HomeMy WebLinkAbout4/29/2002 AGENDA BACKUPCentral Contra Costa Sanitary District
/"Adcl BOARD OF DIRECTORS
POSITION PAPER
Board Meeting Date: April 29, 2002 No-: 3.a. COLLECTION SYSTEM OPERATIONS
DIVISION BOARD WORKSHOP
Type of Action: RECEIVE INFORMATION AND DIRECT STAFF
Subject: REDUCE OVERFLOWS AND CONSTRUCTION BACKLOG IN THE
COLLECTION SYSTEM
Submitted By: Initiating Dept. /Div.:
John Pearl, Collection System Operations /Collection System Operations
Operations Division Manager Division
REVIEWED AND RECOMMENDED FOR BOARD ACTION:
J. Pearl J. K y
Me
ISSUE: Respond to Board input on reducing overflows and the construction backlog in
the collection system.
RECOMMENDATION: Receive information and provide staff guidance on overflow
reduction strategy, concur with proposal to increase staffing at CSO, and create capital
project(s) to aid in the reduction of the spot repairs backlog.
FINANCIAL IMPACTS: The approximate cost of the proposed increase in staffing is
$400,000 per year and a proposed capital project cost of approximately $500,000.
ALTERNATIVES /CONSIDERATIONS: 1) Direct staff to finalize proposed approach, or 2)
provide staff guidance on an acceptable alternative.
BACKGROUND: A presentation on the state of the Collection System Operations Division
was made at the Board meeting of March 7, 2002, by John Pearl, Collection System
Operations Division Manager. In response to this presentation, the Board requested that
staff recommend how to reduce the current number of overflows and the construction
backlog. To address this request, staff recommends the initial increase of staff by adding
two Maintenance Crew Leaders and two Maintenance Crew Members to:
1. Clean additional sewers to reduce the total number of overflows, and
2. Reduce the construction backlog by mobilizing more construction crews and
by creating capital project(s) for spot sewer repairs.
4/25/02
S:\ Correspondence \POSPAPR \2002 \Workshop- CSO.wpd Page 1 of 5
POSITION PAPER
Board Meeting Date: April 29, 2002
Subject: REDUCE OVERFLOWS AND CONSTRUCTION BACKLOG IN THE
COLLECTION SYSTEM
In addition to the recommendation of increased staffing, staff is recommending increased
use of new technologies and best practices, contracting for specialty work, and
continuous improvement of work processes.
Reduce Overflows:
Last year there were a total of 141 overflows within the District's collection system;
36 fell within the guidelines that had to be reported to the Regional Water Quality Control
Board. Roots within our sewer system caused 70 percent of our 36 reportable overflows;
grease caused 14 percent; and "other" conditions caused 16 percent. Only 2 of the
36 reportable overflows occurred in line segments that are in our construction backlog.
Thus, if the entire construction backlog were eliminated, last year's reportable overflows
would have been 32, instead of 34. To further reduce overflows in the short term, more
cleaning must be done to reduce root and grease blockages.
Sewer cleaning at CSO is either "scheduled" cleaning or "routine" cleaning. The
scheduled sewer cleaning addresses lines that require regular, repeat cleaning at frequent
intervals to ensure that sewage can flow through them. The routine cleaning puts the
remainder of the sewer lines on a ten -year cleaning frequency schedule. Fifty -one of last
year's 141 overflows occurred in line segments that were on a routine cleaning schedule.
The amount of routine footage cleaned in the year 2000 was 405,000, and 2001 footage
was 520,000. Our target for 2002 is 1,000,000 feet of sewer line cleaned, which would
reduce the maximum time between routine cleaning intervals in the system to an average
of seven and one -half years, and in areas with the most troublesome pipe, to five years
or less. A map showing the 2001 collection system overflows by type is shown in
Attachment 1 and identifies the area staff refers to as the "overflow crescent." The area
encompasses much of Orinda and Lafayette and some of Pleasant Hill and Walnut Creek
and accounts for approximately 80 percent of our overflows. This area contains much
of our older and smaller pipe, mainly vitrified -clay pipe (VCP). By focusing on this area
with additional personnel cleaning one entire watershed at a time, cleaning maintenance
will focus on the main overflow area and be more efficient since driving time between
locations is minimized.
4/25/02
S:\ Correspondence \POSPAPR \2002 \Workshop- CSO.wpd Page 2 of 5
POSITION PAPER
Board Meeting Date: April 29, 2002
Subject: REDUCE OVERFLOWS AND CONSTRUCTION BACKLOG IN THE
COLLECTION SYSTEM
In the area of "scheduled" cleaning, specific problem pipe segments are cleaned on
schedules ranging from 3 months to 60 months. In reviewing the 2001 overflows that
occurred on scheduled lines, CSO ensures that the cleaning frequency is appropriate to
minimize the chance of overflows before the next scheduled cleaning period. In addition,
the protocol used in the decision - making process for changing schedule frequencies is a
formal process directly involving the field crews.
As part of improving how we do cleaning, staff proposes to increase the use of
technology through the use of chemical root control in heavy root lines and lines that
require hand rodding. Staff also proposes to audit our cleaning effectiveness of these
lines with use of closed- circuit TV.
Reduce Construction Backloa:
CSO proposes both increasing the number of daily construction crews and contracting
jobs that lend themselves to consolidation (aggregation) and contracting, such as "spot
repairs" in streets, lateral abandonments, and some structure work. The Engineering
Department is also increasing the rate of replacement of "critical line segments." Based
on the existing backlog, the potential reduction of "priority one" jobs could be reduced
from 130 to as low as 60 by next summer. Engineering proposes bidding this work for
construction this winter.
CSO also proposes that repair work in our difficult easements continue to be done in-
house. These jobs are unique and access is often difficult. This makes them more
difficult to bundle and bid for an outside contractor. This approach also helps us ensure
excellent customer service through personal contact and high - quality workmanship that
has minimum impact on homeowners' property. To complete more easement repairs,
CSO will need to increase the percentage of "planned work" by increasing the number of
personnel assigned to the Construction Section. The proposed personnel increase would
increase planned work by 50 percent.
Recommendations:
• Increase the CSO field staffing, initially by four people with an average of two
more people in the Cleaning Section and two in the Construction Section. At this
time, there are adequate equipment and facilities for this staffing level.
4/25/02
S:\ Correspondence \POSPAPR \2002 \Workshop- CSO.wpd Page 3 of 5
POSITION PAPER
Board Meeting Date: April 29, 2002
Subject: REDUCE OVERFLOWS AND CONSTRUCTION BACKLOG IN THE
COLLECTION SYSTEM
• Authorize CSO to work with the Engineering Department to bundle and bid sewer
system spot repairs this winter.
In the next 12 months, staff expects 500,000 more feet of sewer will be cleaned than
in the prior 12 months, and that the construction backlog of priority one jobs could be
as low as 60. This effort may not initially result in fewer overflows because it will take
several years to get routine cleaning to the proposed frequency, and the sewer lines will
continue to deteriorate. Over the next 12 months, staff will update the Board on the
amount of sewer cleaned, the number of system overflows, and the condition of the
repair backlog. Based on the overall progress of this strategy, the findings of the
Engineering TV inspection program of the sewer system, and the status of proposed
collection system regulations, staff will make additional recommendations to the Board
in the future.
RECOMMENDED BOARD ACTION: Receive information and direct staff to finalize
proposed approach.
4/26/02
S:\ Correspondence \POSPAPR \2002 \Workshop- CSO.wpd Page 4 of 5
a
N
m
° Central Contra Costa
o Sanitary District
C) -.drARL
N
a
LEGEND
ROOT STOPPAGE CRESCENT
CAUSE OF OVERFLOW
• ROOTS
• GREASE
• OTHER
CENTRAL CONTRA COSTA
SANITARY DISTRICT OVERFLOWS 2001
CSOD
1'rrrlluti;ll III Rcd11cc ( )N c1 Him S :111(1
( u(1,I1'uciiun i�.1c1.1�1��
Apid 29, 2002
Proposal to Reduce Overflows and
Construction Backlog
Agenda
• Introduction
• Overview
• Ovcrfil0w PCduCtl0n Proposal
• COn�tiucUr�n Backl0g Reduction Proposal
• Finah--c Approach
• Pumping Station Staffing
Oveivlew
• CMOM. 550. and State regulations will
require fever overflows
• Cost of property clamage claims is
increasing significantly
• Overflovt causes:
• PSrit� r'r
• _. _asp i-1-
:t1�er 1
• How to Reduce Overflows?
NrvvPe/nnts
^ o,anAr County General Permit
' A`/',/',Ap./s mor
^^" c^uwmo cmom
mu/.n,oI //~
^ m/xom mPosspc,mit
Flow to Reduce 0verf|ows?
`SoouTcmi
. k^"""�.��o»o
^.^'*"`�*�^
Overf|ovv Reduction Proposal
^ nocose noutmcC|onnmg
^
improve 3mcuu|cdCleaning
` m.-oa=coocm|oa| Root Control
^Approve Cleaning Process
^s.,/puu^,`
Inctease Routine Cleaning
• Present cleaning interval is 10 years
• Proposed intervals
• 0.rr11Uw i i.,�_cuil VGP_ 51e,iis
• Inr f, 1, 500 000 H
• Fi: tlif � I! t�vn � r 'c�
FOCl1S Routine Cleaning in the
Overfilow Crescent"
• Contains hi`h percentage of overflows
• Older and smaller VCP pipe
• Promotes cleaning of watersheds
• R,.,lu� ��� ���:unJtilii��ld tiin�,
Scheduled Cleaning
• Ee -st Practices
•
Cl" 1111( i�nt c,ntrol
• T, fit I, ltl 7V
• Protocol for changin;; schedules
• PHT recommendations
• Section meetings
NOr
FINAL REPORT
California
Collection System
Collaborative Benchmarking
Group
flyd'.0-h CI.M g05- 114N..0-sewers
kb—y2
Collection System Collaborative
Menclunarking Group
Best Practices
For
O
S S 0 PEP.
S, S
PI
Construction Backlog Reduction
PioposaI
• Mobilize more construction crews
• Ili, to pl,mt _I,,, 11" b% 50 pw<,rnt
• Pi try >,. t .:girl 1%.,) 't'Al to
Cunsti i� r.., � s,itinn
• Contract repair wori; in streets throu;
If1 I oV0 %Wo1k Anchces
• Utilize no -did, technology
F,,,,"m 0 Unit
%°Jill _ _ I�i��p,,,,i' t , III, F- ud ui
• VO -)i ; overtime where. appropriate
• Contract non -core work to allow C50 staff to
focus on repairs
F- n; u,� f?. ,, \;c!l\ !%I (11- I, iii, upin� ( tc
Proposal
• Inc�case C50 field staff by four
• .. iii CIS- . 'i,ui
• T.
• Bundle and bid street spot tepairs
• Continue m update board on progress and
make additional tecommendations as
l gtnred