD OF DIRECTORS POSITION PAPER Board Meeting Date: June 7, 2007 No.: 3.m. Consent Calendar Type of Action: INFORMATIONAL Subject: ADVISE THE BOARD OF THE CLOSEOUT OF THE M4 -A FORCEMAIN RECONSTRUCTION PROJECT, DISTRICT PROJECT 5410 Submitted By: Initiating Dept /Div.: Wesley Adams, Assistant Engineer Engineering / Capital Projects REVIEWED AND RECOMMENDED FOR BOARD ACTION: /W/A W. Adams A. Antkowiak A. FarT4 Ames M. Kelly, General Manager ISSUE: All work has been completed on the M4 -A Forcemain Reconstruction Project, District Project 5410, and this project can now be closed out. RECOMMENDATION: Closeout the project. FINANCIAL IMPACTS: This closeout will result in $394,041 being returned to the Collection System Program. Attachment 1 shows the project expenditures by category. ALTERNATIVES /CONSIDERATIONS: Not applicable. BACKGROUND: The District annexed the City of Martinez in 1967. Three pumping stations (Martinez, Fairview, and Maltby), three pressurized forcemains (M6, M4, and M2), and three gravity sewer pipes (M5, M3, and M1) were put into service in 1970 to convey wastewater from the Martinez service area to the District treatment plant. Additionally, junction structures were built to provide smooth transitions between the pressured forcemains and gravity sewer pipes. In the last ten years, the District undertook several capital improvement projects to improve and upgrade the pumping stations and to install secondary forcemains to provide backup for the existing forcemains. In the summer of 1998, staff discovered several leaking joints on the original M4 -A forcemain (between the Fairview and Maltby Pumping Stations). A portion of the M4 -A forcemain is above ground and subjected to tidal action. Furthermore, the M4 -A forcemain is close to Waterfront Road and subject to impact from heavy trucks. The M4 -A Forcemain Reconstruction Project removed the aboveground portion of the M4 -A forcemain and installed approximately 4,000 linear feet of 24 -inch HDPE pipe along the centerline of Waterfront Road. Emergency bypass and drain -back structures were installed at the Fairview Pumping Station site. Additionally, construction occurred N: \PESUP \Cbradley \Position Papers\Adams \5410 M4A Forcemain Closeout PP.doc Page 1 of 3 POSITION PAPER Board Meeting Date: June 7, 2007 Subject ADVISE THE BOARD OF THE CLOSEOUT OF THE M4 -A FORCEMAIN RECONSTRUCTION PROJECT, DISTRICT PROJECT 5410 at night to avoid impacts on Acme Landfill, garbage transfer stations, refinery truck traffic, and other businesses. On May 4, 2006, the Board of Directors authorized the award of a construction contract to McGuire and Hester. The Notice to Proceed was issued June 7, 2006. The project was completed and accepted by the Board on March 15, 2007. The value of the original contract work was $3,005,947. Construction change orders were issued totaling $167,139. The total authorized budget for this project was $4,713,000, which included a contingency of $484,800. The total project cost was $4,318,959 and the closeout will result in $394,041 being returned to the Collection System Program. RECOMMENDED BOARD ACTION: This item is presented to the Board of Directors for information. No action is necessary. N:\PESUP\Cbradley \Position Papers\Adams \5410 M4A Forcemain Closeout PP.doc Page 2 of 3 ATTACHMENT 1 EXPENDITURE SUMMARY M4 -A FORCEMAIN RECONSTRUCTION PROJECT (DP 5410) ACTIVITY COST Total Budget $4,713,000 Construction Contract $3,005,947 Change Orders $167,139 Change Orders % of Construction 6% Total Construction Amount $3,173,086 Engineering, Design, CM, Tech Services $997,039 Engineering, Design, CM, Tech Services % of Construction 33% Permit Fees, Right of Way, Miscellaneous Expenses $148,834 Permit Fees, Right of Way, Miscellaneous Expenses % of Construction 5% TOTAL PROJECT EXPENDITURES $4,318,959 TOTAL RETURN TO COLLECTION SYSTEM PROGRAM $394,041 NAPESUP\Cbradley \Position Papers\Adams \5410 M4A Forcemain Closeout PP.doc Page 3 of 3 ' Central Contra Costa Sanitary District BOARD OF DIRECTORS Board Meeting Date: June 7, 2007 Type ofAction: INFORMATIONAL POSITION PAPER No.: 3.n. Consent Calendar subject: ADVISE THE BOARD OF THE CLOSEOUT OF THE RECYCLED WATER PLEASANT HILL (ZONE 1) PROJECT, DISTRICT PROJECT 7167 Submitted By: Don Berger, Associate Engineer REVIEWED AND RECOMMENDED FOR BOARD ACTION: Initiating Dept /Div.: Engineering / Environmental Services D. Berger C. Swanson A. Farrell #rnes M. Kelly- eneral Manager ISSUE: The District's capital budgeting software requires that projects continuing longer than 10 years be closed and assigned a new project number. The Recycled Water Pleasant Hill (Zone 1) Project, District Project 7167, was initiated in 1995, and, therefore, this project must be closed. Work is being continued under a new project number, District Project Number 7194, Recycled Water - Zone 1 Project. RECOMMENDATION: Close out the project. FINANCIAL IMPACTS: None related to this project. ALTERNATIVES /CONSIDERATIONS: Not applicable. BACKGROUND: In 1995, the District entered into an agreement with the Contra Costa Water District (CCWD) that allowed the District to purvey recycled water to landscape irrigation customers and commercial users in the Zone 1 area (Attachment 1), which consists of portions of Pleasant Hill, Concord, and Martinez near the 1 -680 Freeway. A total of 61 sites were identified for possible connection with a total annual recycled water demand of 379 million gallons per year. The Recycled Water Pleasant Hill (Zone 1) Project, District Project Number 7167, completed 29 customer connections in the Zone 1 project area. These customers use almost 200 million gallons per year of recycled water for a variety of uses including landscape irrigation, dust control, concrete manufacturing, truck washing, and kennel wash down at the animal shelter. Additional customers will be connected in the Zone 1 area where economically feasible. The total authorized budget for the Recycled Water Pleasant Hill (Zone 1) Project, District Project 7167, is $2,127,00. The total project cost was $2,189,000. An allocation of $62,000 will be made from the Recycled Water Program to cover the project budget overrun. RECOMMENDED BOARD ACTION: This item is presented to the Board of Directors for information. No action is necessary. N: \ENVRSEC \Position Papers \Berger\2007 \PP Advise Closeout DP 7167 6- 7- 07.doc 1 ZONE 1 RECYCLED WATER PROJECT CENTRAL CONTRA COSTA SANITARY DISTRICT ... �_ WWTP 1-1:181 M RTINEZ '.I 1242 ��F `• 4 ; VINE CENTER �,.� AVE N r PgS i C C 4`� 9F o RD Wp ESMUp1 VIKING BLVD- i \ CONCORD • o� PLEASANT HILLm GREGMY •� i i BOYD RD 0 i OAK PARK ° 0 5000 10.000 RD GEARY RtI. ,,, , ,M•• 0 FEET 0 WALNUT 3 CREEK a a Lrc—c I` 0 E E u ya R�ro �o ,Q� LEGEND: ,� Y a ce R �o —• —• CCWD -EBMUD boundary line —••— CCWD - Martinez Water District (MWD) boundary line 24 — Zone 1 boundary 680 Transmission Mains y 0 16 Transmission Main Diameter 1 Central Contra Costa Sanitary District ' BOARD OF DIRECTORS POSITION PAPER Board Meeting Date: June 7, 2007 No.: 3.o. Consent Calendar Type of Action: INFORMATIONAL Subject: ADVISE THE BOARD OF THE CLOSEOUT OF THE CSO CALTRANS LEASE AREA SITE IMPROVEMENTS, DISTRICT PROJECT NO. 8215 Submitted By: Initiating Dept /Div.: Alex Rozul, Associate Engineer Engineering / Capital Projects REVIEWED AND RECOMMENDED FOR BOARD ACTION: W:. � G A. .., Ames M. Kelly, General Manager ISSUE: All work has been completed on the CSO Caltrans Lease Area Site Improvements Project, District Project 8215, and this project can now be closed out. RECOMMENDATION: Close out the project. FINANCIAL IMPACTS: The closeout will result in $3,000 being returned to the General Improvements Program. Attachment 1 shows the project expenditures by category. ALTERNATIVES /CONSIDERATIONS: Not applicable. BACKGROUND: Several reports and site evaluations that were completed for the Collection System Operations Department (CSOD) maintenance yard identified needed improvements. The CSOD Caltrans Lease Area and Site Improvements Project addressed these issues. A lease agreement was entered into with Caltrans, and the lower yard was expanded under the State Highway 24 overpass to address some of these issues. Approximately 38,000 square feet was cleared, graded, and paved to increase yard space for maintenance vehicle parking and to improve vehicle circulation. Also included in the new lower yard were a vehicle washdown station, a storm water pretreatment structure, a new fence, security gate, lighting, and landscaping. A failing metal retaining wall that posed a safety hazard was demolished and replaced with a concrete wall. The Ducca House was razed and a level paved area was constructed on the former house site, creating additional parking and storage area for the upper yard. RBF Consulting prepared the plans and specifications for this project and the engineer's estimate for construction was $750,000. On August 3, 2006, the Board of Directors authorized the award of a construction contract to William P. Young Construction. The Notice to Proceed was issued effective September 18, 2006. The project was completed and accepted by the Board on March 15, 2007. NAPESUMCbradley \Position Papers \Rozul \8215- CloseoutPP.doc Page 1 of 3 POSITION PAPER Board Meeting Date: June 7, 2007 subject: ADVISE THE BOARD OF THE CLOSEOUT OF THE CSO CALTRANS LEASE AREA SITE IMPROVEMENTS, DISTRICT PROJECT NO. 8215 The value of the original contract work for this project was $832,900. Construction change orders were issued in the total amount of $90,800. The total authorized budget for the project was $1,286,500, which included a contingency of $166,600. The total project cost was $1,283,500. The project closeout will result in approximately $3,000 being returned to the Collection System Program. RECOMMENDED BOARD ACTION: This item is presented to the Board of Directors for information. No action is necessary. NAPESUP \Cbradley \Position Papers \Rozul \8215- CloseoutPP.doc Page 2 of 3 ATTACHMENT 1 Expenditure Summary CSO Caltrans Lease Area Site Improvements Project DP 8215 ACTIVITY COST Total Budget $1,286,500 Construction Contract $832,900 Change Orders $90,800 Change Orders % of Construction 11% Total Construction Amount $923,700 Engineering, CM, Admin $359,800 Engineering, CM, Admin - % of Construction 39% Total Project Expenditures $1,283,500 Total Return to General Improvements Program $3,000 NAPESUP\Cbradley \Position Papers \Rozul \8215- CloseoutPP.doc Page 3 of 3 Central Contra Costa Sanitary District ' BOARD OF DIRECTORS POSITION PAPER Board Meeting Date: June 7, 2007 No.: 3.p. Consent Calendar Type of Action: ACCEPT CONTRACT WORK/AUTHORIZE FILING OF THE NOTICE OF COMPLETION subject: ACCEPT THE CONTRACT WORK FOR THE INSTALLATION OF THE NETWORK FIBER OPTIC CABLE AND WIRE RUNS FOR THE PLANT CONTROL SYSTEM IMPROVEMENTS PROJECT, DISTRICT PROJECT 7204, AND AUTHORIZE FILING OF THE NOTICE OF COMPLETION Submitted By: Initiating Dept. /Div.: David Hefflefinger, Staff Engineer Engineering / Capital Projects REVIEWED AND RECOMMENDED FOR BOARD ACTION: D. Hefflefinger B. Than ecki A. Farrell Oarnes M. Kelly, General Manager ISSUE: Installation has been completed on the network fiber optic cable and wire runs for the Plant Control System Improvements Project, District Project 7204, and the work is now ready for acceptance. RECOMMENDATION: Accept the contract work for the installation of the network fiber optic cable and wire runs for the Plant Control System Improvements Project, District Project 7204, and authorize filing of the Notice of Completion. FINANCIAL IMPACTS: None related to this action. ALTERNATIVES /CONSIDERATIONS: Not Applicable. Filing the Notice of Completion is advisable under the California Civil Code, Section 3093. BACKGROUND: The Plant Control System Improvements Project is currently in the implementation phase. The Board has authorized a contract to Transdyn Controls, Inc to install a new plant control system (PCS). The Board has also authorized the purchase of replacement hardware and peripherals necessary for the operation of the new PCS system. The scope of this contract is to install fiber optic and Ethernet cabling that will connect to switching networks throughout the plant. The switching networks will allow the new PCS system to be remotely accessed at five critical plant locations. The Ultraviolet Disinfection Facility, Filter Plant, Standby Power Facilities, and Headworks will each receive one new remote PCS workstation, while the Solids Conditioning Building will receive two new remote PCS workstations. These remote workstations will allow the operators to respond to process variations more quickly which will help the District increase efficiency and maintain compliance with government regulations. Another use of the cabling will be to upgrade the fiber optic network of the existing PLC's. Much of WPESUP \Position Pape rs \HefFlefinger \7204 - Accept- NOC.doc Page 1 of 2 POSITION PAPER Board Meeting Date: June 7, 2007 subject: ACCEPT THE CONTRACT WORK FOR THE INSTALLATION OF THE NETWORK FIBER OPTIC CABLE AND WIRE RUNS FOR THE PLANT CONTROL SYSTEM IMPROVEMENTS PROJECT, DISTRICT PROJECT 7204, AND AUTHORIZE FILING OF THE NOTICE OF COMPLETION the existing PLC fiber optic network was installed with an older standard cable. This older cable is subject to degradation with age and when exposed to moisture, causing faults in the transmission line. Replacement cable has been installed in faulty cable runs and waterproof cable has been installed wherever moisture was determined to contribute to the cause. On January 25, 2007, the Board of Directors authorized the award of a contract for the construction of the project to Contra Costa Electric. Work began on March 2, 2007, and was completed on April 5, 2007. The contract amount for the project is $39,839. An accounting of the project costs will be provided to the Board at the time of project closeout. It is appropriate to accept the contract work at this time. RECOMMENDED BOARD ACTION: Accept the contract work for the installation of the network fiber optic cable and wire runs for the plant control system improvements project, District Project 7204, and authorize filing of the Notice of Completion. N:\PESUP \Position Papers \Hefflefinger \7204 - Accept- NOC.doc Page 2 of 2 Central Contra Costa Sanitary District ' BOARD OF DIRECTORS POSITION PAPER Board Meeting Date: June 7, 2007 No.: 3.q. Consent Calendar Type of Action: CONFIRM PUBLICATION subject: ADOPT A RESOLUTION CONFIRMING PUBLICATION OF A SUMMARY OF DISTRICT ORDINANCE NO. 243 - AN ORDINANCE AMENDING DISTRICT CODE SECTION 6.12.090, SCHEDULE OF CAPACITY FEES, RATES AND CHARGES Submitted By: Initiating Dept /Div.: Administrative Department Elaine R. Boehme Secretary of the District REVIEWED AND RECOMMENDED FOR BOARD ACTION: James M. Kelly, General Manager ISSUE: Section 6490 of the Health and Safety Code of the State of California provides that District ordinances shall be published once in a newspaper of general circulation within the District, and provides that an Order of the Board of Directors of the District to the effect that the ordinance has been published shall constitute conclusive evidence that publication has been properly made. RECOMMENDATION: Adopt a resolution confirming the publication of a summary of District Ordinance No. 243. FINANCIAL IMPACTS: None. ALTERNATIVES /CONSIDERATIONS: Establishes presumption that the ordinance was correctly published and therefore would be deemed procedurally valid by a court. BACKGROUND: A summary of District Ordinance No. 243 which was adopted by the Board at the meeting of April 19, 2007, and which amends District Code Section 6.12.090, Schedule of Capacity Fees, Rates and Charges, was published in the Contra Costa Times on April 27, 2007. Proof of publication is attached. RECOMMENDED BOARD ACTION: Adopt a resolution confirming the publication of a summary of District Ordinance No. 243. Page 1 of 3 PROOF OF PUBLICATION (2015.5 C.C.P.) STATE OF CALIFORNIA County of Contra Costa I am a citizen of the United States and a resident of the County aforesaid; I am over the age of eighteen years, and not a party to or interested in the above - entitled matter. I am the Principal Legal Clerk of the Contra Costa Times, a newspaper of general circulation, printed and published at 2640 Shadelands Drive in the City of Walnut Creek, County of Contra Costa, 94598. And which newspaper has been adjudged a newspaper of general circulation by the Superior Court of the County of Contra Costa, State of California, under the date of October 22, 1934. Case Number 19764. The notice, of which the annexed is a printed copy (set in type not smaller than nonpareil), has been published in each regular and entire issue of said newspaper and not in any supplement thereof on the following dates, to -wit: April 27, all in the year of 2007 1 certify (or declare) under penalty of perjury that the foregoing is true and correct. Exec utedagWa lnut Creek, California. On thi day of Apri� .. ...................... ............................... Signature Contra Costa Times P O Box 4147 Walnut Creek, CA 94596 (925) 935 -2525 Proof of Publication of: (attached is a copy of the legal advertisement that published) SUMMARY OF ORDINANCE NO. 243 AN ORDINANCE OF THE CENTRAL CONTRA COSTA SANITARY DISTRICT AMENDING DISTRICT CODE SECTION 6.12090, SCHEDULE OF CAPACITY FEES, RATES AND CHARGES NOTE: The above is a summary of malor hich- nance is osted and may be read in the Secretary of the District's Office at 5019 Imhoff Place. Marti- nez and /or a copy may be obtained from the office. Adopted: April 19, 2007 AYES: Members: H o c k e t t, Lucg McGill, Menesini, Neledly NOES: Members; None ABSENT:Members:None s/s lames A. Neledly James A. Neledly President of the District Board of the central Contra Costa San- itary District, County of Contra Costa, State of California COUNTERSIGNED: s/s Randall M. Musgraves Randall M. Musgraves Secretary Pro Tern of the Central Contra Costa Sanitary District, County of Contra Costa, State of California Approved as to Form: s/s Kenton L. Alm Kenton L. Alm District Counsel Legal CCT 2336055 Publish April 27, 2007 RESOLUTION NO. 2007- RESOLUTION CONFIRMING PUBLICATION OF A SUMMARY OF DISTRICT ORDINANCE NO. 243 AMENDING DISTRICT CODE SECTION 6.12.090 SCHEDULE OF CAPACITY FEES, RATES AND CHARGES WHEREAS, Section 6490 of the Health and Safety Code of the State of California provides that District ordinances shall be published once in a newspaper of general circulation within the District, and provides that an Order of the Board of Directors of the District to the effect that the Ordinance has been published shall constitute conclusive evidence that publication has been properly made. NOW, THEREFORE, be it resolved by the Board of Directors of the Central Contra Costa Sanitary District as follows: THAT a summary of District Ordinance No. 243 which was adopted on April 19, 2007, and which amends District Code Section 6.12.090, Schedule of Capacity Fees, Rates and Charges, has been properly published once since its adoption in a newspaper of general circulation within Contra Costa County. PASSED AND ADOPTED by the Central Contra Costa Sanitary District Board of Directors this 7'h day of June, 2007 by the following vote: AYES: Members: NOES: Members: ABSENT: Members: COUNTERSIGNED: Elaine R. Boehme Secretary of the Central Contra Costa Sanitary District, County of Contra Costa, State of California Approved as to Form: James A. Nejedly President of the Board of Directors, Central Contra Costa Sanitary District, County of Contra Costa, State of California Kenton L. Alm District Counsel Central Contra Costa Sanitary District ' BOARD OF DIRECTORS POSITION PAPER Board Meeting Date: June 7, 2007 No.: 3.r. Consent Calendar Type of Action: CONFIRM PUBLICATION subject: ADOPT A RESOLUTION CONFIRMING PUBLICATION OF A SUMMARY OF DISTRICT ORDINANCE NO. 244 - AN ORDINANCE AMENDING DISTRICT CODE CHAPTER 6.30, SCHEDULE OF ENVIRONMENTAL AND DEVELOPMENT - RELATED RATES AND CHARGES Submitted By: Initiating Dept /Div.: Administrative Department Elaine R. Boehme Secretary of the District REVIEWED AND RECOMMENDED FOR BOARD ACTION: 111 W9 LNG_ James M. Kelly, General Manager ISSUE: Section 6490 of the Health and Safety Code of the State of California provides that District ordinances shall be published once in a newspaper of general circulation within the District, and provides that an Order of the Board of Directors of the District to the effect that the ordinance has been published shall constitute conclusive evidence that publication has been properly made. RECOMMENDATION: Adopt a resolution confirming the publication of a summary of District Ordinance No. 244. FINANCIAL IMPACTS: None. ALTERNATIVES /CONSIDERATIONS: Establishes presumption that the ordinance was correctly published and therefore would be deemed procedurally valid by a court. BACKGROUND: A summary of District Ordinance No. 244 which was adopted by the Board at the meeting of April 19, 2007, and which amends District Code Chapter 6.30, Schedule of Environmental and Development - Related Rates and Charges, was published in the Contra Costa Times on April 27, 2007. Proof of publication is attached. RECOMMENDED BOARD ACTION: Adopt a resolution confirming the publication of a summary of District Ordinance No. 244. Page 1 of 3 PROOF OF PUBLICATION (2015.5 C.C.P.) STATE OF CALIFORNIA County of Contra Costa I am a citizen of the United States and a resident of the County aforesaid; I am over the age of eighteen years, and not a party to or interested in the above - entitled matter. I am the Principal Legal Clerk of the Contra Costa Times, a newspaper of general circulation, printed and published at 2640 Shadelands Drive in the City of Walnut Creek, County of Contra Costa, 94598. And which newspaper has been adjudged a newspaper of general circulation by the Superior Court of the County of Contra Costa, State of California, under the date of October 22, 1934. Case Number 19764. The notice, of which the annexed is a printed copy (set in type not smaller than nonpareil), has been published in each regular and entire issue of said newspaper and not in any supplement thereof on the following dates, to -wit: April 27, all in the year of 2007 I certify (or declare) under penalty of perjury that the foregoing is true and correct. Execut Walnut Creek, California. On t 3 da of April, —x'07 ......................... ............................... Signature Contra Costa Times P O Box 4147 Walnut Creek, CA 94596 (925) 935 -2525 Proof of Publication of: (attached is a copy of the legal advertisement that published) SUMMARY OF ORDINANCE NO. ]A4 AN ORDINANCE OF THE CENTRAL CONTRA COSTA SANITARY DISTRICT AMENDING DISTRICT CODE CHAPTER SM, SCHEDULE OF ENVIRON- MENTAL AND DEVELOPMENT - RELATED RATES AND CHARGES Ordinance No. 244 amends the Central Con- tra Costa Sanitary District Code by amending Chap- ter 6.30, "Schedule of En- vironmental and Development - Related Rates and Charges" to in- crease certain rates and charges by between 3.5 percent to 5 percent, to decrease certain rates and charges, to add new rates and charges and eliminate others. NOTE: The above Is a summary of malor high- )posed. A cer- of the full text oposed ordi- sted and may the Secretary •lct's Office at f Place, Marti - a copy may be )m the office. Adopted: April 19, 2007 AYES:Members:H o c kett, Lucey McGill, Menesini, Neledy(y NOES:Members:None ASSENT:Members:None s/s James A. Nejedly James A. Neledly President of the District Board of the Central Contra Costa San- itary District, County of Contra Costa, State of California COUNTERSIGNED: s/s Randall M. Musgraves Randall M. Musgraves Secretary Pro Tern of the Central Contra Costa Sanitary District, County of Contra Costa, State of California Approved as to Form: s/s Kenton L. Alm Kenton L. Alm District Counsel Legal CCT 2336071 Publish April 27, 2007 RESOLUTION NO. 2007- RESOLUTION CONFIRMING PUBLICATION OF A SUMMARY OF DISTRICT ORDINANCE NO. 244 AMENDING DISTRICT CODE CHAPTER 6.30 SCHEDULE OF ENVIRONMENTAL AND DEVELOPMENT - RELATED RATES AND CHARGES WHEREAS, Section 6490 of the Health and Safety Code of the State of California provides that District ordinances shall be published once in a newspaper of general circulation within the District, and provides that an Order of the Board of Directors of the District to the effect that the Ordinance has been published shall constitute conclusive evidence that publication has been properly made. NOW, THEREFORE, be it resolved by the Board of Directors of the Central Contra Costa Sanitary District as follows: THAT a summary of District Ordinance No. 244 which was adopted on April 19, 2007, and which amends District Code Chapter 6.30, Schedule of Environmental and Development - Related Rates and Charges, has been properly published once since its adoption in a newspaper of general circulation within Contra Costa County. PASSED AND ADOPTED by the Central Contra Costa Sanitary District Board of Directors this 7th day of June, 2007 by the following vote: AYES: Members: NOES: Members: ABSENT: Members: COUNTERSIGNED: Elaine R. Boehme Secretary of the Central Contra Costa Sanitary District, County of Contra Costa, State of California Approved as to Form: James A. Nejedly President of the Board of Directors, Central Contra Costa Sanitary District, County of Contra Costa, State of California Kenton L. Alm District Counsel Central Contra Costa Sanitary District ' BOARD OF DIRECTORS POSITION PAPER Board Meeting Date: June 7, 2007 No.: 3.s. Consent Calendar Type of Action: AUTHORIZE AGREEMENT subject: AUTHORIZE THE GENERAL MANAGER TO EXECUTE A RENEWAL OF THE AGREEMENT WITH MOUNTAIN VIEW SANITARY DISTRICT FOR CCCSD TO PROVIDE POLLUTION PREVENTION PROGRAM SUPPORT Submitted By: Timothy Potter Source Control Program Superintendent REVIEWED AND RECOMMENDED FOR BOARD ACTION: Initiating Dept /Div.: Engineering /Environmental Services fl- T. Potter A. FarM K. Alm ames M. Kelley General Manager ISSUE: Continuation of the interagency partnership between the District and Mt. View Sanitary District (MVSD) for supporting the MVSD Pollution Prevention Program beyond fiscal year 2006 -07 requires renewal. The Board of Director's authorization is required for agreements with other public agencies. RECOMMENDATION: Approve renewal of this agreement with MVSD and authorize the General Manager to execute the agreement renewal that would extend this interagency partnership for two (2) years through fiscal year 2008 -09. FINANCIAL IMPACTS: The proposed agreement provides for full cost recovery. The estimated budget for fiscal year 2007 -08 is $24,000. The staff time used to provide the services will not be available to perform other District functions. ALTERNATIVES /CONSIDERATIONS: The Board may decline to renew this agreement, however this action is not recommended. Source Control Inspectors already work in the MVSD service area when completing work under the Clean Water Program (CWP) inspection services agreement for the City of Martinez. Some of the additional 40 inspections per year can be combined with current inspections in Martinez, and the total number is incidental when compared to the more than 1000 inspections completed annually by District inspectors. BACKGROUND: In 2006, MVSD requested that the District provide services to support the MVSD Pollution Prevention Program that was approved by both agencies' Board of Directors through fiscal year 2006 -07. Historically, MVSD used an employee to conduct their Pollution Prevention Program. This was no longer an option in 2006 because the MVSD Pollution Prevention Program work required part-time coverage and drew on diverse skills. N: \ENVRSEC \Position Papers \Potter\2007 \PP MVSD Agreement Renewal 6- 7- 07.doc POSITION PAPER Board Meeting Date: June 7, 2007 Subject: AUTHORIZE THE GENERAL MANAGER TO EXECUTE A RENEWAL OF THE AGREEMENT WITH MOUNTAIN VIEW SANITARY DISTRICT FOR CCCSD TO PROVIDE POLLUTION PREVENTION PROGRAM SUPPORT The scope of services for this agreement includes conducting a minimum of 40 inspections per year of businesses in the MVSD service area that could discharge pollutants identified in the MVSD list of pollutants of concern (including Fats, Oils, and Grease wastes from food service facilities), and preparing the Annual Pollution Prevention Report with input and oversight of MVSD staff. The District is able to perform this work since it is similar to the work performed for its own Source Control /Pollution Prevention Program. MVSD recognized this capability when they approached the District to provide these services. RECOMMENDED BOARD ACTION: Authorize the General Manager to execute an agreement to renew the interagency partnership to support MVSD's Pollution Prevention Program for two (2) years through fiscal year 2008 -09. WENVRSEMPosition Papers \Potter\2007 \PP MVSD Agreement Renewal 6- 7- 07.doc Central Contra Costa Sanitary District ' BOARD OF DIRECTORS POSITION PAPER Board Meeting Date: June 7, 2007 No.: 3.t. Consent Calendar Type of Action: APPROVE MERIT INCREASE subject: APPROVE REGISTRATION DIFFERENTIAL SALARY MERIT INCREASE FOR ASSOCIATE ENGINEER, TOM GODSEY Submitted By: Initiating Dept /Div.: Tad Pilecki, Division Manager Engineering / Capital Projects REVIEWED AND RECOMMENDED FOR BOARD ACTION. ilecki A. Farrell C. Frei as games M. Kelly, General Manager ISSUE: A registration differential salary merit increase requires approval by the Board of Directors. RECOMMENDATION: Grant Associate Engineer, Tom Godsey, a one -step increase in his base salary effective March 23, 2007. FINANCIAL IMPACTS: One -step salary increase. ALTERNATIVES /CONSIDERATIONS: None BACKGROUND: Tom Godsey is an Associate Engineer in the Engineering Department, Capital Projects Division. The Memorandum of Understanding (MOU) between the Management Support/Confidential Group and Central Contra Costa Sanitary District provides for a salary merit increase for employees who achieve registration or license as a Professional Engineer (PE) while employed by the District in a position where the registration or license is not required. A PE license is required for the position of Associate Engineer, and Mr. Godsey has held a PE license in the branch of Civil Engineering for the past 15 years, meeting the requirements of the position. In addition to Mr. Godsey's duties, including Collection System design, construction, and operation, which require the professional level of judgment and skill of a Registered Civil Engineer, he has taken on major responsibilities in the area of mechanical engineering design, managing the HVAC Improvements design and Standby Power Facility Improvements design. Mr. Godsey has provided evidence that he has successfully passed the required examination and now also holds a license as a Professional Engineer in the branch of Mechanical Engineering (see Attachment 1). The MOU states "such merit increase shall be subject to the employee's demonstration of ability to assist in the accomplishment of District activities requiring a level of skills and importance normally expected from a person with such certification." Mr. Godsey has consistently demonstrated the professional judgment and skill expected of a Mechanical Engineer. N: \PESUP \Cbradley \Position Papers \Pilecki \Salary Merit- TG.doc Page 1 of 2 POSITION PAPER Board Meeting Date: June 7, 2007 subject: APPROVE REGISTRATION DIFFERENTIAL SALARY MERIT INCREASE FOR ASSOCIATE ENGINEER, TOM GODSEY RECOMMENDED BOARD ACTION: Grant Associate Engineer, Tom Godsey, a one -step increase in his base salary effective March 23, 2007, as the registration differential salary merit increase provided for in the MOU. NAPESUMbradley \Position Papers\Pilecki \Salary Merit- TG.doc Page 2 of 2 March 23, 2007 TO: BOARD OF DIRECTORS VIA: ANN FARRELLGG�� FROM: TOM GODSEY'ASSOCIATE ENGINEER SUBJECT: REQUEST FOR APPROVAL OF REGISTRATION DIFFERENTIAL SALARY MERIT INCREASE I am pleased to inform you that I have been notified by the Board for Professional Engineers that I have successfully passed the recent Professional Engineer examination. Attached is their January 30, 2004 letter sent as evidence that I now hold a valid license as a Professional Engineer in the Mechanical Engineering branch. The Memorandum of Understanding between the Management Support/Confidential Group and Central Contra Costa Sanitary District provides for a salary merit increase for employees who achieve license as a Professional Engineer (PE) while employed in a position not requiring such license. I have held a PE license in Civil Engineering for the past 15 years meeting the requirements of my position. During the past 19 years I have worked on Collection System projects requiring my skills as a Registered Civil Engineer including many sewer replacement and repair projects. In addition I have taken on more responsibility in the area of Mechanical Engineering and have become a primary resource for mechanical system projects. Since I have added this knowledge to my areas of expertise I decided to acquire a PE license in Mechanical Engineering. The PE license in Mechanical Engineering is not required for my position but, as it states in the MOU, demonstrates my ability to "assist in the accomplishment of District activities requiring a level of skills and importance normally expected from a person with such registration or license." I respectfully ask your consideration of my request for approval of a registration differential salary merit increase as provided for by the MOU. A &ved Ann Farre I Director of Engineering Approved by: lzk� &- &--, Omes Kelly General Manager STATE OF CALIFORNIA-STATE AND CONSUMER SERVICES AGENCY ARNOLD SCHWARZENEGGER, Govsrrgr - - - BOARD FOR PROFESSIONAL ENGINEERS AND LAND SURVEYORS 2535 Capitol Oaks Drive, Suite 300, Sacramento, CA 95833 -2944 10L Mailing Address: P.O. Box 349002, Sacramento, CA 95834 -9002 D"a+,.""m,e of Telephone: (916) 263 -2222 Calnet: 8-435 -2222 Cam"""'Aft" Fax: (916) 263 -2246 or(916)263-2221 Board Internet Address: http: / /www.dea- ca- gov /pels 01/30/2004 BRIAN T. GODSEY 36 BUCKEYE AVE OAKLAND, CA 94618 CONGRATULATIONS! ID: 51509 Branch: Mechanical We are pleased to inform you that you have successfully passed the recent Professional Engineer examination. This letter will serve as temporary evidence that you now hold a valid license as a Professional Engineer. A formal certificate, which will include your license number, will be prepared and mailed to you within four to six weeks. Please refer to the California Code of Regulations (Board Rules) for Professional Engineers and Land Surveyors (Title 16, Division 5, Sections 400 - 474.5) for information on the following subjects that are your responsibility. These Rules can be found on our website at www.dca.ca-gov/pels/laws.htm Rule 407 - Fees Rule 411 - Seal and Signature Rule 412 - Address Change Rule 415 - Practice within Area of Competence Of particular importance is that all licenses are subject to renewal, and payment of a renewal fee is required. A renewal notice will be mailed to you several weeks before the expiration date of your Professional Engineer license. If you do not receive a renewal notice, you are still responsible for renewing your license. If you wish to order a seal or stamp, you may purchase one from any stationary store or rubber stamp company. Please note that some Engineers are required to seal, stamp and sign any plans, specifications, or reports prepared by them, or under their direction. Board Rule 411 provides specific criteria on seals. Notices and newsletters from the Board Office cannot reach you unless we have your current mailing address. Board Rule 412 requires you to advise us in writing of any address changes within 30 days after the effective date of the address change. EXAMINATION AND LICENSING STAFF 4.a. Hearings CONDUCT PUBLIC HEARINGS TO RECEIVE PUBLIC COMMENT ON THE FY 2007 -2008 OPERATIONS AND MAINTENANCE BUDGET, DEBT SERVICE FUND BUDGET AND SELF - INSURANCE FUND BUDGET, AND FOR THE ESTABLISHMENT OF THE FY 2007 -2008 SEWER SERVICE CHARGE RATES, AND ON PLACING CURRENT SEWER SERVICE CHARGES ON THE COUNTY TAX ROLL FOR COLLECTION SUGGESTED AGENDA JUNE 7, 2007 President Nejedly will announce that two separate public hearings will be conducted: (1) Approval of the FY 2007 -2008 Operations and Maintenance (O &M) Budget, Debt Service Fund Budget and Self- Insurance Fund Budget, and establishment of the FY 2007 -2008 and FY 2008 -2009 Sewer Service Charge rates; and (2) Collection of the FY 2007 -2008 Sewer Service Charges on the County tax roll. Call for staff report on both public hearings. 2. Open first public hearing and call for comments. 3. Close public hearing. 4. Board deliberation, and: a. Vote to approve the FY 2007 -2008 O &M Budget, Debt Service Fund Budget and Self- Insurance Fund Budget, incorporating Sewer Service Charge as determined by ordinance to be considered separately; and b. Vote to adopt ordinance setting Sewer Service Charge for FY 2007 -2008 and FY 2008 -2009, to be incorporated in the FY 2007 -2008 budget. •- C. Request additional information from staff and continue the public hearing to June 21, 2007. 5. Open second public hearing and call for comments. 6. Close public hearing. 7. Board deliberation, and: Vote to adopt resolution allowing collection of Sewer Service Charge on the County tax roll. N: \ADMINSUP\ADMIN \RATCLIFF\Public Hearing - Sewer Service Charge & O &M 2007.doc Central Contra Costa Sanitary District ' BOARD OF DIRECTORS POSITION PAPER Board Meeting Date: June 7, 2007 No.: 4.a. Hearings Type of Action: CONDUCT PUBLIC HEARING subject: CONDUCT PUBLIC HEARINGS TO RECEIVE PUBLIC COMMENT ON THE FY 2007 -2008 OPERATIONS AND MAINTENANCE BUDGET, DEBT SERVICE FUND BUDGET AND THE SELF - INSURANCE FUND BUDGET, AND FOR THE ESTABLISHMENT OF THE FY 2007 -2008 and FY 2008 -2009 SEWER SERVICE CHARGE RATES, AND ON PLACING CURRENT SEWER SERVICE CHARGES ON THE COUNTY TAX ROLL FOR COLLECTION Submitted By: DEBBIE RATCLIFF CONTROLLER Initiating Dept /Div.: ADMINISTRATIVE /FINANCE & ACCOUNTING REVIEWED AND RECOMMENDED FOR BOARD ACTION: 4KI4 1* D. Ra i . M graves lm 'met M. Kelly, 4eneral Manager ISSUE: The District Code and State law require public hearings for the establishment of the Sewer Service Charge rates for FY 2007 -2008 and FY 2008 -2009 and on placing the current Sewer Service Charges on the County tax roll for collection. Although not required by law, the District will hold a public hearing to receive public comment on the FY 2007 -2008 Operations and Maintenance Budget, Debt Service Fund Budget and the Self- Insurance Fund Budget. RECOMMENDATION: Conduct two separate Public Hearings and upon their respective conclusions, take the following actions, if considered appropriate: Approve the FY 2007 -2008 Operations and Maintenance Budget (O &M), Debt Service Fund Budget and Self- Insurance Fund Budget Approve an ordinance that establishes the FY 2007 -2008 Sewer Service Charge rate increase of $11 for a total Sewer Service Charge of $300 per residential unit, and establishes a maximum increase of $13 or up to $313 per residential unit for FY 2008 -2009. • Approve a resolution authorizing collection of the 2007 -2008 Sewer Service Charges on the County tax roll. FINANCIAL IMPACTS: The draft FY 2007 -2008 O &M Budget is based on a $11 rate increase in the Sewer Service Charge for a total of $300 per residential unit equivalent, allocating $242 to Operations and Maintenance and $58 to the Sewer Construction Fund. Also, a $2.8 million allocation towards the unfunded liability associated with N:\ADMINSUP\ADMIN \POSPAPER \Budget Position Paper - 06- 07- 07.doc POSITION PAPER Board Meeting Date: June 7, 2007 Subject: CONDUCT PUBLIC HEARINGS TO RECEIVE PUBLIC COMMENT ON THE FY 2007 -2008 OPERATIONS AND MAINTENANCE BUDGET, DEBT SERVICE FUND BUDGET AND THE SELF - INSURANCE FUND BUDGET, AND FOR THE ESTABLISHMENT OF THE FY 2007 -2008 and FY 2008 -2009 SEWER SERVICE CHARGE RATES, AND ON PLACING CURRENT SEWER SERVICE CHARGES ON THE COUNTY TAX ROLL FOR COLLECTION GASB 45 post retirement benefits is included in the draft 2007 -2008 budget. This allocation will remain unencumbered until action by the Board. The proposed $11 Sewer Service Charge increase would generate approximately $1.8 million in new revenue for fiscal year 2007 -2008 to be allocated between O &M and the Sewer Construction Fund. The proposed budget would result in a decrease to O &M reserves at fiscal year end of $2.2 million for a projected O &M reserve balance at June 30, 2008, of $7 million. Effective with the 1982 -1983 fiscal year, Contra Costa County imposed a fee for collecting the Sewer Service Charge on the tax roll. The County fee, which approximates $90,000 annually, is more economical than the alternative of direct billing by the District. ALTERNATIVES /CONSIDERATIONS: The Board could decide not to increase the Sewer Service Charge for FY 2007 -2008, keeping the Sewer Service Charge at the current $289, or choose another amount of increase up to $13 as noticed in the Proposition 218 mailing. BACKGROUND: The FY 2007 -2008 Operations and Maintenance Budget was submitted for review at the May 24, 2007, Board Meeting. A detailed presentation was made to the Board at that meeting and a copy of the overheads used is attached (see Attachment 1). A legal notice was published in the Contra Costa Times for the June 7, 2007, Public Hearing to receive public comment on the FY 2007 -2008 Operations and Maintenance Budget, Debt Service Fund Budget and the Self- Insurance Fund Budget, for the establishment of the Sewer Service Charge rate for FY 2007 -2008 and FY 2008 -2009, and on collection of the 2007 -2008 Sewer Service Charges on the County tax roll. Also, approximately 107,000 Proposition 218 Notices indicating a proposed two year Sewer Service Charge increase were mailed to properties in our service area. As of May 25, 2007, a total of 85 telephone calls, emails and letters have been received (see Attachment 2). It is recommended that two separate hearings be held to consider the matters described. N:\ADMINSUPWDMIN \POSPAPER \Budget Position Paper - 06- 07- 07.doc POSITION PAPER Board Meeting Date: June 7, 2007 subject CONDUCT PUBLIC HEARINGS TO RECEIVE PUBLIC COMMENT ON THE FY 2007 -2008 OPERATIONS AND MAINTENANCE BUDGET, DEBT SERVICE FUND BUDGET AND THE SELF - INSURANCE FUND BUDGET, AND FOR THE ESTABLISHMENT OF THE FY 2007 -2008 and FY 2008 -2009 SEWER SERVICE CHARGE RATES, AND ON PLACING CURRENT SEWER SERVICE CHARGES ON THE COUNTY TAX ROLL FOR COLLECTION Hearing to receive public comment on the FY 2007 -2008 Operations and Maintenance (OW Budget, Debt Service Fund Budget and Self- Insurance Fund Budget and for the establishment of the Sewer Service Charge rate for FY 2007- 2008 of $300 and up to $313 for FY 2008 -2009: The FY 2007 -2008 O &M Budget and Debt Service Fund Budget were submitted to the Board of Directors for initial review at the May 24, 2007, Board Meeting and the Self- Insurance Fund Budget was presented at the May 10, 2007, Board Meeting. All three are scheduled for approval at the June 7, 2007, Board Meeting. Upon approval of the three budgets and determination of adequate levels of reserves, the Board must establish the 2007 -2008 Sewer Service Charge rates. The Board will also consider establishing a Sewer Service Charge rate increase of up to $13 for FY 2008 -2009. Future rates will be based on the District's financial condition and revisted each year. Hearing to consider collection of the FY 2007 -2008 Sewer Service Charges on the County tax roll: The law requires that a public hearing be held each year before the Sewer Service Charge can be placed on the County tax roll. The Sewer Service Charge has been collected on the County tax roll since inception of the service charge in 1976. Collection on the tax roll provides the most economical and efficient means for the District to collect the charges for approximately 105,000 accounts. RECOMMENDED BOARD ACTION: Conduct two separate public hearings and upon their respective conclusions, take the following actions, if considered appropriate: Approve the FY 2007 -2008 Operations and Maintenance Budget, Debt Service Fund Budget and Self- Insurance Fund Budget and Approve an ordinance establishing the 2007 -2008 Sewer Service Charge rate increase of $11 for a total Sewer Service Charge at $300 and establishing a N:\ADMINSUP\ADMIN \POSPAPER \Budget Position Paper - 06- 07- 07.doc POSITION PAPER Board Meeting Date: June 7, 2007 Subject: CONDUCT PUBLIC HEARINGS TO RECEIVE PUBLIC COMMENT ON THE FY 2007 -2008 OPERATIONS AND MAINTENANCE BUDGET, DEBT SERVICE FUND BUDGET AND THE SELF - INSURANCE FUND BUDGET, AND FOR THE ESTABLISHMENT OF THE FY 2007 -2008 and FY 2008 -2009 SEWER SERVICE CHARGE RATES, AND ON PLACING CURRENT SEWER SERVICE CHARGES ON THE COUNTY TAX ROLL FOR COLLECTION maximum increase of $13 or up to $313 per residential unit in the Sewer Service Charge for FY 2008 -2009. • Approve a resolution authorizing collection of the FY 2007 -2008 Sewer Service Charges on the County tax roll. N:\ADMINSUP\ADMIN \POSPAPER \Budget Position Paper - 06- 07- 07.doc RESOLUTION NO. A RESOLUTION DIRECTING THAT THE FY 2007 -2008 SEWER SERVICE CHARGES BE COLLECTED ON THE COUNTY TAX ROLL WHEREAS, the District has previously developed and instituted a Sewer Service Charge Program for services and facilities furnished by the District to finance yearly Operation and Maintenance of the District; and WHEREAS, the Sewer Service Charge is collected through a direct charge to the users: and WHEREAS, the District Code provides that the District may elect to collect current and delinquent charges on the tax rolls as provided by Sections 5470 and following of the Health & Safety Code; and WHEREAS, it is considered to be economically and efficient to continue the existing practice and collect the Sewer Service Charges for the 2007 -2008 fiscal year on the county tax roll; NOW, THEREFORE, BE IT RESOLVED, by the Board of Directors of the Central Contra Costa Sanitary District, that the FY 2007 -2008 Sewer Service Charges are to be collected on the County of Contra Costa tax roll. PASS AND ADOPTED this 7th day of June, 2007, by the District Board of the Central Contra Costa Sanitary District by the following vote: AYES: Members: NOES: Members ABSENT: Members James A. Nejedly President of the Board of Directors Central Contra Costa Sanitary District County of Contra Costa, State of California COUNTERSIGNED: Elaine R. Boehme Secretary of the Central Contra Costa Sanitary District County of Contra Costa, State of California Approved as to form: Kenton L. Alm Counsel for the District N:\ ADMINSUP \ADMIN \RATCLIFF\Resolubon 2007 -2008 sewer service charges.doc Attachment 1 2007 -2008 O &M BUDGET ASSUMPTIONS REVENUE ASSUMPTIONS: Sewer Service Charge - $300 $242 Allocated to O &M $58 Allocated to Sewer Construction Total Budgeted Ad Valorem Tax $11.6 million: $3.7 Million Allocated to Debt Service Fund $7.9 Million Allocated to Sewer Construction Fund EXPENSE ASSUMPTIONS: $5 Million allocation for GASB 45 post retirement benefts Retirement Expense -1.5% Increase in rate Increases to Healthcare costs for active employees: ➢ Healthnet - 11.5% ➢ Kaiser - 24.5% Increases to Healthcare costs for retirees - 17% Weighted Average Administrative Overhead percentage- increased from 103% to 107% (Of Capitalized Salary) Vacancy Factors: ➢ 3% for Salaries ➢ 4% for Benefits TOTAL DISTRICT REVENUE & EXPENSE 2007 — 2008 BUDGET (000 Omitted) Revenues Expenses Revenues Over Expenses Total District Operations & Sewer Maintenance Construction $93,446 $52,998 $40,448 98,288 55,227 43,061 N :\ADMINSUP\ADMIN\RATCLIFF\Budget Overheads 2007- 2008.doc OPERATING AND MAINTENANCE 2006 -2007 BUDGET COMPARED TO 2007 -2008 BUDGET (000 Omitted) Sewer Service Charge Rate (O &M Portion Only) $213 $242 Total Sewer Service Charge $289 $300 N:WDMINSUPWDMIN\RATCLIFF\Budget Overheads 2007- 2008.doc Increase (Decrease) 12.8% 1.9% 2006 -2007 2007 -2008 Budget Budget Revenues $46,976 $52,998 Expenses 54,207 55.227 Revenues Over Expenses (S (S Fund Balance 06/30/08 $7,021 Sewer Service Charge Rate (O &M Portion Only) $213 $242 Total Sewer Service Charge $289 $300 N:WDMINSUPWDMIN\RATCLIFF\Budget Overheads 2007- 2008.doc Increase (Decrease) 12.8% 1.9% V CO) O H Z N V Z V J Z W V W W V Z Z W Z Z CO) Z q0 W IL ao O O N O O N H LL W Z W m Z W a v H N 7 m0 i.7 C N N e' C t V y ai mga 0 c CD A o Goo t O q w !CO O ti d N 000 m N in Z c O> v m o v O _0 > L ' N V to m m O v e E V O N P. O din M f- r G m N 2 ' p ' OODw OMOw Z ti r V C o m COD N C N r N C4 N ci N w m O m Q o w m CO) Opp N W o m ro O m N N ti N _ Ci m pp^ Om m O O 01 CO) W CO O ... m > N Qr- 0 OD 0 46 c LL.= W a C w ° o o °° - O N O O GO 40 In r CO) C4 46 V% N ti tr0 ... 000 M .N N 0 m N O N 0 r M t0 M OZ co In 0 W O N 00 O N O O 40 O O O v 0 O N 0° N r N M m .-. CO 0�0 C O > co N CD N ... r (D N O/ 0 C i O V O N O O 9) N0 00 O 0 y 00 m ti C OD O ' N N C/ COI ! f P, co c t N J O 400 O .- O v O m N N N O 0 0 C m 000 ' g a ci ' CD O O r C ���yy O m N r C; N W) et N " tR C w ^ Q v Z _W Z W Q Q 10 W m m v o 7 m0 i.7 C N N e' C t V y ai t w � d A CL m W V m o a ' N V to m m O z e E V 0 d a CS V m 7 V C O C w m O m Q KEY LABOR COSTS - O &M (000 Omitted) N: \ADMINSUP\ADMIN\RATCLIFF\Budget Overheads 2007- 2008.doc 2006 -2007 2007 -2008 Increase Budget Budget (Decrease) Salaries & Wages $21,087 $21,725 $638 Salary Vacancy Factor 0 (616) (616) Retirement 7,481 7,982 501 Medical Insurance 4,529 5,184 655 Dental Insurance 659 655 (4) Workers' Compensation 510 494 (16) Benefit Vacancy Factor (510) (773) (263) Capitalized Adm. Overhead (2,963) (3,207) (244) All Other 5,218 5.008 210 Total Labor Costs safiau U41 N: \ADMINSUP\ADMIN\RATCLIFF\Budget Overheads 2007- 2008.doc KEY INCREASES 2006 -2007 BUDGET TO 2007 -2008 BUDGET (000 Omitted) N :\ADMINSUP\ADMIN\RATCLIFRBudget Overheads 2007- 2008.doc Dollar Increase (Decrease) % Increase 2006 -2007 Budget $54,207 Salaries (Includes 3% vacancy 21 0.1 factor) Benefits (Includes 4% vacancy 420 2.8 factor) Chemicals 209 17.7 Utilities 115 2.0 Repairs & Maintenance 305 10.0 Hauling & Disposal (36) (3.4) Professional & Legal 10 1.9 Outside Services 85 3.9 Self Insurance 100 14.3 Materials & Supplies 105 6.2 All Other (314) (16.1) 2007 -2008 Budget $55,227 1.9% N :\ADMINSUP\ADMIN\RATCLIFRBudget Overheads 2007- 2008.doc DEBT SERVICE FUND 2007 -2008 BUDGET (000 Omitted) Revenue Debt Service $3,869 Interest Expense 11518 Principal Payments 2,351 TOTAL $3,869 N: IADMINSUP\ADMIN\RATCLIFF\Budget Overheads 2007- 2008.doc Attachment 2 Proposed Sewer Service Charge Increase FY 2007/08 and 2008/09 Public Hearing June 7, 2007 Notices mailed 107,000 Letters Opposition 6 Questions 1 7 E -Mails Support 1 Opposition 10 Charge residential on actual use 3 14 Teleohone Calls Support 1 Opposition 10 Would like senior rate (4 of the above) Questions 16 Other issues 14 Charge residential on actual use 1 Parcels on septic 22 64 Recap as of Mav 25, 2007 Support 2 Opposition 26 Charge residential on actual use 4 Questions 17 Other issues 14 Parcel on septic 22 Total responses 85 N: \SSC \Z_Prop218 \Recap 5- 25- 07.doc RATES RATES - RE: Increased Sewer Service Charge From: "Shirley Redfearne" <redskinaz @commspeed.net> To: "CCC Santiary District" <rates @centralsan.dst.ca.us> Date: Thu, May 3, 2007 11:03 AM Subject: RE: Increased Sewer Service Charge TO: Secretary of the District: I hereby protest your proposed increase in the annual sewer service charge. I feel that, once again, you are literally gouging the commercial property owners in the district. As a homeowner, your fee increase of $13.00 /year is acceptable, but unfortunately, as a commercial property owner (restaurant) the fee is outragious. My current bill is over $12,000 /year. This amount will increase to over $13,300 in two years. I have to sell a lot of food to cover this increase!!! A recent survey has indicated that sewer district employees seldom work more than six hours a day. The same survey indicated that the employees felt that management was overpaid and under - performed. Instead of placing the responsibility for this poor performance on the public's shoulders, why not look inward and become more efficient. Thus costing the tax payer less money. The consumer price index for the East Bay Area is increasing at no where near the amount of increase that you are requesting. I hope you will consider the above information and reduce your commercial price increase to no more than 1 percent. Better yet, say " no " to any increase. Barry Redfearne Page 1 RATES RATES - Increase in Annual Sewer Service Charge From: Rebecca Lorente <lorente513 @yahoo.com> To: <rates @centralsan.dst. ca. us> Date: Mon, Apr 30, 2007 1:01 PM Subject: Increase in Annual Sewer Service Charge To: Secretary of the District I am typing this email to protest the current rate increase proposal. The increases in what all the government agencies claim as necessary are making it difficult for the average homeowner, such as myself to get by. What you view as a small increase, is actually quite large for someone, such as myself who lives in a townhouse. Therefore, consider this my official protest. Rebecca L. Lorente 64 Heather Garden Lane Danville, CA 94506 Page 1 RATES RATES - Increase in Annual Sewer Service Charge - 2007 -2008 From: "Laurent Vernillet" <golden2003 @astound.net> To: <rates @centralsan.dst.ca.us> Date: Tue, Apr 24, 2007 10:57 PM Subject: Increase in Annual Sewer Service Charge - 2007 -2008 Dear Sirs, I would like to protest against the 2007 -2008 potential increase in annual sewer service charges. The amount that we are currently paying is already very high and does not need to be raised again in 2007 and 2008. A better management of the current amount paid by each home would be much better and more suitable than an increase of the charges. Thereby, the amount saved would be probably high enough to avoid this unfair increase. I hope this will be added to the protesting people file. I remain. Yours faithfully, Mr. Laurent Vernillet 2762 Hutchinson Court Walnut Creek CA 94598 Page 1 RATES RATES - Opposition to Increase in Annual Sewer Service Charge From: "cudeh @netzero.net" <cudeh @netzero.net> To: <rates @centralsan.dst.ca.us> Date: Mon, Apr 23, 2007 6:55 PM Subject: Opposition to Increase in Annual Sewer Service Charge Dear Sir /Madam: My name is Hyacinth Udeh. I live at 557 Adriatic Court, San Ramon, CA 94582. 1 recently received notice, from Central Contra Costa Sanitary District, of proposed increase in annual sewer charge. Ile would like to oppose the rate increase. Currently, levies and taxes charged to residents /homeowners in the district are very "exorbitant ". The proposed revenue from the proposed annual increase can be sourced from the other charges and levies that residents /homeowners currently pay. Sincerely, Hyacinth Udeh. Page 1 RATES RATES - OPPOSITION to Proposed Annual Sewer Service Charge Increase From: "Dennis Sewell' <sdsew @astound.net> To: <rates @centralsan.dst. ca. us> Date: Sat, Apr 21, 2007 1:43 PM Subject: OPPOSITION to Proposed Annual Sewer Service Charge Increase Secretary of CCCSD 5019 Imhoff Place Martinez, Ca. 94553 We strongly oppose the proposed increase in sewer charges from $289 to $315 over the next 2 years. Please look for other ways to streamline costs rather than strap the already burdened taxpayers with additional charges. An increase in charges will make Bay Area housing even more unaffordable. Thank you for considering our point of view. Susan & Dennis Sewell No virus found in this outgoing message. Checked by AVG Free Edition. Version: 7.5.446 / Virus Database: 269.5.6/770 - Release Date: 4/20/2007 6:43 PM Page 1 RATES RATES - Written protest of rate increase From: <kgibsonlab @comcast.net> To: <rates @centralsan.dst. ca. us> Date: Fri, Apr 20, 2007 11:05 AM Subject: Written protest of rate increase This is to protest the proposed sewer rate increase 94523. 1 disagree with raising the rates 9% over two years Thank you. Kathy Gibson I live at 481 Bifrost Avenue, Pleasant Hill, CA. This is in excess of inflation. Page 1 RATES RATES - Rate Increase From: "Neil Hansen" <neil.hansen @earthlink.net> To: <rates @centralsan.dst. ca. us> Date: Fri, Apr 20, 2007 10:27 AM Subject: Rate Increase Dear Sir /Madam: We have reviewed the recent mailer about a proposed rate increase. We have no problems with it, if the money is spent solely to maintain or improve the system. However, if part of the increase is used for unfunded pensions of the district personnel, we object, and quite strongly at that. Yours truly, N. Hansen Moraga, CA Page 1 RATES RATES - RE: CCCSD Sewer Service Charges From: "paulpark1" <paulpark1 @sbcglobal.net> To: "'RATES RATES "' < RATES @centralsan.dst.ca.us> Date: Tue, Apr 17, 2007 8:48 AM Subject: RE: CCCSD Sewer Service Charges Thank you The greatness of our country is NOT just raising prices for the "impact of inflation ". It is productivity, being more efficient, doing things better. Your mission statement seems to be the "protection of public health and the environment" regardless of the costs of impact on your "customers /monopoly victims." From: RATES RATES [mai Ito: RATES @centralsan.dst. ca. us] Sent: Tuesday, April 17, 2007 7:43 AM To: paulpark1 Subject: CCCSD Sewer Service Charges This is to acknowledge receipt of your <letter / email> dated <insert date> concerning the proposed increase in the Central Contra Costa Sanitary District (CCCSD) annual Sewer Service Charge. Your <letter / email> will be provided to the CCCSD Board of Directors for consideration at the public hearing, scheduled for June 7, 2007 at 2 p.m. in the CCCSD Board Room located at 5019 Imhoff Place, Martinez. CCCSD appreciates your concern about the rising costs of services. But just as your household or business is impacted by inflation, so is CCCSD. This modest rate increase will allow CCCSD to meet new, more stringent air and water quality regulations; rehabilitate an aging sewer system; and maintain our treatment plant facilities. CCCSD continues to work to keep our rates as low as possible without compromising quality or safety. Our mission remains the protection of public health and the environment. Thank you for taking the time to respond to the CCCSD Sewer Service Charge rate notification. If you have additional questions about CCCSD's operations or the proposed rate increase, please do not hesitate to contact us. Page 1 RATES RATES - Rate Incresase Protest From: "Satyajit Pandey" <satyajit.pandey @gmail.com> To: <rates @centralsan.dst. ca. us> Date: Sun, Apr 15, 2007 10:25 PM Subject: Rate Incresase Protest Hi, The sewage rates at Central Contra Costa Sanitary Dist are already high. I do not think it should be increased. Sincerely, A San Ramon resident. Page 1 RATES RATES - proposal for sewer service charge increase From: virginia khan <selkiekahn @yahoo.com> To: <rates @centralsan.dst.ca.us> Date: Sun, Apr 15, 2007 3:46 PM Subject: proposal for sewer service charge increase FOR 2006, ALMOST ONE -THIRD OF MY INCOME WENT TOWARDS TAXES (INCLUDING PROPERTY, BUT NOT SALES, TAXES). THEREFORE I AM NOT HAPPY TO SEE ANY KIND OF AN INCREASE IN MY PROPERTY TAX OR ANY OTHER TAX BILL. THANK YOU. Do You Yahoo!? Tired of spam? Yahoo! Mail has the best spam protection around http: / /mail.yahoo.com Page 1 RATES RATES - Re: CCCSD Sewer Service Charges From: "Jamie Pehling" <jpehling @cal.berkeley.edu> To: "RATES RATES" <RATES @centralsan.dst. ca. us> Date: Sun, Apr 15, 2007 2:42 PM Subject: Re: CCCSD Sewer Service Charges Friends at CCCSD -- Thanks for the reply. I believe I failed to communicate my concerns, however. I am not primarily concerned with escalating rates. I am concerned that the current flat rate residential fee structure does not discourage people from overuse of water resources. I propose residential fees be indexed to actual usage. Please respond to this point. - -Jamie Pehling ...her last act before being executed in La Perla was to embrace each man on her firing squad. "You are the last human begins I will ever see ... I do not want to leave this world embittered." -- Marguerite Feitlowitz, _A Lexicon of Terror: Argentina and the Legacies of Torture- ----- Original Message - - - -- From: RATES RATES To: Jamie Pehling Sent: Thursday, April 12, 2007 12:05 PM Subject: CCCSD Sewer Service Charges This is to acknowledge receipt of your email dated April 11, 2007 concerning the proposed increase in the Central Contra Costa Sanitary District (CCCSD) annual Sewer Service Charge. Your email will be provided to the CCCSD Board of Directors for consideration at the public hearing, scheduled for June 7, 2007 at 2 p.m. in the CCCSD Board Room located at 5019 Imhoff Place, Martinez. CCCSD appreciates your concern about the rising costs of services. But just as your household or business is impacted by inflation, so is CCCSD. This modest rate increase will allow CCCSD to meet new, more stringent air and water quality regulations; rehabilitate an aging sewer system; and maintain our treatment plant facilities. CCCSD continues to work to keep our rates as low as possible without compromising quality or safety. Our mission remains the protection of public health and the environment. Thank you for taking the time to respond to the CCCSD Sewer Service Charge rate notification. If you have additional questions about CCCSD's operations or the proposed rate increase, please do not hesitate to contact us. Page 1 Page 1 of 1 RATES RATES - Annual increase From: "Carol T Griffin" <nobidd @astound.net> To: <rates @centralsan.dst.ca.us> Date: 4/15/2007 1:54 PM Subject: Annual increase To wjom it concerns, As I will not be able to make your meeting I would very much like someone to suggest a change in the way you charge residences. Would someone please present the idea of charging residences based on the amount they use the sanitary system. Either by past consumption if that is possible, or by the number of square footage per household or by the number of people living the residence. I honestly believe that a set charge per household is not fare. Needless to say, I live along now and when I had a large family living with me along with several animals, we used the system a lot. Now, I am a very small consumer. I am sure this idea has been brought up before but I would very much like it addressed and hear the "arguments" against a change. Many thanks in advance. I look forward to hearing from you. Sincerely, Carol T. Griffin r : Carol T. Griffin 400 Beacon Ridge Lane Walnut Creek, CA 94597 'ff : 925 933 3535 Nobidd @astound.net i' web site: http: / /caroltgriffin.bridgeforyou.com/ FREE Animations for your email - by IncrediMail! Click Here! Rile: / /C: \Documents and Settings \bwener \Local Settings \Temp \GW }00002.HTM 5/29/2007 RATES RATES - FW: Returned mail: see transcript for details From: "paulpark1" <paulpark1 @sbcglobal.net> To: <RATEs @CENTRALSAN. DST.CA. US> Date: Sat, Apr 14, 2007 10:58 AM Subject: FW: Returned mail: see transcript for details Board of Directors I object to the proposed 9% rate increase! Your explanation is very general and too vague. This makes it too easy to take money from hard pressed tax payers. Please consider alternate proposals. Thank you Paul Parkhurst - - - -- Original Message---- - From: Mail Delivery Subsystem [mailto: MAILER - DAEMON @spamx.centralsan.dst.ca.us] Sent: Thursday, April 12, 2007 4:29 PM To: paulpark1 @sbcglobal.net Subject: Returned mail: see transcript for details The original message was received at Thu, 12 Apr 2007 16:28:37 -0700 from smtp107.sbc.mail.mud.yahoo.com [68.142.198.206] - - - -- The following addresses had permanent fatal errors - - - -- <RATE@CENTRALSAN.DST.CA.US> (reason: 550 No such recipient) - - - -- Transcript of session follows - - - -- ... while talking to [192.168.25.36]: >>> RCPT To: <RATE @CENTRALSAN.DST.CA.US> <<< 550 No such recipient 550 5.1.1 <RATE @CENTRALSAN.DST.CA.US >... User unknown Page 1 Page 1 of 1 RATES RATES - INCREASE IN SEWER SERVICE CHARGE From: roger.james @worldnet.att.net To: < rates @centralsan.dst.ca.us> Date: 4/13/2007 5:25 PM Subject: INCREASE IN SEWER SERVICE CHARGE Very few people want to see increases in rates, fees or taxes, but this is one that is easy to support. The rate increase is for a specific purpose and supports the environmental programs run by a very professional and responsible public agency. Keep up the good work. Roger James file: / /C: \Documents and Settings \bwener \Local Settings \Temp \GW }00002.HTM 5/29/2007 RATES RATES - Comments on proposed sewage waste increases From: "Jamie Pehling" <jpehling @cal.berkeley.edu> To: <rates @centralsan.dst.ca.us> Date: Wed, Apr 11, 2007 4:20 PM Subject: Comments on proposed sewage waste increases Friends -- I am concerned that the revised sewage rate schedule offers no financial incentives to residential customers to reduce their sewage output. Under the proposed (and, presumably, the existing) rate schedule, residences are assessed a flat rate regardless of actual use of the sewage system. Such a scheme offers neither a financial penalty for excessive use of water disposal resources, nor a financial reward for reasonable conservation efforts. In the absence of financial incentives, district residential customers are likely to persist in their current pattern of sewage use. There are other incentives which might motivate customers to reduce usage, such as concern for the environment, but experience suggests that cynicism regarding the effectiveness of such motivations is justified. I therefore suggest that the sewage rate schedule for residential customers be amended to provide for volume metering of residential sewage output, and for indexing of sewage fees to actual usage, as is already employed for industrial customers. Barring this, the rate schedule should provide for collective rate reductions for customer actions aimed at reducing use, such as installation of low flush or composting toilets. Thank you for your attention. - -Jamie Pehling 606 Daisy Ct Pleasant Hill CA 94523 -1626 ...her last act before being executed in La Perla was to embrace each man on her firing squad. "You are the last human begins I will ever see ... I do not want to leave this world embittered." -- Marguerite Feitlowitz, _A Lexicon of Terror: Argentina and the Legacies of Torture_ Page 1 Page 1 of 2 Debbie Ratcliff - Protest of Proposed Annual Sewer Service Charges From: Karen Wang <wangkaren6 @yahoo.com> To: <rates @centralsan.dst.ca.us> Date: 5/30/2007 11:19 AM Subject: Protest of Proposed Annual Sewer Service Charges May 27, 2007 PROTEST of Proposed Annual Sewer Service Charge Rate Increase To: Central Contra Costa Sanitary District 5019 Imhoff Place, Martinez, CA 94553 -4392 E -mail: ratesacentralsan.dst.ca.us To Whom It May Concern: I am writing to protest the rate increase of $13 per residential apartment/year for Fiscal Year 2007 -2008 effective July 1, 2007 and an additional increase of up to $13 per residential apartment/year for Fiscal Year 2008 -2009 effective July 1, 2008. I am protesting the rate increase for the following reason: The Central Contra Costa Sanitary District charges uniform residential customer rates for non uniform use. This is not fair. The burden of higher rates should be based on HCF units used, thus customers-pay in pro on_tohow much thev use. A rate increase based on amount consumed is fair to all and encourages conservation. - Under the proposed rate increases, the burden of rate increase is not placed on the customers who consume the most services, but applied to everyone regardless of amount used Thus, low consumption users are forced to subsidize_ high consumption users. I have decreased water consumption by approximately 18.5 %* since the previous year, but under the proposed rate increase I am being burdened with an increase in my rate by a cumulative 9% from current rates effective July 1, 2008. P.S. Under the current flat rate system, I already pay an `increased' rate of 1000% /HCF unit for my use. I use 3.3 HCF units /month/apartment *. For my conservation, I am rewarded with a high rate of $7.29/ HCF unit per month ($289/12 months /3.3 units /month). A neighbor single family home consuming a hypothetical conservative average of 33 HCF units /month pays only $0.73/HCF unit per month ($289/12/33 units /month). M�rate per HCF has already been increased TEN TIMES more per HCF unit used than a theoretical neighbor residential customer who uses more, thus it is absolutely unacceptable for my rates to be increased even more than TEN TIMES.) * Per our East Bay Municipal Utility District water bills, each apartment dwelling at our property used approximately 3.3 hundred cubic foot units per month for the annual period of January 10, 2006 - January 11, 2007. Previous year's use was approximately 4.05 HCF. units /apartment/month. Sincerely, Jane Wang Creekside Court Apartments Property Owner: 1309 Creekside Dr. Walnut Creek CA 94596 file://C:\Documents and Settings \dratcliff\Local Settings \Temp \GW)00002.HTM 6/1/2007 William N. Ise' Attorney at Law* Proctor in Admiralty Nancy C. Ise' 1600 Santiago Drive Newport Beach, CA 92660 April 30, 2007 Secretary and Board of Directors Central Contra Costa Sanitary District 5019 Imhoff Place Martinez, CA 94553 Dear Secretary and Board of Directors: MAY 0 3 2007 SECRETARY OF IRE DISTRICT Re: PROTEST OF PROPOSED INCREASE IN ANNUAL SEWER Service Charge This is in response to the Central Contra Costa Sanitary District's "Notice of Proposed Increase in Annual Sewer Service Charge." We, the undersigned property owners in Concord, CA and Moraga, CA hereby protest the proposed increase in this charge /tax. We protest, object to and oppose any increase because: In the first place, the increase is much too high. Additionally, the charge itself violates Proposition 13. This is nothing but a property tax and it is an unlawful and unconstitutional attempt to circumvent Proposition 13. The District should live within its means like the rest of us. We are already paying increases in the property tax pursuant to Proposition 13. The District should live within the increases we are already being assessed on our property. There should be no other assessments —such as a sewer charge. People are having a very hard time making ends meet these days. It is unfair to constantly burden the people and property owners with excessive and unjustified increases of this nature and amount. Please cancel the increase. Get rid of the charge altogether. We ask the Board members refuse to approve this exorbitant increase or any increase. It is way above the rate of inflation. 4.5 percent the first year and 43 percent the second year are excessive and way above the rates of inflation. People on social security and retirees get increases in their benefits of less than 3 percent, net after deductions for excessive Medicare insurance premiums, etc You people are bleeding the public dry. These rates are confiscatory. Thev are totally unjustified. It is not fair that taxpayers are constantly being asked to pay increases way above the rate of inflation and way above any increases in personal income. You people are bleeding the public dry. Will there ever be an end to these annual, exorbitant increases? You people are public servants. And the public, homeowners, and taxpayers are not doormats that public districts and agencies can step all over every year. Enough is enough!. Cancel the proposed increase. WE PROTEST AND WE PROTEST VEHEMENTLY AND STRONGLY! Very trulp � With H. Ise *(Licensed for the active practice of law in Rhode Island, California and Minnesota) 1 ' C' C. Ise' cc. Thle Howard Jarvis Taxpayers Association Contra Costa County Board of Supervisors Governor Arnold Schwarzenegger Attorney General Jerry Brown Contra Costa Times Mayors of Moraga and Concord, CA APR 1 3 2007 CCCSD To: Board of Directors of the Central Contra Costa Sanitary District SECRETARY OF THE DISTRICT Date: April 12, 2007 Subject: Proposed Rate Increase Please try to reduce your costs and manage our sewer service without any increase in rates. Inflation is inevitable, however, it should not be used as an excuse for automatically increasing rates. I have not seen evidence presented by the Board of Directors to attempt to manage our sewage system with current revenues. The rationale for a rate increase in your proposal should have contained steps taken to attempt avoiding any rate increase. Consequently, I am opposed to any rate increase at this time. nce ly, r. Robert Co 244 Morris Ranch Ct. Danville, CA 9426 bcollins @jps.net L) 0 cl RECEIVED CCCSD ENVIRONMENTAL SERVICES C.,0 r ?rUll -. AMC, 4�,e Z. -f, ex 3 L I f'% etq e 4 3 ?4, 7L & 03 Ll 171 x.. _ � d "l'�"`"t'� � � �'��« u.-a� c•'1,l .Y ���,.v.X -a. ; l•GN.CC,� .: ►- �.c -,v� i -Q /►..,�.� --�.. C -�.. "� . �,.,t�u --�z`, i��..e ,��.� � Ica -�;�- ...�,,_.�p -�' ,�-�.— �- •...�( ��c.�..1 -e �le-�. Zl�... ��c� -..� .�� .��sc�zyl —e- lz�v �.►�.«.< =�., r Cam, ri y C 7 ��%ts� 937 -�cl �CA7�r� � �ia f/4 GAf�t 5t�l. fi� 501 y L"AcAf P/,ce M.r t..ce z , C,/• $51 May 10, 20-7 MAY 15 2007 SECRETARY OF T�}IE DISTRICT CCCSi:> Pl'20$td Siwer S�ryte c�ir..�t v-- t7e� I akeet is X-4e CCt.SD /,to : -beast Ae r�s :d�•, t•+ %y �o wies . Jr a wh .,•y y �o err e : A�d,t st 2L 5` C'. 14r4 operoi�7� Cos:�s mr xbna .A ` JSt�isS CA"// ytet •`••/•l fr•-+s *4 $s14.1 -cS •'d r./e V/covs.....� A6dc / 2.z odt Al. it�ts/i, a M.: l: -1 91d�ess P, a .G�Sa�c I55 $4.1 94 Sd3 APR 1 7 2007 CCCSU SECRETARY OF THE DIS i Rat' r April 13, 2007 Friday Central Contra Costa Sanitary District 5019 Imhoff Place Martinez, CA 94553 -4392 RE: Proposed Increase in Annual Charge Dear Sir /Ms: I have a concern about the proposed increase in sewer service charge. In your information flier (April 24, 2007) it was noted that the increase was needed in part for a pipeline. Your statement read as though the increase would be used to buy and install pipelines for new or future housing areas. My concern and question is: Why do established sewer line customers have to pay for developer's new and future pipelines? Your written reply would be greatly appreciated. Sincerely, ( ' Rod Ca enter 914 Brown Street Martinez, CA 94553 (925) 228 -0668 April 9, 2007 APR 1 3 2007 Secretary CCCSD Central Contra Costa Sanitary District SECRETARY OF THE DISTRICT 5019 Imhoff Place Martinez, CA. 94553 Gentlemen: 1 received your letter today regarding a proposed increase in our sewer service charge. Overlooked in all of these rate increases are the seniors who are struggling to keep their head above water while living in the Bay Area. Most places give a discount to seniors - but not the utilities. Why is this? 1 love living here, my children are here, and Kaiser is here - which locks me into this area. 1 am going to be 79 years old this year, a widow, living on Social Security and a small retirement fund. 1 own my own home but still have a mortgage. My parents were hard - working individuals from the Depression years. We were always taught to always pay our own way. Even though we were in the depression years, we NEVER had to get in the "SOUP LINES". We were taught NEVER to be on Welfare. We were poor but PROUDI The Bible tells us as Christians if you don't work - you don't entl Too bad many people have never learned this but were willing to sit back and let the tax payers pay for everything they got throughout life. They get better treatment than those of us who have struggled to exist. Out of my small income, 1 pay $162/month for convalescent home care so I can know that I'm paying my own way N it should come to that phase of my life and 1 would not be a burden to taxpayers. Please consider giving a sizable discount to senior home owners. You can simply contact the Contra Costa County Tax Department and they have a list of senior home owners who are excluded from Mello Roos assessments if they live in their own homes. This should also apply for sewer assessments. Thank you, Juanita J. Price 146 Park Street Clyde, CA. 94520 (925) 687 -4440 4 APR 1 7 2001 SECRETARY OF THE DISTRICT of Ag� /;,e-2 77v;5r fL-YI7 IVOVL Illy 6l-. t5e,10 cue 77,-17,r A-ob,17 IV,07 A-1 Z. 6,5Z. C oR 4,J e7 " 2 7 jq� ORDINANCE NO. 245 AN ORDINANCE OF THE CENTRAL CONTRA COSTA SANITARY DISTRICT AMENDING CHAPTER 6, SECTION 6.34.010 OF THE DISTRICT CODE ESTABLISHING THE SEWER SERVICE CHARGES FOR FISCAL YEARS 2007 -2008 AND 2008 -2009 WHEREAS, the District has previously developed and instituted a Sewer Service Charge Program to finance the services and facilities furnished by the District; and WHEREAS, the Board of Directors of the District has reviewed the present sewer service charge rate schedule and has determined that the residential annual sewer service charge rates should be increased by an amount of $11 for FY 2007 -2008 and an amount of up to $13 for FY 2008 -2009. Non - residential rates will be increased proportionally based on Residential Unit Equivalents (RUE) factors. WHEREAS, in adopting this Ordinance, the Board of Directors finds that: a. Written notices of the proposed increase in sewer service charge rates were sent by first class U.S. mail to every owner of property connected in the District at least 45 days prior to the Public Hearing on the proposed increase conducted on June 7, 2007. b. All written protests against the proposed increase in the sewer service charge, including those provided in person, by facsimile, email and U.S. mail, were considered and tallied at the Public Hearing conducted on June 7, 2007, and the District was not presented with protests by a majority of the owners of the identified parcels affected by this change. c. The amount of the charge imposed does not exceed the proportional cost of the service attributable to the properties receiving service and the charge is only imposed on those properties actually receiving service or for those which service is immediately available. d. This action is categorically exempt from the California Environmental Quality Act (CEQA) pursuant to Section 15273 (a) (1 -4) of the District CEQA Guidelines. NOW THEREFORE, BE IT ORDAINED by the Board of Directors of the Central Contra Costa Sanitary District as follows: Section I. The 2007 -2008 rates for Sewer Service Charges for users of the District System will be initiated for the fiscal year beginning July 1, 2007, and increased up to the maximum amount as indicated on July 1, 2008, and the rate imposed for 2008 -2009 shall continue thereafter in effect until further action of the Board of Directors. The following chart displays the residential and non - residential charges for fiscal 2007 -2008 and the maximum rate that may be imposed under this Ordinance for Fiscal 2008 -2009: User Group Fiscal Year 2007 —2008 Fiscal Year 2008 —2009 maximum Residential (rate per living unit): Single Family Dwellings, Mobile Homes, Townhouses, Condominium Units, Multi-Family Units $300.00 $313.00 Commercial / Non - Industrial (rates per hundred cubic feet): Bakeries $7.67 $8.00 Supermarkets w /garbage disposals $5.79 $6.04 Mortuaries $5.46 $5.70 Restaurants $5.68 $5.93 Others $2.78 $2.90 Minimum Annual Charge $312.00 $326.00 Industrial: Flow per million gallons $1,530.00 $1,596.00 Biochemical Oxygen (demand per 1,000 lbs.) $638.00 $666.00 Suspended Solids per 1,000 lbs. $456.00 $476.00 Demand per million gallons per day $183,870.00 $191,838.00 Minimum Annual Charge $312.00 $326.00 Special Discharge Permits & Contractual Agreements: Determined Individual) Determined Individual) User Group Fiscal Year 2007-2008 Fiscal Year 2008 —2009 maximum Institutional: Churches $2.78 $2.90 Schools $2.78 $2.90 Fraternal & Service Organizations $2.78 $2.90 Local & State Institutions $2.78 $2.90 Other Tax Exempt (Except Federal) $2.78 $2.90 Federal Institutions $2.78 $2.90 Utilities with Special Tax Status $2.78 $2.90 Independent Living Facilities, Rest Homes, & Convalescent Hos itals $2.78 $2.90 Minimum Annual Charge $312.00 $326.00 Section 2. Prior to fixing the actual rate to be imposed under this Ordinance for Fiscal 2008 -2009, the Board of Directors shall consider the District's proposed budget, its financial condition, projected capital and operations and maintenance costs, as well as other factors which bear on the revenue requirements of the District during the Spring of 2008. This review of the District's financial condition shall be to determine whether increases to the maximum amount set forth herein for fiscal year 2008 -2009 continue to be necessary. If the District Board concludes by a majority vote that sewer service charges for less than the maximum amount as set forth in this Ordinance for fiscal year 2008 -2009 will produce adequate revenues for that fiscal year, the Board may by resolution fix the fiscal year 2008 -2009 Sewer Service Charges to be imposed at appropriate amounts up to the maximum rates set forth herein without an amendment of this Ordinance. In such case, the resolution shall clearly set forth such lesser charges that are to be imposed and those charges shall remain in place until further action of the Board. If the Board determines the maximum rates set forth in the table are appropriate for imposition in 2008 -2009, no further action of the Board shall be required. Section 3. This ordinance shall be published once in the Contra Costa Times, a newspaper of general circulation within the Central Contra Costa Sanitary District, and shall be effective July 1, 2007 PASSED AND ADOPTED this 7th day of June 2007, by the Board of Directors of the Central Contra Costa Sanitary District by the following vote: AYES: Members: NOES: Members: ABSENT: Members: James A. Nejedly President of the Board of Directors Central Contra Costa Sanitary District County of Contra Costa, State of California COUNTERSIGNED: Elaine R. Boehme Secretary of the Central Contra Costa Sanitary District County of Contra Costa, State of California Approved as to form: Kenton L. Alm Counsel for the District Revised (through June 7, 2007) Proposed Sewer Service Charge Increase FY 2007/08 and 2008/09 Public Hearing June 7, 2007 Notices mailed 107,000 Letters Opposition 6 Questions 1 7 E -Mails Support 1 Opposition 11 Charge residential on actual use 33 15 Telephone Calls Support 1 Opposition 10 Would like senior rate (4 of the above) Questions 16 Other issues 14 Charge residential on actual use 1 Parcels on septic 22 64 Recap as of June 7. 2007 Support 2 Opposition 27 Charge residential on actual use 4 Questions 17 Other issues 14 Parcel on septic 22 Total responses 86 N:\ ADMINSUP\ADMIN \RATCLIFF\Proposed SSC Increase 06- 07- 07.doc 4.0'.... Debbie Ratcliff - Protest of Proposed Annual Sewer Service Charges From: Karen Wang <wangkaren6 @yahoo.com> To: <rates @centralsan.dst.ca.us> Date: 5/30/2007 11:19 AM Subject: Protest of Proposed Annual Sewer Service Charges May 27, 2007 PROTEST of Proposed Annual Sewer Service Charge Rate Increase To: Central Contra Costa Sanitary District 5019 Imhoff Place, Martinez, CA 94553 -4392 E -mail: rates@centralsan.dst.ca.us To Whom It May Concern: I am writing to protest the rate increase of $13 per residential apartment/year for Fiscal Year 2007 -2008 effective July 1, 2007 and an additional increase of up to $13 per residential apartment/year for Fiscal Year 2008 -2009 effective July 1, 2008. I am protesting the rate increase for the following reason: The Central Contra Costa Sanitary District charges uniform residential customer rates for non uniform use. This is not fair. The burden of higher rates should be based on HCF units used, thus customers pay in proportion to how much they use._A rate increase based on amount consumed is fair to all and encourages conservation. - Under the proposed rate increases, the burden of rate increase is not placed on the customers who consume the most services, but _aDi ied to everyone regardless of amount used. Thus, low consumption users are forced to subsidize high consumption users. I have decreased water consumption by approximately 18.5 %* since the previous year, but under the proposed rate increase I am being burdened with an increase in my rate by a cumulative 9% from current rates effective July 1, 2008. P.S. Under the current flat rate system, I already pay an 'increased' rate of 1000% /HCF unit for my use. I use 3.3 HCF units /month/apartment *. For my conservation, I am rewarded with a high rate of $7.29/ HCF unit per month ($289/12 months /3.3 units /month). A neighbor single family home consuming a hypothetical conservative average of 33 HCF units /month pays only 0.73/HCF unit per month ($289/12/33 units /month). My rate per HCF has already been increased TEN TIMES more ep r HCF unit used than a theoretical neighbor residential customer who uses more, thus it is absolutely unacpe table for my rates to be increased even more than TEN TIMES.) * Per our East Bay Municipal Utility District water bills, each apartment dwelling at our property used approximately 3.3 hundred cubic foot units per month for the annual period of January 10, 2006 - January 11, 2007. Previous year's use was approximately 4.05 HCF. units /apartment/month. Sincerely, Jane Wang Creekside Court Apartments Property Owner: 1309 Creekside Dr. Walnut Creek CA 94596 file: //C:\Documents and Settings \dratcliff\Local Settings \Temp \GW)00002.HTM 6/l/2007 Central Contra Costa Sanitary District ' BOARD OF DIRECTORS POSITION PAPER Board Meeting Date: June 7, 2007 No.: 6.a. Bids and Awards Type of Action: AUTHORIZE AWARD Subject: AUTHORIZE AWARD OF A CONTRACT TO ROTO- ROOTER SEWER SERVICE FOR THE TELEVISION INSPECTION OF SANITARY SEWERS, PHASE 5, DISTRICT PROJECT NO. 5547 Submitted By: Initiating Dept. /Div.: Tom Godsey, Associate Engineer Engineering / Capital Projects REVIEWED AND RECOMMENDED FOR BOARD ACTION: T. Godsey I. O--%QA A. Antkowiak AV-) M,7�_ cki A. Farrell James M. Kelly, General Manager ISSUE: On May 25, 2007, five (5) sealed bids were received and opened for a contract for the Television Inspection of Sanitary Sewers, Phase 5, District Project 5547. The Board of Directors must authorize award of the contract or reject bids within 50 days of bid opening. RECOMMENDATION: Authorize award of a television inspection contract. FINANCIAL IMPACTS: The total project cost for TV inspection and contract administration as bid is $1,342,334. ALTERNATIVES /CONSIDERATIONS: Reject all bids, which is not recommended. BACKGROUND: The contract before the Board today the fifth and sixth years of a multi -year program to inspect all existing sewers and develop a comprehensive assessment of the District's collection system. It will focus primarily on sewers in the cities of Martinez and Danville. Previous years focused on the cities of Orinda, Walnut Creek, Pleasant Hill, and Lafayette, which were recently completed. To date, 3,578,215 feet or 48% of the collection system has been televised. Staff anticipates that it will take two years of additional TV work after this contract to complete the entire collection system. Five sealed bids were received and publicly opened on May 25, 2007. A summary of bids received is shown in Attachment 1. Bids ranged from $1,227,334.44 to $2,794,293.35. Capital Projects Division staff conducted a technical and commercial review of the bids and determined that Roto- Rooter Sewer Service is the lowest responsive bidder with a bid amount of $1,227,334.44. The District will administer the television inspection contract and provide inspection and CCTV inspection data review. The funds required to complete this phase of the project, as shown in Attachment 2, are $1,327,334. The total cost of the Television Inspection N: \PESUP \Cbradley \Position Papers \Godsey \5547 Award Phase 5 PP.doc Page 1 of 4 POSITION PAPER Board Meeting Date: June 7, 2007 Subject: AUTHORIZE AWARD OF A CONTRACT TO ROTO- ROOTER SEWER SERVICE FOR THE TELEVISION INSPECTION OF SANITARY SEWERS, PHASE 5, DISTRICT PROJECT NO. 5547 of Sanitary Sewers Project is anticipated to be $6,600,000. This contract is a price agreement contract that allows for increasing or decreasing the quantities actually completed. This project is included in the fiscal year 2007 -2008 Capital Improvement Budget (CIB) on pages 41 -43. Staff has concluded that this project is exempt from the California Environmental Quality Act (CEQA) under District CEQA Guidelines Section 15262, since it will provide information for design of sewer improvements and will not have a legally binding effect on later activities. Authorization of the award of the contract will establish the Board of Directors' independent finding that the project is exempt from CEQA. RECOMMENDED BOARD ACTION: Authorize the award of a service contract in the amount of $1,227,334.44 for completion of the Sewer Television Inspection of Sanitary Sewers Project, Phase 5, District Project 5547, to Roto- Rooter Sewer Service, the lowest responsive bidder, and authorize the General Manager to execute the contract documents. WPESUMbradley \Position Papers \Godsey \5547 Award Phase 5 PP.doc Page 2 of 4 ATTACHMENT 1 Central Contra Costa Sanitary District DRAFT SUMMARY OF BIDS PROJECT NO. 5547 DATE: MAY 25, 2007 PROJECT NAME: TELEVISION INSPECTION OF SANITARY SEWERS, PHASE 5 LOCATION: MARTINEZ AND DANVILLE, CALIFORNIA ENGINEER EST.: $1,500,000 No. BIDDER BID PRICE Name & address Roto- Rooter Sewer Service $1,227,334.44 195 Mason Circle Concord, CA 94520 925 - 939 -3100 2 Presidio Systems Inc. $1,238,034.95 435 El Alamo Danville, CA 94526 925 - 456 -8400 3 California Trenchless, Inc. $1,558,221.70 2283 Dunn Road Hayward, CA 94545 510- 782 -5335 4 National Plant Services, Inc. $2,410,466.08 1461 Harbor Avenue Long Beach, CA 90813 -2741 562- 436 -7600 5 Pacific Liners $2,794,293.35 70 Union Way Vacaville, CA 95687 707 - 446 -8222 BIDS OPENED BY /s/ Elaine Boehme N: \PESUP \Cbradley \Position Papers \Godsey \5547 Award Phase 5 PP.doc DATE May 25, 2007 SHEET NO. 1 OF 1 Page 3 of 4 ATTACHMENT 2 TELEVISION INSPECTION OF SANITARY SEWERS DISTRICT PROJECT NO. 5547 - PHASE 5 ITEM DESCRIPTION TOTAL PERCENT OF ESTIMATED CONTRACT COST 1 Contract Cost $1,227,334 Contract Subtotal $1,227,334 2 Contract Ad ministration /Ins ection $100,000 8.1% 3 Pre -bid Expenditures $15,000 1.2% 4 Total Project Cost $1,342,334 9.4% 5 Funds Allocated to Date $15,000 6 Allocation Required to Complete Project $1,327,334 N: \PESUP \Cbradley \Position Papers \Godsey \5547 Award Phase 5 PP.doc Page 4 of 4 Central Contra Costa Sanitary District ' BOARD OF DIRECTORS POSITION PAPER Board Meeting Date: June 7, 2007 No.: 6.b. Bids and Awards Type of Action: AWARD CONSTRUCTION CONTRACT /AUTHORIZE EXECUTION OF CONTRACT DOCUMENTS subject: AWARD A CONSTRUCTION CONTRACT AND AUTHORIZE THE GENERAL MANAGER TO EXECUTE CONTRACT DOCUMENTS WITH RANGER PIPELINES, INC., FOR THE NORTH ORINDA SEWER RENOVATIONS, PHASE 2.1, DISTRICT PROJECT NO. 5968 Submitted By: Initiating Dept/Div.: Dana Lawson, Associate Engineer Engineering / Capital Projects REVIEWED AND RECOMMENDED FOR BOARD ACTION: kl-- A l D. Lawson A. Antkowiak T. i A. Farr ames M. Kelly, General Manager ISSUE: On May 22, 2007, seven (7) sealed bids were received and opened for the construction of the North Orinda Sewer Renovations, Phase 2. 1, District Project 5968. The Board of Directors must award the contract or reject bids within 50 days of the bid opening. RECOMMENDATION: Award a construction contract and authorize the General Manager to execute the Contract Documents. FINANCIAL IMPACTS: Approximately $2,498,000, including design, right -of -way, bid price, contingency, and construction management. ALTERNATIVES /CONSIDERATIONS: Reject all bids, which is not recommended. BACKGROUND: The North Orinda Sewer Renovations, Phase 2.1 Project will replace 3,700 feet of 6- and 8 -inch sewers that are within backyard easements that parallel Tarry Creek in Orinda (see Attachment 1 for map). The District will continue to work closely with the affected property owners. District staff prepared the plans and specifications for the project. The Engineer's estimate for construction of North Orinda Sewer Renovations, Phase 2.1 is $1,500,000. This project was advertised on May 4 and 11, 2007. Seven (7) sealed bids ranging from $1,536,600 to $2,224,880 were received and publicly opened on May 22, 2007. The Engineering Department conducted a technical and commercial review of the bids and determined that Ranger Pipelines, Inc., is the lowest responsive bidder with a bid amount of $1,536,600. A summary of bids received is shown in Attachment 2. N: \PESUP \Cbradley \Position Papers \Lawson \5968 Award Contract PP.doc Page 1 of 5 POSITION PAPER Board Meeting Date: June 7, 2007 Subject: AWARD A CONSTRUCTION CONTRACT AND AUTHORIZE THE GENERAL MANAGER TO EXECUTE CONTRACT DOCUMENTS WITH RANGER PIPELINES, INC., FOR THE NORTH ORINDA SEWER RENOVATIONS, PHASE 2.1, DISTRICT PROJECT NO. 5968 The District will administer the construction contract and will provide contract administration, inspection, survey, office engineering, and submittal review. The funds required to complete this project, as shown in Attachment 3, are $2,019,000. The total cost of North Orinda Sewer Renovations, Phase 2.1 is anticipated to be $2,498,000. This project is included in the fiscal year 2006 -2007 Capital Improvement Budget (CIB) on pages CS -23. Staff has conducted a cash -flow analysis of the Collection System Program and concluded that adequate funds are available for this project. At its November 1, 2005 meeting, the CCCSD Board of Directors independently found that this project is exempt from the California Quality Act (CEQA) under CCCSD CEQA Guidelines Section 15301 since it involves only alterations to existing sewer facilities with negligible or no expansion of capacity. A Notice of Exemption has been filed with the County Clerk. RECOMMENDED BOARD ACTION: Award a construction contract in the amount of $1,536,600 for the construction of the North Orinda Sewer Renovations, Phase 2.1, District Project 5968, to Ranger Pipelines, Inc., the lowest responsive bidder, and authorize the General Manager to execute the Contract Documents. N: \PESUP \Cbradley \Position Papers \Lawson \5968 Award Contract PP.doc Page 2 of 5 l 0 100 500 HFEET U t Central Contra Costa Attachment Sanitary District NORTH ORINDA SEWER RENOVATIONS CCCSD DP 5968 1 Page 3 of 5 ATTACHMENT 2 NORTH ORINDA SEWER RENOVATIONS, PHASE 2.1 DISTRICT PROJECT NO. 5968 SUMMARY OF BIDS PROJECT NO. 5968 DATE: MAY 22, 2007 PROJECT NAME: NORTH ORINDA SEWER RENOVATIONS - PHASE 2.1 LOCATION: ORINDA, CALIFORNIA ENGINEER EST.: $1,500,000 No BIDDER BID PRICE Name & address 1 Ranger Pipelines, Inc. $1,536,600 1790 Yosemite Avenue San Francisco, CA 94124 415- 822 -3700 2 California Trenchless $1,564,840 2283 Dunn Road Hayward, CA 94545 510- 782 -5335 3 McNamara & Smallman Construction Inc. $1,696,435 1756 Holmes Street Livermore, CA 94550 925 - 606 -7190 4 J. Howard Engineering, Inc. $1,776,385 1325 Howard Avenue #265 Burlingame, CA 94010 -4212 650- 375 -8314 5 Pacific Trenchless $2,062,920 1619A Campbell Street Oakland, CA 94607 510- 601 -9340 6 K. J. Woods Construction, Inc. $2,114,000 2625 Judah Street, No. 2 San Francisco, CA 94122 415- 759 -0506 7 McGuire and Hester $2,224,880 9009 Railroad Avenue Oakland, CA 94603 510- 632 -7676 BIDS OPENED BY /s/ Elaine Boehme DATE May 22, 2007 SHEET NO. 1 OF 1 WPESUP\Cbradley \Position Papers \Lawson \5968 Award Contract PP.doc Page 4 of 5 ATTACHMENT 3 NORTH ORINDA SEWER RENOVATIONS, PHASE 2.1 DISTRICT PROJECT NO. 5968 POST -BID / PRECONSTRUCTION ESTIMATE No. Item Description 1 CONSTRUCTION a. Construction Contract $ b. Contingency at 20% $ c. Permits $ TOTAL CONSTRUCTION $ 2 CONSTRUCTION MANAGEMENT a. District Forces - Construction Management $ - Construction Inspection $ - Design Engineer $ - Survey $ - Community Relations $ - Record Drawings $ SUBTOTAL $ b. Consultant / Construction Support Services - Materials Testing $ - Arborist $ - Geotech $ SUBTOTAL $ TOTAL CONSTRUCTION MANAGEMENT $ 3 TOTAL CONSTRUCTION PHASE COST $ 4 TOTAL PREBID EXPENDITURES (not including Right of Way costs) $ 5 TOTAL DESIGN AND CONSTRUCTION MANAGEMENT COST $ 6 TOTAL RIGHT OF WAY COSTS $ 7 TOTAL ESTIMATED PROJECT COST $ 8 FUNDS AUTHORIZED TO DATE , $ 9 ALLOCATION NEEDED TO COMPLETE PROJECT $ MTESUP\Cbradley \Position Papers \Lawson \5968 Award Contract PP.doc Percent of Estimated Amount Construction Cost 1,536,600 307,400 2,000 1,846,000 111 11 111 111 111 111 111 111 5,000 3,000 • 111 17,000 171,000 2,017,000 49,000 220,000 432,000 2,498,000 479,000 2,019,000 Page 5 of 5 100%1 8%1 1% 9% 109% 3% 12% 23% 135% Central Contra Costa Sanitary District ' BOARD OF DIRECTORS POSITION PAPER Board Meeting Date: June 7. 2007 No.: 6.c. Bids and Awards Type of Action: AWARD CONSTRUCTION CONTRACT /AUTHORIZE EXECUTION OF CONTRACT DOCUMENTS subject: AWARD A CONSTRUCTION CONTRACT AND AUTHORIZE THE GENERAL MANAGER TO EXECUTE CONTRACT DOCUMENTS WITH AZTEC CONSULTANTS FOR THE CONSTRUCTION OF THE TREATMENT PLANT SAFETY ENHANCEMENTS, PHASE 3, DISTRICT PROJECT NO. 7263 Submitted By: Initiating Dept /Div.: Craig Mizutani, Associate Engineer Engineering / Capital Projects REVIEWED ND RECOMMENDED FOR BOARD ACTION: A 'rr t C i Mizutani Ba Than ecki A. Farrell Ames M. Kelly, eneral Manager ISSUE: On May 17, 2007, four sealed bids were received and opened for the construction of the Treatment Plant Safety Enhancements, Phase 3, District Project 7263. The Board of Directors must award the contract or reject bids within 50 days of the bid opening. RECOMMENDATION: Award a construction contract and authorize the General Manager to execute the Contract Documents. FINANCIAL IMPACTS: Approximately $492,000, including design, bid price, contingency, and construction management. ALTERNATIVES /CONSIDERATIONS: Reject all bids, which is not recommended. BACKGROUND: This project is the third phase of treatment plant related safety work. In 2006, Treatment Plant Safety Enhancements, Phase 2, District Project 7229, was completed. The project included items from the continuing list of safety improvements developed by District Staff. Project elements included handrail and grating enhancements, concrete work, site access and fall protection improvements. Since the completion of Phase 2, other safety improvements have been identified through the District's Safety Suggestion Program. These improvements will be made through the construction of the Treatment Plant Safety Enhancements, Phase 3, District Project 7263. The project includes: valve access platforms; handrail installation and repair; replacement of equipment access hatches; fall protection modifications at the A/N tanks; and ladder brackets on the secondary clarifiers. In addition, tunnel ventilation fans and electrical pull boxes along the levee road will be raised to provide N: \PESUP \Position Pape rs\M izutan i\7263 Award.doc Page 1 of 5 H 0 0 150 300 FEET e Warehouse m C N m as SITE 8 SITE 2 (VARIOUS) CONTRACTOR - SITE 7 STAGING AREA / /j SITE 8 SITE 5 SITE 1 SITE 3 0 // // �e // \�� you / S / SITE 6 SITE 4 /� (VARIOUS) r Central Contra costa TREATMENT PLANT SAFETY Attachment Sanitary District ENHANCEMENTS PHASE 3 District Project 7263 Project Location u Page 3 of 5 Central Contra Costa Sanitary District SUMMARY OF BIDS PROJECT NO.: 7263 DATE: MAY 17, 2007 PROJECT NAME: TREATMENT PLANT SAFETY ENHANCEMENTS, PHASE 3 LOCATION: MARTINEZ, CALIFORNIA ENGINEER EST.: $250,000 BIDDER BID PRICE NAME & ADDRESS Aztec Consultants, Inc. $276,221 2021 Omega Road, Suite 200 San Ramon, CA 94583 Pleasanton Engineering Contractors $320,100 4602 Laramie Gate Court Pleasanton, CA 94566 Water Works Construction, Inc. $330,849 4989 -C Noonan Lane Fairfield, CA 94533 Valentine Corporation $353,369 111 Pelican Way San Rafael, CA 94901 BIDS OPENED BY /s/ Elaine Boehme DATE May 17, 2007 NAPESUP \Position PapersUzutani \7263 Award.doc Page 4 of 5 ATTACHMENT 3 TREATMENT PLANT SAFETY ENHANCEMENTS, PHASE 3, DISTRICT PROJECT NO. 7263 POST - BID / PRE - CONSTRUCTION ESTIMATE % of No. Item Description Amount Estimated Construction Cost 1 CONSTRUCTION a. Construction Contract $276,221 b. Contingency at 20% $54,779 TOTAL CONSTRUCTION $331,000 100% 2 CONSTRUCTION MANAGEMENT BY DISTRICT STAFF a. District Forces - Construction Management and Inspection $26,000 - Project Engineering /Operations Department $13,000 SUBTOTAL $39,000 12% b. Consultants - Material Testing $10,000 SUBTOTAL $10,000 .3% TOTAL CONSTRUCTION MANAGEMENT $49,000 15% 3 TOTAL CONSTRUCTION PHASE COST $380,000 115% 4 TOTAL PREBID EXPENDITURES $112,000 34% 5 TOTAL DESIGN AND CONSTRUCTION MANAGEMENT COST $161,000 49% 6 TOTAL ESTIMATED PROJECT COST $492,000 149% 7 FUNDS AUTHORIZED TO DATE $124,000 8 ADDITIONAL ALLOCATION NEEDED TO COMPLETE PROJECT $368,000 Page 5 of 5 Item 7.a.1 Subdivision 8331 Report on Undercollection of Connection Fees 6/7/2007 1 Subdivision 8331 Tributary Areas '01. Fees Collected for Lots Tributary to West Branch — \ were for Gravity Zone only 1i a,Kh "lJ (w�l r s, 6/7/2007 —r ���.� .,,�:.t 2 NP d) Subdivision 8331 Developer _- Ownership IW.v 3,.,, h nb 1 L�•.. lia*xs —_ v 6/7/2007 3 Connection Fees — Gravity Zone Fee Description Fee Amount Application Fee — New Parcel $173.00 Capacity Fee, Residential, Gravity Zone $4,263.00 Sewer Service Charge, Prorated $24.00 Inspection Fees $248.00 Total Fees: $4,708.00 6/7/2007 4 Subdivision 8331 2 Connection Fees — Pumped Zone Fee Description Fee Amount Application Fee — New Parcel $173.00 Capacity Fee, Residential, Gravity Zone $4,263.00 Sewer Service Charge, Prorated $24.00 Inspection Fees $248.00 Capacity Fee, Residential, Pumped Zone $1,404.00 Lawrence Rd Benefits District Reimbursement $251.20 Lawrence Rd Trunk Sewer Reimbursement $612.15 Windemere Trunk Sewer Reimbursement $400.00 Dougherty Tunnel Reimbursement $1,239.00 CCCSD Reimbursement Transaction Fee $483.00 Total Fees: $9,097.35 6/7/2007 5 Additional Connection Fees Due • KB Home (41 lots) $179,411.87 • Lennar Homes (76 lots) $326,785.70 Total: $506,197.57 6/7/2007 6 Subdivision 8331 3 Questions? 6/7/2007 Subdivision 8331 7, a , 0'2� Central Contra Costa Sanitary District June 1, 2007 TO: HONORABLE MEMBERS OF THE BOARD OF DIRECTORS VIA: JAMES M. KELLY At FROM: DOUGLAS J. CRAIG SUBJECT: PROPOSED LOCAL WASTEWATER TRAINING PROGRAM On a statewide basis, it is estimated that 10,000 of the State of California's 40,000 wastewater treatment plant operators will retire in the next three years. Similarly, at Central Contra Costa Sanitary District (CCCSD), it is anticipated that at least ten Shift Supervisors and Senior Plant Operators will retire in the next four years. As such, there is a need to train new Plant Operators, as well as provide progressive training to existing Plant Operators, so they can advance to higher positions. Most of the recent Plant Operators hired at the District have either been recruited as Plant Operators 1 /11 or have progressed from the Plant Operator Trainee Program. Two community colleges offer water and wastewater curricula in California. One college is in Southern California, and the other is Solano Community College in Northern California. Solano Community College offers a program that has been attended by some District employees. However, it is inconvenient due to the location and as a result limits the interests of District employees and other students in the county. In an effort to generate more interest and to increase the local pool of potential wastewater treatment plant operators, several agencies are investigating the possibility of a local contract education program. This program would be administered through an agreement between Solano Community College and Bay Area Clean Water Agencies (BACWA). Preliminary discussions have included participation by West County Sanitation District, Delta Diablo Sanitary District, Dublin San Ramon Services District, Union Sanitary District, East Bay Municipal Utility District, Contra Costa Water District, and CCCSD. The program would provide broad -based skills training in both water and wastewater treatment, and would provide credits toward an Associate of Science degree. N: \POSUP\Administrative \Craig \2007 \Local WW Trng.doc Honorable Members of the Board of Directors Page 2 June 1, 2007 Initially, the program would consist of three courses: Water 100 — Introduction to Wastewater Treatment (4 Units) Water 104 — Introduction to Water Supply and Treatment (3 Units) Water 107 — Mathematics of Water and Wastewater Treatment (4 Units) Although a training site has not been determined, preliminary discussions suggested that CCCSD would be a convenient location for one or more of the classes. This would be particularly beneficial to existing CCCSD Plant Operators who are interested in progressing toward an Associate of Science degree in water and wastewater technology. It is proposed that the participating agencies fund the training courses through contributions to BACWA or by individual tuition payments. The cost to provide each course is $12,000, and the total cost for the three initial courses would be $36,000. The cost for each participating agency would depend upon the number of employees enrolled. Further discussions are necessary to develop and define the issues regarding cost allocation and reimbursement of training costs. The District provides up to $1,000 tuition refund per employee per fiscal year, which could also be used to cover the costs of the training courses. Staff has contacted other community colleges to determine if they could offer water and wastewater education courses. Los Medanos College and Diablo Valley College have indicated they are not interested now, but they may consider providing on -site or contract education programs in the future. Since a water and wastewater program does not already exist at these schools, a curriculum would have to be developed and approved by the State school administration. This process would take a year or longer to complete. For the short term, Solano Community College has a program in place, and is receptive to a contract education program. As noted previously, District participation in the contract education program would be a benefit to the District. It would enable existing District's Plant Operators to conveniently take college courses to enhance their knowledge and prepare them for advancement through the State certification system. It would also give aspiring employees who are not yet Plant Operators the opportunity to get the education requirements necessary to become a wastewater operator. Furthermore, if some classes were held at the District, it would allow others in the community access to wastewater classes and to become familiar with our treatment plant, thereby, expanding the pool of operator candidates from which the District can recruit future operators. JMK:DJC:dk:pk N: \POSUPWdministrative \Craig \2007 \Local WW Tmg.doc 7.a.2 Proposed Local Wastewater Training Program Randy Grieb Board Meeting June 7, 2007 The Need for Training ■ 10,000 of California's 40,000 wastewater treatment plant operators will retire in the next three years. ■ CCCSD expects at least ten Shift Supervisors and Senior Plant Operators to retire in the next four years. ■ Formal training will develop a pool of qualified journeymen plant operators and supervisors. I Proposal ■ Pilot training program using three existing Solano Community College accredited program courses. ■ Alameda and Contra Costa County agencies would participate. ■ Bay Area Clean Water Agencies would administer the program. Evaluation ■ Evaluate after 6 to 12 months to determine if there is interest or need for a Contra Costa County -based program. 2 Benefits to the District Provides a pathway to a career in wastewater and develops a pool of future employees. Gives employees who are not yet plant operators the opportunity to get the education necessary to become a wastewater treatment plant operator. Encourages District Plant Operators to take college courses to prepare for advancement through state certification. Questions? Project Overview •19 Sites •1400 LF, Open Cut •4200 LF, Pipeburst •4 Spot Repairs •850 LF, 2 Material Demonstration Sites 7a.�) 1 Expanda Pipe Rib Loc Liner • Less Traffic Disruption • Quick • No Digging • No Impact on Utilities Nearby Stnxturol Uning for Deteriorated Pipelines '; Titt tti3x List �++:tsranchr A;�se Prin:Hakt. S'"116atpr.6l. 9 Public Outreach • Public Outreach — Met with homeowners on easement sites — Public Meeting held on June 6, 2007 — Letters will be sent out notifying residents that construction will be occurring • Construction Signs — Will be posted prior to construction FA NORTH ORINDA SEWER RENOVATIONS PHASE 3, DP 5963 Engineer's Estimate: $1,410,000.00 Advertised: June 1 and 7, 2007 PreBid Meeting: Bid Opening: June 8, 2007 June 19, 2007 QUESTIONS 5 Board Meeting of June 7, 2007 Announcements Agenda Item 7.a.4) a) Public Bidding of Alhambra Valley Trunk Sewer (Phase 2), DP 5919 The project plans and specifications for the Alhambra Valley Trunk Sewer are complete and the project is ready for bidding. Phase 1 was constructed last year, and installed the northern and southern portion of the Alhambra Valley trunk line. Phase 2 will connect these sections and complete the trunk sewer for the Alhambra Valley. This project includes 2,700 feet of 10- and12 -inch sewer pipe and a 150 -foot dual pipe siphon crossing under the Arroyo del Hambre Creek. Included with the trunk line and manholes will be sewer laterals and pipe stub outs for future connections by property owners. The NEPA process and Right of Way Agreement with the National Park Service are expected to be completed by the end June. To avoid delaying sewer construction, the project will be advertised on June 11 th and 15th, and the bids will be opened on June 29th. Provided the NEPA process and Right of Way Agreement are completed as planned, the Board will be asked to award the construction contract on July 19, 2007. The estimated construction cost is $1,470,000. Regarding annexation of the Alhambra Valley Estates property, staff will submit the annexation application to LAFCO on June 4, 2007. A status letter about the project has been sent to Alhambra Valley homeowners and property owners. A copy of the letter was delivered to the Board of Directors. b) Public Workshop and Advertisement of Martinez Sewer Renovations (Phase 1), DP 5975 The project will construct 2,600 feet of 8 -inch sewer pipes in Marina Vista, and in easements on Ulfinian Way and Green Street by use of open cut and pipe -burst methods. This project will be advertised on June 9th and 15th. Bids will be opened on June 25, 2007. The construction cost is estimated at $920,000. More information will be presented when the Board is asked to approve the construction contract on July 5, 2007. A public meeting was held on Thursday, May 24, from 6:00 - 7:00 pm at the City of Martinez Council Chambers. In attendance from City of Martinez was Joe Enke, and from the District were Ann Farrell, Tad Pilecki, Michael Scahill, Andrew Antkowiak, Dana Lawson and Chris Carpenter. Six members from the public attended the meeting including our point of contact from the County Superior Court. Dana gave the same PowerPoint presentation that was delivered to the Board week before, and questions predominantly focused on traffic along the Marina Vista portion of the project. C) Recycled Water Rate Increase Recycled water rates will be increasing 3% on July 1st in accordance with the Recycled Water Ordinance adopted by the Board. This is an automatic annual increase that was built into the ordinance; therefore, no Board action is needed at this time to implement the rate increase. This increase is consistent with the increase in water rates by the Contra Costa Water District and our rates remain at about 80% of the water district's rates. A comparison of the new rates with the existing rates follow : Rates Former Potable Water Customers Former Canal Water Customers Existing $2.59 per 1,000 gallons $1.23 per 1,000 gallons $844 per acre -foot $399 per acre -foot) New $2.67 per 1,000 gallons $1.27 per 1,000 gallons ($870 per acre -foot) ($414 per acre -foot) Staff will be sending letters to recycled water customers, by the end of the week, announcing the increase. Central Contra Costa Sanitary District ' BOARD OF DIRECTORS POSITION PAPER Board Meeting Date: June 7, 2007 No.: 8.a. Administrative Type of Action: REVIEW SELF INSURED RETENTION AND LIABILITY INSURANCE PREMIUMS FOR FISCAL YEAR 2007 -08 Subject. REVIEW THE SELF INSURED RETENTION (SIR) AND LIABILITY INSURANCE PREMIUMS FOR FISCAL YEAR 2007 -08 TO DETERMINE THE APPROPRIATE SIR LEVEL Submitted By. Initiating Dept. /Div.: Randall M. Musgraves, Director of Administration Administrative /Safety & Risk Management REVIEWED AND RECOMMENDED FOR BOARD ACTION: A. sgraves ,V*� James M. Kelly, General Manager ISSUE: The Board of Directors directed staff to obtain preliminary liability insurance premium quotations at a $500,000 and a $1,000,000 Self Insured Retention (SIR) levels to assist the Board in determining the appropriate SIR level for the District. RECOMMENDATION: Authorize staff to bind coverage for general and automobile insurance coverage at a $500,000 SIR with $15,000,000 excess coverage; bind pollution (HHW) liability insurance coverage at a $500,000 SIR with $5,000,000 excess general liability and $10,000,000 excess pollution liability coverage; bind property insurance coverage with a $250,000 SIR; and bind employment practices liability insurance coverage at a $15,000 SIR with $15,000,000 excess coverage. FINANCIAL IMPACTS: The impact of the proposed recommendation is a slight increase, approximately $3,300, in premiums from fiscal year 2006 -2007 to fiscal year 2007 -2008. ALTERNATIVES/CONSIDERATIONS: The alternative to the recommended action is to bind coverage for general, automobile, pollution (HHW) and employment practices liability insurance coverage with lower or higher Self Insured Retention (SIR) levels and premiums. These alternatives are discussed below. BACKGROUND: The Board has asked staff to obtain insurance premium quotes with Self Insured Retention (SIR) levels of $500,000 and $1,000,000 for general liability. The District's insurance Broker, Alliant Insurance Services, has marketed the District's insurance needs and received quotations from insurance carriers. They also included a quote for coverage at a $250,000 SIR level. Staff developed a memo to the Board, delivered under separate cover, providing a greater detailed review of the District's insurance coverage, premiums and claims costs. POSITION PAPER Board Meeting Date: June 7, 2007 subject:: REVIEW SELF INSURED RETENTION AND LIABILITY INSURANCE PREMIUMS FOR FISCAL YEAR 2007 -08 The following are the recent premium quotes provided by the carriers for general and employment liability insurance coverage at differing SIR levels for $10,000,000 excess coverage. SIR Premium * Premium Accumulated Accumulated Net (Savings) / $ Difference Premium Claim Cost (In relation Difference (Savings)1 (9 Years) to $500,000 (9 Years) Cost SIR) (9 Years) $250,000 $300,228 $64,000 $573,000 ($1,293,000) ($720,000) $500,000 $236,524 - -- - -- - -- - -- $1,000,000 $180,783 ($56,000) ($501,000) $543,000 $42,000 * All quotes include a $1,000,000 SIR for employment liability claims. It would cost the District an additional $64,000 in premiums to move to a $250,000 SIR. The District would save approximately $56,000 per year in premiums if the District had a $1,000,000 SIR. The District's current premium for $10,000,000 is $265,523 and is quoted for 2007 -2008 at $236,524. Over a nine -year period of time the District would have saved claim costs of $1,293,000 with a $250,000 SIR, all other factors being equal. The District would have spent an additional $573,000 in premiums, netting to a total savings of $720,000. However, the carrier would likely refuse to offer a $250,000 SIR or raise premiums to a greater cost for the multiple claims. A $1,000,000 SIR would have cost the District an additional $543,000 in claims costs but would have saved the District an additional $501,000 in premiums for a net cost of $42,000. AIG has also quoted a premium for $15,000,000 excess general liability and employment practice for approximately $265,000, the current premium amount. Staff is recommending to bind coverage for $15,000,000 excess general and employment liability. If the District has a lower SIR the carrier can assume control of the claim sooner (or the less control the District has over settling a large claim). Conversely, the higher the SIR, the carrier would not step in until the claim costs exceeded $500,000 at a $1,000,000 SIR. Staff is recommending retaining the current level of SIR, $500,000, based upon the following. • Board's desire to balance customer service and claim loss (retain as much control over claim settlement as possible). • The District's increased cleaning, repair and replacement of sewer lines and new Sewer System Management Plan (SSMP) requirements should reduce sewer overflows. POSITION PAPER Board Meeting Date: June 7, 2007 subject:: REVIEW SELF INSURED RETENTION AND LIABILITY INSURANCE PREMIUMS FOR FISCAL YEAR 2007 -08 • Increased premiums if there were increased claim payouts at a $250,000 SIR. • Good claims history. • The SIR covers all general liability accidents (sewer overflows, land subsidence claims, automobile accidents, trip and falls at District facilities). RECOMMENDED BOARD ACTION: Authorize staff to bind coverage for general and automobile insurance coverage at a $500,000 SIR with $15,000,000 excess coverage; bind pollution (HHW) liability insurance coverage at a $500,000 SIR with $5,000,000 excess general liability and $10,000,000 excess pollution liability coverage; bind property insurance coverage with a $250,000 SIR; and bind employment practices liability insurance coverage at a $15,000 SIR with $15,000,000 excess coverage.