Loading...
HomeMy WebLinkAboutAGENDA BACKUP 10-29-87 . Centri.. Contra Costa Sanitar) District BOARD OF DIRECTORS PAGE 1 OF 42 POSITION PAPER BOARD MEETING OF SUBJECT NO. IV. HEARINGS 1 CONDUCT A PUBLIC HEARING ().! THE PROPOSED 1987-88 SCHEDULE OF FEES DATE October 27, 1987 TYPE OF ACTION CONDUCT PUBLIC HEARING SUBMITTED BY INITIATING DEPT./DIV. i neer Division ISSUE: A public hearing is required prior to the adoption of a new schedule of fees. BACKGROUND: As part of the annual Rates and Charges review, District staff has analyzed the available data for the cost of providing the services for which the fees are assessed. An updated fee schedule has been developed and is recommended for adoption by the Board. A reduction in mainl ine inspection and IV inspection fees are proposed because of recent actual cost experience and improved efficiency in the use of 1 abor and equipment. Septage disposal and industrial permit fees are proposed to be increased to reflect additional sampling, analysis, and staff time related to these activities. other fees are recommended to be increased slightly to reflect the District's three percent wage rate increase. In order to equitably recover District costs, several new fees are proposed. These fees include plugging abandoned laterals, special discharge permit, and a surcharge for multiple television inspections. The information presented in Attachment A summarizes the findings and fees that have been reviewed by District staff. Both the current charge and recommended revisions are shown. Attachment B provides a comparison of fees charged by other agencies, and Attachment C provides a detailed basis of the proposed 1987-1988 fees. Since the October 15, 1987, submittal, Attachment A has been rewritten. A few pages in Attachment C have also been revised as noted. Attachment B has not been changed. Legal notice of the publ ic hearing on the proposed new fee schedule was publ ished on October 20, 1987, in the Contra Costa Times. District staff has notified permitted industries, waste haulers, representatives from the Building Industry Association of Northern California, the Underground Contractors' Association, and the Association of General Contractors of the publ ic heari ng date and suppl ied them with the necessary documentation explaining the basis of the new fees. Only one response has been received to date. Mr. Joe Bristol of Roto Rooter stated he did not have any comments and would not be attending the Board meeting. If any further comments are received, they will be presented at the Board meeting. RECOMMENDATION: Conduct a public hearing on the proposed new schedule of fees. Consider, revise, as appropriate, and adopt the findings as set forth in Attachments A and C. Consider approval of the proposed fee schedule and adoption of an ordinance to be effective on or about November 16, 1987. ~J"A Jt1A~ fCZ:: OGER J. DOLAN INITIATING DEPT.lDIV. 1302A.9/85 BLB JMK Page )f 42 REVISED 10/27/87 ATTACHtlCNT A SU~ARY OF FINDINGS AND SOiEOOLE OF FEES The fees collected by the District from developers, contractors, and users of the District's facilities are intended to recover costs incurred by the District to provide service to the groups. This attachment provides the summary of findings and proposed schedule of fees which have been reviewed by District staff. Recommendations are noted in bold. The findings and recommendations are as follows: A. Development and Plan Review Fees* 1. The Development and Plan Review Fee has been analyzed to determine actual District costs to provide this service. These costs incl ude subdivi sion development review at the initi al study stages as well as review of sewer plans and specifications for new developments to ensure the design meets the criteria established in the District's Standard Specifications. The Plan Review Fee is reco_Bnded to be adjusted 'to SO.85/f't. Can increase froll SO.16/f't. last year). See A-l fee in Schedule of Fees. 2. Because of the increased efficiency in reviewing construction drawings for conformance with District specifications, i't is reco-.ended 'tha't subsequen't plan reviews be reduced by 18 percen't. See A-2 and A-3 fees in Schedule of Fees. B. Construction Inspection Fees 1. For mainline projects, the District collects a Mainline Inspection Fee and a Lateral Inspection Fee. A review of 88 mainline projects, which had been initiated and completed under the existing rate structure, showed that District costs would be recovered by collecting the Mainline Inspection Fee alone. Mainline projects have a median of about 7 laterals per job. If the $48 Lateral Inspection Fee is not charged for a median size project, a contractor would pay $336 less in fees to the District. For larger projects (several projects each year have more than 100 laterals), the fee reduction would be much more substanti al. Therefore. i't is rec:on8nded 'tha't a separa'te la'teral Inspection Fee for .ainline projec'ts no't be charged. 2. It was also determined that current procedures had reduced TV inspection costs by 54 percent because of higher productivity from the TV inspection crews and more efficient use of existing equipment. Since TV inspection represents about 36 percent of * labor rates used to determine District costs for plan review and other rates ref1 ect a 43 percent employee benefit overhead rate. At Board direction, administrative overhead has not been included in any fee ca1cul ations. Page .") "f 42 REVISED 10/27/87 the Mainline Inspection Fee, the mainline fee could be reduced by 19 percent. Therefore. i't is reca.ended 'tha't 'this fee be reduced by 19 percerrt. See B-1 fee in Schedule of Fees. 3. La'teral inspections. ..nhole connections. and overti. inspection fees are reco.ended 'to be increased 'to reflect 'the 3 percen't wage ra'te increase. See B-2. 8-4. and B-S fees in the Schedule of Fees. 4. The inspection of structures fee is reeo.ended 'to be increased fl'Oll $100 'to $150 'to recover 'the District's actual cos'ts in inspecting these structures. See B-6 fee in the Schedule of Fees. c. Collection System Fees 1. 1V inspection fees which are not paid as part of the Main1 ine Fee include initial TV inspections which occur on overtime or TV reruns which occur on regu1 ar or overtime. These fees are ~nded 'to be reduced by approxi.'tely 19 percen't 'to reflect increased efficiency and reduced labor and equipll8ll't cos'ts. See 0-1 and c-6 fees in Schedule of Fees. 2. A new TV i nspecti on fee is proposed to recover the cost of inspecting a mainline when the contractor chooses to split a project into smaller segments. A surcharge for projects segmented by the contractor would be assessed. I't is rec:o.I8nded tha't 'the UIOun't of 'the surcharge be detel"llined by CSO a't 'the ~letion of 'the project and would be based on 'the actual cost of inspecting each 58g118n't of 'the project. A credi't woul d be given 'the con'tractor for TV inspection fees already paid. See 0-2 fee in 'the Schedule of Fees. 3. Sewer 'taps and dye 'tes'ts are ~nded 'to be increased 'to reflect 'the 3 percen't wage rate increase. See 0-3. 0-4. and 0-7 fees in 'the Schedule of Fees. . 4. In order to reduce infiltration and inflow from private 1 ateral s, Oi strict specifications requi re that abandoned laterals be plugged at the mainline. It is proposed that a new fee be established to recover the cost of District personnel plugging a lateral at the mainline when the lateral is abandoned. Previously, this was done by the owner's demolition contractor who may not be familiar with sewer construction. The new approach is to have District personnel do the plugging work. A Sewer P1 ug Fee woul d recover Di stri ct costs for an encroachment permit, excavation, pl ugging, backfill, and surface repairs. Typically, this will require a crew of three ei ght hours to cornpl ete the work. The .-eco.I8nded fee for a sewer pl ug is $1.300 and is condi'tioned on approval of a District Code revision which will be considered by the Board on Nov8llber 19. 1987. See c:HS fee in 'the Schedule of Fees. D. Right-of-Way ar ~iscellaneous Fees Page I' f 42 REVISED 10/27/87 1. Fees for surveying. segregation of LID assesSll8nts. and processing quit c1ai. deeds are recc..ended to be fncreased to reflect the 3 percent wage rate fncrease. See 0-1. 0-2. and E-3 fees 1n the Schedule of Fees. 2. It is proposed that a standard fee be established to recover the cost of processing Real Property Agreements. Previously, the fee was estimated, primarily for the cost of surveying. Additional requirements should also be considered which include the Real Property Special ist's time, site review, ferreting, and televising the existing line. The ~nded fee for Real Property Agreell8nts would be S8OO. See 0-3 fee in the Schedule of Fees. E. Industrial Permit Fee 1. The Industrial Permit Fee recovers the portion of the costs allocable to individual industries for the administration of the Industri al Pretreatment Program. Because of fncreased s~p1ing. ana1ysfs, and staff tf~ related to a~fnfstratfon of the progr.. and deal fng wfth specfffc fndustrfes. ft fs recc:I..ended that these fees be fncreased by an average of 18 percent. See F-l and F-2 fees in the Schedule of Fees. 2. A new fee is recommended to recover the cost of investigating and processing special discharge requests. These requests range from clean water discharge for swimming pools to wastewater from industrial holding tanks. This permit fee will enabl e the Di stri ct to control these di sCharges more effectively. Also, the District will be able to recover actual costs involved in insuring that the discharge complies with the Source Control Ordinance. The Specfal Dfscharge fee would be $30 when an on-sfte fnspectfon fs not required, or $175 when an on-sfte fnspectfon fs required. See F-4 fee in the Schedule of Fees. F. Septa~e Disposal Fees 1. It is proposed that septage disposal fees be increased to recover the District's costs in administering and enforcing the trucked-in waste program. This will allow the District to recover the full cost of billing the waste haulers each month and verify permit and waste source information. The greatest percentage increase fs for the annual per'llft which fs recc..ended to be increased fro. $100 to $350. The fixed cost per truck load is reccl..ended to be increased froll S7 .00 to S7 .50 for trucks less than 2.000 gallons' capacfty and frOll $21.35 to $31.00 for trucks greater than 2,000 gallons' capacfty. 2. Previous Board policy and staff recommendation was to keep the volume charge low for grease interceptor waste to help encourage restaurant owners to pump thei r grease interceptors more frequently. The vo1a.e charge for trucked-fn waste (excluding grease interceptor wastes) fs recGllll8nded to re.ain unchanged at SO.05 per gallon. The vo1u.e charge for grease interceptor waste is reon..anded to re.afn unchanged at SO.Ol per gallon. SCHEDULE OF FEES Activity (A) DEVELOPMENT AND PLAN REVIEW: (A-l) Development Review and 2 Preliminary + 1 Final Plan Reviews (A-2) 3rd & Subsequent Preliminary Pl an Reviews (A-3) 2nd & Subsequent Final Plan Reviews (B) CONSTRUCTION INSPECTION: (B-1) Mainline Inspection (B-2) Lateral Inspection (B-3) Side Sewer Repair Inspection (B-4) Inspection of Manhole Connection (B-S) Overtime Inspection Weekends & Holidays (4-hour min.) Overtime Inspection Credit (B-6) Inspection of Structures (MH or RI> (C) COLLECTION SYSTEM: (C-l) TV Inspection: - TV Overtime - In1t1 al - Weekends & Holidays (4-hr. min.) - TV Overtime - Initial - Credit - TV Rerun (2.S-hr. mi n. ) - TV Overtime Rerun - Weekends & Holidays (4-hr. min.) (C-2) Multiple TV Inspections Current , 986-87 Fees .. Page 5 of 42 REVISED 10/27/87 Recommended 1987-88 Fees SO.76/ft. SO.85/ft. ($304 mi nimum) ($304 mi nimum) $38 each * IlJ.lm~~ii.tI SS7 each * ~~iDlt~i.aiI See Table A-1 $48 each $10 each S48 each $41/hour $164 See Table A-2 $100 each $1,044/day $1161 hour $464 $0.41/ft. $170 + $991 hr. ($418 min.) $170 + $116/hr. $634 * IIIiIliijUiIIli.[i1 $S2 each No Change $52 each $42/hour $168 No Change $150 each * 1111111;11[\[\\: * mD1.im * \:i!f:i\1.t[it~I *lllllI11~lll~[I~lll * i:\lii.jJ1IIIj)liftt~\\\ * ::::t:E.1i~::: ::::~:::: * Surcharge ~OTE: Activities indicated in bold type are proposed new or revised fee ~tegor1es, and fees indicated in a box are proposed to be reduced for 1987-88. Activity (C-3) Sewer Tap (C-4) Dye Test (C-S) Collection System Repair (C-6) TV Inspection Cancellation (Initial and Rerun) (C-7) Sewer Tap Cancellation (C-8) lateral Plug (0) RIGHT-OF-WAY: (0-1) Segregation of LID Assessment (0-2) Processing of Quitclaim Deeds (0-3) Preparation and Processing of Agreements Relatfng to Real Property (E) MISCELLANEOUS: (E-1) Engineering for Private Sewer Proj ects (E-2) Soils Evaluation for Private Sewer Proj ects (E-3) Surveying (F) INDUSTRIAL PERMIT FEE: ( F-l) Annual Permit Fee Page 6 of 42 Current 1986-87 Fees $171 each SS6/ each Based on actual cost $198 $54 S32/Parce1 $28/hour ($84 mi n. ) Estfmated Hourly Rate REVISED 10127/87 ReCOlllllended 1987-88 Fees $176 SS8 No Change * 0'1fi( $56 * $1300 $33/Parce1 $29/hour ($87 min.) * $800 Estimate required No Change Based on actual No Change cost $100/hour $103/hour Fee based on actual cost of service for prior fi sca 1 year. Annual permit fee for 1986-87 varies from $1108 to $2049. Fee based on actual cost of service for pri or ff sca 1 year. Annual permit fee for 1987-88 varies from $1212 to $2419. Page "7 ')f 42 REVISED 10/27/87 Current 1986-87 Activity Fees (F-2) Concord Industries Annual Permit Fee Recommended 1987-88 Fees F1 rst year fees based on average cost for s1m1- 1 ar 01 strict 1 ndustr1 es. Subsequent 'years based on actual cost of service. Annual permit fee for 1987-88 var1 es from S1401 to S2367 (F-3) New Industrial Permit Fee Fee based on actual District cost pri or to connection (SSOO m1 n1mum) No Change (F-4) Special Discharge Pe,..it Fee - No On-site Inspection - On-site Inspection (G) SEPTAGE DISPOSAL:* * $30 * $175 (G-1) Annual Permit Fee S100 S350 (G-2) Disposal Charge - Domestic Waste <2,000 gallons/truck >2,000 gallons/truck S7.00 + SO.OS/ga1. S20.3S + SO.OS/ga1. S7.S0 + SO.OS/ga1. S31.00 + SO.OS/ga1. S31.00 + SO.OS/ga1. - Non-Domestic Waste *Grease interceptor waste will be charged the same fixed cost depending upon truck capacity, but the volume charge is SO.01/ga1. PROJ ECT LENG11-I (FT) 0-100 101-200 201-300 301-400 401-500 501-600 601- ( TABLE A-I MAINLINE INSPECTION FEE 1986-87 MAINLINE INSPECTION FEE $300 + $3.001 ft. $350 + $2.501 ft. $450 + $2.00/ft. $525 + $1.751 ft. $625 + $1.501 ft. $750 + $1.25/ft. $810 + $1.151 ft. TABLE A-2 Page P f 42 1987-88 MAINLINE INSPECTION FEE 1987-88 OVERTIME MAINLINE INSPECTION CREOIT* Total Project Overtime Overtime Hours Credit Hours < 4 1 4 < < 8 2 8 < < 16 4 - 16 < < 32 6 32 < 8 *Credit to contractors when Oi strict inspectors are requi red to work overtime. en m ~ i I c ! .t 1;;_ 81. 1;; .- L.Q +> I: 8. +> 1;;~ .. .en - Q e5111 A 8 -- :.;l; l!~ ,.. "0 Q -8 en J~~ ......11I ~I ..... II.. .: . en I - > i . 1;: o r- .D . - Q 1 . +> :! 11'I00 ""11'I0 ..:;;~ . 11I1. 11I1) S 1)r- r- L. 0\0 00\ NIO Ir-O II'INr- "0 I:: .11I .DS !Cil ~- r-t> ~.f ~I:'" coo ~ . ~ i - Ii - . I: +> - "'+>E .....- 011I0 ~ &.!i 0." .. "0 .... t +..... N 11'I r- C\'\ . "0 ~ I - J o lQ .. i Ii - . I: +>- "'E ..... In" coo .C\'\ OM .. .... * .. I: . No: "0 I:r- . . I: Ii: - >.-4 . 0::+ +>>. I: I. l~ III ~~I ....- > . > !~! ~ ~ > ~ i It Q i ~ ~ ..J loJ ~ Q ..... r- .I: .... ..... < .... &. r- U. . I: .0 - o+> 11'I- M "0 "0 < &. U . . .-4 ~ >. L. . I: - E - ... . L. D.. +> I: . ~ fill 11I1 .D- ~ > en. 0:: .., C "0. ;;0: r- . ~ t . c o "0 11;; :S &. U . . r; .. ..... N .I: c . 0: ... . c - II.. ~ . ~ f III .D ~ enUl ..,1 - "0> ~! ..... C\'\ J: .. ! ~ ~ ~ en Z ~ ,.. CD .... . - +> II loJ 011;; ~S "'''0 0$ ~I Page 9 ')f 42 "0 :l ~ ... $ ~!~:~~;i ~ ii "0+ j.D . ~"'Ul _ L......c r-O+> 1II . o. In U 1II !lQ~ 1n'Q. ~ ~ lit. 0 L +> .-8' .. U 1II+> 0 _ Cl... I: ~.I. "0 :i :c 1II C'" +>C"O.D 8cc5f~I-.0"O ~~:.;+> ~ -~ ~~fl. =-.............,. ..... .::s.. .eau.. .....0!"0_L. Oc.....sr +>e..~ - 0 0 · t .a - · Go sr'" ~::::;;... t:~i: !+> ~ t e + +L. OUE+>L..C- e. 2i8$ U~__OGo:l 1II ~>... Mb1;;&.1IIL:...2::1~ ..O~. ~1II. e.ol....+> ..... I .a :E cI ~ 'i E .- +>c ... - .....E o 1n0 ... 0" .. .... ... . L. . . 1II +>~ .0 r- &. lQ~ .... &. U . . lQ M lQ .. :i . r- .D ~ &. U . . N In .. J C o t . Q. 1II C .... g 1._ Ot c! o 1II _C t~ .c co c- 8t .$ 1II... ~< ~L. . ~I .en L. . . +>"0 .- ..Jen ~ - ... C - l. ..... r- ell ..... N ell &. U . . ..... ~ .. &. U . . ..... lQ .. &. U . . o r- .. C o t . Q. 1II C ~ I. - III C. CD 0:: I. Gl I en Gl "0 - en :E c: &. ..... In l'l .. c:+ &. .....0 In", C\'\... .... 1 1 I &. U . Gl N In .. Gl I. ... :l .D ~ ~ .....co ~~I .. .. en g t ~ C 8 ,.. . C - Ii I. ~+> 0- &. "0 -A-f ....0 g ~5 _11I_ t~t !'O! 1II:1: 1II I: I: ......,.... Gl ... o &. C l ... o c o t Gl e. III I: .... I"Gl "OE _1:_ +>Gl+> L.,lj: I. GlIGl ~.~ ,.. .. ell ..... In ell &. U . Gl .... o In .. N J: &. U : o In r- .. I ... o I: o - t~ ~o:: I. +>L. 1II 0 C 8i .... c o Gl _I. t~ !g 1IIL. I:+> ~ en ..... ~ ell c. ,... ~ 0 CD U) iCIJ~ lor- 8"" III CD CIJ : a:~&&.. .t t:_ 8'- t: .- L.O +J C 8. +J t:'C CD. .U) . C . U) I - > i ~ - o e511l ~8 -- ~> AL. 6~ o ~ A . - o .L +J 8 - > - ~ .. x ~ U) >- U) ! ... b W ..J S o - ~1IIt: C~ 8 -CD ~!l CD-+J ~Cll. ::ICE ~W- g...t: ....OCD ~ CD L. .1:::1 g ~,g ~ L.Cll OC ...- . ~ +J L.L. ... ::10 ...... O. 11\"".1: ,... ....... C .CII\. 0-,....1: "'E"'+J III L.CD ...1; 0__ M ~t: II\WCD ~ L. ::I o .I: ..... 11\ ,... ... ...J'-\ "'--"-. ^~ ,~' '....~ -- '"\ i ..... . let . 00 +~ 0'- lQ~ ...0 >.'- . ::I ~o ......1: N..... ,...~ ~... 10 CI'l ~ .. C o t CD CL III C .... ~ . - +J - C ... I CD E - +J L. CD ~ ~ III >. . ~ - ~... IItIC - III E ~ c . CD L. ~ .I: I~ ..... ~ ,... ~ i ...... ,... ... . o ... ~ . - +J - C ... I CD E - +J L. CD+J ~~ ~b L. ::I o .I: ..... o 11\ ... . L. .I: ..... ,........ ~C - + E oeo ION _CI'l ... ... - . L. .I: ..... ~ ... + o 10 - ... C ::I L. I ~ C ::I '- I. CD E t CD ~ ~ o C L. I OCL t~ . L. III +JCD C ~ I 8=... C o t CD CL III C - -,... >. lQ'C "'0 ~ . ... .I: U . CD ..... 10 ,... - ... III >. . ~ - i,... IItIC - IIlE ~ C . CD L. ~.I: I~ ..... CL III .... '- CD J ,... N ~ I ... -i t: II -i .I: U . CD ..... eo 11\ ... 1;; ~ - ~ 8 ,... ,... & ~ pag "0 of 42 . L. Cll C W ... ot: ~8 - III ::I t . c o ~U1 It: :8 - . ::I ~ ~ ~ It: :8 .. .. - ... L. - . CL I. c o - +J . - Be C ::I l!'- I. g~ _c till l'; Ul_ C+J ... - C ~::: I t: ~ c o ~ ,... ~ Pa~ 1 of 42 " ~t CD c+' Ill.... ...."'CD 8L. I EE+' t: .... &J. III ....Ill 10.... t:1II L.O ~ ~ lQi~1 L.O 1Il~ 101 L. > tilt ~~ +' ~ +' 0.... .. C g8 u~~ tL.L.~ ..... ?n- 8", OIL. Q.CDCD +,oOS +'....0 fill! I.... +' ~~ ~L.. ....M L. +'.... 1$ +'CD............ !l"'l+'CD IIlC L.>. CL.OI>1ll III . GlIO 1010 8 o III 8:Cift: .fs81 :aU) CDE ..... I~ ,;, III U) I .... > i >.~ GIGI c... GlL.... -.... L.O.... L..... Ill+'~ IIlGl'" . III +' f!t: t: ~ ~llliL. .... .... .... GI,a.... CD ~OI>. 0 01 L.i~ ~1Il L. C t: L. g- l'iii I~GI'" 1G11 A:5 GI .c GI 011I 0 L. ~ > ~1i:1 .... .... i~ .... ... L. oS ~~ .... IIIGI GI>.... i'....~ >.... > 6~ c!t. i fCO c!L.GI .... "'+' Q.L. (r.~ 0 ... l ~ '" - 0 .I. +' ... c! ~ f ... .... III :J :J ~ C ~ ~ t ico~ u ... ,.. III ;: 8 . L. L. C ~ g :II \D L. :J_ 0 J~"'" '" C III 0& ~ tilt C a.. ~ E ~ , ,....11I '" , ,,... C - It: S col .. '" ~~ 2 +' ~I&.. ... ~ III :8 ... tilt tilt ..... tilt W tilt +' III .... '- C ~ 0 CD I 8 ... I CD 0111I 1i: III ~l U) III > C CD E III CD .... 0 III - 1Il,a 1i: '- - III III ~OI a.. 1i: c ... > U .... L. ... 0 +' L.C L. 0 ... .... - a...... a.. .... S .... a +' 'alii '- g C .... c.... 0 ~ 0 .... III GI .... ....11I 01 0 0:: +'+' :J g gill 01 :~ a. 0: 01 C {!!. .... C ....+' .... ... ...., +' - +'C>. '- III 11I0 01 ... '" III "'CD+' - I~ > L. C '- III ~ 01 III L.IL. U) wa.. .... '- GI ~ III III 8 t- GI $ '- a. a. - .., III '- ! , 01 III '-0 W 010 ...CD > III ~ '- 01 '- ~ C '- -. '- .... ~ a.. a..Ca.. Wa.. ~~ :J .... U) ~ .... ,.. ,.. ,.. ,.. ,.. ~ ... ~ & ... :!: :!: ... ,.. ,.. ~ .! U) I N "jl .... W I - 0:: :IE ..... w w > ..... ..... - ~ Q ,.. w ..... ..... t - d~ '11- L.O +> C 8; +> ~c 1)'11 ;a en - Q a: en III .!:S -- ~t 5~ o .... l. ~ I 'II +> 8 "g C I) en ico~ lor'" e,... III ~~ I a:.....1L. o C 'II en I - > i t - > ~ 1)$ U c_+> -~1II "g18>. -I I) l:; :;OL.OlIII ,...I)L.:;O ul'II"g C ~ C .... u- ,... 'II - L. t: :;0 "g C -I :i~ Ol C - 'Q. E IX.. g~ I) "g:;O !l CD'" .N.O \oN.N ~';'a.."; ....;!le~ C'l'\ .... .... M M I I I I r-.- >. >. -O"r-r- :;o:;o~~ cC+,1) CCCI) <~i;a J L. o - "'L. oa. g+,L.L. 1ft 0 'II '0 8'" I) 8l >. ....8.- .,Q '11- 'II :;0 > U .+'L.1ft .Ul)- IL. 'II 1ft ... o. W ~ I- .... :IE a: ~ : +' f :. ,... 'II :;0 C C < ..l < .... ~ en ; .... ... ... ....'ON I C I IL. 'II IL. ... ..... ... IL. ... "gCD I)+' +''11 'II>E E- 1II -L.1;; i;~ ... L. O~I) ~81 t ... g't$ ! ~L.c.! "g_ooc Ic............ 'II...atE .,Q'II 1)0 :;o+'co It 1ft 6~ IL.'IISu... * I IL. +' f :. >. L. +' 1ft :;0 '0 C .... I T IL. i IL. +' E :. I) Ol L. 'II ~ U III - o .... 'II - u i en ... T IL. o C'l'\ M C o t I) a. 1ft C - $ - III I 5 :i III .... ..- M g t i III C - $ - III I 8 .. ..l < ~ en .... Q W Cl t w en c:; ... o III ~ : +' E :. ..- 'II :;0 C C < ... ,... c!, I) ~ :l+> 'II +' g& 'II+' III +' C t a. 'II ~I'Q. ~ . ~ :l +' g I) 1ft 1ft'll A~ I) ~ :l1i: 2& 'II+' 1ft +' C t Cl. 'II ~8l'Q. f'-I'-\ I) Ol L. 'II t3 I) ~ 'II ;a U - 1;; I) ~ Ci 1ft o a. 1ft - Q ... N c!, o 0 ..- ,... '11'11 Ol Ol ........ III III 00 o 0 00 M M ++ 00 III 0 o 0 ....,... M C'l'\ M ~~ u u :;0:;0 L.L. +'+' ........ o 0 ..- ..- '11'11 0l0l 00 00 ~~ NN V^ Pa 12 of 42 "l:J CD ! ~ 1ft III ~ t :;0 1ft L. I) ~ ~ o I - f +' C I o ,... I) > -8 I) "l:J :;0 g +' g .a t - L. ~ - Q t- 'II +' - C 'II en ; D ) :.' o .... 'II Ol .... III o . o M + o o o ..- ~ .i >'E o 8l i i! ... 1ft "l:J-+' C~- 'II E L. I) .0 a. 1ft... S"l:J to -I)+' > Ollft L. L. :;0 1)'II"l:J CI)~c u- I!! a: I) ~'II c;L. ~CDOL. .\:'0'" ,.. _co ..-'110 .,Q III :;0 . M Q8l111 .01) 0'" Ol ""c; .,Q'II~ :! en u o . C :l~~ ..-~; c!o~ L.+'''O 0:;0..- ...CI) ..- - 'II'" Ift;a L. i+>'; .... 'II IL. . ~* +'* .~ ~~:..,. CD +> III 'II :a u - +' i "l:J I C :i Page ," of 42 ATTACHMENT C DETAILED BASIS OF FEE RECOMMENDATIONS PART I DEVELOPMENT AND PlAN REVIEW FEES A. DEFINITION The Development and Plan Review Fee is required to reimburse the District for its review of developer sewer pl ans to ensure the design meets the criteria established in the District's Standard Specifications. Comments on designs are made with the intent that when the p1 ans are ready for construction approval, all required changes have been made. B. 1986-87 FEES The 1986-87 plan review fees are as follows: Two preliminary and one final plan review $0.76/ ft. ($304 mi nimum) Third and subsequent preliminary plan reviews $38.00 each Second and subsequent final plan reviews $57.00 each C. DISOJSSION In past years, estimates of plan review costs were determined from interviews with staff members involved with plan review. Estimates of time involved in plan review were determined from estimates of a percentage of total work effort or as an estimate of average hours spent per project. In July 1986, District staff involved with this activity began chargi ng thei r time to a specific Operati on and Mai ntenance (O&M) account number. This enabled actual costs to be determined from the O&M account balance. Between July 1986 and July 1987, total staff costs, including salary and benefits, were determined to be $69,300. During this same time period, 100 projects were reviewed total 1 ing 112,000 feet. Therefore, the cost per foot was $69,300/112,100 ft. = $0.62 ft. It is proposed that for 1987-88 Di stri ct costs be recovered for subdivision development review. The subdivision development review effort is usually the initial contact between the District and the developer. The developer's initial concepts are reviewed and 1 nformati on 1 s shared with the developer on items such as the District's Hillside and Creek Crossing Policies. Also, an initial sewer capacity assessment is made by the District. Since development and pl an reviews are closely rel ated, the development review is recommended to be incorporated with the a1 ready established Plan Review Fee. _._'------_."._._-~--,-<-~-~-~,.._-,-,~-_.._~_._.._-,._,---_._'_.._-_._----_._~-,---_._------ Page 111 of 42 REVISED 10/27/87 The annual cost of subdivision development reviews has been estimated to be S26,300. This is estimated to result in an incremental review cost of $26,3001112,100 ft. = $0.23/ft. Therefore, the total Development and Plan Review Fee is SO.62/ft. + SO.23/ft. = SO.85/ft. Staff will establish categories for other types of development reviews such as for county and city plan amendments and governmental agency projects. Costs will be determined during the upcoming year for these additional categories. Because of the increased efficiency in reviewing construction drawings for conformance with District specifications, it is recommended that subsequent plan reviews be reduced by 18 percent. D. RECOMMENDATION Incl ude development review in the initial Pl an Review Fee. Revi se the other Pl an Revi ew Fees to refl ect actual costs to the Di stri ct. The new fees a re as follows: Development review and two preliminary and one final plan reviews Third and subsequent preliminary plan reviews Second and subsequent final plan reviews SO. 851 ft. ($304 minimum) S31.00 each S47.00 each Pa~ ' 5 of 42 PART II CONSTRUCTlON INSPECTION FEES A. DEFINITIONS 1. Mainline Inspection Fee required to reimburse the District for the costs incurred in the field inspection of sewer installation projects by developers. The mainline inspection fee includes the cost of the initial TV inspection. 2. lateral Inspection Inspection fee required to cover District costs associated with inspecting the install ation of a private 1 atera1 or house connection into a mainline or a side sewer alteration (e.g. installation of restaurant grease interceptor, etc.). 3. Side Sewer Repair Inspection l 4. Fee required to compensate the District for the costs involved in inspecting a side sewer repai r. (If more than ten feet of 1 ateral is rep1 aced, a side sewer alteration permit is requi red.) Overtime Inspection Inspection fee required to cover the cost of providing a District inspector for a private sewer project at other than normal work hours (after 4:30 p.m., weekends, and District ho'lidays). Overtime inspection may be requested if a contractor is attempting to finish an installation by working late or is involved with an emergency repair. 5. Inspect Construction of New Structure (MH or RI) Inspection fee required to cover District costs associated with inspecting the installation of a new manhole (MH) or rodding inlet (RI) on an existing sewer line by a private contractor. 6. Inspection of Manhole Connection Inspection fee required to cover District costs associated with inspecting the installation of a private lateral into an existing manhole by a private contractor. Contractor work includes breaking into the wall of the manhole at the elevation of the manhole shelf. Pa9 '6 of 42 B. W\INL INE AND LATERAL INSPECTION The mainline and lateral inspection for subdivisions are discussed together because the time inspecting each is not recorded separately. A comparison of fees charged ys. actual cost is only valid when all fees are considered. 1. 1986-87 Fee The 1986-87 mainline inspection fee is as follows: TABLE 0-1 1986-87 Mainline Inspection Fees PROJ ECT LENGTH (FT) FEE $300 + $3.00/ft. $350 + $2.50/ft. $450 + $2.00/ft. $525 + $1.75/ft. $625 + $1.50/ft. $750 + $1.25/ft. $810 + $1.15/ft. 0-100 101-200 201-300 301-400 401-500 501-600 600- L. The above fee structure was first approved on September 1, 1985 and remained unchanged 1 ast year. The fee was not adjusted last year because a larger data base was needed to provide a valid comparison between fees collected and accrued cost. The basis of the fee structure is summarized as follows: a. The data included actual construction inspection time for 131 projects. b. Costs included Construction Inspector's direct salary and a 43 percent employee benefit overhead factor. c. Pickup truck rental rate of $6.20/hour. d. A $0.20/ft. charge was added to account for the Collection System Inspection Supervisor and an Engineering Assistant. e. The data base for television inspection costs included 63 projects. A best fit correlation of the time required to televise these projects was found to be: Hours = 2.43 + 0.0041 X project length (ft.) f. The average television inspection production was determined to be 1,100 ft./day. This assumes the lead line was not left in the pipe by the contractor. l Pa9 ' 7 of 42 g. Costs for television inspection included direct salary and a 43 percent employee benefit overhead rate for a supervisor (one hour/day) and a crew of three ($608/day). h. other television inspection costs included the capitalized and operation and maintenance expenses for the lV van ($174/day) and other equipment such as a pickup truck and water truck C$10S/day). The 1986-87 lateral, house connection, or side sewer alteration inspection fee is $48 each and is based on the following costs: a. Estimated 1.5 hours inspection time for each lateral, house connection, or alteration. b. Di rect 1 abor and a 43 percent employee benefit overhead factor. c. Pickup truck rental rate of S6.20/hour. 2. Discussion During 1 ast year's review of the 1986-87 fees, it was noted that only 11 mainline projects had been initiated and completed under the current rate structure. This did not provide a sufficient data base for a valid comparison between fees collected and accrued costs. It was recommended last year that the fees be adj usted in 1987-88 when more projects had been compl eted. In the future, it is believed that an appropriate review of mainline inspection fees would be every two years to allow sufficient data to be collected for a valid comparison of costs and fees collected. Table 0-2 shows 88 mainline projects which were completed prior to July 1, 1987, and where fees were collected under the current rate structure (starting September 1, 1985). The table shows the accrued cost per the criteria discussed previously and the total fees collected at the permit counter. The projects are disaggregated by the schedule of fees shown in Table 0-1. The mainline and lateral inspection fee/cost comparison for these projects is also shown graphically in Figure 0-1. Very good correlation is apparent for projects less than 600 feet with the District collecting 3.2 percent more in fees than costs accrued. However, for projects greater than 600 feet, the fees collected exceeded accrued cost by 72 percent. The formul a for mainline inspection fees developed in 1985 and imp1 emented on September 1, 1985, inc1 uded Di strict costs for mai nline inspection .!!l& 1 atera1 inspection. The reason for this was that it was not practical for inspectors to record their time separately for mainline and lateral inspections. It was recognized that overcharging may occur on some projects, especially those with a large number of laterals since a ..., .... <D G: .:.. t i ... i:i ... .....l! 1- ... ... ... ~a~ c_ ...- .... <:' ... ... 'f .... '- I i 5 ~ ... ... :5 I w ;i c .. '"' ... ~~ =! ... n=:;;;=cs:;;;:;;; II I I I , I I I' .... . ~ ~ ....CI 1l.!:.:::!:!Jt~ It . I I I , t I. N......NN..... .._____N II II II II II II II ...~ ~~ ~... ... ... en ... B;;: II encall ......" ~t;n .....~I :!s ... ... ... ...... .."";a:iai"';. :;:;:;llIl:lll=~ -.---. ~... ~~ :5 ~~~~~~ .. CD CD CD .. ED ......... ------ ... ... ... II ~I,....:.u. w. .I"';"';_.O:N aN _~::~:~:';:;~N~ ~tll------5M 2~ II ... ! II ... Bi ~... U~ill!:;::~:;;;: u.nstM.....:..o II .L'S!3~:o~ n------ II II ...!! ii ... - ~: c II n~!2:::;;;:~ !!s=~~~~ II NNNNt'fr.l . ------ ... - ;i -... 2 CD__N_~ ,.....-........" "';.ai.... !2::::~~n:;;::; ---..-- en ;! ~I!c ... :::!!:.:: .: ~~=~~~ n-_____ II ... II n II !: Si ~~ F.:.:.~: =";"';..0"';..0..0 ..------ .. ----. II II II H ~ .. .... ~ ~~ ;i:;: en lit * 111l_1!~.~ II ='l n~"';"';NN.nn.; UIn!:!~~~~U;! n------=;: II U r = II II ~... ~~ c - ..... M___"""_ ~ ... ... .... ... - ... .... ... ~!2I:I:::;; II u~ 8 ii~ ...~ ut; ~l6/c.;: ~n.I_.::i1D .lli.....l5~gt; ....= cc:.....~ IiiiUi!EI.13~l!il __=E=~:C~S2 ..lialiftlDa:::. =-a~!:8~!!~ ................. - II r. _ u .. II ... II ... : ... II " II '-' L '-' w ...., pag ;; ... :;;;=cscscs==~cs:;;;cscs:;;;=:;;;:;;;cscs:;;;cs= . I I I I I . I I I I I I . , I I I I I I ~~~&-~~&~~~&~~i~j~~&i . I t I ~ . I I I , I I I:f. I I I I I I I _MN~.~_...........m_.m~""'_M_.~ NNNNNNN_N___-N_NNN-N_ : N ... II'> ,..; ... ..~.=~.='l.='l~=~~.~~='l..~e~ . . . . . . . . . . . . . . . . . . . . . H . __~~M_M.~MM~.~~___~mM". ~~~.~~~~~~~~~~g~~~~~~=~ ---.-.--~---~-~--~~-~=~ - -. -- .u- II ........=..........:. =~~~~:~~=~~#~~~:~.~~~ ___N____.___._N__~~_M . -- --- --- ..~..='l.~.~~.='l~.='l~~..~ n~~~~N~Nn~~-N~~NNN_-~ ~~~::~~~~~~~~~~:Zm~::: --------------------- ~ N g; ,..; ... ~~~~~N=~.~~~~~:~S~~~~ . . . . . . . . . . . . . . . . . . . . . ~.-.~NnnN-~.-.~.-M--~ ~~~=~!2~~~~~g;~N~CS:;:;~g~~ -~----~-----~~----~-- - - -- - ... .... .n ~ ;; ~~~~~~~~~~~~~~~~~~~~~ ~;~~~~~E;~~~~~~~~~~~~ ---------------.----- ='l ~ N ... N~~_~=~~~~~~~~~~~~~~~=~ .~~N~~_~~~.~_~~~~.~m~ ~ ~~~~~~~~~~~~~~~~~:~~~ = -~----~-----~-------- - - - ; :!!: .;. l: ... ::~:!!:..:::!!:.~~=~~~~:I:~: __~_~N.~.~.~.~~~..~-. ~~~~~~~~::_=~~~=-~==~ - - -- ----- - I: ~ ... ... :!!:.=~s.:!!:=:..:!!:..~:!!::!!:.:::n~ ~~~~~~~~~~~~~~~~~~~~~5~ II .... a ... I ~~~_~#~;~N~~~~g~~~~~~n~ ~~~~~~~=~~=~~~=~~~~~~U- M__N_NmM_~M__~.M-~nMN"~ -~-------------------u. - a ... a n NN-~-__.~NNN~.~--~~-~ !====~~~~~~~~~~~~~~~; ;i .... ... ... m = en A ~ ~ ~ ... g = ~;: "'~A 8...... ~ =... I ~ 8 ...~~ -~~...8~~ =~~... ~ ...~-~ ~l!ii~l~en8~ci-2~...i~~z~~ ;:1 - en:5...;: c~~z~ ~""'....... -.~ =- ....5 ~Q _...c~_a~ m-i~2.!~2 ~=~~~S~~~~5 E.....5.~.....5...a -~m~a.5-...en... 5d...85wu~...d~...~...~Ez~~:5~ ~1I'>~....._~~-..-~!2.....~......- 5;!a~~;~~~;;~;;;;;~5; "-' B of 42 u = II . " ~ n n ... II . r. Il n ~ II I::; e ~ ... ..... ,-,' :.: ..... I 1iiG;:O~~cgcl I t I I . I I I~a.....~>~ ..a-:!~Jt~c!:: t I I . I . I __M.""'&t')_ N-NN_NM =cs:;;; I I , i~.I- I I I --... -.......... .......... !i"';"'-N-cD-~""; &:~g!=lQ~~~lIP: ...-... -..-..--- ------- ------- ....:..... ....m';'.._r>>_cDcD :::~~:~~:~ ---...- .. .....=:=:= ':=~~~:!~~~ai &1......._-___:;1 ----.:.:..:.:..::..: ------ ,., .... ~ .. cO ;; ~~;s:"!~~~~t:!=:&~ _..IMN_N....,~C ~:;;;~ ~~~~P:~=~ --,..;-- --~-.:NUM;;- - - .. --a . - ~ ~ - .... ... s:~~~N:;;;:~&1:;:; .,;NNmcDO:~,,:.....;,...; p:::;~~~~~~~~ .-...-....----- :!!:~~~~~g!~~:;:; .;.....;...,;,...;..:N,,:.N ~~I?~~~~~I!~ -- -- --..-- .. .... - - - :!!: ~=.I:.=.=~=' ~ O:...icD..o"":";"':...n-= ...: ::A=N:~:!::; II - - - -- - ,., .... N ... :~~~:!!:~:=:I: = ~~~;;~~tric=i~tii~ a ... B " :!!:&1::::;;;~~g!~g;J::: ....:...:=N,..;!I!~.nN !!=;!;.~;:;ii'iN~!; -- --.---..... .... - ... ... N-_""'''''M..o~_..o ~~~~a;~~~:!:: NNNNNt""NNNC"" ..... c ... ... i en w... ~,... .....s~ w;:c ... .:aClllGl:a :5D-~:: =8~i!;~w~8;:l!i a::~=l5a~;Ic::t1D z:lal~....IB...~-l5= 5e.~=l!:!lE:::~llid D.....zzm-la::wc-' ~~~~;;~~!Si~ ................. ,....i ::: ci . .; ~ ;; . cD ... .. ;; " U I: :: ..0 01 ... 01 .... II ,;: U ... " e ~ : ....; u ~ II ,...; a ... ;; ..... - :t ... .;.- - ;; n ~ U N I: ~ " " ~ 01 ... " II = ii ... Q !i en .... * e .... ( .... I! ... i3 ... ....B I ...- ... ...~ s'" c. -- ... ... , ;; l ... . Ii en i ~ ~ ~ i !It ~ C E .... ~... ill! ... ;S il ... "" II ............. ~Lt... en L&.. II Ban II II II II II II II II II II II m~ .....~ :!!e 12'" II ..... II :l! ... II l!;!'" I' ~... ... ... ... !Ii .::: i~ ! ... Bi ~... CO< '" :z: - - I!= ... - - :> -- e !It ~ii c'" E '" ;~ l!!:~ ... l! 6i ~t: !5 r:; II ... II oM II ~ft'n ~I!!II '&:II il'll" II " II II " II " II II II II " " II " II II II II ..... ... :l!!i!! ~~ e_ ..... ~ ....~ ... - ... .... ... II iI;;gil~iliI~aU; II · I · I I . I I I n!i.l.!-.I.f.!.I.! II . , . I I I I . I =:ace=iI~NIt;_:iii l!3l!3I!:!Il!ll!?l!?~lQll!l mN....:N...;....:,;.~..: ......._...on....__ ~~~~~~~~~ --------- ~~~~~~~~~ NCD.,.,..._.oCD_ O-N..oIlllr...m,..,"'CD _iI'__ .,..,....... ---- -- .. lQlQl!:!~l!?I!:!~lQ~ ~:~~!Ci::;?~r:: ::~~~~~~::~ --------- ~~'!~~~:;~~ ::l -M...CD-M'tt')!R- ..; S;J!it=~~=N:: I!! -:-":":':--":N' ~ .. --- -.U. II ~;::~~~~~;z~ ~~"':o:~~:::=;i ....,......,.~....,t-')...,...,_.... ----...-....-. ~~~=in=~!2~ ......;,..: cD"": ui I."; _NI"'N,..,-ctm G:I 1"'01,..,..0............-... _ -------- .. _ .... - ... ~s..::.~:t! ,..;O:'....:..NcD....;a:i. N__N.-Oo-U'1... N______-... .. --- -- .~:::t!.::t!:: ....;....;NM....;...;0: ............................................ II " II II " II ~!::::;:::!.~~~~If~ N.:ai_N....o....;,;.Uai ~:!!:~~I;n;;;MIn::l II:!!: ----- -- -u.,;" _n_ I! II " ..=~,..,-~......-~ ~~:ri!:!2~&1:;J~ ,..,,..,,..,,..,,..,...,,...,,..,,.., II " II II II II " II II n I II " II .... II tl II l!!: II en II ... li.... ........ ~....2i... el!5'" 8"":!i... s:!... i.....~""~ "''''':! ........!2Wl!!iW~t::"" ::lelalco<ee:>i!l! _~. ~en"''''en ~ - j!Sw....... a.~ "".111 _ "!!!.o_""'''_N:-=N ===-li;i;~!e;; ~ ,"'; .... - ~ ... II II .... II ... n . II .... " on II M II ... II II U ~ n . l ... .... ,.: ... l!!Il ,..; I:; II ... II II II :t! U oN II ~ II ... if II ... . ~ , iliI~ , , , . ,.. .. ':::8:2 , , , .......- ....-- Il!l ..; == !i - ~Il!l:ll: .."";N ~~~ --- ...... ... . em CD ... - ... ... ..,,; - -- ...-.... ...- ~~~ NNN ........... .... ... ... --- - -- I!I!!:: 1'" .. ..: ....- ..~ -:. ....-- ......- lQ~~ ....:....;....; - ... ... --- -...- ~1Q~ ,...;,..:,...: ......- In on ... -- - .... ... ~~~II:t! -__n. r;==:I~ ...... _ fI'" il II II ... II. .,;,..;,..;11 CDo-D-n~ Ii - 1I ~~l;:!lIliiii "':NNn...; G:I!II~IIC= ':--UN'" ... II ... II II II II - ... on on on on .........., ... ... - ..... e - e:> .... !l en i ~I Z~... en CI: =- '" =- ... e __e :> - t;!~ ~~E ... ... ..., :~~ --... II II :II: II 0: II :::t II ..;- II ... II II II II . II oN II ~ II ... if II II II Il!l 1I ,..: I' I! ... - , II _ II ... Pa .9 of 42 ~ ~ ~iliI~ I I I I ~C:_I: ...""" C ... ... ... I I I I r- ..0..0 _ 1'1-__ l!?1l!ll!?l!3 ';'.':'00 _._V1 '"":. QQ.. ....... -:. ___N .......... .. .... ..oNcDN ...., ,.., QQ .... ...,_N..o --.- 1!:!~1!!l!3 llJ MN"";..o ..; ~-NCD _ ..:~~~ ~ ---.9.. liil ~ .,;- ... ~~It~ .nE-o:..; ... on CD .... ...... ..:- ... ...- on In ..; lIS II ~~g:::II~ ,,;.;....;..uo: ~~~~n~ .......... " I! ; II ... - em .... ... ... ... ...--- ,..,.- - .cDwi..o ... ...., 0- D'- ....... N m -- ..- ;; ~.:!!:l!: ";Nan. !::l4fllS!:: - ...... II ~~~I! I'. _..0,......... ....; !!!:!!= ~ ... ...--- _ 0- _... N_NcD ~~~:; .. --.. ,....,~N~ ,...._0-0-. -...,,...,= U"J an V') U"1 -' e - e:> .... i! ... !a!tl E~ .... ....w ..... gt::l~~ ""esU;!i :lilitle:> B-~:: ~~LJIo.. .,.,,....,~...,, N..a CD- ---- ......... IIIIr II II It II ..; !IllS 11.,;- II ... II II II " - II _ n . II ~ U..; II ... II II U ~ II ,..: II ~ II ... iI II i') ..; - .... ~ li .1 II ... ... .. - , ... "": ... . lQ ..; ... ... ,.: - II 1I1!:! II II II ~ II .,; II ~ II . em .... ... - - II ~ ~ .... ... .0 - I!:! oN M .,; - - n ~ u ..; II Ii:: 1I .0 on - ~ ,..: ... .... ~ - lIS 0: CD on .,; ... - llIJ oN ;5l ,.: ... . ~ ... N ... II ~ U IN II :G II .,; II .... II _ II I! -' e - e !! en a - S c: .. .... .... '" '" ~ z - e:> .... ... !.f .... I l i ~ ... IS .... i3 o.. Nil 1_ .... ... .... ... ... I!!! ...- ..... a ... ~ ... :I W it i II ... II I!:! &oJ :1 at 1\ &: II " II ... &oJ II tllll II II II ~ffi II II ... o.. II en o.. .. 8::: .. II II e3c:l II II ~~ II II ~~ " II II ...is II ... .... II ... II .. a! II ... &oJ I!:!'" co.. ..... ... ~ lI!. -... .....- -- i~1I ! II .. ... H Bill ~""1I ... en :z: ... - m. ....- - e... C w - ... ~B C ., en ~~ .. !!f~ II ... A- U ... - ... B -... ~1!5 ~~ ... ... ... .. :0_" lil!! I&: W III I'" I!:!~ c~ ..... ~ ...Ie ...- ... A- o.. I ... tl ... e: .. CD I ... " ..- ~ CD II I .... II ... - - .. Pa~- ?O of 42 ~"~'~~~'~"~~"~"~~T~'~~~~"'~'~~ 1~.C~~C~~.U~~~~.~~_~~~.~.CCiC~~=~~~ -~a~~~~~~~&~.~~a~M~.......~~~~~_~&~_~.~ ~~~~~~~~~~~~.~~~~~.~~~~~~~~~~.~~..~ -NN--~--_N______~_~_N_______N_N__~N ~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~ . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . '. . . . . ~=~~n_.-_n_~~~-~Nn.~_..NM__~n~M_~.n ~~~~.~-~~~~~~=~~~:~~~~~~~=~~=~M~N~: ~NN~~NN~_NNM~~._M~~M.~~~m~_~m~_N_~~ ------------------___________-__MNN ... ------ ...=..........:....=.............:: Nm__._.._~.NN~...__m_._c..._NNN_.N. ~~=-:=~~~~=;~n~~~~~~~~z~=:~:~g=~_~N .......... ............... -... .... ... ... .. - ..- .. .. ... .. .. ... .. .. .. .. .. .. ... .. .. -- M N____ _N~~MN~MN_NM._~ -. ... ----- --------------- -- ~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~ ~ M-~~~-.._~_~.~~__~~~_~_.._.~M.__~~~ _ ~~~~~~~~~N~~~~~~g.~~~g=~~=~:~~~~~~~ ~ ~~~~~~~~~~~~~~~~~~~~~~~~.._~~~~~~~~~U~ ------------------------::------;;;U. II ;; " ~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~1I~ .-~~~-N-MM-~n~MN-..~M--.~nMMN~NN.~~=_ =;~~~~~~~;~.~~~~.~~.~~~~~~~~~~~~~~~Il~ N~~~~-NN~NNN~NNNNNM~"N~.N~~~n~~~.~~U_ -------------------------.-...----;=;U~ " - . ~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~H~ ~~-NM-.n-~.__.N~._.-~-~-~.-~MM-.M-MU~ ~~~~~~~~~~~.~~~~#~=~N~~~~~~~~~~~~~~lI~ ----...------------~~~~~~~~~~~~NN~~~~"~ ------------------U~ II ~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~ir~ .~~~.~~~N~~~~~-~e~~~~~-~=~~~~~.MM~~n~ ~CD-~~.......~N...CD_.~....N....N.~-N...~.N~:~~...NII... N-~--~~~-~~~~~~~~~N~N~NM~~~~~M~~~;~". -... --- ---------------___________u. - ~~~..~~.~~~~==~~~...~~~~~~=.~.~.~=~ ~NN-~-~~_NM~_~~~._~~..M~~E~~~=~-N~~ =~~=~~~~~~~~N~~~~N:~~~~.~~~~S~~~~~~ -------- ---------------------~-~~~ - - -- ~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~ N-~-~.~~~~-.~~~.N~MMM~m..~M~.~~-m-~ ~~=~~~~N~~~~~~~R~=~:~~~~~~~._~~~~~~ -__NNM =.~~~~~~~~:~~~s~~~~.~g..s~~~~:;~~~~n~ ...................................u. ~~--~~~~~-.-~~N~~~.I.N~~.--N--N-N.m'l~ ~.~.~~~~~~~~~~~~W~~ ~~~S~.~~S~~~~~~n~ ~----~~~---~-~~~~-~~~-~~-~--~N~~~~~U~ - --- - ---- --- -- - -------U~ .. II n--~-N-CD~~...CD~~-CD......~~....CD~-~N-=--...-N-N - - - __NN N. = ~= ~_.~~~~ :~~~~g=~~~~~~~~~:~~~~~~~~~s~=~~~;~~ ..~~~~~==~~~~~~~~~~~~~~~~~~:S~~~a~~ Q ~ w ! I ~ ~... wll! ~ d :o_~~ ~&oJE =CQ ~ 5... "'~Q ~~w~~ .~~ aZi.......d......~~g~_ ....~ B~8 i-...~...~ ...9....~_enen 8g~~~~...2~~~ ~B...ai;~8~~~.~wi.i8~~i~~~~;;;:~i~!;z ~i~en...z .;...*~-~~..........~.i...B-~~~~:I~I~...3~~ ...~...~9...~IIl~.~.~...~g~W~-~:o-~-E~~Z=...IS~_;<< !~il!~.;~;@;!~~SII!&!!!SI~81;!~!~.i N~__-~_._.-~~~_-n~N...-MN~".-..C_-~ ;;;i;~;;;~;e5!!;S;;e;S5;;~;;i;5;;;; ... - N ... o ... 1'0 ,..; ~ . II II - .. - II .. . ... ~ m ;:;; - : ..; 1'0 CD ,.; ~ - . ,..: ... I: ... II N .. - .. " ~ II n ti ~ II i . - II - II ... II ..; .. II ~ " r. ..r II ... II - U ~ . r. ..; II ... " ... II ,.; II ~ .. ... II II ~ II .. r. 1'0 - II ,.; II II .... II - II - " II - " ..; II U ~ II ..; II .... U - II ~ II .. N H . 1'0 II ..r II n CD II - II lG cD 1'0 1'0 .- <l3 - - - ..; ~ ,.: ~ - ~ cD ~ . !!f - - - .. ... ... ,.; 1'0 - ..- en - l!!l = ... . ..... .... co co: .. .r:: a! ..- ... ... ... :: ... .. AI ... ~ a! ... ... ... &D 9"'" Z 0 (f) ~ 9"'" - !k:: <! a... ~ N 9"'" 0 U ." CD - u I- CD (f) 0 0 - () . 9"'" 0 . f) .... CD U 0 . CD 0 ,...., . ... " fto.. &D "tJ-- CD-O W C o .... ~ 0 IIOftO W .c ::J.. .. La... '- ,g.+ .! .... """-'..... l_- 0 Z f ,......- 0 0) I "'0 .t! &D UQJ ::l - LLJ e: l- v e::: .~ . - ::> .j-J U e <.!:Ie: .....0 W D- ~u ........ a... ~ (f) Z .. ft 0 W 0 "tJ Z N . - ~ -1 v v Z < - <! 0 0 ~ N 0 JIO &D ~ N 0 110 &D ~ N 0 110 &D ~ N 0 If') 11) N N N N N 9"'" 9"'" 9"'" 9"'" 9"'" Par- ~2 of 42 (.pUD8n04l.) ...DlloO Pa9' ~3 of 42 separate lateral fee was retained. It was suggested that once a sufficient data base was developed, a maximtlll per project lateral charge may be supported. The data in Table 0-2 shows that the Mainl ine Inspection Fee tracks very closely with the accrued cost. For all projects. the accrued cost was 1.6 percent less than the fees collected for mainline inspection only. This would support not charging a separate lateral fee for mainline projects. The effect of thi s action woul d be substantial in many cases. For exampl e. for project 4163 (see Table 0-2, page 3) the fees collected for 110 lateral inspections was $5,280. while the fees collected for mainline inspection was $5.144.35, for a total fees collected of $10,424.35. The accrued cost to the District was $3,323.21. If the lateral fee of $5.210 was not charged, the fees collected would more closely approximate District costs. As mentioned before. one of the components of the mainline inspection cost is TV inspection. The TV inspection costs were estimated in 1985 by determining the average length of pipe which could be televised in one day and the associated cost of labor and equipment. Costs were determined to be $99/hour with the number of hours determined from the formul a shown in the 1986-87 fees presented previously. Several factors have led to an increase in productivity since these costs were developed. l a. District specifications now require a lead line to be left in the pipe by the contractor so that the TV camera can be attached. This eliminates the need for the TV inspection crew to float the lead line down the sewer. b. A water truck and third crew member are no longer needed because the lead line is left in place by the contractor. c. A new television truck has been purchased which has the ability to pull the camera greater distances, thus requiring fewer setups. Seventeen projects were selected to determine the productivity under the new procedures discussed above. Figure 0-2 shows that the best fit corre1 ation is represented by the foll owing formula: Hours = 2.44 + 0.0021 x project length (ft). The figure shows that 2,000 feet of pipe can be televised in 6.5 hours (including travel time). The remaining 1.5 hours in the day is used for equipment maintenance and training. This formul a only inc1 udes travel time to the project site for projects which can be completed within one day or less. A factor (based on one-hour travel time per day) to adjust for travel time for projects over 2,000 feet would be 0.0005 x project length Cft). Therefore, the formula Hours = 2.44 + 0.0026 x project length (ft.) would include the additional time required to make multiple trips to the same project site. o Par. 2,4 of 42 ..... N ~ 0 0 ~ . ..... "0 !. z u 0 . N 0- i= ,....rJ I 0 rJoE ::) "0 U C c- O ~OO- a:: . rJ- a.. .....:ta.. W 0.... Z .1:0 e::: 0 C.s: ( i= - :::> 0 Q I.IJ C '" a.. ~ en - z lL. GO ~ . 0 ..... . 0 0 0 0 [J 0 0 O"l GO ,.... ~ II) ..... Jot) ~ ..... 0 ..... (JeM).I.l 8ulpnJ:)uJ) ..InoH JDJO.l Pag -25 of 42 A 61-percent increased productivity has been realized with the new procedures and equipment (2,000 feet vs. 1,240 feet, inspected in an eight-hour day). This increased productivity has been accomplished with one less crew member and one less vehicle. New labor and equipment costs are as follows: Crew Leader - $18.64/hr. x 1.43 x 8 hrs. = $213.24 Crew Member - $16.14 x 1.43 x 8 hrs. = 184.64 Supervisor - $21.09/hr. x 1.43 x 1 hr. = 30.16 Total Labor Cost $428.04/day Equipment capital recovery and operation and maintenance costs are estimated to be as follows: $ 6,400 4,500 4,000 3 ,800 2,900 $21,600 per year *$45,000 capital cost with 10-year recovery at 7 percent interest TV Van* Operating Consumables Cabl e Light bulbs and headers (- Estimated TV van use is 4.5 days per week or 234 days per year. Therefore, the daily rate is $21,600/234 = $92.31 per day. The only other equipment used is a pickup truck which is estimated to cost $6.50 per hour. The supervisor's time is one hour per day. The total daily labor and equipment cost is as follows: labor 1V Van Pickup Truck $428.04 92.31 6.50 $526.85 or $530 per day The $530 per day cost compares with the 1985-86 cost of $790 per day or 33 percent less. The labor cost is less because of the two-man vs. three-man crew and the TV van cost is 1 ess because of the higher maintenance cost associated with the older TV van. Page of 42 3. Recommendation Review Schedule a. It is recommended that a review of the mainline inspection fee be conducted every two years in order to allow enough time to collect a sufficient data base for a valid cost vs. fee comparison. b. Lateral Inspection Fee The fee schedule shown in Table C-3 is adequate to recover lateral inspection costs associated with mainline projects. For mainline projects, sufficient fees are collected in the Mainline Inspection Fee alone to recover District costs. Therefore, it is recommended that a separate Lateral Inspection Fee not be charged for mainline projects. The lateral fee would still be charged for other 1 atera1 inspecti ons where contractors have not paid a mainline fee. An adjustment of the Lateral Inspection Fee to $52 is recommended and includes salary increases since the fee was first established in 1985. c. Mainline Inspection Fee The reduced TV costs from $lOO/hour to $67/hour and the increased productivity from 1,240 feet/day to 2,000 feet/day transl ates into a 54-percent reduction in television inspection costs. A comparison of TV costs vs. total mainline inspection costs for the 88 projects listed in Table C-12 shows that television inspection is 36 percent of the total mainline inspection cost. A 54-percent reduction in TV costs woul d mean a 19-percent reduction in mainl ine inspection costs. Therefore, the mainline inspection fee is recommended to be reduced by 19 percent to reflect lower television inspection costs. The mainline inspection fee with a reduction of 19 percent is shown in Table C-3. TABLE C-3 MAINLINE INSPECTION FEE SCHEDULE PROJ ECT LENGTH (FT.) 0-100 101-200 201-300 301-400 401-500 501-600 601- 1986-87 FEE $300 + $3.00/ft. $350 + $2.50 $450 + $2.00 $525 + $1.75 $625 + $1.50 $750 + $1.25 $810 + $1. 15 1987-88 FEE $245 + $2.40/ft. $285 + $2.00 $365 + $1.60 $425 + $1.40 $505 + $1 .20 $605 + $1.00 $665 + $0.90 Pa~~ ?7 of 42 C. SIDE SEWER REPAIR INSPECTION The 1986-87 fee is $10. recommended. A fee adjustment for 1987-88 is not O. OVERTIME INSPECTION 1. 1986-87 Fees Overtime Inspection S41/hour Weekends & Holidays (4 hour mi nimum) S164 Overtime Inspection Credit (See Table 4, below) TABLE C-4 OVERTIME CREDIT T ota 1 Proj ect Overtime Hours Overtime Credit Hours l < 4 - 4 < < 8 - 8 < ~ 16 16 < ~ 32 32 < Discussion 1 2 4 6 8 2. The overtime inspection credit policy was established in September 1985 as a response to contractors who stated they were being billed twice when overtime was charged. The credit policy has worked well over the 1 ast two years. The only factor affecting the 1987-88 rates would be the 3 percent wage rate increase. 3. Recommendations To reflect additional labor costs, the following fees are recomended: Overtime Inspection S42/hr Weekends & Holidays (4 hour minimum) $168 Page ':)" of 42 REVISED 10/27/87 E. INSPECT CONSTRUCTION OF NEW STRUCTURE CMH OR RI> The 1986-87 fee for new structure inspection is S100. Table C-5 shows three new manhole structure projects which have "been finaled. The average inspection cost of these projects is $360. Last year the average inspection cost was $494. Although costs for the limited data show a decrease from last year, it is apparent the District is not recovering all the costs for these projects. It is recommended that the fee be increased to S150 and continue monitoring cost to broaden the data base. F. INSPECTION OF MANHOLE CONNECTION The 1986-87 19tt7w88"fee is $48. It is recommended that this fee be increased to $52 to reflect salary increases since the fee was f1r~stab1ished 1 n 1985. b.e.c a IIC;~ -it. -1.s. -s:fJn..U...ar... ~ ..a. -1.a.ter..a.l.. -1.nspe.c:t:lon. PaC1" 29 of 42 co ... I"- I"- ID CD ID ii ID - .... ....-- li'l ... ... ... ... tl a.. - .. ... II! Ii lit it i en a:: : e~ ..om aD ~ l. a!fl:l ~~: - ....~ eB :z c en en :lit Q: 8 ...-... .... <C .... lit -....- CD i: t:l -.... ...;r.;. 0: c ~B ~NI"- I"- G- ....- ~ L,) en .... ~ II en c - u .... .... co:: It') LU I LU Q:: U L4. C I!!l-- I!!l 1.1.1 z: ! II -- ..... 8 S..;...: ..... m .... .... ~ CI: .... .... u ~ .... 1.1.1 G- el) .... :!; g I LU co:: ... I .... .... :lit en i.. I I"- _ I"- .... .... I .......- ~ ! ~ I ~~:: ~~ I I"- Z CD <C I ....- - CD .. .. I z: 1I I ;i ! ... I !a ....-- fa .. - .... co .. . w c - ... - ....1. .... ~...~ tl -c a!c I!! IU"" ... zl! ....c .... "" z ~!ia! - . CD ~....- . L ;:; II. N_ t .... .... ... .. .. .. ~ ... - I .. ... .. ~ ... Pa('l" 30 of 42 PART III COLLECTION SYSTEM FEES A. DEFINITIONS 1. TV Inspection The District's Coll ection System Operations CCSO) Department conducts a TV inspection of all new sewer 1 ines in order to verify the interior condition of the pipe prior to final acceptance by the District. The cost of the initial TV inspection is included in the mainline inspection fee. However, TV inspection fees not included in the mainline inspection fee are as follows: a. TV Inspection Overtime - Fee requi red to canpensate the District for the costs of televising any new sewer main installation during non-normal work hours Cafter 4:30 p.m. or weekends). b. TV Inspection Rerun - Fee required to compensate the District for the costs of re-televising a portion of a private sewer main project to confirm that necessary corrective work was performed by a private contractor. The corrective work is required if excessive pipe joint gaps, failed pipe sections, or pipe profile problems were identified during the initial TV inspection of a new sewer main. l c. Overtime Credit - When a contractor pays the mai nl ine inspection fee, he is actually paying for a certain number of hours of TV inspection. The contractor can el ect to have this inspection occur on overtime hours. For this overtime work, the full overtime fee is pai d but a credit given for that portion of the TV inspection cost included in the mainline inspection. 2. Sewer Tap A new lateral connection to an existing main requires a sewer tap if an existing wye connection does not exist. The District requires that the contractor perform the excavation work; however, the actual sewer tap involving the cutting of a hole into the existing pipe and installation of a saddle connection must be performed by District personnel. 3. Dye Test A dye test is used to confi rm a property is connected to the pub' ic sewer or served by a private septic tank system. CSO personnel add dye tabl ets to interior pl umbing fixtures and observe evidence of the dye color in the downstream public sewer mai n. Page of 42 REVISED 10/27/87 4. Non-cancellation This fee is charged if 'the contractor does not give 24-hour notice cancelling a TV inspection or sewer tap work request. B. TELEVISION INSPECTION 1. 1986-87 Fees The 1986-87 television inspection fees are as follows: a. Initial TV - Overtime $1,044/day $1l6/hr. $464 - Weekends & Holidays (4-hr. min.) - Overtime Credit SO.41/L.F. b. 1V Rerun - Regu1 ar (2.S hour minimum) Weekends & Holidays (4-hr. min.) S170 + $99/hr. $418 $170 + $1l6/hr. $634 - Overtime 2. Discussion a. T.V. Overtime Television inspection costs were discussed in Part II of this attachment where the basis for a $67/hr. charge was presented. The labor portion of the $67/hr. charge is $S3 .SO/hr., whfl e the remaining $13.S0/hr. ref1 ects equipment costs. The new overtime rate wou1 d be $53.50/hr. x 1.5 = $80.50/hr. plus $13.50/hr. =-Si4~~~Pr $94.00/hr. b. Overtime Credit Also discussed in Part II of this attachment was the formula for 1V inspection productivity (Hrs. = 2.44 + 0.0026 x project length (ft.)). The new overtime credit rate is determined by the base production rate of 0.0026 hrs./ft. Therefore, the new credit rate is as fo11ows~ Overtime Credit = 0.0026 hrs./ft. x S67/hr. = SO.17/ft. l Pa~l'" 32 of 42 c. T.V. Rerun The TV rerun cost incurred is determined as follows: Additional CSO Crew Time 0.5 hrs. x $67/hr. · $ 33.50 Video Tape Review 2 hrs. x $32.23/hr. · $ 64.46 Supervision and Rescheduling 2 hrs. x $30.79/hr. ~ $ 61.58 $159.54 Use $160.00 CSO crew time, video tape review, supervision, and reschedul ing costs refl ect current production and wage rates. d. Multiple T.V. Inspections A new TV inspection fee is proposed to recover the cost of inspecting a mainline when the contractor chooses to split the project into smaller segments. When the contractor pays the mainline inspection fee, he pays for the cost of televising the entire project in one day if it is less than 2,000 ft. or in subsequent days if it is more than 2,000 ft. Several contractors have been requesting a TV inspection of a portion of a project as it is campl eted. For exampl e, a 2,800-foot project which cou1 d ordinarily be televised in 9.7 hours (one full day and a portion of another) may be split by the contractor into four different segments, each 700 ft. in length. The TV portion of the mainline inspection fee, which the contractor paid is as follows: (2.44 hrs. + 0.0026 hrs./ft. x 2,800 ft.) <$67/hr.) = $651 However, because the contractor split the project into four segments requiring CSO to make four trips to the site on separate days, the actual cost is as follows: (4) (2.44 hrs. + 0.0026 hrs./ft. x 700 ft.) ($67/hr.) = $1,142 Therefore, an additional fee of $1,142-$651=$491 should be charged to recover costs. This fee or surcharge would be assessed at the completion of the mainline project. CSO wou1 d not incl ude in the surcharge any project segmenti ng which was caused by their actions or del aYe For examp1 e, if CSO arrived at the proj ect site di scussed above, where 700 ft. was available for inspection but because of equipment malfunction they could only televise 400 ft. before the end of the day and had to return the next day to complete the last 300 feet of the segment, there would still be four 700-ft. segments included in the surcharge calculation. 3. Recommendat-, Page .,... of 42 REVISED 10/27/87 a. Reduce the 1V overtime and 1V rerun fees to ref1 ect CSO's increased efficiency to the following rates: Initial 1V Overtime ~~~~ $752/day -$84{~- $941 hr. Weekends & Holidays (4-hr. min.) ~ $376 Overtime Credit $O.17/ft. 1V Rerun Regu1 ar (2.5-hour mi n. ) $160 + $67/hr. Overtime -$-l6O-.....-$94I-hfo...- $160 + $941 hr. Weekends & Holidays (4-hr. min.) -$496- $536 - b. Assess a surcharge for projects segmented by the contractor. The amount of the surcharge would be determined by CSO at the completion of the project and wou1 d be based on the actual cost of inspecting each segment of the project. A credit would be given the contractor for T.V. inspection fees already paid. C. SEWER TAP The 1986-87 fee for a sewer tap is $171. This fee includes two hours' labor for a two-member crew, the expense for truck operation, a pipe saddle, and tap machine depreciation. A three percent increase in 1 abor and expenses is requi red. Therefore, the new fee wou1 d be $176. D. DYE TEST The 1986-87 fee for dye testing is $56. This fee includes one-hour labor for a two-member crew and the expense for truck operation and dye. It is recommended that the 1987-88 fee be increased to $58 to reflect a 3% increase in wage rates and expenses. E. NON-CANCELLATION These fees are based on lost crew time when a contractor schedu1 es work with CSO and a crew arrives at the project site and finds that it is inaccessible or otherwise not ready. The 1986-87 non-cancellation fees for 1V inspection and sewer tap should be adjusted to reflect the 1987-88 costs as follows: 1V Inspection - Initial and Rerun (2 hrs. charged) $144 Sewer Tap (1 hr. charged) $ 56 Par~4 of 42 F. LATERAL PLUG Before a building connected to the District's sewer system is removed or modified in a manner which requires a physical disconnection of the building from the sewer, District specifications require that the owner of the building obtain an abandonment permit from the Di strict at no cost to the owner. The purpose of this physical disconnection is to reduce infiltration and inflow from private laterals. In the past, the work required was done by the owner's demolition contractor. Since a demolition contractor is not necessarily familiar with sewer construction and is often not equipped to properly plug a lateral, it is proposed that CSO personnel be required to provide all equipment and labor necessary to complete the job. This includes obtaining an encroachment permit from the City if needed, excavating to the lateral and mainline, plugging the lateral at the main line, backfilling, and repairing the surface. It is estimated that a typical job will take a crew of three about eight hours to complete the work. The following is an estimate of the cost. Equipment Paving Labor $ 420.00 270.00 640.00 Total $1,330.00 Use $1,300 ( It is recommended that a 1 ateral pl ug permit fee of $1,300 be established to recover the District's cost to abandon the lateral. Page' of 42 PART IV RIGHT-Of-WAY fEES A. DEFINITIONS 1. Segregation of Local Improvements District (LID) Bond Assessments As properties which have LID bonds assessed are divided, the outstanding LID bond is segregated (apportioned) to the newly created parcel s. The fee charged recovers the time spent researching and establishing the apportionment. 2. Processing of Quitclaim Deeds This fee recovers the cost of preparing a legal description and Right-of-Way map for public sewer easements no longer required by the District. 3. Processing Real Property Agreements This fee recovers the cost of investigating and processing agreements with a property owner who wants to encroach into a District easement with any use which is not permitted by the District's Standard Specifications. B. 1986-87 FEES The 1986-87 Right-of-Way fees are as follows: Segregation of LID Assessment $32/Parcel Processing Quitclaim Deeds (3-hr. min.) $28/hr. ( $84 ) Processing Real Property Agreements Surveying as Requi red c. DISClJSSION The only change for the 1986-87 fees for Segregation of LID Assessments and Processing of Quitclaim Deeds is the 3 percent wage rate increase. In past years, the Processing Real Property Agreement Fee was estimated for each project, primarily from the cost of surveying. However, this year interviews with the Construction Division and CSO staff have provided enough information to develop a standard charge. Pa9' ~6 of 42 The following is recommended to be the fee for this activity: Real Property Specialist $84 (3-hr. min.) Survey of Easement $412 (4-hr. min.' Site Review, Ferreting, and Televising Existing Sewers $288 (4 hours) Total Fee $784 Use $800 D. RECOt+1ENDATIONS The following fees are recommended to recover the costs expected in 1987-88: Segregation of LID Assessment $33/Parcel Processing Quitclaim Deeds (3-hr. min.) $29/hr. ($87 mi n. ) Processing Real Property Agreements $800 ~ Par 37 of 42 PART V MISCELLANEOUS FEES A. DEFINITIONS Incl uded in this part are services provided to engineers, contractors, or other private and public agencies who request engineering, so11 eval uation, or surveying. Actual District staff cost, incl uding employee benefits and administrative overhead, is charged to these projects. B. 1986-1987 FEES The 1986-87 miscellaneous fees are as follows: Soil Evaluation for Private Sewer Projects Surveying Estimate Requi red Actual Cost $lOO/hour Engineering for Private Sewer Projects c. DISaJSSION l The only factor affecting these fees is the 3 percent wage rate increase. Onl y surveying costs woul d be affected by the published rate. D. RECOt41ENDATIONS The following fees are recommended to recover the costs expected in 1986-87. Engineering for Private Sewer Projects Estimate Requi red Soil Evaluation for Private Sewer Projects Actual Cost Surveying Sl03/hour ( Par 18 of 42 PART V I INDUSTRIAL PERMIT FEE A. DEFINITIONS 1. Industrial Permit Fee This fee recovers a portion of the cost associated with the administration of the Industrial Pretreatment Program by billing each of the District's permitted industries. Each bill is based on the following components: source control force account for each industry, 1 aboratory costs for unannounced sampling by the District, and pretreatment program administration. 2. New Industry Permit Fee This fee recovers the cost to the District when an industry requests connection. District costs are associated with a review of the proposed industrial discharge and developing an industrial permit. B. DISQJSSION 1. Industrial Permit Fee ( 1986-87 industrial permit fees which were billed to each industry are as follows: TABLE C-7 PERMIT FEES FOR DISTRICT INDUSTRIES 1986-87 Permit Fee Recommended 1987-88 Permit Fee Beckman Chevron Park Del Monte Dow Chemical Etch-Tek PG&E Siemens Tracor/MBA Varian Naval Weapons Station $1,270 1,398 1,266 1,314 2,049 1,220 1,108 1,251 1,151 1,450 $1,503 2,314 1,252 1,289 2,419 1,790 1,241 1,633 1,288 1,212 In 1985, the District amended its existing contract with the City of Concord: the amendment sti pul ated that the Di stri ct would take over Concord's Industrial Pretreatment Program. Details for assuming Concord's pretreatment program were to be agreed upon at a later date. Earlier this year, the District and the City of Concord developed and approved a fourth pa9{ -=l9 of 42 amendment to the existing agreement and a memorandum of understanding which defines the District's authority and enforcement powers as it pertains to the pretreatment program. Consequently, beginning this year, the District will charge permitted industries within the City of Concord in a similar manner as the District's industries. Tab1 e C-8 shows the 1987-88 Industri a1 Permit Fees which will be billed to each of the industries transferred from the Concord pretreatment program. These fees are based on the actual cost for similar industries within the District and assumes full-year participation in the District's program. A prorated amount would be billed for partial-year participation. TABLE C-8 PERMIT FEES FOR INDUSTRIES TRANSFERRED FROM CONCORD Recommended 1987-88 Permit Fee Analog Annabelle ADL Ci rcuits Systron Donner $1,401 1,401 2,367 1,401 ( 2: New Industry Permit Fee .. , Starting in 1986, the District initiated a fee "mechanism to recover costs associated with the review of potential new industri a1 users. The new Industry Permit Fee is assessed to new industries at the beginning of the review process once an Industrial Wastewater Discharge Questionnaire is completed and returned by the industry. The fee is based on actual costs incurred by the District prior to connection or prior to an Industrial Discharge Permit being issued with a $500 minimum fee. Two industries were billed new industry permit fees in 1986-87. They are GSF Energy and Internati ona1 Technology (1. T.) Corp. Staff has developed the di scharge requi rements for GSF Energy and forwarded a permit contract for them to execute. GSF is in the process of finalizing their pretreatment facility design and connection to the District is expected this year. The I.T. application is still under review, with the major work effort involving review of their pilot plant testing and the draft Environmental Impact Report to be received later this year. 3. Special DischarQe Permit Fee This is a new fee which is proposed to be implemented. A special discharge can be from any source not normally connected to the District's sewer system. These discharges would normally be infrequent and the permit either issued for a Pag' 4{) of 42 one-time discharge or for a specified period, usually not exceeding one year. If the nature of the source results in a continued discharge beyond a year or if the discharge may contai n a significant quantity of poll utants, an industrial permit would be required, as described previously. A permit for a special discharge woul d be issued before the owner is allowed to discharge the wastewater into the sewer or it is trucked to the trea'bnent pl ant. Source Control staff effort depends on the nature of the waste. For examp1 e, a wastewater from a hol ding tank reportedly contai ns domestic sewage, but the business that di scharges to the hol ding tank uses toxic chemicals which may also have been discharged to the tank. In this case, a staff member from the Source Control Section would make a site visit to inspect the facility, interview employees, and witness a wastewater sample. The analysis would be conducted by a private laboratory, and staff would provide information to the prospective discharger on the analyses required and other information on District requi rements. It is estimated that the average staff time requi red to process this permit woul d be six hours or $175, including labor and benefits. l_ If a waste does not contain pollutants such as the contents of a swimming pool but the owner wishes to discharge the water to the sewer, a permit would be issued without an on-site inspection and sampling. In this case, the average staff time required to process the permit would be one hour or $30. C. RECOtJMENDATION The following industrial permit fees are recommended: 1. District Industries Annual Permit Fee Fee based on actual cost of service for prior fiscal year. Annual permit fee for 1987-88 varies from $1,212 to $2,419. 2. Concord Industries Annual Permit Fee First year fees based on average cost for similar District industries. Annual permit fee for 1987-88 varies from $1,401 to $2,367. 3. New Industry Permit Fee Fee based on actual costs prior to connection to the District ($500 minimum) 4. Special Discharge Permit Fee No on-site inspection On-site inspection $30 $175 Pagf' 41 of 42 PART V II SEPTAGE DISPOSAL FEES A. DEFINITION The septage disposal fee allows the District to recover the cx>st of administering the trucked-in waste program and treating the waste. B. 1986-87 FEES The 1986-87 septage disposal fees are as follows: Annual Permit Fee S100 Disposal Charges - Grease Interceptor within the Di stri ct - Septage < 2,000 gal ~ 2,000 gal DISCUSSION SO.01/ga1 S7.00 + SO.05/ga1 S20.35 + SO.05/ga1 C. ~ The septage disposal fees were last evaluated two years ago. Recently, the District has revised the septage disposal procedures to include more administrative and enforcement involvement. There are three components to the septage di sposa1 fees: the annual permit, fixed cost per truck, and volume charge. The annual permit fee is recOl'llTlended to be revised to reflect additional administrative effort. The cx>st includes the following components: monthly billing, periodic verification of reported waste sources, and verification and processing of the annual permit. The annual permit fee allocation of costs is as follows: Accounting Source Control Permit Dept. S192.00 146.00 12.00 S350.00 The fixed cost portion of the disposal fee depends on the size of the truck and the level of District testing required before disposal. If a truck has a capacity of less than 2,000 gall ons and contai ns waste from a domestic origin, the fixed cost segment inc1 udes the gate guard time in checking manifests, special discharge, and recei pt forms to he1 p ensure accuracy and compl eteness. It al so 1 nc1 udes the p1 ant operator time 1 n taking a sampl e to be he1 din case there is a pl ant upset. Therefore, the fixed portion of the disposal fee is $7.50. Pa9 42 of 42 If a truck contains more than 2.000 gallons of domestic waste or if the truck contains nondornestic waste. the gate guard has the same involvement in checking the forms. but the operator must take a sample to the District laboratory where toxicity. pH. and visual tests are performed before the truck is allowed to dispose of the waste. Therefore. the fixed portion of the disposal fee is S31. The volume charge' is primarily based on the estimated cost of treatment and ref1 ects average vol ume and strength characteristics for a typical waste load. The other component of this charge is for laboratory costs. The laboratory will select a number of trucks each month to perform additional analyses for heavy metals. BOD. Oil and Grease. and TSS. Additionally. one sample each month will be analyzed for toxic organics. Thi s data. although coll ected after dumping, will provide valuable information regarding the characteristics of the waste discharged and whether they have met the District's local limits. The data will also provide staff with a basis for adjusting the average strength characteristics for subsequent fee reviews. The volume charge is reconrnended to be SO.05/ga110n. c Although the cost for the treatment of trucked-in waste is SO.05/ga110n, it is recommended that the charge for restaurant grease interceptor waste remain at the SO.Ol/gallon rate. Hopefully, the lower rate will encourage restaurant owners to have their interceptors pumped at appropriate time intervals, assuming the waste haulers pass this cost savings on to their customers. The District's charge of SO.01/gal10n represents about one third of the cost of pumping an interceptor. The remaining cost is the waste hauler's charge for pumping and transportation. D. RECOMMENDATIONS The following fees are recommended to recover the District's costs in 1987-88: Annual Permit Fee $350 Disposal Charges - Domestic Waste < 2.000 gal/truck > 2,000 gal/truck Non-domestic Waste $7.S0 + $0.05/gal* $31.00 + $0.05/ga1* $31.00 + $0.OS/ga1 *Grease interceptor waste will be charged the same fixed cost as domestic wastes. but the volume charge is $O.Ol/gal. . Central ~ontra Costa Sanitary ..Astrict BOARD OF DIRECTORS PAGE OF 5 POSITION PAPER BOARD MEETING OF October 29, 1987 NO. V. BIDS AND AWARDS 1 SUBJECT AWARD A CONTRACT TO PACIFIC MECHANICAL CORP. FOR CONSTRUCTION OF DISTRICT PROJECT NO. 4257, SOLDIER PILE INSTALLATION FOR PROTECTION OF FUTURE A-I LINE EXCAVATION DATE October 23, 1987 TYPE OF ACTION AWARD CONTRACT APPROVE ALLOCATION OF FUNDS SUBM'tI'[P ~Y. Pilecki Associate Engineer INITI'E:~R'SJt'iIXg Department Engineering Division ISSUE: A soldier pile installation is needed now to protect a section of the future A..,.lline excavation in Walnut Creek. On October 22, 1987, sealed bids for the construction of District Project No. 4257, Soldier Pile Installation, were received and opened. The Board must award the contract to the lowest responsible bidder or reject all bids within 60 days of opening of bids. Approval of the Board of Directors is required to allocate program contingency funds for new projects in excess of $25,000. BACKGROUND: The City of Walnut Creek has recently approved the construction of a three-story sports health center (Lupois Building) at the corner of Ygnacio Valley Road and the old Southern Pacific Railroad right-of-way (see Exhibit A). The District's future A~lline will be installed immediately east of the east wall of the sports health center. Due to a zero setback requirement on the proposed building, the clearance between the future pipe and the building foundation is estimated to be less than 10 feet. Extreme difficulty is anticipated in installing shoring for the future A-Iline excavation without causing any damage to the adjacent building. The proposed soldier pile project will facilitate the installation of the A-l1ine in the future and greatly lessen the possibility for damage. The proposed sports health center is scheduled for completion in the spring of 1988. Construction of the A-lline in this area is at least three years in the future. Plans and specifications for the soldier pile project were completed in October and the project was advertised on October 9 and 15, 1987. A total of 3 bids were received. A tabulation of the bids is shown in Attachment 1. The Engineering Department conducted a technical and commercial evaluation of the bids and concluded that the lowest responsible bidder is Pacific Mechanical Corp., with a bid price of $49,000. The Engineer's Estimate for construction is $48,000. The budget to complete this project is $65,600. The total project cost is anticipated to be $82,600. as shown in Attachment 2. This project is not included in the Capital Improvement Budget. Funds will be allocated from the Collection System Program contingency account. CEQA consideration for this project has been covered under the Negative Declaration for the Walnut Creek Downtown Bypass and the EIR for the San Ramon Valley Trunk Sewer. REVIEWED AND RECOMMENDED FOR BOARD ACTION 1302A-9/85 ~~-J DRW -,.,--~--~_.._..__._---,---,~-------,-~.__.~-----_.__..,_.....~._._---"~._-_.,--_._~--_.._-_._._..._-----_.,..._..._---~."_..._-- SUBJECT AWARD A CONTRACT TO PACIFIC MECHANICAL CORP. FOR CONSTRUCTION OF DISTRICT PROJECT NO. 4257, SOLDIER PILE INSTALLATION FOR PROTECTION OF FUTURE A-I LINE EXCAVATION POSITION PAPER PAGE 2 OF 5 DATE October 23, 1987 RECOMMENDATION: Award a contract for the construction of District Project No. 4257, Soldier Pile Installation to Pacific Mechanical Corp. as the lowest responsible bidder and approve allocation of $65,600. from the Collection System Program contingency account. ....------. 13028-9/85 '" \ \ 1\\ ~~~ ~ \ \\ \\ \\ \ \ \ ..l.. \\ \\ \ \ \ ~ \\ \\ \ \ \ ~ ~ ~\\ 0 t ~\ t \\ ~.:;::.-:;::.~r~ ~ r;-........ \\ ,\ J j\ ." I; ......""...... \~ \\::: ;:::;;:::; \\f( \ 9 I;......~ ~ \ \ I; ~ PROPOSED ~ \ \ 'J SPORTS HEALTH CENTER~. ~ \ 1\ kSOLDIER PILE I; 785 YGNACIO VALLEY BLVD. ~l~ \ \ / \ (Typical) I; ~ < \ PROPERTY /7=-~ -~ I; j \ ~LINESPRR /.r- ,-'L--d \ \ R/W ~ /t-ty- L~--.J5-u 15 CT"O-CT'1')=cT~=o-=O=cr-o=O" -0 ---- \ r----:--- _-- -:----:---~ --~-- -::---- -~--:-r-__:____l --CC=--~T~~~L~;E "7 -----------_____"\-=--=o- ~----------------------:7I ----~~ ~--E~~~IA~I; 7--~--E~~~~~E~- -~~-\~~ o c:: ~ D:: D:: D:: ll. lJ) li- o f!! ~ ..J SPRR RlW~ ----------------------'---------------- - Central Contra Costa Sanitary District ~ i 1 0/87 Exibit IA SOLDIER PILE INSTALLATION DISTRICT PROJECT 4257 2523-1/87 ----.--....-...--,..,.-.--.--...-......-...........-..--.~,..__.__...."...._----._~......,.-._,._._...__.__._.-_._---_.,_._.._._..~~,.,'"..'"-_.~--_..,,--'"'---- ATTACHMENT 1 Central ~ontra Costa Sanit,-ty District 8UMMARY OF BIDS PROJECT NO. 4257 Soldier Pile Installation DATE 1 g 22 S7 ENGR. EST. $ 48.000 LOCATION Ygnacio Valley Rd. @ former SPRR R/W a: ~ BIDDER (Nome, telephone & address) BID PRICE .-=- 1 PMC ( 415) 827-4940 $ P. O. Box 4041 ~ Concord 94524 49,000 00 ~ 2 Valentine Corp. ( ) 453-3732 $ P. O. Box 9337. San Rafael 9491? 87.354.00 3 Judd Drilling ( 415) 825-4212 $ 1926 Arnold Industrial Way. Con co rd 9411?0 88~136.00 ( ) $ ( ) $ ( ) $ ( ) $ ( ) $ - ( ) $ - ( ) $ - ( ) $ - ( ) $ PREPARED BY DATE SHEET NO. OF ...__._._-_._-----~---~>--~~-,,_._-_.,._,-----_._-_.._---*----.-..,,--- ?c;O'l-q 'A4 ATTACHMENT 2 POST-BID PRECONSTRUCTION ESTIMATE OF COSTS FOR SOLDIER PILE INSTALLATION Item Description Item Amount Total % Total Constr. Cost 1 Construction Contract (as bid) $ 49,000 2 Estimated construction contingencies* 7,300 3 Total construction cost 56,300 100.00 4 Estimated construction incidentals to project completion Contract Administration Contract Inspection Engineering During Construction Legal As-Built Drawings Survey Clerical $ 700 4,000 800 500 500 2,500 300 Total estimated construction incidentals ~ 16.5 5 Total estimate required to complete project 65,600 116.5 6 Prebid expenditures 17.000 30.2 7 Total estimated project cost 82,600 146.7 8 Less funds previously authorized (17 ,000) 9 Total additional funds required to complete project (Item 7 minus Item 8) $65,600 * Contingency will be used for change orders, force accounts, or engineering assistance as necessary. . Centr&..w Contra Costa Sanltar ~ District BOARD OF DIRECTORS PAGE 1 OF 1 POSITION PAPER BOARD MEETING OF October 29, 1987 NO. VI. CONSENT CALENDAR 3 SUBJECT APPROVE AND AUTHORIZE THE EXECUTION OF AN AMENDMENT TO STATE UTILITIES AGREEMENT 106.09.6 CONCERNING RELOCATION AND ADJUSTMENT OF CERTAIN DISTRICT FACILITIES IN NORRIS CANYON ROAD AND EAST OF FREEWAY 680 (DP 4042) DATE October 21, 1987 TYPE OF ACTION APPROVE AMENDMENT/ ADOPT RESOLUTION SUBMITTED BY J ay McCoy Construction Division Manager ~ITIATING DEPT./DLY. engineering uepartment Construction Division ISSUE: Utilities' agreement 106.09.6 has been amended to reflect an increase in cost of the relocation work. The Board of Directors must approve the amendment. BACKGROUND: In December of 1986, the District and the state of Cal ifornia, Department of Transportation, entered into an agreement to relocate certain sewer facilities to accommodate the state's proposed widening of the Norris Canyon Road overcrossing of Freeway 680 in San Ramon. The agreement provided for the District performing the relocation work and for the state reimbursing the District for the cost of the relocation work which was estimated at $3,500. The work actually cost $5,065.15. Since the actual cost exceeded the estimated cost by more than 25 percent, the state requires and has prepared an amendment which shows the actual cost of the work to the state ($5,065.15). The increased costs were due to interferences with existing underground utility conduits, cables, and vaults. An invoice has been sent to the state in the amount of $5,065.15. The state will pay the invoice after receipt of an executed amendment. RECOMMENDATION: Approve an Amendment to Utility Agreement No. 106.09.6 with the state of California, Department of Transportation, and adopt a resolution authorizing the President and Secretary to execute the Agreement. REVIEWED AND RECOMMENDED FOR BOARD ACTION 1302A.9/85 RAB . Centrc.~ Contra Costa Sanitar) District BOARD OF DIRECTORS PAGE 1 OF16 POSITION PAPER BOARD MEETING OF October 29, 1987 NO. VI. CONSENT CALENDAR 4 DATE October 21, 1987 TYPE OF ~TION INITIAlt ANNEXATION DA 98 SUBJECT INITIATE PROCEEDINGS TO FORMALLY ANNEX TEN SEPARATE AREAS UNDER THE TITLE OF DISTRICT ANNEXATION 98 s'D~MrrhTf~ EJ.lall Associate Engineer ~~~~~~P,~TgD~epartment/ Construction Division ISSUE: This District must initiate the annexation process with the Local Agency Formation Commission (LAFCO) before the annexation process can be officially completed. BACKGROUND: LAFCO has requested that the District submit no more than 10 separate areas under anyone proceedi ng to avoi d overl oadi ng thei r schedul e. The subj ect areas are generally located in Martinez, Pleasant Hill, Lafayette, Concord, Orinda, and Danville (see attached maps). LAFCO has indicated that they may add adjoining unannexed parcels to the separate areas we submit to eliminate islands or straighten boundary lines. The District will have to hold a public hearing to consider the annexation of any parcel added by LAFCO. RECOMMENDATION: Pass a Resolution of Application for the annexation of properties to Central Contra Costa Sanitary District under District Annexation 98. REVIEWED AND RECOMMENDED FOR BOARD ACTION INITIATING DEPT.lDIV. ~ 1302A--9/85 D H .' -, ,. ,. ,. ,. ,. . ~~; DA. 38/ /{ ~ \ -Y' :/ .'1 '1 --~"".. "- -:/' -: reek , ,'\ \ --- .J ' ,. )t:::~::-7-_u'--"---':I--;;t.:. -:'.':', ,.' ! ..'/ ----_/ . (,..~~ ". f' ..... "- ~. \"\',.. -"-2;-' l r ~~JOA. 981 \ 't'\ \\ , . ~/ ,. ./ \,p?-- r,- I~ \ ~. ." ,- ( \. I,', , " " --'..:': ./ '-1, i': ~ /" '~~:' ~/ '\,:\/ .,>-;~ / " ,.y------------.:::::, ~---5 f 't:;.....-.k.) /----~... ",! \\ ~~ \ I !. ..r}:~ .-1~ \ ,/ ,/ ...... \ "'-../ \/ <~:-. ,..~ --:..~ ;~"'1-"'--.... '. -. '. " ' .... '" ;DA. 381 \J . .Spring t' /' \ "-~-..... -.::'.'l"- .. , .--./ -- ._--""~ ~<c:-: ". ." \, ....~! " . \, I . \ ,.~ ......, ' \ . , , ., 'i,S~ri~gs ., . ., ., ~'. ~ .>' .. , . , y-J: . . , . '. '. '-.- . ,'a - , , M .~.~.... " .~ ,Eugene", . Spring. \, ", ~ "'""c '",-~.. . ", '1',: .~ / , :. \l\ \ \l, A //.. .t" \Spring ,,--_.~.._--,...,., ~ ~ @ 1~"1 .::::....::~Ifi@.!ltt4=mS~'ti:::::.:~.::.....:.:: NBI ae'E If\ 5'2"1.1 ' Z~ ~~ ~~ <iig; cn$ 2~ a:a: il~ ~ N810'28'E 4"10.6'3' ~ - - :8 (\l . r ~ CD (\I 2 o:l\I or- Z-: UJa: lIlci 4<f :iltl -\II >~ 2 2l\l 4. ~o: a:ci S~ ~ STEVENSON-DUNN CO. '7565 O.R. '2'24 DISTRICT ANNEXATION NO. 98 PARCEL NO. 1 MARTINEZ AREA (1)- g: 0:>, "'U1 ~ Z -l o i1 (Jl m ...... Q2 z Z ::::::'::::::::;:;::::::::=;:;::::=;:;::=;::=:=::;' .::=;:;:....... ~ < ~ V) :;:::: f~~ .... " ~ p ~ (i) ~ :iii~ I ~~I~ .!! ~ ~ ~ ; ). Ii!!!!! ~_~ ~ .rN ~x Z ,+ .o~U1 . .z, o ~ ~~~~ 1+1 !1 dl!! . - N -i tD * .Q; 6'I~Z,!, 'k~ lT1 N mN fft N 8900S'E 202,94' J. -< U1 :...... ~~~~*;; ~.'t0 ~>~ ~.I I N e9005' E 202.94' {if z_........ ~~ 111111111 i..... II: LITTLE LANE mT- /II 87.()/J'~ - . \ 20'~ t....... ~ ~ c, V) '..J ~ ~ ~ Z -I o 11 m ill z z Z tj) ...... ::l:: ..... .... m: ~: ~l I: tf ~ I~ P> 0.:: ~ -m 2: :~: :1 It 8 @f ~ fi .:.:<< :2 ()) p 8 lJ) :ffi S' ~ U1 rn * ~U1-1 i~i 0> P - (JI > ::0 - . :~ ~ .Orn(J) I::! ~~;If ::::::: CD p = Ol - ::::::: ~ ;Xl \J\ Jl1 :::::::.... ~ ~ j * ::~: III :::l N 8905"1'W 2'21'.00' N B9"OS'E 2.74.'50 ~ '" ~e IE /z ~ I c:'I~ ~~ ....... ~< '" ~ :-i ~I'\ ~ ~ I\l ~ v) ~~ ~ )o;~ \'~~ t.N Cl?,j ~ 11\ ~..-J "t! ~ P(\lOl;U ::tl;.Jm)O ~-J::t~ ~lJ1UiN *6' Ul~~:U . -, }> "., t: ::u . ::00> ~ ~ I DISTRICT ANNEXATION NO. 98 PARCELS 2 & 3 PLEASANT HILL .- - -~ Nlt\IMl ~ ~~. N63046'sooe 3~.10' N4tO"OG'31"e ~.G3' ....:~;t.... (';<... ~<::. ..,... w' ...' o (.'<" '3 ,-Z..v N 3~o~e'04"W 4n. 58' F'OINrOF BEGINNING NGZ04Z'SS"E ~ 10,.12' 1>~ ~ N,soQ4'O"w lOe.67' Nze.,e'03'W 88.59' N e04,'07"e 1/1.31' DISTRICT ANNEXATION NO. 98 Parcel 4 LAFAYETTE AREA POINT OF BEG\NN\NG . ~ ~ TRA CT 2937 / / / A\. / @ 19<09 DISTRICT ANNEXATION NO. 98 PARCEL NO. 5 CONCORD AREA Q ~ INT OF BEGINNING ) 20 U1VTJ (') h ~ - ~ o i I ! DISTRICT ANNEXATION NO. 98 PARCELS 6 & 7 ORINDA AREA L4k:E O"i'/ N 04 -"'/G-"'L4IVOS UNlr CWe f20 "r Si?8) "'>-'0 ~ ~~ < NcSO/3,W IGo'j: JOHN A. c..t~ONIN (/798 QR. 569) .2 ~ ~ -4 I o 98 DISTRICT ANNEXATION N. A ORINDA ARE PARCELS 8 & 9 ~ / ~v / ~& ~ ~-9GJ . Q"'<' ~-<.. . ~ 4"1- \<3'1. vJT DJABLO fSTATE PARK DIABLO ROAD ~~:~:~:~;;~;;;;~;~~~~~~~~;~;~;~~~~ii~~~~l~l~~~lll~~llllt~l~l~l~l~l~lil~l~~ilillilf~l~l~m~llll~l~~rmlrrilil;l;;il~;~;~;i;i;~;~;immmm~~rtr~mmmmmttI~l~~~~~~~tt~~~~~l~~~~llt~l~~;;~~t:~:~~::::: '385' ~ @ 1961 A ~ SUBD 4937 220 j\jj 47 @ \<3Ba OF BEGINNING N4"'1036'41"W S'C.l61 N ~Oo25141"W 9.00' DISTRICT ANNEXATION NO. 98 PARCEL NO. 10 DANVILLE AREA ; DISTRICT ANNEXATION NO. 98 Tabulation of Parcels Parcel No. P.A. No. & Area Lead Aaencv Owner Address Parcel No. & Acreaae Date Approved by Board and Remarks 1 87-5 Martinez J. Foran 760 Vine Hill Way Martinez, CA 94553 155-060-001 (1.0 Ac.> 155-060-002 (0.51 Ac.> E. Barnum 740 Vine Hill Way Martinez, CA 94553 155-060-003 (0.49 Ac.> G. Miller 736 Vine Hill Way Martnez, CA 94553 155-060-004 (0.95 Ac.> H.G. Golden 730 Vine Hill Way Martinez, CA 94553 155-060-005 (0.97 Ac.> Stevenson-Dunn Co. 310 Preda Street San Leandro, CA 94557 155-060-006 (0.51 Ac.> L. Gorman 735 Vine Hill Way Martinez, CA 94553 162-030-07 (2.090 Ac.> F. Vi 11 asenor 741 Vine Hill Way Martinez, CA 94553 162-030-008 (2.07 Ac.> S.M. Thanas 15 Dickson Lane Martinez, CA 94553 162-030-006 (1.02 Ac.> 162-030-009 (0.5 Ac.> February 19, 1987 "Notice of Exemption" by District CCCSD DISTRICT ANNEXATION NO. 98 Tabulation of Parcels P a rce 1 No. P.A. No. Owner Address Date Approved by Board & Area Parcel No. & AcreaQe and Remarks ' Lead AQencv 1 ( cont. ) M. T. Hoyles 725 Vine Hill Way Martinez, CA 94553 162-030-010 (0.62 Ac.) F.V. Higby 749 Vine Hill Way Martinez, CA 94553 162-110-002 (0.55 Ac.) C.E. Smalley 947 N. 11th Street Lake View, OR 97630 162-110-003 (0.45 Ac.) 162-110-005 (0.82 Ac.) T.R. Lavino 777 Vine Hill Way Martinez, CA 94553 162-110-006 (0.55 Ac.) D.O. Simonsen 801 Vine Hill Way Martinez, CA 94553 162-110-007 (0.61 Ac.) H. Burns 811 Vine Hill Way Martinez, CA 94553 162-110-008 (1.00 Ac.) R.M. Hall 825 Vine Hill Way Martinez, CA 94553 162-110-009 (1.00 Ac.) R.L. Smith 827 Vine Hill Way Martinez, CA 94553 162-110-010 (0.20 Ac.) 162-110-015 (0.04 Ac.) J. A. Reeves 803 Vine Hill Way Martinez, CA 94553 162-110-017 (0.42 Ac.) DISTRICT ANNEXATION NO. 98 Tabulation of Parcels Parcel N P.A. No. Owner Address & A P 1 N & A Lead A Date Approved by Board d R k o. rea arce o. creaae an emar s \aencv 1 (cont. ) C.B. Taylor 831 Vi ne Hill Way Martinez, CA 94553 162-110-011 (0.71 Ac) J. Lucas 745 Vine Hill Way Martinez, CA 94553 162-110-019 (1.10 Ac) 2 87-33 John T. Figoni October 1, 1987 CCCSD Pleasant I 185 Harriet Drive I "Notice of Exemption" I Hill Pleasant Hill, CA 94523 by District I I I 85-25 Gary W. Whitney, et ux November 7, 1985 CCCSD 8 Bristol Court "Notice of Exemption" Pleasant Hill, CA 94523 by District 152-070-013 (0.45 Ac) 3 85-21 Madelle R. Bettis October 17, 1985 CCCSD Pleasant 581 Best Road "Notice of Exemption" Hill Pleasant Hill, CA 94523 by District (152-092-009) 0.42 Ac. Margie E. Best October 17, 1985 CCCSD 589 Best Road "Notice of Exemption" Pleasant Hill, CA 94523 by District (152-092-12) 0.42 Ac. (152-092-13) 0.42 Ac. 86-26 Bruce W. Bettis November 6, 1986 City 0 56 Bolero Court "Negative Pleasa Danv ill e, CA 94526 Declaration" by Hill 152-029-011 (0.52 Ac.) City of Pleasant Hill 86-27 K. Lee Martyn, Trustee November 6, 1986 CCCSD 584 Littl e Road "Notice of Exemption" Pleasant Hill, CA 94523 by District 152-070-004 (0.39 Ac.) I 86-28 J .G. Farrant I November 6, 1986 I City 0 I 391 Camino Las Juntas I "Notice of Exemption" I Pleasa Pl easant Hi 11, CA 94523 I by City of Pl easant 152-092-004 (1.31 Ac.) I Hill I Hill I f nt f nt DISTRICT ANNEXATION NO. 98 Tabulation of Parcels Parcel P.A. No. Owner Address Date Approved by Board d k Lead A No. & Area Parcel No. & Acreaae an Remar s \oe ncv 3 86-30 M.K. Mehta November 6, 1986 CCCSD (cont.) Pleasant 580 Littl e Road "N ot ice of Exem pt ion" Hill Pleasant Hill, CA 94523 By District 152-070-24 (0.62 Ac.) 87-24 Sky Ranch Investors November 6, 1986 City of 3333 Vincent Road "Negative Declar- Pleasant I Suite 209 ation" by City of Hill I Pleasant HIll, CA 94523 I Pl easant Hill 152-092-012 (0.42 Ac.) I I 152-092-011 (0.52 Ac.) I I 152-092-019 (4.70 Ac.) 4 83-6 Raman Catholic Bishop Apri 1 14, 1983 I Contra Lafayette of Oakland Boundary Reorgan- I Costa P.O. Box 488 ization with LAFCO County Lafayette, CA 94549 167-360-002 and -003 (197.99 Ac. Total) Annex. fee based on 4.53 Ac. 5 86-34 Mary E. Berkowitz December 18, 1986 City of Concord 3361 McGraw Lane "Negative Declar- Concord Lafayette, CA 94549 ation" by Concord 147-272-007 (1.00 Ac.) 6 84-26 Will iam Grover December 20, 1984 CCCSD Orinda 40 Camino Del Diablo "Notice of Exemp- Orinda, CA 94563 tion" by District 264-091-027 (0.46 Ac.) 7 86-2 Carol L. Hassl er January 16, 1986 CCCSD Orinda 21 Camino Del Diablo "Notice of Exemp- Orinda, CA 94563 tion" by District 264-101-009 (0.22 Ac.) L.C. and J.F. Franklin January 16, 1986 CCCSD 19 Camino Del Diablo "Notice of Exemp- Orinda, CA 94563 tion" by District I 264-101-010 (0.26 Ac.) 87-32 I James W. Morando October 1, 1987 CCCSD 580 Palo Alto Place "Notice of Exemp- I Pleasant Hill, CA 94523 I tion" by District 264-101-011 (0.30 Ac.) 8 83-1 Dieter Scholz January 6, 1983 CCCSD Orinda 227 El Toyonal "Notice of Exemp- Ori nda, CA 94563 tion" by District 264-102-27 (Por. 0.26 Ac.) DISTRICT ANNEXATION NO. 98 Tabulation of Parcels Parcel P.A. No. Owner Address Date Approved by Board Lead No. & Area Parcel No. & Acreaae and Remarks Aaencv 9 86-4 D.R. Doll and D.J. Lenci January 28, 1986 CCCSD Orinda 4 Mira Monte Road "Notice of Exemp- Ori nda, CA 94563 tion" by District 264-250-014 (0.48 Ac.) 10 87-17 M.H. Robertson May 7, 1987 Tow n of Danvill e 2016 Diablo Road I "Negative Decl ar- I Danvflle Danv i 11 e, CA 94526 tion" by Town of 215-010-006 (6.01 Ac.) i Danvflle i . Centr, Contra Costa Sanlta. District . BOARD OF DIRECTORS PAGE 1 OF 4 POSITION PAPER BOARD MEETING OF October 29, 1987 NO. VI. CONSENT CALENDAR 5 SUBJECT ESTABLISH NOVEMBER 19, 1987, AS THE DATE FOR A PUBLIC HEARING TO CONSIDER ADDING A CHAPTER TO THE DISTRICT CODE ENTITLED "ABANDONING OF SEWERS" DATE October 21, 1987 TYPE OF ACTION SET HEARING DATE SUBMITTED BY J ay McCoy Construction Division Manager INITIATING DEPT.lDIV. Engineering Department Construction Division ISSUE: District Counsel has advised that it is necessary to add certain language to the Code to provide for the collection of a new fee which is proposed for adoption by the Board of Directors on October 29, 1987. BACKGROUND: A new lateral plug fee is proposed for adoption by the Board. Proper abandoning of laterals is needed to eliminate potential infiltration from unused sewer laterals and to protect the District's sewer system from damage. The past procedure of having private sewer contractors pl ug the sewers has proven to be ineffective and difficult to enforce. The new procedure includes the payment of a fee and the completion of the abandonment work by District forces. This new procedure and fee were created to provide a better guarantee that sewers are properly abandoned. The new fee is based on the cost of the work by District forces. District Counsel reviewed the new fee and determined that the Code does not contain adequate provisions to collect the fee or to administer the new procedure for abandoning sewers. A new chapter of the Code has been drafted which when adopted, will provide adequate authority. The draft is attached for information. The addition to the Code must be the subject of a public hearing. It is necessary to set the date for the public hearing and publish proper notice as prescribed by law. When the date is set, the Secretary of the District will have the notice published. RECOMMENDATION: Establish November 19, 1987, as the date for a public hearing to consider adding a chapter to the District Code entitled "Abandoning of Sewers." Sections: 9.20.010 9.20.020 9.20.030 9.20.040 9.20.050 CHAPTER 9.20 ABANDONING OF SEWERS Permit required. Payment of fee. Construction. Responsible parties. Responsible parties - special circumstances. 9.20.010 Permit reauired. A permit must be obtained before a sanitary sewer or facility which is connected to the District collection system is abandoned, including the aban- donment of a side sewer, lateral sewer, or house sewer. 9.20.020 Payment of fee. The District Board shall from time to time set fees for the issuance of the abandon- ment permit, inspections of an abandoned line, and/or the plugging and sealing of the abandoned line or facility. 9.20.030 Construction. The abandoning of sewers shall be done in accordance with the District's Standard Specifications and other District procedures as may be devel- oped. - 1 - 9.20.040 Responsible parties. The property owner at the time of the abandonment is primarily responsible for paYment of the sewer abandonment fee and such other costs as may be associated with abandoning sewers in a manner which complies with District standard specifications and Proce- dures. In the event a property is redeveloped and the sewer abandonment permit has not been obtained and/or the applica- ble sewer abandonment fees have not been paid, then the owner proposing redevelopment shall be responsible for obtaining an abandonment permit and paYment of applicable fees and charg- es, at such time as the redeveloping owner first submits plans for review by the District, or connects to a District facility, whichever comes first. If an abandonment of a sewer facility without a permit is first discovered by the District at a time subsequent to the plan review process and connection to the sewer system, then the owner of the proper- ty at the time of abandonment and/or the owner at the time of redevelopment will be responsible for paYment of the appropri- ate abandonment fees and charges. Such fees and charges will be due and payable at such time after discovery of abandon- ment as notice of the fees and charges is provided to the responsible owner. For the purposes of this chapter, a property shall be defined as being redeveloped when existing buildings or outbuildings are removed or modified so as to abandon a sewer or lateral which is directly or indirectly connected to the District - 2 - system, and thereafter new structures are constructed on the property. 9.20.050 Responsible Parties - Special Circumstances. When, due to development taking place, whether it be new development or redevelopment, a public sewer or public sewage facility is to be abandoned, the developer, person, or entity seeking approval of the sewer plan incorporating such abandon- ment shall be responsible for all costs and fees associated with the abandonment authorized by this Chapter and such fees shall be due at the time of plan review. If any development causes or requires that an existing side sewer, lateral sewer or house sewer, which services a property not owned by the person or entity undertaking the development to be abandoned, the person or entity undertaking the development shall be responsible for the costs and fees authorized by this Chapter associated with that abandonment. - 3 - . Centra._ Contra Costa Sanitar) Oistrict BOARD OF DIRECTORS PAGE 1 OF 1 POSITION PAPER BOARD MEETING OF October 29, 1987 NO. VI. CONSENT CALENDAR 6 SUBJECT DATE AUTHORIZE THE ATTENDANCE OF WILLIAM E. BRENNAN, PLANT OPERATIONS DIVISION MANAGER, AT THE SPECIALTY CONFERENCE, "STRATEGIES FOR WASTEWATER ODOR CONTROL." October 19, 1987 TYPE OF ACTION AUTHORIZE ATTENDANCE SUBMITTED BY William E. Brennan Plant 0 erations Division Mana er INITIATING DEPT.lDIV. Plant 0 erations Department ISSUE: The Board of Directors must authorize attendance at an out-of-state conference in Richmond, Virginia. BACKGROUND: In early fall of this year, Will iam Brennan was contacted by a representative of the Virginia Water Pollution Control Association who asked him to present a paper on the odor control strategies used at the Central Contra Costa Sanitary District Treatment Plant. This will be a paper entitled "Case History: Odor Source Identification, Quantification, and Corrective Action at Central Contra Costa Sani tary Di stri ct. " Mr. Brennan asked to present a paper at this conference instead of attending the Water Pollution Control Federation Conference in Philadelphia, which he was budgeted to attend as part of the 1987 - 1988 Fiscal Year, Technical Training, Conferences, and Meetings Budget. The Virginia Water Pollution Control Association will pay for lodging and meals. The District is asked to pay for the air fare. The air fare was budgeted as part of the Water Poll ution Control Federation Conference. This will not adversely impact the Technical Training, Conferences, and Meetings Budget. RECOMMENDATION: Approve the attendance of Will i am Brennan at the Vi rgi ni a Water Pollution Control Association Specialty Conference, "Strategies for Wastewater Odor Control. " REVIEWED AND RECOMMENDED FOR BOARD ACTION e3 INITIATING DEPT.lDIV. 1302A.9/85 WEB . Centre... Contra Costa Sanitar) District BOARD OF DIRECTORS PAGE 1 OF 1 POSITION PAPER BOARDME~t~b~r 29, 1987 NO. VII. ENGINEERING 1 SUBJECT AUTHORIZE THE GENERAL MANAGER-CHIEF ENGINEER TO EXECUTE AN AGREEMENT WITH CAMP DRESSER & MCKEE, INC. (COM) FOR PROFESSIONAL SERVICES RELATED TO WATERSHED PLANNING DATE October 23, 1987 TYPE...Qf ACTION AUTHORIZE AGREEMENT SUBMITTED BY INITIA TING DEPT.lDIV. Jack Case, Associate Engineer Engineering Dept./P1anning Div. ISSUE: Authorization of the Board of Directors is required for the General Manager-Chief Engineer to execute professional services agreements greater than $50,000. BACKGROUND: The Watershed planning activity includes local sewer system capacity analysis of District mains. A description of the watershed planning capital activity is provi ded in the Capital Improvement Budget on page CS-66. As noted in the description, there are two categories of ongoing local sewer system capacity analyses included in the activity. The first category is local sewer system capacity analysis in response to proposed development. The second category is local sewer system capacity analysis to identify and define existing deficiencies in the sewer system. Due to the heavy workload in the development review/local capacity analysis section of the Planning Division, staff recommends that consultants perform selected local sewer system capacity analyses to prevent an excessive backlog of capacity analyses from developing. The current backlog is one year. This approach was anticipated in the Capital Improvement Budget description of the Watershed Planning Project. COM was selected to assist the District in watershed planning based on the qual1fications of their proposed project team, familiarity with 1 and-use data management and sewer network analysis, as well as their satisfactory performance during this past year on the District's local capacity studies. Staff has negoti ated a cost reimbursement agreement. The agreement has a cost cei 1 i ng of $75,000. RECOMMENDATIONS: Authorize the General Manager-Chief Engineer to execute an agreement with COM for professional services related to the watershed planning in the amount of $75,000. REVIEWED AND RECOMMENDED FOR BOARD ACTION INITIATING DEPT.lDIV. 1302A . Centr&... Contra Costa Sanltar) District BOARD OF DIRECTORS PAGE 1 OF 10 POSITION P APE R BOARD MEETING OF Oc NO. VII. ENGINEERING 2 SUBJECT ADOPT FINDINGS UNDER CEnA. AUTHORIZE THE GENERAL MANAGER OHEF ENGINEER TO EXEQJTE AN AGREEMENT WITH SHAPELL INDUSTRIES. INITIATE PROCEEDINGS TO FORMALLY ANNEX THE WEST BRANCH DEVELOPMENT UNDER THE TITLE OF DISTRICT ANNEXATION 101. DATE o TYPE OF ACTION ADOPTING FINDINGS AUTHORIZE AGREEMENT AUTHORIZE ANNEXATION SUBMITTED BY Jay S. McCoy Construction Division Mana er INITIATING DEPT./DIV. Engineering Department/ Construction Division ISSUE: Shapell I ndustri es has petiti oned the Di stri ct for annexati on of thei r West Branch development. BACKGROUND: West Branch is a proposed development of 668 houses on 400 acres of 1 and adj acent to the intersection of Crow Canyon Road Extension and Dougherty Road. The sewers proposed for West Branch are at an elevation which is lower than the nearby existing District sewer system. Hence, the sewage from West Branch must be pumped if this District is to serve the development. This pumping requirement as well as the fact that the West Branch area must be annexed to be served was brought to the attention of the Board of Di rectors in August, 1985. Based upon input from the Board, the Planning Division responded to Shapell stating that the following conditions would be required by the District for a future West Branch annexation: 1. "In accordance with normal District procedure, the developer must design and build to District specifications the sewers and, if required, a pump station at the developer's cost. All plans must be reviewed and approved by the District prior to construction. If any sew,rs are placed in a hillside area, plans must be reviewed prior to design. 2. If a pump station is required, either a county service area, maintenance district, or similar entity would have to be established to provide a mechanism to pay for the annual O&M costs associated with pumping. It would be understood that CCCSD personnel would operate and maintain the pump station with the District being reimbursed for all associated costs. 3. The developer must pay all appropri ate District fees and connection charges. 4. The incremental cost of providing watershed trunk capacity for the West Branch development would be an additional cost that would be paid by the developers of West Branch. Once the method of servi ng West Branch is decided, the watershed fees applicable to West Branch can be determined." _._'--_._--_._....__._-_._-----~-------~._."~-----~._---.--.-----,--.------ SUBJECT ADOPT FINDINGS UNDER CECA. AUTHORIZE THE GENERAL MANAGER CHIEF ENGINEER TO EXECUTE AN AGREEMENT WITH SHAPELL INDUSTRIES. INITIATE PROCEEDINGS TO FORMALLY ANNEX THE WEST BRANCH DEVELOPMENT UNDER THE TITLE OF DISTRICT ANNEXATION 101 POSITION PAPER PAGE DATE 2 OF 10 October 21, 1987 Relative to item 4 above, since it has now been determined that West Branch will be served by a pump station and force main, the applicable watershed fees can be calculated during the construction plan review process. Shapell has agreed to the above conditions. These conditions have been formulated into an agreement which, when executed, will bind Shapell to the conditions. The approval of the agreement must comply with the Cal ifornia Environmental Quality Act (CEQA). Shapell has completed the processing of an Environmental Impact Report (EIR) for West Branch. Contra Costa County was the lead agency for the EIR. The EIR identified Central Contra Costa Sanitary District as the appropriate provider of sewer service for West Branch. The Di strict has compl ied with CEnA with respect to the approval of the EIR as follows: o Section 15231 of the CEnA Guidel ines states "A final EIR prepared by a Lead Agency" (Contra Costa County) "shall be concl usively presumed to compl y with CEnA for purposes of use by Responsible Agencies. ." (Sanitary District). o Section 15096f of the CEnA Guidelines states "Prior to reaching a decision on the project, the Responsible Agency must consider the environmental effects of the project as shown in the EIR . . ." In this case, the District is the Responsible Agency. The decision being reached by the Board in this position paper is whether or not to annex and to enter into an agreement to provide sewer service to the West Branch development. The Board must consider the environmental effects of the project (West Branch) as shown in the EIR which has been distributed to the Board. The significant environmental impacts which were identified in the EIR and mitigation measures therefore are shown on Attachment A. The Board must make findings regarding each significant impact identified in the EIR and whether each significant impact has been eliminated, substantially lessened, or properly mitigated. Shapell has appl ied for the annexation of West Branch to CCCSD and East Bay Municipal Utilities District (EBMUD). EBMUD has approved the annexation of West Branch. Since Shapell has completed the planning process through Contra Costa County it is appropriate for this District's Board to act on the petition for annexation. This District's sphere of influence must be changed as part of the annexation of West Branch. The Resol ution of Appl ication for the annexation to the Local Agency Formation Commission (LAFCO) will include a request to change the sphere of influence. 13028-9/65 SUBJECT ADOPT FINDINGS UNDER CEQA. AUll-IORIZE ll-IE GENERAL MANAGER a-tIEF ENGINEER TO EXEQJTE AN AGREEtlENT WITH SHAPELL INDUSTRIES. INITIATE PROCEEDINGS TO FORMALLY ANNEX THE WEST BRANa-t DEVELOPMENT UNDER ll-IE TITLE OF DISTRICT ANNEXATION 101. POSITION PAPER 3 OF 10 PAGE DATE October 21, 1987 West Branch is one of the developments in the Tassajara Valley which is the subject of a suit by Tassajara Now and Tomorrow (TNT). TNT is an association of residents of the San Ramon Valley area who are concerned about development in the valley. TNT states that it is organized for the purpose of "ensuring the orderly development of the San Ramon Valley area and particularly the Tassajara Valley in conformance with the goal s and pol ici es of the county-wi de and area general pl ans." The suit by TNT challenges the approval by the county of the West Branch development and the adequacy of the EIR. The developer is attempting to resolve the TNT suit. This suit does not preclude this District from proceeding with the annexation of West Branch in keeping with Section 15233 of the CEQA Guidelines, part of which follows: If a lawsuit is filed challenging an EIR or Negative Declaration for noncompl i ance with CEQA, Responsi bl e Agenci es shall act as if the EIR or Negative Declaration complies with CEQA and continue to process the appl ication for the project . .. An approval granted by a Responsible Agency in this situation provides only permission to proceed with the project at the applicant's risk prior to a final decision in the lawsuit. It should be noted that TNT has not f1led suit challenging the approval of the annexation of West Branch to EBMUD. The following are proposed findings which staff recommends based on review of the final EIR prepared by Contra Costa County as the lead agency, review of Resolution No. 45-1984 of the San Ramon Valley Area Planning Commission, and review of Resolution No. 84/695 of the County Board of Supervisors: o Environmental effects of the project have been considered. Each and every effect on the environment as shown in Attachment A has been reviewed by the Board of Directors. The Board has used discretion in determining that all significant effects on the environment have been eliminated or substantially lessened where feasible. Mitigation measures as shown in Attachment A are within the responsibil ity and jurisdiction of another publ ic agency (Contra Costa County) and not the Sanitary District. o Contra Costa County has required adequate mitigation of all significant environmental impacts as identified in Attachment A. o Filing of a Notice of Determination as a Responsible Agency stating that the District considered the EIR as prepared by Contra Costa County is required. RECOMMENDATION: 1. Adopt the findings regarding consideration of the environmental effects of the project and direct the General Manager - Chief Engineer to file a Notice of Determination as a Responsible Agency. 13028-9/85 SUBJECT ADOPT FINDINGS UNDER CEOA. AUTHORIZE THE GENERAL MANAGER (}lIEF ENGINEER TO EXEaJTE AN AGREEMENT WITH SHAPELL INDUSTRIES. INITIATE PROCEEDINGS TO FORMALLY ANNEX THE WEST BRANCH DEVELOPMENT UNDER THE TITLE OF DISTRICT ANNEXATION 101. POSITION PAPER PAGE 4 DATE October 21, 1987 OF 10 2. Authorize the General Manager - Chief Engineer to execute an agreement with Shapell Industries for sewer service to West Branch. 3. Approve the request for annexation and pass a Resolution of Application for the annexation of West Branch to Central Contra Costa Sanitary District under District Annexation 101. 1302B-9/85 ___~_"________'_"__' ___,. __._"_..~_.,,_.. ,__.^_'..m.._.'....~__..,.._._..___...~"..... .,.,_.__'., ..,~.,...w.,_._~.._,__._.__.".'".._ __._.___,_._,._~,__,.._...____.".~_'._____.,__.__~___"_--......--.,".. "" _...,...._-,---" .-.--..----.,..--.-....~....,.-----".-~.~...~--,.~.----.-----------~ 5 of 10 ------1:- '!l '---.., ." '~ -:----- "- - ---------- ':'..."':-=~-:::----- ROAD " Ex. CCCSD Sewer -- .... cc,~ i, _--cAN' '-', MORGAN -1 ; ! PR~P~RT> ; 1-:\ ['-/ . EXTENSION OF ~ CROW CANYON ROAD. 1111/1111111/ 1111lllli.!1 /y SYCAMORE VALLEY 111111I111I11I11I11I1111/1 CCCSD ANNEXED BOUNDARY Central Contra Costa Sanitary District . WEST BRANCH ANNEXATION October 29, 1987 FIG. 1 2523,1/87 6 of 10 ATTAa-tMENT A ENVIRONMENTAL IMPACTS AND MITIGATION MEASURES* LAND USE AND PLANNING Impacts o The project is outside the area intended for urban expansion by the General Pl an. o The project would conform to the General Plan's objectives of providing a portion of the planned Crow Canyon Road extension, providing a range of residential densities, and expanding employment opportunities. o The proj ect woul d resul tin the permanent loss of 400 acres of productive grazing land. o The project's proposed land uses along the northwestern and western project site boundaries would be incompatible with adjacent pending and approved development. o The proposed pl an amendment coul d confl ict with the potenti al need to widen Dougherty Road in the future. o The project would extend urban services and increase economic incentives to convert additional agricultural lands south and east of the site to urban use. Miti gati ons o To resolve potential land use conflicts, proposed land uses within the plan amendment is rearranged to correspond more closely to those of adjacent approved development. o Upper elevations of the site are proposed to be retained as permanent open space. o Approvals of development projects could be delayed until properties to the west and northwest are developed. o The plan amendment's allowable density considerations is reduced to approximately 960 units. o Open space buffer zones are incorporated into the proposed land use pl an amendment to reduce 1 and use confl icts and pressure for urban development to the east of the plan site. * Attachment A is a verbatim copy of the pertinent sections of Resolution No. 45-1984 of the San Ramon Valley Area Planning Commission. 7 of 10 o Internal land uses proposed by the applicant are adjusted to conform with the physical constraints of the property as well as policies of the General Plan. WATER SERVICE Impact o If the plan amendment area is annexed to EBMUD, a major supply line and additional storage and pumping facllities would be required. This area is adjacent to, but not within, East Bay Municipal Utility District's (EBMUD's) sphere of influence. EBMUD is reviewing possible extension of water service into the plan amendment area. MitiQation o Decision on annexation and sphere of influence modification are those of LAFCO and EBMUD. SANITARY SERVICE Impacts o The pl an area is not within the service area of any sanitary district. The area immediately to the north of the project site is served by Central Contra Costa Sanitary District (CCCSD). o If the pl an area is annexed to the CCCSD, a pump station woul d be needed to lift sewage to an existing trunk sewer on Camino Tassajara; current CCCSD policy, however, prohibits such facilities. Miti Qati ons o The plan area should be annexed to the CCCSD. o Decisions on annexation and sphere of influence modification are those of LAFCO and the sanitary district. POLICE SERVICES Impact o The plan area would increase demand on the Sheriff's Department for public safety services. MitiQation o The Sheriff's Department woul d need an additional substati on and additional personnel to serve the site. Specific social or other considerations make infeasible the mitigation measure for this development alone. Area developments may participate in a substation collectively. 8 of 10 FIRE SERVICES Impact o The plan area is contiguous to, but not within, the San Ramon Valley Fi re Protecti on Di stri ct. If the pl an area was annexed to the District and the Crow Canyon Road extension was completed through the site, the first-due response would be from Station #4. Mitigation o No additional capital improvements woul d be necessary to serve the site, so no mitigation is needed. CULTURAL RESOURCES Impact o There is a potential for prehistoric or historic deposits of significance to be encountered during grading and excavation of the site. Mitigation o Any construction would be halted if a deposit was encountered, until the deposit could be inspected and appropriate additional measures taken. VISUAL AND AESTHETIC ISSUES Impact o The project woul d change the character of the site from rural to urban, extendi ng urban el ements farther east and south into the existing rural landscape. o Development is proposed for areas designated as scenic ridges on the General Pl an. o The project may, depending on its design, degrade the scenic quality of the Dougherty and Crow Canyon Roads view corridors where they pass through the site. o The project would be highly visible in regional vistas extending south from Mt. Diablo. o The cumulative effect of the project and other approved and proposed development in southeastern Contra Costa County may confl ict with County policy to preserve scenic open space areas for the enjoyment of County residents. 9 of 10 MitiQation o The visual impact of the project was partly mitigated by redesignating the upper slopes and ridges to General Open Space in the proposed Plan Amendment, by designating Dougherty and Crow Canyon Roads as scenic routes. Any subsequent development would be subjected to detailed design review. TRAFFIC AND CIRCULATION Impact o The project would generate about 23,400 daily vehicle trips. Project traffic would require improvement of Dougherty Road. o Cumulative anticipated development in the project area would generate about 174,000 vehicle trips/day. This level of development woul d requi re improvements to Crow Canyon Road, Sycamore Valley Road, Bolli nger Canyon Road, Carni no Tassaj ara, and woul d requi re construction of a new interchange with 1-680 at Bollinger Canyon Road. o Construction truck traffic would be expected to have a deleterious effect on the older, two-lane roadways in the project area (e.g., Dougherty Road). o The plan area's internal circulation plan lacks secondary access to the eastern and northwestern porti ons of the si te unti 1 adj acent properties are developed. This access may be necessary during an emergency. MitiQation o Any subsequent development would be required to post bond to repair/replace pavement on County roadways affected by project construction traffic. o Any subsequent development would be required to contribute a proportionate share towards regional roadway improvements. o Require appropriate dedication of right-of-way along Dougherty Road through property owned by applicant. o Require preparation of a site-specific traffic analysis. o Density consideration allowed by the plan area is reduced to approximately 960 units to further diminish traffic impacts. 10 of 10 OTHER IMPACTS Impacts o Those impacts mentioned in the Final EIR dealing with solid waste; parks and recreation; hydrology and water quality; biotic resources; geology, soils and seismicity; and energy can only be mitigated upon review and decision of subsequent development applications. M1t1Qat1on o The appropriate mitigation measures can only be mitigated upon review and decision of subsequent development applicants.