HomeMy WebLinkAboutAGENDA BACKUP 04-07-77 April 7, 1977 MEMORANDUM FOR: THE HONORABLE MEMBERS OF THE BOARD OF DIRECTORS VIA: Roger J. Dolan, General Manager-Chief Engineer SUBJECT: COMPLETION OF DISTRICT SEWERING PROJECT 2338, MUTH DRIVE, ORINDA PROBLEM: DISTRICT SEWERING PROJECT 2338, MUTH DRIVE, ORINDA has been completed by J & W Pipelines, Inc., and the Notice of Completion may be executed. RECOMMENDATION: Accept District Sewering Project 2338 and execute the Notice of Completion. Respectfully submitted, €.,_,:~;;::f,C/~~ /7 Jack L. Best Ma~ger- Engineering Department JLB:sf Recommendation Approved: ~~4~ General Manager-Chief Engineer April 5, 1977 MEMORANDUM FOR: HONORABLE MEMBERS OF THE BOARD OF DIRECTORS VIA: Roger J. Dolan, General Manager-Chief Engineer SUBJECT: ACCEPTANCE OF EASEMENT AT A COST OF $100 FROM CHARLES E. LABAT, JOB NO. X1579, PARCEL 26, WALNUT CREEK AREA BACKGROUND: The District's existing sewer main and manhole serving Mr. Labat and others, encroaches upon the northeastern portion (340 sq. ft.) of Mr. Labat's property. No easement exists and he wanted us to move our facilities or pay him the amount this would cost (he had an estimate of $1,527.16 from Pioneer Underground, Inc.). Special District Counsel was authorized to write a letter to attorney for Mr. Labat, offering $100 for the 340 sq. ft. of required easement and if not acceptable, to proceed with condemnation. The condemnation was filed and as a result Mr. Labat has granted, out of court, the necessary easement for the originally offered $100. RECOMMENDATION: Acceptance of easement at a cost of $100 and authorize recording. Respectfully submitted, JLB:sf cmh Recommendation ~ ~g General Manager-Chief Engineer April 5, 1977 MEMORANDUM FOR: THE PERSONNEL COMMITTEE OF THE BOARD OF DIRECTORS VIA: Roger J. Dolan, General Manager-Chief Engineer SUBJECT: REQUEST AUTHORIZATION TO EMPLOY JOHN GRIFFIN ON A TEMPORARY BAS IS AT AN HOURLY WAGE OF $4. 55 PER HOUR EFFECTIVE APRIL 8, 1977. PROBLEM: Ken Roan, our maintenance equipment mechanic, has undergone surgery and will be off work through the month of April. BACKGROUND: We only have two men working in our shop, so Ken's absence is really felt. John Griffin has worked as a shop assistant in our summer work program for the past two years and would be coming back in May again this year. Because we need some help right away, I'd like to bring him in now. RECOMMENDATION: Approve request to employ John Griffin. Respectfully submitted, ~IJ( tJ-i~ Robert H. Hinkson Manager, Maintenance Department RHH:yb cc: Boneystee1e, Mitchell, and Rustigian Reviewed: (~~~ W. C. Dalton, Deputy General Manager-Chief Engineer ~~~rOWd: General Manager-Chief Engineer t.f_7~77 March 31, 1977 MEMORANDUM FOR: PERSONNEL COMMITTEE OF THE BOARD OF DIRECTORS VIA: Roger J. Dolan, General Manager-Chief Engineer SUBJECT: APPOINTMENT OF JAMES NAIL TO POSITION OF PLANT ATTENDANT SALARY RANGE R46, ($884), EFFECTIVE APRIL 1, 1977 Problem: A vacancy exists in the operations department due to an employee termination. Background: Mr. James Nail's placement on the current plant attendant eligibility list is No. 3 with No. 1 held by Ramona Macaluso who has waived appointment to the position and placement No. 2 held by Gregory Walker which is held pending reprimand on misconduct while working as a C.E.T.A. on-the-job training employee. James Nail originally placed eighteenth on the eligibility list with an overall grade of 86.33 per cent. Recommendation: James Nail be appointed to the Plant Attendant position, salary range 46A, ($884), effective April 1, 1977. Respectfully submitted, DGN : j 1 <::Q 9. rJ j~ D. G. Niles Manager, Plant Operations Reviewed: I . A~ ('D--. W. C. Dalton Deputy General Manager-Chief Engineer Recommendation Approved: ,-tfl~~~ General Manager-Chief Engineer PLANT ATTENDANT ELIGIBILITY LIST ESTABLISHED FEBRUARY 1~, 1977 Name Score Action 1 McCauley, Fred 93 Hired, 3-3-77 2 Barton, Roy 92 Hired, 3-7-77 3 ,. _ n Cheryl 90.67 Hired, 3-3-77 ,'U, J.<il10 , 4 J"owler, George 90.33 Hired, 3-7-77 5 i",('~c(..l.l\.A.sO , Ramona 90.33 Retain on elig. list 6 l)c~rez , William 90.33 Hired, 3-7-77 7 higgins, Robert 90 Hired, 3-7-77 8 S01.1.Z, Zaragosa 90 Hired, 3-3-77 9 Hankins, James 89.67 Hired, 3-3-77 ::"0 nOOpS, Edward 89.33 Hired, 3-3-77 11 Ne.Lsor" Daniel 89 Hired, 3-7-77 12 l-{eyes, Adela 89 Hired, 3-3-77 13 Cc,rdova, George 88.67 Hired, 3-3-77 14 GV6.~J.S , Robert 88.33 Hired, 3-7-77 15 t,~inoY: , James 87.67 Hired, 3-7-77 16 ,Ii uhiaromad , Saleem 86.67 Hired, 3-3-77 17 \~ 'l~JCer , Gregory 86.67 18 j\J,I. I ,I , James 86.33 19 . :(IJ_)r~.i{lS, Clyde Lee 85.67 20 1"_l.l.J.OP(.l./ John 85.5 21 i;'d(~lJ..Les , Pedro 85.33 22 (~(~ J._ge:c , James 85 23 \. -Tl..4.\~'_ 'c:cy , Dennis 84 24 ,'" ,J.ckney, Michael 84 25 hO (l1e(l, James 83.67 26 J'Jii\SOn, Robert 83 27 i:"'(~-(ton , Noel 82.33 28 ,v,c,)owe1l, William 82 29 . ,;nacds, Michael 81.67 30 1.'(~'1.'..I.O[ , 0aniel 81. 33 31 ,\,,;Cowrl, Daniel 81 32 ;'H..[ c.lnez, Dale 80.67 33 \'<L.\~il1o, Bruce 80.33 34 ~~ICl'lWa.r tz, William 80 35 ti'dJ<.er, Roy 79.67 36 J" usn, Douglas 79 37 j'v!arLn , Joseph 79 38 : ,t,n,l\an , Thomas 78.67 39 0f,nn, William 72.33 40 Me'tcalf, Dear, 72 41 Castro, Maximo 63