MINUTES OF THE ADJOURNED REGULAR MEETING
OF THE BOARD OF DIRECTORS OF THE
CENTRAL CONTRA COSTA SANITARY DISTRICT
HELD ON MAY 30, 1996
The District Board of the Central Contra Costa Sanitary District convened an adjourned
regular session in the Second Floor Conference Room, 5019 Imhoff Place, Martinez,
County of Contra Costa, State of California, at 2: 1 0 p.m. on May 30, 1996.
President Menesini called the meeting to order and requested that the Secretary call roll.
1. ROLL CALL
PRESENT:
Members:
Rainey, Boneysteele, Menesini
ABSENT:
Members:
Dalton, Hockett
Member Dalton had advised staff that he would be unable to attend this meeting and had
asked that he be excused. Member Hockett entered the meeting at the hour of 3:53 p.m.
2. PUBLIC COMMENTS
None
3. ENGINEERING
a.
BOARD RECYCLED WATER COMMITTEE MEETING/BOARD WORKSHOP SESSION
TO REVIEW AND TAKE ACTION AS APPROPRIATE WITH REGARD TO THE
DISTRICT'S RECYCLED WATER PROGRAM
Mr. Roger J. Dolan, General Manager-Chief Engineer, introduced Mr. Doug Craig, Planning
Division Manager, who reviewed the agenda and topics of discussion relating to the Zone
1, Pleasant Hill Recycled Water Project, and the East Bay Municipal Utility District
(EBMUD)/Central Contra Costa Sanitary District (CCCSD) Recycled Water Project to serve
the Lamorinda area.
Mr. Craig introduced Mr. Jim Coe, Associate Engineer, who described the Zone 1
CCCSD/Contra Costa Water District (CCWD) Recycled Water Project to serve the Pleasant
Hill area. Mr. Coe noted that on June 3, 1996, the Pleasant Hill City Council will consider
approval of a recycled water prepurchase agreement whereby the District agrees to
provide recycled water to the City for a specific period in exchange for an easement
valued at $42,000. Mr. Coe described required plant improvements and the flow of
recycled water through the plant and into the pipeline for distribution. The total
estimated cost for the Zone 1 project is $4.4 million. Mr. Coe reviewed the proposed rate
structure for a declining block rate with a retrofit surcharge as discussed with the Board
previously.
With regard to the State loan, Mr. Coe stated that the District is required to have signed
customer contracts before construction bids can be opened. Work is proceeding to secure
those signed contracts. The District's recycled water is approximately equal in cost to the
costs of new water, with the exception of two large well users. To get State loan
coverage, the District must show that the well water is of sub-quality. This is not
expected to be a problem. The present value of the State loan to the District is about
$500,000 in savings to the project.
Mr. Coe described the permit proce~s to secure permits from the Regional Water Quality
Control Board, the Department of Health Services, and the Contra Costa County Health
Department. A consultant has been hired to assist with this effort. Mr. Craig reviewed
the schedule for the Zone 1 Recycled Water Project, noting that it is still anticipated that
recycled water will be delivered in the third quarter of 1997.
Mr. Coe described the CCCSD/EBMUD cooperative project to provide recycled water to
the Lamorinda area using the Shell pipeline. This project can be divided into two phases,
05
30
96
94
thus allowing sufficient time to address the perceived issue of putting recycled water into
an EBMUD watershed. Copies of the CCCSD/EBMUD Recycled Water Project Technical
Memorandum No.5 prepared by G. S. Dodson & Associates were distributed to the
Board. The information from that study has been given to Barakat and Chamberlain for
use in preparing the Draft Feasibility Report which should be completed in the near future.
Mr. Coe summarized the findings, stating that the recycled water cost is approximately
$1,220 per acre foot. Mr. Coe stated that the EBMUD Board Committee for Recycled
Water will consider this project at its meeting next week. EBMUD staff has been
supportive of this cooperative project. To date CCCSD has spent $30,000 for its share
of the studies. The total estimate cost for the lamorinda Recycled Water Project is $12.3
million. Mr. Coe stated that the next step will be to begin the consultant selection
process for the Facilities Plan and California Environmental Quality Act (CEQA) effort. It
is expected that the cost of this effort will be approximately $75,000 per agency. This
matter will be brought back at a future Board Meeting for amendment to the existing
agreement between CCCSD and EBMUD and approval of the consultant contract.
Discussion followed with regard to the recycled water costs for this project and possible
impacts on the willingness of EBMUD to proceed with the project.
Mr. Coe requested that the Board consider Shell pipeline ownership/operation issues.
Currently EBMUD staff stipulates that the owner of the Shell pipeline should be
responsible for operation and maintenance. Mr. Coe reviewed the options and
advantages and disadvantages of each as set forth in the handouts provided to Board and
staff .
Member Hockett entered the meeting at the hour of 3:53 p.m.
Mr. Coe presented the staff recommendation with regard to ownership and operation of
the Shell pipeline as follows:
1 )
That CCCSD sell the Shell pipeline to EBMUD for costs incurred to date;
2)
That the contract include a reversion clause;
3)
4)
That EBMUD finance, operate, maintain, and replace at its expense; and
That CCCSD wholesale recycled water to cover its costs.
Mr. Coe requested that the Board consider this matter as it will be part of the Principles
of Agreement that will be developed. Discussion followed with regard to consideration
of a long-term lease, delaying transfer of the pipeline until the project is ready to proceed,
and the costs and issues involved in maintaining a high pressure pipeline.
Mr. Craig reviewed the schedule for the Lamorinda Recycled Water Project, which calls
for delivery of Phase 1 recycled water in the spring of 1999 and delivery of Phase 2
recycled water about one year later.
Mr. Coe reported that filter plant testing is being done to gather more data for EBMUD
staff to address the watershed concerns. This information will also be used in producing
the CEOA report. Mr. Coe reviewed the scope of the testing program.
Mr. Craig stated that CCCSD and CCWD staff are in the very early stages of discussing
an industrial project to deliver recycled water to the refineries. The project would be 3-5
MGD or 5,000 to 6,000/AF per year. The cost of the recycled water is estimated to be
in the range of $500/AF.
In closing, Mr. Craig summarized the estimated total capital cost for the District's
Recycled Water Program as follows:
Existing Pipe
$ 2,200,000
Treatment Plant
3,800,000
Zone 1 Distribution
2,200,000
05
30
96
95
Lamorinda
11,000,000
Industrial Near-Term
9.500,000
TOTAL
$28,700,000
Ms. Harriette Heibel, Community Education Officer, discussed the community education
component of the District's Recycled Water Program, describing steps to be taken in
development of this effort. Ms. Heibel noted that a detailed presentation will be made at
a future Board Meeting.
President Menesini thanked staff for the informative presentations.
4. REPORTS/ANNOUNCEMENTS
None
5. ADJOURNMENT
There being no further business to come before the Board, President Menesini adjourned
the meeting at the hour of 4:35 p.m.
~(a 1-f 6; '-1 ~ ,S r~
President of the Board of Directors,
Central Contra Costa Sanitary District,
County of Contra Costa, State of California
COUNTERSIGNED: