HomeMy WebLinkAbout7/7/2005 AGENDA BACKUPCentral Contra Costa Sanitary District ' BOARD OF DIRECTORS POSITION PAPER Board Meeting Date: July 7, 2005 No.: 3.a. CONSENT CALENDAR Type of Action: ADOPT RESOLUTION subject: ADOPT A RESOLUTION ACCEPTING PUBLIC SEWER IMPROVEMENTS AND AN OFFER OF DEDICATION FROM UDC HOMES, INC. FOR AN EASEMENT SHOWN ON THE RECORDED FINAL MAP OF SUBDIVISION NO. 8054 IN THE CITY OF WALNUT CREEK (JOB 5259) submitted By: Initiating Dept /Div.: John Mercurio, Management Analyst Engineering /Environmental Services REVIEWED AND RECOMMENDED FOR BOARD ACTION: J. Mercurio M. 1 Nel nvy C. Swanson A. Farrell Char s . Ba s, General Man ger ISSUE: A resolution of the Board of Directors is required to accept public sewer improvements and offers of dedication, and to authorize staff to record documents. RECOMMENDATION: Adopt a resolution accepting public sewer improvements and an offer of dedication, and authorizing staff to record the easement acceptance with the Contra Costa County Recorder. FINANCIAL IMPACTS: None. ALTERNATIVES /CONSIDERATIONS: None. BACKGROUND: The Board of Directors regularly accepts easements and public sewer improvements by resolution. The recommended resolution will accept an easement shown on the recorded final map of Subdivision No. 8054 that is required for a recent public sewer extension off Rossmoor Parkway in the City of Walnut Creek (as shown on Attachment 1). Staff has reviewed the final subdivision map, inspected the public sewer improvements and determined that they are in compliance with District standards. RECOMMENDED BOARD ACTION: Adopt a resolution accepting Job 5259 public sewer improvements and an offer of dedication from UDC Homes, Inc. for an easement shown on the recorded final map of Subdivision No. 8054 in the City of Walnut Creek and authorizing staff to record the easement acceptance with the Contra Costa County Recorder. Page 1 of 2 S: \Position Papers \Mercurio \5259 UDC Homes.doc UT SIT c Central Contra Costa Sanitary District --011(- z - -,.... LOCATION MAP N. T. S. N ACCEPTANCE OF EASEMENT DEDICATION SUBDIVISION 8054 JOB 5259 Page 2 of 2 Attachment i Central Contra Costa Sanitary District ' BOARD OF DIRECTORS POSITION PAPER Board Meeting Date: July 7, 2005 No.: 3.b. CONSENT CALENDAR Type of Action: ADOPT RESOLUTION subject: ADOPT A RESOLUTION ACCEPTING PUBLIC SEWER IMPROVEMENTS AND AN OFFER OF DEDICATION FROM ROBERT H. AND MARIAN T. FALK FOR AN EASEMENT SHOWN ON THE RECORDED FINAL MAP OF SUBDIVISION NO. 7566 IN THE TOWN OF DANVILLE (JOB 5267) Submitted By: Initiating DeptdDiv.: John Mercurio, Management Analyst Engineering /Environmental Services REVIEWED AND RECOMMENDED FOR BOARD ACTION. J. Mercurio M. ny C. Swanson A. Farrell C aWa Gen ISSUE: A resolution of the Board of Directors is required to accept public sewer improvements and offers of dedication, and to authorize staff to record documents. RECOMMENDATION: Adopt a resolution accepting public sewer improvements and an offer of dedication, and authorizing staff to record the easement acceptance with the Contra Costa County Recorder. FINANCIAL IMPACTS: None. ALTERNATIVES /CONSIDERATIONS: None. BACKGROUND: The Board of Directors regularly accepts easements and public sewer improvements by resolution. The recommended resolution will accept an easement shown on the recorded final map of Subdivision No. 7566 that is required for a recent public sewer extension off El Pintado in the Town of Danville (as shown on Attachment 1). Staff has reviewed the final subdivision map, inspected the public sewer improvements, and determined that they are in compliance with District standards. RECOMMENDED BOARD ACTION: Adopt a resolution accepting Job 5267 public sewer improvements and an offer of dedication from Robert H. and Marian T. Falk for an easement shown on the recorded final map of Subdivision No. 7566 in the Town of Danville and authorizing staff to record the easement acceptance with the Contra Costa County Recorder. Page 1 of 2 S: \Position Papers \Mercurio \5267 Falk Easement.doc 0 Loi: EL LEGEND: �2 — — PRIVATE ROAD EASEMENT —�— EXISTING SEWER , 2 —Q— NEW SEWER SUBDIVISION BOUNDARY EASEMENT AREA Central Contra Costa ACCEPTANCE O F Sanitary District EASEMENT DEDICATION SUBDIVISION 7566 JOB 5267 Page 2 of 2 Attachment 1 .yy DANVILLE� SITE e`GO vplpe�� --' t O Q LOCATION MAP 2 ' N. T. S. J F s Z o IU) 1 0 0 Loi: EL LEGEND: �2 — — PRIVATE ROAD EASEMENT —�— EXISTING SEWER , 2 —Q— NEW SEWER SUBDIVISION BOUNDARY EASEMENT AREA Central Contra Costa ACCEPTANCE O F Sanitary District EASEMENT DEDICATION SUBDIVISION 7566 JOB 5267 Page 2 of 2 Attachment 1 Central Contra Costa Sanitary District ' BOARD OF DIRECTORS POSITION PAPER Board Meeting Date: July 7, 2005 No.: 3.c. CONSENT CALENDAR Type of Action: INFORMATIONAL Subject: ADVISE THE BOARD OF DIRECTORS OF THE CLOSEOUT OF THE 1996/1997 SEWER RENOVATION PROJECT, DISTRICT PROJECT 5166 Submitted By: Initiating Dept /Div.: Tom Godsey, Associate Engineer Engineering / Capital Projects REVIEWED AND RECOMMENDED FOR BOARD ACTION: 2� - - n4-1 r W% T. Godsey ecki W. Brennan A. Fa II General ISSUE: All work has been completed on the 1996/1997 Sewer Renovation Project (DP 5166) and this project can now be closed out. RECOMMENDATION: Close out the project. FINANCIAL IMPACTS: This closeout will result in $81 being returned to the Collection System Program. Attachment 1 shows the project expenditures by category. ALTERNATIVES /CONSIDERATIONS: Not applicable. BACKGROUND: The District's 1,500 miles of sewers have pipe segments that range in age from new to over 100 -years old. Some of these pipe segments are at the end of their useful life. This is evidenced by high maintenance costs and increases in call -outs by Collection System Operations Division (CSOD). In 1991, the District implemented a sewer renovation program. Since that time, an annual allowance for this program has been included in the Capital Improvement Budget and Plan. In 1996, sewers in Lafayette were identified in a predesign planning report as needing extensive renovation. This capital project was used for design and construction of the Lafayette Sewer Renovation Phase 1 Project, as well as for design of Phases 2 through 4 and the Happy Valley Road Trunk Sewer Renovation Project. The original scope of the 1996/1997 Sewer Renovation Project included pipe segments that were later deferred to Phases 2 through 4 or the Happy Valley Road Trunk Sewer Renovation Project. Thus, the designs were completed in this project versus setting up new design projects. Recently, a new process has been adopted where new project numbers are set up each year. This project also collected planning, design, and coordination information for other renovation projects. Candidate sewer line segments were identified, evaluated, and placed on a priority list for replacement and /or renovation, then included in projects such as the Walnut Creek and Orinda Sewer Renovation Projects. hPosition Papers\2005 \July \5166 Closeout.DOC Page 1 of 3 POSITION PAPER Board Meeting Date: July 7, 2005 Subject: ADVISE THE BOARD OF DIRECTORS OF THE CLOSEOUT OF THE 1996/1997 SEWER RENOVATION PROJECT, DISTRICT PROJECT 5166 The total authorized budget for the project was $1,964,000, which included a contingency of $48,051. The total project cost was $1,963,919, which is approximately the budgeted amount. The project closeout will result in $81 being returned to the Collection System Program. RECOMMENDED BOARD ACTION: This item is presented to the Board of Directors for information. No action is necessary. 1APosition Papers\2005\July \5166 Closeout.DOC Page 2 of 3 ATTACHMENT 1 EXPENDITURE SUMMARY 1996/97 SEWER RENOVATION PROJECT DISTRICT PROJECT 5166 ACTIVITY Total Budget Construction Contracts Under 5166 Planning, Design, Drafting, Project Management Field Investigating (Survey, TV, Potholing locating) Consultants R/W TOTAL PROJECT EXPENDITURES TOTAL RETURN TO COLLECTION SYSTEM PROGRAM COST $1,964,000 $212,002 $1,092,282 $493,678 $118,496 $47,461 $1,963,919 $81 *OTHER CONSTRUCTION CONTRACTS DESIGNED IN DP 5166 - CONSTRUCTION COST Lafayette Sewer Ren — Phase 1 $874,435 Lafayette Sewer Ren — Phase 2 $1,283,287 Lafayette Sewer Ren — Phase 3A $196,678 Lafayette Sewer Ren — Phase 3B $1,214,661 Lafayette Sewer Ren — Phase 4 $1,600,935 Happy Valley Road Trunk Sewer $648.411 $5,818,437 hPosition Papers\2005 \July \5166 Closeout.DOC Page 3 of 3 Central Contra Costa Sanitary District ' BOARD OF DIRECTORS POSITION PAPER Board Meeting Date: July 7, 2005 No.: 3.d. CONSENT CALENDAR Type of Action: INFORMATIONAL subject: ADVISE THE BOARD OF THE CLOSEOUT OF THE PLEASANT HILL ROAD EAST IMPROVEMENTS, DISTRICT PROJECT 5553 submitted By: Initiating Dept. /Div.: Alex Rozul, Associate Engineer Engineering / Capital Projects REVIEWED AND RECOMMENDED FOR BOARD ACTION: F;WZUl i W. Brennan A. Farrell General ISSUE: All work has been completed on the Pleasant Hill Road East Improveme District Project 5553, and this project can now be closed out. RECOMMENDATION: Closeout the project. FINANCIAL IMPACTS: This closeout will result in $547,000 being returned to the Collection System Program. Attachment 1 shows the project expenditures by category. ALTERNATIVES /CONSIDERATIONS: Not applicable. BACKGROUND: The Collection System Master Plan Update of March 2000 identified severely under - capacity sewers within the corridor from Christie Drive to Forrest Way, Pleasant Hill Road East to Brackman Lane, and Brackman Lane to Highway 4 on -ramp. The sewer model calculated flows to these lines are anywhere from 170 — 750 percent of capacity. Surcharge indicators placed in manholes confirmed significant capacity issues. A project was planned and designed to replace approximately 6,000 feet of 6- through 10 -inch sewers with appropriately sized pipes. The sewer replacement includes a crossing at Alhambra Creek, work within Burlington Northern and Santa Fe (BNSF) Railway property, and work crossing a Caltrans Highway 4 on -ramp at Alhambra Avenue. During inter - agency plan review, the City of Martinez (City) informed the District that a waterline replacement project was planned within Pleasant Hill Road East. Both agencies agreed that combining the work into a joint project would be cost efficient and least disruptive to the residents. A Joint Powers Agreement (JPA) was authorized by the Board and entered into with the City of Martinez creating the joint project, Pleasant Hill Road East Improvements, DP 5553. L Position Papers\2005 \July \5553 Closeout.DOC Page 1 of 3 POSITION PAPER Board Meeting Date: July 7, 2005 Subject ADVISE THE BOARD OF THE CLOSEOUT OF THE PLEASANT HILL ROAD EAST IMPROVEMENTS, DISTRICT PROJECT 5553 The project was awarded to Mountain Cascade, Inc., and they commenced work on May 7, 2004. The project was completed and accepted by the Board on December 2, 2004. The value of the original contract work was $1,639,268, which includes sewer, waterline, and paving work. There were six (6) construction change orders issued totaling $192,383. The resulting total amount paid to Mountain Cascade, Inc. was $1,831,651. In accordance with the JPA, the City of Martinez reimbursed the District $574,415. The final authorized budget for the project was $2,273,143, which included a contingency of $235,000. The total project cost was $1,725,679, which is approximately 24 percent less than the budgeted amount. The project closeout will result in $547,464 being returned to the Collection System Program. RECOMMENDED BOARD ACTION: This item is presented to the Board of Directors for information. No action is necessary. I: \Position Papers\2005\July \5553 Closeout.DOC Page 2 of 3 ATTACHMENT 1 EXPENDITURE SUMMARY PLEASANT HILL ROAD EAST IMPROVEMENTS (DP 5553) ACTIVITY COST Total Budget $2,273,143 Construction Contract $1,639,268 Change Orders $192,383 Change Orders % of Construction 12% Total Construction Amount $1,831,651 Engineering, CM, Admin $468,443 Engineering, CM, Admin - % of Construction 26% Reimbursement from the City of Martinez ($574,415) TOTAL PROJECT EXPENDITURES $1,725,679 TOTAL RETURN TO COLLECTION SYSTEM PROGRAM $547,464 hPosition Papers\2005\July \5553 Closeout.DOC Page 3 of 3 Central Contra Costa Sanitary District ' BOARD OF DIRECTORS POSITION PAPER Board Meeting Date: July 7, 2005 Type of Action: INFORMATIONAL No.: 3.e. CONSENT CALENDAR subject: ADVISE THE BOARD OF THE CLOSEOUT OF THE WALNUT CREEK SEWER RENOVATIONS PROJECT, PHASE 2, DISTRICT PROJECT 5709 Submitted By: Initiating Dept. /Div.: REVIEWED AND RECOMMENDED FOR BOARD ACTION. A' cki W. Brennan A. Farreff General ISSUE: All work has been completed on the Walnut Creek Sewer Renovations Project, Phase 2, District Project 5709, and this project can now be closed out. RECOMMENDATION: Close out the project. FINANCIAL IMPACTS: This closeout will result in approximately $1,000 being returned to the Collection System Project. Attachment 1 shows the project expenditures by category. ALTERNATIVES /CONSIDERATIONS: Not applicable. BACKGROUND: Work completed under this project included the reconstruction of approximately 6,000 linear feet of 6 -, 8 -, and 10 -inch sewer lines in fourteen (14) locations. Five (5) sites were located in the public right of way, four (4) in easements and private streets, and the remaining five (5) were in both easements and the public right of way. Construction of the sewers in easements involved close cooperation with customers for site access and restoration. The work on Botelho was restricted to nighttime to reduce impact on traffic and local businesses. On May 20, 2004, the Board of Directors authorized the award of a construction contract for this work for $1,015,332 to D'Arcy & Harty Construction, Inc. The contractor was issued a Notice to Proceed that was effective June 16, 2004, with a required contract completion date of December 17, 2004. The District had beneficial use of the work on September 14, 2004. Contract work was accepted by the Board on November 18, 2004. The original construction contract amount was $1,015,332. Construction change orders were issued in the total amount of $134,120.85. Several of these change orders were at the request of the Collection System Operations Department (CSOD) to repair line segments with serious deficiencies. hPosition Papers\2005 \July \5709 Closeout.DOC Page 1 of 3 POSITION PAPER Board Meeting Date: July 7, 2005 subject ADVISE THE BOARD OF THE CLOSEOUT OF THE WALNUT CREEK SEWER RENOVATIONS PROJECT, PHASE 2, DISTRICT PROJECT 5709 The total authorized budget for the project was $1,642,000, which included a contingency of $152,668. The total project cost was $1,641,000. The project closeout will result in approximately $1,000 being returned to the Collection System Program. RECOMMENDED BOARD ACTION: This item is presented to the Board of Directors for information. No action is necessary. hPosition Papers\2005 \July \5709 Closeout.DOC Page 2 of 3 ATTACHMENT 1 EXPENDITURE SUMMARY WALNUT CREEK SEWER RENOVATIONS PROJECT, PHASE 2 DISTRICT PROJECT 5709 ACTIVITY COST Total Budget $1,642,000 Construction Contract $1,015,332 Change Orders $134,121 Change Orders - % of Construction 13% Total Construction Amount $1,149,453 Engineering, Design, Construction Management, Administration $491,547 Engineering, Design, CM, Admin - % of Construction 43% TOTAL PROJECT EXPENDITURES $1,641,000 TOTAL RETURN TO THE COLLECTION SYSTEM PROGRAM $1,000 hPosition Papers\2005 \July \5709 Closeout.DOC Page 3 of 3 Central Contra Costa Sanitary District ' BOARD OF DIRECTORS POSITION PAPER Board Meeting Date: July 7, 2005 Type of Action: INFORMATIONAL No-: 3.f. CONSENT CALENDAR Subject: ADVISE THE BOARD OF THE CLOSEOUT OF THE STEAM SYSTEM IMPROVEMENTS PROJECT, DISTRICT PROJECT 6144 Submitted By: David J. Reindl, Associate Engineer Initiating Dept. /Div.: Operations / Plant Operations / Maintenance Engineering REVIEWED AND RECOMMENDED FOR BOARD ACTION: General ISSUE: All work has been completed on the Steam System Improvements Project, District Project 6144, and the project can now be closed out. RECOMMENDATION: Close out the project. FINANCIAL IMPACTS: None related to this action. ALTERNATIVES /CONSIDERATIONS: Not applicable. BACKGROUND: The treatment plant steam system was originally installed during the 5a treatment plant expansion in the late 1970's. The steam system as designed, is an integral part of plant operations, and is an economical source of energy for aerating the secondary process. Over 85 percent of the steam generated is a result of the heat - recovery operation in the furnace waste -heat boilers and cogeneration systems. This project upgraded the auxiliary boilers with the manufacturer's low nitrous oxide (NOx) emissions burner, replaced numerous valves, and inspected and corrected leaks in the existing deaerator. Additional work included replacing the boiler makeup water softener and the turbine - driven, boiler- feed -water pumps. The boiler chemical feed system was upgraded to accept delivery of bulk chemicals. In addition controls for the waste -heat exchanger, aeration blowers, and auxiliary boilers were upgraded to provide a more effective system operation. The Board of Directors authorized the award of a construction contract for the work in the amount of $817,000 to Pacific Mechanical Corporation on August 17, 2000. The contract completion date was March 19, 2001. The project was completed and accepted by the Board on August 9, 2002. The value of the original contract work performed by Pacific Mechanical was $817,000. Four change orders totaling $126,269 were issued to repair or replace additional steam SACorrespondence \Position Papers\20050P6144- Closeout.doc Page 1 of 3 POSITION PAPER Board Meeting Date: July 7, 2005 Subject ADVISE THE BOARD OF THE CLOSEOUT OF THE STEAM SYSTEM IMPROVEMENTS PROJECT, DISTRICT PROJECT 6144 system components. An additional $322,212 was expended to replace burners and controls on the auxiliary boiler to maintain compliance with current emission limits. The final authorized budget for the project was $1,645,000. The total project cost was $1,643,317 (see Attachment 1). The project close out will result in $1,683 being returned to the Treatment Plant Program. RECOMMENDED BOARD ACTION: This item is presented to the Board Of Directors for information. No action is necessary. SACorrespondence \Position Papers\20050P6144- Closeout.doc Page 2 of 3 ATTACHMENT 1 EXPENDITURE SUMMARY STEAM SYSTEM IMPROVEMENTS PROJECT DISTRICT PROJECT NO. 6144 ACTIVITY COST Total Budget $ 1,645,000 Construction Contract $ 817,000 Change Orders $ 126,269 Change Orders % of Construction 15% Total Construction Amount $ 943,266 Process Equipment $ 322,212 Engineering, Construction Management, Administration $ 377,839 Engineering, Construction Management, Administration % of Construction o 30 /o TOTAL PROJECT EXPENDITURES $ 1,643,317 TOTAL RETURN TO TREATMENT PLANT PROGRAM $ 1,683 SACorrespondence \Position Papers\20050P6144- Gloseout.doc Page 3 of 3 Central Contra Costa Sanitary District ' BOARD OF DIRECTORS POSITION PAPER Board Meeting Date: July 7, 2005 No.: 3.g. CONSENT CALENDAR Type of Action: INFORMATIONAL subject: ADVISE THE BOARD OF THE CLOSEOUT OF THE TREATMENT PLANT ELECTRICAL CABLE REPLACEMENT PROJECT, DISTRICT PROJECT 7214 Submitted By: Initiating DeptJDiv.: Alex Rozul, Associate Engineer Engineering / Capital Projects REVIEWED AND RECOMMENDED FOR BOARD ACTION: l� i lx�_— ( A. ozul B. Than W. Brennan A. Fa II General ISSUE: All work has been completed on the Treatment Plant Electrical Cable Replacement Project, District Project 7214, and this project can now be closed out. RECOMMENDATION: Close out the project. FINANCIAL IMPACTS: This closeout will result in $277,603 being returned to the Treatment Plant Program. Attachment 1 shows the project expenditures by category. ALTERNATIVES /CONSIDERATIONS: Not applicable. BACKGROUND: Power for the treatment plant's electrical system is distributed (fed) from the main substations to the local area substations through medium -high voltage electrical cables. These "feeder" cables were installed in the mid- 1970's and were aluminum or copper with insulation that was not suitable for wet locations. In submersed conditions, the insulation was found to crack, which can lead to catastrophic failure. Maintenance inspections uncovered areas that were candidates for premature failures that could seriously cripple the plant's electrical system. Seventy percent (70 %) of those cables were replaced in previous capital improvement projects. This project replaced the remaining medium -high voltage cables to maintain the reliability of the main electrical distribution system. Plans and specifications for this project were produced by ATS Engineering Services (ATS) and District staff and were reviewed by Montgomery Watson Harza (MWH). MWH also provided construction support services that included reviewing shop drawings and submittals. The contractor, Con J. Franke Electric Inc., commenced work on August 4, 2004. The project was completed and accepted by the Board on November 18, 2004. I: \Position Papers\2005\July \7214 TP Elec Cable Replace Closeout.DOC Page 1 of 3 POSITION PAPER Board Meeting Date: July 7, 2005 subject~ ADVISE THE BOARD OF THE CLOSEOUT OF THE TREATMENT PLANT ELECTRICAL CABLE REPLACEMENT PROJECT, DISTRICT PROJECT 7214 The original construction contract amount was $1,047,700. There were two (2) construction change orders issued totaling $8,300. The resulting total amount paid to Con J. Franke Electric Inc. was $1,056,000. The final authorized budget for the project was $1,606,000, which included a contingency of $209,300. The total project cost was $1,328,397, which is approximately 17 percent less than the budgeted amount. The project closeout will result in $277,603 being returned to the Treatment Plant Program. RECOMMENDED BOARD ACTION: This item is presented to the Board of Directors for information. No action is necessary. I: \Position Papers\2005 \July \7214 TP Elec Cable Replace Closeout.DOC Page 2 of 3 ATTACHMENT 1 EXPENDITURE SUMMARY TREATMENT PLANT ELECTRICAL CABLE REPLACEMENT PROJECT (DP 7214) ACTIVITY COST Total Budget $1,606,000 Construction Contract $1,047,700 Change Orders $8,300 Change Orders % of Construction <1% Total Construction Amount $1,056,000 Engineering, CM, Admin $272,397 Engineering, CM, Admin - % of Construction 26% TOTAL PROJECT EXPENDITURES $1,328,397 TOTAL RETURN TO TREATMENT PLANT PROGRAM $277,603 hPosition Papers\2005\July \7214 TP Elec Cable Replace Closeout.DOC Page 3 of 3 Central Contra Costa Sanitary District ' BOARD OF DIRECTORS POSITION PAPER Board Meeting Date: July 7, 2005 NO-: 3.h. CONSENT CALENDAR Type of Action: INFORMATIONAL Subject: ADVISE THE BOARD OF THE CLOSEOUT OF THE TREATMENT PLANT PROTECTIVE COATINGS PROJECT, PHASE 2, DISTRICT PROJECT 7221 Submitted By: Initiating Dept /Div.: Alex Rozul, Associate Engineer Engineering / Capital Projects REVIEWED AND RECOMMENDED FOR BOARD ACTION: 40A A �, kgv- L, - t^ ( A. zul B. Than W. Brennan A. Farrell General ISSUE: All work has been completed on the Treatment Plant Protective Coatings Project, Phase 2, District Project 7221, and this project can now be closed out. RECOMMENDATION: Close out the project. FINANCIAL IMPACTS: This closeout will result in $199,210 being returned to the Treatment Plant Program. Attachment 1 shows the project expenditures by category. ALTERNATIVES /CONSIDERATIONS: Not applicable. BACKGROUND: The original treatment plant was built in the late 1940's. Since then, there have been multiple additions and expansions, such as that in the late 1970's. Much of the process infrastructure is nearly 30 -years old. Unfortunately, limited coating or repainting has occurred over the lifetime of the treatment plant. Prior to this project, coating of equipment would sometimes be incorporated into current projects being completed, but not consistently. Due to the corrosion of the facilities, proper coating and protection is needed to reduce deterioration. The first phase of the Treatment Plant Protective Coatings Project (DP 7212) rehabilitated two secondary clarifiers, two 24 -inch steel aeration pipes, the denitrification channel, the sludge blending tanks, all non - fiberglass piping, and equipment in the Solid Conditioning Building's (SCB) odor control unit. Phase 2 of the Treatment Plant Protective Coatings Project (DP 7221) rehabilitated four secondary clarifiers, four 24 -inch steel aeration pipes, air plenum drainpipes in the primary effluent channel, electrical substation MCC enclosures, fuel oil storage tanks, and the water system air gap tanks. The contractor, Kaweah Construction Company, commenced work on May 7, 2004. The project was completed and accepted by the Board on December 2, 2004. lAPosition Papers\2005\July \7221 TP Protective Coatings Closeout.DOC Page 1 of 3 POSITION PAPER Board Meeting Date: July 7, 2005 subject ADVISE THE BOARD OF THE CLOSEOUT OF THE TREATMENT PLANT PROTECTIVE COATINGS PROJECT, PHASE 2, DISTRICT PROJECT 7221 The original construction contract amount was $1,177,622. There was one (1) construction change order issued totaling $8,793. The resulting total amount paid to Kaweah Construction Company was $1,186,415. The final authorized budget for the project was $1,593,000, which included a contingency of $176,378. The total project cost was $1,393,790, which is approximately 12 percent less than the budgeted amount. The project closeout will result in $199,210 being returned to the Treatment Plant Program. RECOMMENDED BOARD ACTION: This item is presented to the Board of Directors for information. No action is necessary. hPosition Papers\2005 \July \7221 TP Protective Coatings Closeout.DOC Page 2 of 3 ATTACHMENT 1 EXPENDITURE SUMMARY TREATMENT PLANT PROTECTIVE COATINGS, PHASE 2 (DP 7221) ACTIVITY COST Total Budget $1,593,000 Construction Contract $1,177,622 Change Orders $8,793 Change Orders % of Construction <1% Total Construction Amount $1,186,415 Engineering, CM, Admin $207,375 Engineering, CM, Admin - % of Construction 17% TOTAL PROJECT EXPENDITURES $1,393,790 TOTAL RETURN TO TREATMENT PLANT PROGRAM $199,210 hPosition Papers\2005\July \7221 TP Protective Coatings Closeout.DOC Page 3 of 3 Central Contra Costa Sanitary District ' BOARD OF DIRECTORS POSITION PAPER Board Meeting Date: July 7, 2005 No.: 3J. . CONSENT CALENDAR Type of Action: INFORMATIONAL Subject: ADVISE THE BOARD OF THE CLOSE OUT OF 28 CAPITAL IMPROVEMENT PROJECTS Submitted By: Initiating Dept./Div.: Gail Chesler, Associate Engineer Engineering /Environmental Services REVIEWED AND RECOMMENDED FOR BOARD A ION: G. Chesler R. Schmidt C. Swanson A. Farrell General ISSUE: Work has been completed on 28 capital improvement projects. The financial results are reported to the Board prior to closing the projects' accounts. RECOMMENDATION: This item is presented to the Board of Directors for information only. No action is necessary. FINANCIAL IMPACTS: As a result of the close out of these 28 projects, $539,200 is being returned to the Treatment Plant, Collection System, and General Improvements Programs. ALTERNATIVE /CONSIDERATIONS: No alternatives have been prepared. This is an informational position paper. BACKGROUND: 28 capital improvement projects have been completed and staff is closing out the project accounts effective June 30, 2005. Below is a summary of the allocated budgets and expenditures for the 28 projects by program. Attachment 1 summarizes the allocated budgets and expenditures for each individual project. Attachment 2 contains a brief summary for each project. Program Allocated Expenditures* Under spent Budget (Overruns) Treatment Plant 1,244,000 996,128 247,872 Collection System 5,058,769 4,814,196 244,573 General Improvements 448,159 401,395 46,755 Totals 6,750,928 1 6,211,719 1 539,200 S: \Position Papers \Chester \Closeout of 28 CIP.DOC Page 1 of 8 POSITION PAPER Board Meeting Date: July 7, 2005 Subject ADVISE THE BOARD OF THE CLOSE OUT OF 28 CAPITAL IMPROVEMENT PROJECTS The total budget for the 28 projects is $6,750,928. Total project expenditures are $6,211,719. A net under run of $539,200 (8% of the total authorized budgets) will result in $247,872 being returned to the Treatment Plant Program, $244,573 being returned to the Collection System Program, and $46,755 being returned to the General Improvements Program. RECOMMENDED BOARD ACTION: No action is necessary. SAPosition Papers \Chesler\Closeout of 28 CIP.DOC Page 2 of 8 ATTACHMENT 1 CAPITAL PROJECTS TO BE CLOSED OUT TREATMENT PLANT PROGRAM DISTRICT PROJECT PROJECT TITLE ALLOCATED EXPENDITURES* UNDERRUN NO. BUDGET (OVERRUNS) 6134 SLUDGE DEWATERING 125,000 110,722 14,278 ENHANCEMENTS 6157 AERATION AIR LEAKS 600,000 475,192 124,808 5436 REPAIR 365,000 351,190 13,810 6164 TP COMPLIANCE REPORTING 109,000 44,317 64,683 7217 EMERGENCY BYPASS POINT 75,000 62,779 12,221 INVESTIGATION 7219 SAFETY ENHANCEMENTS 235,000 234,510 490 7223 SCRUBBER PUMPS 100,000 68,608 31,392 5630 RENOVATION 977,000 953,858 23,142 Program Totals 1,244,000 996,128 247,872 COLLECTION SYSTEM PROGRAM DISTRICT PROJECT PROJECT TITLE ALLOCATED EXPENDITURES* UNDERRUN NO. BUDGET OVERRUNS 5246 2003 CURED -IN -PLACE 382,000 359,127 22,873 PIPE 5364 LA QUESTA MANHOLE 8,000 0 8,000 5436 WENDT RANCH OFFSITE 365,000 351,190 13,810 SEWER EASEMENTS 5499 CARMEL CT SEWER 147,000 142,710 4,290 RENOVATION 5601 ECHO SPRINGS ROAD 156,000 180,850 (24,850) CAD 2001 -2 5630 MARTINEZ M3 SAG 977,000 953,858 23,142 RENOVATION 5640 CAMILLE COURT 146,869 146,869 0 CAD 2002 -1 5644 ARBOR LANE 178,000 155,498 22,502 CAD 2002 -4 5672 COW CREEK CROSSING 77,000 75,700 1,300 RENOVATION 5691 VIA DON JOSE 197,000 188,445 8,555 CAD 2002 -6 5700 N MAIN DOWNTOWN WC 552,900 553,005 (105) 5714 LA SONOMA WAY 77,000 59,294 17,706 CAD 2002 -5 SAPosition Papers \Chester \Closeout of 28 CIP.DOC Page 3 of 8 5724 ROSSMOOR SEWER IMPROVEMENTS - PH 9 507,000 422,357 84,643 5727 ACACIA FORCE MAIN 160,000 154,816 5,184 5772 2004 - 05 DEVELOPMENT SEWERAGE 988,000 976,054 11,946 5925 DIABLO FACILITIES PLAN 50,000 16,058 33,942 5926 DANVILLE FACILITIES PLAN 25,000 24,985 15 5927 ORINDA SD RISK ASSESSMENT 65,000 53,380 11,620 Program Totals 5,058,769 4,814,196 244,573 GENERAL IMPROVEMENTS PROGRAM DISTRICT PROJECT PROJECT TITLE ALLOCATED EXPENDITURES* UNDERRUN NO. BUDGET OVERRUNS 8168 PERMANENT RECORDS 151,000 151,312 (321) DRAWING CON 8176 ACQUISITION OF 25,159 25,160 (1) EASEMENTS — MARTINEZ 8189 GEOGRAPHIC DATA 252,000 201,698 50,302 INTEGRATION 8204 HHWCF CANOPY 20,000 23,225 (3,225) Program Totals 448,159 401,395 46,755 * Expenditures are estimated. While they include expenditures through May, some additional charges, will occur during June prior to the end of the fiscal year on the 30tH SAPosition Papers \Chesler \Closeout of 28 CIP.DOC Page 4 of 8 ATTACHMENT 2 CAPITAL PROJECTS TO BE CLOSED OUT TREATMENT PLANT PROGRAM Sludge Dewatering Enhancements, DP 6134, completed a number of enhancements including improved centrifuge flush and hot water system, improved centrate sampling system, installation of sludge cake level sensors in cake hoppers, and purchase of a pressure washer for cleaning the centrifuges. The District also cooperated with the Water Environment Research Foundation to test a number of centrifuge automation devices for polymer control. Most recently, polymer- mixing equipment was purchased to allow use of a new type of sludge dewatering polymer, which is replacing the type that is no longer available. The goal of the Aeration Air Leak Repair, DP 6157, was to improve reliability of the plant's aeration piping systems above and below ground by inspection, renovation, and replacement where required. The project involved exposing the headers and branch lines in four locations around the aeration and nitrification tanks. The interior of the entire length of the two 78 -inch headers south of the tanks, and the 24 -inch header north of the tanks were inspected and the wall thickness tested to identify the condition of the headers. Leaks in the branch lines, couplings and concrete encasing were identified and corrected. In addition, the project investigated the condition of the air plenum boxes and floor slabs under the aeration basins. The investigation entailed the use of ground penetrating radar and vibration analysis techniques, core drilling through the foundation slab to visually inspect the slab /rock interface, and collecting soil samples from under the structure for analysis to determine character and composition of the soils. TP Compliance Reporting, DP 6164, provided both hardware and software for the ModComp Data Archival and Retrieval System (DARS). It purchased a server to replace the existing PC the data is achieved on. It also bought another interface device for the backup of ModComp thus doubling reliability. The project also provided custom vendor software modifications, which saves manpower to perform the daily verification that the Treatment Plant process control complies with our Title V air permit. The Emergency Bypass Point Investigation, DP 7217, produced a technical memorandum analyzing the ability to bypass plant flows through Pacheco Slough under various flood conditions. Hydraulic conditions were calculated from the bypass channel near Basin A North out to Walnut Creek and the Bay. The existing emergency bypass point was compared to the option of relocating the emergency bypass point to Basin B with a discharge to Walnut Creek. A new district project appears in the FY 2005 -06 CIB to select and implement a bypass solution. The TP Safety Enhancements, DP 7219, constructed many items resulting from the District's safety suggestion program and the resulting safety work orders. Work included replacing damaged grating, installing fall protection devices throughout the treatment plant, improved access at the economizer in the SCB, and installing a platform at Orinda Crossroads Pumping Station. SAPosition Papers \Chesler \Closeout of 28 CIP.DOC Page 5 of 8 The Scrubber Pumps Renovation, DP 7223, produced a technical memorandum on the performance problems occurring with the 12 pumps that provide spray water to the wet scrubbers on each of the two furnaces in the Solids Conditioning Building. An estimate was developed to replace and relocate the pumps and associated piping at a cost of approximately $1,000,000. In lieu of building the project now, the Plant Operations Division is testing a pump that can directly replace the existing pumps. If the test pump can provide reliable service, its use would substantially reduce the project cost while providing reliable service. COLLECTION SYSTEM PROGRAM 2003 Cured -In -Place Pipe, DP 5246, installed 568 feet of 30" Cured -in -Place pipe liner on Bancroft Road at Minert Road in Walnut Creek for structural repairs and to prevent further corrosion. Also, 705 feet of 8" Cured -in -Place pipe liner on Moraga Way at Glorietta Boulevard in Orinda was installed for structural repairs and to prevent root and groundwater intrusion. • The La Questa Manhole, DP 5364, was initially started to design and construct a manhole along an easement sewer off of La Questa, Orinda. Subsequently, it was determined that this manhole was not necessary. • The Wendt Ranch Offsite Sewer Easements, DP 5436, acquired easements through eminent domain proceedings. All project costs were reimbursed to the District by Shapell Homes, the Wendt Ranch developer. • The Carmel Court Creek Crossing Renovation, DP 5499, rehabilitated the protective coating on the supporting structure and the 30 -inch sewer creek crossing of Walnut Creek near Carmel Court. In addition, the project addressed concerns raised by neighboring commercial establishments regarding the pipe bridge's appearance. • Echo Springs Road CAD 2001 -2, DP 5601, financed design and construction of 1,055 feet of sanitary sewer to serve seven properties along Echo Springs Road in Lafayette. • The Martinez M3 Sag Renovation, DP 5630, abandoned the existing settled portion of the 36 -inch gravity line, which had created a debris trap, and constructed a new 36 -inch sanitary sewer with manholes in Waterbird Way. • Camille Court CAD 2002 -1, DP 5640, financed design and construction of 980 feet of sanitary sewer to serve 10 properties along Camille Court in Alamo. Arbor Lane CAD 2002 -4, DP 5644, financed design and construction of 733 feet of sanitary sewer to serve ten properties along Arbor Lane and Bernie Lane in Alamo. The Cow Creek Crossing Renovation, DP 5672, restored a channel within the Town of Danville to its original configuration as it had been undermining an existing manhole. SAPosition Papers \Chesler \Closeout of 28 CIP.DOC Page 6 of 8 Via Don Jose CAD 2002 -6, DP 5691, financed design and construction of 1,241 feet of sanitary sewer to serve 22 properties along Via Don Jose and North Jackson Way in Alamo. The Walnut Creek North Main Street Sewer Replacement, DP 5700, replaced existing sewer lines on North Main Street between Civic Drive and Ygnacio Valley Road. Work included construction of 1,640 feet of new 8 -inch and 12 -inch sanitary sewer lines by open cut method, construction of seven new manholes, reconstruction of laterals, abandonment of existing sewer lines, and paving. Work was performed during night hours to minimize the impact on traffic and businesses. La Sonoma Way CAD 2002 -5, DP 5714, financed design and construction of 327 feet of sanitary sewer to serve six properties along La Sonoma Way in Alamo. • The Rossmoor Sewer Improvements - Phase 9, DP 5724, installed four manholes and renovated 2,000 linear feet of six and eight -inch sewer line by open cut, sliplining and pipe bursting methods. Upon completion of work, easements were described, signed, and recorded. • The Acacia Parallel Force Main, DP 5727, installed a new four -inch forcemain running parallel to the existing forcemain. In additional, complete site paving was achieved, which allows for adequate facility drainage. A valve structure was installed which will allow the operating staff to work safely outside the wetwell. • The 2004 - 05 Development Sewerage, DP 5772, was used to properly account for the District's staff time and other direct costs associated with planning, design reviewing and inspecting of main sewer extensions installed by developers and individuals. These costs are recovered through plan review and inspection rates, fees, and charges. Diablo Facilities Plan, DP 5925, created a document that details the condition of sewer lines in Diablo. The driving force for initiating this study was the increase in maintenance and cleaning schedules as well as reports of damaged sewers in the area. The document provides descriptions of problematic and high maintenance sewer lines and performs a planning -level economic analysis, which it uses to help determine renovation recommendations. The document also includes research into locations of EBMUD waterlines and Contra Costa County Capital Improvement Plans. Danville Facilities Plan, DP 5926, created a document that details the condition of sewer lines in downtown Danville. The driving force for initiating this study was the increase in maintenance and cleaning schedules as well as reports of damaged sewers in the area. The document provides descriptions of problematic and high maintenance sewer lines and performs a planning -level economic analysis, which it uses to help determine renovation recommendations. The document also includes research into locations of EBMUD waterlines and Town of Danville Capital Improvement Plans. SAPosition Papers \Chesler \Closeout of 28 CIP.DOC Page 7 of 8 The Orinda Storm Drain Risk Assessment, DP 5927, accomplished the following: The first component of the project was an evaluation study, where sites were identified, visited, and evaluated based on risk potential. A technical memorandum assessing potential exposure / remediation costs was developed and will be discussed with Management and the Board. GENERAL IMPROVEMENTS PROGRAM The Permanent Records Drawings Conversion, DP 8168, accomplished the digital conversion and scanning of 20,000 full size engineering permanent records drawings (as -built drawings) to provide backup copies, improve legibility of old damaged drawings, and increase productivity and access through the District's Geographic Information System (GIS). Through the Acquisitions of Easements, DP 8176, missing easements for existing sewers were acquired. The District took over responsibility for the City of Martinez sewer system in 1968. There were many missing or deficient easements for portions of these existing sewers. Under the sewer transfer agreement, the City identified the easement deficiencies. Through this project, dozens of missing easements for existing sewers in Martinez were obtained. The Geographic Data Integration (GDI), DP 8189, created an intranet based Geographic Information System (GIS) that linked most of the digital location -based data at the District. This innovative project has changed the basic workflows of many of the working units at the District, contributing to significant cost savings, more efficient use of employee time, and improved internal and external customer service. The HHWCF Canopy, DP 8204, was initially intended to install a canopy over the waste bins at the HHWCF loading dock, and install ventilation improvements in the HHWCF sorting and packing areas. Staff later determined that it would be more economical to include the canopy in the HHWCF Roof Project. This project did install ventilation fans on the sorting area roof and install filters on the supply air ducting for the HHWCF. SAPosition Papers \Chester \Closeout of 28 CIP.DOC Page 8 of 8 Central Contra Costa Sanitary District ' BOARD OF DIRECTORS POSITION PAPER Board Meeting Date: July T, 2005 No.: 3.i. CONSENT CALENDAR Type of Action: SET PUBLIC HEARINGS subject: SET AUGUST 11, 2005 AT 2:00 P.M. AS THE DATE AND TIME FOR PUBLIC HEARINGS ON THE KIEWIT PROPERTY CLEAN FILL LEASE PROJECT, DP 8210 Submitted By: Initiating Dept/Div.: Russell B. Leavitt, Engineering /Environmental Services Division Management Analyst REVIEWED AND RECOMMENDED FOR BOARD ACTION: J IV" APK_. I f R. Leavitt ren an A. Farrell *General , er ISSUE: District practice is to hold a public hearing prior to the Board's possible adoption of a Negative Declaration or Mitigated Negative Declaration. In addition, under Health and Safety Code § 6514.1, a sanitary district may lease unneeded district property only after holding a public hearing, which affords all persons present an opportunity to be heard with respect to the proposed lease. RECOMMENDATION: Set August 11, 2005 at 2:00 p.m. as the date and time for public hearings on the proposed lease of the Kiewit Property, APN # 159- 140 -051, for use as a clean fill site by an independent operator and the consideration and possible adoption of a Mitigated Negative Declaration. FINANCIAL IMPACTS: Not applicable. ALTERNATIVES /CONSIDERATIONS: Not applicable. BACKGROUND: A Mitigated Negative Declaration has been prepared for the Kiewit Property Clean Fill Project, District Project 8210. The District plans to lease its Kiewit Property parcel for a clean fill site to obtain revenue. The site is approximately 33 acres and located between Grayson and Walnut Creeks, Highway 4, and Imhoff Drive adjacent to the District wastewater treatment plant in Martinez, Contra Costa County, California (see Attachment 1 for a site map). The vacant property is owned by the District and used as a buffer zone for the wastewater treatment plant located to the west of the project, across Grayson Creek. The project scope consists of filling the site with clean fill to match the elevation of Imhoff Drive to the north. The site will be raised a nominal five feet to an elevation estimated to range from 20 to 23 feet above sea level. A private lessee /clean fill site operator will be selected by the District to design the project, obtain permits, and operate the project over its expected three -year life. Page 1 of 3 S: \Position Papers \Leavitt \Set Kiewitt Property Public Hearing.doc POSITION PAPER Board Meeting Date: July 7, 2005 Subject: SET AUGUST 11, 2005 AT 2:00 P.M. AS THE DATE AND TIME FOR PUBLIC HEARINGS ON THE KIEWIT PROPERTY CLEAN FILL LEASE PROJECT, DP 8210 While not required by law or the District's procedures, it has been the District's customary practice to hold public hearings in advance of the adoption of Negative Declarations or Mitigated Negative Declarations. Holding a hearing on the proposed Mitigated Negative Declaration for the Kiewit Property would be consistent with this practice. Similarly, under Health and Safety Code § 6514.1, a sanitary district may lease district property that is not needed during the term of a proposed lease only after holding a public hearing which affords all persons present an opportunity to be heard. If a sanitary district's board of directors finds that the proposed lease is compatible with agency operations, is of public benefit, and is for a term of less than 10 years, the sanitary district may follow less elaborate procedures as to the proposed lease. This Board previously held a public hearing under Health and Safety Code § 6514.1 on the Kiewit Property on June 2, 2005. However, that hearing was solely for the purpose of considering the propriety of leasing the property for short term agricultural and related uses. A new hearing is required under Health and Safety Code § 6514.1 if the District wishes to lease the property for a clean fill operation. At that hearing, the Board could consider such things as the compatibility of the proposed clean fill operation with District activities and whether the Kiewit property would be needed during the proposed term of the new lease. RECOMMENDED BOARD ACTION: Set August 11, 2005 at 2:00 p.m. as the date and time for public hearings on the Kiewit Property Clean Fill Lease Project, District Project 8210. At these hearings, the Board would consider the proposed Mitigated Negative Declarations and also determine the propriety of leasing the property for a clean fill operation under Health and Safety Code § 6514.1. Page 2 of 3 SAPosition Papers \Leavitt \Set Kiewitt Property Public Hearing.doc v 0 Page 3 of 3 Central Contra Costa Sanitary District ' BOARD OF DIRECTORS POSITION PAPER Board Meeting Date: July 7, 2005 No.: 3.k. CONSENT CALENDAR Type of Action: APPROVE REGISTRATION DIFFERENTIAL subject: APPROVE REGISTRATION DIFFERENTIAL FOR ASSISTANT ENGINEER NANCY KELLY Submitted By: Randy Schmidt Senior Engineer Initiating Dept /Div.: Engineering /Environmental Services REVE WED AND RECOMME DED FOR BOARD ACTION: " V14 chmidt C. wanson A. Farrell General ISSUE: A registration differential requires the approval of the Board of Directors. RECOMMENDATION: Approve a registration differential effective June 24, 2005 for Assistant Engineer Nancy Kelly. FINANCIAL IMPACTS: One -step salary increase (5 %). ALTERNATIVES /CONSIDERATIONS: None. BACKGROUND: Nancy Kelly is an Assistant Engineer in the Environmental Services Division's Planning Work Group. This classification does not require registration as a Professional Engineer. The Memorandum of Understanding (MOU) between the District and the Management Support/Confidential Group provides for a one -step salary increase for employees who achieve registration or license as Professional Engineer, Land Surveyor or Certified Public Accountant while employed by the District in a position not requiring such registration or license. Nancy Kelly has provided evidence that she has passed all required examinations and is now licensed as a Professional Engineer in California (see Attachment 1). Nancy has consistently demonstrated the professional judgment and skill expected of a Professional Engineer in her assignments. RECOMMENDED BOARD ACTION: Approve a registration differential effective June 24, 2005, for Assistant Engineer Nancy Kelly, as the registration differential provided for in the MOU with the Management Support/Confidential Group. Page 1 of 2 SAPosition Papers \Schmidt \N Kelly Registration Differential Increase.DOC STATE OF CALIFORNIA -STATE AND CONSUMER SERVICES AGENCY ARNOLL D SCHWARZENEGGER, Govema sacra BOARD FOR PROFESSIONAL ENGINEERS AND LAND SURVEYORS a 2535 Capitol Oaks Drive, Suite 300, Sacramento, CA 95833 -2944 Consumer A trs Telephone: (916) 263 -2222 Calnet: 8- 435 -2222 Fax: (916) 263 -2246 or(916)263-2221 Board Internet Address: http: / /www.dca.ca.gov /pels 06/24/2005 NANCY A. KELLY 98 FOUNTAINHEAD CT MARTINEZ, CA 94553 CONGRATULATIONSI ID: 28518 Branch: Civi 1 We are pleased to inform you that you have successfully passed the recent Professional Engineer examination. This letter will serve as temporary evidence that you now hold a valid license as a Professional Engineer. A formal certificate, which will include your license number, will be prepared and mailed to you within four to six weeks. Please refer to the California Code of Regulations (Board Rules) for Professional Engineers and Land Surveyors (Title 16, Division 5, Sections 400 - 474.5) for information on the following subjects that are your responsibility. These Rules can be found on our website at www.dca.ca.gov/pels/laws.htm Rule 407 - Fees Rule 411 -Seal and Signature Rule 412 - Address Change Rule 415 - Practice within Area of Competence Of particular importance is that all licenses are subject to renewal, and payment of a renewal fee is required. A renewal notice will be mailed to you several weeks before the expiration date of your Professional Engineer license. If you do not receive a renewal notice, you are still responsible for renewing your license. If you wish to order a seal or stamp, you may purchase one from any stationary store or rubber stamp company. Please note that some Engineers are required to seal, stamp and sign any plans, specifications, or reports prepared by them, or under their direction. Board Rule 411 provides specific criteria on seals. Notices and newsletters from the Board Office cannot reach you unless we have your current mailing address. Board Rule 412 requires you to advise us in writing of any address changes within 30 days after the effective date of the address change. EXAMINATION AND LICENSING STAFF Page 2 of 2 Central Contra Costa Sanitary District ' BOARD OF DIRECTORS POSITION PAPER Board Meeting Date: July 7, 2005 No.: 3.1. CONSENT CALENDAR Type of Action: CONFIRM PUBLICATION subject: ADOPT A RESOLUTION CONFIRMING PUBLICATION OF DISTRICT ORDINANCE NO. 236 - AN ORDINANCE AMENDING DISTRICT CODE SECTION 6.20.300 SCHEDULE OF REIMBURSEMENT FEES TO ESTABLISH REIMBURSEMENT FEES APPLICABLE TO PROPERTIES THAT DIRECTLY CONNECT TO PROJECT 5497 (EL TOYONAL / CAMINO DEL CIELO, ORINDA), PROJECT 5667 (DEL AMIGO ROAD, DANVILLE, OR PROJECT 5698 (EL PINTADO, DANVILLE) STANDARD SEWER FACILITIES Submitted By: Initiating Dept. /Div.: Administrative Department Elaine R. Boehme Secretary of the District REVIEWED AND RECOMMENDED FOR BOARD ACTION. E. Boehme General ISSUE: Section 6490 of the Health and Safety Code of the State of California provides that District ordinances shall be published once in a newspaper of general circulation within the District, and provides that an Order of the Board of Directors of the District to the effect that the ordinance has been published shall constitute conclusive evidence that publication has been properly made. RECOMMENDATION: Adopt a resolution confirming the publication of District Ordinance No. 236. FINANCIAL IMPACTS: None. ALTERNATIVES /CONSIDERATIONS: Establishes presumption that the ordinance was correctly published and therefore would be deemed procedurally valid by a court. BACKGROUND: District Ordinance No. 236 which was adopted by the Board at the meeting of May 19, 2005, and which amends District Code Section 6.20.300 Schedule of Reimbursement Fees to Establish Reimbursement Fees Applicable to Properties that Directly Connect to Project 5497 (El Toyonal /Camino Del Cielo, Orinda), Project 5667 (Del Amigo Road, Danville, or Project 5698 (El Pintado, Danville) Standard Sewer Facilities, was published in the Contra Costa Times on May 28, 2005. Proof of publication is attached. RECOMMENDED BOARD ACTION: Adopt a resolution confirming the publication of District Ordinance No. 236. S:\ADMIN \SECRETARY OF THE DISTRICT \Resolutions \PP CONFIRM PUB ORD 236.doc Page 1 of 3 I PROOF OF PUBLICATION (2015.5 C.C.P.) STATE OF CALIFORNIA County of Contra Costa I am a citizen of the United States and a resident of the County aforesaid; I am over the age of eighteen years, and not a party to or interested in the above - entitled matter. I am the Principal Legal Clerk of the Contra Costa Times, a newspaper of general circulation, printed and published at 2640 Shadelands Drive in the City of Walnut Creek, County of Contra Costa, 94598. And which newspaper has been adjudged a newspaper of general circulation by the Superior Court of the County of Contra Costa, State of California, under the date of October 22, 1934. Case Number 19764. The notice, of which the annexed is a printed copy (set in type not smaller than nonpareil), has been published in each regular and entire issue of said newspaper and not in any supplement thereof on the following dates, to -wit: May 28 all in the year of 2005 I certify (or declare) under penalty of perjury that the foregoing is true and correct. ExecuT2ay lnut Creek, California. On thi of May, 005 .. .. .. ..... .. ...SignatContrimes P O Box 4147 Walnut Creek, CA 94596 (925) 935 -2525 Proof of Publication of: (attached is a copy of the legal advertisement that published) ORDINANCE NO. 236 AN ORDINANCE TO AMEND DISTRICT CODE SECTION 6.20.300 SCHEDULE OF REIMBURSEMENT FEES TO ESTABLISH REIMBURSEMENT FEES APPLICABLE TO PROPERTIES THAT DIRECTLY CONNECT TO PROJECT 5497 (EL TOYONAL / CAMINO DEL CIELO, ORINDA), PROJECT 5667 (DEL AMIGO ROAD, DANVILLE, OR PROJECT 5698 (EL PINTADO, DANVILLE) STANDARD SEWER FACILITIES WHEREAS, the Central Contra Costa Sanitary District (District) Code Chapter 6.20 provides for reimbursement to installers of standard and special facilities from fees charged property owners when they apply to connect their property to the public sewer system; and WHEREAS, District Code Chapter 6.20 provides for the establishment of reimbursement accounts for construct- ed standard and special facilities; and WHEREAS, Project 5497, 5667 and 5698 sewers, the locations of which are shown on Exhibits A -1 A -2 and A -3 of this ordinance, Incorporated in full herein by this reference, are standard facilities as defined (n District Code Chapter 6.20; and WHEREAS, reimbursement fees have been calculated by the method specified In District Code Chapter 6.20, which calculations are summarized in Exhibits B -1, B -2 and B -3 of this Ordinance, incorporated in full herein by this reference; and WHEREAS, a properly noticed public hearing to receive comments on the proposed reimbursement fees was conducted at the District Board of Directors' regularly scheduled meeting on May 19, 2005. NOW, THEREFORE, the Board of Directors of the Central Contra Costa Sanitary District does ordain as follows: Section 1 Reimbursement fees applicable to properties that directly connect to Project 5497, 5667 or 5698 standard sew- er facilities, designated on Exhibits A -1, A -2 and A -3 are hereby established. Said reimbursement fees, which shall be consecutively added to District Code Section 6.20.300 Schedule of Reimbursement Fees, have been cal- culated in the manner set forth in District Code Chapter 6.20 and shown in Exhibit B -1, B -2 and B -3 of this ordi- nance. The reimbursement fees for properties that directly connect to the projects as cited above shall be as follows. District Protect Description of Facility Actual ore of Number Reimbursement s Number Estimated RUES PN UnR Cost 5497 El Toyyonal /Camino Del Clelo, $124,411.76 6 $20,735.29 Orinda 5667 Del Amigo Road, Danville $64,410.66 2 $32,205.33 5698 El Plntado, Danville $110,989.70 4 $27,747.43 Section 2 The reimbursement fees set forth herein shall be administered, adjusted, and collected according to the provi- sions of District Code Chapter 6.20. Section 3 Exhibits A -1, A -2, A -3, B -1, B2 and B -3 hereto shall not be incorporated into the District Code; however, copies of same shall be maintained in the District offices and made available for inspection during the periods when the subject reimbursement fees is in effect Section 4 This ordinance shall be a general regulation of the District and shall be published once In the Contra Costa Times, a newspaper of general circulation within the District, and shall be effective on the eighth calendar day following such publication. PASSED AND ADOPTED by the Board of Directors of the Central Contra Sanitary District on the 19th day of May 2005, by the following vote: AYES: Members: Boneysteele, Menesini, Nejedly, Hockett NOES: Members: None ABSENT: Members: Lacey COUNTERSIGNED: /s/ Elaine R. Boehme Secretary of the District, Central Contra Costa Sanitary District, County of Contra Costa, State of California APPROVED AS TO FORM: /s/ Kenton L Alm, Counsel for the District Legal CCT 2958; Publish May 28, 2005 President of the BoBarbara r f D. Directors, Central Contra Costa Sanitary District, County of Contra Costa, State of California Page 2 of 3 RESOLUTION NO. 2005- RESOLUTION CONFIRMING PUBLICATION OF DISTRICT ORDINANCE NO. 236 AMENDING DISTRICT CODE SECTION 6.20.300 SCHEDULE OF REIMBURSEMENT FEES TO ESTABLISH REIMBURSEMENT FEES APPLICABLE TO PROPERTIES THAT DIRECTLY CONNECT TO PROJECT 5497 (EL TOYONAL / CAMINO DEL CIELO, ORINDA), PROJECT 5667 (DEL AMIGOROAD, DANVILLE, OR PROJECT 5698 (EL PINTADO, DANVILLE) STANDARD SEWER FACILITIES WHEREAS, Section 6490 of the Health and Safety Code of the State of California provides that District ordinances shall be published once in a newspaper of general circulation within the District, and provides that an Order of the Board of Directors of the District to the effect that the Ordinance has been published shall constitute conclusive evidence that publication has been properly made. NOW, THEREFORE, be it resolved by the Board of Directors of the Central Contra Costa Sanitary District as follows: THAT District Ordinance No. 236 which was adopted on May 19, 2005, and which amends District Code Section 6.20.300 Schedule of Reimbursement Fees to Establish Reimbursement Fees Applicable to Properties that Directly Connect to Project 5497 (El Toyonal /Camino Del Cielo, Orinda), Project 5667 (Del Amigo Road, Danville, or Project 5698 (El Pintado, Danville) Standard Sewer Facilities, has been properly published once since its adoption in a newspaper of general circulation within Contra Costa County. PASSED AND ADOPTED by the Central Contra Costa Sanitary District Board of Directors this 7th day of July, 2005 by the following vote: AYES: Members: NOES: Members: ABSENT: Members: COUNTERSIGNED: Secretary of the Central Contra Costa Sanitary District, County of Contra Costa, State of California Approved as to Form: President of the Board of Directors, Central Contra Costa Sanitary District, County of Contra Costa, State of California Kenton L. Alm District Counsel Page 3 of 3 Central Contra Costa Sanitary District ' BOARD OF DIRECTORS POSITION PAPER Board Meeting Date: July 7, 2005 No.: 5.a. BIDS AND AWARDS Type of Action: AUTHORIZE AWARD subject: AWARD A CONSTRUCTION CONTRACT TO POWER ENGINEERING CONTRACTORS FOR THE CONSTRUCTION OF THE HOUSEHOLD HAZARDOUS WASTE COLLECTION FACILITY PAINT BULKING ROOM MODIFICATIONS PROJECT, DISTRICT PROJECT 8209 Submitted By. Initiating Dept /Div.: Clint T. Shima, Assistant Engineer Engineering / Capital Projects REVIEWED AND RECOMMENDED FOR BOARD ACTION: C. Shima 40- r, bly B. Than B. Br nnan A. Farrell General ISSUE: On June 15, 2005, sealed bids were received and opened for the Household Hazardous Waste Collection Facility Paint Bulking Room Modifications Project, District Project No. 8209. The Board of Directors must make a determination whether to award the contract to the lowest bidder within 50 days of the bid opening. RECOMMENDATION: Authorize award of a construction contract to the lowest bidder, Power Engineering Contractors. FINANCIAL IMPACTS: Construction costs are approximately $250,000 including bid price, contingency and construction management. ALTERNATIVES /CONSIDERATIONS: Alternatives include (1) award a construction contract to Power Engineering Contractors, or (2) reject all bids. Staff does not recommend that the Board reject all bids. BACKGROUND: Latex paint is currently bulked by hand for 5- gallon containers and a machine is available for 1- gallon containers. During peak periods, paint is received faster than it can be bulked. Paint containers are delivered to the bulking room in large bins carried by a forklift. The existing room was not designed to accommodate the forklift. To improve the efficiency and safety of the paint bulking, a new bulking machine will be installed that will mechanically bulk 5- gallon and smaller containers. The room will be modified to better accommodate the forklifts and large bins. Attachment 1 shows the location of this project work. The design of the Household Hazardous Waste Collection Facility Paint Bulking Room Modifications Project was a combined effort of District staff and ATI Architects and Engineers (ATI). The engineer's pre -bid estimate for the construction cost was L: \Position Papers \Shima \8209 - Award.doc Page 1 of 5 POSITION PAPER Board Meeting Date: July 7, 2005 subject. AWARD A CONSTRUCTION CONTRACT TO POWER ENGINEERING CONTRACTORS FOR THE CONSTRUCTION OF THE HOUSEHOLD HAZARDOUS WASTE COLLECTION FACILITY PAINT BULKING ROOM MODIFICATIONS PROJECT, DISTRICT PROJECT 8209 $160,000. The project was advertised on May 24 and 25, 2005. Four (4) bids ranging from $172,001 to $187,000 were received and publicly opened on June 15, 2005. A summary of these bids is shown on Attachment 2. The apparent low bid is from Power Engineering Contractors in the amount of $172,001. The Capital Projects Division conducted a technical and commercial evaluation of these bids and has determined that Power Engineering Contractors is the lowest responsible bidder with a bid amount of $172,001. District staff will perform construction management, inspection, and construction contract administration. ATI has performed satisfactorily during the design phase of this project and staff recommends retaining ATI to provide support services during construction for this project. The construction support services include reviewing shop drawings and submittals, responding to design questions, evaluating change order requests, and performing site visits to verify compliance with the design intent. Staff has negotiated a professional engineering service agreement with ATI with a cost ceiling of $7,000. The allocation of funds required to complete this project, as shown in Attachment 3, is $230,000. The Household Hazardous Waste Collection Facility Paint Bulking Room Modifications Project is included in the 2005 -2006 Capital Improvement Budget on pages GI -33 through GI -34. Staff has determined that there are adequate funds in the Capital Improvement Budget and Plan for this project. Staff has concluded that this project is exempt from the California Environmental Quality Act (CEQA) under District CEQA Guidelines, Section 15301, since it involves repairs to an existing public facility. Approval of this award establishes the Board of Directors' independent finding that this project is exempt from CEQA. RECOMMENDED BOARD ACTION: Staff recommends for the Board's approval to authorize award of a construction contract in the amount of $172,001 for construction of the Household Hazardous Waste Collection Facility Paint Bulking Room Modifications Project, District Project 8209 to Power Engineering Contractors, the lowest responsive and responsible bidder. LAPosition Papers \Shima \8209 - Award.doc Page 2 of 5 J 0 150 900 FEET PROJECT SITE r ���r Clin to, M Imhoff � ` \ Place � v i lc .ste 1 , o� VOID N ov�sN on O / 0 _ / Central Contra Costa HOUSEHOLD HAZARDOUS WASTE COLLECTION FACILITY Attachment Sanitary District PAINT BULKING ROOM MODIFICATIONS 10 CD District Project 8209 >a6 Project Location Page 3 of 5 ATTACHMENT 2 HOUSEHOLD HAZARDOUS WASTE COLLECTION FACILITY PAINT BULKING ROOM MODIFICATIONS PROJECT DISTRICT PROJECT NO. 8209 SUMMARY OF BIDS PROJECT NO.: 8209 DATE: June 15, 2005 PROJECT NAME: Household Hazardous Waste Collection Facility Paint Bulking Room Modifications Proiect LOCATION: Martinez, California ENGINEER EST.: $160,000 No BIDDER BID PRICE Name & address 1 Power Engineering Contractors 1501 Viking Street, Suite 200 $172,001 Alameda, CA 94501 -5017 2 D.W. Nicholson Corporation 24747 Clawiter Road $172,456 Hayward, CA 94540 -4197 3 Monterey Mechanical Company 8275 San Leandro Street $182,000 Oakland, CA 94621 -1901 4 EA Sparacino 2506 Via Verde $187,000 Walnut Creek, CA 94598 BIDS OPENED BY /s/ Elaine Boehme DATE June 15, 2005 Page 4 of 5 ATTACHMENT 3 HOUSEHOLD HAZARDOUS WASTE COLLECTION FACILITY PAINT BULKING ROOM MODIFICATIONS PROJECT DISTRICT PROJECT NO. 8209 POST - BID / PRE - CONSTRUCTION ESTIMATE Page 5 of 5 % of No. Item Description Amount Estimated Construction Cost 1 CONSTRUCTION a. Construction Contract $172,001 b. Contingency at 20% $33,999 c. Permit $5,000 TOTAL CONSTRUCTION $211,000 100% 2 CONSTRUCTION MANAGEMENT a. District Forces - Construction Management and Inspection $32,000 SUBTOTAL $32,000 15% b. Consultants - ATI Architects and Engineers $7,000 SUBTOTAL $7,000 3% TOTAL CONSTRUCTION MANAGEMENT $39,000 18% 3 TOTAL CONSTRUCTION PHASE COST $250,000 118% 4 TOTAL PREBID EXPENDITURES $55,000 26% 5 TOTAL DESIGN AND CONSTRUCTION MANAGEMENT COST $94,000 45% 6 TOTAL ESTIMATED PROJECT COST $305,000 145% 7 FUNDS AUTHORIZED TO DATE $75,000 8 ADDITIONAL ALLOCATION NEEDED TO COMPLETE PROJECT $230,000 Page 5 of 5 r cu co �J U C� LL D O U) U L 0 C/) C6 L El LO 0 0 N w 75 mm) +-r G c� 0 m cn E 0 E cu .0 cu L- 0 CL L 0 al D O U t, O H i 0■ O C ca cn O cn cu 0- cn o .0 cn ca. CD cu ° 0 U > c ° c o > cu o CD ° ° ° U .cn � Q cn �C O cn .�• "O 0- cu m o — CU -0 a� 2 U cn ° CU cu c cn > ch ch � cu _0 w L ca. C Q — ca O U -0 L = O O c c ca cu 0 .0 ca ca � cu '� 'O ca � cn ca � O N N .,..r U cn � a--• U N � N Q O ..... O m *EL _ ° Q -� _ 'U > > Q 0 c6 U N N O _ O L O N N CO 0 w U 0 N O M O N cu M O O N C C) CC--) cu CN C5, —� LO LO N � � O O O M N d' N N N E N °O E N cu N O Q > O � Q L i D Q c O cn a) _ -i-0 ID m N O C -- O c Z a) L v co cu (D O N O _O ME 4 � co U C: a a) a •° O O C6 U 0 C)- W -4--a w 0 72 cu L � O 'V c O .— -0 L a -0 a) •— L. _ L— L. a) L O :3 co >, ca O O O O O 2t 2t U• • • • • z go E z f Q of ml al OZ Ot a Ot C l W A o 10 Q'I IK I Jh I F W W z V cu a CO V1 m L ^a W 9 L.. cu c O O 2 . L O Al D O U) 0 cn U lam, i N O N C*l N o 00 000 0000 NO • o ' N N N N N N N N M O O O to M LM f` N M to M M d' r- O .. 1` co 00 co O d. }• N L. L. C.0 O O O O O I` CO V d• d- M p N CO r c L •E •c O L co L a N U Y C .. OU c t0 2 O C U � N U N - C Q U � •L � cn C O N (� - O O . 4-j 42 L L _ O U — 0 O R3 cu W (n F-- M m C) H cn U lam, cu c ■0 -#-a cu L. 0 D. L. 0 "All D O U H .w H O v m H O a L ea a E O 0 N cc a c 0 .a cu ,0- L cu cu 0 0 .E co 64 0 LO 0 AU i �r N L 6g O O p co O Lo 0 V .i�.r bg 6� O of V p 6R _ R +� as o LO o +1 +1 0 � �' M a C) N LO co qt:t N N U) o �a o 0 0 0 00 M M co 0 CO L cc C14 CN ICT cc V +I +I p LO 0 p O O O O � O N p M r- N O m N L cu o T5- L- C6 ti L 'p "D O O L a� .n C5 -� O cu E C O c E O co � 3 O CN 0 Oi .O • p C p 0 co C .c N m o v •`n > v > U cu c o c o c c ca c •L N Q Q Q U -a Q U axi Q U N cc a c 0 .a cu ,0- L cu cu 0 0 .E co 64 0 LO 0 AU i �r N L cn W E (1) -}-+ O O 0 -6-0 cu CL •— E E O cr •— U � L CL H LL O L o cu \ .� CD c _ 0 CU 0 cu cu p (1) .� . 0 O IM L C: o U qql o U L o �N 0 0 A O O Cl) �_ r U) U m m + U LO O N N U N 'o L Q O Cl) 0 ca 0 V re, NO cu a) 0 N 0 C O .N N �> C N C N o O O` d Q ca . O C CL o 0 U cu } N c m 0 � c U c c o o a Q U p � U 0 U i ;1� '':% w 1,. Sr t , • t -jr r , Itt ' liti 1. NAA �`-y� f _ l'+. �j'�y'�iXl f r�r"'•itj l i , t ,[ � �� •• �9 h \�'�lr�' -,fit ', }� `� tL +:'\` \1•,' t tq �r r 1 A ,Yl �o f y� o� �W �e Z �a o Z* o O O W 0' Q 00� t 0 0 .jmn-�-o .3 � y t l'F t .i 11, . -�-Ii t + l 1 1 J kL s r ...,'Y5, '•h . 7'i { t ijt f It (�' li` t'� . 1 kv i g. 5 c 1• � � 5 + �. ` �Zc t i� 4 ..� %i 1 i� 1 4 b t. , �•T I l + i �� f �� ��� �\ ;r of •r. :.rw"�, `,�,r, "'". V♦ C2 ^� W W L- > (n 0 0. O E 0 � C: �U cn C Ca O UL • cn cn ca cu U to >- C .a) O C: U — o '- U cu O � a) i C: O U p � O a� U) z U U � L � L cn cn cn O O -cn � a- 0 O E -f-a O O ca 0 c: a) cu O cn -� N E O O a) - E CU L. C: > cn CU cn CU O cu ca C: C: V O •— c cu CU U Cn 4- O ° z �: >� 0 �-�_z V± E -t W 0 L 0 L. E /'\ CU �. � C: (D.0— CD cu .0 cl) c O Chi CL _0 a E 0 _0 �- O S. C6 X O ' Fn OU CU E a) z E _>% ca .O 0 cu cu L O 0 CL � V) =3 o L O O y-- 'i U cam. ( a) ca. Q Q 0-0 cr 0 O � = a) Y / W v � w v U Q L 0 m L• Al w L O U lu Source Control Update Board Meeting July 7, 2005 Regulatory Compliance _. Customer Service Initiatives Overview of Process • Audited Source Control files • Selected three industries for site visit • Accompanied Source Control Inspectors on site visit � - (D(. Q-) Pretreatment Compliance Inspection (PCI) ■ March 16 -17, 2005 Inspection by USEPA, SWRCB, and CRWQCB ■ 2005 PCI Report - Dated April 28, 2005 ■ Response within 45 days in writing - Delivered June 10, 2005 Overview of Findings • District Program is rigorous and well run • District Inspectors are knowledgeable and professional • District has very little flexibility in interpretation of the regulations • From a technical standpoint, the District Program is exemplary 1 PCT FINDINGS Legal Authority not Properly Documented Requirements for complying with Total Toxic Organic Limit Use of Toxic Organic Management Plan in lieu of monitoring Authority to analyze only pollutants expected to be present Must Sample and Analyze Properly Only analytical methods form 40 CFR Part 136 may be used Proper sampling methods must be used (grab vs. composite) Must Identify Non - Compliance Violation for Total Toxic Organics missed Non - compliance notice from industry not received in 24 hrs Re- sampling not conducted within 30 days Must Implement Enforcement Must consistently take enforcement action when non - compliance identified Audit Team Recommendation to EPA Region 9 • Nominate CCCSD for National Pretreatment Award • Large Pretreatment Program (> 21 Significant Industrial Users) • Representing all of Region 9 (CA,NV,HW,AR) RESPONSE TO PCI FINDINGS Legal Authority will be updated at same time as new local limits are incorporated in District Code. Letter will be sent to all permitted industrial users reviewing proper sampling techniques and analytical methods. New permits and permit renewals will include information on proper sampling techniques and analytical methods. A checklist has been developed and will be used to review each permit and self- monitoring report to ensure that instances of non- compliance are not overlooked. No discretion Is allowed. All instances of non - compliance will be reviewed to ensure that proper enforcement action is taken. Customer Service Initiatives Develop an Inspection approach that Integrates proactive customer service with effective pretreatment and stormwater Inspection Solicit input from the Develop a best business community practices model 2 Plan of Action • Ride Alongs • Industrial User Focus Group • Industrial User Survey • Customer Service Training • Development of Best Practices Model Industrial User Focus Group • Want help in complying with regulations • Want to be approached as partner, not adversary • Want consistent approach among SC Inspectors • Want to know when their sampling is in compliance Industrial User Focus Group ■ 12 permitted industries participated ■ Found it helpful to hear CCCSD also has to "comply" with EPA and other regulations ■ Process, more than the SC Inspectors, seemed to be the issue ■ Told us CCCSD permits are more complex than others Key Recommendations • Revise current website information • Put applicable permit forms on -line • Investigate pre - consultation visit for newly permitted businesses • Develop a "Cliffs Notes" on regulations ■ Mail /e -mail bi- annual newsletter targeting permitted industries . Use e-mail rather than phone to schedule appointments and provide information 3 Key Recommendations (cont.) ■ Develop an Industrial Users' Workshop to provide businesses with help on • Understanding the permitting process • Sampling protocols and strategies • Analytical techniques • EPA requirements • Enforcement procedures Customer Service Training • Each SC Inspector to be assessed on his current level of customer service skills • Specific customer service training to be conducted in -house • Best practices model to be jointly developed to ensure inspection and enforcement consistency rd Central Contra Costa Sanitary District ' BOARD OF DIRECTORS POSITION PAPER Board Meeting Date: July 7, 2005 No.: 9.a. BUDGET AND FINANCE Type of Action: Subject: AUTHORIZE ASSIGNMENT AND AMENDMENT OF DEFERRED COMPENSATION PLAN ADMINISTRATION AGREEMENT Submitted By: Initiating Dept /Div.: REVIEWED AND RECOMMENDED FOR BOARD ACTION: �V/ D. Rat . MA raves A n ISSUE: Board authorization is needed to assign and amend the District's Deferred Compensation Plan Administration Agreement from National Deferred Compensation, Inc., to Nationwide Retirement Solutions, Inc. RECOMMENDATION: The Deferred Compensation Plan Advisory Committee recommends that the Board authorize the assignment and amendment of the District's Deferred Compensation Plan Administration Agreement from National Deferred Compensation, Inc., to Nationwide Retirement Solutions, Inc. FINANCIAL IMPACTS: None ALTERNATIVES /CONSIDERATIONS: The Board could choose not to amend the existing agreement. BACKGROUND: In November 1999, the District's Board authorized the assignment and amendment of the Deferred Compensation Plan Administration Agreement from Washington Mutual Bank, FA, to National Deferred Compensation, Inc. Since that time, National Deferred Compensation, Inc., has provided administrative, recordkeeping, report, enrollment, sales and brokerage functions for the District's 457 Deferred Compensation Plan, and the 457 FICA - Substitute Plan for Part-time, Seasonal, and Temporary Employees (PST). National Deferred Compensation, Inc., was acquired by Nationwide Retirement Solutions, Inc., in 1998. National Deferred Compensation, Inc., now desires to assign and transfer to Nationwide Retirement Solutions, Inc., its rights and interest in the District's Administration Agreement. Nationwide Retirement Solutions, Inc., will now provide all administrative reporting, recordkeeping, enrollment, sales and brokerage functions for the District's 457 Deferred Compensation Plan and FICA - Substitute Plan. Page 1 of 7 SAADMIMPOSPAPERTeffered Comp 06- 2005.doc POSITION PAPER Board Meeting Date: July 7, 2005 subject: AUTHORIZE ASSIGNMENT AND AMENDMENT OF DEFERRED COMPENSATION PLAN ADMINISTRATION AGREEMENT This amendment has been reviewed by both the Deferred Compensation Advisory Committee and the District's benefit counsel, Lee Trucker. RECOMMENDED BOARD ACTION: Authorize the assignment and amendment of the District's Deferred Compensation Plan Administration Agreement from National Deferred Compensation, Inc., to Nationwide Retirement Solutions, Inc. Page 2 of 7 S:WDMIN \POSPAPER \Deffered Comp 06- 2005.doc LjNationwide Retirement Solutions a Nationwide Financial company 20`h April, 2005 Deborah L Ratcliff Cent Ctra Costa Sani 457 Plan &Trust Dear Deborah L Ratcliff ; We had previously announced the re- branding of our affiliate company, National Deferred Compensation, Inc., that occurred on June 30, 2004. The re- branding served to integrate National Deferred Compensation, Inc. (NDC) with Nationwide Retirement Solutions, Inc. (Nationwide), and it's operational, education and marketing services to ensure quality service to our customers. The re- branding phase included the delegation of all duties and responsibilities from NDC to Nationwide. In June 2004, Nationwide began providing all services previously provided by National Deferred Compensation, Inc. Nationwide is now the sole entity responsible for providing all services under the NDC Administrative Agreements. Since Nationwide is responsible for all performance to you and your participants, Nationwide is requesting that your Deferred Compensation Plan Administrative Agreements for your 457 Deferred Compensation Plan and your FICA - Substitute Plan for Part -Time, Seasonal, and Temporary Employees (PST) be assigned to it. This will avoid unnecessary inconvenience for our customers. Nothing in the enclosed Assignment Agreement modifies the current investment options under either Plan. The Assignment Agreement does include a modification regarding consolidated participant statements, which will be provided annually rather than quarterly for the PST Plan. There are no modifications to the 457 Deferred Compensation Plan. All other terms and conditions will continue to apply without modification. Please sign the enclosed Assignment Agreement and return it in the postage paid envelope provided. Please retain a signed copy for your records. We value your business and appreciate the loyalty and confidence you have placed in us over the years. We are committed to providing exceptional service and unparalleled education to you. We have changed our name, but not our voice. Nationwide is On Your Side! Sincerely, Lance W. Kesterson Vice President of Operations Nationwide Retirement Solutions Enclosures: One (1) Assignment Agreement, One (1) Postage Paid Envelope Securities offered by Nationwide Investment Services Corporation, Member NASD In Michigan only: Nationwide Investment Svcs. Corporation Page 3 Of % 5900 Parkwood Place, Columbus, Oh 43016 g ASSIGNMENT AND AMENDMENT OF DEFERRED COMPENSATION PLAN AND FICA - SUBSTITUTE PART -TIME, SEASONAL, AND TEMPORARY EMPLOYEE ADMINISTRATION AGREEMENT This Assignment of the Deferred Compensation Plan Administration Agreement and FICA - Substitute Part-Time, Seasonal, and Temporary Employee Administration Agreement (the "Assignment Agreement ") is entered into this 7th day of Jill , 2005, by and among National Deferred Compensation, Inc ( "Assignor ") and Nationwide Retirement Solutions, Inc. (the "Assignee ") and the Central Contra Costa Sanitary District ( "Agency ") BACKGROUND A. The Assignor is the successor party to Washington Mutual, FA ( "WaMu ") to a certain Deferred Compensation Plan Administration Agreement dated November 4 , 199 9, by and between Agency and WaMu. B. By assignment from WaMu, the Assignor assumed contractual rights and obligations to provide certain administrative, recordkeeping, reporting, enrollment, sales and brokerage functions for the Agency's Section 457 Deferred Compensation Plan pursuant to the terms of the Deferred Compensation Plan Administration Agreement. The administrative, reporting, and recordkeeping functions were sub - contracted by WaMu to Assignor pursuant to the Administrative Service Contract dated July 1, 1993 while the enrollment, sales, and brokerage functions were sub - contracted to Assignor per the First Amendment to Administrative Service Contract dated February 24, 1997 (collectively the "Joint Sub - Servicing Agreement"). All right, title, and interest in the Deferred Compensation Plan Administration Agreement, other than Assignor's depository functions associated with federally insured deposit products established prior to the date of the assignment from WaMu to Assignor, were assigned to Assignor. C. By assignment from WaMu, the Assignor assumed contractual rights and obligations to provide certain administrative, recordkeeping, reporting, enrollment, sales and brokerage functions for the Agency's Section 457 FICA - Substitute Plan for Part-time, Seasonal, and Temporary Employees (PST) pursuant to the terms of the Plan Administration Agreement. The administrative, reporting, and recordkeeping functions were sub - contracted by WaMu to Assignor pursuant to the Administrative Service Contract dated July 1, 1993 while the enrollment, sales, and brokerage functions were sub - contracted to Assignor per the First Amendment to the Administrative Service Contract dated February 24, 1997 (collectively the "Joint Sub - Servicing Agreement "). All right, title, and interest in the PST Plan Administration Agreement established prior to the date of the assignment, other than Assignor's depository functions associated with federally insured deposit products established 030705 PST ahc Page 1 of Page 4 of 7 prior to the date of the assignment from WaMu to Assignor, were assigned by Assignor. D. The Assignor was acquired by a wholly -owned subsidiary of Nationwide Financial Services, Inc. (NFS) in 1998. The Assignor now desires to assign and transfer to Assignee all of Assignor's right, title, and interest in and to the Deferred Compensation Plan Administration Agreement, other than WaMu's despository functions associated with federally insured deposit products established prior to the date of the assignment from WaMu to Assignor, and Assignee, an indirect subsidiary of NFS, desires to accept such assignment. STATEMENT OF AGREEMENT NOW, THEREFORE, in consideration of the foregoing and of the terms and conditions hereinafter set forth and for other good and valuable consideration, the sufficiency and receipt of which are hereby acknowledged, the parties, intending to be legally bound, do hereby agree as follows: 1. Assignment Assignor does hereby grant, assign, transfer, convey and deliver to Assignee, all of Assignor's right, title and interest in and to the Deferred Compensation Plan Administration Agreement and PST Administration Agreement accruing on or after the date of this Assignment Agreement, other than those depository functions described in Section 4.A. and 4.B. of such Deferred Compensation Plan Administration Agreement and PST Administration Agreement entitled "Investment Options ", which will continue to be performed by WaMu on or after the date of this Assignment. 2. Acceptance of Assignment Assignee does hereby accept the assignment set forth in Section 1 herein and expressly assumes and agrees to keep, perform and fulfill the terms, covenants, conditions and obligations required to be provided by Assignor under the Deferred Compensation Plan Administration Agreement and PST Administration Agreement. 3. Indemnification Assignee, its successors and assigns, hereby covenant and agree that they shall defend, indemnify and hold harmless Assignor from and against any and all claims, liabilities, damages, losses, suits, costs and expenses of every kind, nature and type asserted by any person, entity or party attributable to events arising out of or under the Deferred Compensation Plan Administration Agreement and the PST Administration Agreement on or after the date of this Assignment. All indemnity rights existing under the Joint Sub - Servicing Agreement between WaMu and Assignor are not superseded by this Assignment Agreement and shall remain in full force and effect. 030705 PST ahc Page 2 of 4 Page 5 of 7 4. Consent to Assignment The Agency hereby consents to the assignment set forth in this Assignment Agreement and hereby acknowledges that all rights, obligations or liabilities under the Deferred Compensation Plan Administration Agreement and the PST Administration Agreement accruing on or after the effective date of this assignment will be the responsibility of Assignee and Assignor is expressly released from such obligations and liabilities assigned hereunder. 5. Consolidated Participant Statements for PST Administration Agreement The Agency hereby consents to the following modification of the PST Administration Agreement: o.F. Nationwide will provide participants consolidated annual statements detailing participant's annual deferral amounts, account balance information that includes changes in account value since the previous report date and any fees or charges assessed against the Participant account. Participants shall be informed that they must notify Nationwide within thirty (30) days of receipt of their statements or confirmation of their investments, to report any errors to Nationwide. Nationwide will not be liable for any errors not reported within this time frame. All other terms and conditions of the PST Administration Agreement remain unmodified. 5. Miscellaneous The Assignment Agreement sets forth the entire understanding of the parties hereto with respect to the assignment of the Deferred Compensation Plan Administration Agreement and the PST Administration Agreement and shall supersede all prior contracts, agreements, arrangements, communications, discussions, representations and warranties, whether oral or written, among the parties related to said assignment. The parties hereto expressly agree that the Joint Sub - Servicing Agreement between WaMu and Assignor is in full force and effect; provided, however, any rights, liabilities and obligations thereunder relating to Agency that accrue on or after the date hereof are terminated. This Assignment Agreement shall be binding upon and inure to the benefit of successors and assigns of each of the parties hereto. The rights, obligations or liabilities under this Assignment Agreement shall not be assignable by any party without the prior written consent of each of the parties hereto. This Assignment Agreement may be executed in any number of counterparts, each of which shall be deemed to be an original and legally binding for contractual purposes. The failure on the part of the parties hereto to enforce any provision of this Assignment Agreement shall not be construed to be a waiver of such provision or of the right thereafter to enforce same, and no waiver of any breach shall be construed as an agreement to waive any subsequent breach of the same or any other provision. 030705 PST ahc Page 3 of 4 Page 6 of 7 In all other respects, the Deferred Compensation Plan Administration Agreement and PST Administration Agreement, with the exception of Section 6.F thereunder, shall remain the same. IN WITNESS WHEREOF, the parties to the Assignment Agreement have executed this instrument to be effective on the date set forth above. National Deferre Compensation, Inc. By: Lance . Kesterson Its: Vice President, General Manager Nationwide Retirement Solutions, Inc. By: obert A. Bilo Its: Regional Vice President Agency - Central Contra Costa Sanitary District By: Its: President of the Board, Barbara D. Hockett 030705 PST ahc Page 4 of 4 Page 7 of 7