HomeMy WebLinkAboutAGENDA BACKUP 07-19-90 ~ Central Contra Costa Sanitary Llistrict BOARD OF DIRECTORS PAGE 1 OF 1 POSITION PAPER BOARD MEE:fu~~ 19, 1990 NO 3. CONSENT CALENDAR a D~fily 6, 1990 TXc~E':Pflo~ONTRACT WORK SUBJEKCCEPT THE CONTRACT WORK FOR PHASE I OF THE HALL DRIVE SEWER IMPROVEMENT PROJECT (DP 4331A) AND AUTHORIZE THE FILING OF THE NOTICE OF COMPLETION SUBMm!ft~y B. Thom Senior Engineer INITIATIEni1fh~~ring Department/ Construction Division ISSUE: Construction has been completed on Phase I of the Hall Drive Sewer Improvement Project (DP 4331A) and the work is now ready for acceptance. BACKGROUND: Phase I of the Hall Drive Sewer Improvement Project included the installation of 2,700 feet of new 8-inch sewer on Hall Drive in Orinda. Also included in the project are connections for the future pipelines from Phase II of the Hall Drive Project. The Phase I improvements are required to relieve the existing sewer of upstream flow due to its deteriorated condition. Phase II will connect 23 homes currently served by the deteriorated easement sewer located along the creek bank into the Phase I Bypass Sewer. Additional information on the project is given on page CS-57 of the 1990-91 Capital Improvement Budget. On November 1, 1989, the Board authorized award of a contract to Ranger Pipelines, Inc., to construct Phase I of the project. Notice to Proceed was issued on December 27, 1989. The contract completion date was June 15, 1990. The contract work was substantially complete on June 15, 1990, and the new work was put into operation as of that date. The remaining work consists of punch list items which do not affect the project acceptance. The total authorized budget for Phase I of the project, including the cost of construction, engineering design, consultant services, District forces, testing services, etc. is $1,105,414. A detailed accounting of the project cost will be provided to the Board at the time of project closeout. It is appropriate to accept the contract work at this time. The Phase II work is expected to begin in early spring, 1991. The estimated cost of the Phase II work is. $700,000. RECOMMENDATION: Accept the contract work for construction of Phase I of the Hall Drive Sewer Improvement Project (DP 4331A) and authorize the filing of the Notice of Completion. REVIEWED AND RECOMMENDED FOR BOARD ACTION 1.10~A 9'8~> HBT JS~1 RAB INITIATING DEPT IDIV . Central Contra Costa Sanitary uistrict BOARD OF DIRECTORS PAGE 1 OF 2 POSITION PAPER BOARD MEJU1}PF19, 1990 SlIBJECADVISE THE BOARD OF THE CLOSE OUT OF THE OUTFALL REHABILITATION PHASE II PROJECT (DP 20056) NO 3. CCNSENT CALENDAR b. DATE July 9, 1990 TYPE OF ACTION INFORMATIONAL SUBMIT~1tty B. Thom Senior Engineer INI1E'1l~iftre'e:tJi'ng Department/ Construction Division ISSUE: All work has been completed on Phase II of the Outfall Rehabilitation Project (DP 20056) and this project can now be closed out. BACKGROUND: The Outfall Rehabilitation Project was required to upgrade the condition of the outfall in order to increase the plant's effluent discharge capabilities and allow the outfall to be operated in a pumped condition. A large portion of the work on the Phase II Project was performed directly by District staff. This work included the draining and cleaning of the outfall in preparation for the contractor, checking and evaluating the defective pipe joints, testing of the repaired joints, and the upgrading of the chlorination system. The major elements of the project performed by the contractor consisted of the installation of mechanical joint (Weco) seals for approximately 126 leaking pipe joints, thrust restraining harnesses, surge protection air release and air vacuum assemblies, large access hatches, additional dechlorination piping, an isolation slide gate at the weir structure, corrosion protection coatings, pressure grouting of fractured pipe sections, grouting and sealing of approximately 40 dry pipe joints found to have separated excessively, survey monuments, inclinometers, and strain gauges. Additional information on the Phase II Project is presented in the 1989-1990 Capital Improvement Budget beginning at page TP-7. The contractor, McGuire and Hester General Contractors of Oakland, commenced work on June 6, 1988, and completed all contract work on September 27, 1988, ahead of the original contract completion date of October 4, 1988. The contractor's portion of the project was accepted by the Board of Directors on October 6, 1988. The District staff continued with the remaining project work until September 1989. REVIEWED AND RECOMMENDED FOR BOARD ACTION JSM RAB l:jO~A 98" HBT (1 SUBJECT , ADVISE THE BOARD OF THE CLOSE OUT OF THE OUTFALL REHABILITATION PHASE II PROJECT (DP 20056) POSITION PAPER PAGE DATE 1 OF 2 Jul y 9, 1990 . McGuire and Hester's original construction contract was for $779,779.00. There were six change orders issued on the project for additional work associated with minor equipment modifications, providing additional mechanical j oint seals, and the repair of deteriorated existing lining discovered after the outfall was dewatered. The total amount for all change orders was $60,822.84. The total contract amount paid to McGuire and Hester was $840,601. 84. The total budget for the project was $2,453,214. The total cost for work performed by District staff and consultants during design and construction was $1,282,310. The total completed project cost is $2,209,100 which is approximately 10 percent less than the budget. The close out of this project has been delayed due to the delay of the final billing from the design consultant. Staff is closing out the project account which will result in $244,130 being returned to the Treatment Plant Program. RECOMMENDATION: This item is presented to the Board of Directors for information. No action is necessary. 13028-9/85 -.-----.-.. '-----"---'----_.~_._.__._._,._-----.",.__._-,-~~._-------------~.,..._._"-----_...__.,._~-_.,....._._....-~.-. -. -~---_."'-_.._..".,..-..,._-_.._--_._---~_.._---,--_.------- . Central Contra Costa Sanitary District BOARD OF DIRECTORS PAGE 1 OF 2 POSITION PAPER BOARD MEETING OFJuly 19, 1990 NO. 3. CONSENT CALENDAR c. DATE July 16, 1990 SUBJECT ADVISE BOARD THAT A CENTRAL COUNTY WASTE CHARACTERIZATION STUDY IS BEING UNDER- TAKEN TO COMPLY WITH AB 939 TYPE OF ACTION INFORMATIONAL SUBMITTED BY Paul Morsen De ut General Mana er INITIATING DEPT!DIV Administrative Department ISSOE: Informational - Update the Board on the District's progress in complying with Assembly Bill 939. BACKGROOND: All cities and counties are state mandated under AB 939 to prepare a Source Reduction and Recycling Element (SR&RE) by July 1, 1991. As Central Contra Costa Sanitary District is the garbage franchiser for Danville, Lafayette, Orinda and Moraga, District staff will assume their responsibility to comply with AB 939. The SR&RE consists of ten components. One of the components is a waste characterization study, which describes the constituents of a jurisdiction's solid waste stream by quantity, type, and generator source. Five of the remaining nine components require the development of alternative programs for the diversion of solid waste from landfill disposal: source reduction, recycling, composting, special waste, and household hazardous waste. The results of the waste characterization study will be used to determine which types of materials should be targeted for the alternative diversion programs to meet the solid waste reduction goals; 25 percent reduction by 1995 and 50 percent reduction by 2000. Therefore, the waste characterization study is the first step in preparing the SR&RE. A separate study for each of the central county cities would be costly and would require a high level of coordinating efforts with the garbage haulers, transfer stations and disposal facilities. Acknowledging this fact, the California Integrated Waste Management Board (CIWMB) encourages regional studies where practicable. To this end, District staff solicited participation with all central county cities and the county for a central county (regional) waste characterization study. All central county jurisdictions agreed to participate in a regional study with the exception of Clayton and the County. District staff will include the unincorporated areas within Central County in the study. The unincorporated areas in central county will be included in any future solid waste diversion programs implemented by the District. Study information will assist in making these decisions. REVIEWED AND RECOMMENDED FOR BOARD ACTION F ENG. SUBJECT ADVISE BOARD THAT A CENTRAL COUNTY WASTE CHARACTERIZATION STUDY IS BEING UNDER- TAKEN TO COMPLY WITH AB 939 POSITION PAPER 2 2 PAGE DATE OF .Tn1 u , e;. ., a a n - In order to form a joint cities committee for project management, the District invited all central county city representatives to participate in the consultant selection process. Representatives from the cities of Concord, Martinez, Pleasant Hill, San Ramon and Walnut Creek have volunteered to serve on the committee and have actively participated in selecting a consultant. These representatives, along with District staff, constitute the joint cities committee. The committee received five proposals ranging in cost from $89,361 to $304,118. After receiving the proposals and interviewing three of the consultants, the committee recommended Cal Recovery Systems, Inc. to conduct the study. Cal Recovery proposed a cost of $96,735. The general scope of work and completion schedule are included in Attachment I. The final agreement including a detailed scope of work will be coordinated with participating cities and negotiated after the committee agrees on July 23, 1990 to the terms and conditions that will be acceptable to each participating jurisdiction. The consultant will bill the District and each city separately and proportionately according to the tonnage of garbage disposed from within the boundaries of each franchiser's service area. A total of fifty five thousand dollars ($55,000) is allocated in the O&M budget in the 1990-1991 fiscal year for Central San's efforts in complying with AB 939 for Danville, Lafayette, Orinda and Moraga. Central San's portion of the total cost of the waste characterization study is not known exactly at this time; however, the authorization will be accommodated within the General Manager- Chief Engineer's signature limit of $50,000. AB 939 allows each jurisdiction to impose fees for preparation, adoption, and implementation of the SR&RE. Central San's portion of the study will be included in the franchise fees collected from the franchise refuse collectors in the 1990-1991 fiscal year. The resulting increment to the residential collection rate will be approximately $.07 per month. The remaining participating cities will determine their own funding mechanisms. RECOMMENDATION: District staff is advising the Board of actions taken for preparation of a Central County Waste Characterization study in compliance with Assembly Bill 939. Informational - No Board action is required. SSS/P.P#2/Informa.PP 13028-9/85 -'---.--_".______._~_v____".._____,.__"'__~_"_._,,.....'_._.._..,....__.___...,.,_____~___.__~.'__.._._~___._ . Central Contra Costa Sanitary District BOARD OF DIRECTORS POSITION PAPER PAGE 1 OF 2 NO. 19 1990 4 . ENGINE:ERlN; a. DATE SUBJECT AUTHORIZE THE GENERAL MANAGER-CHIEF ENGINEER TO EXECUTE AN AGREEMENT WITH CH2M HILL ENGINEERS FOR PHASE 2 OF THE ORINDA SEWER IMPROVEMENTS PROGRAM, DP 4614 AUTHORIZE AGREEMENT SUBMITTED BY James Coe Associate En ineer INITIATING DEPT/DIV Engineering Department/ Plannin Division ISSUE: Authorization by the Board of Directors is required for the General Manager-chief Engineer to execute professional services agreements for amounts greater than $50,000. BACKGROUND: The Wastewater Collection System Master Plan identified capacity deficiencies in Orinda (Watersheds 2, 3, and 8). These deficiencies are validated by the District's recent experience of wet weather overflows nehr Moraga Way and Glorietta Boulevard and high flows at the Crossroads Pump Station during rain storms. Overflows in Orinda are of particular concern since the area drains to San Pablo Reservoir, a drinking water source for the East Bay Municipal Utility District. A four-phase sewer improvements program is underway to correct these deficiencies. The first phase consisted of wet weather flow monitoring. In February 1989, the Planning Division selected CH2M Hill Engineers to conduct wet weather flow monitoring at ten sites in Orinda south of Highway 24 (Watershed 8). The flow monitoring demonstrated that almost one-third of Watershed 8 exhibits excessive rainfall-dependent infiltration (RDI) during moderate rainstorms. sixteen additional sites north of Highway 24 (Watersheds 2 & 3) were monitored this past winter. Results of this monitoring confirm that RDI is also a significant problem in these areas. It is now time to begin Phase 2 of the Orinda Sewer Improvements Program. Phase 2 includes collection of relevant data, preliminary geotechnical and cost effectiveness studies, identification of near-term projects, and recommendation of an overall approach for the remaining phases of the project. The third phase will include more detailed studies in high priority areas and field work. Phase 4 will include the phased design and construction of projects. This project is listed on page CS-45 of the FY 1990-91 Capital Improvement Budget. INITIATING DEPT/DIV. RAB SUBJECT POSITION PAPER AUTHORIZE THE GENERAL MANAGER-CHIEF ENGINEER TO EXECUTE AN AGREEMENT WITH CH2M HILL ENGINEERS FOR PHASE 2 OF THE ORINDA SEWER IMPROVEMENTS PROGRAM, DP 4614 PAGE DATE 2 OF 2 July 16, 1990 A cost reimbursement agreement with a cost ceiling of $76,000 for Phase 2 has been negotiated with CH2M Hill Engineers. CH2M Hill was selected for this work based on their experience on similar projects, knowledge of the project area, and satisfactory work on Phase 1. The District will conduct environmental evaluations of future construction projects as they are identified during this planning program. Depending on the type of project and potential environmental impacts, preparation of a Notice of Exemption, Negative Declaration, or an Environmental Impact Report may be required in accordance with District CEQA guidelines. The appropriate CEQA documentation will be prepared by the District or by an outside consultant at that time. RECOMMENDATION: Authorize the General Manager-Chief Engineer to execute a cost reimbursement agreement with CH2M Hill Engineers in the amount of $76,000 for Phase 2 of the Orinda Sewer Improvements Program (DP 4614). 1..._______.. 1302B-9/85 ., Central '- antra Costa Sanitary l .strict BOARD OF DIRECTORS PAGE 1 OF 4 POSITION PAPER BOARD MEETING OF NO. SUBJECT 4. ENGINEERING b. DATE AUTHORIZE EXECUTION OF AN AGREEMENT WITH JOHN CAROLLO ENGINEERS FOR DESIGN OF THE MARTINEZ RENOVATION-BERRELLESA STREET, ARREBA STREET, MARINA VISTA, AND "F" STREET SEWER REPLACEMENT PROJECT DP 4768 AUTHORIZE AGREEMENT SUBMITTED BY INITIA T1NG DEPT./DIV. Eng~neer~ng D7P~r~ment Laura A. Gee ISSUE: Authorization by the Board of Directors is required for the General Manager-Chief Engineer to execute a consulting engineering agreement in an amount greater than $50,000. BACKGROUND: The District annexed the City of Martinez collection system in 1967. The Martinez system is old and in need of renovation and expansion. Sewage overflows during rainstorms occur every two to four years when combined sewer flow and infiltration/inflow (I/I) exceed capacity of the system. Dry weather overflows occur and wet weather overflows are aggravated due to root intrusion and damaged pipes. In 1987, a planning effort was initiated to determine the nature and extent of the facilities necessary to upgrade the Martinez sewer system. The facilities planning effort was completed in December 1989. The Facilities Plan recommended that a portion of the Berrellesa Street trunk sewer between "c" Street and the Martinez Pumping Station be replaced. In 1988 the portion of the trunk sewer between Marina Vista and the pumping station was replaced as part of the "Early Start.. Project; the portion between Ward Street and Marina Vista will be replaced as part of the Subbasin 5-Lower Renovation Project. The proposed project will complete the near-term improvements to the trunk sewer from Ward Street to "C" Street. A short extension of the main sewer on Arreba Street will be included in the proposed project work. In addition, two other sites have been identified as requiring near-term improvements. The 18-inch trunk sewer in Marina vista is in very poor structural condition and it will be replaced from Berrellesa to Castro Street. The six-inch main sewer in "F" Street does not have adequate capacity for existing conditions and it will be upsized to accommodate the required. design flows. REVIEWED AND RECOMMENDED FOR BOARD ACTION 1302A-9/85 DRW RAB rp tOw ImP SUBJECT AUTHORIZE EXECUTION OF AN AGREEMENT WITH JOHN CAROLLO ENGINEERS FOR DESIGN OF THE MARTINEZ RENOVATION-BERRELLESA STREET, ARREBA STREET, MARINA VISTA, AND "F" STREET SEWER REPLACEMENT PROJECT, DP 4768 POSITION PAPER PAGE DATE 2 OF 4 July 16, 1990 The trunk sewer replacement element of this project will consist of approximately 4,800 feet of 18- and 21-inch diameter sewer pipeline to be installed in Berrellesa Street and Alhambra Avenue. The Arreba Street Extension will consist of approximately 600 feet of 8-inch diameter main sewer. The Marina Vista Trunk Sewer will consist of approximately 750 feet of 12-inch diameter trunk sewer. The "Fit Street Main Sewer will consist of approximately 750 feet of 8-inch diameter main sewer. The project will also include the replacement of the lower lateral sewers serving homes and businesses currently connected to the sewers being replaced. The lower laterals will be replaced to the private property line where two-way clean-outs will be installed to provide access to the laterals for cleaning, performance testing and overflow prevention. The District is replacing lower laterals (that portion which is within the public right-of-way) in this project as part of an ongoing demonstration pilot program to determine the extent of III reduction. Even though the District will replace the lower laterals in this project, under District Code, the property owner is still responsible for maintenance of the entire lateral. Under any main sewer replacement project, it is not uncommon to replace the lower lateral to match the location and grade of the new sewer. District staff is preparing a proposed policy for lateral replacement which will be submitted to the Board for consideration in the future. The estimated construction cost of the rehabilitation and replacement is $1,550,000. proposed sewer John Carollo Engineers (JCE) was selected to design the recommended Martinez Sewer Improvements, based upon their experience and performance in the design of the Martinez "Early Start" Sewer Improvements and other experience in designing small and large diameter sewer systems, including the District's 1-680 trunk sewer relocations and portions of the Walnut Creek Bypass Sewer. A cost reimbursement agreement has been negotiated with JCE with a cost ceiling of $139,000. -- This project has been evaluated by staff and determined to be exempt from the California Environmental Quality Act (CEQA) under District CEQA Guidelines Section 18.3, since it involves replacement or reconstruction of existing facilities involving 13026-9/85 SUBJECT AUTHORIZE EXECUTION OF AN AGREEMENT WITH JOHN CAROLLO ENGINEERS FOR DESIGN OF THE MARTINEZ RENOVATION-BERRELLESA STREET, ARREBA STREET, MARINA VISTA, AND "F" STREET SEWER REPLACEMENT PROJECT, DP 4768 POSITION PAPER OF 4 PAGE 3 DATE July 16, 1990 negligible or no expansion of capacity. A Notice of Exemption will be filed with the County Clerk. The proposed sewer rehabilitation project is included in the 1990- 91 Capital Improvement Budget beginning at Page CS-40. RECOMMENDATION: Authorize the General Manager-Chief Engineer to execute a cost reimbursement agreement with a cost ceiling of $139,000 with John Carollo Engineers for the Martinez Renovation - Berrellesa Street, Arreba Street, Marina Vista, and "F" Street Sewer Replacement Project, DP 4768. 13028-9/85 l' -:\ s P.... _..~ ~ ~ .~ ". ',' ~ ~ " , . ~ ..'" '1;, I' . ~ . .' . ;(J CCC ., .... ........... ~ :/ .~~~~'I'a ~. , ~. u/~ .-.>\\: ~ . ~~ ~, ~ .'\ ~ '\~ ~.v:..~ ~ iF.. ~~ :.- ~ ,'l @ t4? , ,~ ~ .... y,,~ :.t. I ~ -. ~'( ~~ ~ V~'~A. ~. _~.~ ~I~ ;~ - ~~. .~. ~;:':.Jj:..~~ 11 .... ~. . ~ ~?g;, .~ ;;L' JE ~ '" W .{ ~ ~.' t.~~;' ~.\ ~ ~... ~ ~ .. ~ \ ;'T~'V.~ =. , . ~ .(~K .",. , ''\r .." " :-. ~...... ,.' ~ , ~. : II . "\... .' '~i.r I.eLL OIL CO. ,. .. .;,~. .'. #614.... -, (~.... ..-/ .... :s " ...... ~,.. ,. . ~~ ~I ~ .' ""'" -;: l!<. '.' "f ~ ..r 'tJflIJ. \.,,,, .""~"'. '''' ....,..,.,...y ~ " ". . ~ " . ...~ .'iI' .. .....ntC1 ~ v ~ S. . 3"' -, · · i = I r i . l' ...., ,'" 'nL r~ ..: · Y\ ~ !i~",,, .. ~ .... ~~~l .>>r ~~ /1 .~~ - i;;. " .~~..~:. .. f'(.y.-....:;..' I "\\' a,.j"'!I'..~f"~.k."",.... , 4' ~ J~.i J \. \ \ \ . _t CON'R" COSf. I COUNTT HOSI't'''L : r-- U _J--~~ ID[1;'cm '-- .. I.", . ~ J. . ., , Q . \ R~...., :: "i;L '/ ~\W . t I l! .' . C C C - ..... SS~ ': i,... ! ~ "z. . . . ft, ) "OUS'NG ""'..,..n r-L~ .~~ .. ~IE ~ ~1' .. ~l"" t:~ C:lll' '~' ~ . . '1': ~.1..J h ,:-- ~ "'O""fC"O '~...' ... o iIoI -"':-". .(. B . " 11 ..l --II "Ie ., '.A' ~~'''':: It' b..!. "00< (''''S.JP~~J:Ifffj~7' ~~I~~ .. II.. )... rn . ....'ft _!~.)- ::.t..~7 J I L!:.:.:1.. y- ) ~ _ ~. Ji!I~ rr~ . .. '-. I;.~~"'~ ;~ ,.. ~... .. r;?J ~ ,..~ CJ.~~Jj ~\_~' K ' .. _ If\.}.~ I L ~ ~ ____ Project Locations MARTINEZ RENOVATION SEWER REPLACEMENT PROJECT Fig. 1 2523-9/88 . Centra~ ~ontra Costa Sanitar) .Jistrict BOARD OF DIRECTORS POSITION PAPER PAGE 1 OF 3 NO. 4. ENGINEERING c. SUBJECT DATE AUTHORIZE EXECUTION OF AN AGREEMENT WITH CAMP DRESSER & MCKEE FOR FINAL DESIGN OF THE MARTINEZ M-4 PARALLEL FORCE MAIN, DP 4781 TYPE OF ACTION AUTHORIZE AGREEMENT SUBMITTED BY Curtis Princi ISSUE: Authori zat i on of the Board of Di rectors is requ i red for the General Manager-Chief Engineer to execute a professional services agreement in an amount greater than $50,000. BACKGROUND: The District annexed the City of Martinez sewer system in 1967. In 1970, three pump stat ions and force mains were placed in servi ce to convey wastewater from Martinez to the District treatment plant (see attached sketch). Since then, there have been several problems with the force mains. The M-2 force main from the Maltby Pump Station has suffered several failures due to ground settlement and corrosive soils. Leaks due to corrosion have also occurred on the M-4 force main from the Fairview Pump Station. When repairs are made to either the M-2 or M-4 force main, sewer service from Martinez is interrupted and on occasion raw sewage has been bypassed at the Martinez Pump Station. A parallel M-2 force main has been designed and will be constructed during the latter half of 1990. Construction of a parallel M-4 force main will provide needed conveyance reliability from the Fairview Pump Station to the Maltby Pump Station. With the completion of this project, overall system reliability will be provided for conveying wastewater from the Martinez Pumping Station to the treatment plant. Preliminary design of the M-4 parallel force main has been completed. The proposed parallel force main project consists of approximately 5,500 feet of 20- inch pipeline and appurtenant valve, access, and corrosion facilities. The current estimated construction cost of the M-4 Parallel Force Main Project is $1. 7 mill ion. Preliminary design (alignment, etc.) of the M-4 parallel force main was completed under the M-2 Parallel Force Main Project (DP 4610). Final design and construction of the M-4 parallel force main was originally intended to be completed along with the M-2 parallel force main. However, due to complications, the M-4 Project was delayed and will be designed and constructed separately. Camp Dresser & McKee (COM) has been selected to provide final design services for the M-4 Parallel Force Main Project. COM is familiar with the project since they performed preliminary design of the M-4 parallel force main, designed the M-2 parallel force main, and were a subconsultant on the preparation of the Martinez Sewer Improvement Facil ity Pl an. A cost reimbursement agreement has been negotiated with COM with a cost ceiling of $118,300. REVIEWED AND RECOMMENDED FOR BOARD ACTION 1302A-9/85 CWS DRW RAB ()/AJ )fJt SUBJECT AUTHORIZE EXECUTION OF AN AGREEMENT WITH CAMP DRESSER & MCKEE FOR FINAL DESIGN OF THE MARTINEZ M-4 PARALLEL FORCE MAIN, DP 4781 POSITION PAPER PAGE 2 OF 3 DATEJuly 16, 1990 The District will prepare an environmental evaluation of the project. Depending on the potential project impacts, preparation of a Negative Declaration or an Environmental Impact Report may be required in accordance with District CEQA Guidelines. The appropriate CEQA documentation will be prepared by the District or by an outside consultant at that time. The proposed M-4 Parallel Force Main Project is included in the 1990-91 Capital Improvement Budget (page CS-82 to CS-84). The total project cost estimate as listed in the budget for the M-4 parallel force main is $2,232,000. RECOMMENDATION: Authorize the General Manager-Chief Engineer to execute a cost reimbursement agreement with a cost ceiling of $118,300 with Camp Dresser & McKee for final design of the M-4 Parallel Force Main Project. 13028-9/85 @ WalnLit Creek IIIIIIIIII Project Location Central Contra Costa Sanitary District I M-4 PARALLEL FORCEMAIN 2523-9/88