SUBJECT PUBLIC HEARING FOR DRAFT EIR FOR THE DOS OSOS/ALTA
TYPE OF ACTION
VISTA SEWER LINE EXTENSION IN ORINDA
PUBLIC HEARING
FOR DRAFT EIR
SUBMITTED),4y McCoy
y�T�,?1
ffli J 99iaF1PcJ/diilection System
ISSUE: A public hearing is necessary to hear and consider any written
and verbal comments on the Draft EIR concerning the proposed 1800 ft.
extension of an 8" sewerline generally along Alta Vista and E1 Toyonal
in the Lake Orinda Highlands area of Orinda.
BACKGROUND: The County Health Department established a septic tank
moratorium in 1970 in the project area (E1 Toyonal Septic Tank Moratorim
Area) because of septic tank seepage and potential health problems. This
moratorium is currently in effect. The County Health Officer will not
accept applications for septic tank permits and any new construction must
be connected to a public sanitary sewer. The proposed sewer extension
project is required for the development, initially, of 3 vacant single
family residential lots. The parcels require annexation to CCCSD with
the annexation being subject to review and approval by the Contra Costa
County Local Agency Formation Commission (LAFCO). The project area is
within the adopted LAFCO sewer service sphere of influence for CCCSD.
The annexation of the three lots has been approved in concept; however,
formal annexation will take place in the future.
The following staff comments relate to the project area which could be
sewered by direct connections to the proposed sewer project, and also
the total tributary area which may ultimately be served via additional,
future gravity sewer main extensions from the project sewer.
1. The project as proposed would directly result in the construction
of three units in the project area. Five additional vacant lots
which front the proposed sewerline could also develop and connect.
Of the five vacant lots, it appears that four could use a gravity
system, while one would require a ppping system. Existing homes
presently on septic systems and adjacent to the proposed project
which could connect number 15.
2. The tributary area which could be served by extensions of the
project sewer is primarily located to the south and southwest of
the sewer project. (on Dos Osos, Alta Vista and Tres Mesas)
It is estimated that there are 17 additional potential building
sites in the tributary area which could be developed if sewers
were extended. Eleven existing residences are on septic systems.
REVIEWED AND RECOMMENDED FOR BOARD ACTION
INITIATING DEP ./DIV.JMC
CLQ
GE G I E F G.
The following table summarizes all of the possible
connections which could be made to the project sewer
and extensions therefrom:
Existing Homes Potential Homesites
on Septic (Vacant land)
Direct Connection 15 8
Total
23
to project sewer
Sewer Extension
required from 11 17* 28
project sewer
Total 26 25 51
* This represents growth that could be considered
induced by the sewer project, assuming the
required main extensions are constructed.
Staff has no additional comments.
-al-
Jay McCoy
Revised 2/5/81
February 5, 1981
FORMAT FOR PUBLIC HEARING ON DRAFT EIR:
DOS OSOS/ALTA VISTA
1. President announces item and introduces Roger Dolan.
2. Roger Dolan comments on the project and asks Mr. Malcolm Sproul
(Seeman Associates), to briefly discuss the content of the Draft EIR.
3. Mr. Sproul discusses Draft Eir.
4. Roger Dolan asks Dennis Hall to review staff comments.
5. Dennis Hall covers staff comments and answers any questions from Board.
6. President opens Public Hearing:
Members of the public are allowed to speak; those in favor
are allowed to speak first, those opposed second. Staff
and the EIR consultant will be available to answer questions.
7. After all testimony is taken, the President closes the public hearing.
The President states: "All written comments received will be responded
to in the final EIR by Mr. Sproul. Said response will include
measures to mitigate adverse environmental impacts identified in the
comments. The Board of Directors will consider certifying the Final
EIR after review and consideration of its contents and will consider
approval or disapproval of the project at its February 19, 1981,
regular meeting. Any persons who would like copies of the responses
which will be incorporated into the Final EIR should contact Mr. Sproul
of Seeman & Associates).
(CCSD Central ntra Costa SanitaryDistrict
BOARD OF DIRECTORS
NO.
POSITION PAPER : ROGER J. DOLAN DATE
General Manager—Chief Engineer 2/5/81
SUBJECT TYPE OF ACTION
ADOPT BUDGET FOR CONSTRUCTION SERVICES DIVISION
FOR FISCAL YEAR 1980/81 BUDGETARY
SUBMITTED BY INITIATING DEPT./DIV.
Roger J. Dolan, GM -CE I Engineer Administration
ISSUE: The Construction Services Division has been functioning under a
tentative budget for the fiscal year 1980/81. The actual budget has now
been prepared and reviewed and is here presented for adoption.
BACKGROUND: During the budget process in late spring of 1980, it had
become clear that it was in the District's best interest to make changes
in the immediate future in an area that could significantly affect the
budget for the Construction Services Division. For that reason, a tentative
budget figure was adopted pending confirmation of actual needs for litigation
support. At that time, it was unclear whether the manpower requirements
would increase, decrease or remain the same.
Presently the District is in receipt of a confidential report covering
litigation activities which will be discussed in closed session. The
conclusion of this report is that the present 5A-1 litigation support
activities within the Construction Services Division should not continue.
A management analysis of the present staffing requirements of the
Construction Services Division has reached the conclusions contained in
the table on the next page. Because the management analysis contains
confidential information both pertaining to litigation and to personnel
matters, it will be given in closed session.
REVIEWED AND RECOMMENDED FOR BOARD ACTION
INITIATING DEPT./DIV.
R./CH
of 3
(CCSD Central Contra Costa Sanitary District
BOARD OF DIRECTORS
2 of 3
NO.
POSITION PAPER
SIA' ROGER J. DOLAN
General Manager—Chief Engineer
DATE
FEBRUARY
5 1981
r
SUBJECT
ADOPT
BUDGET FOR
CONSTRUCTION SERVICES
DIVISION
TYPE OF ACTION
FOR FISCAL YEAR
1980 - 1981
BUDGETARY
SUBMITTED BY
Roger J. Dolan General -Manager -Chief Engr.
INITIATING DEPT./DIV.
Staffing
Justified
Position Not
Without
Required In
Reduction
Employment
Present Staffing
5A-1 Lit.
Absence of 5A-1
In
Position Title
Status
Authorized Filled
Support
Lit. Support
Force
Construction
Permanent
1 1
1
0
Ser.Div.Mgr.
Contract
Permanent
1 1
1
0
Administrator
Associate
Permanent
1 1
1
0
Engineer
Resident
Permanent
1 1
1
0
Engineer
Senior
Permanent
2 2
2
0
Inspector
Civil Inspector
Permanent
1 1
1
0
(on loan from
C.S.E.S.)
Claims Anaylst
P.I.
6 4
1
5
3
Supervising
P.I.
1 1
0
1
1
Clerk Typist
Clerk Typist 1/II
P.I.
6 4
0
5
3
Clerk Typist 1/II
Permanent
0 0
1
Secretary
Permanent
1 1
1
0
REVIEWED AND RECOMMENDED FOR BOARD ACTION
INITIATING DEPT./DIV.
GEN. MGR./CHIEF ENG.
2 of 3
SCD
BOARD OF DIRECTORS
NO.
POSITION PAPER
VIA: ROGER J. DOLAN
DATE
2/05/81
General Manager—Chief Engineer
SUBJECT
ADOPT BUDGET FOR CONSTRUCTION SERVICES DIVISION
TYPE OF ACTION
FOR FISCAL YEAR 1980/81
Budgetary
SUBMITTED BY
Roger J. Dolan, General Manager -Chief Engineer
RECOMMENDATION: It is recommended that the Board consider the management analysis
of the work assigned to the Construction Services Division and the confidential
report on litigation and, provided they agree with the conclusions contained therein,
take the following actions.
1) Adopt the attached budget based on the above table of staffing needs.
2) Create one permanent position of Clerk Typist I/II in the Construction
Services Division.
3) Authorize funding of the surplus positions through March 15, 1981 with the
understanding that the actual work requirements of these positions_ will be
completed considerably prior to that date.
4) Authorize your representatives to meet and confer with the Employees Association
to develop the program for implementation of the reduction in force.
REVIEWED AND RECOMMENDED FOR BOARD ACTION
INITIATING DEPT.%DIV.
GEN. MGR.%CHIEF ENG.
SHEET 3 OF 3
CONSTRUCTION DIVISION
OPERATING AND MAINTENANCE EXPENSES BUDGET
FISCAL YEAR 1980 - 1981
SALARIES & WAGES - MNGT.
SALARIES & WAGES - NON MNGT.
EMPLOYEE BENEFITS
OFFICE EXPENSE
OPERATING SUPPLIES
MICROFILM SUPPLIES
ELECTRICITY
TELEPHONE
REPAIRS & MAINTENANCE
RENTS & LEASES
JANITORIAL
TRAVEL & CONFERENCES
PRINTING
MEMBERSHIPS
SUBSCRIPTIONS
EMPLOYEE EDUCATION
MILEAGE
PUBLICATION
MISCELLANEOUS
TOTAL 0 & M EXPENSES
EXPENSES CAPITALIZED:
SALARIES & WAGES
EMPLOYEE BENEFITS
OTHER EXPENSES
TOTAL EXPENSES CAPITALIZED
NET 0 & M EXPENSES
ACTUAL FOR PROJECTED
07/01/80 - 01/01/81- TOTAL
12/31/80 06/30/81 BUDGET
$ 23,025 $ 21,390 S 44,415
194,457 140,620 335,077
67,414
50,223
117,637
3,856
4,248
8,104
408
450
858
3,565
2,078
5,643
1,462
3,528
4,990
3,409
2,200
5,609
3,745
1,755
5,500
18,700
27,156
45,856
11090
1,222
2,312
867
1,250
2,117
4,328
1,100
5,428
---
100
100
26
100
126
---
550
550
137
225
362
327
8o
407
1,130
450
1,580
$327,946 $258,725 $586,671
(199,164)
(150,667)
(349,831)
( 62,171)
( 46,707)
(108,878)
( 33,717)
( 36-X5)
(169,942
(295,052)
(233,599)
(528,651
$ 32,894 $ 25,126 $ 58,020
CONSTRUCTION DIVISION 1980-1981 EQUIPMENT BUDGET
Table
Bookcases 4' high
Desk, metal
Desk, wood
Credenza
Secretarial chairs, swivel
Coat racks, wood
Table, 30" x 60"
Credenzas, wood
Bookcases, wood, 6' high
Desks, 60" x 30", wood
Chairs, swivel, with arms
Side Chairs, non -swivel, with arms
Reception chairs, with arms
Reception table, 18" x 24"
Files, 2 drawer, wood, legal
IBM Recorder
Typewriter, electric, 19" correcting
Refrigerator, 5.1 cu. ft.
Microwave Oven, 1.25 cu. ft.
Dinette Sets (2)
File Cabinet, metal, legal, 4 drawer
Copier/Collator, Cannon
Trailer, 12' x 55'
QUANTITY
3
5
4
3
2
3
3
3
4
2
1
1
1
1
1
2
5
1
1
TOTAL
AMOUNT
$ 227.00
159.00
298.00
378.00
369.00
188.00
175.00
380.00
470.00
198.00
746.00
257.00
186.00
376.00
136.00
149.00
464.00
1,625.00
192.00
315.00
317.00
638.00
10,532.00
10,498.00
$29,273.00
((CSD Central i is rict
BOARD OF DIRECTORS
NO.JX. REAL PROPERTY
POSITION PAPER
V IA' ROGER J. DOLAN
DATE
2/2/81
General Manager—Chief Engineer
SUBJECT
TYPE OF ACTION
AUTHORIZATION FOR P.A. 81-4 (DANVILLE AREA) TO BE
INCLUDED IN THE NEXT FORMAL ANNEXATION TO THE DISTRICT
ANNEXATION
SUBMITTED BY
INITIATING DEPT./DIV.
Jay McCoy
Engineering/Collection System
Owner
Parcel
Address Lead
No. Area
Parcel No. & Acreage Remarks Agency
81-4
Danv.
Jerry Riggs, et ux
Septic tank has failed. County
CCCSD
302 Montair Drive
Health Dept. has advised
Danville, CA
property owner to connect to
199-120-06
public sewer District to
1.81 AC.
prepare "Notice of Exemption"
RECOMMENDATION:
Authorize P.A. 81-4 to be included in the next formal annexation to
the District.
REVIEWED AND RECOMMENDED FOR BOARD ACTION
INITI TING DEPT./DIV.
GE HIE ENG.
V.4.
JMc
W CLW
((CSD Central Contra Costa SanitaryDistrict
BOARD OF DIRECTORS
NO.1A. KealProperty
-
2/5/81
POSITION PAPER
VIA: ROGER J. DOLAN
General Manager -Chief Engineer
DATE
2-2-81
SUBJECT AUTHORIZATION FOR P.A. 80-49 (DANVILLE AREA), P.A. 81-1
TYPE OF ACTION
(DANVILLE AREA), P.A. 81-2 (DANVILLE
AREA), AND P.A. 81-3
(W.C. AREA) TO
BE INCLUDED IN THE NEXT FORMAL ANNEXATION TO
ANNEXATION
THE DISTRICT.
SUBMITTED BY
INITIATING DEPT./DIV.
Jay McCoy
Engineering/Collection System
Owner
Parcel
Address
Lead
No. Area
Parcel No. & Acreage
Remarks
Agency
80-49
Danv.
202-110-03, -05, 06
Previously considered on 12/2/80
County
Shapell Industries
deferred to 2/5/81 by Board of
P.O. Box 469
Directors. Proposed Sub. 5959 -
Milpitas, CA 95035
total of 92 single family homes.
64.04 Acres
EIR Approved by County
81-1
Danv.
John J. Ramos
Previously considered 1/8/81,
County
120 Entrada Mesa
deferred to 2/5/81. Owner
Danv, CA 94526
intends to build 5 condominium
216-101-08 .37 Ac.
units -Negative Declara.by,County
81-2
Danv.
Harold W. Smith Co.
Proposed Subd. 5607 - having 7
County
2076 Mt. Diablo Blvd
large lots totaling 70.66 acres
Walnut Creek, CA
and 3 open space areas totaling
194-060-04
43.30 acres. Negative Declara-
113.96 Ac.
tion by C.C.County.
81-3
W.C.
Marlin R. Head
Property to be split into four
County
888 Trails End
lot minor subd. Tentative map
Walnut Creek, Ca
(M.S. 128-77) approved by county
138-141-001
7.0 Acres
RECOMMENDATION:
Defer action until March 5, 1981
REVIEWED AND RECOMMENDED FOR BOARD ACTION
INIT TINGD IV.
GE /
HIE F ENG.
�i
JMc
CLW
DCentral Contra Costa Sanitary District
BOARD OF DIRECTORS
WNF
NO.
POSITION PAPER
vIA.
ROGER J. DOLAN
DATE
General Manager—Chief Engineer
January 14 1981
SUBJECT
TYPE OF ACTION
REPORT ON JOINT STUDY OF THE
CURRENT AND PROPOSED DISTRICT
MEMORANDUM OF
INSURANCE BENEFITS PROGRAM
UNDERSTANDING OF JULY
SUBMITTED BY
INITIATING DEPT./DIV.
Walter N. Funasaki
Accounting Division
A joint study and marketing
of the District's current insurance benefits program
was required by the Memorandum
of Understanding dated July 17, 1980.
The report on the joint
study and marketing is submitted herewith. The
representatives of the Board
of Directors and the Wage and Benefits Committee assert
that this report represents the
results of the joint study stipulated by the
Memorandum of Understanding.
The projected annual savings
of $70,000 from the remarketing of the coverages in
force and the projected annual
cost of $156,280 for additional coverages are affirmed
by the undersigned.
REPRESENTATIVES OF THE
REPRESENTATIVES OF THE
BOARD OF DIRECTORS:
EMPLOY S' ASSOCIATION:
By
By
kialte N. Funasaki
G. Donald Risden
< , 'Of•
414t ��
Peter ich
ail 9. f
Filip
David Jo nson
Distri f sel
en Laverty
Kenneth Moon
4-4d. -
Peter Wiebens
REVIEW)KINO RECOMMENDED FOR BOARD ACTION
INITIAT
GEN H F E
(DDE..PTTT/./DIV. )
7.
WNF
REPORT ON JOINT STUDY OF THE CURRENT AND PROPOSED
DISTRICT INSURANCE BENEFITS PROGRAM
The following are the results of the joint study of the District's current
insurance benefits program conducted by representatives of the Board of
Directors and the Wage and Benefits Committee of the Employees' Association.
A. Savings From Conversion of In -Force Coverages
The annual savings from conversion of the group medical, dental,
and life insurance coverages are projected at $70,000, as detailed on
Exhibit I.
B. Comparison of Major Coverage Terms
A comparison of the major provisions of the policies in force
and the proposed policies from Prudential Insurance Company for group
medical, dental, and life insurance is shown on Exhibit II.
C. Summary of Premium Expense for Additional Coverages
The annual premium expense for additional insurance coverage
for non -management personnel is projected to be $156,280, as shown on
Exhibit III.
D. Policy Documents
Copies of the policy descriptions are provided in Exhibit IV.
E. Conclusion
The following have been determined as a result of the joint study:
1. The new group medical, dental, and life insurance
policies proposed by Prudential Insurance Company
are equivalent, or superior, to the coverages
currently in force and should be obtained for the
policy year beginning February 1, 1981.
2. The Wage and Benefits Committee has requested that
additional coverages be obtained in the following
order of preference:
Expanded Group Life Insurance
Long -Term Disability
Short -Term Disability
Vision Care
A summary prepared by the Wage and Benefits Committee on the
following page presents the requested application of the savings to
additional coverages.
January 14, 1981
Honorable Board of Directors:
In accordance with the Memorandum of Understanding dated July 17, 1980 between
the Board of Directors and the Employees' Association, a joint study for joint
marketing to maximize the employees' coverage has been done.
The results of the study are: ,
I. SAVINGS:
A. Group Medical $48,195.
Group Medical, Added Benefits Savings 7,808.
Subtotal $56,003.
Group Medical, Added Benefits Applied
Subtotal Savings to be Applied
B. Group Dental $12,912.
Group Dental, Added Benefits Savings 13,662.
Subtotal
Group Dental, Added Benefits Applied
Subtotal Savings to be Applied
C.
Life Insurance
$-8,893.
Total Savings to Maximize Benefits'
$91,470.
Total Savings Applicable to New
Coverages
II. APPLICATION
OF SAVINGS:
Total
New
From
Coverages
Savings
A.
Increased Life Ins.
Plan B
$ 25,386.
$25,386.
B.
Long -Term Disability
73,596.
44,614
C.
Short -Term Disability
37,333.
D.
Vision Care
19,965.
--
Totals
$156,280.
$70,000.
Submitted by Wage and Benefits Committee
$26,574.
(13,662.)
$12,912.
$ 8,893.
$70,000.
Added Funds
at B/D
Discretion
$28,982.
37,333.
19,965.
$86,280.
N
N
G
7•
(O
N
O
3
�vr
O
z
(D
O-
a)
rt
(D
U
Z
O
ca
d
3
m
X
S
O'
rt
r
v
3
n
-
(D
(D
O
=3
a
<
(.
rt
-•
(D
v
o�
cD
O
W
v
((D
((DD
C
C
(D
(D
Z
Z
—
�
rt
rt
m
O•
O•
O
v
�
n
N
to
W
%n
VI
N
(D D
C
�n
3 n)
ON
I--
ON
C
w
-•
V
3
G)
x C•')
Co m
C-- n z
v o -i
3 ;o
3 v D
m D r
vv:;o
X - - n
"O
_0
n
O (•') N o
n
0)
(- D O z
c
c
c
m r z -I
a
a.
a
�o
(D
(D
(D-
-i O D
D
D
Z)
N•
m y -n
rt
rt
rt
-t
v m n
-
-•
-•
z v O
�•
N
O1
N -I :;o N
-
D m �
v
-•r3D
=3
O
OoDcN
Ln
to
cn
-0
— z 3 D
•
O
v z
Ln
) m -
(D
rx-i
O_
N — -0 D
-<
�mZ
to
-
N
v D
- N
N
�
co
'i 7
00— m v
00
ON
N
O
(D :
N Z —
3 C
N n N
cc
N
Vl
O
-•N
C O�
V
N
C
;v ;a po
O
Cl
\.D
3
D -
z n
n -I
m
to
to
;o v D
vn
w
(D -I D
OD
N
N
Q (D 7
c 3• C
w
ao
�
�
n -n�
�D
\.n
rt c
3
O
D
r
70
(D 0 '0
V1
V7
a < O
c(Dc
o�
n -s N
w
w
rt v (D
-•tn
O (D
ma 0
0
0o
N
ao
(D
rtrt
c 3 a,
J
o
\
rt c
O
w
Iv
-• 3
O
m
X
S
O'
rt
64
v
3
CD
x -va
Cl C
D>
C7
•
S
rL
-5
CD
rD --
N
m
V
41
r7 i.
N -i)°\°
J
a CL O
Un
C3i
tD
-+•
S
0) n
C+
m
C
'
3
O
<< rD O
�• O
SL
C7
m m m
C
C
CL
O.ct
N O
J
r
E3=3 30
U'1
C
rD P7
C ='
c+N
Z
- �•
"O "O 'L7
N
O 'O
O
rD -1 rD
-5 C+
C)
n
J J J
-0
co
C+
X rD i
(` -8•
rD
Z
00 O
rD
rD
0 O
n t/)
n
Q
r/Y
CD rD
•S
O" �
�cr
V C+ .
(n
J• • (+
A%
CDD
CD "a
(DD
J•J,
-0 —0
'0
n
;)a
CD rD rD
-ha
-h
Cr rD tD
Ch "• =r
-S
CI-
p
=r -+
0)
-+•
- fi O
O rD
rD
�•
Z
+ +
J to
C+
CD
O n a
<
CT
C)
J.
(+ C)
•
5 - C
rD
J
m
ri N -+
J
J CL
E3
C+ C J
O
rD
J
rD
f1)
(�
3 CL rD
C+
to
-O O CL
'C7 'C7
.O -0
N X
O CL
�.
m -SrD
rD
-S
0-
<
v m
to X
rD i
p-
J
m
Q a (D Cn
(D (<
O O
O
O
rD O O
n (D
rD <<
CDD El
C+
N CT
O Z CL
C SL
D. rD
-S
J,
J.
tt rD rD
i Z
C A�
N
n
Ott
N =3
rD
S Z
O
N
fi
C+
V)
rD
O
fy
64
-t) 40c)-
rD -F) b4
J J "o
f -D
C+ CL 0) J
{t>
A
•
O N
X O N
rD -+• O
CD
O rD O C)
N
rD
V
41
r7 i.
N -i)°\°
o\°
a CL O
Un
C3i
tD
rD O
N rD
C o\°
C+ C °\°
m
C
0) O
-a fL O
C+ C
C
i 0 '0
"a
C7
-p
tD
C+ J O
CL C)
n
O C+ '1 U
rD
J
CD
U'1
C
rD P7
;a
— rD O
Z
- �•
-a
O 'O
CL rD
CT i
< CT < C+
J•
n
-0
1 N rD
C C+
J
— J rD S
-h
--F)
rD
t+ n Z
0 O
rD
N rD O
Ai
Z
ry
•S
O" �
�cr
V C+ .
(n
J• • (+
A%
CD "a
-+ O 'EfT
J•J,
In
�.
J.
C -)
-ha
Q (D
Cr rD tD
N < 0)
-+
=r -+
0)
O C -5
- fi O
CL
r rD ca
<<
O
J to
�. O
CD
'S
J.
(+ C)
•
rD
Cfl to
J
J CL
E3
C
Z J• N
J
rD
f1)
(�
rD
O C+
1
'C7 'C7
.O -0
N X
C+<<
(DD J.
<I
rD
-S
rD 0-0
v m
to X
rD i
p-
J
(D (<
O O
O
O
r(D
n (D
rD <<
CDD El
(D
N CT
C SL
D. rD
-S
J.
i Z
C A�
N
O
Ott
rD
S Z
O
O
fi
V)
rD
O
fy
N
•
64
-t) 40c)-
Z - CO
lD
CL J
479
O N
O -+• O
O
rD O
N
-S
UIWJ
Z .
o
CL C)
U9
C
V kD 00
O
CL rD
C o\°
m
0) O
rD t+ C
C
0
_0
rD
0 0, oo
a c-)
c-)
C+ -h
rD
m O W
-+
C
Z7
�. O
i
C+
-a
0 rD
CT i
J•
V) rD
C+ C+
J
J
SL
0 i
- . CT O
rD
rD 0)
cu
-�
='
Cr rD
N
=1
CD "a
-+ O 'EfT
G- (D
rD rD J
J
C Z
fi M
CL
C3
<<
J to
�. O
CD
'S
rD O
(+ C)
CL
rD
CL O
C
<
C3
(�
rD
'C7 'C7
rD ry
C+-0
v m
to X
rD i
p-
J
(D (<
O O
O
O
n (D
V
N CT
C SL
N
J.
i Z
O
O
Ott
rD
O
fi
V)
fy
N �
O Q) V
N Ulcn
Ol W
CJl W Ol
C
- I'D
Z
v
CD
V N Ul
J.
mmm
a
(D 0)i
fL O
-00-0-0
D
000
Qi (3:
l<
X,
rD (TD CD
<<'a
CD
—'
N
(D n
N �
S v
cL O rL
O
N (DD
0
-a -0
J. N 0
(D a CD
1�n1
0 i 4-4).
= O
W
0--s
0) J.
(D rD rD
J.
C+ O
Q' Z
C+ C+
N
ct E3
N �
O Q) V
N Ulcn
Ol W
CJl W Ol
fir
F-4
C
- I'D
-h b4
v
(A
V N Ul
(D
Z
f]r N
(D 0)i
fL O
O
D
O
Qi (3:
J.
X,
0 1
<<'a
L
—'
N
(D n
rD
S v
C
O
(D
0
S
J. N 0
MM
1�n1
0 i 4-4).
co
W
Z
0) J.
J. a
J.
C+ O
Q' Z
pr
0+
ct E3
(D �
(D O
3
(<
o\C
Z
(D
CD �
J O
o
O
Com+
(D rD
r
(D
C+ J.
fD
N
C7
(D O
Oji C+
0-
HI
Cl
0
0
-hJ.
(D c+
O
n
tL
c+ aO
(D 'S
Z s
c J. J
0_ ifi
f]r fi
(D (D
0 O
CD
C+
r
(D
n
0)C+
N
C+
C O
fL
x
E3
(D 0
n
�
Z
J•
(D
Z (D
-�
Z
Q
3
J. O
(D
N
-V
C+
O
N
V)
(D
0_ Ai
�
N
'cfi
0_
�a
n
C.n
'S
r
J•
(D
z
<
O
O
n
Z
J
O
m
(�
(D
(D
C+
J.
(D
fir
F-4
qw
64
C
- I'D
-h b4
v
(A
V N Ul
J•
Q
O .p W
0_ < O
C
O o
(D O
O
Qi (3:
J.
o
�N P
<<'a
0.n
(D (D
rD O
C P) Z
0-1
C+ -h
(D
O
O
J. N 0
MM
1�n1
0 i 4-4).
co
`
CD
0) J.
J. a
J.
C+ O
Q' Z
fL -0 O
O
O
N O O
C
(D O
CU .
O
o\C
S O O
(D
(D
J O
O
O
h '-h
(D rD
C+ J.
fD
N
C7
(D O
O
=
(D 00)
�.
-S N
O
(D c+
0_ a
O
tL
c+ aO
(D 'S
Z s
c J. J
0_ ifi
f]r fi
(D (D
0 O
�
m
X
c—
N
C+
C O
O
n
�
p
C+
J.
Z
�
3
Z N
rD X c+
(D
-V
C+
O
�
N
'cfi
C
r -a
C.n
N
O
O
Z
O
(�
qw
64
C
- I'D
-h b4
v
Ul
V N Ul
J•
Q
O .p W
0_ < O
O O
O o
(D O
O
Qi (3:
J.
o
�N P
<<'a
0.n
(D (D
rD O
C P) Z
0-1
C+ -h
(D
O
O
J. N 0
0 O
a
N
C+ N
CD
0) J.
J. a
J.
C+ O
Q' Z
Z S
-+• S Q
�"� fL
O
(D O
C0 O
O i
n
N (D (v
(D
J X
h '-h
(D rD
C+ J.
C0 rD
Q
C+
(D Z
(D
cr
-S N
C+ C+
O
tL
rD O
(D 'S
0_ ifi
f]r fi
N
J•
0_ O
N
C+
C O
qw
64
C
- I'D
-h b4
v
Ul
OO
far -
-S
O
—�
O o
a O
C
VO
J.
o
O
(D
O
��
O
J•
C+ -h
(D
O
O
C+
S
a
C+
CD
(D C+
fir a
J.
Z S
C0
Sy
CD (D
C0 O
-�
(L
Z �<
h '-h
(D rD
C+ J.
C0 rD
(D Z
0)
-S N
C+ C+
C+
rD O
0_ ifi
N
(D N
0_ O
O
C O
O
n
O
V
C+
J.
(D
-0m
� x
' S
a -
O rt
W _
v
CD
3
o D r c•
(D 0—.
"O Cl) -h N
(D 0 J• (D
J. Ia.
CL H (D
(D a =
O (D c+ N
c+ �L
N O-
CD Ai
I00
E3 (D n
(D Dv (D
O c+
c+ =r v
(zo (D
J.
cn O rn
T J J
00
-� O O
—' O O
O•
co Ul
w W
pi J J
J O O
O O
<< O O
C7
C7
; D
C')
N
m
O
(D
(D
0
;7
O
'v
r+
(v
s
O
<
(D
J•
(A
(D
C
(D
-5 O
N
Q
-v
I
a.
(D c+
J.
C
cn
(D
(D =-
-n
r
J.
O
N (D
(D
f.y
O
c+
-S
C')
-9
a
O
m
O
O
c+
-+
►
•S
<
fL
O
J.
(D
<
(D
(D
A)
Z
Q3
O
n
(D
0
m
(D
L
J.
C+
J.
LO
J
ca
iU
N
O
14
J•
to
fL
CL
J.
0
0
O
O
.1
O
O
O
O
O
O
to
J
O
O
O
C) m
A7 O
C+ C
= -0
sm r
J.
o�
J. (D
N
a a
(D
cr
(D D
5 n
� n
(D J.
Q
c+ CD
A)
J
m
X
C
3
m n
X m
v z
m -I
z;v
N D
m r
v
z m n
O O O
C-zz
m � D
v n
O O
N � N
M D
\X
0o •V N
D D
z
I p
m
N v D
X
\z
00 N v
N C
� N
z �
n—
m n
C-)
O
G
m
D
c�
m
N
m
X
S
rt
N
r ._
O
n
0
•S
0
V)
O
O
<
_
-t
(Q
c
(D
O
rtI
p
-1
7
I
-i
a)
-I
(D
r
(n
n
(D
z
-.
(D
-
3
-h
3
(D
rn
v
v
-•
-•
In
In
�
O
O-
—
rt
rt
K
O -0 `G O
rt 0 :
7 -0 VI
a 3 (D t/). 6,%'O In -O
3 T N
a) —
v
(D
� (D (D 7
O -h N
O (D
(D a) a) J-- Cr, a) -• (D
oo
a) -• r+
7 -• 7
(D
a)
-I a) (D
(D
rt a
a X -S - I -• 0-1
O
X (O (D
7 3 0
In
I
-h -S
ih :E 77
a)
C -• 7 %-n N IZ T. -
-• S 'O
C -• -1
0
In
-I (D
w (D w
rt O K
0 3 -• O\ O
m
3 (D
v rt (D
�
•
a) (D X
Un (D
O a
rt C o O w rt— a
a)
C (A -I
— W a)
_.
3 N rt a)
O X-
-• f
-• 3 (n (NO O(D
K
3 rt 0
In
O
(D -1 f 3
--0
(D a)
U- cn O a) O
c
In rt (D
rt
to O
a)
X a- -•
-r
-• - • -h O a) < -1
(D
O to =3a)
O
-
7•
d <
n (D rt
(D (D -h cn (D
-•
-h a
— n
0
- O — a)
X In In
(D 7 -
In A/)- 3 (D � • (D
-
(D
v rt O
7
7 m (D rt
-• a)
(D (D :
O- In w O -h 7
3
vs O Cl.
i<
(D O --
3 -•%.n
a -h LO
(D 7 -• a` Q' a
-•
v1 O
K O (D
rt In 0
c a O
-•
=1 O o rt n %-n (D
M
O O rt
-I
i In (D O
3 I NO
N rt
(D — O 7" In 7 0
a)
O
a) rt a)
O (D In
K
ON In
-h — O rt (D -h
rt
p rt
rt -• (n
rt -0
-• K -h
0 0:3
3(D
(D
rt -•
O
O (D
= (D
In m rt
:3
a) X
m In
' < In
rt
=
N
v
n
-I
rt
rt
v
(D
0
d
(D
-
v
a,
:3
(D
rt
-t
rt
-I
a)
a)
:3
c
c
Ln
Ln
n
a,
7
(D
(D
(D
(OD
<n to
v
3 3 3
-o -0 v
p w
(D
�n
�n
vt ON
3
O O O
O\O
O\O
W\
-•
(D m
M
-h
°,
a0)
In In In
rt O
n
SOO
+ cn 1
O
O
3
ch o
a
N N yr
rt
r
rt
-h
C
_0 w
T�_
v -h O
rt
O O
-• O '1
a)
c
In
rt
In lD
3 r
O (D
(D D -•
O
o
1 t/)- (D
K
K
a- n (D
(D V -s
-I
"I.
(D --
O_
O
1 o_ —
tnO 3
1,0�n O
-•
-•
m 3 N
• I
7 rt c
rt
rt v
N (D S
I
7
(D
O
7
3 rt
-U).
00
S
N
=3 lC
V
W
V'1
j
rt
N 3
�D
w
vI
c
3 c
vi
rn
w
(0
Irn
-• a,
C)
v1
w
m
ON
c --
3
44,m
N
N
'C
7
ON
(D -•
N
a).
O
p
p
3 (D
0
7
(D
rt
i?
rt
N
lD
W
U1
w
3 c
00
D`
W
t0
00
-• O
O
VI
W
ON
C
3
m
X
C
3
m n
X m
v z
m -I
z;v
N D
m r
v
z m n
O O O
C-zz
m � D
v n
O O
N � N
M D
\X
0o •V N
D D
z
I p
m
N v D
X
\z
00 N v
N C
� N
z �
n—
m n
C-)
O
G
m
D
c�
m
N
m
X
S
rt
(CCSD Central Contra Costa Sanitary District
BOARD OF DIRECTORS
UUN JaTery t;. -
Training Supv.Central Safety Comm.
NO. VIII. Cap Im rogjement
55
POSITION PAPER
vIA' ROGER J. DOLAN
General Manager—Chief Engineer
DATE
January 26, 1981
SUBJECT
TYPE OF ACTION
Purchase of three Enmet CGS -100 meters and one Gasteck HS -80
meter for a total of $4,980
Capital Expenditure
SUBMITTED BY
INITIATING DEPT./DIV.
D. G. Niles, Manager
Plant Operations Department
Issue: Recent deaths of two sanitary workers at the Burbank treatment plant have
resulted in stricter guideline enforcement of the Cal/OSHA requirements for confined
space work.
Background: Hydrogen sulfide which caused the death of the sanitary workers in Burbank
is a common toxic gas in the wastewater industry. Although it is common, manufacturer's
of confined space metering equipment have not in the past produced meters which would
simultaneously monitor for 02 deficiency, combustibles, and hydrogen sulfide.
There are three companies who now produce instruments capable of simultaneous
monitoring for 02 deficiency, combustibles, and 1-12S. In my opinion the Enmet Company
has a reliable combination meter. The Plant Operations Department needs to purchase
three combination meters and one meter which monitors only H2S in order to insure safe
confined space work in each of its divisions. Presently the Plant Operations Department
has three MSA 260 meters and one Combo 33. The MSA 260 measures only 02 deficiency and
combustibles. The Combo 33 will measure all three.
Proposed distribution of Confined Space meters:
Operations and Maintenance Divisions: Two CGS -100 (new
Pumping Stations, West: One MSA 260 and one HS -80 (new)
Pumping Stations, North: One CGS -100 (new)
Backup meters: Two MSA 260
One Combo 33
Note: As single monitoring meters wear out they will be replaced with combination
monitoring meters in order to reduce replacement parts, inventory, and operational
training.
Recommendation: Purchase of three Enmet CGS -100 meters for $4500 and one Gasteck
HS -80 for 0 for a total of $4,980 to be authorized from the Sewer Construction Fund.
REVIEWED AND RECOMMENDED FOR BOARD ACTION
INITIATING DEPT./DIV.
ENG.
WGE.HIEF
UUN JaTery t;. -
Training Supv.Central Safety Comm.
((CSD Central District
BOARD OF DIRECTORS
NO• VIII. Cap. prr vemts
2� 5181
POSITION PAPER
VIA. ROGER J. DOLAN
DATE JANUARY 28, 1981
General Manager -Chief Engineer
SUBJECT APPROVE PLANS AND PROJECT MANUAL AND AUTHORIZE
TYPE OF ACTION
ADVERTISING FOR BIDS FOR DISTRICT PROJECT 3474,
APPROVAL OF PLANS &
TREATMENT PLANT NORTH PARKING LOT AND ACCESS ROAD
AUTHORIZE FOR BID
MODIFICATION
SUBMITTED BY
INITIATING DEPT./DIV.
JAY S_ MCCOV
COLLECTION SYSTEM ENGINEERING -DESIGN DIVN.
BACKGROUND: This project will provide a new access road into the
treatment plant and additional private vehicle parking outside of
the plant fenced area. Completion of the project, prior to the start
of construction for the new headquarters office building, is necessary
so that the construction area will be clear.
RECOMMENDATION: Approve plans and project manual and authorize
advertising for bids for District Project 3474.
Attachment: Engineers Estimate
REVIEWED AND RECOMMENDED FOR BOARD ACTION
INI ATING PlIrT.DIV.
GE R. HIEF ENG.
JMc
CL
(CCSD
Central Contra Costa Sanitary District
BOARD OF DIRECTORS
RAB DGN
RJD
S.
NO. VIII. cap. mprovem
2 2/5/81
POSITION PAPER
vIA. ROGER J. DOLAN
DATE Januar y 30, 1981
General Manager—Chief Engineer
SUBJECT
AUTHORIZATION OF $18,000 IN SEWER CONSTRUCTION FUNDS FOR
TYPE OF ACTION
THE PURCHASE OF REPLACEMENT DISSOLVED OXYGEN PROBES
Capital Expenditure
SUBMITTED BY
INITIATING DEPT./DIV.
D. G. Niles
Plant Operations
ISSUE: The Plant Operations Department requests authorization to expend $18,000 in
sewer construction funds for the purchase of dissolved oxygen probes.
BACKGROUND: The activated sludge process at the Water Pollution Control/Reclamation
Plant has eight permanently installed dissolved oxygen probes which are used to
control tank aeration. These probes are important because they are used to control
the environment of the bacteria which are the heart of the treatment process and
because close aeration flow control can save money in air compression energy cost.
The present dissolved oxygen probes are unexpectedly reaching the end of their
service lives. In addition, the installed dissolved oxygen probes have become
obsolete and replacements are not available. Since it was not anticipated that
the dissolved oxygen probes would only have a three-year service life, insufficient
money was budgeted for replacing all of the probes in this budget year.
RECOMMENDATION: Authorize $18,000 in sewer construction funds for the purchase
of replacement dissolved oxygen probes.
REVIEWED AND RECOMMENDED FOR BOARD ACTION
INITIATIN
GE G /CH EF ENG.
`DDEPT./DIV.
0
RAB DGN
RJD
S.
(CCSD Central Contra Costa Sanitary District
BOARD OF DIRECTORS
NOMI. Jonseq/ Windar
POSITION PAPER
VIA' ROGER J. DOLAN
DATE
General Manager—Chief Engineer
2-2-81
SUBJECT
TYPE OF ACTION
ACCEPT GRANT OF EASEMENT FROM KIM ABBOTT, DSP 2695, PARCEL
5, WALNUT CREEK AREA, AT A COST OF $2,300 TO THE DISTRICT
RIGHT OF WAY
SUBMITTED BY
INITIATING DEPT./DIV.
Jay McCoy
Engineering/Collection System
ISSUE: The subject easement is the 8th of the total of 14 easements required
for DSP 2695.
BACKGROUND: The District Board previously authorized staff to proceed with
easement acquisition for this District Sewering Project. All easements must
be obtained before sewer construction may begin. Construction has been
tentatively scheduled to begin in the Spring of 1981.
The cost of the above easement is $2,300.
RECOMMENDATION: Accept easement, authorize payment as specified above
and authorize recording of said easement.
REVIEWED AND RECOMMENDED FOR BOARD ACTION
INITTI,(DIV.
GE HIE F ENG.
�f�/'moi JMc
cxj'�CLW
'
(CCSD Central Contra Costa Sanitary District
BOARD OF DIRECTORS
NO,
VI . Adrg5�811 c
POSITION PAPER
VIA. ROGER J. DOLAN
DATE
General Manager—Chief Engineer
Feb. 2, 1911
SUBJECT APPROVAL OF AMENDMENT NO. 2 TO THE TASK C/D AGREEMENT
TYPE OF ACTION
WITH METCALF & EDDY TO INCREASE THE COST CEILING FOR
ADMINISTRATIVE
DEFINITION OF SCOPE OF ALTERNATIVE RECLAMATION STRATEGIES
SUBMITTED BY
INITIATING DEPT./DIV.
John Larson
Special Projects Engineering Division
BACKGROUND: 'Metcalf & Eddy (M&E) is under contract to provide professional
engineering services for evaluation of alternative reclamation strategies at
the District Water Reclamation Plant. The first phase of Task C is to define
the scope of this evaluation and the eventual facilities plan. Work to define
the scope began in March, 1980, and is nearing completion.
The District staff has requested M&E to prepare a cost analysis of alternative
sludge handling systems as part of the definition of scope. This analysis will
aid the District in determining the appropriate courses of action under Task C
as well as Tasks A and B (Stages 5A and 5B -I). However, to be able to prepare
this cost analysis, the cost ceiling of the Task C Agreement must be increased.
This amendment will increase the cost ceiling of the M&E Agreement by $5,030
from $35,547. Since the scope of work has not changed, and the M&E Agreement
is a cost plus fixed fee type of contract, only the direct and indirect costs
are being increased. The fixed fee remains unchanged. These costs are eligible
for reimbursement under the Clean Water Grant Program.
RECOMMENDATION: Authorize the President of the Board of Directors to execute
Amendment No. 2 to the Task C Agreement to increase the cost ceiling by $5,030
for the definition of scope of alternative reclamation strategies. Authorize
expenditure of sewer construction funds for this work.
REVIEWED AND RECOMMENDED FOR BOARD ACTION
INITIATING DEPT./DIV.
GE
JL
CLW
'tea
((CSD
Central Contra Costa Sanitary District
BOARD OF DIRECTORS
NO.V. Consent Calendar
2 2/5/81
POSITION PAPER
VIA_ ROGER J. DOLAN
DATE
General Manager—Chief Engineer
SUBJECT
EXECUTE AGREEMENT RELATING TO REAL PROPERTY WITH
TYPE OF ACTION
KELLY K. JAY, ET UX, JOB 1373 PARCEL 3
RIGHT OF WAY
SUBMITTED BY
INITIATING DEPT./DIV.
Jay McCoy
Engineering/Collection System
ISSUE: The property owners, Mr. and Mrs. Kelly K. Jay, desire to construct
a tennis court and related improvements over a District easement.
BACKGROUND: The property owners have supplied the District with their
plans. District staff has inspected the site and televised the existing_
sewer.
Staff has determined that the improvements do not interfere with the present
use of our sewer, however, if it should become an interference, the agreement
requires the property owner to remove the structure within 30 days of notice
to do so.
RECOMMENDATION: Approval, execute "Agreement" and authorize its recording.
REVIEWED AND RECOMMENDED FOR BOARD ACTION
INIT TING DEPT�./�V.
GEN. / IEF NG.
JMc
CL
((CSD Central Contra Costa Sanitary District
BOARD OF DIRECTORS
:S.
NO. VIII. Cap. Improve
4 2/5/81
POSITION PAPER
VIA: ROGER J. DOLAN
DATE
General Manager -Chief Engineer
2-2-81
SUBJECT AUTHORIZE $80,700 FOR PREPARATION OF PLANS FOR DSP 3465,
TYPE OF ACTION
A WATERSHED TRUNK SEWER ALONG CAMINO TASSAJARA AND FOR
DSP 3466, A WATERSHED TRUNK SEWER ALONG SYCAMORE VALLEY RD
SUBMITTED BY
INITIATING DEPT./DIV.
Jay S. McCoy
I Engineering/Collection System
BACKGROUND: Blackhawk has forwarded a check in the amount of $80,700 as
identified in the attached letter. The money will be used for design of
two projects which are shown on the attached map. The total cost of both
projects is estimated to be $1,250,000. It is anticipated that Blackhawk
will construct the projects. These two projects, when finished, will
complete the trunk sewers for Watershed 35 South.
RECOMMENDATION: Authorize $80,700 for preparation of plans for District
Sewerinq Projects 3465 and 3466 Watershed 35 South.
Attachments
REVIEWED AND RECOMMENDED FOR BOARD ACTION
INIT TING//EPT./DIV.
JMc
CLW
GEN /CHIEF ENG.
y///j/!�/(f/
:S.
(CCSD Central Contra Costa Sanitary District
BOARD OF DIRECTORS
"VI. Adm. la
2/5/81
POSITION PAPER
SIA' ROGER J. DOLAN
DATEFeb. 2 1981
General Manager—Chief Engineer
,
SUBJECT APPROVAL OF AMENDMENT NO. 4 TO THE TASK A AGREEMENT
TYPE OF ACTION
WITH METCALF & EDDY TO INCREASE THE COST CEILING FOR
THE DEFINITION OF SCOPE OF STAGE 5A CORRECTIONS
ADMINISTRATIVE
SUBMITTED BY
INITIATING DEPT./DIV.
John Larson
Special Projects Engineering Division
BACKGROUND: Metcalf & Eddy (M&E) is under contract to provide professional
engineering services for the design of correction to the existing Stage 5A
facilities. The first phase of work, Definition of Scope of the Stage 5A
Corrections, began in March, 1980 and is nearing completion.
Many more deficiencies were uncovered during this phase of Task A work than
were originally anticipated. Additional engineering was necessary to define
the Stage 5A problems and the program to correct them. The cost ceiling
must be increased to be able to complete this important portion of Task A.
This amendment will increase the cost ceiling of the M&E Agreement by
$58,116.00 from $109,837. Since the scope of work has not changed and the
M&E Agreement is a cost plus fixed fee type of contract, only the direct
and indirect costs are being increased. The original fixed fee remains
unchanged. These costs are eligible for reimbursement under the Clean
Water Grant Program.
RECOMMENDATION: Authorize the President of the Board of Directors to
execute Amendment No. 4 to the Task A Agreement with M&E to increase the
cost ceiling by $58,116.00 for the Definition of Scope of the Stage 5A
Corrections. Authorize the expenditure of sewer construction funds for
this work.
REVIEWED AND RECOMMENDED FOR BOARD ACTION
INITIATING DEPT./DIV.
GEN. HIE F ENG.
r t L JL
CLW
((CSD Central Contra Costa Sanitary District
BOARD OF DIRECTORS
No. VI. Adm.
2/5/81
POSITION PAPER
VIA: ROGER J. DOLAN
DATE eb. 2 1981
General Manager—Chief Engineer
,
SUBJECT L NDMENT N0. 2 TO THE TASK B AGREEMENT
TYPE OF ACTION
WITH METCALF & EDDY TO INCREASE THE COST CEILING FOR
ADMINISTRATIVE
DEFINITION OF SCOPE FOR COMPLETION OF DESIGN OF THE STAGE
5B -I PROJECT
SUBMITTED BY
INITIATING DEPT./DIV.
John Larson
Special Projects Engineering Division
BACKGROUND: Metcalf & Eddy (M&E) is under contract to provide professional
engineering services for completion of design of the Stage 5B Phase I project.
The first phase of Task B is to define the scope of work required to complete
the design, and includes review of the Stage 5B -I plans and specifications as
well as the Stage 5A plans and specifications.
To adequately review the Stage 5B -I design, more engineering time was required
than anticipated because of the volume and condition of the plans and the
supporting design information. In addition, the unavailability of Stage 5A
as -built plans necessitated more field inspection than originally envisioned.
Consequently, an increase in the cost ceiling of the Task B Agreement is
required to allow completion of the Definition of Scope.
This amendment will increase the cost ceiling of the M&E Agreement by $6,834.00
from $35,490. Since the scope of work has not changed, and the M&E Agreement is
a cost plus fixed fee type of contract, only the direct and indirect costs are
being increased. The fixed fee that was originally negotiated remains unchanged.
These costs are eligible for reimbursement under the Clean Water Grant Program.
RECOMMENDATION: Authorize the President of the Board of Directors to execute
Amendment No. 2 to the Task B Agreement to increase the cost ceiling by $6,834.00
for the Definition of Scope for Completion of the Stage 5B Phase I Project.
Authorize the expenditure of sewer construction funds for this work.
REVIEWED AND RECOMMENDED FOR BOARD ACTION
INITIATING DEPT./DIV,
GEN / HIEF ENG.
` (_ JL
y \
•"""
.
CLW
W
BOARD OF DIRECTORS
NO.
POSITION PAPER
VIA. ROGER J. DOLAN
DATE
General Manager—Chief Engineer
January 13, 1981
SUBJECT
TYPE OF ACTION
REPORT ON TAX INCREMENT PROGRESS
ADMINISTRATIVE
REVIEW
SUBMITTED BY
INITIATING DEPT./DIV.
Jay McCoy
Engineering/Collection System
The attached draft letter is being presented to the Board for
review and comment at the Board meeting. The purpose of the letter
is to notify the County of this District's position with respect to
sharing of "tax increments" from future annexed properties.
REVIEWED AND RECOMMENDED FOR BOARD ACTION
INIT16,TING DEPT./ IV.
//'� JMc►
CLW
GE / HIE ENG.
Draf t
Mr. Mel Wingett
County Administrator
Contra Costa County
Admin. Bldg.
Pine & Escobar Streets
Martinez, CA 94553
Dea r
In accordance with our discussion last Wednesday, I have had data prepared
relative to this District's position on sharing of tax increments. The attached
tabulation is based on an estimate of the properties which might annex to this
District over a year's period. The properties are listed by Assessor's parcel
number and an estimate of the tax increment which may result when the properties
are improved can be found in column G of the tabulation.
The data is being provided so that the County Auditor can make estimates
of sharing of the tax increments. I would like to illustrate the position of
this District on the method for sharing. For the following example, these
percentages for sharing will apply:
Agency Share of taxes, %
Schools 38
County 30
County Agencies 22
CCCSD 4
EBRPD 3.5
EBMUD 1.5
BARTD 1
100
Since the law provides for a guarantee of the School's share (in this
example, 38%), 62% of the taxes remain for distribution. It is the position
of this District that CCCSD's share will be equivalent to 4% of the original,
full tax increment. To achieve this end, it will be necessary to obtain a 6.5
( 4 - .62) % share of the tax increment which remains after the School's share
is removed:
tax increment $1,000
CCCSD Share at 4% $ 40
Schools share at 38% $ 380
Remaining tax increment $ 620
CCCSD's share to equal
original share = .065X620 $ 40
It is also the position of this District that the other agencies must
make up the 2.5% differential. Once the Auditor complets the calculations
based on the attached tabulation, we will be happy to meet and discuss the
issues further with specific examples.
V ty
RJD
Attachment
cc: J. Carniato
DBMUD
(A)
(B)
(D)
(E)
(F)
(G)
1980-81
New Parcel
New Assessed
Assessor's
1980-81
Numbers If
Value When
Tax Base
Increment
CCCSD
Parcel
Assessed
Parcel Has
Property Is
(C)X.04*
((E)-(C))X.04*
Number
Number
Value $
Been Split
Improved $
$
$
79-17
197-190-013
4,950
100,000
198
3802
197-190-014
36,175
100,000
1447
2553
197-190-015
24,750
100,000
990
3010
197-190-016
5,450
100,000
218
3782
197-190-018
31,250
All
100,000
1250
2750
197-190-019
5,450
The
100,000
218
3782
197-190-020
5,450
Same
100,000
218
3782
197-190-021
5,450
100,000
218
3782
197-190-022
_4,950
100,000
198
3802
197-190-023
4,800
100,000
192
3808
197-190-024
2,794
100,000
112
3888
197-190-025
1,750
100,000
70
3930
79-18
191-020-055
23,173
All
23,173
927
0
191-020-056
27,100
The
65,000
1084
1516
191-020-057
25,750
Same
65,000
1030
1570
71-19
197-100-021
20,000
75,000
800
2200
197-100-030
27,200
225,000
1088
7912
197-120-001
17,187
75,000
687
2313
197-120-002
37,812
150,000
1512
4488
197-120-011
13,575
All
150,000
543
5457
197-120-012
10,250
The
150,000
410
5590
197-120-014
2,068
Same
2,068
83
0
197-120-015
25,950
225,000
1083
7962
197-130-004
29,562
150,000
1182
4818
197-130-05
77,500
300,000
3100
8900
197-130-007
42,075
300,000
1683
10317
*Based on
$4.00 per $100
Assessed
Value Tax Rate for
simplification
(A)
(B)
(`,
(D)
(E)
(F)
(G)
1980-81
New Parcel
New Assessed
Assessor's
1980-81
Numbers If
Value When
Tax Base
Increment
CCCSD
Parcel
Assessed
Parcel Has
Property Is
(C)X.04*
((E)-(C)))CD4*
Number
Number
Value $
Been Split
Improved $
$
$
Same
79-20
208-034-009
22,237
Same
22,237
889
0
79-21
191-010-020
24,375
24,375
975
0
All
191-010-021
1,982
90,000
79
3521
The
191-010-022
1,982
90,000
79
3521
Same
191-010-023
1,982
90,000
79
3521
79-22
199-070-014
12,500
All
125,000
500
4500
199-070-015
21,250
The
125,000
850
4150
199-070-016
12,500
Same
125,000
500
4500
79-23
216-160-003
11,785
Same
11,785
471
0
79-24
140-220-006
10,013
All
180,000
400
6799
140-220-007
8,843
Same
180,000
354
6846
79-25
200-220-004
3,174
All
75,000
127
2873
200-220-007
3,483
Same
75,000
139
2861
79-26
159-060-57
923,965
159-381-01
36,959
323,041
159-381-02
159-381-03
159-381-04
159-381-05
159-381-06
159-381-07
159-381-08
159-381-09
9,000,000
159-381-10
159-381-11
159-381-12
159-381-13
159-382-01
159-382-02
159-382-03
159-382-04
159-382-05
159-382-06
159-382-07
159-382-08
2
(A)
(B)
(L.
(D)
(E)
(F)
(G)
1980-81
90,384
New Parcel
New Assessed
3615
Assessor's
1980-81
Numbers If
Value When
Tax Base
Increment
CCCSD
Parcel
Assessed
Parcel Has
Property Is
(C)X.04 *
( (E) - (C) )X.04*
Number
Number
Value $
Been Split
Improved $
$
$
200-020-013
5,851
234
79-27
192-041-007
24,625
Same
34,625
985
400
79-28
135-050-010
41,875
Same
225,000
1675
7325
79-29
197-070-014
17,575
Same
90,000
703
2897
79-30
110-120-041
52,810
Same
52,810
2112
0
79-31 140-131-002 5,107 750,000
140-410-001
140-410-002
140-410-003
140-410-004
140-410-005
140-410-006
140-410-007
140-410-008
140-410-009
140-410-010
204 29,796
79-32
197-150-002
19,636
785
200-020-011
90,384
3615
Same
200-020-012
8,452
2,025,000
338
75,777
(Total)
(Total)
200-020-013
5,851
234
200-020-019
6,242
250
79-33
152-070-017
2,069
40,000
83
1,517
Same
152-070-018
7,650
40,000
306
1,294
80-1
196-120-004
42,500
Same
60,000
1700
700
80-2
200-010-023
32,535
Same
150,000
1301
4699
200-020-018
17,251
150,000
690
5310
80-3
192-030-017
28,625
Same
28,625
1145
0
3
(A)
(B)
(l,
(D)
(E) (F)
(G)
0
1980-81
193-080-015
New Parcel
New Assessed
225,000
970
Assessor's
1980-81
Numbers If
Value When Tax Base
Increment
CCCSD
Parcel
Assessed
Parcel Has
Property Is (C)X.04*
((E)-(C))X.04*
Number
Number
Value $
Been Split
Improved $ $
$
13,141
Same
300,000
526
9,720
80-4
215-060-001
77,800
Same
2,160,000 3112
83,288
80-5
215-030-006
56,125
Same
56,125
2245
0
80-6
193-080-015
24,241
Same
225,000
970
8,030
80-7
193-200-009
24,731
989
All
193-200-014
13,141
Same
300,000
526
9,720
(Total)
(Total) -
193 -200-015
19,127
765
80-8
138-020-003
20,682
320,000
827
11,973
138-020-004
138-020-005
138-020-006
138-020-007
138-020-008
138-020-009
138-020-010
138-020-011
80-9
139-090-011
12,500
40,000
500
1,100
Same
139-090-012
32,500
32,500
1300
0
80-10
139-062-012
10,018
Same
120,000
401
4399
80-11 208-240-036 344,250 6,000,000 13,770 212,460
208-500-001
208-500-002
208-510-001
208-510-002
208-520-001
208-520-002
208-520-003
80-12 197-161-027 17,940 Same 17,940 718 0
4
(A)
(B)
16,640
(D)
(E)
(F)
(G)
80-16
1980-81
19,143
New Parcel
New Assessed
766
17,234
Assessor's
1980-81
Numbers If
Value When
Tax Base
Increment
CCCSD
Parcel
Assessed
Parcel Has
Property Is
(C)X.04*
((E)-(C))X.04*
Number
Number
Value $
Been Split
Improved $
$
$
197-040-026
80-13
139-040-001
43,750
Same
150,000
1750
4250
80-14
209-570-001
143,876
Same
3,000,000
5756
114,244
80-15
196-120-005
16,640
Same
16,640
666
0
80-16
197-040-008
19,143
450,000
766
17,234
197-040-023
197-040-024
197-040-025
-
197-040-026
197-040-027
80-17
192-011-042
_'59,875
Same
225,000
2395
6,605
80-18
197-270-006
37,825
Same
300,000
1513
9,637
(Total)
(Total)
197-270-007
21,250
850
80-19
192-020-003
14,351
Same
14,331
573
0
80-20
264-250-013
38,250
Same
38,250
1530
0
G'+