HomeMy WebLinkAboutAGENDA BACKUP 12-04-80
<CCSD
Central Contra Costa Sanitary District
BOARD OF DIRECTORS
NOIV. Consent Ca~29~780- 10
POSITION PAPER
VIA: ROGER J. DOLAN
General Manager-Chief Engineer
DATE
Dec. 1, 1980
SUBJECT
AUTHORIZATION FOR P.A. 80-48 (ALAMO AREA) AND 80-49
(DANVILLE AREA) TO BE INCLUDED IN THE NEXT FORMAL
ANNEXATION TO THE DISTRICT.
TYPE OF ACTION
ANNEXATION
SUBMITTED BY
Jay McCoy
INITIATING DEPT./DIV.
Engineering/Collection System
Parcel
No. Area
Owner
Address
Parcel No. & Acreage
Remarks
Lead
Agency
80-48 Alamo
Dr. D. S. Gabor
1855 San Miguel Dr #7
Walnut Creek, Ca
196-110-07
1. 17 Ac.
202-110-03,-05,-06
Shapell Industries
P.O. Box 469
Milpitas, CA 95035
64.04 Acres
Existing house - failing septic
tank. District to prepare
"Notice of Exemption".
CCCSD
80-49 Danv.
Proposed Sub. 5959 - total
of 92 single family homes.
E.I.R. approved by County.
County
RECOMMENDATION: Authorize P.A. 80-48 and PA 80-49 to be included in the next formal
annexation to the District.
REVIEWED AND RECOMMENDED FOR BOARD ACTION
1~;/flZ~c
~~
CLW
(((sD
Central Contra Costa Sanitary District
BOARD OF DIRECTORS
NO.
POSITION PAPER
VIA: ROGER J. DOLAN
General Manager-Chief Engineer
DATE
Dec. 1, 1980
SUBJECT
QUITCLAIM EASEMENT - LAFAYETTE AREA - JOB 3363
PARCEL 1
TYPE OF ACTION
RIGHT OF WAY
SUBMITTED BY
Jay McCoy
INITIATING DEPT./DIV.
Engineering/Collection System
ISSUE: The owners of Parcel B (86 P.M. 47), Donald Chaiken, et ux,
have requested that the District quitclaim the subject easement which
lies within their property.
BACKGROUND: The subject
north of said Parcel B.
require that the subject
has been granted to this
District.
easement was created to serve properties to the
Changes to the development plans of Parcel B
easement be realigned. A replacement easement
District for concurrent acceptance by this
RECOMMENDATION: Approval, execute Quitclaim Deed and authorize its
recording.
REVIEWED AND RECOMMENDED FOR BOARD ACTION
TING,D/J;/~V.
?//I~ JMc
~~
CLW
<<<SD
Central Contra Costa Sanitary District
BOARD OF DIRECTORS
N~ IV. Consent a
12/4/80
8
POSITION PAPER
VIA: ROGER J. DOLAN
General Manager-Chief Engineer
DATE
Dec. 1, 1980
SUBJECT
QUITCLAIM EASEMENT - LAFAYETTE AREA - JOB 2671 -
TRACT EASEMENT
TYPE OF ACTION
RIGHT OF WAY
SUBMITTED BY
Jay S. McCoy
INITIATING DEPT.!DIV.
Engineering/Collection System
ISSUE: The District has been requested to Quitclaim the subject easement
to the owners of Lot 9 of Subdivision 4604.
BACKGROUND: The subject easement was created to serve Lot 10 of
Subdivision 4604 with a public sewer main. District staff has now
determined that Lot 10 can be served by a private sewer lateral across
said Lot 9. The owner of Lot 9 has agreed to this change and will
grant a private sewer easement to replace the subject easement.
RECOMMENDATION: Approval, execute Quitclaim Deed and authorize its
recording.
REVIEWED AND RECOMMENDED FOR BOARD ACTION
INI A7~IV.
7' JMc
~~
CLW
<((sD
Central Contra Costa Sanitary District
BOARD OF DIRECTORS
NO. IV.
ar
7
POSITION PAPER
VIA: ROGER J. DOLAN
General Manager-Chief Engineer
DATE
Dec. 1, 1980
SUBJECT
QUITCLAIM EASEMENT - CONCORD AREA
JOB 1379 - PORTION OF PARCEL 2
TYPE OF ACTION
Right of Way
SUBMITTED BY
Jay S. McCoy
INITIATING DEPT./DIV.
Engineering/Collection System
ISSUE: Mr. and Mrs. R. F. Querio, owners of Assessors Parcel number
159-100-03, have requested this District to quitclaim the portion of an
existing public sewer easement which lies within their property.
BACKGROUND: The sewer trunk which was located within the subject
easement has been relocated to accommodate the widening of State Highway
4. Therefore, the subject easement is no longer required for District
purposes.
The property owner has paid our quitclaim processing fee of $75.00.
RECOMMENDATION: Approval, execute Quitclaim Deed and authorize its
recording.
REVIEWED AND RECOMMENDED FOR BOARD ACTION
INJJ:~7DgT/DIV.
P1" . //Mv? JMc
t:.~
CLW
<C<SD
Central
BOARD OF DIRECTORS
District
rf: BIDS & AWARDS - 1
12/4/80
POSITION PAPER
VIA: ROGER J. DOLAN
General Manager-Chief Engineer
DATE
December 2, 1980
SUBJECT
EAST BAY FORD TRUCK SALES, INC. REQUEST TO WITHDRAW BID
TO SUPPLY THE DISTRICT WITH FOUR COURIER TRUCKS
TYPE OF ACTION
1980-81 Vehicle Bids
SUBMITTED BY
Robert H. Hinkson
INITIATING DEPT./DIV.
Collection System Operations
ISSUE: East Bay Ford Truck Sales, Inc. was awarded the bid to supply the
District with these trucks on November 6, 1980 for $23,259.00. They submitted
a corrected bid of $24,813.00 because of pricing errors which was denied by
the Board on November 20, 1980. They are now asking to withdraw their
corrected bid by submitting additional information to substantiate their
mistake.
BACKGROUND: East Bay Ford states that they did not have the correct pricing on
the 1981 models they quoted the District. They used the cost of the 1980 model
plus what they understood the increase would be on 1981 models ($205.00). They
have submitted an invoice on a 1980 model that is close to our specifications
with their bid calculations on it. They have also submitted a copy of the
worksheet and price 1 ist used for the correct pricing. The invoice indicates
that the basic wholesale price for the 1980 Courier is $4,460.81 per unit.
Adding the $205.00 increase, East Bay Ford anticipated a basic wholesale cost
of $4,660.81 per unit for 1981 model Couriers. The correct pricing they
subsequently found out was $5,255.47, an increase of $594.66 per unit over
their estimate. I believe this substantially illustrates their error and that
they be allow to withdraw their bid.
RECOMMENDATION: Approve the withdrawal of East Bay Ford Truck Sales, Inc. bid
to supply the District with four Courier trucks.
REVIEWED AND RECOMMENDED FOR BOARD ACTION
INITIATING DEPT./DIV.
R..~~
RHH
((sD
Central Contra Costa Sanitary District
BOARD OF DIRECTORS
POSITION PAPER
VIA: ROGER J. DOLAN
General Manager-Chief Engineer
DATE
November 17, 1980
SUBJECT
AUTHORIZATION OF $1,700 FOR THE INSTALLATION OF
RAILING AROUND THE ROOF HATCH ON THE SOLIDS CONDITIONING
BUILDING
TYPE OF ACTION
Capital Expenditure
SUBMITTED BY
D. G. Niles
INITIATING DEPT./DIV.
Plant Operations Department
Issue: The roof hatch on the Solids Conditioning Building is not in conformance
with CAL/OSHA requirements.
Background: During an inspection tour the District Safety Consultant, Al Barnes,
noted that the railing installation on the stairs to the roof hatch and around the
roof hatch does not conform to the requirements of CAL/OSHA. The roof hatch access
is routinely used by Plant Operations personnel for equipment that must be maintained
on the roof.
The Special Projects Engineering Division has a recommendation for railing installation
that will comply with the requirements of CAL/OSHA. The cost of this construction is
approximately $1,700.
Recommendation: Authorization of $1,700 for the installation of railing for the
roof hatch in the Solids Conditioning Building.
REVIEWED AND RECOMMENDED FOR BOARD ACTION
DGN
<((sD
Central Contra Costa Sanitary District
BOARD OF DIRECTORS
No.VI. Capital Improveme ts
3 12/4/80
POSITION PAPER
VIA: ROGER J. DOLAN
General Manager-Chief Engineer
DATE
SUBJECT
December 2, 1980
TYPE OF ACTION
AUTHORIZATION OF $600 FOR PURCHASE OF METAL
SHELVING UNITS FOR STORAGE OF INACTIVE FILES
CAPITAL IMPROVEMENTS
SUBMITTED BY
Clyde M. Hopkins
INITIATING DEPT./DIV.
ADMINISTRATION
ISSUE: The District currently has numerous inactive files in the
damp unheated metal building at the rear of the Office Site and in
other unsatisfactory locations. These files must be moved to dry
storage at the Treatment Plant for protection from further damage.
BACKGROUND: The subject files have been necessarily removed from
our filing vaults in the Main Office to make room for current files.
Since there is no designated space within our present facility for
such files, these files have been placed in cardboard files and
boxes and stored wherever space was available. Excessive moisture
and dust in addition to poor handling has caused serious deterioration
to these files and they must be moved to a better storage and filing
space at the Plant for protection from further damage. Good space
is available at the Plant, but heavy duty steel shelving must be
purchased and installed for satisfactory storage of these files.
RECOMMENDATION: Approve expenditures up to $600 for steel shelving
for storage of itJact ive. fi 1 es.
REVIEWED AND RECOMMENDED FOR BOARD ACTION
<c(sD
Central Contra Costa Sanitary District
BOARD OF DIRECTORS
POSITION PAPER
VIA: ROGER J. DOLAN
General Manager-Chief Engineer
NO. VI. Capl tal Improveme ts
2 12/4/80
DATE
Dec. 1, 1980
SUBJECT
AUTHORIZATION OF $3,000 FOR COMPUTER DIAGNOSTIC
EQUIPMENT AND ASSOCIATED TRAINING
TYPE OF ACTION
Capital Expenditure
SUBMITTED BY
D. G. Ni les
INITIATING DEPT./DIV.
Plant Operations Department
Issue: The Plant Operations Department requests that $3,000 be allocated to purchase
a microprocessor testing system and to send Kenneth Moon, Maintenance Technician I I I,
Instrumentation, to a three-day school in Newport Beach, Cal ifornia for training on
the use of the system.
Background: The Treatment Plant computer control system has 20 field microprocessors
which are a necessary link in the control system operation. Due to a construction/
design deficiency the field microprocessors are in poor environments, being exposed
to heat and dust; consequently, failure rates in the field microprocessors are
increasing and are severely taxing the ability of the plant staff to keep the
system operational. The requested funds will provide for the purchase of a computer
diagnostic system which will indicate which component in a field microprocessor has
failed. This will reduce the time necessary to troubleshoot field microprocessor
problems and will improve the reliability of field microprocessor repair work.
The computer diagnostic system is a specialized piece of equipment, so factory
training is necessary for the Central Contra Costa Sanitary District to be able
to util ize the system.
Recommendation: Authorize $3,000 for the purchase of a computer field microprocessor
diagnostic system and a three-day factory training session for Kenneth Moon,
Maintenance Technician I I I, Instrumentation.
REVIEWED AND RECOMMENDED FOR BOARD ACTION
DGN
(((sD
Central Cont Costa Sanitary District
BOARD OF DIRECTORS
NO. VI. Capital Improvem nts
4 12/4/80
POSITION PAPER
VIA: ROGER J. DOLAN
General Manager-Chief Engineer
DATE
December 2 1980
TYPE OF ACTION
Authorization of Sewer
Construction Funds
SUBJECT
AUTHORIZE THE USE OF SEWER CONSTRUCTION FUNDS FOR INTERIM
IMPROVEMENTS TO CHLORINE AND SULFUR DIOXIDE FACILITIES AT
THE TREATMENT PLANT.
SUBMITTED BY INITIATING DEPT./DIV.
John Larson, Senior Engineer-Project Manage ent Special Projects Engineering Division
BACKGROUND
Kennedy/Jenks Engineers are currently conducting a study of Central Contra Costa
Sanitary District's Chlorine and Sulfur Dioxide Facilities. Based on their observations
interim improvements to both the safety and security of both systems have been recom-
mended. The recommended improvements are:
1. Provide a sulfur dioxide leak detector and emergency alarm at the sulfur
dioxide storage area,
2. provide a security fence around the sulfur dioxide storage tank,
3. provide seismic restraint for the sulfur dioxide storage tank, and
~. provide automatic shutoff valves and emergency alarm at the chlorine storage
facility.
The cost of the interim improvements is estimated to be $38,500 for the design and
construction. The work would be accomplished by District forces, Kennedy/Jenks
Engineers, and various contractors.
The existing Kennedy/Jenks agreement, dated August 4, 1980, does not include
design services for interim improvements in the Scope of Work. The cost ceiling should
be increased by $8,500 to cover this design effort.
RECOMMENDATION
Authorize the use of sewer construction funds for interim improvements to the
chlorine and sulfur dioxide facilities at the Treatment Plant. Authorize the General
Manager-Chief Engieer to execute an amendment to the Kennedy/Jenks Agreement increasing
the cost ceiling by $8,500 to cover the design effort.
REVIEWED AND RECOMMENDED FOR BOARD ACTION
~~