HomeMy WebLinkAboutAGENDA BACKUP 02-20-86
.
Centr, Contra Costa Sanitar District
BOARD OF DIRECTORS
PAGE 1 OF 1
POSITION PAPER BOARD MEETI~B~uary 20, 1986
NO.
v. HEARINGS 1
~~b~uary 14, 1986
SUBJECT
CONDUCT A PUBLIC HEARING ON THE FORFEITURE OF
A PORTION OF P AND J UTILITY COMPANY'S CASH DEPOSIT
TYPE OF ACTION
HOLD HEARING
SUBMITTED BY
Dennis Hall, Associate Engineer
INITIATING DEPT.lDIV.
Engineering Dept./Construction Div.
ISSUE: A publ ic heari ng is requi red pri or to consi deri ng the forfeiture of a
contractor's cash deposit.
BACKGROUND: P and J Utility Company (P&J) has been 1 icensed to do work in this
District since 1979. The company has constructed a small number of sewer projects
in the past six years. On their last project, P&J worked on a Saturday which
required an Inspector to work overtime. It is District practice to inform
contractors that they must pay for the overtime and to subsequently invoice the
contractors for the overtime in situations like this. They were billed on two
occasions for the cost of the overtime inspection, including a late charge (a
total of $261.80), and did not pay. Additional follOti-up letters by certified
mail were sent, without any response from the company. The foll Oti-Up 1 etters were
returned unopened by the postal service.
The General Manager-Chief Engineer has made a determination that P&J has violated
its permit by not paying the overtime inspection charges. The Board of
Directors, at its meeting of February 6, set February 20 as the date for hearing
this matter. Staff has sent notification of the proposed hearing to P&J. It is
the position of staff that, unless P&J provides substantial evidence at the
hearing that they are not in violation, the Board should authorize $261.80 to be
deducted from the contractor's cash deposit.
RECOMMENDATION: Make a fi ndi ng that vali d charges have not been paid and di rect
the Secretary of the District to notify P&J of the proposed deduction of $261.80
from P&J' s cash deposi t.
REVIEWED AND RECOMMENDED FOR BOARD ACT/ON
JSM
RAB
1302A.9/85
~
DH
INITIATING DEPT./DIV.
.---.----...----.----..-.---.--,.--... ..---.........
...
....
~
P 057 337 444
RECEIPT FOR CERTIFIED MAIL
NO INSURANCE COVERAGE PROVIDED
NOT FOR INTERNATIONAL MAIL
(See Reverse) /
;! SeAt to . ,
~ I"' and J lJti-trt
..
i St~~1n~~caneiforte
d P.O" State ~nd ZIP Code
a; A
~ Postage
=:)
... Certified Fee
1
Central Contra Costa Sanitary District
5019 Imhoff Place
Martinez, California 94553
(G
February 21, 1986
$
Special Delivery Fee
CERTIFIED MAIL
RETURN RECEIPT REQUESTED
P and J Utility Company
523 Branc1forte Street
Vallejo, CA 94590
Restricted Delivery Fee
Return Receipt Showing
to whom and Date Delivered
~ Return receipt Showing to whom
~ Date, and Address of Delivery ,
.g TOTAL Postage and Fees
LL ,--"'--
$
On February 20, 1986, the District's Board of 01
" "-
)... :;-:. '.
',' v ;,. \
\ ~c })~ ! .5,~' I
'\~~~) -j
" c. j
that valid charges due the District have not beeu pa 0 IJ:J ,....... --"'r-'~.,,;/
and authorized the deduction of the charges in the amount of $261.80 from
your cash deposit with this District.
g Postmark or Date.
co
C')
Gentl emen:
FORFEITURE OF CASH DEPOSIT
E
o
LL
CIJ
a.
Please be advised that unless you pay the $261.80 within ten calendar
days from the date of receipt of this letter, the District will deduct
sa1 d amount from your deposit. The bal ance of your deposit will be
retu rned to you, and you r company w ill be removed from the li st of
contractors who are eligible to do work in this District.
Sincerely,
~CLt.ln~~
~y:e E. McMill an
Secretary of the District
JEM/jl
cc: Board of Directors
R. Dolan
J. Hazard
bee: R. Baker
D. Ha 11
J. t~eCoy
.46.
Central Contra Costa Sanitary District
5019 Imhoff Place Martinez, California 94553
February 10, 1986
CERTIFIED MAIL
RETURN RECEIPT REQUESTED
P and J Utility Company
523 Branciforte Street
Vallejo, CA 94590
Gentlemen:
FORFEITURE OF CASH DEPOSIT
This letter is to notify you that the Distric
its meeting of February 6, 1986, established
forfeiture of a portion of your $1,000 cash de
in the amount of $261.80, the value of the 0
which your company owes this District. The
20, 1986, as the date for hearing this ma
Board will make an official declaration
unless you pay said amount prior to the h
appear at the hearing and provide testimon
to speak at the hearing, please notify the
Sincerely,
/~, 6- ~ . 'rh (lL}.A.~~~
~yce E. McMlll an
Secretary of the District
JEW jl
cc: Board
R. Dolan
J. Hazard
bcc: R. Baker
J. McCoy
o . Ha 11
.
Centr\ Contra Costa Sanital District
BOARD OF DIRECTORS
PAGE 1 OF 2
POSITION
PAPER
BOARD MEETING OF
NO.
VI.
CONSENT CALENDAR 3
SUBJECT
QUITClAIM SEWER EASEMENT, JOB 4147; SUBDIVISION 6230,
WALNUT CREEK AREA
DATE
TYPE OF ACTION
APPROVE QUITClAIM
OF EASEMENT
SUBMITTED BY
Dennis Hall, Associate Engineer
INITIATING DEPT./DIV.
Engineering Dept./Construction Div.
ISSUE: Albert D. Seeno Construction Company, ao/ner-developer of Subdivision
6230, has requested the District to quitclaim a sewer easement which lies within
Parcel "D" of Subdivision 6230.
BACKGROUND: The subject easement was dedicated to this District when the
subdivision map was filed. The alignment of the sewer was subsequently adjusted.
A new easement has been granted for the revised sewer al ignment. The subject
easements are no longer needed. The property ao/ner has paid our processing fee.
RECOMMENDATION: Approve Quitclaim Deed to Albert D. Seeno Construction Company,
Job 4147, authorize the President of the District Board of Directors and the
Secretary of the Di strict to execute sai d Quitcl aim Deed, and authorize the
Quitclaim Deed to be recorded.
REVIEWED AND RECOMMENDED FOR BOARD ACTION
130211.9/85
~.....
DH
INITIATING DEPT./DIV.
RAB
56
()~
~
<
~~
~ f:t
..
..~
(;j ..~
,p Ju~ .v" .../::
~(T ,~ "".
~k "...... :i';"
~ ~, /:?"':...
, ... -:. .':~"
.... .....
/
,
,
...... (":
./ ..-
.......:. ,-,.
::.::. .:~.: ~
.,:",. ,."
......
. .
.. .-
. .
....
(75AS)
QUITCLAIM EASEMENT
JOB 4147
WALNUT CREEK AREA
.
Centrl Contra Costa Sanitar District
..
BOARD OF DIRECTORS
PAGE 1 OF 2
POSITION PAPER BOARD MEETI~~Fruary 20, 1986
NO.
VI. CONSENT CALENDAR 4
SUBJECT
DATE
QUITClAIM SEWER EASEMENT, JOB 522,
WALNUT CREEK AREA
February 11, 1986
TYPE OF ACTION
APPROVE QUITCLAIM
OF EASEMENT
SUBMITTED BY
Dennis Hall, Associate Engineer
INITIATING DEPT./DIV.
Engineering Dept./Construction Div.
ISSUE: Mr. Jerry Loving, the general partner of The Woodbridge Partnership and
The 255 Limited Partnership, which a-/ns Lot Nos. 16 and 7 of Block 11 in the
Pringle Addition to Walnut Creek, has requested the District to quitclaim a sewer
easement which is within their property.
BACKGROUND: The subject sewer easement was sha-/n on the map of the "Pringle
Addition" when the map was filed in 1912. The subject easement and sewer line
ctossed several lots (bull di ng sites) and was subsequently relocated as part of
Local Improvement District No. 4 in 1949-50.
The subject sewer easement is no longer required for District use. The property
a-/ner has paid our processing fee.
RECOMMENDATION: Approve Quitclaim Deed to The Woodbridge Partnership and The 255
Limited Partnership, Job 522, authorize the President of the District Board of
Directors and the Secretary of the District to execute said Quitclaim Deed, and
authorize the Quitclaim Deed to be recorded.
REVIEWED AND RECOMMENDED FOR BOARD ACTION
~f
7~
1302".9/85
DH
JSM
RAB
INITIATING DEPT./DIV.
~
.1
i'
/l
I.:'
I i
~
,
-\
:xl
\
J ./
/.'
. "
,,,.'"
p40
";
/..
/ ,
'.:
l ."/
" .
P29843C
p3g~2'L.
P39581/'4
"
()
~
()
...
"
'0
IQ
~
Q..
16 17
4 3
~
'It
~
~
I
~
f\..
.....
IQ
~ ~
I\.
.....
1.0
it)
^'
.....
&..
.....
~
"-
~C)\o
~r\I
.....~
.....
~
a~~
~ ~
" -?~ 'f'> ~
" ~ ~
'>...~
? ~"1"
!tl~~
'It ~/~
~ ~
11)" ~
Q..
12 13
"-
0\
IQ
~
....
Q..
~
'..
~
~
.....
eo,
II)
....
0-
~
f\..
It')~
~"
25e'-,ovc- 522
196~6VC 522 It)
~
/0 P87'~9 .....
P60325F
I\.
~
PI0332 .....
QUITCLAIM EASEMENT
JOB 522
WALNUT CREEK AREA
~
I
~
,
~
\.:
~ '8/64F
~
I
.......
P6$69L
Ch
<8
Centr~. Contra Costa Sanitar) District
BOARD OF DIRECTORS
PAGE 1 OF 3
POSITION PAPER
BOARD MEETING OF
February 20, 1986
CONSENT CALENDAR 5
SUBJECT
NO.
VI.
DATE
February 14, 1986
TYPE OF ACTION
AUTHORIZATION FOR P.A. 86-6 (DANVILLE) AND P.A. 86-7
(ALAMO) TO BE INCLUDED IN A FUTURE FORMAL ANNEXATION TO
THE DISTRICT
SUBMITTED BY
Dennis Hall, Associate Engineer
Owner
Address
Parcel No. & Acreage
Parcel
No.
Area
86-6
Da n vi 11 e
Dennis Casagrande
409 Front Street
Danville, CA 94526
216-102-006 (0.45 acres)
86-7
Alamo
Maximilian Mfg. Co.
460 Roland Way
Oakland, CA 94621
197-170-016 (37.04 acres)
ACCEPT ANNEXATION FOR
PROCESSING
INITIATING DEPT./DIV.
Engineering Dept./Construction Div.
Remarks
Lead
Agency
Proposed Office Building
on Hartz Avenue.
Negative Declaration by
the City of Danville.
City of
Danville
Property owner is building
one single family house
and must extend the public
sewer 900 feet (appx.) in
Stone Valley Road.
District to prepare
"Notice of Exemption"
CCCSD
RECOMMENDATION: Authorize P.A. 86-6 and 86-7 to be included in a future formal
annexation.
INITIATING DEPT./DIV.
REVIEWED AND RECOMMENDED FOR BOARD ACTION
1302".9/85
",,.y
DH
!l
JSM
RAB
It
i~ ~ ~ --.. ~;! ~ '"
<(C[RRO c.r~ ~ '" I ..~ \Ow ~ ~ " ~~
25 ... 1 l! 117 ....... II. -: 8 ; , : 'J~ ~ 0 ~~
\/'448 13483 'ID"'" '8 SUllo r'"'l.~t!.A~:~~ ~~+~~!I"~ ~~3 ~< 34 \:!,.,l'; \
.,;sr I 10 'f' I "pW ! ~ . I S71J'B' I ,,'" 5 44 2 ,C'~ ~Ir 133 1 "
...::!J ~, "..I.~ L IS J ro ~ ~~ ""0 .., 0
I I " LN 1Ib_ . \ IS / · ,tXI 6:T4
T' c I~s ,,~SI\ V K~ ',,- II 152.~ 5..'. ,~~ .,OOAO "
D * .. ~\ II .s t! r<' 1...:.L,.;.j I~ ,_ He 'm4e
10 SUB 4918 ~ 1--! !- ~t6z155 ~;".~Al / .. 'wi:" ~r-
;;c. _ i-- -.:. ..~, 156 i" ,...v:~ 'i ' 3 IS J '
~.o... =- I ,_, " . .~!.~
130 .E 46 l'\a 57 i 5 1~ " / / ,~r-- '~:: '1" j~ .......
I t5 ,5' 5. 15 \ . / -:I 5aAe ,-
'- ,.) , ....- ~ j.:HA( r---;:;
..... '..,' f~T~'~\I\: O'~'~J~j · ,;., "AA' ~~
A "";3 ~ 31 ~ -1' 39';0 i 1\,..6: ~5- --- OtiC 10 AC
\ ,n ..;; i~ 'H~~32_ ~~'::~ ~ _'i~~~l~t\t& & 10 '
! I -I ~ ;::;:& .--: ,2 1)
III -...,rf =j V "'.I~."~ .610 1 :01 ~ ~ 3\\\2t5'C1J~\
-t '- --;; " ~ 1.:..0'01' r-;':' c. ~7 ~3
"~ 14.' I~ Hli~~J:~..Ji.'e:':::' ~ 2S;~
~~. 'DS' ~ l'45 'It/IL' ~ c~ u lN1 V~~:.A:AeN:: SCHOOL 24 23$-:
.... .'5.... ~ ~ ~.v.... ..,~~~~" ':i
...,_.." _ ~ 4J''' ," "..1...'2.'2' '30 '3'10,' ~o _L7/
~ ~ su~ B-n/~ ~o. '52' ~~'2'1 r;. \ /'4,
~ l.:::r..~ 6-/5/9 J '55 i '2. 00 2 --1l .. ., ~
,~I~' .:.. -. :;~ --..;.. ,.....iNO-eT ''''Ga 00 q~/7 / .1,1 r(=
~ 't:>~r DI. ;or ~ '68 '67 'I.. '56 O:..,YL.. . ...JI\ 37 '0 "'. '6
:r.. D/~~~O /ltD. /~ ", h i '6" ,.. f- '5:r:-1~ A~::!E 26 VI T 23 (. R!J1I~a",~
~ y_~ SO' HH f\ 1~,9S RO:l.."~~' 'TO').. ~~"K , Nu
I '~:;1ltiil. .1l"~\::, ~ry01 h : "-iJrr~~~~~'~ ~
A~'HM7z ~ ~
. ..~1'~ ' 5' 50 ~ ANNSX~ 35 '3~ 1~~6.5 ..~~
( , _ -'._., -II; YNlu.-:W ,'7
52 ..:.2.... '. .,i _ ~o 64
_~:._, II ~ rr 138 ~ 63 12 61
I 53 .. ..i 19 57 -2 .. ,0-
S. ~ t ~_ Xi \ 56 J 13. e, ~. ~ I~
5. 0: 47 ( .... ')".i , 5.\ 5. 1\ ' "0 ~ ., 43.. .... 4406 I--
'6 "\.~" ........,,;1 A 0 PeA ..
,,\'" ~~~. Lt ~ 0 ::'~ :2 ~~' .. .. " ":. .~ ~.; ,h ~~
~'2 '.,-~;~ .. ~ lit !ti. .. ,. ~ ~=- 3,
2. / 13 ~ ~ 24 r;-
DR I ,/'lJ. Ii ,0, . , e ;
6~ .. 11. 0... 05 I 26 ~/{~..I.' 0 AlA IR -2,
daTil .~bll. "l..F~\' ~7/ '.. ... 'so IS, · le2 .ul,J", ..
.....,.... ... ~L\c\. .. 27 ~"(~ 4 \3 J2 ~
3 \r.'~ .. 1.:8 .... /'.~ n ~"'tC':YL 12 ,~ ,
\~' ,.z;; .s I ~ -; r.....~~... ;-;--- 5 !:l ~' J
~.' ,.'\. / \.. J. 34~ :I:l~~ ". ~ F5. B~
t \;.1'('" 2 I. 3~ IS .-- ~ l3 ~ ~ ~
'-' "'\t}.' .,t:. /<>4' ~ 3; I !! ~ I ~ ~""P I 8..0 ~
\\L.AU ~ ~ .~2t
\!:!. ~ln-4 L312 \2 \Dll '\\.\.~ ~~.. .....~, 0 S, 'i~5. ..
~'4 ",..'I'. \:. V'.~D \~~ " 8 ~-'
\ I .~~X"hl~.IT~ I 1,::\2' SUB23 ~, 3 ' 4' 54 :-:-i
\ ' " "53:!",
\ " I. ~ -'., ~:rl$" . '7 31
.5..., . III In' _, -r. n -, CT I::i'
i'Jca .. ~
PROPOSED ANNEXAT I ON I '\ ~
~.o ~
-u,,,~~
;::;. ...;:: . :::. S
"'iiE .'
~\J' ~7.~~Z ~
~. q:jr tll I r
;-t~\b "[J
~~.J U
r;-\ 55~8 n
I I - . 'f;
,..... '.2a~
fi'oJ ~{. ,.\...~
\.~~ 110 ~
\\' '~~
-_...~"\~~.:~~ ._::=-\ ~
--__________'..'~4__.~
..
'1
.
""
'7 ~
~ 10
~
'~:'"
",'....
, ,
, '
~'~>"
,I ~ \- SUB
:>, T 543 ~
LNT'-
~ ~~~~/ZIZ
13tH ...J ~ \
..
::I
-
10
;:;:;::; .'~-
'," ',::~.
~5 ..
.. ....
::t:
1'1:1'0
78
..
::
"
~.
.'0'
ti
tI;
1\
.
c:::::r.
P!A.8~'"
-
,_. _,_.~-==-=~__~!\'';7...~~~~ T';J'
y
0,1
10. '~~1~'
~,..,
22
i
I
\
ALAWO PROPERTIES CO
"
NOW \t-l
D' S"T~\ Co ,..
( D,A.QO-7
'.
..
1360 AC
I!A. 8''''7
.~...L
.._.-l~~;:~ili;LL". .....).,\\:> '"
.
Centr" Contra Costa Sanitar. District
BOARD OF DIRECTORS
PAGE 1 OF 2
POSITION
PAPER
BOARD MEETING OF
February 20, 1986
NO.
VII.
ADMINISTRATIVE
1
SUBJECT
CONSIDER REQUEST TO REVISE CERTAIN INTERNAL AUTHORITY
LIMITS
DATE
February 14, 1986
TYPE OF ACTION
REVISE AUTHORITY
LIMITS
S'Ff~~T~D.f.Y Dolan
General Manager-Chief Engineer
INITIATING DEPT./DIV.
Administrative
ISSUE: As Assembly B11l 1036 (Frazee) became effective January 1, 1986, the limit
for bidding construction work projects was increased from $5,000 to $10,000. Within
the District several internal limits are keyed to this $5,000 figure.
BACKGROUND: On December 2, 1982, the Board of Directors instituted a procedure
whereby expenditures from the Sewer Construction Fund of less than $5,000 would be
reviewed and approved by the Board by inclusion on the Consent Calendar.
On December 3, 1981, the Board of Directors delegated authority to the General
Manager-Chief Engineer to initiate capital projects and to expend up to $5,000
subject to subsequent Board authorization. No money is or would be expended from
capital funds without ultimately being approved by the Board. In the event that the
project requi res further expenditures, the $5,000 initi al advance woul d be incl uded
in the project authorization position paper for Board approval. If the project
fails to proceed beyond the $5,000 initial advance, an explanatory position paper
would be prepared and presented for Board consideration on the Consent Calendar.
The Board has del egated authority to staff for settl ement of damage cl aims on
matters up to $5,000. The Collection System Operations Manager handles items up to
$1,000 routinely. The Risk Management Committee reviews and approves settlement of
items of $5,000 or less. Matters exceeding $5,000 are presented to the Board of
Directors for consideration. Effective January 1, 1982, the statutory limit for
settling damage claims by staff without requirement of Board action was raised form
$5,000 to $20,000 by the State Legislature. However no change was made in District
procedure at that time.
Staff requests that the Board of Directors consider revising internal limits as
indicated in the recommendation.
RECOMMENDATION:
1. Revise internal procedure to reflect that expenditures of $10,000 or
less from the Sewer Construction Fund will be reviewed and approved by
the Board of Directors by inclusion on the Consent Calendar.
2. Delegate authority to the General Manager-Chief Engineer to expend
$10,000 or less for initiation of capital projects subject to
subsequent Board approval.
REVIEWED AND RECOMMENDED FOR BOARD ACTION
INITIATING DEPT./DIV.
1302A.9/85
-------------.-..."....-------...,...--.----..,',".---._-"-_._~'~---~--_._----,~-......--_.__..,.,_..,-,._....._..,....._--,--~,--_.._--_._---..".
SUBJECT
CONSIDER REQUEST TO REVISE CERTAIN INTERNAL AUTHORITY
LIMITS
POSITION PAPER
PAGE ?
DATE
OF ?
Januarv ~n. lQAA
3.
Delegate authority to staff for settlement of damage claims on matters
not exceeding $10,000, with the understanding that settlements between
$5,000 and $10,000 would be reported to the Board as information items
on the Consent Calendar.
l...._______.
13028-9/85
.
Centra.. Contra Costa Sanitar.. District
BOARD OF DIRECTORS
PAGE 1 OF 2
POSITION
PAPER
BOARD MEETING OF
Februa 20, 1986
NO.
VI I 1.
ENGINEERING
1
SUBJECT DATE
AUTI-lORIZE $64,490 FROM TI-lE SEWER CONSTRUCTION FUND FOR TI-lE February 14, 1986
MARTINEZ (M-2) FORCE MAIN EMERGENCY REPAIR PROJ ECT <DISTRICT TYPE OF ACTION
PROJ ECT NO. 20036), ACCEPT TI-lE COMPLETED WORK, AND AUTI-lORIZE AUTI-lORIZE FUNDS, ACCEPT
THE FILING OF TI-lE NOTICE OF COMPLETION. WORK, AUTI-lORIZE FILING
NOTICE OF COMPLETION
SUBMITTED BY
Steve McDonal d
Senior Engineer
INITIATING DEPT.lDIV.
Engineering Department/
Engineering Division
ISSUE: Funds must be authorized for the emergency repai r of the Marti nez (M-2)
Force Mai n.
BACKGROUND: On August 22, 1985, the Board declared an emergency situation
pursuant to Public Contract Code Secti on 20806 so that a 1 eak in the Marti nez
(M-2) Force Main could be repaired as soon as possible. The leak occurred in the
20-inch line where it passes through an easement on the Industrial Tank <IT>
Corporation property. If the leak had not been immediately corrected, service to
the Marti nez area coul d have been interrupted and damage to the IT 1 evees coul d
have resul ted.
A project team composed of District forces from the Engineering, Collection System
and Plant Operations Departments, as well as the construction firm of McGuire and
Hester, immediately secured the pipe with temporary pipe repair couplings. Later
a replacement section of pipe was spliced in with flexible connection couplings to
render a permanent repair. Staff recommends accepting all repair work as complete
at this time.
Staff believes that pipe settlement from an unauthorized IT levee is directly
responsible for the break. Negotiations are currently proceeding with IT for
reimbursement of repai r costs, as well as removal of a second 1 evee over the
pipeline at a different location.
District and contractor costs to complete the temporary and permanent repair total
$64,490. A breakdown of costs is presented in Attachment 1. Following
authorization of the requested funds and acceptance of the completed work, a
Notice of Completion will be filed with the County, and the project will be closed
out.
This project was not in the Five-Year Capital Improvement Plan because it was an
unanticipated emergency.
RECO~NDATION: Authorize $64,490 from the Sewer Constructi on Fund for the
Martinez (M-2) Force Main Emergency Repair Project <District Project No. 20036),
accept the completed work, and authorize the filing of the Notice of Completion.
St{
{RlJ
J0
JAL
INITIATING DEPT.lDIV.
1302A.9/85 SM
DRW
Attachment 1
MARTINEZ (M-2) FORCE MAIN
EMERGENCY REPAIR PROJECT
(D.P. 20036)
ProJect Cost Breakdown
February 10, 1986
DISTRICT FORCES
o
o
o
o
Proj ect Management
Design
Plant Operations
Construction Management
Subtotal
PROFESSIONAL SERVICES
o
o
Soils consultant (Woodward-Clyde)
Corrosion consultant
(Jose Villalobos & Associates)
Subtotal
CONSTRUCTION
o
o
McGui re & Hester
Materials
Subtotal
TOTAL PROJ ECT COST
$ 708
7,174
1,261
2,026
$ 2,433
2,343
$ 46,782
1,763
Page 2 of 2
$ 11,169
4,776
48,545
$ 64,490
.
Centrl
Contra Costa Sanitar. District
~
BOARD OF DIRECTORS
PAGE 1
OF 11
POSITION
PAPER
BOARD MEETING OF
February 20, 1986
NO.
IX.
BUDGET AND FINANCE 1
SUBJECT
DATE
February 14, 1986
RECEIVE 1985-1986 OPERATIONS AND MAINTENANCE BUDGET
REVIEW FOR THE SIX MONTHS ENDED DECEMBER 31, 1985
TYPE OF ACTION
RECEIVE BUDGET
REVIEW
SUBMITTED BY
INITIATING DEPT.lDIV.
Walter N. Funasaki, Finance Officer
Administrative/Finance & Accounting
ISSlE: A report of the resu 1 ts of a compa rat i ve rev i ew of actu a 1 and bu dgeted
Operations and Maintenance (O&M) revenues and expenses for the first six months of
the 1985-1986 fiscal year is provided in this Position Paper.
BACKGROUND: A general summary of actual and budgeted Di strict O&M revenues and
expenses for the six months ended December 31, 1985 follows:
DISTRICT REVENUES
District revenues from all revenue sources through the six months ended December
31, 1985 totaled $15,817,960, representing 87.8% of the total revenues budgeted
for the entire fiscal year of $18,012,477. The primary revenue amounts budgeted
for the fiscal year are $13,794,977 of Sewer Service Charges and $3,600,000 of
Service Charge Revenue from the City of Concord. Sewer Service Charge revenues
of $14,190,930 were recorded through December 31, 1985, of which $13,632,808 was
credited to the District through the Contra Costa County property tax rolls, and
the remainder collected directly by the District. $856,642 has been received
from the City of Concord as an advance payment of one-hal f of the service
charges for the fi rst six months of the fi scal year. The bal ance of the
budgeted City of Concord service charge revenues of $2,743,358 is expected to be
realized during the remainder of the fiscal year.
As Sewer Service Charge revenues, which comprise 76.6% of District budgeted
revenues for the fiscal year are $395,953 greater than budget, the total budgeted
revenues of $18,012,477 are projected to be exceeded by $400,000 for the
1985-1986 fiscal year.
DISTRICT EXPENSES
District expenses of $8,766,308 for the first six months of the fiscal year
were $253,180 less than budgeted expenses of $9,019,488. A summary of variances
between actual and budgeted expenses by department for the six months ended
December 31, 1985, and the projected variances from budgeted expenses for the
1985-1986 fiscal year are presented in Attachment I. Variances between actual
and budgeted expenses by major expense categories are shown in Attachment II.
Causes of major overexpended or underexpended accounts for the six months ended
December 31, 1985 are described for each department in Attachment III.
RECOMMENDATION: Receive the 1985-1986 Operations and Maintenance Budget Review for
the six months ended December 31, 1985, and provide comments and guidance to
Di strict staff.
INITIATING DEPT.lDIV.
REVIEWED AND RECOMMENDED FOR BOARD ACT/ON
~~
1302A-9/85 WN F
Central Contra Costa Sanitary District
Suanary of Actual and Budgeted O&M Expenses By Department
For the Six Months Ended December 31. 1985
ATTACHMENT I
ATTACHMENT II
Central Contra Costa Sanitary District
Summary of Actual and Budgeted O&M Expenses By Expense Categories
For the Six Months Ended December 31. 1985
Chemicals
445,537
Favorable
<Unfavorable>
Budget Variance
5,799,679 105,6190 )
592,404 146,867 (2)
1,537,436 64,885(3)
3,258,483 68,751
11,188,002 386,122
<2,168,514> <132,942> (4)
9,019,488 253,180
Expense Category
Labor and Employee Benefits
Actual
$ 5,694,060
Utl1ities
1,472,551
All Other
3 , 189,732
Total Expenses
$10,801,880
Total Capitalized Expenses
<2,035,572>
Net Expenses
$ 8,766,308
Variance Review
(1) Labor and Employee Benefits:
The favorable Labor and Employee Benefits variance of $105,619 is primarily
the result of the deferral of filling authorized job positions during the
first half of the fiscal year, principally within the Engineering and
Collection System Operations Departments.
(2) Chemicals:
The favorable Chemicals variance of $146,867 is primarily the result of a
lower than anticipated price increase for Lime, lower requirement for odor
control chemicals due to a cool summer and lower influent flows than
p roj ected.
(3) Utl1iti es:
The favorable Utilities variance of $64,885 is primarily the result of lower
than projected Natural Gas expense for the Plant Operations Department as a
result of the deferral of the start-up testing of the second multiple hearth
furnace.
(4) Total Capitalized Expenses:
The unfavorable Capitalized Expenses variance of $132,942 is primarily the
result of the deferral of capital projects of the Plant Operations and
Collection System Operations Departments to the second half of the fiscal
year.
ATTACHMENT III
EXPENSE ACCOUNT VARIAr<<:E EXPLANATIONS
ADMINISTRATIVE DEPARllENT
Six Month Review:
Operations and maintenance expenses for the six months ended
December 31, 1985 totaled $1,444,590, and were $13,749 less
than budgeted expenses of $1,458,339. The .9% underexpen-
diture is primarily the result of the following variances:
Property Insurance expense of $189,847 is $41,408 higher
than the budgeted expense of $148,439 as a result of a Board
decision to retain earthquake and flood insurance
coverages until completion of a review of the District's
insurance program by a risk management consultant. The
property insurance expense budgeted was based on
discontinuing earthquake and flood coverages. This
account is projected to be $80,000 overexpended for the
1985-1986 fiscal year.
Legal Services-Staff expense of $26,890 is $8,516 higher
than the budgeted expense of $18,374 because of legal
services required of the District Labor Counsel and
Di strict Counsel rel ated to recent changes in personnel
procedures required under the Federal Labor Standards Act,
and assistance in negotiating the Southern Pacific
Railroad easement acquisition, respectively. This account
is projected to be $9,000 overexpended for the fiscal
year.
Public Information expense of $5,356 is $2,076 higher than
the budgeted expense of $3,280 because the expense of
produci ng the 1984-1985 Annual Report exceeded the
budgeted amount, and the expense for Update '85 was not
budgeted. This account is projected to be $2,000
overexpended for the fiscal year.
Recruitment expense of $8,633 is $8,167 less than the
budgeted expense of $16,800 as a result of providing for
the services of an executive recruitment firm which
ultimately was not required. This account is projected to
be $17,000 underexpended for the fiscal year.
The bal ance of the net underexpenditure occurred within
accounts in which variances between actual and budgeted
expenses were less than $7,000. However, these accounts
were underexpended on a cumulative basis by $57,000 for
the six month s en ded Decembe r 31, 1985.
Fiscal Year Projection:
The Administrative Department's operations and maintenance
expenses are projected to be equivalent to budgeted expenses
for the fiscal year ended June 30, 1986. Although
overexpenditures are projected for the fiscal year in the
amount of $80,000 in Property Insurance, $9,000 in Legal
Services-Staff, and $2,000 in Public Information, offsetting
underexpenditures are projected in the amounts of $17,000 in
Recruitment and the balance of $74,000 in all other
departmental expenses.
ENGINEERING DEPARTMENT
Six Month Review:
Operations and maintenance expenses for the six months ended
December 31, 1985 totaled $999,832, and were $152,654 less than
budgeted expenses of $1,152,486. The 13.2% underexpenditure is
primarily the result of the following variances:
Salaries and Wages and related employee benefits of
$1,522,098 are $66,278 less than budgeted expenses of
$1,588,376 because of unfilled positions during the first
half of the fiscal year. These accounts are projected to
be $85,000 underexpended for the fiscal year.
Other Outside Services expense of $51,591 is $8,909 less
than the budgeted expense of $60,500 as a resul t of the
processing charge by the Contra Costa County for including
the District's Sewer Service Charges on the County's real
property tax bills being less than budgeted. This account
is projected to be $9,000 underexpended for the fiscal
year.
Printing expense of $9,843 is $8,232 less than the
budgeted expense of $18,075 because the District's
Standard Specifications document was not produced during
the first half of the fiscal year as planned, and has been
rescheduled for the second half. This account is
projected to be substantially equivalent to budget for the
fiscal year.
Salaries and Wages-Contra and related capitalized expenses
of $663,063 are $55,796 higher than budgeted capitalized
expenses of $607,267 as a resul t of devoti ng a greater
than anticipated portion of staff effort to capital
projects during the first half of the fiscal year. The
capital ized sal aries and wages and rel ated accounts are,
therefore, projected to be $60,000 higher than budgeted
for the fiscal year.
2
The bal ance of the net underexpenditures occurred withi n
accounts in which variances between actual and budgeted
expenses were less than $4,000. These accounts are
projected to be substantially equivalent to budgeted
expenses for the fiscal year.
Fiscal Year Projection:
The Engineering Department's operations and maintenance
expenses are projected to be $154,000 underexpended for the
fiscal year ending June 30, 1986, as a result of
underexpenditures of $85,000 in Salaries and Wages and related
employee benefits, $9,000 in Other Outsi de Services, and a
$60,000 higher than budgeted capital izati on of Sal aries and
Wages - Contra and related capitalized expenses.
COLLECTION SYSTEM OPERATIONS DEPARTMENT
Six Month Review:
Operati ons and mai ntenance expenses for the six months ended
December 31, 1985 totaled $1,352,345, and were $119,699 more
than budgeted expenses of $1,232,646. The 9.6% overexpenditure
is primarily the result of the following variances:
Salaries and Wages and related employee benefits of
$1,005,722 are $51,902 less than budgeted expenses of
$1,057,624 as a result of unfilled positions during the
first half of the fiscal year. These accounts are
projected to be $90,000 underexpended for the fiscal year.
Operating Suppl ies expense of $110,131 is $54,153 higher
than the budgeted expense of $55,978 as a result of a 54%
increase in the number of pipeline repairs during the
first six months of the fiscal year compared to the same
period last year. The repair activities are anticipated
to continue at this rate through the second hal f of the
fiscal year. Therefore, this account is projected to be
overexpended by $106,000 for the fiscal year.
Outside Repair and Maintenance expense of $40,290 is
$19,337 higher than the budgeted expense of $20,955 due to
the unanticipated need to use special ized outside sewer
cleaning contractors in instances where specialized
cleaning equipment was required, or to provide equipment
during periods when the District's equipment was
undergoing repair. This account is projected to be
overexpended by $38,000 for the fiscal year.
Rents and Leases expense of $20,662 is $8,114 higher than
the budgeted expense of $12,548 due to the recordi ng of
certain lease expense during the first half of the fiscal
year, which were budgeted duri ng the second hal f.
However, it is anticipated that additional construction
equipment will need to be rented during the last six
months of the fiscal year. Therefore, this account is
projected to be $16,000 overexpended for the fiscal year.
3
Technical Services expense of $71~497 is $53 ~841 higher
than the budgeted expense of $17~656 due primarily to the
use of temporary workers to fill vacancies caused by
unfilled positions. The overexpenditure in this account
is largely offset by the underexpenditure in the Salaries
and Wages and related employee benefits expense accounts.
This account is projected to be $100~000 overexpended for
the fi scal year.
Salaries and Wages -- Contra and related capitalized
expenses of $2~486 are $39~922 less than budgeted
capitalized expenses of $42~408 as a result of the
deferral of planned sewer installation projects to the
second half of the fiscal year. The capitalized salaries
and wages and related accounts are~ therefore~ projected
to be substantially equivalent to budget for the fiscal
yea r .
The bal ance of the net underexpenditure occurred within
accounts in which vari ances between actual and budgeted
expenses were less than $8~000. These accounts are
projected to be substantially equivalent to budgeted
expenses for the fiscal year.
Fiscal Year Projection:
The Collection System Operations Department's operations and
maintenance expenses are projected to be $170~000 overexpended
for the fiscal year ending June 30~ 1986~ as a result of
overexpenditures of $106~000 in Operating Supplies~ $38~000 in
Outside Repai rs and Maintenance~ $16~OOO in Rents and Leases~
and $100~000 in Technical Services~ offset by a $90~000
underexpenditure in Sal aries and Wages and rel ated employee
benefits.
PLANT OPERATIONS DEPARnENT
Six Month Review:
Operati ons and maintenance expenses for the si x months ended
December 31~ 1985 totaled $4~493~473~ and were $90~553 less
than budgeted expenses of $4~584~026. The 2.0% underexpen-
diture is primarily the result of the following variances:
Salaries and Wages and related employee benefits of
$2~203~692 are $35~969 higher than budgeted expenses of
$2~167~723 primarily due to a number of long-term absences
due to illness and an unfilled position necessitating
greater than antici pated overtime work. These accounts
are projected to be $72~OOO overexpended for the year.
4
Lime expense of $138,850 is $65,150 less than the budgeted
expense of $204,000 as a result of a lower than
antici pated price increase which was effected 1 ater than
expected, and lower than projected influent flows. This
account is projected to be $80,000 underexpended for the
fi scal year.
Polymer expense of $140,900 is $29,500 less than the
budgeted expense of $170,400 as a result of a deferral of
polymer purchases to the second half of the fiscal year.
This account is projected to be substantially equivalent
to budget for the fiscal year.
other Chemi ca 1 s expense of $11 ,445 is $13 ,555 1 ess than
the budgeted expense of $25,000 as a result of lower than
projected influent flows and a cool summer which enabled
less use of odor control chemicals. Additionally,
chemicals budgeted for dust suppression for the furnace
ash loading system have not been required. This account
is projected to be $25,000 underexpended for the fiscal
yea r .
Electrical expense of $749,048 is $11,014 higher than the
budgeted expense of $738,034 due to an overstatement in
the el ectricity use estimate for the month of December.
This account is projected to be $20,000 underexpended for
the fiscal year.
Natural Gas expense of $551,337 is $47,879 less than the
budgeted expense of $599,216 as a resul t of the bake-out
of the second multi hearth furnace being deferred from
December and January to February, and operational
efficiencies realized through experience. This account is
projected to be $36,000 underexpended for the fiscal year.
General Repairs and Maintenance expense of $221,089 is
$13,237 higher than the budgeted expense of $207,852
because of increased furnace and boiler parts
requirements, and repairs to a combustion air motor. This
account is projected to be substantially equivalent to
budget for the fiscal year.
Outside Repairs and Maintenance expense of $89,576 is
$17,706 less than the budgeted expense of $107,282 because
a number of major repair projects were deferred to the
second half of the fiscal year. This account is projected
to be substantially equivalent to budget for the fiscal year.
Rents and Leases expense of $13,284 is $5,422 higher than
the budgeted expense of $7,862 because of the
unanticipated need to rent an emergency generator to
backup the multi hearth furnace cooling fan. This rental
will be di sconti nued when improvements to the emergency
electrical generation facility in the Solids Conditioning
5
Building are completed. This account is projected to be
$10,000 overexpended for the fiscal year.
Technical Services expense of $25,310 is $12,930 higher
than the budgeted expense of $12,380 as a resu1 t of two
temporary help employees replacing two District employees
who are working on temporary assignments in another
department. This account is projected to be $25,000
overexpended for the fiscal year.
Ash Removal expense of $45,369 is $53,651 less than the
budgeted expense of $99,000 due to lower than anticipated
vol ume of ash as a resu1 t of decreased 1 ime consumpti on,
lower influent flow, and vacuuming of the multi hearth
furnace not being required during the first six months of
the fiscal year; additionally, hauling charges were not
increased. This account is projected to be $90,000
underexpended for the fiscal year.
Sludge Removal expense of $12,640 is $51,092 less than the
budgeted expense of $63,732 because furnace shutdown
periods for major maintenance and during work on the
Solids Conditioning Building Control Room Project were
anticipated to require sludge hauling. However,
mai ntenance work has been accompli shed without extended
fu rnace shutdowns and the Control Room Proj ect has been
delayed. This account is projected to be $35,000
underexpended for the fiscal year.
Computer Maintenance expense of $58,585 is $17,085 higher
than the budgeted expense of $41,500 because of the
unanticipated replacement of a fixed head disc and repairs
to memory boards in the P1 ant process control computer.
This account is projected to be $18,000 overexpended for
the fi sca1 year.
Other Outside Services expense of $11,026 is $11,026
overexpended as the entire expense for the fiscal year of
$24,000 was budgeted in the second hal f of the fiscal
year. The overexpenditure was the result of a payment of
the District's allocated share of the Bay Area Dischargers
Association operating budget in the first half of the
fiscal year. This account is projected to be
substantially equivalent to budget for the fiscal year.
Salaries and Wages -- Contra and related capitalized
expenses of $4,031 are $87,398 less than budgeted
capitalized expenses of $91,429 as a result of Plant
personnel's invol vement in capital projects such as the
Seismic Bracing and 5B Projects occurring later in the
fiscal year than antici pated. The capital ized sal aries
and wages and related accounts are projected to be $20,000
underrealized for the fiscal year.
6
The balance of the net underexpenditure occurred within
accounts in which variances between actual and budgeted
expenses were less than $6,000. These accounts are
projected to be substantially equivalent to budget for the
fiscal year.
Fiscal Year Projection:
The Plant Operations Department's operations and maintenance
expenses are projected to be $141,000 underexpended for the
fiscal year ending June 30, 1986 as a result of the following
account variances:
Salaries and Wages and
Employee Benefits
lime
Other Chemical s
Electrical
Natural Gas
Rents and Leases
Technical Services
Ash Removal
Sludge Removal
Computer Maintenance
Salaries and Wages - Contra
and Related Capitalized Expenses
PlW STATIONS
Six Month Review:
Favorable
(Unfavorabl e)
$<72,000)
80,000
25,000
20,000
36,000
(10,000)
( 25 ,000 )
90,000
35,000
<18,000)
(20,000)
$141,000
Operati ons and mai ntenance expenses for the six months ended
December 31, 1985 totaled $476,068, and were $103,097 less than
budgeted expenses of $579,165. The 17.8% underexpenditure is
primarily the result of the following variances:
Salaries and Wages and related employee benefits of
$245,103 is $15,079 less than budgeted expenses of
$260,182 as a result of an unfilled position during the
first half of the fiscal year. These accounts are
projected to be $15,000 underexpended for the fiscal year.
Other Chemicals expense of $70,641 is $28,425 less than
the budgeted expense of $99,066 due to a cool summer
requiring less use of chemicals for odor control. This
account is projected to be $40,000 underexpended for the
fiscal year.
7
Electrical expense of $97,357 is $17,476 less than the
budgeted expense of $114,833 because of lower than
anticipated influent flows resulting in lower electrical
pumping demands. This account is projected to be $15,000
underexpended for the fiscal year.
General Repairs and Maintenance expense of $17,485 is
$9,189 less than the budgeted expense of $26,674 because
of lower than anticipated maintenance activity caused by
an unfilled position. This account is projected to be
substantially equivalent to budget for the fiscal year.
Outside Repairs and Maintenance expense of $28,092 is
$19,026 less than the budgeted expense of $47,118 due to
deferral of repairs to the roof of the Or1nda Crossroads
Pump Station to the second half of the fiscal year. This
account is projected to be $10,000 underexpended for the
fiscal year.
The bal ance of the net underexpend1ture occurred w1th1 n
accounts in which the variances between actual and budgeted
expenses were less than $6,000. These accounts are
projected to be substantially equivalent to budget for the
fiscal year.
Fiscal Year Projection:
The Pump Station's operations and maintenance expenses are
projected to be $80,000 underexpended for the fiscal year
ending June 30, 1986, as a result of underexpend1tures of
$15,000 in Salaries and Wages and related employee benefits,
$40,000 in Other Chemicals, $15,000 in Electrical and $10,000
in Outside Repairs and Maintenance.
DISTRICT CONTINGENCY
A District contingency account of $100,000 was included in the
1985-1986 Operations and Maintenance Budget to provide for expenses
which were not included in other budgeted expenses because of a high
level of uncertainty as to timing and amount. The contingency
account was allocated evenly to the first and second six month
periods. During the six months ended December 31, 1985, $37,174 was
transferred to the Cl a1 ms expense account for a cl aim settl ement
which produced an unexpended bal ance in the conti ngency account of
$12,826 at the end of the first six months of the fiscal year.
The $62,826 contingency account balance available for the remainder
of the 1985-1986 fiscal year is projected to be applied to
settlement of claims.
8
.
Centra~ ':ontra Costa Sanitar~ .Jistrict
BOARD OF DIRECTORS
PAGE 1 OF 6
NO.
X. PERSONNEL
1
POSITION
PAPER
BOARD MEETING OF
SUBJECT
AUTHORIZE THE REQASSIFICATION OF THE POSITION OF
SURVEY TEa-JNICIAN TO SURVEY ASSISTANT AND ADOPT A
NEW SALARY RANGE FOR SURVEY ASSISTANT OF G-60
($2186-$2645 )
DATE
TYPE OF ACTION
PERSONNEL
SUBMITTED BY
Jay S. McCoy, Construction Div. Manager
INITIATING DEPT.lDIV.
Engineering Dept./Construction Div.
ISSUE: Board approval is required for reclassification of personnel actions.
BACKGROUND: The promotion of Doug Neufeld (former Survey Technician) to
Construction Inspector has created a vacant position in the Survey Section (see
Attachment 1, Organizational Chart for the Section). This position is presently
being filled on a temporary basis pending recruitment. The Engineering
Department has analyzed this position to determine if any changes in the Class
Description are appropriate.
The result of the position analysis is that the present Class Description includes
several duties which are typically performed by an individual of a higher
classification in other agencies. These duties are as follows:
o Taking notes on field elevations and profiles
o
Performing calculations on property closures,
construction staking, grades, and triangulation
traversi ng,
o Calibrating equipment
Staff proposes to delete the above duties from the Survey Technician Class
Description and to lower the education and experience requirements for the
position. This will make the position comparable to similar positions in other
agencies and will align the appropriate education and experience requirements with
other positions within the District. The duties deleted fram the Survey
Technician position will be assigned to the existing journey-level Senior Survey
Technician class.
A salary survey and a review of comparable District positions were conducted in
January 1986 by Personnel to determine the appropri ate sal ary to the modified positi on
(see Attachment 2). It is recommended that a reduction be made in the salary
range for the position of 10 percent from Range G-64 ($2,405 per month to $2,910
per month) to Range G-60 ($2,186 per month to $2,645 per month). This salary
reduction will bring the position salary into the proper perspective with
comparable District and outside positions.
REVIEWED AND RECOMMENDED FOR BOARD ACTION
1302
CRF
RAB
U!I
!44f3
SUBJECT
POSITION PAPER
AUTHORIZE THE RECLASSIFICATION OF THE POSITION OF SURVEY
TECHNICIAN TO SURVEY ASSISTANT AND ADOPT A NEW SALARY
RANGE FOR SURVEY ASSISTANT OF G-60 ($2186-$2645)
PAGE 2
DATE
OF 6
January 28, 1986
Staff recommends that the changes to the Survey Techni ci an be accompl i shed by
reclassification and that the position be re-titled Survey Assistant to more
clearly describe the new position. A new Class Description is shown in Attachment
3.
RECOMMENDATION: Delete the Class Description for Survey Technician, Range
G-64 and adopt the Class Description for Survey Assistant, Range G-60.
'--------.
13028-9/85
Attachment 1
u.
o
...
C
i
C
...
W
cr:
(J
W
III
1:
<; ~ ~
~ 3 i
~ ci
III
CXl
Cl
...
C/)
:::>
C)
:::>
<
'"
... ~
...z ~ .
(JW c " "
C:IE ~ .. 0
cr:w w ... . e
...0 ; ... :0 e
'" :1:-
zc III
OZ ~ 2 . <; -
(JC a:
:IE .. !
.
c N ~
0 to '0
u U
.
~ ai
c
z 0 0
0 u u
j: ~ '" ~
.. 0.
~ .. .
(J . c ~ <>
::I ~ .. 0- .-
~ <> c -c u'::
cr: w 00 ! 0 ~
~ ... '"
0 ;i u ",..,:
0: III j .
~< Z II! ~
0 c
0
UI (J u
a:U
~z
~o .
0- .. " .
.
~ 0 <>.
><z z ;::: 7: u . "
~ ~ ~ .-
0 0. Q~
O:NO i ~
j: > "- c ciciO:
<z- r./: :::::: ... ...
(J ~~ .. i c
t::<(/) ... 0 -c .
W Ii '" :I: ~ <> ...
Q, u . N
ze,,5 III z . ..>
<(0:- ! ~ . .
c
(/)00 0 . . co
u CDU "0
<~z ~ - ~ ;:;; ... ~Q >-
~. ~~ ~ 0
~zO U :c
u
(/)UJ- ~..:: ::E III ~~::E ::E ~
o~t; C7' .
E. a:: C-;:; ~ c
u~::) '-' c5 0
<0:0: c .! "C
0 .. ~
o:<~ ~ .
~a..(/) ~ 0- = ~
.. '" .. III
zwz '" ~ 0
CD C
000 .. g
c .;
ue"U w Iii
c 0
..Jz 0 Q.
<(- ~ i "0
0:0: ~.~ N ...
~:::; .. Q;
~w .; .Q
ZW '" E
w~ c
.. W ~
~ z
ue" ~ ...
cr:!! c :;
Z ....> ~ i ~~ ..
W ...w w ... 0-0- . '"
~ ... :I: . 0 -c N
_cr: '" ~~(,.? 0
::Ez <; Q
~ o 0.
a::c 0'"
w... Q: ~ co
Q,Q, ..c ~ = "0
~ . >-
_ c . "
. 0 .- ;..;
. u " = Q;
"'-.. . :0
c -c
.,~ L:) ~ :Ii c
- 0 0
el- :I::e 0
;; Q "C
<L III
N
III 0
W
(J ~
;: :;
Q. cr: <
~ W :! Q;
0 III
~ '"
c \aI Q co
~ 0 Q.
v .. ... Q .'!?
E ~i c lu ~ ~
III ~~~ : Q
:2 . c
-i: ~f :0 0
0 a: iil
lDU ; ..; c:
lD' '" 0
~t: .~ ...
Q. 8. c > ... . Iii
E Q. lD W J . 0_ . 0
'i! <LON ~ Q.
w~E > ~ :c :....:.i:"'"
_Ill III cr: ~UCJ i "0
!~ g>> ::I <II ..,
lD E c III j ..i '" ai Q;
c ... co .Q
~~~ E
~
t:l(/)~ Z
Attachment 2
CENTRN... OONlRA roSTA SNUTARY DISlRICT
SURVEY TEDiNIClAN
S1t..ARY SURVEY
Agency
Ci ty & Coun ty of
San Franci sco
Ci ty of San Jose
Contra Costa County
Contra Costa Water
Di strict
East Bay Mun i ci pal
Util ity Di stri ct
Publ ic Util iti es
Canmission
Santa Cl ara
Sanitary District
Union Sanitary Dist.
CCCSD
Current
Proposed
Engineering Depart.ent
Titl e
Salary Range
Surveyor's Field Assistant
$2214 - $2600
$1946 - $2366
$2006 - $ 2'El6
Engineering Technician II
Engineering Technician
No comparison
N/A
Survey Technician I
$2002 - $2448
No compari son
N/A
No compari son
N/A
No. compa r i son
N/A
Survey Technician
Survey Assistant
$2405 - $2910
$2186 - $2645
r\ttachment 3
CENTRAL CONTRA COSTA
SANIT MY DI STRICT
Effective:
Representation Unit:
SURVEY ASSISTNfT
DEnNITION
Perform a variety of technical and routine field and office survey work.
DISTINGUISHING CHARACTERISTICS
This is the journey-level in the Survey Technician cl ass series.
Positions assigned to this class are assigned a variety of field and
office work rel ated to the Di strict's survey services. This cl ass is
distinguished fran the cl ass of Senior Survey Technician by the more
limited independence which an incumbent is expected to assume in the
performance of assigned duties and by the more limited compl exity and
difficul ty of the work.
SUPERVISION RECEIVED AND EXERCISED
Receive general supervision fran higher level supervisory personnel.
EXAMPlES OF DUTIES - Duti es incl ude, but are not limited to, the
following:
Act as a rodman/chainman as a member of an engineering survey crew.
Assist in determining lines, points, elevations, and distances for
property, construction and topographic surveys, and precise levels.
Perform fl agging when working in traffic.
May occasionally operate survey instruments for rel ief purposes or to
expedite the work of the survey party.
Assist in the collection and calculation of office data relating to
survey work including information regarding easements, parcel maps,
right-of-ways, and boundaries.
As assigned, draft parcel maps, easements, plans, and profiles.
Maintai n survey ing equipment.
Perform related duties as required.
QUALlnCATIONS
Knowl edge of:
Engineering survey principles, practices, methods, and techniques.
CENTRAL CONTRA OOSTA SANITMY DISTRICT
Survey Technician (Continued)
Survey equipment and its proper application and use.
Trigonometry, algebra, and geanetry as applied to the completion of
angl es, areas, el evati ons, di stances, and traverses.
Basic drafting and mapping methods and techniques.
Safety hazards and appropriate precautions applicable to work
assi gnments.
Abil ity to:
Perform survey work effectively with a minimum of supervision.
Learn to read and interpret survey notes.
Learn to operate survey equipment with increasing skill and
proficiency.
Perform basic drafting work using appropriate equipment and tools.
Perform demanding physical work as required by assigned activities.
Learn and observe all appropri ate safety precauti ons as requi red by
the District including, but not limited to, Cal/OSHA General
Industry Safety Orders and the Di strict's Respi ratory Protecti on
Progr ern.
ExPerience and Education
Any combi nati on equival ent to experi ence and educati on th at coul d
likely provide the required knowledge and abilities would be
qualifying. A typical way to obtain the knowledge and abilities
woul d be:
Experience:
Two years of experience in an engineering-related area, of which
at least 6 months of this time is on a field survey crew.
Educati on:
Equivalent to completion of the twelfth grade.
Licenses and Certificates
Possession of a valid California Driver's License.