Centra. ~ontra Costa Sanitary ..~istrict
BOARD OF DIRECTORS
PAGE 1
OF!
POSITION PAPER BOARD MEETING OF
October 18, 1990
SUBJECT APPROVE CONTRACTOR'S REQUEST TO ADD A
SUBCONTRACTOR TO PEFORM HAZARDOUS WORK ON THE
M-2 PARALLEL FORCE MAIN PROJECT (DP 4610) AND
AUTHORIZE THE GENERAL MANAGER TO APPROVE A CHANGE
ORDER EXCEEDING $50,000
NO
3. ENGINEERING a.
DATE
October 1 7 1990
TYPE OF ACTION
ADD SUBCONTRACTOR AND
APPROVE CHANGE ORDER
SUBMITTED BY
INITIATING DEPT 'DIV
Munawar Husain, Associate Engineer
Engineering Department/Construction Division
ISSUE: Contractor needs to proceed with contract work on the LT. Baker site and requires a
subcontractor to perform work involving a hazardous material which was encountered during the
course of construction. A change order in excess of $50,000 will be necessary to cover the
additional costs of this work. Change orders in excess of $50,000 require board authorization.
BACKGROUND: A section of the new M-2 sanitary force main passes through a 20-foot wide
right-of-way at the LT. Baker site. During excavation for the parallel force main at this site, the
contractor had to cease work due to high readings recorded on the monitoring equipment. Soil
and water samples were taken by Woodward-Clyde Consultants and the results of laboratory
tests and the recommended Health and Safety Guidelines were presented to the District on
October 12, 1990.
The general contractor, Fee Construction, Inc., has been given these Health and Safety
Guidelines. Fee Construction has notified the District that a specialty subcontractor will be able
to perform work at the LT. site. The subcontractor personnel will have training and the
insurance protection to perform the work in the hazardous environment encountered.
The M-2 Parallel Force Main Project has the potential to be impacted by the oncoming wet
weather. Pipe laying and testing must be completed before the ground becomes too wet for the
contractor operations. The cost of additional work will exceed $50,000. More details will be
provided at the Board meeting.
RECOMMENDATION: Approve contractor's request to add a subcontractor and authorize the
General Manager to approve a change order exceeding $50,000.
INITIA TING DEPT /DIV
~hJj
'r;.~L.
RAB
REVIEWED AND RECOMMENDED FOR BOARD ACTION
l~jO?A 9'8~,
MH
RSK
JSM
"__"^._....._._._..._."___,___~..__.__._._'___. ._......M......_._____________
.
Centra" ~ontra Costa Sanitar) Jistrict
BOARD OF DIRECTORS
PAGE 1 OF
POSITION
PAPER
BOARD MEETING OF
SUBJECT
NO.
3.
BIDS AND AWARDS a.
DATE
AUTHORIZE THE AWARD OF CONTRACT TO DALZELL
CORPORATION FOR THE CONSTRUCTION OF FINAL
EFFLUENT VALVE ACCESS, DISTRICT PROJECT
NO. 10042
TYPE OF ACTION
AUTHORIZE AWARD
SUBMITTED BY
Ba T. Than
Assistant En ineer
INITIATING DEPT./DIV.
Plant 0 erations De artment
ISSUE: On September 27, 1990, sealed bids for the Final Effluent Valve Access Project, District
Project No.1 0042, were received and publicly opened. The Board of Directors must award the
contract to the lowest responsible bidder or reject bids within 30 days of the opening date.
BACKGROUND: The effluent flow from the treatment plant is controlled by the 72-inch final
effluent valve located 25 feet below grade in a concrete vault structure on the east side of the
Pump and Blower Building. Access to the electrically powered valve is required for periodic
maintenance and repair. Access is available only by lifting a three-ton concrete slab off the
structure. Personnel access and egress is via a portable ladder and requires a stand-by crew for
the confined space entry. Restricted access reduces the quality and quantity of maintenance
of this very important valve.
This project was designed to provide ready access to the final effluent valve vault by installing
a permanent ladder, working platform, lighting, and a supplemental ventilation system. The Final
Effluent Valve Access Project is included in the 1990-91 Capital Improvement Budget beginning
on page TP52. The total project cost was estimated to be $47,000. This project was listed as
a Priority 1 project on the Stage 5A, Fix and Finish Settlement Schedule.
Plans and specifications for this project were completed by Plant Operations Department (POD)
staff and were publicly advertised on September 13, 1990, and September 19, 1990. A total
of four bids were received and opened on September 27, 1990. A tabulation of the bids is
shown in Attachment I. An evaluation of the bids, conducted by the POD and Purchasing
Section, concluded that the lowest responsible bidder is Dalzell Corporation with a bid price of
$31,940. The additional allocation of funds required to complete this project is estimated to be
$35,000, as shown in Attachment II. The project cost is now estimated at $49,000.
At the time of the 1988 - 1989 Capital Improvement Budget, the Board of Directors determined
that this project is exempt from the California Environmental Quality Act (CEQA) under District
CEQA Guidelines, Section 18.2, because it involves a minor alteration to the treatment plant's
final effluent valve vault and no expansion of use would occur beyond the previously existing
condition. A notice of exemption was filed with the county clerk on August 24, 1988.
INITIATING DEPT./DIV.
BTT
REVIEWED AND RECOMMENDED FOR BOARD ACTION
1302A-9/85 BTT
~
SUBJECT
AUTHORIZE THE AWARD OF CONTRACT TO DALZELL
CORPORATION FOR THE CONSTRUCTION OF FINAL
EFFLUENT VALVE ACCESS, DISTRICT PROJECT
NO. 10042
POSITION PAPER
PAGE 2 OF 4
DATE October 12, 1990
RECOMMENDATION: Authorize award of the construction contract in the amount of
$31,940, for Final Effluent Valve Access, District Project No. 10042, to Dalzell
Corporation, the lowest responsible bidder.
---------
13028-9/85
~~
~- +'
~ :~
r-<
r-<
~ l'
~ ....10- ..0
% HI, c ..0
~ ~IZ 0
r-
.~
1:
~"C
::Jc
"Co
.5.E
> u
ClJ-
::w:::0:::
(I)
(I)
ClJ
...... U
u
l- e::(
z: ClJ
I..1J
:E: >
:J: r-
U ftS
e::( :>
I- of.)
l-
e::( c
ClJ
:::J
r-
<<to-
<<to-
W
-% r-
Q ftS
0- C
a..
5 -
u...
CI)
w ClJ
Q "C
3! -
a: >
~ 0
S-
::E a..
Ie
o ClJ .
u Ir-
Ir-
..... or-
.....>
ClJ~
NS-
r- ClJ
~~
I-c
~
'-
~~
o u
iuC
;8
.
.
.
~ :2 :z: .
d 0
a:: a z ~ 3 -
... ... !1 .
8 S ~. ~ ai CL "'"
Z ~ g ~ a:: id
~ ~
~
<:>
en
Q
m
lL
0
:z
O.
~
-I
:::>
m
~ 0
I :z:
'j ~
~
a: a:
~
~
~
~ ffi
of-
~ lE
H! ~
.
8
m
0'\
:}
('i)
.
.
.
e
e
. d
. 8
a:5'
~
.
.
Ig
. d
. ~
0'\
..
~
.
c
. ......
co
e
: z:
~
o
:E:
I- 0:::
V. :z C>
w u...
<i: ::> l- .
.J c::(
0- W u... .J z:
~ :J: u... a.. C>
I- lLJ ......
C,!) I-
-s 0::: .J z: e::(
;:E C> e::( ...... .J
I..L. z: C ......
c::. ...... ::> l-
V) I..L. .J z:
g~ U lLJ
I..L. z: :>
3~ C> ......
.
z: z: V) :J:
~ lLJ C> V) u
<i: I- ...... lLJ I-
0::: I- U c::(
::> c::( u :J:
:J: a... .J e::(
V) a... .J V)
...... c::( c::( lLJ V)
z: I- :> lLJ
0::: C V) ....J U
:::> z: z: c::( U
\J... c:{ ...... :> c:{
l-
e
~
r-<
r-<
Paqe 3 of 4
~
:b
:;
0:::
~ Cl
.... ~
V)
c::( ~
. c
V) 0-
:E: I-
~ 5
~ ::;:
:: ~
z: a...
...... V)
I- 0
~~~
...... :J: z:
....J u......
c::( 3
Cll-C:{
z: I- 0:::
c:{c:{Cl
c
.cr-
.......
('...
Page 4 of 4
ATTACHMENT II
FINAL EFFLUENT VALVE ACCESS
DISTRICT PROJECT NO. 10042
Post-Bid/Preconstruction Estimate
PERCENT
ITEM CONSTRUCTION
ITEM DESCRIPTION AMOUNT TOTAL CONTRACT
1 Construction Contract $31,940
2 Estimated Construction 5,060
Contingencies at 1 6 percent
3 Subtotal 37,000 100
4 Estimated Construction
Incidentals to Project Completion:
. Inspection 1,000
. Contract Management 1,000
. Survey 500
. As-Built Drawings 500
5 Subtotal 3,000 8
6 Total Estimated Construction
Cost 40,000
7 Pre-bid Expenditures 9,000 24
8 Estimated Total Project Costs 49,000 132
9 Funds Previously Allocated 14,000
10 Additional Allocation of Funds
Required to Complete Project 35,000
.
Central Contra Costa Sanitary District
BOARD OF DIRECTORS
PAGE 1 OF 1
POSITION
PAPER
BOARD MEETING OF
October 18, 1990
NO.
4.
CONSENT CALENDAR f.
SUBJECT
DATE
ADVISE THE BOARD OF DIRECTORS OF THE CLOSEOUT
OF THE CRITICAL PROJECT - INCINERATOR
OPTIMIZATION, DISTRICT PROJECT NO. 20086
TYPE OF ACTION
INFORMATIONAL
SUB/-1ITTED B)'
Lynne I. Putnam
Senior Engineer
INITIA1JNG OEPT /QIV
t:nglneenng Department
Planning Division
ISSUE: All work has been completed on the study and implementation of the Critical Project
- Incinerator Optimization, District Project No. 20086.
BACKGROUND: The Critical Project Program was initiated to implement near-term projects
identified in the Treatment Plant Master Plan. The Critical Project - Incinerator Optimization
is the last project in this program and was initiated to maximize the capacity and efficiency
of the existing incineration system. The consulting firm Incinerator Rx performed a study
of the existing furnaces and recommended changes in operating procedures and equipment.
These changes have reduced fuel consumption and minimized visible stack emissions (yellow
plume). The Incinerator Rx report also recommended further, long-term incinerator
equipment changes to improve reliability and increase capacity. These changes will be
implemented as conditions warrant.
The total budget for this project was $80,000 of which $55,487 was expended leaving
$24,513 to be returned to the Capital Budget.
RECOMMENDATION: This matter is presented as information to the Board of Directors. No
action is required.
INITIATING DEPT./DIV.
Ifjf>
RAB
REVIEWED AND RECOMMENDED FOR BOARD ACTION
.
Central Contra Costa Sanitary District
BOARD OF DIRECTORS
PAGE 1 OF 1
POSITION PAPER BOA~~f6B~~ 9F8, 1990
NO.
4. CONSENT CALENDAR g.
SUBJECT
DATE
October 1 2, 1 990
AUTHORIZE OUT-OF-STATE ATTENDANCE BY KEN F. LAVERTY,
PURCHASING AND MATERIALS OFFICER, AT THE INTERNATIONAL
PURCHASING ASSOCIATION LEADERS MEETING IN IRVING, TEXAS
TYPE.OF ACTION
AUTHORIZE
ATTENDANCE
SUBMITTED BY Paul Morsen
Deputy General Manager
INITIATING DEPT IDIV
Administrative
ISSUE: Board authorization is required for out-of-state travel or travel exceeding $500 not
previously authorized in the 0 & M Budget.
BACKGROUND: Representatives of 28 major purchasing associations are meeting on November
8, 1990 at the Dallas/Fort Worth Airport to form an international advisory committee to
coordinate the activities of the combined 80,000 members. One major goal will be to provide
for a coordinated effort in recommending legislative revisions to federal and state laws which
would provide both simplification and standardization of purchasing procedures required of the
public agencies. Another goal is to create one Professional Purchasing Certification which could
be used by all the organizations to establish appropriate criteria for those hiring professional
purchasing agents.
Because of Ken Laverty's active role over the past several years with the California Association
of Public Purchasing Officers (CAPPO) as well as other national associations, he has been
requested by both CAPPO and the National Association of Purchasing Management (NAPM) to
be a representative at this first international leaders meeting. This is and an opportunity for the
District to have someone experienced in California public agency purchasing at this first
international professional purchasing gathering.
The total cost to attend this meeting will not exceed $750. CAPPO will be requested to share
the travel expenses at its next Board meeting, but at this time its participation is unknown.
Approval of this request may result in an overexpenditure of the Purchasing and Materials Control
Section's Technical Training, Conferences, and Meetings account by $370.
Recommendation: Authorize Ken Laverty, Purchasing and Materials Officer, to travel out of
state to the International Purchasing Association Leaders meeting at the Dallas/Fort Worth
Airport Marriott to be held on November 8, 1990.
REVIEWED AND RECOMMENDED FOR BOARD ACTION
R~ ENG.
.
Central Contra Costa Sanitary District
BOARD OF DIRECTORS
5
PAGE 1 OF
POSITION
PAPER
BOARD MEETING OF
October 18, 1990
NO.
5.
SOLID WASTE a.
OCTOBER 15, 1990
S~VIDE VALLEY WASTE MANAGEMENT WITH CLARIFICA-
TION OF SERVICE LEVEL AND RATES FOR TOWNHOUSE
CUSTOMERS, AND RESOLUTION OF INCONSISTENT HILLY
AREA SERVICE LEVEL AND RATES
DATE
TYPE OF ACTION
PROVIDE CLARIFICA-
TION OF SERVICE
LEVELS AND RATES
SUBMITTED BY
Walter N. Funasaki, Finance Officer
INITIATING DEPT/DIV
Administrative/Finance and Accounting
ISSUE: Valley Waste Management seeks clarification and resolution of the service levels and
collection rates for two categories of customers: townhouses; and hilly area residential
customers.
BACKGROUND: The brochure titled "Putting a Lid on Rising Garbage Costs," which was
recently distributed by the District to all customers of the franchised refuse collectors, has
prompted inquiries by customers of Valley Waste Management regarding whether weekly
trimmings and seasonal cleanup services are included for certain customer categories. In
response to these inquiries, Valley Waste Management and District staff have reviewed the
service levels and collection rates of townhouse customers and residential customers living in
hilly areas which require service by a smaller collection vehicle. The issues which have been
identified and are being brought before the Board are summarized below:
. Does the service level for townhouse customers include three seasonal cleanups,
in addition to refuse collection and recycling services?
. Does the service level for hilly area customers include trimmings collection, in
addition to refuse collection, three seasonal cleanups, and recycling services?
. Should approximately 1,100 hilly area customers who have been billed at the lower
residential rates have their rates adjusted to the higher hilly area rates during the
current rate year?
Results of Staff review of related Board Actions in establishina the trimminas and seasonal
cleanuo services.
In March 1967, the Board of Directors, when setting collection rates for residential, multi-family,
and commercial customers for each of the five franchise zones in the District, added weekly
collection of garden trimmings to the service level for residential customers of Pleasant Hill
Bayshore Disposal. On March 14, 1970, the Board approved the addition of weekly collection
of garden trimmings and three all-purpose seasonal clean-up collections for residential dwelling
units served by Valley Disposal Service. A copy of the pertinent section of the March 14, 1970,
Board minutes is provided as Attachment I.
REVIEWED AND RECOMMENDED FOR BOARD ACTION
1302A-9/85
WNF
PM
e?J.
.c._ ....c"'~
INITIATING DEPT/DIV.
SUBJECT
POSITION PAPER
PROVIDE VALLEY WASTE MANAGEMENT WITH CLARIFICATION
OF SERVICE LEVEL AND RATES FOR TOWNHOUSE CUSTOMERS,
AND RESOLUTION OF INCONSISTENT HILLY AREA SERVICE
LEVEL AND RATES
PAGE
DATE
2 OF 5
OCTOBER 15, 1990
In establishing collection rates for Valley Disposal Service effective January 1, 1984, the Board
approved the request by the refuse collector for a higher collection rate for customers required
to be serviced by a small truck because of inaccessibility by full-size trucks. In the rate
application, the refuse collector described the service level for such hilly area customers as not
including trimmings or seasonal cleanup service, ..." unless the customer hauls the material to
the nearest road accessible to the full-size trucks." A copy of the pertinent section of the rate
application is provided as Attachment II.
Townhouse Service Levels and Rates Issues
The current monthly single-can rate of $15.40 for townhouse customers of Valley Waste
Management compares to $16.90 for regular residential customers. Townhouse customers are
provided only with the basic collection and recycling services for the $15.40 rate. The refuse
collector indicates that if the owners' association for the townhouses requests the trimmings
and cleanup services, these services are added for the same $16.90 rate charged to regular
residential customers. Townhouses which use commercial bins are billed and serviced as
commercial accounts.
As a result of a review of the establishment of the townhouse can rate and service level,
District staff believes that the refuse collector unilaterally, and without Board approval,
established a townhouse rate in 1984, which it contends was for refuse collection only.
Because the differential of $1.50 per month between the single-can townhouse and regular
residential rates is not sufficient to warrant exclusion of both trimmings and seasonal cleanup
services, the seasonal cleanup service should be included in the townhouse service level.
Furthermore, the refuse collector should be required to justify the townhouse rates at the next
rate-setting process.
Hillv Area Customer Service Levels and Rates Issues
The hilly area monthly rate for a single-can is currently $20.50 compared to $16.90 for regular
residential customers. While Valley Waste Management acknowledges that the service level
for hilly area customers includes seasonal cleanup collections, it believes that weekly trimmings
collection is not included. Based on the description of the hilly area service provided by the
refuse collector in 1983 (Attachment II), when the Board adopted the higher hilly rates in all
zones serviced by Valley Disposal Service, it is clear that both trimmings and seasonal cleanup
collections were intended to be available to hilly area customers, provided the customer brings
the material to the nearest street served by a full-size collection vehicle.
11028 9,8:)
SUBJECT
POSITION PAPER
PROVIDE VALLEY WASTE MANAGEMENT WITH CLARIFICATION
OF SERVICE LEVEL AND RATES FOR TOWNHOUSE CUSTOMERS,
AND RESOLUTION OF INCONSISTENT HILLY AREA SERVICE
LEVEL AND RATES
PAGE
DATE
3 OF 5
OCTOBER 15, 1990
Valley Waste Management has advised District staff that it has recently determined that as
many as 1, 1 00 homes in the hilly areas of Lafayette and Danville are being charged the lower
regular residential rates, although being provided hilly area service. The refuse collector wishes
to notify these hilly area customers of its billing error, and, during the next month, adjust the
rates to the higher hilly area rates.
District staff believes that hilly area customers should be notified of the availability of the
seasonal cleanup and trimmings collection, and the location for depositing such material, before
the next seasonal cleanup date. Adjustments to the affected hilly area customers' rates should
not be made until the next regular rate-setting process, as the latest rate increase effective
August 1, 1990, was based upon the revenues projected using the current rates charged these
customers.
RECOMMENDATION: The following actions are recommended regarding townhouse and hilly
area customers service levels and rates:
. Establish that the service level for townhouse can-service will include three seasonal
cleanups in addition to refuse collection and recycling services; the refuse collector will
be required to justify the current townhouse rate in the next rate-setting process.
. Affirm that, if requested by townhouse owners' associations, trimmings collections may
be added to the service for which the townhouse customer will pay the same rate as the
regular residential customer.
. Affirm that hilly area customers receive trimmings and seasonal cleanup services,
provided the customer delivers such material to the nearest street served by a full-size
collection vehicle.
. Establish that hilly area customers in Lafayette and Danville who have been incorrectly
billed at regular residential rates should be notified immediately of the intention to adjust
their rates effective with the next rate year beginning July 1, 1 991 .
13078 q.'f3r:
ATTACHMENT I
EXTRACT PRa ~INUTES OP THE KAY 14, 1'~ BOARD KEETING
IV. HEARINGS
EXTRA PICKUP AND CHARGES FOR GARDEN TRIMMINGS
President Gibbs opened the Bearing and asked Mr. Horstkotte, General
Manager-Chief Engineer, to explain District planning.
Mr. Horstkotte stated that the problem is area-wide but the District
had decided to start in a local area and expand.
The District decided to ask Valley Disposal Service for a proposal
for pickup and charges for garden cuttings.
The proposal aet forth in their letter of March 30, 1970, follows:
"We would like to suggest in addition to our regular weekly garbage
collection service. that for each occupied residential dwellinR unit within
any building containing not ~ore than two such units one collection of
garden trimmings per week provided such trimmings are placed in container
having a capacity of not ~ore than thirty gallons and is located at the
street curb line by 5:00 a.~. on the collection day.
"In addition to the garden trimming pick-up we auggest three all pur-
pose clean-ups, Spring, Summer and Fall. We will send notices to custo~ers
as to dates and rules to follow. Maxim\ID two (2) yards for each clean up.
'~ue to the amount of customers in our zone we ask to be permitted to
divide our zone into three areas and start one area at a time, completing
the change within one year.
"The esti~ated rate for this type aervice is $3.00 per ~onth."
Board Members stated this would not be a voluntary aervice but a general
compulsory service. The following in attendance at the ~eeting and representing
certain homeowners associations discussed the proposal with Members of the Board:
Tom Mann, President, Linda Vista Homeowners Association
Pete Vnda, Sun Valley Improvement Association
Al Martin, Mohawk Drive, Pleasant Bill
E. W. Thompson, Glenwood BClIDes Association, 60 homes minim\ID
1/2 acre, Danville
Charles H. Shepard, President, Creek Circle Homeowners Association
(80 ~embers on Windsor Drive, Condit load, Buchan Drive,
Old Tunnel Bead, etc., Lafayette)
After discussion, President Gibbs asked the audience for any objection
to starting the program as proposed. There was none.
It was ~oved by Me~ber Mitchell, aeconded by Member Boneysteele, that
the staff be directed to go ahead and set up the schedule according to the
proposal of Valley Disposal Service for their area. Carried by the following
vote:
AYES:
NOES:
ARSEN'I:
Members:
Members:
Members :
Boneysteele, Rustigian, Mitchell, Allan and Gibbs
None
None
Board Members stated that Hearings would be held at six-month intervals
to determine how the new schedule is working.
President Gibbs closed the Hearing.
ATTACHMENT I I
EXTRACT PROM VALLEY DZSPOSAL SBRVZCE
RATE APPLZCATZON DATED OCTOBER 20, 1183
USED ZN SETTZNG COLLECTZON RATES BPPBCTZVB JANUARY 1, 1184
Explanation of Proposed Billy Area Rates
Valley operates a route using a small truck in order to
service customers who are not accessible to full size gar-
bage trucks. This service does not include trimming or
refuse cleanups unless the customer hauls the material to
the nearest road accessible to the full size trucks.
Although the service is provided in all three zones
served by Valley, a regulated rate was established only in
Zone 4. The rates charged in the three zones varied. The
reasons for these differences is not known.
Current rates for this service are: Zone 2 - $10.90J
Zone 4 - $6.70 and Zone 5 - $9.35. There are approximately
500 customers in Zone 4 and approximately 200 customers
total in Zones 2 and 5.
The current proposal is to increase the $6.70 rate by
8.25% to $7.25 per month and to freeze the rates in the
other zones. Approximately 200 customers will not receive
an increase.
Valley desires to achieve a unified rate for this unus-
ual service. The actual cost of the service is likely to
equal or exceed the highest rate now charged. At this time
the cost of this service is not known and Valley believes it
would be difficult to justify an increase of all rates to
the Lafayette level.
valley. will attempt to compile the cost data associated
with this service for the next rate review in early 1985.
.
Central Contra Costa Sanitary District
BOARD OF DIRECTORS
PAGE 1 OF 1
POSITION
PAPER
BOARD MEETING OF
October 18, 1990
NO.
5.
SOLID WASTE b.
October 16, 1990
SUBJECT
UPDATE ON WASTE MANAGEMENT SYSTEM PILOT
PROGRAM
DATE
TYPE OF ACTION
Solid Waste
SUBMITTED BY
Paul Morsen, Deputy General Manager
INITIATING DEPT/DIV
Administrative
ISSUE: The Waste Management System Demonstration Project has encountered delays in
securing permits necessary from Alameda County.
BACKGROUND: Valley Waste Management has the equipment, including vehicles and garbage
containers on board to implement the Waste Management "POD" System Pilot Project. It was
intended to begin this project in October of 1990. However, Alameda County authorities have
required Valley Waste Management to make application to use the "POD" system to bring waste
into their county to Altamont Fill.
Contra Costa County officials have requested Alameda County to levy fees including those for
Acme Fill's administrative expenses and amortization of Acme Fill's capital expenses in addition
to Contra Costa County planning fees. The letter from Contra Costa County Community
Development's staff is attached for information. These fees are in addition to the Alameda
County mitigation fee. This request from Contra Costa County has complicated the Alameda
County permitting process and caused a delay in securing the necessary permits.
Mr. Ron Proto, General Manager of Valley Waste Management, will be making an oral report to
the Board regarding the implementation of the Waste Management System.
RECOMMENDATION: Receive report from Valley Waste Management.
REVIEWED AND RECOMMENDED FOR BOARD ACTION
.
Central Contra Costa Sanitary District
BOARD OF DIRECTORS
1
PAGE 1 OF
POSITION
PAPER
BOARD MEETING OF
October 18, 1990
NO.
6. LEGAL/LITIGATION a.
D~TE
uctober 12, 1990
SUBJECT
DENY CLAIM FOR DAMAGES FROM PACIFIC BELL
TYPE OF ACTION
DENY CLAIM
SUBMITTED BY
Jack E. Campbell
INITIATING DEPT.lDIV
Administrative/
ISSUE: The Security Division of Pacific Bell has filed a claim for $100,000 against the District.
Claim denials require action by the Board of Directors.
BACKGROUND: The Dalton Construction Company is performing a District construction contract
to relocate sewer lines as required by CalTrans for the 1-680/SR-24 highway interchange
modernization. On August 9, 1990, while trenching on Ygnacio Valley Road with a backhoe,
Dalton Construction struck and damaged three underground communication cables and one air
pressure supply pipe belonging to Pacific Bell. Dalton Construction made the required
Underground Services Alert (USA) notification prior to the start of the trenching, but Pacific Bell
failed to indicate the existence of these active lines when they did the street marking.
The District is an additional insured on the contractor's insurance policy and has also been
indemnified by the contractor. The staff recommends that Pacific Bell's claim be denied.
RECOMMENDATION: Deny the $100,000 telephone line damage claim from Pacific Bell and
refer it to staff for further action as needed.
1302A-9/
JEC
PM
KLA
~NG.
ROGER J. DOLAN
T~GLDIV.
.
Central Contra Costa Sanitary District
BOARD OF DIRECTORS
PAGE 1 OF 2
POSITION PAPER BOARD MEETIN<ac!tober 18, 1990
RECEIVE THE AUDITED FINANCIAL STATEMENTS
FOR THE FISCAL YEAR ENDED JUNE 30, 1990
NO.
9. BUDGET AND FINANCE a.
~tober 8, 1990
TEc;~WT;e{jDITED
INANCIAL
TATEMENTS
SUBJECT
SUBMITTED BY
Walter Funasaki, Finance Officer
INITIATING DEPT.lDIV
Administrative/Finance and Accounting
ISSUE: The audited financial statements of the Central Contra Costa Sanitary District for
the fiscal year ended June 30, 1990, and related management letter are being submitted
to the Board of Directors.
BACKGROUND: The firm of Johnston, Gremaux and Rossi, Certified Public Accountants,
has completed its examination of the District's financial statements for the fiscal year
ended June 30, 1990, and has submitted the audited financial statements and auditor's
opinion thereon.
In performing their examination of the financial statements, the auditors evaluate the
District's internal accounting controls to determine the nature and extent of the auditing
procedures required. Based on their observations during the course of the examination,
the auditors advise District management of any major weaknesses noted in the system
of internal accounting controls. As indicated in the management letter provided as
Attachment I, the auditor's evaluation disclosed no condition that was considered to be
a material weakness in the system of internal accounting controls.
The audited financial statements and management letter were submitted in draft form to
the Board's Budget and Finance Committee for review.
State and local governments which receive federal financial assistance of $100,000 or
more annually are subject to the requirements of the Single Audit Act of 1 984 for fiscal
years beginning after December 31, 1984. As Clean Water Grant proceeds received by
the District in the fiscal year ended June 30, 1990 were less than $100,000, the
requirements of the Single Audit Act did not apply to the audit by Johnston, Gremaux and
Rossi.
RECOMMENDATION: Receive the audited financial statements and related management
letter for the fiscal year ended June 30, 1990.
REVIEWED AND RECOMMENDED FOR BOARD ACTION
~IA TING DEPT.lDIV. .
~..~~
1302A-9/85 WF PM
ADS/posPaper#3/AudFinSt.PP
ATTAcm1ENT I
Johnston, Gremaux &Rossi
CERTIFIED PUBLIC ACCOUNTANTS
September 6, 1990
BOARD OF DIRECTORS
CENTRAL CONTRA COSTA SANITARY DISTRICT
We have audited the financial statements of CENTRAL CONTRA COSTA SANITARY
DISTRICT for the year ended June 30, 1990, and have issued our report thereon dated September
6, 1990. As part of our audit we made a study and evaluation of the District's system of internal
accounting control to the extent we considered necessary to evaluate the system as required by
generally accepted auditing standards. The purpose of our study and evaluation was to determine
the nature, timing, and extent of the auditing procedures necessary for expressing an opinion on the
District's financial statements. Our study and evaluation was more limited than would be necessary
to express an opinion on the system of internal accounting control taken as a whole.
The management of CENTRAL CONTRA COSTA SANITARY DISTRICT is responsible for
establishing and maintaining a system of internal accounting control. In fulfilling that responsibility,
estimates and judgments by management are required to assess the expected benefits and related
costs of control procedures. The objectives of such a system are to provide management with
reasonable, but not absolute, assurance that assets are safeguarded against loss from unauthorized
use of disposition, and that transactions are executed in accordance with management's
authorization and recorded properly to permit the preparation of financial statements in accordance
with generally accepted accounting principles.
Because of inherent limitations in any system of internal accounting control, errors or irregularities
may nevertheless occur and not be detected. Also, projection of any evaluation of the system to
future periods is subject to the risk that procedures may become inadequate because of changes in
condition or that the degree of compliance with procedures may deteriorate.
Our study and evaluation made for the limited purpose described in the first paragraph would not
necessarily disclose all material weaknesses in the system. Accordingly, we do not express an
opinion on the system of internal accounting control of CENTRAL CONTRA COSTA SANITARY
DISTRICT taken as a whole. However, our study and evaluation disclosed no condition that we
believed to be a material weakness.
This report is intended solely for the use of management and should not be used for any other
purpose.
-1~ G-~ ~~
JOHNSTON, GREMAUX & ROSSI
Certified Public Accountants
500 Lennon Lane, Walnut Creek, California 94598 . Tel (415) 944-1881 . Fax (415) 933-9167