HomeMy WebLinkAbout10/17/2002 AGENDA BACKUPYEAR 2001 PLANT OPERATIONS
• Total Processed Flow —15.8 billion gallons
Total Ash Produced — 5,256 tons
• Laboratory Compliance Analyses — 39,600
• Permit violations — 0 (100% Compliance)
AMSA AWARDS CRITERIA
• Silver - 1 to 5 Violations Per Year
• Gold - 0 Violations Per Year
• Platinum - 0 Violations for 5 Years
1
Year 2001 AMSA Statistics
• AMSA Agencies - 324
• 2001 AMSA Silver Awards - 122
• 2001 AMSA Gold Awards - 181
• 2001 AMSA Platinum Awards - 14
2
PAST
PERFORMANCE
YEAR
AWARD
1992
Silver
1993
Silver
1994
Silver
1995
Gold
1996
Silver
1997
None
1998
Gold
1999
Gold
2000
Gold
2001
Gold
PERMIT COMPLIANCE
"CHALLENGES"
• Construction Impacts
• Mechanical Breakdown of Critical Equipment
• Communication of Activities
• Uncontrollable Constituents
• New Permit Concerns — More Difficult Permit
Requirements
3
ACKNOWLEDGEMENTS
• Board Support
• Staff Efforts
PRESENTATION OF AWARD
• LABORATORY
• OPERATIONS
• MAINTENANCE
• MARY LOU ESPARZA-
VIGNALATS
• BRUCE DOBEY
• DEAN McNEELY
4
Central Contra Costa Sanitary District
' BOARD OF DIRECTORS
POSITION PAPER
Board Meeting Date: October 17, 2002 No.: 5.a. BIDS AND AWARDS
Type of Action: AUTHORIZE AWARD
sub /ect: AUTHORIZE AWARD OF A SERVICE CONTRACT TO ROTO- ROOTER FOR
PROVIDING TV INSPECTION OF SANITARY SEWERS
Submitted By: Initiating Dept. /Div.:
Tom Godsey, Associate Engineer Engineering /Capital Projects
REVIEWED AND RECOMMENDED FOR BOARD ACTION.
ire) /
T. Godsey ecki W. Brennan A. arrell C
General Man)(ger
ISSUE: On October 4, 2002, sealed bids were received and publicly opened for providing
television (TV) inspection of sanitary sewers for a three -year period for capital
improvement projects. The Board must authorize award of the contract or reject bids
within 50 days of the bid opening.
RECOMMENDATION: Authorize award of a service contract to Roto- Rooter, the lowest
responsible bidder, for providing TV inspection of sanitary sewers for a three -year period.
FINANCIAL IMPACTS: The cost will be $ 153,840 on several sewer renovation projects
during design. Staff has reviewed the Capital Improvement Program and has concluded
that there are adequate funds available.
ALTERNATIVES /CONSIDERATIONS: Reject all bids and re -bid the project.
BACKGROUND: The Engineering Department needs to assess the condition of
approximately 60,000 feet of sanitary sewers each year as part of the planning and design
of collection system capital projects. Sanitary sewers are TV inspected with the service
contractor for immediate capital project investigations such as utility coordination, risk
management investigations, and corrosion studies. The purpose of TV inspecting the
sanitary sewers is to determine their condition. The results are used to coordinate design
and to minimize change orders during construction.
Staff has found that bidding the TV inspection work as a service contract results in a
lower overall cost and a significant reduction in paper work associated with negotiating
and issuing separate contracts. The purpose of the bid request is to establish unit cost
(instead of a total lump -sum bid amount) for each portion of the work for certain potential
projects, while obtaining the lowest overall cost for the District.
10/9/02
I: \Construction \Position Papers \2002 \TV Blanket.wpd Page 1 of 3
POSITION PAPER
Board Meeting Date: October 17, 2002
Subject: AUTHORIZE AWARD OF A SERVICE CONTRACT TO ROTO- ROOTER FOR
PROVIDING TV INSPECTION OF SANITARY SEWERS
A bid request was advertised on September 20 and September 25, 2002. Six bids were
received and publicly opened on October 4, 2002. These bids are listed in Attachment 1,
Tabulation of Bids. The Engineering staff conducted a technical and commercial
evaluation of the bids and concluded that Roto- Rooter is the lowest responsible bidder.
The initial contract amount will be $153,840 over a three -year period. Future revisions
may be made if additional work is identified. The engineer's estimate for the proposed
contract work over a three -year period was $245,000.
Staff has concluded that this contract is exempt from the California Environmental Quality
Act (CEQA) under District CEQA Guidelines Section 15262 since it will provide
information for design of sewer improvements and will not have a legally binding effect
on later activities. Approval of this award of contract will establish the Board of Directors'
independent finding that the contract is exempt from CEQA.
RECOMMENDED BOARD ACTION: Authorize award of a service contract to Roto- Rooter,
the lowest responsible bidder, for providing TV inspection of sanitary sewers for a three -
year period.
10/10/02
Page 2 of 3
Attachment 1
Central Contra Costa Sanitary District
SUMMARY OF BIDS
PROJECT NO. 025194ENG Television Insl2ection of Sanitary Sewers
DATE Oct. 4. 2002
LOCATION Entire Service Area ENGR. EST. $ 245.000
BIDDER (Name, Telephone & Address)
BID PRICE
1
Roto Rooter Sewer Service
$153,840
2
Subtronics Corporation
$194,000
3
National Plant Services
$ 229, 100
4
JCC, Inc. Video Pipeline Inspection
$261,000
5
Gelco Services, Inc.
$324,400
6
Cal Sierra Construction, Inc.
$338,005
7
Page 3 of 3
BIDS OPENED BY Joyce E. Murlhy DATE 10/4/02 SHEET NO 1 OF 1
r)
(D
n
0
-1l
.� O
V)
[D
::E
(D
r -�A cn
O w R•
w
.
0o 03
c- —.
mommm a C) CL
o�
Ul
CU
c:)
o �
3
Owl
70 0
o 3
feet
o Ln
Imm"
Ln
o w
0 "%
rwml� c
CD -A,
C)
0
vo
_ ,
C.
0
0
0
(0)
0
c-
CD
OMI
C)
C)
D
(D
(9n
N
"a
rot
m
3
Meet
rn
N
O
Q
N
tTi
L
m tw
roor
o
n �
o reel'
= o
Meet -o
cou-
.o
Ul
N
(D
MMI
E
ui
CD
n'
10—
CD
(D
(D
n
0
fD
rt
m
m
3
CD
fD
t--�
(J')
n
o�
n
fD
V)
CD
0
LAW
C) n U, (D
�. 0) < u
CD
tn' --t
w
O —• (v
=r Cl) Q.
r-or CL (D O n (� 1-1
-� 0 0 (D CD CD
Cu
En -I to ro. O
CD CU CD �•
O 3
�7
rim m
a�i CD ^ ;
_. n �-
. 3 r1',O
cu
fl�
:3 p
n (D -�
r C)
O (n
=3 %--oO
W
ui
n
0
rn
0
oh
0
O
CD��'
'C7
C
CD
"0
CD
m
0--100
fl)
3
t�
En
9
�.
�.
CD
�•
3
c
O
0
C0Un
-0
CQ
-n
CAD
tN
�-
0
O
u
Q-
�
0
�
(D
(D
cu
n
V)
in
iv
n
(D 0
0
m
---14
[D
rt
O.
O
O
ui
n
0
rn
0
oh
0
CD��'
'C7
C
CD
"0
m
Co
fl)
3
t�
En
CD
-0
CQ
-n
CAD
tN
0
�
n
CD
ui
n
0
rn
0
oh
0
0
V)
C)
l )
M
'6q-
4i'
Ln
e-r
0)
MMI
CU
(D
n
°o
0
0
oo
CD
°o
s
O
°
_0
c-°
v�
�
ov
c°
D
{�
o
�
�
0
D
�
CU
0
0
V)
C)
l )
zz
0)
00
0)
MMI
CU
oo- s
>
e-r
0
<
CD
s
CD
v�
O
i
v
O
D CD
O �
=3 N
o
0
CIV
C� n
CD o
L1I
=�
CD
CD
CD
N
N
n
Om
X
CD
0
y
CD
W
0
to
L
2001 -2002 Annual Report
• Purpose
• Audience
• Theme
• Content
• Schedule
Purpose of Annual Report
• To provide an overview of CCCSD
accomplishments during past year
• To provide financial highlights
• To provide a historical perspective
• To communicate who CCCSD is and what
we do
3
Audience
• Wastewater and water agencies within
California
• Local elected officials in our service area
• Related friends, partners, agencies and
associations
• Employees
• Media
Theme
• Building on our Strengths
• Highlighting the four goal areas
- Full regulatory compliance
— Excellent customer service
— Responsible rates
— High performance organization
1
Content
• About the Board of Directors
• Letter /message from the General Manager
• Overview of the District
• Highlights of major activities organized by
the four Goal Areas
• Financial/Budget information
Content
• Full Regulatory Compliance
— New NPDES permit
— New Environmental Laboratory
— Pollution Prevention efforts
— Pre - treatment program
• Excellent Customer Service
— Public outreach on construction projects
— Serving the public at the HHWCF
— Serving customers at the Permit Counter
— Web site
Content
• Responsible Rates
— Finance/Budget information
— Capital Improvement Program
— Cost - cutting efforts, cost - effective solutions
• High Performance Organization
— Safety program
— Strategic planning and continuous improvement
— Training
— How we measure ourselves
Schedule
• Discuss in more detail with the Board
Outreach Committee on October 241'
• Bring to full Board November 2181
• Mail out to audience in early December
K
UPDATE:
PROPOSED LAND USE
OF I.T. BAKER SITE
CURTIS SWANSON
October 17, 2002
CCCSD PIPELINE ISSUES
. IMPACTS ON MAJOR CCCSD PIPELINES
• CONSTRUCTION DAMAGE
• SETTLEMENT
• DIFFERENTIAL SETTLEMENT
• HORIZONTAL DISPLACEMENT
ACCESS ISSUES
. ACCESS TO I.T. BAKER SITE
• CURRENTLY VIA A GRAVEL ROAD ON
20 - 34 FOOT WIDE EASEMENTS
• VEHICLE TRAFFIC WILL INCREASE:
CONCO -130 TRUCKS / DAY
U.S. DEVELOPMENT - 50 TO 80 TRUCKS /DAY
CONCO CEMENT PROPOSAL
• AWARE OF CCCSD PIPELINES
• BUILDINGS WILL BE 80 FEET AWAY FROM
M -2 FORCE MAINS
• NO INCREASE IN LOADING ON PIPELINES
• PROHIBIT STORAGE AND PARKING OVER
PIPELINES
• ENGINEERED VEHICLE CROSSINGS
WHAT CONCO CEMENT
NEEDS FROM CCCSD
• APPROVAL OF BUILDING AND PIPE
CROSSING DESIGNS
• WATER LINE EASEMENT ACROSS LAGISS
PROPERTY
• IMPROVEMENTS TO ACCESS ROAD ACROSS
CCCSD PROPERTY
• RELOCATE CCCSD ACCESS EASEMENTS ON
THEIR PROPERTY
• SEWER SERVICE
• RECYCLED WATER
U.S. DEVELOPMENT PROPOSAL
• AWARE OF CCCSD PIPELINES
• AWARE OF SET -BACK REQUIREMENTS
• RAIL CROSSINGS OF OUTFALL
. SOIL CEMENT "PIERS" WITH CONCRETE
SLAB
• ETHANOL STORAGE PLAN IS OUT FOR NOW
2
WHAT U.S. DEVELOPMENT
NEEDS FROM CCCSD
• IMPROVEMENTS TO ACCESS ROAD
ACROSS CCCSD PROPERTY
• APPROVAL OF CROSSING DESIGN AND
STORAGE LOCATIONS
. RECYCLED WATER?
Central Contra Costa Sanitary District
' BOARD OF DIRECTORS
POSITION PAPER
Board Meeting Date: OCTOBER 17, 2002 No.: 7.a. TREATMENT PLANT
Type of Action: ADOPT A RESOLUTION, AUTHORIZE SOLE - SOURCE CONTRACT
Subject: ADOPT A RESOLUTION; AUTHORIZE THE GENERAL MANAGER TO
EXECUTE A SOLE - SOURCE CONTRACT FOR THE STEAM TURBINE
SYSTEM UPGRADES PROJECT, DISTRICT PROJECT NO. 6158, WITH
DRESSER -RAND FOR AN AMOUNT NOT TO EXCEED $200,000
Submitted By: Initiating Dept. /Div.:
Craig Mizutani, Associate Engineer Operations /Plant Operations
REVIEWED ND RECOMMENDED FOR BOARD ACTION:
6 A
C. t ni J. K ly R. Musgr es K. m •Charles Batts,
General Manager
ISSUE: Board of Directors' approval is required for this sole- source contract with Dresser -
Rand.
RECOMMENDATION: Adopt a resolution to authorize the General Manager to execute a
sole- source contract with Dresser -Rand for the installation of Terry Turbine replacement
parts for an amount not to exceed $200,000. Dresser -Rand is the authorized
manufacturer's representative of Terry Turbine products.
FINANCIAL IMPACTS: The sole- source contract for installation of the replacement parts
would be approximately $200,000. The parts were prepurchased from Dresser -Rand in
July of this year at a cost of about $1,000,000. The engineer's estimate for the
installation of the remaining project elements is $1,000,000. The overall project cost is
budgeted at $2,400,000.
ALTERNATIVES /CONSIDERATIONS: The installation of the Terry Turbine replacement
parts could potentially be performed by others; however, this would jeopardize the
warranty of the replacement parts. The manufacturer's authorized representative has the
required unique equipment knowledge and expertise to install the proprietary parts and
provide the District with a reliable, warranted system.
BACKGROUND: The two Terry steam turbines, which drive the aeration blowers, are the
heart of the aeration system and a key component in the secondary treatment process.
The turbines have been in continuous service, 24 hours a day, for over 25 years and have
provided outstanding service. However, due to their age and high number of run hours,
they are in need of refurbishment. Recent inspections have revealed significant wear and
10/10/02
Page 1 of 5
POSITION PAPER
Board Meeting Date: October 17, 2002
Subject: ADOPT A RESOLUTION; AUTHORIZE THE GENERAL MANAGER TO
EXECUTE A SOLE- SOURCE CONTRACT FOR THE STEAM TURBINE
SYSTEM UPGRADES PROJECT, DISTRICT PROJECT NO. 6158, WITH
DRESSER -RAND FOR AN AMOUNT NOT TO EXCEED $200,000
cracking on key turbine components. By refurbishing the turbines, they will continue to
provide reliable service in the years to come.
The Steam Turbine System Upgrades Project, DP 6158, provides upgrades, repairs, and
improvements to the existing steam turbine system. The core of the project is the internal
and external turbine upgrades. Additional work includes the installation of the lube oil
system, work platform, new control cabinet, and ancillary piping relocation.
The Board authorized the sole- source prepurchase of repair and upgrade parts for the two
steam turbines at the Board meeting on June 6, 2002. The parts were prepurchased due
to the long lead time required for manufacture and assembly. The District executed a
purchase order for approximately $1,000,000 with Dresser -Rand for the recommended
equipment at the end of July. The purchase order included (for each turbine) new nozzle
rings, reversing rings, diaphragms, updated controls with a new digital governor package,
and a lube oil skid. The equipment is on schedule for delivery by the end of January 2003.
The installation of these parts, in addition to other improvements, is incorporated in the
Steam Turbine System Upgrades Project, DP 6158.
On a typical District construction project, the general contractor is responsible for all work
associated with the project. Staff does not recommend this course of action for this
project because the unique nature of the turbine retrofit requires a different approach.
Staff recommends that the construction project be divided into two separate work efforts.
One contract is for work associated with the turbine upgrade only and is valued at
$200,000. The second, larger contract is for all other work, which will be competitively
bid and is valued at $1,000,000. Staff has evaluated the options for installing the turbine -
specific equipment and recommends executing a sole- source contract with Dresser -Rand
for an amount not to exceed $200,000.
Dresser -Rand is the only local authorized factory representative for Terry Turbine and
performed well on the two turbine repairs last winter. Dresser -Rand provides the unique
knowledge and expertise to install this proprietary equipment and will guarantee the
overall performance of the turbine system. Both parts and labor will be warranted by a
single- source (Dresser- Rand).
10/10/02
Page 2 of 5
POSITION PAPER
Board Meeting Date: October 17, 2002
Subject: ADOPT A RESOLUTION; AUTHORIZE THE GENERAL MANAGER TO
EXECUTE A SOLE - SOURCE CONTRACT FOR THE STEAM TURBINE
SYSTEM UPGRADES PROJECT, DISTRICT PROJECT NO. 6158, WITH
DRESSER -RAND FOR AN AMOUNT NOT TO EXCEED $200,000
The Steam Turbine System Upgrade Project, DP 6158, is identified as the Aeration
System Improvements Project in the 2001 -2002 Capital Improvement Budget, pages
TP -57 through TP -59.
Staff has concluded that this project is exempt from the California Environmental Quality
Act (CEQA) under District CEQA Guidelines Section 15302 since it involves replacement
of an existing facility on the same site (the treatment plant) and with substantially the
same purpose and level of activity as the facility being replaced. Approval of this project
will establish the Board of Directors' independent finding that this project is exempt from
CEQA.
RECOMMENDED BOARD ACTION: Adopt a resolution finding that, pursuant to the Public
Contracts Code and District Purchasing Standard S -013, entering into a contract with
Dresser -Rand is required to provide the District with reliable steam turbines. The
resolution also includes a finding that the public interest is best served by utilizing the
unique technology that Dresser -Rand, the authorized factory representative of the
District's two existing Terry Turbines, has developed to upgrade these specific machines.
Authorize the General Manager to execute a sole- source contract with Dresser -Rand in
an amount not to exceed $200,000. Make a finding that under the circumstances
Dresser -Rand is the only authorized factory representative available for installing the Terry
Turbine replacement equipment, and that it is in the best interest of the District to
proceed with a sole- source contract with Dresser -Rand.
10/10/02
Page 3 of 5
RESOLUTION NO.
A RESOLUTION APPROVING A SOLE - SOURCE CONTRACT FOR
THE INSTALLATION OF TURBINE REPLACEMENT PARTS TO
DRESSER -RAND COMPANY
WHEREAS, the Central Contra Costa Sanitary District's (District) Purchasing
Standard, S -013, Bids, provides that in those cases involving a unique or novel product
application required to be used in the public interest, a governmental entity may specify
such unique or novel product as an appropriate sole source; and
WHEREAS, the District has two Terry Turbines, both of which are in need of major
refurbishment and upgrade;
WHEREAS, the proprietary technology incorporated in Terry Turbine's current
technology will be furnished and incorporated in the District's two Terry Turbines and can
be upgraded by Dresser -Rand Company to extend the life of the turbines and to increase
reliability and maintainability;
WHEREAS, Section 3400(b) of the California Public Contract Code provides that
a particular material, product, name brand, item, or service may be purchased without the
necessity of competitive bidding when the governmental body of the public entity makes
a finding by resolution that the designated material, product, thing, or service being
purchased to match existing and utilize proprietary technology, and is only available
through a single or sole source, may be made; and
WHEREAS, in order to best protect the replacement parts warranty, it is prudent
to have the parts installed by Dresser -Rand, the authorized factory representative for Terry
Turbine in Northern California; and
WHEREAS, staff analysis concludes that the District can significantly benefit from
entering into an agreement with Dresser -Rand Company to install replacement parts,
upgrade, modify, and repair the District's two steam turbines with current state -of- the -art
technology, which is proprietary; and
WHEREAS, staff analysis further concludes that the public interest in achieving the
most cost - effective, practical upgrade and repair alternative is by using this application
in the District's treatment plant, which requires using the unique and proprietary
technology offered by Dresser -Rand Company, as a sole supplier.
NOW, THEREFORE BE IT RESOLVED:
1. THAT, the Board of Directors of Central Contra Costa Sanitary District finds
that the proprietary technology offered by Dresser -Rand Company, shall be
S:\ Correspondence \POSPAPR \2002 \Resolution- Turbine Installation. wpd Page 4 of 5
Resolution No.
Page 2 of 2
utilized in the District's treatment plant to repair the District's two Terry
Turbines; and that a sole source contract with Dresser -Rand be entered into
for installation of said replacement parts by the authorized factory
representative in this area.
2. THAT, the General Manager be authorized to execute a series of
agreements with Dresser -Rand Company, as an appropriate sole- source
provider, to install replacement parts for the Terry Turbines.
3. PASSED AND ADOPTED this 17th day of October 2002, by the Board of
Directors of the Central Contra Costa Sanitary District by the following vote:
AYES: Members:
NOES: Members:
ABSENT: Members:
President of the District Board of the
Central Contra Costa Sanitary District,
County of Contra Costa, State of California
COUNTERSIGNED:
Secretary of the Central Contra Costa
Sanitary District, County of Contra Costa,
State of California
Approved as to form:
Kenton L. Alm
District Counsel
S:\ Correspondence \POSPAPR \2002 \Resolution- Turbine Installation. wpd Page 5 of 5
Steam Turbid ole- Source
Parts Installation Presentation
CRAIG MIZUTANI
BOARD OF DIRECTORS MEE
OCTOBER 17, 2002
2,500 Horsepower
Steam - Driven Turbines
Turbines use waste furnace/
cogeneration heat to produce aeratii
air.
Continuous operation since 1975.
Reliable service until last winter.
1
Turbine Repairs
Turbines failed Winter 2002
Dresser -Rand (D -R), Benicia,
responded quickly to restore turbine.
a Have stood behind work
Inspection revealed worn parts
Upgrade /replacement parts required`'
replace worn turbine parts
Turbine Project/Parts
Prepurchase
Project
*Turbine Refurbishment
* Piping /Structural Modifications
# Control System Upgrade
Board authorized sole- source prepurch
of turbine parts from D -R on June 6,
Possibility of sole- sourcing installat
by D -R also discussed
2
Sole- Source Installation
Justification
Turbines are large, fast, and complex.
Unique supplier of good product.
D -R, Benicia, is factory repair /service fay
for Terry turbines.
Staff recommends D -R install parts, and
contractor do other work.
Other agencies have contracted directly
• LA County Sanitation
• Local Refineries
Sole - Source Installation
More District control of turbine work.
Reduces risk to contractor and D -R.
Warranty of proprietary replacement
parts.
Negotiated price, scope, and
conditions.
3
Costs
Sole- source contract (D -R) not to
exceed $200,000
Other turbine - related work (contrc,
$1,000,000
Central Contra Costa Sanitary District
' BOARD OF DIRECTORS
POSITION PAPER
Board Meeting Date: October 17, 2002 N" 8.a. HUMAN RESOURCES
Type of Action: HUMAN RESOURCES
Subject: ADOPT RESOLUTION APPOINTING DIANE WAGNER TO THE POSITION OF
PURCHASING AND MATERIALS MANAGER, M -35 ($6677 - $8115), EFFECTIVE
OCTOBER 28, 2002
Submitted By:
R. Musgraves
Initiating Dept. /Div.:
Administration
REVIEWED AND RECOMMENDED FOR BOARD ACTION.
I • air ,
OUM741 I
Charles 9V ' Bafis,
General Mag6ger
ISSUE: Appointment of individuals to management positions requires the approval of the
Board of Directors.
RECOMMENDATION: Adopt resolution appointing Diane Wagner, Purchasing and Materials
Manager, M -35 ($6677 - $8115), effective October 28, 2002.
FINANCIAL IMPACTS: Budgeted position.
ALTERNATIVES /CONSIDERATIONS: Alternatives to filling the position and the
dissemination of duties to other positions was considered and rejected as not viable.
BACKGROUND: The position of Purchasing and Materials Manager became vacant on
June 7, 2002 with the resignation of Ms. Victoria Lamica from the District. Director of
Administration, Randy Musgraves, took over the management duties of the Purchasing
and Materials Manager and determined that filling the position was critical to the
organization. The Human Resources Division conducted the recruitment. Out of
approximately fifty applicants, nine were scheduled for interviews with an outside panel
of experts in the field of purchasing and materials services. Two of the top candidates
were invited to final interviews with the General Manager and Mr. Musgraves.
Ms. Wagner has over twenty years of employment experience in the public sector,
including eight years at the City of Porterville Treatment Plant. While at the Treatment
Plant, Ms. Wagner obtained a Grade IV Operator state - certification. She was later
assigned responsibility over their laboratory.
10/9/02
H:\ Backup \FILES \PERSMISC \purchmgr.pp.wpd Page 1 Of 3
POSITION PAPER
Board Meeting Date: October 17, 2002
Subject: ADOPT RESOLUTION APPOINTING DIANE WAGNER TO THE POSITION OF
PURCHASING AND MATERIALS MANAGER, M -35 ($6677 - $8115), EFFECTIVE
OCTOBER 28, 2002
After leaving Porterville, Ms. Wagner became a Purchasing Agent /Administrator with
various agencies, including the Cities of Greenville and Visalia and the College of the
Sequoias. She holds a B.A. in Management and Organizational Development and
certifications as a Certified Purchasing Manager and Accredited Purchasing Practitioner.
Ms. Wagner is currently completing her Master's degree in Public Administration.
RECOMMENDED BOARD ACTION: Adopt the attached resolution appointing Diane
Wagner to the position of Purchasing and Materials Manager, M -35 ($6677 - $8115),
effective October 28, 2002.
10/9/02
H: \Backup \FILESTERSMI SC \purchmgr. pp. wpd Page 2 of 3
RESOLUTION NO. 2002-
A RESOLUTION APPOINTING DIANE WAGNER
TO THE POSITION OF
PURCHASING AND MATERIALS MANAGER
BE IT RESOLVED that effective October 28, 2002, Diane Wagner be appointed to
the position of PURCHASING AND MATERIALS MANAGER, Range M -35 ($6,677 -
$8,115), and be entitled to benefits accorded to the Management Group by Resolution No.
85 -042 and subsequent Memoranda of Understanding.
PASSED AND ADOPTED this 17th day of October, 2002, by the following vote:
AYES: Members:
NOES: Members:
ABSENT: Members:
COUNTERSIGNED:
Secretary, Central Contra Costa
Sanitary District, County of Contra
Costa, State of California
Approved as to form:
President of the District Board of the
Central Contra Costa Sanitary District,
County of Contra Costa, State of California
Kenton L. Alm
District Counsel
Page 3 of 3
C/1
4)
N
C�
U
ct
19
�� �
N
O
O
N
O
M
.r
w
U
�z
4*
V
41
`ire\
V
mill,
a O
N
w� o
M
�z
A�
w
E�
Z
O
�.y
w
w
FZ
E�
H
O
w
A
�
z
�
w
�
a
�
�
o
�
� N
W °o
ZN
a M
W
Wz
A�
�A
� Wo
W
W �
za
W�
W
as
W
;q '-N
�2
r
196-1
N
0
o�D
N �
°o U
N
N H
N L7
o
o �
N
�n to
MCIN O t-
N
W�
00
r
�
�
N
N
MCIN O t-
N
�
�
O
M
N
pp
O
b14
�
W W
W
a w
� d
O O
N N
w
W
Z
d'
N
O
O
M
i
�O
U
d
Aa
w
E-i
� � o
E-
o � H
N �
° U �
o� 3
N � �
r-,
00
M
OMO^ N
�O M
N
O
E=�A�
v�WAo
W
�
N
M
OAZ�
W
�
Z
W
W
�
h
�O
E-i
� � o
E-
o � H
N �
° U �
o� 3
N � �
r-,
00
M
OMO^ N
�O M
h
�O
M
Ge
00
b�
0
A
t—
00
401
�
N
b
W
W
W
M
N
el
O
O�
w
O
A
Central Contra Costa Sanitary District
' BOARD OF DIRECTORS
POSITION PAPER
Board Meeting Date: October 17, 2002 No-: 11.a. BUDGET AND FINANCE
Type of Action: RECEIVE AUDITED FINANCIAL STATEMENTS
Subject: RECEIVE THE AUDITED FINANCIAL STATEMENTS FOR THE FISCAL YEAR
ENDED JUNE 30, 2002.
Submitted By:
Debbie Ratcliff, Controller
Initiating Dept. /Div.:
Administrative /Financing
REVIEWED AND RECOMMENDED FOR BOARD ACTION.
D. Ratcliff R. fjusgraves
General
ISSUE: The audited financial statements of the Central Contra Costa Sanitary District for
the Fiscal Year ended June 30, 2002 are being submitted to the Board of Directors.
RECOMMENDATION: Receive the audited financial statements for the Fiscal Year ended
June 30, 2002.
FINANCIAL IMPACTS: None
ALTERNATIVES /CONSIDERATIONS: None
BACKGROUND: The firm of Hood and Strong, Certified Public Accountants, has
completed its examination of the District's financial statements for the Fiscal Year ended
June 30, 2002, and has submitted the audited financial statements and auditor's opinion
thereon.
In the routine performance of their examination of the financial statements, the auditors
evaluate the District's internal accounting controls to determine the nature and extent of
the auditing procedures required. Based on their observations during the course of the
examination, the auditors routinely advise District management of any recommendations
to improve the system of internal accounting controls. There were no recommendations
for improvements this year.
The audited financial statements were reviewed in detail at a Budget and Finance
Committee meeting on September 30, 2002. During the meeting, the committee
recommended two minor changes to the Note Section of the audited financial statements.
10/3/02
S: \ADMIN \RATCLIFF\AUDFIN02.PP.wpd Page 1 of 2
POSITION PAPER
Board Meeting Date: October 17, 2002
Subject: RECEIVE THE AUDITED FINANCIAL STATEMENTS FOR THE FISCAL YEAR
ENDED JUNE 30, 2002.
A copy of the audited financial statements has been received by the Board under separate
cover.
In accordance with Government Code Section 53891, information from the audit will be
used to prepare a report to the State Controller's office. The report will be sent by the
annual deadline of October 30, 2002.
RECOMMENDED BOARD ACTION: Receive the audited financial statements for the Fiscal
Year ended June 30, 2002.
Page 2 of 2
10/3/02
S: \ADMIN \RATCLIFF \AUDFIN02.PP.wpd