HomeMy WebLinkAbout02-03-00 AGENDA BACKUPCentral Contra Costa Sanitary District
' BOARD OF DIRECTORS
POSITION PAPER
Board Meeting Date: February 3, 2000 No-: 4. a. CONSENT CALENDAR
Type of Action: ACCEPT CONTRACT /AUTHORIZE NOTICE OF COMPLETION
Subject: ACCEPT CONTRACT WORK FOR THE SOLIDS CONDITIONING BUILDING
CONTROL ROOM MODIFICATIONS PROJECT, DISTRICT PROJECT 6114A, AND
AUTHORIZE THE FILING OF THE NOTICE OF COMPLETION
Submitted By: Initiating Dept. /Div.:
James L. Belcher, Senior Engineer Plant Operations Department /Maintenance
RE EWE ND RECOMMENDED FOR BOARD ACTION:
J. Belcher J. Kelly C arles . att
General ManaV
ISSUE: Construction has been completed on the Solids Conditioning Building Control
Room Modifications Project, DP 6114A, and the work is now ready for acceptance.
RECOMMENDATION: Accept contract work.
FINANCIAL IMPACTS: None related to this action.
ALTERNATIVES /CONSIDERATIONS: Not applicable. Filing the Notice of Completion is
advisable under the California Civil Code, Section 3093.
BACKGROUND: This project modified the Solids Conditioning Building (SCB) Control Room
so the treatment plant can be entirely operated from the SCB Control Room. This will
allow the Plant Operations Department (POD) Control Room to be unattended during off -
shift hours, providing more staff flexibility and opportunities to improve the District's
effectiveness, without changing plant operation reliability.
The Board of Directors authorized the award of a construction contract for this work in
the amount of $168,440 to N.E. Carlson Construction on September 2, 1999. The
contractor was issued a Notice to Proceed, which was effective September 13, 1999,
with a required contract completion date of December 28, 1999. The District took
beneficial use on December 17, 1999, with all work being completed on December 28,
1999.
It is appropriate to accept the contract work at this time. The total authorized budget for
this project is $264,000. An accounting of this project will be provided to the Board of
Directors at close out.
1/26/00
S:1CorrespondenceTOSPA PR120001DP6114A.pp.wpd Page 1 of 3
POSITION PAPER
Board Meeting Date: November 18, 1999
Subject: ACCEPT CONTRACT WORK FOR THE SOLIDS CONDITIONING BUILDING
CONTROL ROOM MODIFICATIONS PROJECT, DISTRICT PROJECT 6114A, AND
AUTHORIZE THE FILING OF THE NOTICE OF COMPLETION
RECOMMENDATION BOARD ACTION: Accept contract work for the Solids Conditioning
Building Control Room Modifications Project, DP 6114A, by N.E. Carlson Construction, and
authorize the filing of the Notice of Completion.
1/25/00
S:\ Correspondence \POSPAPR \2000 \DP6114A.pp.wpd Page 2 of 3
.o
Y
O
MAI N GATE
O`
o�
0
rr
O
/r
O
/r
rr
/r
/r
i rl l
PROJECT
SITE lir ill
r %rr
>� e
/ r
x Central Contra costa SOLIDS CONDITIONING BUILDING Attachment
0
Sanitary District CONTROL ROOM MODIFICATION
' District Project 6114A
Project Location
T
Page 3 of 3
Central Contra Costa Sanitary District
r BOARD OF DIRECTORS
POSITION PAPER
Board Meeting Date: February 3, 2000 No.: 4.b. CONSENT CALENDAR
Type of Action: ACCEPT CONTRACT /AUTHORIZE NOTICE OF COMPLETION
subject: ACCEPT CONTRACT WORK FOR THE TREATMENT PLANT DOWNLIGHT
FIXTURE RETROFIT PROJECT, DISTRICT PROJECT 6147, AND AUTHORIZE THE FILING
OF THE NOTICE OF COMPLETION
Submitted By: Initiating Dept. /Div.:
James L. Belcher, Senior Engineer Plant Operations Department /Maintenance
RECOMMENDED FOR BOARD ACTION.
�0_ el 4",-
J. Belcher r J. Kelly
C"Watts,
ISSUE: Construction has been completed on the Treatment Plant Downlight Fixture
Retrofit Project, DP 6147, and the work is now ready for acceptance.
RECOMMENDATION: Accept contract work.
FINANCIAL IMPACTS: None related to this action.
ALTERNATIVES /CONSIDERATIONS: Not applicable. Filing the Notice of Completion is
advisable under the California Civil Code, Section 3093.
BACKGROUND: Early last year, the Treatment Plant Light Fixture Retrofit Project,
DP 6136, was completed. During the post audit of that project, it was determined that
the downlights could be retrofitted, creating a savings in both reduced energy costs and
deferred maintenance while providing improved lighting. After reviewing the project
feasibility and cost savings, staff recommended completing this project as part of the
Success Sharing Program.
The Board of Directors authorized the award of a construction contract for this work in
the amount of $26,143.25 to Vista Universal, Incorporated, on October 7, 1999. The
contractor was issued a Notice to Proceed, which was effective November 1, 1999, with
a required contract completion date of December 28, 1999. The District took beneficial
use on December 20, 1999, with all work being completed on December 27, 1999.
It is appropriate to accept the contract work at this time. The total authorized budget for
this project is $42,000. An accounting of this project will be provided to the Board of
Directors at close out.
S: \Correspondence \POSPAPR \2000 \DP6147.pp.wpd Page 1 of 3
POSITION PAPER
Board Meeting Date: November 18, 1999
Subject: ACCEPT CONTRACT WORK FOR THE TREATMENT PLANT DOWNLIGHT
FIXTURE RETROFIT PROJECT, DISTRICT PROJECT 6147, AND AUTHORIZE THE FILING
OF THE NOTICE OF COMPLETION
RECOMMENDATION BOARD ACTION: Accept contract work for the Treatment Plant
Downlight Fixture Retrofit Project, DP 6147, by Vista Universal, Incorporated, and
authorize the filing of the Notice of Completion.
S:\ Correspondence \POSPAPR \2000 \DP6147.pp.wpd Page 2 of 3
g N �
L4 N
4 (p Z
y Io
o�
s
MAIN GATE
o�
o�
T o
-o
Central Contra Costa
Sanitary District
R
as
F
C
0
PROJECT
/ i Ali SITES
TREATMENT PLANT DOWNLIGHT RETROFIT
District Project 6147
Project Location
Page 3 of 3
Attachment
E
Central Contra Costa Sanitary District
' BOARD OF DIRECTORS
POSITION PAPER
Board Meeting Date: February 3, 2000 No.: 5.a. HEARINGS
Type of Action: CONDUCT PUBLIC HEARING; ADOPT RESOLUTIONS; AUTHORIZE
AGREEMENT
Subject: CONDUCT A PUBLIC HEARING; ADOPT A RESOLUTION OVERRULING
PROTESTS; ADOPT A RESOLUTION CONFIRMING COMPLIANCE WITH CALIFORNIA
CONSTITUTION, ARTICLE XIIID, SECTION 4; ADOPT A RESOLUTION APPROVING
ENGINEER'S REPORT AND ASSESSMENT AND ORDERING IMPROVEMENT; AND
AUTHORIZE EXECUTION OF AGREEMENT WITH HAVEN LANE PARCEL OWNERS IN
CONJUNCTION WITH THE HAVEN LANE CONTRACTUAL ASSESSMENT DISTRICT NO.
98 -3, DISTRICT PROJECT NO. 5406
Submitted By: Initiating Dept. /Div.:
Curtis Swanson, Division Manager Engineering /Environmental Services
REVIEWED AND RECOMMENDED FOR BOARD ACTION:
2�
C. Sw nson
General M
ISSUE: A public hearing must be conducted to consider objections and inquiries regarding
the proposed assessment, the Resolution of Intention, the Engineer's Report, and any
other comments from the public, including the affected parcel owners, relating to the
proposed Haven Lane Contractual Assessment District No. 98 -3 (C.A.D. No. 98 -3).
RECOMMENDATION: Conduct a public hearing. Adopt resolutions and authorize an
agreement to implement Haven Lane CAD No. 98 -3.
FINANCIAL IMPACTS: The estimated total project cost is $82,505. Funding for this
C.A.D. is included in the 1999 -00 Capital Improvement Budget (CIB) on page CS -62. The
District will be reimbursed for this project cost over a 10 year assessment period.
ALTERNATIVES /CONSIDERATIONS
1. Continue this item to receive additional public comment or allow additional
deliberation.
2. Withhold or delay approval of the project.
BACKGROUND: A group of eleven parcel owners on Haven Lane in Walnut Creek have
requested that the District form an assessment district for the purpose of financing and
constructing a public sewer system that will benefit their properties. The proposed sewer
includes approximately 505 linear feet of 8 -inch sewer main and two manholes that will
1/27/00
U: \CAD \Haven Lane \PubHear.PP.wpd Page 1 of 11
POSITION PAPER
Board Meeting Date: February 3, 2000
Subject: CONDUCT A PUBLIC HEARING; ADOPT A RESOLUTION OVERRULING
PROTESTS; ADOPT A RESOLUTION CONFIRMING COMPLIANCE WITH CALIFORNIA
CONSTITUTION, ARTICLE XIIID, SECTION 4; ADOPT A RESOLUTION APPROVING
ENGINEER'S REPORT AND ASSESSMENT AND ORDERING IMPROVEMENT; AND
AUTHORIZE EXECUTION OF AGREEMENT WITH HAVEN LANE PARCEL OWNERS IN
CONJUNCTION WITH THE HAVEN LANE CONTRACTUAL ASSESSMENT DISTRICT NO.
98 -3, DISTRICT PROJECT NO. 5406
serve the proponents' eleven existing properties, all of which have existing homes
presently relying on septic tanks. A map showing the proposed boundary and the
proposed sewer location is attached as Exhibit A.
On September 3, 1998, the Board of Directors adopted a resolution directing the
preparation of a report for a known as Haven Lane C.A.D. No. 98 -3. A report has been
prepared, and assessments have been estimated. (The Engineer's Report is being
provided to the Board under separate cover.) On December 16, 1999, the Board of
Directors set a public hearing for February 3, 2000. Since assessments are proposed to
be levied on properties, the procedural requirements of Proposition 218 do apply.
Compliance with these requirements has been included in the documents and actions
proposed for Board consideration. In order to continue the process for Haven Lane
C.A.D. No. 98 -3 the following actions are necessary:
1. Conduct a public hearing to:
a. announce the tabulation of ballots submitted by owners of each
affected parcel indicating approval or opposition to the proposed
assessment.
b. consider public testimony on the Resolution of Intention and the
Engineer's Report.
2. If, at the close of the hearing, the Board finds that protests and ballot
opposition are insufficient, the following resolutions may be considered and
adopted:
a. Resolution overruling protests of improvement (Exhibit B)
b. Resolution confirming compliance with California Constitution,
Article XIIID, Section 4 (Exhibit C).
1/27/00
U: \CAD \Haven Lane \PubHear.PP.wpd Page 2 of 11
POSITION PAPER
Board Meeting Date: February 3, 2000
Subject: CONDUCT A PUBLIC HEARING; ADOPT A RESOLUTION OVERRULING
PROTESTS; ADOPT A RESOLUTION CONFIRMING COMPLIANCE WITH CALIFORNIA
CONSTITUTION, ARTICLE XIIID, SECTION 4; ADOPT A RESOLUTION APPROVING
ENGINEER'S REPORT AND ASSESSMENT AND ORDERING IMPROVEMENT; AND
AUTHORIZE EXECUTION OF AGREEMENT WITH HAVEN LANE PARCEL OWNERS IN
CONJUNCTION WITH THE HAVEN LANE CONTRACTUAL ASSESSMENT DISTRICT NO.
98 -3, DISTRICT PROJECT NO. 5406
C. Resolution approving the Engineer's Report, assessments, and
ordering improvement (Exhibit D).
An agreement between the owners and the District is needed to establish the rights and
obligations of both parties. District Counsel has prepared such an agreement in which the
owners agree to:
• assessments being placed on their property tax bills;
• pay the assessments;
• accept total responsibility for the design and construction of the sanitary
sewer extension;
• require the contractor who is selected by the owners to maintain certain
insurance coverage;
• accept total responsibility for the costs associated with the sanitary sewer
extension, including interest for District financing; and
• have the sanitary sewer extension constructed in accordance with District
standards.
The District will:
• finance the costs of the sanitary sewer extension;
• accept the work of the contractor, provided the work is done in accordance
with District standards;
• place assessments on owners' tax bills;
• record as liens on the participants' properties the obligation of each
participant to pay assessments; and
• be reimbursed in full by receiving payments, including interest, for the total
amount financed from owners over a ten -year period.
The agreement has been executed by all eleven affected parcel owners. It is appropriate,
therefore, to authorize the General Manager to execute the agreement on behalf of the
District.
1/27/00
WCAD \Haven Lane \PubHear.PP.wpd Page 3 of 11
POSITION PAPER
Board Meeting Date: February 3, 2000
subject: CONDUCT A PUBLIC HEARING; ADOPT A RESOLUTION OVERRULING
PROTESTS; ADOPT A RESOLUTION CONFIRMING COMPLIANCE WITH CALIFORNIA
CONSTITUTION, ARTICLE XIIID, SECTION 4; ADOPT A RESOLUTION APPROVING
ENGINEER'S REPORT AND ASSESSMENT AND ORDERING IMPROVEMENT; AND
AUTHORIZE EXECUTION OF AGREEMENT WITH HAVEN LANE PARCEL OWNERS IN
CONJUNCTION WITH THE HAVEN LANE CONTRACTUAL ASSESSMENT DISTRICT NO.
98 -3, DISTRICT PROJECT NO. 5406
A summary of project costs is shown in Exhibit E.
Staff has concluded that this project is exempt from the California Environmental Quality
Act (CEQA) under District CEQA Guidelines, Section 5.2(b)(3), since it can be seen with
certainty that there is no possibility that the activity in question may have a significant
adverse effect on the environment. This certainty is based on the District's past
experience with numerous similar sewer construction projects, the developed nature of
the project environment, and the limited service area of the project (no potential for
growth inducement). Approval of the Engineer's Report will establish the Board of
Directors' independent finding that this project is exempt from CEQA.
RECOMMENDED BOARD ACTION: If a majority protest is not filed and if less than a
majority of returned ballots from affected parcel owners oppose the assessment, staff
recommends that the Board of Directors take the following actions:
• Conduct public hearing.
• Adopt a resolution overruling protests.
• Adopt a resolution confirming compliance with California Constitution, Article XIIID,
Section 4.
• Adopt a resolution approving the Engineer's Report, assessments, and ordering
improvement.
• Authorize the General Manager to execute an agreement with the Haven Lane parcel
owners.
1/27/00
U: \CAD \Haven Lane \PubHear.PP.wpd Page 4 of 11
.Y
I I ll FELIMI NOOD --
li 2l
/0
o I 20
II I o I
I I
Ln 01)
N I N DR N N
I
I -- --
a
1IlI I1 I i I -- --T ----- - - - - -- � 80
LOCATIO
N MAP
2670 LEGEND
J p PARTICIPANT
S
FRANCES N WAY + NON- PARTICIP
AN
TS
? --- - EXISTING SEWER
W
PROPOSED So SEWER
......•.•. C.A.D BOUNDARY
u
v
N
x Central Contra Costa PLAN OF IMPROVEMENT Attachment
a Sanitary District HAVEN LANE
CONTRACTUAL ASSESSMENT DISTRICT A
No. 98-3
Page 5 of 14
II
I
3
I
20
2795
2797,
31 °°
I
30
2/ z
2.1
I
- - - - - --
__ - - -�
41
40
3/
i
30
,-2763
- -2759
- -- 2755
I I
I
i
I
II
I
N
I
PROPOS
BOUNUD Y
1
0
2731
O' ��
()
II
Ln
1b
2728
�I
2722
I 1
2720
°
C°v
L 272/
(I
-------
-
- --
- - - -
--
Cn
- --
- - - - --
�
- - - - --
N
` -
- - - - --
2701
w N
II
=
�I
+
o Aso
\
1
FEEr
I CONTRA
COSTA
CANAL
" �`
/
2694
&
i
C\J
`°
2697
II
i 19
2695
I -- --
a
1IlI I1 I i I -- --T ----- - - - - -- � 80
LOCATIO
N MAP
2670 LEGEND
J p PARTICIPANT
S
FRANCES N WAY + NON- PARTICIP
AN
TS
? --- - EXISTING SEWER
W
PROPOSED So SEWER
......•.•. C.A.D BOUNDARY
u
v
N
x Central Contra Costa PLAN OF IMPROVEMENT Attachment
a Sanitary District HAVEN LANE
CONTRACTUAL ASSESSMENT DISTRICT A
No. 98-3
Page 5 of 14
RESOLUTION NO.
EXHIBIT B
RESOLUTION OVERRULING PROTESTS
HAVEN LANE CONTRACTUAL ASSESSMENT DISTRICT NO. 98 -3
The Board of Directors of the Central Contra Costa Sanitary District resolves:
On February 3, 2000, the Board of Directors held a public hearing on the Resolution
of Intention and the Engineer's Report on the proposed improvement in Haven Lane
Contractual Assessment District No. 98 -3.
At or before the time set for hearing, certain interested persons made or may have
made protests or objections to the proposed improvement, the extent of the Contractual
Assessment District, or the proposed assessment.
The Board hereby overrules each of these protests, written or oral.
The Board finds that the protest against the proposed improvement (including all
written protests not withdrawn in writing before the conclusion of the protest hearing) is
made by the owners of less than one half of the area of the land to be assessed for the
improvement.
PASSED AND ADOPTED this 3rd day of February, 2000, by the Board of Directors
of the Central Contra Costa Sanitary District by the following votes:
AYES:
Members:
NOES:
Members:
ABSENT:
Members:
Gerald R. Lucey
President of the Board of Directors,
Central Contra Costa Sanitary District,
County of Contra Costa, State of California
COUNTERSIGNED:
Joyce E. Murphy
Secretary, Central Contra Costa
Sanitary District, County of Contra Costa,
State of California
APPROVED AS TO FORM:
Kenton L. Alm,
District Counsel
1/27/00
U: \CAD \Haven Lane \PubHear.PP.wpd Page 6 of 11
RESOLUTION NO.
*� � -- A
RESOLUTION CONFIRMING COMPLIANCE WITH
CALIFORNIA CONSTITUTION, ARTICLE XIIID, SECTION 4
HAVEN LANE CONTRACTUAL ASSESSMENT DISTRICT NO. 98 -3
The Board of Directors of the Central Contra Costa Sanitary District resolves:
1. The Board set 2 p.m. on February 3, 2000, at the Meeting Room of the
Board of Directors, 5019 Imhoff Place, Martinez, California, as the time and place for a
public hearing pursuant to California Constitution, Article XIIID, Section 4.
2. Pursuant to Article XIIID of the California Constitution, as amended by
Proposition 218, commonly known as the "Right to Vote on Taxes Act," notice of the
proposed assessment was provided to all owners of affected parcels within the District,
which notice contained a ballot whereby each owner could indicate support or opposition
to the proposed assessment.
3. At the time and place for which notice was given, the Board of Directors
conducted public hearing, pursuant to California Constitution, Article XIIID, Section 4, and
gave every person present an opportunity to comment on and object to the amount of the
proposed assessment.
4. The Board finds that less than a majority of parcel owners who returned
ballots, weighted by financial obligation, opposed the proposed assessment.
PASSED AND ADOPTED this 3rd day of February, 2000, by the Board of Directors
of the Central Contra Costa Sanitary District by the following votes:
AYES:
Members:
NOES:
Members:
ABSENT:
Members:
Gerald R. Lucey
President of the Board of Directors,
Central Contra Costa Sanitary District,
County of Contra Costa, State of California
COUNTERSIGNED:
Joyce E. Murphy
Secretary, Central Contra Costa
Sanitary District, County of Contra Costa,
State of California
APPROVED AS TO FORM:
Kenton L. Alm,
District Counsel
1/27/00
U: \CAD \Haven Lane \PubHear.PP.wpd Page 7 of 11
EXHIBIT D
RESOLUTION NO.
RESOLUTION APPROVING ENGINEER'S REPORT AND ASSESSMENT
AND ORDERING IMPROVEMENT
HAVEN LANE CONTRACTUAL ASSESSMENT DISTRICT NO. 98 -3
The Board of Directors of the Central Contra Costa Sanitary District resolves:
This Board has taken a series of actions preliminary to ordering the improvement in
the Haven Lane Contractual Assessment District No. 98 -3, Central Contra Costa Sanitary
District, Contra Costa County, California, and now makes the following findings and
orders:
1. The Board adopted a map showing the boundaries of the land benefitted by
the proposed improvement. A copy of the boundary map was filed in the office of the
County Recorder of the County of Contra Costa in the Book of Maps of Assessment and
Community Facilities Districts.
2. The Board adopted its Resolution of Intention to order the improvement
described therein under the Municipal Improvement Act of 1911, and directed Curtis W.
Swanson, Principal Engineer, as the Engineer of Work for the Assessment District, to
prepare the report required by Section 5989.22 of the Streets and Highways Code.
The improvement is generally described as follows:
Construction and installation of approximately 588 linear feet of
sanitary sewer line, together with appurtenant work and facilities
located at Haven Lane in Walnut Creek, California.
3. The Board called a hearing of protests on the Haven Lane Contractual
Assessment District No. 98 -3. Notice of the hearing was given by publication, by street
posting, and by mailing to affected parcel owners, all according to the Municipal
Improvement Act of 1911. Affidavits of publication, posting, and mailing were filed with
the Secretary of the District.
4. At the time and place for which notice was given, the Board of Directors
conducted a public hearing pursuant to Section 5898.26 of the Streets and Highways
Code, which included a summary of the Engineer's Report and gave every person present
an opportunity to comment on and object to the proposed Contractual Assessment
Program improvement and the extent of the Assessment District.
5. The Board further finds that written protests against the proposed
improvement have not been made by owners representing more than one half of the area
of the land to be assessed for the improvement.
1/27/00
UACAD \Haven Lane \PubHear.PP.wpd Page 8 of 11
6. The documents and events described in paragraphs 1 to 4, inclusive, are
stated here in tabular form, with their dates and, where appropriate, their numbers. All
documents are now on file with the District except as otherwise noted.
7. The Board approves the Engineer's Report and each component part of it,
including each exhibit incorporated by reference in the report.
8. The Board finds that the Engineer of Work, in the Engineer's Report has fairly
and properly apportioned the cost of the improvement to each parcel of land in the
Assessment District in compliance with the agreement between the owners and in
proportion to the special benefits derived by each parcel, in relationship to the entirety of
the capital cost of the improvement. The Board hereby confirms and levies each individual
assessment as stated in the Engineer's Report.
9. This Board orders the improvement described in paragraph 2 and as detailed
in the Engineer's Report.
10. According to Section 10603 of the Streets and Highways Code, the Board
designates the District Controller to collect and receive payment of the assessments.
11. The Board independently finds that this project is exempt from the California
Environmental Quality Act (CEQA) under District CEQA Guidelines, Section 5.2(b)(3),
since it can be seen with certainty that there is no possibility that the activity in question
may have a significant adverse effect on the environment. This certainty is based on the
District's past experience with numerous similar sewer construction projects, the
developed nature of the project environment, and the limited service area of the project
(no potential for growth inducement).
1/27/00
U: \CAD \Haven Lane \PubHear.PP.wpd Page 9 of 11
Number
Document or Event
Date
or Action
a.
Resolution of Intention
09/03/98
98 -105
b.
Resolution Approving Boundary Map
09/03/98
98 -106
c.
Boundary Map Filed with County Recorder
09/03/98
Filed
d.
Certificate of Mailing Notice of Improvement
Dated
e.
Certificate of Posting Notice of Improvement
Dated
f.
Affidavit of Publication of Notice of Improvement
Dated
7. The Board approves the Engineer's Report and each component part of it,
including each exhibit incorporated by reference in the report.
8. The Board finds that the Engineer of Work, in the Engineer's Report has fairly
and properly apportioned the cost of the improvement to each parcel of land in the
Assessment District in compliance with the agreement between the owners and in
proportion to the special benefits derived by each parcel, in relationship to the entirety of
the capital cost of the improvement. The Board hereby confirms and levies each individual
assessment as stated in the Engineer's Report.
9. This Board orders the improvement described in paragraph 2 and as detailed
in the Engineer's Report.
10. According to Section 10603 of the Streets and Highways Code, the Board
designates the District Controller to collect and receive payment of the assessments.
11. The Board independently finds that this project is exempt from the California
Environmental Quality Act (CEQA) under District CEQA Guidelines, Section 5.2(b)(3),
since it can be seen with certainty that there is no possibility that the activity in question
may have a significant adverse effect on the environment. This certainty is based on the
District's past experience with numerous similar sewer construction projects, the
developed nature of the project environment, and the limited service area of the project
(no potential for growth inducement).
1/27/00
U: \CAD \Haven Lane \PubHear.PP.wpd Page 9 of 11
PASSED AND ADOPTED this 3rd day of February, 2000, by the Board of Directors
of the Central Contra Costa Sanitary District by the following votes:
AYES: Members:
NOES: Members:
ABSENT: Members:
Gerald R. Lucey
President of the Board of Directors,
Central Contra Costa Sanitary District,
County of Contra Costa, State of California
COUNTERSIGNED:
Joyce E. Murphy
Secretary, Central Contra Costa
Sanitary District, County of Contra Costa,
State of California
APPROVED AS TO FORM:
Kenton L. Alm,
District Counsel
1/27/00
U: \CAD \Haven Lane \PubHear.PP.wpd
Page 10 of 11
EXHIBIT E
SUMMARY OF PROJECT COSTS
HAVEN LANE CAD NO. 98 -3
Construction $60,900
Construction Contingency 9,100
Engineering 8,000
District Services 4,505
TOTAL 82 505
1/27/00
U: \CAD \Haven Lane \PubHear.PP.wpd Page 11 of 11
Central Contra Costa Sanitary District
' BOARD OF DIRECTORS
POSITION PAPER
Board Meeting Date: February 3, 2000 No.: 5.b. HEARINGS
Type of Action: CONDUCT PUBLIC HEARING; ADOPT RESOLUTIONS; AUTHORIZE
AGREEMENT
Subject: CONDUCT A PUBLIC HEARING; ADOPT A RESOLUTION OVERRULING
PROTESTS; ADOPT A RESOLUTION CONFIRMING COMPLIANCE WITH CALIFORNIA
CONSTITUTION, ARTICLE XIIID, SECTION 4; ADOPT A RESOLUTION APPROVING
ENGINEER'S REPORT AND ASSESSMENT AND ORDERING IMPROVEMENT; AND
AUTHORIZE EXECUTION OF AGREEMENT WITH FOREST LANE PARCEL OWNERS IN
CONJUNCTION WITH THE FOREST LANE CONTRACTUAL ASSESSMENT DISTRICT
NO. 99 -1, DISTRICT PROJECT NO. 5406
Submitted By: Initiating Dept /Div.:
Curtis Swanson, Division Manager Engineering /Environmental Services
REVIEWED AND RECOMMENDED FOR BOARD ACTION.
C. S anson A. Farrell
Charle-
General
ISSUE: A public hearing must be conducted to consider objections and inquiries regarding
the proposed assessment, the Resolution of Intention, the Engineer's Report, and any
other comments from the public, including the affected parcel owners, relating to the
proposed Forest Lane Contractual Assessment District No. 99 -1 (C.A.D. No. 99 -1).
RECOMMENDATION: Conduct a public hearing. Adopt resolutions and authorize an
agreement to implement Forest Lane CAD No. 99-1.
FINANCIAL IMPACTS: The estimated total project cost is $63,700. Funding for this
C.A.D. is included in the 1999 -00 Capital Improvement Budget (CIB) on page CS -62. The
District will be reimbursed for this project cost over a 10 year assessment period.
ALTERNATIVES /CONSIDERATIONS:
Continue this item to receive additional public comment or allow additional
deliberation.
2. Withhold or delay approval of the project.
BACKGROUND: A group of five parcel owners on Forest Lane in Alamo have requested
that the District form an assessment district for the purpose of financing and constructing
a public sewer system that will benefit their properties. The proposed sewer includes
1/27/00
U: \CAD \Forest Lane \PubHear.PP.wpd Page 1 of 11
POSITION PAPER
Board Meeting Date: February 3, 2000
Subject: CONDUCT A PUBLIC HEARING; ADOPT A RESOLUTION OVERRULING
PROTESTS; ADOPT A RESOLUTION CONFIRMING COMPLIANCE WITH CALIFORNIA
CONSTITUTION, ARTICLE XIIID, SECTION 4; ADOPT A RESOLUTION APPROVING
ENGINEER'S REPORT AND ASSESSMENT AND ORDERING IMPROVEMENT; AND
AUTHORIZE EXECUTION OF AGREEMENT WITH FOREST LANE PARCEL OWNERS IN
CONJUNCTION WITH THE FOREST LANE CONTRACTUAL ASSESSMENT DISTRICT
NO. 98 -3, DISTRICT PROJECT NO. 5406
approximately 474 linear feet of 8 -inch sewer main and two manholes that will serve the
proponents' five existing properties, all of which have existing homes presently relying on
septic tanks. A map showing the proposed boundary and the proposed sewer location
is attached as Exhibit A.
On March 4, 1999, the Board of Directors adopted a resolution directing the preparation
of a report for a known as Forest Lane C.A.D. No. 99 -1. A report has been prepared,
and assessments have been estimated. (The Engineer's Report is being provided to the
Board under separate cover.) On December 16, 1999, the Board of Directors set a public
hearing for February 3, 2000. Since assessments are proposed to be levied on properties,
the procedural requirements of Proposition 218 do apply. Compliance with these
requirements has been included in the documents and actions proposed for Board
consideration. In order to continue the process for Forest Lane C.A.D. No. 99 -1 the
following actions are necessary:
1 . Conduct a public hearing to:
a. announce the tabulation of ballots submitted by owners of each
affected parcel indicating approval or opposition to the proposed
assessment.
b. consider public testimony on the Resolution of Intention and the
Engineer's Report.
2. If, at the close of the hearing, the Board finds that protests and ballot
opposition are insufficient, the following resolutions may be considered and
adopted:
a. Resolution overruling protests of improvement (Exhibit B)
b. Resolution confirming compliance with California Constitution,
Article XIIID, Section 4 (Exhibit Q.
1/27/00
WCAD \Forest Lane \PubHear.PP.wpd Page 2 of 11
POSITION PAPER
Board Meeting Date: February 3, 2000
subject: CONDUCT A PUBLIC HEARING; ADOPT A RESOLUTION OVERRULING
PROTESTS; ADOPT A RESOLUTION CONFIRMING COMPLIANCE WITH CALIFORNIA
CONSTITUTION, ARTICLE XIIID, SECTION 4; ADOPT A RESOLUTION APPROVING
ENGINEER'S REPORT AND ASSESSMENT AND ORDERING IMPROVEMENT; AND
AUTHORIZE EXECUTION OF AGREEMENT WITH FOREST LANE PARCEL OWNERS IN
CONJUNCTION WITH THE FOREST LANE CONTRACTUAL ASSESSMENT DISTRICT
NO. 98 -3, DISTRICT PROJECT NO. 5406
C. Resolution approving the Engineer's Report, assessments, and
ordering improvement (Exhibit D).
An agreement between the owners and the District is needed to establish the rights and
obligations of both parties. District Counsel has prepared such an agreement in which the
owners agree to:
• assessments being placed on their property tax bills;
• pay the assessments;
• accept total responsibility for the design and construction of the sanitary
sewer extension;
• require the contractor who is selected by the owners to maintain certain
insurance coverage;
• accept total responsibility for the costs associated with the sanitary sewer
extension, including interest for District financing; and
• have the sanitary sewer extension constructed in accordance with District
standards.
The District will:
• finance the costs of the sanitary sewer extension;
• accept the work of the contractor, provided the work is done in accordance
with District standards;
• place assessments on owners' tax bills;
• record as liens on the participants' properties the obligation of each
participant to pay assessments; and
• be reimbursed in full by receiving payments, including interest, for the total
amount financed from owners over a ten -year period.
The agreement has been executed by all five affected parcel owners. It is appropriate,
therefore, to authorize the General Manager to execute the agreement on behalf of the
District.
1/27/00
WCAD \Forest Lane \PubHear.PP.wpd Page 3 of 11
POSITION PAPER
Board Meeting Date: February 3, 2000
Subject: CONDUCT A PUBLIC HEARING; ADOPT A RESOLUTION OVERRULING
PROTESTS; ADOPT A RESOLUTION CONFIRMING COMPLIANCE WITH CALIFORNIA
CONSTITUTION, ARTICLE XIIID, SECTION 4; ADOPT A RESOLUTION APPROVING
ENGINEER'S REPORT AND ASSESSMENT AND ORDERING IMPROVEMENT; AND
AUTHORIZE EXECUTION OF AGREEMENT WITH FOREST LANE PARCEL OWNERS IN
CONJUNCTION WITH THE FOREST LANE CONTRACTUAL ASSESSMENT DISTRICT
NO. 98 -3, DISTRICT PROJECT NO. 5406
A summary of project costs is shown in Exhibit E.
Staff has concluded that this project is exempt from the California Environmental Quality
Act (CEQA) under District CEQA Guidelines, Section 5.2(b)(3), since it can be seen with
certainty that there is no possibility that the activity in question may have a significant
adverse effect on the environment. This certainty is based on the District's past
experience with numerous similar sewer construction projects, the developed nature of
the project environment, and the limited service area of the project (no potential for
growth inducement). Approval of the Engineer's Report will establish the Board of
Directors' independent finding that this project is exempt from CEQA.
RECOMMENDED BOARD ACTION: If a majority protest is not filed and if less than a
majority of returned ballots from affected parcel owners oppose the assessment, staff
recommends that the Board of Directors take the following actions:
• Conduct public hearing.
• Adopt a resolution overruling protests.
• Adopt a resolution confirming compliance with California Constitution, Article XIIID,
Section 4.
• Adopt a resolution approving the Engineer's Report, assessments, and ordering
improvement.
• Authorize the General Manager to execute an agreement with the Forest Lane parcel
owners.
1/27/00
U: \CAD \Forest Lane \PubHear.PP.wpd Page 4 of 11
PJ- v'
xl Central Contra Costa
Sanitary District
.Y
CT
y.�PyJ�
P/
ag9
X68
6eo
g87 O.
87 2
Iv
SITE
P"
llp� %
LOCATION MAP
/ N.T.S.
Py�
zz
N
o eo 160
FEET
PLAN OF IMPROVEMENT Attachment
OF FOREST LANE A
CAD NO. 99-1
I
Pann q of
PROPOSED
CAD AREA
EXISTING
SEWER
••••••••••••
PROPOSED
8" CAD SEWER
• ^••O••••
MANHOLE
1 9E
PROPERTIES
SERVABLE
BY CAD SEWER
PLAN OF IMPROVEMENT Attachment
OF FOREST LANE A
CAD NO. 99-1
I
Pann q of
RESOLUTION NO.
i�:�:n:�lll■:3
RESOLUTION OVERRULING PROTESTS
FOREST LANE CONTRACTUAL ASSESSMENT DISTRICT NO. 99 -1
The Board of Directors of the Central Contra Costa Sanitary District resolves:
On February 3, 2000, the Board of Directors held a public hearing on the Resolution
of Intention and the Engineer's Report on the proposed improvement in Forest Lane
Contractual Assessment District No. 99 -1.
At or before the time set for hearing, certain interested persons made or may have
made protests or objections to the proposed improvement, the extent of the Contractual
Assessment District, or the proposed assessment.
The Board hereby overrules each of these protests, written or oral.
The Board finds that the protest against the proposed improvement (including all
written protests not withdrawn in writing before the conclusion of the protest hearing) is
made by the owners of less than one half of the area of the land to be assessed for the
improvement.
PASSED AND ADOPTED this 3rd day of February, 2000, by the Board of Directors
of the Central Contra Costa Sanitary District by the following votes:
AYES: Members:
NOES: Members:
ABSENT: Members:
Gerald R. Lucey
President of the Board of Directors,
Central Contra Costa Sanitary District,
County of Contra Costa, State of California
COUNTERSIGNED:
Joyce E. Murphy
Secretary, Central Contra Costa
Sanitary District, County of Contra Costa,
State of California
APPROVED AS TO FORM:
Kenton L. Alm,
District Counsel
1/27/00
U: \CAD \Forest Lane \PubHear.PP.wpd Page 6 of 11
EXHIBIT C
RESOLUTION NO.
RESOLUTION CONFIRMING COMPLIANCE WITH
CALIFORNIA CONSTITUTION, ARTICLE XIIID, SECTION 4
FOREST LANE CONTRACTUAL ASSESSMENT DISTRICT NO. 99 -1
The Board of Directors of the Central Contra Costa Sanitary District resolves:
1. The Board set 2 p.m. on February 3, 2000, at the Meeting Room of the
Board of Directors, 5019 Imhoff Place, Martinez, California, as the time and place for a
public hearing pursuant to California Constitution, Article XIIID, Section 4.
2. Pursuant to Article XIIID of the California Constitution, as amended by
Proposition 218, commonly known as the "Right to Vote on Taxes Act," notice of the
proposed assessment was provided to all owners of affected parcels within the District,
which notice contained a ballot whereby each owner could indicate support or opposition
to the proposed assessment.
3. At the time and place for which notice was given, the Board of Directors
conducted public hearing, pursuant to California Constitution, Article XIIID, Section 4, and
gave every person present an opportunity to comment on and object to the amount of the
proposed assessment.
4. The Board finds that less than a majority of parcel owners who returned
ballots, weighted by financial obligation, opposed the proposed assessment.
PASSED AND ADOPTED this 3rd day of February, 2000, by the Board of Directors
of the Central Contra Costa Sanitary District by the following votes:
AYES:
Members:
NOES:
Members:
ABSENT:
Members:
President of the Board of Directors,
Central Contra Costa Sanitary District,
County of Contra Costa, State of California
COUNTERSIGNED:
Secretary, Central Contra Costa
Sanitary District, County of Contra Costa,
State of California
APPROVED AS TO FORM:
Kenton L. Alm,
District Counsel
1/27/00
WCAD \Forest Lane \PubHear.PP.wpd
Page 7 of 11
EXHIBIT D
RESOLUTION NO.
RESOLUTION APPROVING ENGINEER'S REPORT AND ASSESSMENT
AND ORDERING IMPROVEMENT
FOREST LANE CONTRACTUAL ASSESSMENT DISTRICT NO. 99 -1
The Board of Directors of the Central Contra Costa Sanitary District resolves:
This Board has taken a series of actions preliminary to ordering the improvement in
the Forest Lane Contractual Assessment District No. 99 -1, Central Contra Costa Sanitary
District, Contra Costa County, California, and now makes the following findings and
orders:
1. The Board adopted a map showing the boundaries of the land benefitted by
the proposed improvement. A copy of the boundary map was filed in the office of the
County Recorder of the County of Contra Costa in the Book of Maps of Assessment and
Community Facilities Districts.
2. The Board adopted its Resolution of Intention to order the improvement
described therein under the Municipal Improvement Act of 1911, and directed Curtis W.
Swanson, Principal Engineer, as the Engineer of Work for the Assessment District, to
prepare the report required by Section 5989.22 of the Streets and Highways Code.
The improvement is generally described as follows:
Construction and installation of approximately 474 linear
feet of sanitary sewer line, together with appurtenant work
and facilities located at Forest Lane in Alamo, California.
3. The Board called a hearing of protests on the Forest Lane Contractual
Assessment District No. 99 -1. Notice of the hearing was given by publication, by street
posting, and by mailing to affected parcel owners, all according to the Municipal
Improvement Act of 1911. Affidavits of publication, posting, and mailing were filed with
the Secretary of the District.
4. At the time and place for which notice was given, the Board of Directors
conducted a public hearing pursuant to Section 5898.26 of the Streets and Highways
Code, which included a summary of the Engineer's Report and gave every person present
an opportunity to comment on and object to the proposed Contractual Assessment
Program improvement and the extent of the Assessment District.
1/27/00
UACAD \Forest Lane \PubHear.PP.wpd Page 8 of 11
5. The Board further finds that written protests against the proposed
improvement have not been made by owners representing more than one half of the area
of the land to be assessed for the improvement.
6. The documents and events described in paragraphs 1 to 4, inclusive, are
stated here in tabular form, with their dates and, where appropriate, their numbers. All
documents are now on file with the District except as otherwise noted.
7. The Board approves the Engineer's Report and each component part of it,
including each exhibit incorporated by reference in the report.
8. The Board finds that the Engineer of Work, in the Engineer's Report has fairly
and properly apportioned the cost of the improvement to each parcel of land in the
Assessment District in compliance with the agreement between the owners and in
proportion to the special benefits derived by each parcel, in relationship to the entirety of
the capital cost of the improvement. The Board hereby confirms and levies each individual
assessment as stated in the Engineer's Report.
9. This Board orders the improvement described in paragraph 2 and as detailed
in the Engineer's Report.
10. According to Section 10603 of the Streets and Highways Code, the Board
designates the District Controller to collect and receive payment of the assessments.
11. The Board independently finds that this project is exempt from the California
Environmental Quality Act (CEQA) under District CEQA Guidelines, Section 5.2(b)(3),
since it can be seen with certainty that there is no possibility that the activity in question
may have a significant adverse effect on the environment. This certainty is based on the
District's past experience with numerous similar sewer construction projects, the
developed nature of the project environment, and the limited service area of the project
(no potential for growth inducement).
1/27/00
WCAD \Forest Lane \PubHear.PP.wpd Page 9 of 11
Number
Document or Event Date
or Action
a.
Resolution of Intention 03/04/99
99 -027
b.
Resolution Approving Boundary Map 03/04/99
99 -028
c.
Boundary Map Filed with County Recorder
Filed
d.
Certificate of Mailing Notice of Improvement
Dated
e.
Certificate of Posting Notice of Improvement
Dated
f.
Affidavit of Publication of Notice of Improvement
Dated
7. The Board approves the Engineer's Report and each component part of it,
including each exhibit incorporated by reference in the report.
8. The Board finds that the Engineer of Work, in the Engineer's Report has fairly
and properly apportioned the cost of the improvement to each parcel of land in the
Assessment District in compliance with the agreement between the owners and in
proportion to the special benefits derived by each parcel, in relationship to the entirety of
the capital cost of the improvement. The Board hereby confirms and levies each individual
assessment as stated in the Engineer's Report.
9. This Board orders the improvement described in paragraph 2 and as detailed
in the Engineer's Report.
10. According to Section 10603 of the Streets and Highways Code, the Board
designates the District Controller to collect and receive payment of the assessments.
11. The Board independently finds that this project is exempt from the California
Environmental Quality Act (CEQA) under District CEQA Guidelines, Section 5.2(b)(3),
since it can be seen with certainty that there is no possibility that the activity in question
may have a significant adverse effect on the environment. This certainty is based on the
District's past experience with numerous similar sewer construction projects, the
developed nature of the project environment, and the limited service area of the project
(no potential for growth inducement).
1/27/00
WCAD \Forest Lane \PubHear.PP.wpd Page 9 of 11
PASSED AND ADOPTED this 3rd day of February, 2000, by the Board of Directors
of the Central Contra Costa Sanitary District by the following votes:
AYES: Members:
NOES: Members:
ABSENT: Members:
Gerald R. Lucey
President of the Board of Directors,
Central Contra Costa Sanitary District,
County of Contra Costa, State of California
COUNTERSIGNED:
Joyce E. Murphy
Secretary, Central Contra Costa
Sanitary District, County of Contra Costa,
State of California
APPROVED AS TO FORM:
Kenton L. Alm,
District Counsel
1/27/00
WCAD \Forest Lane \PubHear.PP.wpd
Page 10 of 11
EXHIBIT E
SUMMARY OF PROJECT COSTS
FOREST LANE CAD NO. 99 -1
Construction $45,430
Construction Contingency 6,820
Engineering 7,000
District Services 4,450
TOTAL la3.700
1/27/00