HomeMy WebLinkAboutAGENDA BACKUP 01-17-80
BOARD OF DIRECTORS
NO.
VII. NB-4
1/17/80
POSITION PAPER
VIA: ROGER J. DOLAN
General Manager-Chief Engineer
DATE
January 9, 1980
SUBJECT
AUTHORIZE $2,000 FOR DISTRICT PARTICIPATION IN THE
UPGRADING OF THE ROADWAY CROSSING AT THE AT&SF
RAILROAD NORTHWEST OF THE TREATMENT PLANT
TYPE OF ACTION
AUTHORIZATION OF FUNDS
SUBMITTED BY
Jay S. McCoy
INITIATING DEPT.!DIV.
Engineering/Collection System
ISSUE: AT&SF RAILROAD has requested that the crossing be paved to prevent
further damage to crossing facilities.
BACKGROUND: Th is Di stri ct, IT Corporati on and CCCWD have an agreement for
monetary participation in the maintenance of the road which runs along the
District's west property line to the IT ponds. CCCWD is included in the
agreement because the road serves their water softening facility. Costs of
road improvement and maintenance are shared 60% IT, 20% CCCSD and 20% CCCWD
per the agreement.
AT&SF Railroad has been experiencing problems at the roadway crossing in
conjunction with the crossing protection equipment and electrical coriduits
and wires. AT&SF has requested that the approaches to the crossing be paved
to eliminate the problems. A sketch of the location and work to be done is
attached. The cost estimate for the total project is $10,000. Central San
has a responsibility for payment of $2,000.
RECOMMENDATION: Authorize 20% of actual cost of corrective work, estimated not
to exceed $2,000 for District participation in the upgrading of the roadway
crossing at the AT&SF Railroad northwest of the treatment plant.
Attachment
REVIEWED AND RECOMMENDED FOR BOARD ACTION
INITI TI7/)JzZ'
~SM
e.z: ~
CLW
-"-
c::.
~~ '\.
'" ~ \S- "\.
"\.~'"
'\.
pJ.?OJECr ~,
SITE ~
.....
<:>
~
,
4
. J/WV
10 (!/CIIM/JNO ..........
FIN/?J/EI7 L?t1AOWAV
HEY tJPE-Rd7EP GAIEG-
/MP,(!PY~p ,(?.f?. ~I?U~"!J'NG-
.g(!A~I!i: /"=50'
ro ~?/J(IP6
- ~
ROLlO IMPRtJI/E,MEA/r.e5
. LlT- df ~ 8./:"
I?d/L t?tJL10
1- It) -80
.,., .......-"'-'-"'---,,:..----~.~--,~.......~~... ---~-~~-"~~....."=;:;:.=~.;:.'_..;...;..c.~~__"___.___~,_.,_._~
BOARD OF DIRECTORS
NO.
VI!.
POSITION PAPER
VIA: ROGER J. DOLAN
General Manager-Chief Engineer
DATE
NB-2 1/17/80
Jan 10, 1980
SUBJECTANNEXATION OF THREE PARCELS OF LAND (240 ACRES~)
LOCATED NORTH OF ALHAMBRA VALLEY ROAD NEAR VACA CREEK
ROAD.
TYPE OF ACTION
ANNEXATION
SUBMITTED BY
Jay McCoy
INITIATING DEPT./DIV.
Engineering/Collection System
ISSUE: Stonehurst Valley Partnership, owners of the subject property have
requested annexation to this District. The project has been designated
"Proposed Subdivision 5693 - Stonehurse'.
BACKGROUND: The project is planned for 115 lots (0.6 Acres/Ave.), with a
total area of 161 acres reserved for open space. The project will require
the extension of the existing sewer main from Gilbert Lane in Martinez
(approximate distance 10,000 feet). The owners engineer, Mr. John A. Wollman,
has indicated that the sewer main would be extended at the sole cost to the
developer, and no rebates would be charged to the future downstream connectors.
The downstream system through Martinez is currently overloaded in the winter.
A major sewer project will be required in the future to alleviate this problem.
The capacity of the District's treatment plant is an ongoing problem.
The largest of the three parcels (223 Ac~) is located outside but adjoins our
sphere of influence boundary. L.A.F.C. must consent to a change in our Sphere
of Influence to include the whole project. This project is not contiguous to
the present Di stri ct boundary and woul d requi re a "cherry stem'l type annexa-
tion along Alhambra Valley Road or, with L.A.F.C. permission, it could be a
noncontiguous annexation.
The City of Martinez has indicated their concurrence that the annexation of
this parcel by the District is a matter for the District to decide. The
developers of this parcel are required to prepare an E.I.R.
RECOMMENDATION: Defer action on the requested annexation until the environ-
mental documents are prepared, reviewed and finalized and LAFCO's action on
the change of the sphere of influence is completed.
REVIEWED AND RECOMMENDED FOR BOARD ACTION
CLW
~
-----,.-.~.....-_._-_....---.-..-_..______._w_____,._~_._____"___,._,_____.,_...__"..._,__,,__._,,_.,.____...__~__,___.._.._.__.______n_.
BOARD OF DIRECTORS
NO.
VII-NB-3
1/17/80
POSITION PAPER
VIA: ROGER J. DOLAN
General Manager-Chief Engineer
DATE
January 7, 1980
SUBJECT
AUTHORIZATION OF $850 FOR THE PURCHASE OF A CHENlCAL
INJECI'ION PUMP FOR THE CLYDE PUMP STATION
TYPE OF ACTION
Capital Expenditure
SUBMITTED BY
D. G. Niles
INITIATING DEPT./DIV.
Plant Operations DepartIrent
Issue: '!he Clyde Pump Station requires the installation of a chemica 1 feed pump.
Background: The control of hydrogen sulfide generation at the Clyde pumping station
has been through the addition of Chlorine Dioxide to the wastewater flow. This
Chlorine Dioxide feed has been through a gravity feed system which has presented
problems in maintaining a controlled, regulated feed rate. 'lb provide a rrore effective
control of the Chlorine Dioxide feed, the addition of a chemical injection pump is
required.
Recorrrcendation: Authorization of $850 for the purchase of a chemical injection pump
for sulfide control at the Clyde Pump Station.
REVIEWED AND RECOMMENDED FOR BOARD ACTION
INITIATING DEPT./DIV.
OON
>"--~---~"----_..._-",..- ."___._..~,,~,__...,__.__..m_______..,__"_______,,_________'___'___....__..~~_...____._.~_"..~___....._..'._M.______.~ ,'_ n' . ~__.."_.,__._._,,
BOARD OF DIRECTORS
NO.
VIr. NB-5
1 /17/80
POSITION PAPER
VIA: ROGER J. DOLAN
General Manager-Chief Engineer
DATE
January 4, 1980
SUBJECT
TYPE OF ACTION
AUTHORIZATION OF $3,500 FOR THE PURCHASE OF THREE
SCBA UNITS - MSA MODEL 401 WITH CYLINDERS
Capital Expen.di ture
SUBMITTED BY
D. G. Niles
INITIATING DEPT.!DIV.
Plant Operations Department
Issue: SCBA air mask units canplete with full cylinders must be maintained at all
times to be instantly ready in the event of an emergency at the Treatment Plant.
Background: CUrrently the Treatment Plant has enough SeBA units to be used jointly
as working units and emergency units. This equipnent is used during the handling of
chlorine equipnent, noxious gases, or entry into confined areas where proper oxygen
does not exist. The same units have been used in the past for emergency situations.
During the recent chlorine incident, it was brought to the attention of District
personnel that this joint use of the same equipnent can result in a severe safety
hazard. A study of the emergency situations that may possibly occur at the plant
reveals that three SCBA units are required as emergency standby to be ready at all
times. The cost of this equipnent will be approxima.tely $3,500.
Recarmendation: Authorization of $3,500 for the purchase of three SCBA units - MSA
MJdel 401 with cylinders.
REVIEWED AND RECOMMENDED FOR BOARD ACTION
IV.
IX;N
BOARD OF DIRECTORS
NO.
VI I. NB-6
1/17/80
POSITION PAPER
VIA: ROGER J. DOLAN
General Manager-Chief Engineer
DATE
January 4, 1980
SUBJECTAUTHORIZATION OF $7,000 FOR THE INS'I'AIJATION OF CL-6
SECURITY FEt\CE AT THREE LOCATIOOS ON THE TREA'll1ENT
PLANT SITE
TYPE OF ACTION
CAPITAL EXPENDITURE
SUBMITTED BY
D. G. Niles
INITIATING DEPT.!DIV.
Plant Operations Depart:Iren
Issue: A need has developed at the Wastewater Pollution Control/Reclamation Plant
for additional secure storage sites.
Background: Currently the only major storage site that is secure is the warehouse.
This building was acquired from the contractor. Approximately one-half of the
building area is totally enclosed. The remaining half of the building is an open shed
enclosed on three sides with a roof. This nnsecure area is being utilized for
storage space. Recent events regarding pilferage have indicated the need for additional
secured areas. By fencing in approximately two-thirds of the semi-exposed area at the
warehouse, part of the present needs will be fulfilled. An additional area located
inside turmel '1'-4, adjacent to the Solids Conditioning Building, is presently not
utilized as this turmel extension has been constructed for future plant growth. By
placing a drive gate at the appropriate area, a secure dry storage area would be
cheaply obtained.
The other area that needs to be secured lies i.nnediately to the north of the
diesel storage tanks. This area is being utilized as an outside storage area for
equipment to be salvaged or disposed. The cost of securing these areas is
approximately $7,600.
Reccmrendation: Authorization of $7,000 for the placing of chain link fencing and
drive gates in turmel '1'-4, the warehouse area, and the outside storage located north
of the diesel storage tanks.
REVIEWED AND RECOMMENDED FOR BOARD ACTION
OON
INITIATING DEPT.!DIV.
~
I l....--.-...---"'-.-......--...------
'~ I
~ .
l I
I
I
I
I
I
I
I I'
,;' ,frOO
.
J:
~
CENTRAL CONTRA COSTA SANITA_d DISTRICT
SCALE: NONE APPROVE&: -rt:.--.. DRAWN BY .lJ A 0
JANUARY 1980
DATE: /1~(
SECURITY GATE POSITION PAPER
ORilW!NG NUMBER
N
I
I
1
tv 11M
1
BA S IN A - Sovf1..+
/
/
(
,6vc.c.{;):;,c /35" x 1'20
.;5TORA6c AREA
W f iH ~l CHA, kJ l..llVK,
F='ef'JGi/.Jb AND TWO
'ZO' ~ATe:~
(5/0 u= FENC.l tv(.)
c)
\)
\()
{\J
4J
~
N
\lJ
/-3-80 -PAo
~. _...,_,.~_,._...,.._'.._..~,._,,-..______._.............'_........._____._,~...._..-J.._....;....~~_____...____..._____........_......_....~____.._._.
_._-~~
~.
~'
i
t
t
.\
-f"
~
I
I
I
~
-N-
~
------
SOLIDS CONDITIONING BUILDING
CL-6 DRIVE GATE
& FENCE
~
TUNNEL T - 4
TUNNEL T - 4 -- DRIVE GATE FOR STORAGE AREA
WAREHOUSE - CL-6 FENCE & DRIVE GATE FOR OUTSIDE STORAGE
DRIVE GATE
PLACE.WHEELS ON GATES-t
OFFICE
WAREHOUSE
OUTSIDE
STORAGE
AREA
STORAGE
CL-6 FENCE
CENTRAL CONTRA COSTA SANITARY DISTRICT
SCALE: NONE
DATE: JANUARY 198
SECURITY GATE POSITION PAPER
~N-
DRAWN BY JKP
DRAWING NUMBER
-
BOARD OF DIRECTORS
NO.
VII. NB-7
1
1/11/80
POSITION PAPER
VIA: ROGER J. DOLAN
General Manager-Chief Engineer
DATE
January 14, 1980
SUBJECT CONTRACT SERVICES FOR COMPUl'ER TRAINING AND
'lIDUBLESHCXJrING
TYPE OF ACTION
Personnel Staffing
SUBMITTED BY
D. G. Niles
INITIATING DEPT./DIV.
Plant Operations DepartIrent
Issue: The Plant Operations Depart::rrent wishes to contract for 192 hours of ti.n:e
from Paul Papke for computer training and troubleshooting services.
Background: The Process Corrputer Engineer, Paul Papke, has left the District for
enploynent elsewhere. The Plant Operations Depart::rrent is attenpting to fill the
vacant position; however, the new Process Conputer Engineer will need training and
will need access to Paul Papke as a resource person.
Recornrendation: Contract for 192 hours of consulting and training tine from Paul
Papke at $39 per hour. The 192 hours of contract service are to be corrpleted by the
end of the fiscal year. The contract price is not to exceed $7,500.
REVIEWED AND RECOMMENDED FOR BOARD ACTION
OON
(c<SD
Central Con
.i Costa Sanitary Distric'lo.
! ' PURCHASE ORDER NO.
1250 SPRINGBROOK ROAD - WALNUT CREEK, CALIF. 94596
TELEPHONE (415) 934-6727
N~
3500
PURCHASE ORDER
SHOW THIS NUMBER ON INVOICES
ACKNOWLEDGMENTS. SHIPPING CARTONS
ORDER DATE ICONTRACT ORDER NO
1/15/80 .
SUBMIT QUESTIONS REGARDING THIS
ORDER TO:
DELIVERY REQUIRED F.O.B.
As requested
C.C.C.S.D.
Martinez, CA
SHIP VIA
TERMS
Net 15 days
HEREIN CALLED CONTRACTOR/VENDOR
HEREIN CALLED DISTRICT
_ CENTRAL CONTRA COSTA SANITARY DISTRIC'T
o 1280 SPRIN"8ROOK ROAD. WALNUT CREEK. CA 94896
o TREATMENT PLANT, END 0,. IMHOFfi' ROAD. PACHECO, CA 9.558
o
TO: r:
Paul Papke Jr.
L
MAIL INVOICES TO:
I. CENTRAL CONTRA COSTA SANITARY DISTRICT. P.O. BOX 5266. WALNUT CREEK, CA 94596.
2. IF DELIVERY IS NOT OR CANNOT BE MADE PROMPTLY BY CONTRACTOR MUST SO NOTIFY OISTRICT
IMMEDIATELY. ANO DISTRICT RESERVES THE RIGHT TO CANCEL THIS ORDER IN WHOLE OR IN PART.
S. 00 NOT FILL THIS ORDER IF UNABLE TO FILL EXACTLY AS WRITTEN INCLUDING PRICE WITHOUT PRIOR APPROVAL FROM
PURCHASING AGENT. TRANSPORTATION CHARGES MUST BE PREPAID ON ALL PURCHASES WHERE F.O.B. POINT IS OTHER THAN
SHIPPING ADDRESS. THESE CHARGES MAY BE ADDEO TO VENDOR'S INVOICE AND SHOWN AS A SEPARATE ITEM.
4. SHOW CASH DISCOUNT TERMS ON INVOICE. ALL INVOICES FOR MATERIAL ON WHICH NO DISCOUNT IS ALLOWED WILL BE PAlO
30 DAYS FROM DATE INVOICE IS RECEIVED.
ITEM NO. QUANTITY MATERIAL,oR SERVICE UNIT PRICE UNIT AMOUNT
SERVICE: . COMPUTER SOFTWARE' SERVICES
This purchase agreement is entered .into as of
January 1), l':HSU, Detween t'au1 t'apKe Jr. I.l,;ontractor
and Central Contra Costa Sanitary District (District ,
and shall continue in effect until June 30, 1980 ,
or until terminated.
WORK TO BE PERFORMED:
Contractor shall perform all operations necessary
and required to satisfactorily perform its services
in the areas of training, consulting, design work,
programming and other related services as specified
by the District (Robert Baker or his designee).
Contractor agrees to perform the serv1ces, dur1ng
normal working hours, at least thirty-two (32) hours
1n one (1) calendar month, i.e. one 0) eight (8)
hour day per week. By prior mutual agreement,
add1t1onal t1me (serv1ces) may be prov1ded at tne
hourly rate as fixed under IICOMPENSATION.II
Page , of 3 pages SUB TOTAL. ---
~.
SAL.ES TAX ---
-
&WHO):..':.ilI ALL PROVISIONS ON THE FACE HEREOF, AS WELL AS THE TERMS AND CONDITIONS Not to excee
ON THE BACK HEREOF, ARE PART OF THIS ORDER. TOTAL. AMOUNT $7,500.00
d
ACCOUNT NUMBER
o s.c.
o R.E.
PURCHASING AGENT OR AUTHORIZED REPRESENTATIVE
APPROVED BY
ITEM NO.
QUANTITY
PURCHASE ORDER ~v'l
REQUISITION NO.
3500
B
PAGE 2
OF 3
PAGES
DESCRIPTION
CODe OR
EQUIP. NO.
EXTENSION
UNIT PRICE
$
s
The District hereby agrees that it will make available
to Contractor at least thirty-two' (32) hours per
calendar month, for Contractor to perform its services.
COMPENSATION:
As full consideration for satisfactory performance by
Contractor of the services, the District shall pay
Contractor at the hourly rate of $39.00. Furthermore,
the total compensation for Contractor's services per
this agreement shall not exceed $7,500.00
;'~:
'Contractormay submit an invoice, for the services it
.has performed~ once each calendar month. The invoice
shall have a payment term of net f5 days.
GENERAL CONDITIONS:
1. Contractor is an independent contractor, and' all
persons employed by Contractor in connection
herewith shall be its employees and not employees
of the District in any respect.
2. Contractor shall indemnify and defend the District
against all suits, actions, loss, damage, expense,
and liability for injury or harm to persons or .
property resulting from, arising out of, or in any
way connected with the performance of this agree-.
ment, including the use by Contractor of any
District furnished equipment. Contractor's
aforesaid indemnity obligations shall apply to the
fullest extent permitted by law, but in no event
shall they apply to liability caused by the sole
negligence or willful misconduct of the party
indemni fi.ed.
3. The District may give thirty (30) days prior
written notic:e to Contractor to terminate the
agreement and in such event the District shall
pay and Contractor shall accept, in settlement of
all claims under the agreement, such a sum as
shall fully compensate Contractor for the services
performed prior to the termination date.
4. Contractor shall pay all taxes, including but not
limited to income,. sales, use, payroll, value added
or turnover taxes, and levies, duties, imposts,
and assessments. of every nature due in connection
with any work under the agreement and shall make
any and all payroll deductions required by law,
~~_._----
ITEM NO. QUANTITY
PURCHASE OROER h __I
REQUISITION NO.
3500
8
PAGE 3
OF 3
PAGES
DESCRIPTION
CODE OR
EQUIP. NO.
EXTENSION
UNIT PRICE
$
$
- and hereby indemnifies and holds harmless the
District from any liability on account of any and
all such taxes, levies, duties, imposts, assess-
ments and deductions.
5. Any subletting or assignment of this agreement, by
operation of law or otherwise, without the prior
written consent of the District shall 'be voidable.
6. This agreement embodies the entire agreement betwee
the District and Contractor. The parties shall not
be bound-by or be liable for any statement, repre-
sentation,- promise, inducement or understanding of
any kind of nature not set forth herein. No changes,
amendments or modifications of any of the' terms or
conditions of the agreement shall be valid unless
reduced to writing and signed by both parties.
BOARD OF DIRECTORS
NO.
!- f7S[(/
1 1 5 80
VIr. NB-8
POSITION PAPER
VIA: ROGER J. DOLAN
General Manager-Chief Engineer
DATE
JanuaJ::y 7, 1980
SUBJECT
AUl'HORIZATION '10 ADVERI'ISE AND ROOUEST BIDS FOR THE
INSTALLATION OF 'IWJ WASTEWATER SAMPLERS AT THE TREAT-
MENT PLANT AT AN ESTllifATED OOST OF $17, 700
TYPE OF ACT ION
Capital Expenditure
SUBMITTED BY
D. G. Niles
INITIATING DEPT./DIV.
Plant Operations Depart:Irent
IsslE: Additional sarrplers for the raw wastewater and prirrary effluent are required.
Background: The Board authorized the purchase of wastewater samplers for the Treatrrent
Plant's influent and prinary effluent. These sarrplers have been purchased, and Special
Projects of the Engineering Division has completed designs for their installation.
Present Treatrrent Plant workload would delay the installation of this equi~t, and
it is recormended that an outside contractor be utilized. The estimated cost of this
project is $17,700.
ReCC>ImEI1dation: Board authorization for the advertisement and request for bids for
the installation of two wastewater sarrplers.
REVIEWED AND RECOMMENDED FOR BOARD ACTION
INITIATING DEPT./DIV.
~~~
cw