Central Contra Costa Sanitary District
BOARD OF DIRECTORS
NO.
POSITION PAPER
VIA: ROGER J. DOLAN
General Manager-Chief Engineer
DATE
March 29, 1983
TYPE OF ACTION
SUBJECT
QUITCLAIM EASEMENTS - SAN RAMON AREA
JOBS 3148 AND 3506
QUITCLAIM EASEMENTS
SUBMITTED BY
Jay S. McCoy
INITIATING DEPT./DIV.
Construction and Services Division
ISSUE: Woodhill Development Company, owner of the property which is
encumbered by the subject easements, has requested this District to quitclaim
said easements.
BACKGROUND: The subject easements were created in 1979 and 1981. Development
plans for the property have changed, and the easements are no longer required.
New easements will be created for the revised development plans.
RECOMMENDATION: Approve and execute Quitclaim Deed and authorize its recording.
REVIEWED AND RECOMMENDED FOR BOARD ACTION
~
JSM
<((sD
Central Contra Costa Sanitary District
BOARD OF DIRECTORS
N~ IV. Consent Calendar
3. 4 7 83
POSITION PAPER
VIA: ROGER J. DOLAN
General Manager-Chief Engineer
DATE
EXECUTE CONSENT TO DEDICATION TO CONTRA COSTA COUNTY -
HAPPY VALLEY ROAD - JOB 911, PARCEL 1
March 18, 1983
TYPE OF ACTION
EXECUTE CONSENT TO
DEDICATION
SUBJECT
SUBMITTED BY
Dennis Hall
INITIATING DEPT./DIV.
Construction and Services Division
ISSUE: HAPPY VALLEY ROAD, a City of Lafayette street, is being widened 10 feet
by dedication to the City on the map of Minor Subdivision MS 505-82.
This 10-foot widening crosses an existing 25-foot-wide District sewer easement.
BACKGROUND: District consent is required whenever a roadway widening encroaches
upon an existing District easement.
RECOMMENDATION: Approve and execute consent document and authorize its recording
by the City.
REVIEWED AND RECOMMENDED FOR BOARD ACT/ON
AIf/fJ
DH
c((SD
Central Contra Costa Sanitary District
BOARD OF DIRECTORS
NO.
POSITION PAPER
VIA: ROGER J. DOLAN
General Manager-Chief Engineer
DATE
March 25,1983
SUBJECT APPROVAL AND EXECUT I ON OF AMENDMENT TO STATE UT I LIT I ES
AGREEMENT 106.75.2 CONCERNING RELOCATION OF CERTAIN DISTRICT
FACILITIES ADJACENT TO 1-680 BETWEEN NORTH MAIN STREET AND
O. MILES NORTH 0
TYPE OF ACTION
RESOLUTION APPROVING
AMENDMENT TO
U . T. 1 06 . 75 . 2
SUBMITTED BY
INITIATING DEPT./DIV.
Construction and Services
ISSUE: The subject amendment is necessary to cover extra costs associated with
the sewer relocation project.
BACKGROUND: On January 15, 1980, the State of California issued to the District
a "Notice to Relocate" ordering that certain sewer lines, manholes, and rodding
inlets be relocated to accommodate proposed Sate freeway modifications.
In March of 1980, the District Board approved State Util ities Agreement 106.75.2,
which required the State to reimburse the District for the cost of the relocation
work--then estimated at $90,200. The actual cost of the project is approximately
$118,800 and will be reimbursed to the District after this amendment is approved.
RECOMMENDATION: Approve Amendment to the State Utility Agreement 106.75.2, authorize
the President and Secretary to execute, and adopt resolution to that effect.
REVIEWED AND RECOMMENDED FOR BOARD ACTION
r1N>
I Contra Costa Sanitary District
BOARD OF DIRECTORS
NO. VI. Eng.
3 4 7 83
POSITION PAPER
VIA: ROGER J. DOLAN
General Manager-Chief Engineer
DATE
March 31, 1983
SUBJECT
TYPE OF ACTION
AUTHORIZE $115,000 IN SEWER CONSTRUCTION FUNDS
FOR CONTINUED WORK ON STORM DAMAGE PROJECTS
AUTHORIZE FUNDS
DECLARE EMERGENCY
SUBMITTED John Larson / Jay McCoy
INITrrig~n~'e'r-r;~hgV& Constructi on Department
ISSUE
Supplemental funds are required for continued work on storm damage projects.
An emergency declaration is required to allow interim corrective actions to
proceed rapidly.
BACKGROUND
The District sustained damage at 15 locations as the result of heavy rains
that occurred in January, 1982. At this time five projects are complete
and one project is under contract for construction this summer. To date
the Board has authorized a total of $265,800 for work on the 1982 storm
damage projects and the District has received $115,684 in Federal Emergency
Management Agency grant authorizations.
In February, the Board declared an emergency and authorized $50,000 in
sewer construction funds for interim corrective action at the Moraga Trunk
Sewer in Lafayette. This authorization was given with the understanding
that the repairs could cost more. At this time $80,000 has been expended
including $10,000 for stabilizing a slide that occurred on March 4. Condi-
tions at the site are such that additional slides could occur at any time.
Extensive damage has occurred at over 20 new locations. A preliminary
investigation is in-progress. A rough estimate of the cost of permanent
corrective actions is $1,000,000.
Supplemental funds in the amount of $95,000 are required at this time to
cover expenditures to date and to continue work on the storm damage pro-
jects. An estimate showing the distribution of costs is attached. Sub-
stantial subsequent authorizations are anticipated upon completion of the
preliminary investigations.
The threat of imminent collection system failure currently exists at
several locations. In February the Board declared an emergency in con-
junction with the Moraga trunk sewer. The current damage warrants a
declaration of emergency that would extend to all current and future
storm damage sites. This declaration and the au'thorization of $20,000
wou'!d allow Di~trict staff .~o proceed rapidly with interim corrective
~ctlon as requlred.
REVIEWED AND RECOMMENDED FOR BOARD ACTION
JL
NRAB
ENG.
RE COMMEN DATI ON
1. Authorize $115,000 in Sewer Construction Funds to cover expenditures
to date, to continue work on storm damage repairs, and to provide a
$20,000 emergency repair allowance.
2. Declare that an emergency exists in certain portions of the collection
system due to storm damage resulting from the excessive winter rains
of the 1982-83 wet weather season.
REVIEWED AND RECDMMENDED FOR SOARD ACTION
INITIATING DEPT./DIV.
GEN. MGR./CHIEF ENG.
JAL
JSM
RAB
COST ESTIMATE
CONTINUED WORK ON STORM DAMAGE PROJECTS
Emergency Repairs to Moraga trunk
sewer slide
Emergency Repair Allowance
Design Permanent Repairs for Moraga
trunk sewer slide
Design Permanent Repairs for South
Trail Creek Crossing
Design Permanent Repairs for Carrol
Place Creek Crossing
Conduct Preliminary Investigations at
20 new storm damage sites
DSP Nos.
$30,000 3642
20,000 3642
44,000 3642
7,500 3643
7,000 3666
6,500 3861
Total $115,000
BOARD OF DIRECTORS
NO. V. Adm.
1
4 7 83
POSITION PAPER
VIA: ROGER J. DOLAN
General Manager-Chief Engineer
DATE
March 30, 1983
SUBJECT
CONSIDER CONSULTANT'S SUGGESTIONS BASED ON A REVIEW
OF DISTRICT'S REFUSE COLLECTION RATE SETTING PROCEDUR S
TYPE OF ACTION
Consider Effecting
Consultant's Suggestion
SUBMITTED BY
Walter N. Funasaki
INITIATING DEPT./DIV.
Administrative De artment
ISSLE: Changes to the District's refuse collection rate setting procedures suggested by
Price Waterhouse are under consideration by the Board of Directors.
BACKGROUND: At its March 3, 1983 Board Meeting, the Board of Directors received a
report prepared by Price Waterhouse based on a review of the District's rate setting
procedures. The Board provided the franchised refuse collectors the opportunity to review
the report and provide the Board with their comments. Concerns were expressed by the
refuse collectors regarding implementability and desirability of the suggested changes to
rate setting procedures. The Board directed that District staff meet with the consultant and
refuse collectors to review the report and identify suggested changes for which concurrence
exists and those which are at issue.
A meeting was held on March 25, 1983 with representatives of Price Waterhouse, Valley
Disposal Service, Inc., and Orinda-Moraga Disposal Service. The consultant's suggested
changes and their disposition by the participants are summarized in Attachment A.
District staff has identified suggested changes which it recommends be instituted with the
review of the immediate rate applications, and those changes which should be implemented
for subsequent rate applications. The phased implementation of changes in the rate setting
procedures is recommended primarily because immediate rate applications have already been
prepared by the refuse collectors on the customary basis. The summary below categorizes
the implementation of suggested changes within the immediate and subsequent rate
applications:
Immediate Rate Applications
A. Operational information should be included as part of the rate application. The
refuse collector would be required to include operational information described in
Attachment A, as can be readily obtained; however, all such operational informa-
tion presented in Attachment A would be required for subsequent rate
applications.
B. Franchise fees should be excluded from allowable operating expenses, as recom-
mended in the Price Waterhouse report.
REVIEWED AND RECOMMENDED FOR BOARD ACTION
~
~
0 , w Z Ul rT "U ~ 0 rT-tlZ
::::T(1) ~O rT 0 , 0 0 ::::TO 0
W.o ~ W (1) Ul ~(1) , ::0
:J e: 0 0 rTW Ul rT 3 3 mn
(Q -.~ 0'" -.0 (1) (1) Ul W W <I'TI
(1) , W L-. Ul 0 :J 0 0"U rT L-. - Z
(1) 0"'(1) rTe: rT -TI rT (1) ~ 0 I'TI-I
3 3 ~o -.3 0 0 , ~::o
W (1) (1) rT 0 e: -< rT , -.0'" )>
-< :J Ul ::::T --toe: 0 Or
rT(1) 0 W W (1) Ul -.rT 0 "
:J ~ X :J rT 0 0 :J ::0 ~ n
0 "U (1) 0 0 0 ~ 0 (1) )>::00
rT 0'" (1) rT e: "U ::::T-Tl0 (1) -TI ::0 I'TI Z
e: :J 0 3 (1) W 0 e: , e: n,,-I
O"'rTUl .0 e: , , , ~:J Ul ~c::o
(1) (1) (1) e: ~w rT3 o.Ul (1) VI)>
rTUl X (1) W rT Ul IV I'TI
~ ::::T 0 Ul rT -. 0 ~, n V1 n
0 (1) rT (1) :J -TI~ -.(1) 0 no
, :J e: -. a. (Q ::::T ^"(Q o VI
rT W a. o ~ W -.(1) W ~r-l
::::T3 a. -. :J Ul 0 0 , (1) \.Dr)>
0 (1) :J Ul W rT 0 ::::TrTo. 0 00 I'TI
rTe: rT(Q :J W 0 0 -. rT wnVl
::::T:J (1) :J a. rT e: ~ :J 0 -I)>
(1) rT , -TI (1) :J O"'(Q , - Z
Ul 3 , (1) ~ Ul rT e: (1) ~o-
(1) -.w 0.0 rT !fl e: n I'TIz-I
-TlW :J :J e: -. a. -. Ul 0 I'TI )>
-TI, -.0 -TI~O :J (1) :J -1::0::0
0 (1) :J ::::T 0 o.Ul 0 < 0 -)>-<
, (Q -. , 0 0 0 (1) Z-I
rT 3 Ul -.w :J - -TI , C>I'TIO
-. rT (1) .0 :J , Ul < :J
:J ::::T e: < (1) -.(1) W Ul VI VI
0 (1) -TI W 0 a. a. I'TI-I
, (1) , ~:J (1) Ul -1::0
, (1) rT < 0 , -.rT -1-
W (1) Ul (1) (1) rT :J W -n
:J < , rT :J Z-I
0.(1) -TI ~w ::::T a. a. C>
:J , -< (1) (1) W
rTe: 0 0 < , ~
::::T(1) 3 0 (1) a. (1)
Ul --. (1)
Ul rT 0 N rT
"U (1)
I a. :J
(Q
0 " W 0"'-1 VI W 0 )>
"U , :J (1) ::::T (1) 0 rT
(1) W :J ~(1) "U 0 Ul rT
, :J e: ~ rT 0 rT (1)
W 0 -TI (1) a. 0 0'" W W 0 (1) e: , :J
rT ::::T "U 3 :J a.
(1) 0'" rT 0 (1)
:J Ul 0 W , (1) W rT (1)
(Q (1) W 0 ZN ZN Z a. Z-< Z -TI Z , :J W , :J Ul
:J e: e: 0 e: 0 e: e: e: (1) e: 0 e: o.rT rT Ul
.(1) -to :J Ul 3 :J 3 :J 3 , 3 W 3 , 3 W ~ Ul rT ::0
X (1) e: rT 0"'(1) 0"'(1) 0'" -. 0"', 0'" 0'" :J rT:J \.D W (1)
"U (1) W 0 (1) (1) (1) :J (1) . (1) W (1) :J ::::T(Q 00 rT -to Ul ~ ."
(1) Ul ~3 , a., 0.,(Q , , 0 , e: (1) wo -to 0
:J (1) e: e: rT W Ul
Ul ~ 0"', 0 , 0 , 0 rTO 0 e: 0 ~ -to rT -TI~ e: " ~
(1) W -TI -. -TI -. -TI ::::T -TI -TI W -TI , W rT e: 0
Ul Ul 0 :J :J (1) 0"'(1) rT :J ~ :J ,
-. -0 (Q O(Q , a. rT 0 w.o W ~ 0 W Ul
Ul W 0 0 (1)-< , -< e: Ul e: Ul :J Ul (1)
0'" Ul 3 rT~rT< (1) "U (1) Ul -.(1) rT -.3 W :J
(1) Ul"U ::::T~::::T(1) W < Ul W rT Ul :J N (1) 0 ^"
~(1) (1) (1) :J , (1) , 0 0 0 (1) (1) ,
(1) W 0 e: . , W 3 -< Ul rT
X 0'" -.-< rT-< (1) Ul rT 0 (1) Ul 0 ~
0 -< :J (1) -.(1) :J , 0 :t rT :t C> C> )> VI
rT W 0 W "U W )> Ul ::::T(1) W Ul .,,-1
e: N Ul , :J , , :J 0 Ul W , :J rT "U W )>
a. 0 0 a. 3 (1) 0'" :J (1) a. ::::T 0 Z OJ " VI (Qn
(1) :J , , a. (1) 3-< (Q W Ul W e: -.^" (1) ~
a. (1) (1) 0 e: ::::T (1) , , 0 < :J 0 W ~
0 e: 0 (1) " I N 0.(1) 0.0 rT 0 ^",(Q ~I'TI
-TI (1) rT W 0 < :J (1) (1)(Q Z
, 0 -. (1) :J "U :J :J rT -TI ~ 0 (1) , :J Ul 0-1
0 :J < (Q (1) :J (1) 0 Ul 0 (1) :J rT -TI)>
3 (1) 3 , e: ~ (1) , 0
W a. rT Ul a. W W a. 3 rT :J IV
W , e: ~O'" Ul 0 0
Ul 0'" (1) e: 0'" , -< Ul W ,
(1)-< Ul 0 -< 0- (1) Ul o-Ul
~ 3 ^" :J W 0 3 -< n I'TI
0'" Ul N (Q Ul ~ -.Ul
W -< 0 -.w I ::::T
0'" 0'" :J rT Ul Ul ~ OJ ~
-< (1) ::::T Ul e: 0
(1) (1) :J rT ,
-.rT
:J (1)
(1) :J
Ul
(1)
:J
VI
l- e:
"'C 1 <1l I- 0
VI 0 <1l <1l <1l 0 .c: <1l <1l e:
<1l +J +J E I-+J +J > I- +J 0
0'1 I- l1l ~ 0. 0 0 l1l VI U.-
e: O"'C~~ e: 0'1 l1l+J
l1l e: <1l 0.0"'C "'C 0 <1l"'C VI e: >- VI.-
.c: .- "'C E >~ VI e:.- +J .c: <1l 1-.- <1l.o e:"'C
U E e: <1l ~ +J l1l+J e:+J e: 0 >.0 l1l"'C
N <1l+J I- 0 e: <1l +J l1l "'C I- l1l
l- I- +J e: <1l.c: <1l "'C "'C E l- E U VI~O +J
4- 0 0 e: 0 E 3 E <1l"'C <1l 0 I- <1l ~.- e:
0 4- 4- .- U 0 <1l +J l1l I- <1l +J .- I- >-.-
+J <1l I- l1l <1l +J VI 3<1l +J
N e: VI"'C +J VI VI 0'1'- ~ e: ~ e: <1l 0 0 0. I-
0 +J <1l 0.- ~ l1l ~ ~.- 0-0-0 U U VI l1l VI
<1l e:"'C e: U+J 0- U <1l +J3 0..-
0'1 +J <1l e: +J e: <1l VI 1-4- <1l <1l I- e:<1l VI 3
l1l E <1l <1l-"'C <1l I- l1l I- 0.0 VI 0 <1l'- "'C l1l <1l
0... VI <1l+J I- <1l U U 0 <1l ~4- E> <1l.o .-
0 l- e: l1l +J I- <1l +J ~ e:...... 4- <1l<1l +J >
0. . U <1l ~ <1l U e: o~ <1l l1l 1-1- l1l <1l <1l
VI ~ VI l1l <1l o.t: .0 <1l <1l.-.- 1-.-.- ~~ I-
O-+J Q) - ---. <1l I- >+J 3 I- ~>- <1l U
c <1l 0 C'l~ O"'C > <1l l1l >-<1l 0-l1l I- >-4-
l- e: e: E I- <1l <1l ~c I- U >- .0 +J <1l"'C U 0
I- l1l I- o.e: l- I- 1-1 4-
0 <1l <1l.c: 0 34-"'C4- l1l VI I- 0 0 l1l~
~ I- U4- e: E 0 0 <1l'- E ~ U Eoo <1l
e: e: l1l I- +J >- +J +J .- l1l l1l...... 3 e: >
0 <1l <1l"'C <1l +J"'C ~ e: I- VI U I- <1l 0 <1l
> <1l E <1l VI +J +J .- I- 0.<1l 0. . 0.- 0ll1l
+J <1l E ~ X <1l <1l e: ~ l1l E"'C "'C 0.4- 0 >"'C
~ I- :J - e_ C'l"'C <1l 0-0 0'- OlI- 0'- 1-0'1 <1l <1l >-
...... 04- e: E UJ m U e: l1l I- U o.e: l- E I-
0 0 0 > l1l l1l +J <1l.- 0 0.<1l .- 4- I- l1l
VI +J > l1l.c: VI e: <1l >-.c: <1lm 0."'C I- 4- "'C 0 E
<1l "'C U"'C ~ O.c:......I-'O VI V) e: ~ l1l <1l4- 0
0:: VI l- e: e: <1l', +J +J <1l 0'1 l1l "'C +J I- +J
+J <1l l1l 0 I- <1l"'C e: e: VI.c: e: VI <1l VI
e: E 0 U l1l I- 0 <1l l1l+J . VI"'C l1l 0. ~
<1l 0 e<l.""C-, X ~+J I- VI >~~ <1l+J +J U
E +J VI <1l l1l <1l >- +J I- <1l <1l >- l1l l1l l1l o.U <1l <1l
+J VI <1l VI E 4- <1l"'C ~ I- 1-.0 VI e: VI 0'- "'C .0 <1l
VI ~ C'll1l .c: .- 0:: <1l U ~ ~ 0 o~ I- .c:
~ U e:.o +J U+J +J VI VI <1l +J.- 0.<1l+J <1l~ +J
" l1l l1l'- VI <1l e: <1l l1l l1l E VI+J 0 > VI I-~
"'C e:.c: <1l .c: .c: ~ .c: <1l.c: <1l <1l'- 0 0.1- <1l'- 0.- 0
<( .- u.o+J 3', I- VI+J E E +J U 0 0."'C C ~ 3 +J
I-
O.c: VI <1l <1l e:
+J U e: <1l VI > I- 0
U.- "'C 0 0 +J"'C l1l "'C
l1l.c: +J l1l <1l VI 1 +J e: +J
4- 3 ~ I-+J <1l .- VI l1l e: l1l e: e: l1l l1l
"'C uO 0 U "'C VI I- l1l >-.0 0 I- 0 l1l VI
0'1 VI <1l VI 3 +J <1l <1l ~ 0..0 <1l +J l1l e: +J U l1l VI e:
e: <1l+J I- U', +J 4- <1l 0 0'1 0 E~ VI +J e: <1l <1l
VI l1l l1l.c: <1l 0 <1l.c: I- <1l l1l e: l1l 0 U "'C 0 VI 0.
+J e:...... <1l+J...... I- ~ I-+J 0. .0 l- I- e: +J e: l1l e: e: 8
+J <1l <1l >-3~ 0. VI 0. <1l VI 0 0 VI l1l +J <1l
VI <1l 0.1- o 0 VI ~ l1l "'C > +J .- e: E e: 0. U
e: VI X +J I- U <1l <1l l1l <1l l1l U+J <1l"'C l1l <1l "'C X
I- 4- <1l VI VI 0'1 .c: I- > <1l ~ "'C <1l 0.> l1l I- "'C <1l 0'1
<1l 4- l1l l1l <1l+J 0 I- 0 I- <1l~ o .- . +J .0 l1l e:
U o 4- .c: 0. I-.c: E"'C VI o.c: 0 .0 ...... 0'11- E l1l 4-
e: 0 <1l+J4- e: e: E VI 0 >- <1l l1l >- I- >- 0 3
0 e: +J e: E VI l1l <1l >- I- u...... VI.c: I- +J 0 e: <1l
u l1l VI .-.- O"'C +J <1l e: +J U -.- ~ 0'1 I- > l1l VI .-
e:4- +J e: VI VI e:.o I- VI <1l l1l <1l 0 l1l l1l e: >
I- <1l 0 O+J VI l1l <1l "'C <1l'- ~ ~ <1l VI +J e:.c: I- 0. 4- .c: 0 <1l
0 +J .- 1-.- ~ U 0 VI >-+J 0- -0 ~ 0 0 3 0. +J I-
+J l1l+J 0.4- U <1l e: .c: VI ...... l1l <1l <1l 4- +J.- "'C <1l +J
U e: U 0 e: <1l +J <1l l1l E l- E <1l +J VI <1l <1l I- 3 l1l 0
<1l .- <1l...... I- 4- .- ~ <1l e:+J l1l I- l1l l1l e:.c: +J l1l U . +J
E', l1l 0.0 E 0- E'-'- "'C <1l VI I- +J O+J l1l <1l 0 <1l
0 ~ I- <1l VI o.o.c: I- 0l<1l e: 0'- VI . +J VI
0 ~ I-+J"'C VI <1l VI >-~ l1l .c: +J <1l >- o.c: 0 e: +J >- <1l <1l"'C l1l ~ .0 e:
u <1l o.u <1l e:+J e: +J .0 U+J "'C+J I-+J e: VI 4- I- +J <1l I- l1l l1l 0
l1l+J 0 <1l 0 <1l4- ~.- 0. +J 0 <1l'- l1l E <1l 3'-
<1l "'C "'C U.- "'C U ~ <1l +J E 0 0 ~ 4- 0 U ~+J .c: l- I- 0. <1l <1l+J
VI <1l VI <1l+J 0-> 0 .c: 0- VI.- e: o-VI U 0 . 1-.- U
~ ~+J l1l', U 0 <1l UJ .- e: 0 e:~ <1l 0'1 <1l ~ l1l 0'1 4- 0 VI l1l > <1l
4- 0 l1l 0 <1l+J.c: VI .- 0 U e: ~ I- > .~.l <1l e: e: U 3 <1l', VI
<1l 3 E ...L.,--, +J e: e: VI +J .- 0- .- <1l 0'- e: 0 <1l <1l I-'O~
0:: .- "'C 0.0+J 0 <1l'- l1l+J+J VI >~ +J 0 VI I- o.U~ .- VI 0 <1l
<1l+J <1l I-~ I- +J 0:: l1l VI I- l1l.o <1l l1l .- +J 0 0. > <1l <1l >
0'1 VI I- 0 o.~ ~ e: e: e: <1l VI l1l +J C'l+J e: 4- <1l'- <1l.c: I- 0 <1l
e: <1l I- +J U U 0'1 1-.- 0 Ol~ 0'1 "'C e: l1l <1l l1l <1l 1-.03: 1-1- l1l:Z~
l1l I- ~ <1l'- e: e: ~ .- e: U e:~ +J 0 0. e: o.E VI
..c <1l U >- +J 4- .- 0 ~- ~.-_.- 0 VI'-'- .- <1l +J
U"'C u~ l1l4- I- <1l l1l U+J l1l "'C .c: O+J U 0 U l- e:
e: 0 <1l I- '--0 3 O::+J <1l l1l U e:~ U U.- e:.-.- <1l l1l .0 U "'C
VI ~ VI ~"'C""" I- <1l U <1l+J +J ~ E
VI 0 U ~ <1l <1l 0....... <1l <1l 0 <1l',I-"'C I- 0- E
.c: 0 l1l...... U <1l 0 I- .c: l1l 0 0. .c: e: +J .c: .0 l1l e: l1l <1l 0
I- +J.c: U l1l.o 3 l1l I- U U O+J 0 VI I- 0 0.l1l 0.1- U
I
<1l
I-
VI
~ <1l 0'1 "'C
0- e: <1l VI
<1l I- <1l.o +J <1l
I- <1l .c: l1l > l1l "'C 0'1
E +J ~ l1l e: I-
<1l 0 VI <1l l1l l1l
~ +J VI ~ I- ..c
e: VI l1l...... +J VI U
<1l ~ l1l VI 4- <1l
> U >- 0 0 0'1 <1l VI
<1l +J 0'1 U I- VI <1l e:
<1l l- e: .- e: 3 l1l l1l 0'1 0
0'1 ~.- I- <1l .c: <1l l-
e: <1l o-e: 0 U l1l +J
l1l .c: VI UJ .- 4- > .c: l1l
.c: +J <1l E <1l . U VI
U 0'1 e: I- VI I- 0 0 e:
+J e: 0 <1l e: u u <1l
-0 VI l1l +J l1l "'C l1l 0.
<1l ~.c: e: <1l <1l 0'1 e: E
+J " U I-"'C 0... e: 0 0
VI "'C ~ U
<1l l1l"'C +J I- <1l l1l VI 4- . VI VI
0'1 <1l <1l 0 > +J e:"'C VI l1l
0'1 >-+J 0:: 4- <1l 0 e:"'C <1l > VI
~ l1l U +J "'C .- l1l e:....I l-
V) E <1l 0'1 "'C e: +J ....I <1l "'C <1l
" e: 0 <1l <1l U "'C LL. I- U
+J 0 .- .c: u I- l1l <1l'- <1l
U I- VI+J e: 0 VI E > ~ +J 4-
0. ~ <1l E e: U.- e: 4-
l- E l1l<("'C LL. 0
+J l- I- I- VI l- I-
VI 0 <1l >- . <1l E <1l +J
.- 4- <1l "'C I- +J "'C l1l "'C
C E l1l'- I- >- l1l .0 U "'C
+J ~ VI E4- VI 0'1 VI +J
<1l e:~ e:.- 0 e: 0 e: I-
.c: <1l 0 0 l- I- 0 I- 0 l1l
l- E > U 0. 0. U 0. U 0.
..::r Ln \.0 ,.......
C. Return on Equity as a method of calculating allowable profit should be provided to
the Board in addition to the customary Operating Ratio calculation. Return on
Equity rates within the industry and in general business will be presented for
comparative purposes to aid the Board in determining the appropriate rate to be
used for rate setting. Selection of a primary method for rate setting would be
based on the Board's judgment. As the Return on Equity method is based on the
application of a determined rate of return applied to the refuse collector's
stockholders' equity amount, refuse collectors operating in more than one
regulatory jurisdiction, such as Valley Disposal Service and Pleasant Hill Bayshore
Disposal, will require apportionment of their stockholders' equity.
D. Officers' compensation should be reviewed for reasonableness by District staff by
referring to industry compensation guides, as recommended by Price Waterhouse.
Subsequent Rate Applications
A. Structured and standardized formats should be used for rate applications.
Detailed formats will be finalized by the District staff and the refuse collectors.
B. Revenue requirements should be adjusted for projected changes in customer
volume; however, such adjustment should be made by District staff only if the
change in volume is projected to be significant and exceeds a benchmark
percentage, as determined by the Board.
C. Cost savings programs may be proposed by refuse collectors at their option. The
cost savings proposal should be submitted for review by the District 180 days
before desired implementation. The development of criteria for the cost savings
proposal and program requirements, including verification of results by manage-
ment audits, will be completed during the 180 day period by District staff.
D. Related party transactions involving Acme Landfill's tipping rates and dividends,
F & F Leasing Company's lease charges and cross-jurisdictional allocation of
expenses are to be reviewed by District staff in greater detail on a rotating bi-
annual cycle basis.
RECOMMENDATION: It is the District staff's recommendation that the suggested changes to
rate setting procedures presented in Attachment A be implemented in a phased sequence for
the immediate and subsequent rate applications, as described in this Position Paper.
.
REVIEWED AND RECOMMENDED FOR SOARD ACTION
INITIATING DEPT./DIV.
GEN. MGR'/CHIEF ENG.
BOARD OF DIRECTORS
NO. V. Adm.
2
4 7 83
POSITION PAPER
VIA: ROGER J. DOLAN
General Manager-Chief Engineer
DATE
April 1, 1983
SUBJECT
AUTHORIZE $13,500 OF SEWER CONSTRUCTION FUNDS FOR
INTERIOR ARCHITECTURAL TREATMENT IN THE
HEADQUARTERS OFFICE BUILDING
TYPE OF ACT ION
Authorization
of Funds
SUBMITTED BY INITIATING DEPT./DIV.
P. Morsen Administrative De artment Mana er Administrative De artment
ISSUE: Certain areas of the Headquarters Office Building were specifically designed to accept
interior architectural treatment. Staff formed an "Interior Architectural Committee" to
investigate, study, and give recommendations on how to best complete the interior finishing of
the Headquarters Office Building at the lowest possible cost.
BACKGROUND: MWM (Headquarters Office Building architect) made a detailed proposal in
February 1982, for the designing of decorative graphics and interior finishing. The proposed cost
for the desiqn only was approximately $30,000 and in June 1982 was reduced to $20,600;
additional money would have been required to implement the plan. Due to this high cost, staff
decided to delay the interior finishing of the affected areas until the new building was physically
completed and the carpeting and furniture were installed.
To minimize costs, the Interior Architectural Committee was formed in January 1983, from the
Administrative and Engineering departments to investigate, study, and make recommendations
for wall treatment and plants in all public areas of the Headquarters Office Building. The
Committee interviewed four companies that had varying types of decorative art. Each was
requested to submit estimated pricing for each major area. The Committee studied the
proposals and concluded that a mix of printed graphics, pictures, and plants would be the best
overall architectural treatment to preserve the District's public image and to complete the
overall design esthetics of the Headquarters Office Building.
The Committee, after much work, feels that adequate interior architectural treatment can be
designed and installed for a cost of $13,500. The $13,500 is a 55% reduction from the original
design only cost figure and a 34% reduction from the second MWM design only proposal.
Staff and the Interior Architectural Committee will work closely together during the
implementation phase to ensure that an appropriate form and statement is achieved at project
completion.
RECOMMENDA TIONS: Authorize $13,500 of Sewer Construction Funds to complete the
Headquarters Office Building interior architectural treatment.
REVIEWED AND RECOMMENDED FOR BOARD ACTION
jJjJ..
Yd
PM
._--_._^-------"~--,_._---_....__._._._--_.~-_.._-~,~~-""-_.._~--_.---..._._,^~.__._-~_.-._'._-_.._"._-~_.-._._---...
c((SD
Central Contra Costa Sanitary District
BOARD OF DIRECTORS
NO. VI. Eng
1
4/7 /83
I VIA: ROGER J. DOLAN
POSITION PAPER General Manager-Chief Engineer
DATE
March 30, 1983
SUBJECT
TYPE OF ACTION
REPORT TO BOARD OF DIRECTORS ON ENGINEERING AND
CONSTRUCTION DEPARTMENT'S 1982-83 ACCOMPLISHMENTS
Robert A. Baker
INITIATING DEPT./DIV.
Engineering and Construction Dept.
SUBMITTED BY
The Engineering and Construction Department will present an overview of what
has been accomplished during the current fiscal year. Goals and Objectives
for 1983-84 will be distributed at the close of the presentation.
REVIEWED AND RECOMMENDED FOR BOARD ACTION
INITIA~T./DIV"
. :(ifJJ:!;::"
..... .
I
o The project coordination task includes design, design review, and contract
package preparation for various project completion elements.
o Grant administration/audit preparation will consist of preparing this
$S6,000,000 grant for its final audit.
Additional funding for Stage SA Phase I in the amount of $123,000 is required at this
time for continued staff work during the next 12 months. A cost estimate is attached.
The operator training task has been approved with the expectation of being grant funded.
The project coordination task is fundable, but mayor may not actually receive grant
funds. The grant administration/audit preparation task is not grant fundable (but is
necessary).
RECOMMENDATION:
1. Authorize $31,SOO in sewer construction funds to update the Larwin, Martinez, and
North Concord/Clyde watershed studies.
2. Authorize $123,000 in sewer construction funds for ongoing work or the Stage SA,
Phast I Project.
REVIEWED AHD RECOMMEHDED FOR BOARD ACTION
INITIATING DEPT./DIV,
GEN. MGR.lCHIEF ENG.
BOARD OF DIRECTORS
NO. VI. Eng.
4
4/7/83
POSITION PAPER
VIA: ROGER J. DOLAN
General Manager-Chief Engineer
DATE
April 5, 1983
TYPE OF ACTION
SUBJECT
AUTHORIZE $154,500 IN SEWER CONSTRUCTION FUNDS FOR
ONGOING PROJECTS, THREE WATERSHED STUDIES & STAGE 5A
PROJECT
AUTHORIZE FUNDS
SUBMITTED BY
John Larson
INITIATING DEPT./DIV.
Engineering Division
ISSUE: Additional funds are necessary to enable District staff to continue work on certain
watershed studies and the Stage 5A Project.
BAO<GROUND: Some capital projects are presented to the Board for funding on an annual
(or periodic) basis to keep the Board current on District activities. The stage 5A project and
watershed studies are in this category.
Watershed Studies
The collection system is divided into 17 watersheds which correspond with geographical
basins. A watershed study is conducted periodically to identify short and long term
facility needs and to set connection fees at the level to fund the long term facility
needs.
The watershed studies for three watersheds are currently being updated for the fist time
in 7 to 10 years: Larwin Pump Station, City of Martinez, and North Concord/Clyde.
These three watersheds were picked for study at this time because of high growth rate
and/or known operational problems.
Funding for these three watershed studies in the amount of $31,500 is required to
complete the work. A cost estimate is attached.
Stage 5A Phase I
The Stage 5A Phase I grant was received by the District in September 1972. This grant
funded the secondary and solids handling facilities construction. As the Board is well
aware, the District has spent considerable effort in keeping this grant open in order to
secure funding for the plant completion project. Complications in the regulatory process
have slowed the completion of the project and have caused the District to incur
continuing costs.
Continued District staff work on this project includes operator training, project
coordination, and grant administration/audit preparation.
o An additional $76,000 grant amendment to the original Stage 5A, Phase I grant
has been secured by the Plant Operations Department for a unique slide/tape
training program.
REVIEWED AND RECOMMENDED FOR BOARD ACTION
JL
EdfRAB
<c(sD
Central Contra Costa Sanitary District
BOARD OF DIRECTORS
NO. Eng i neer i ng
2nd I tern 4/7/83
POSITION PAPER
VIA: ROGER J. DOLAN
General Manager-Chief Engineer
DATE
Ma rch 29, 1983
SUBJECT CLOSE OUT UNDEREXPENDED CAPITAL PROJECTS, RETURNING
$123,471 TO THE SEWER CONSTRUCTION FUND, AND CLOSE OUT OVER~
EXPENDED CAPITAL PROJECTS, AUTHORIZING $38,248 IN SEWER
TYPE OF ACTION
Jay S. McCoy
INITIATING DEPT./DIV.
Construction & Services
ISSUE: Supplemental funding is necessary to close out certain overexpended
capital projects.
BACKGROUND: Nineteen capital projects have been completed and can be closed out. A
I ist of these projects is attached. Thirteen of the projects have surpluses totall ing
$123,471. Projects with overruns greater than $1,000 are explained below:
o PROJECT 9 - The Wegman/Carollo Sol id Waste to Energy account overran
$14,870 due to a contractually required adjustment to the EPA audited
overhead rate.
o PROJECT 3520 - The Trailer City account overran $9,320 due to the
later-than-expected occupancy of the new office building.
o PROJECT 3608 - The Furniture and Equipment Study overran $4,246 due
to staff costs resulting from the Board~requested re-evaluation
effort. (This study resulted in overall reduced costs, particularly
a $14,000 savings in partitions.)
o PROJECT 3693 - The New Office Telephone account overran $8,884 because
the phone system startup phase took more staff time than had been
anticipated.
To cover these overruns, $38,248 in Sewer Construction Funds is being requested. The
net effect of this action is to return $85,223 to the Sewer Construction Fund.
RECOMMENDATION: Close out thirteen underexpended capital projects, returning $123,471
to the Sewer Construction Fund, and authorize $38,248 to close out six overexpended
capital projects.
REVIEWED AND RECOMMENDED FOR BOARD ACTION
f)t1t
CAPITAL PROJECT SUMMARY
PROJECT REMAINING BALANCE
BOARD
NUMBER DESCRIPTION AUTH. SURPLUS DEFICIT
9 Wegman/Carollo $450,000 $14,870 -;'"
501 Solid Waste to Energy 66,000 357
502 Landfill Gas Util ization 227,400 $ 15,773
706 Centrate System Mods 10,000 4,515
1380 LID 50 Martinez 5,049 4, 185
2570 4-lnch Gas Line 95,000 1,595
3023 Gea ry Road Reloation 1 21 ,000 167
3152 Outfall Repair 160,000 603
3469 Landfill Gas Pipel ine 20,000 25,537 ,',,',
3520 Trailer City 53,000 9,320
3608 Furniture & Equipment Study 40,500 4,246
3633 New Office Carpeting 103,740 5,811
3639 Landfill Gas Contract 116,500 5,632
3641 A r reba Street Storm Repairs 6,800 364
3644 Leland Drive Storm Repairs 24,300 571
3653 Berrellessa Emerg. Repair 40,000 37,056
3693 New Office Telephones 7,000 8,884
3804 Centrifuge Pi lot Plant 48,100 21 ,796
3817 Furniture and Equipment 9,256 437
TOTALS $123.,471 $38,248
Net returned to sewer construction fund
$85,223
* Estimate. After the final invoice is paid, excess will be returned to the
sewer construction fund.
** For the first time more money is being returned than was authorized.
Getty reimbursed the District for design, survey, and right~of~way work
on the landfill gas pipeline.
3/29/83
COST ESTIMATE
Ongoing Projects
WATERSHED STUDIES
Larwin Pump Station
$ 4,500
City of Martinez *
Watershed Study
Surveying
As Built Trunk Sewers
8,500
9,000
1 ,000
Subtotal
8,500
$ 31,500
North Concord/Clyde
STAGE SA PHASE I
Operator Training
76,000
Project Coordination
17,000
Grant Administration/
Audit Preparation
Subtotal
30,000
$123,000
$154,500
TOTAL AUTHORIZATION
* This is the first watershed study for the City of Martinez since
the CCCSD takeover and the size, length, and slope of each of the
trunk sewers must be established for the study as well as for
future use.