HomeMy WebLinkAboutAGENDA BACKUP 05-21-81
BOARD OF DIRECTORS
No.IV.
jonseghr'ATndar
POSITION PAPER
VIA: ROGER J. DOLAN
General Manager-Chief Engineer
DATE
May 19, 1981
SUBJECT
EXECUTE AGREEMENT RELATING TO REAL PROPERTY WITH MR.
RON E. PROVENCHER - JOB 2928 PARCEL M I SC. (LOT 29 -
SUB 4704) DANVILLE AREA
TYPE OF ACTION
RIGHT OF "'AY
SUBMITTED B~ay S. McCoy
INITIATING DEPT./DIV.
Engineering/Collections System
ISSUE: The property owner desires to construct a wooden deck (with
a hinged section over an existing manhole), a brick barbecue with
concrete decking area and a concrete swimming pool deck within and
adjacent to an existing District sewer easement.
BACKGROUND: The owner has cooperated with District staff in modi-
fying his plans to meet with our approval. The owner has signed
an Agreement Relating to Real Property and has assumed responsi-
bil ity for future problems which may result from the installation
of the proposed improvements.
Staff has determined that the improvements do not interfere with
the present use of our sewer. However, if it should become an
interference, the Agreement requires the property owner to remove
the structure within 30 days of notice to do so.
RECOMMENDATION: Approval, execute "Agreementl! and authorize its
recording.
REVIEWED AND RECOMMENDED FOR BOARD ACTION
~~CL'v1
BOARD OF DIRECTORS
No.IV. Consent Items - 2
5 21 81
POSITION PAPER
VIA: ROGER J. DOLAN
General Manager-Chief Engineer
DATE
May 18, 1981
SUBJECT
EXECUTE "AGREEMENT RELAT I NG TO REAL PROPERTY" WITH
MR. & MRS. GARY BOWERS, JOB 1597, PARCEL 35- ALAMO
AREA
TYPE OF ACTION
RIGHT OF '-flAY
SUBMITTED BY
Jay S. McCoy
INITIATING DEPT./DIV.
Collection/Engineering
ISSUE: The property owners, Mr. and Mrs. Bowers, have constructed a
brick patio over an existing District easement and also intend to
construct a concrete patio and pool deck over said easement.
BACKGROUND: The property owners have supplied the District with their
plans. District staff has reviewed the plans and the existing on-site
improvements.
Staff has determined that the existing patio and the planned new
construction will not interfere with the present use of our sewer.
However, if they become an interference, the agreement requires the
property owner to remove the structure within 30 days of notice to
do so.
RECOMMENDATION: Approval, execute "Agreement" and authorize its
recording.
REVIEWED AND RECOMMENDED FOR BOARD ACTION
JSM
e~ CLH
District
BOARD OF DIRECTORS
NO.
POSITION PAPER
VIA: ROGER J. DOLAN
General Manager-Chief Engineer
DATE
5/21/81
May 18, 1981
SUBJECT
TYPE OF ACTION
EXECUTE "CONSENT TO DED I CATION" TO THE CITY OF LAFAYETTE
SUBD. 5668 - JOB 1529
RIGHT OF WAY
SUBMITTED BY
Jay S. McCoy
INITlf.TJIiG DEP.T./DII.\l.. .
COllectlon,'tnglneerlng
ISSUE: BROOK STREET, a City of Lafayette street, is being widened 5 feet
by dedication to the City on the map of Subdivision 5668.
This 5 foot widening crosses an existing 10 feet wide District sewer
easement.
BACKGROUND: District consent is requIred whenever a roadway widening
encroaches upon an existing District easement.
RECOMMENDATION: Approval, execute document and authorize its recording
by the City.
REVIEWED AND RECOMMENDED FOR BOARD ACTION
~~ CL
<c(sD
Central Contra Costa Sanitary District
BOARD OF DIRECTORS
NOJ: I 1. 1 B&D~ & A~'~9S
POSITION PAPER
VIA: ROGER J. DOLAN
General Manager-Chief Engineer
DATE
SUBJECT
TYPE OF ACTION
AWARD OF CONTRACT FOR DISTRICT PROJECT 3516, INSTALLATION
OF NATURAL GAS LINE CATHODIC PROTECTION SYSTEM AND
F
Clark L. Weddle
CONTRACT AWARD
SUBMITTED BY
INITIATING DEPT./DIV.
Engineering
BACKGROUND: On April 23, 1981, the Board authorized staff to advertise
for bids for the subject project. Bids were received May 19, 1981 and
are summarized on the attached tabulation. The low bid was by Power-
Anderson, Inc., at $52,500 (138% of the Engineer's estimate).
The District sent information to 20 possible bidders when authorization
to advertise was received. Since there is a lot of similar work in
the Bay Area, and the amount of work is small, only two contractors bid
on the Project. The Engineer determined the difference between his
estimate and the low bidder is for the reasons given.
The construction of this project is required prior to construction of the
Headquarters Office Building, which is estimated at approximately $4 million.
The delay and impact costs to the Headquarters Office Building Project would
be more than the $14,560 difference between the Engineer's estimate and
the low bid if the contract is not awarded.
A post bid preconstruction cost estimate is attached. Total project cost
at this estimate is $80,375. The amount previously authorized is $15,000.
The additional amount required to complete the project is $65,375.
RECOMMENDATION: Award contract to Power Anderson,Inc., and authorize
an additional $65,375 to complete the project.
INITIATING DEPT
REVIEWED AND RECOMMENDED FOR BOARD ACTION
~ q.,.J.-. 'X .
_..,_____w~.__.~___,.__.,_._._~._.._~_, '"~___....__._." .,..__...., _...._'.._....____.......__._..._"_._.,__."_._,_~.._.._.,_._.__'"..___~____,_".__.._~__.___,_._.____~_____."____.___._...__......___
fll,,, T 810- PRECONSTRUCTiON ESTIMATE OF COSTS
FOR
DISTRICT SEWERING PROJECT 3516
;0 CO~\ST.
ITE~~ DESCRIPTIOi'J iTE') AMOUW TOT,:l,L ~m~TP~ACT
1 . Construction Contract (As Bid) . . $ 52,500
2. Estimated Construction Contingencies . $ 5,250 10%
3. Estimated Construction Incidentals to Project Completion
Survey. . S 2.000
Inspection . $ 3.000
Engineering .$ 3.000
Total Estimated Construction Incidentals . S 8,000 $ 8,000 15%
4. Street Res urfac i ng or Sea I Coat .$ 0 ()
5. Total Estimate Required to Complete Project . $ 65.750 125~;
6. Pre Bid Expenditures
Survey, Engineering, Printing, Advertising . $ 350.
Special Services . $ 0
Right-of-Way Acquisition. .$ 0
7. Total Preconstruct ion Incidentals \as of 4/30/81 .$14,625 $ 14,625 28%
8. Total Estimated Project Cost . $ 80.375 153%
(items5&7)
9. Funds Prev;ously Authorized . $ 15.000
10. Total Additional Funds Required to Complete ProJect. .$ 65.375
(Item 8 minus Item 9)
2050-8-78
N
0 ""'C :z
s:ll 0 s:ll
--I :e: :3
N ro ro
ro -S
--I I 0
--I )::0 -+.
~
CI 0.. CI
0 ro 0
-S -S ~
-0 VI M-
0 -S
~ s:ll
n
M-
....... 0 .......
~ -S :z
n <n
-I
<n )::0
c:: .-
::s: .-
::s: )::0 )::0
)::0 :z -I
:;c 0 .......
-< 0 CI
:;c :z m
0 m :z
" .- 0 -I
-b'l- -b'l- o:l 0 " :;c
\.0 CJ"I ...I. CI CI )::0
W N 0.. 0 )::0 :z .-
:z 0 -I )::0
'-J CJ"I ~ -I ....... ....... -I CI
0 0 :;c <n 0 c:: 0
0 0 0 )::0 -I :z :;c :z
l:: CI :;c )::0 -I
~ -I ....... 0 .- :;c
M- 0 CI " )::0
:;c -I Ci")
<n )::0 )::0 CI
""'C <n 0
o:l :;c ""'C <n
....... 0 :;c .- -I
0 c... m ....... )::0
<n lTl <n :z
CI <n m <n
<n -I c:: )::0
-b'l- ~~ c:: :;c CI :z
-i=:a o:l :z lTl )::0 .......
--I :e: 0 ::s: 0 -I -I
l:: ....... :;c ::I: )::0
N o:l~ -I m 0 :;c
0 ...I. M- -I w 0 0 -<
0 0.. m CJ"I c:: .......
0.. )::0 0 --I CI CI 0
roo- C"l ....... .......
-S 0 ::s: :z ""'C <n
< )::0 Ci") :;c -I
ro -< 0 :;c
<n -I .......
-I lTl CI
\.0 )::0 CI -I
-I -I
....... .......
0 0
\.0 :z :z
OJ
--I <n
-<
<n
:;c -I
ro lTl
:3 ::s:
s:ll
-S
^
VI
BOARD OF DIRECTORS
No.VI. - Eng. - 1
POSITION PAPER
VIA: ROGER J. DOLAN
General Manager-Chief Engineer
DATE
May 15, 1981
TYPE OF ACTION
SUBJECT
APPROVE PLANS AND PROJECT MANUAL AND AUTHORIZE ADVER-
TfSING FOR BfDS FOR DfSTRfCT PROJECT 3429, 3430, 3435
Jay S. McCoy
APPROVAL OF PLANS
AND AUTHORIZE BID
DSP 3429 3430 3435
INITIATING DEPT IDIV.
Collection/Engineering/Design Div.
SUBMITTED BY
BACKGROUND: This project will provide permanent chemical injection
equipment installations for the Maltby, Fairview and Moraga Pumping
Stations which will replace existing temporarily rented equipment.
RECOMMENDATION: Approve plans and project manual and authorize adver-
tising for bids for District Projects 3429, 3430, 3435
ATTACHMENT: Engineers Estimate
REVIEWED AND RECOMMENDED FOR BOARD ACTION
ENG.
~ CL\~
J.J. CARNIATO
Counsel for the District
Tel. 283-1552
CLYDE M. HOPKINS
Secretary
'":ENTRAL CONTRA COS':""A
SANITARY DISTRICT
1250 SPRINGBROOK ROAD
MAILING ADDRESS P. O. BOX 5266
WALNUT CREEK, CALIFORNIA 94596
TEL. 934-6727 AREA CODE 415
January 20, 1981
The District Board
Central Contra Costa Sanitary District
1250 Springbrook Road
Walnut Creek, CA 94596
Gentlemen:
Re: DISTRICT SEWERING PROJECTS 3429, 3430 and 3435
MALTBY, FAIRVIEW AND MORAGA PUMPING STATIONS
IMPROVEMENT WORKS
ROGER J. DOLAN
General Manager-Chief Engineer
CLARK L. WEDDLE. PhD.
Deputy Chief Engineer
Submitted herewith is an estimate of the cost of work in accordance
with District plans for District Sewering Project Nos. 3429, 3430 and 3435,
the Improvement Work at District Pumping Station in Maltby, Fairview and
Moraga for additional facilities and to comply with minimum safety.'
standard requirements.
Item
No.
Description
Unit
Price
Quantity
1
2
3
4
5
6
7
8
3 Ea.
3 Ea.
1 Ea.
40 L.F.
40 L.F.
20 Tons
1,400 S.Y.
1 Ea.
Chemical Injection Station
Water Supply System
Pump and Pressure System
Drill Well
6" Cased Well
AC Paving
Seal Coat
Access Road and Gate
$21,000
1,200
1,400
40
28
60
1
2,800
Subtotal
Construction Contingencies 10%
Incidentals (Engineering, Legal, Survey
Construction Inspection, Printing &
Advertising) 20%
Total Cost
Very truly yours,
CENTRAL CONTRA COSTA SANITARY DISTRICT
k{~t
Collection System Engineering
and Services Division Manager
JSM: sf
Total
$63,000.00
3,600.00
1,400.00
1,600.00
1,120.00
1,200.00
1,400.00
2,800.00
$76,120.00
7,610.00
15,220.00.
$98,950.00
@ Recycled Pape,