HomeMy WebLinkAboutAGENDA BACKUP 03-01-90
.
Centra. =ontra Costa Sanitar~ .Jistrict
BOARD OF DIRECTORS
PAGE 1
OF 5
POSITION
PAPER
BOARD MEETING OF
Ma rch 1, 1990
NO.
IV.
BIDS AND AWARDS
1
SUBJECT
AUTHORIZE AWARD OF CONTRACT TO LES MCDONALD CONSTRUCTION
COMPANY FOR THE CONSTRUCTION OF ASH STORAGE BASIN I
IMPROVEMENTS AND HOLDING BASIN LEVEE ROADS PAVEMENT,
DISTRICT PROJECT NOS. 10066 AND 10067
DATE
Februa ry 23, 1990
TYPE OF ACTION
AUTHORIZE AWARD
SUBMrBT~Df: Th an
Assistant Engineer
INITIA TING DEPT./DIV.
Plant Operations Department
ISSUE: On February 15, 1990, sealed bids for the Ash Storage Basin I Improvements
and Hol ding Basin Levee Roads Pavement Projects, District Project Nos. 10066 and
10067, respectively, were received and publicly opened. The Board of Directors must
award the contract to the lowest responsible bidder or reject bids within 60 days of
the opening date.
BACKGROUND: The District wastewater treatment plant produces an average 12 tons
per day (24 cubic yards per day) of incinerator ash and 2 tons per day (1.5 cubic
yards per day) of dewatered grit. Presently, the ash is transported to both Redwood
Sanitary Land Fill, Inc. and the Colusa County Landfill for disposal. Grit is
transported and disposed of only at Redwood Sanitary Land Fill, Inc. The purpose of
District Project No. 10066 is to provide temporary on-site storage of ash and
dewatered grit in the event that off-site disposal is not available. The ash or
grit stored on site will be removed after the disposal crises ends and will
ultimately be disposed of off site in an approved manner.
The treatment plant has three basins north of the plant that store wet weather flow.
One of the levee roads is the major artery to the plant's dechlorination facility at
the north end of the holding basin, and another levee road provides access to the
plant's main electrical station. The levee roads will also provide access to the
on-site ash and grit storage basin. During winter, these gravel roads deteriorate
forming potholes and washboard ridges in the roadway. District Project No. 10067
was desi gned to 'pave these 1 evee roads with asphal t concrete to provi de safe,
year-around access to maj or process facil iti es. These two proj ects have been
combined for ease of bidding, cost savings, and construction coordination.
Pl ans and speci f i cati ons for these proj ects were compl eted by the Pl ant Operati ons
Department staff and were publ icly advertised on January 29, 1990, and February 5,
1990. A total of 14 bids were received and opened on February 15, 1990. A summary
of the bids is shown in Attachment I. An evaluation of the bids, conducted by Plant
Operati ons Department staff, concl uded that the lowest responsi bl e bi dder isLes
McDonald Construction Company with a bid price of $154,000. The favorable bid price
reflects an aggressive bidding climate. The engineer's estimate was $225,000.
These projects are included in the 1989 - 1990 Capital Improvement Budget, pages
TP-30, Sludge/Ash Handling Project, and TP-63, Pave Holding Basin Levee Roads. The
total amount budgeted for the contracted work was $300,000. The budget to complete
this project is $250.500. as shown in Attachment II.
BTT
RECOMMENDED FOR BOARD ACTION
INITIATING DEPT./DIV.
8r1
1302A-9/85
JLB
SUBJECT
POSITION PAPER
AUlHORIZE AWARD OF CONTRACT TO LES MCDONALD CONSTRUCTION
COMPANY FOR lHE CONSTRUCTION OF ASH STORAGE BASIN I
IMPROVEMENTS AND HOLDING BASIN LEVEE ROADS PAVEMENT,
DISTRICT PROJECT NOS. 10066 AND 10067.
PAGE
2
5
OF
Dt~bruary 23, 1990
This project has been eval uated by staff and determined
to be exempt fran the Cal ifornia Environmental Qual ity Act (CEQA) under District
CEQA Guidelines, Section 18.2, since it involves a minor alteration to an existing
facility.
RECOMMENDATION: Authorize award of the constructi on contract in the amount of
$154,000, for Ash Storage Basin I Improvements and Hol ding Levee Roads Pavement,
District Project Nos. 10066 and 10067, to Les McDonald Construction Company as the
lowest responsible bidder.
---.------..
13028-9/85
ATTACHMENT I Page 3 of 5
Ce"'~al Contra Costa Sf 'itary District
lOu66 SUMMARV DF BIDB
and Ash Storage Basin I Improvements and
PROJECT NO. 10067 - Holding Basin levee Roads Pavement DATE February 15.1990
LOCATION District Treatment Plant $ 225,000
ENGR. EST.
II:
<Vt BIDDER (Name; telephone & address) BID PRle.
Les McDonald Constructlon <415 ) 785",,4844 $ 154,000
Company
1 P.O. Box 4076, Hayward, CA 94540 ,
W.K. McLeland Company ( ) $ 156,550
2 254 Sears Point Road, Petu1uma, CA 94954
-
Gallagher and Burk, Inc. ( ) $ 176,495
3 P.O. Box 7227, Oak1 and, 'CA 94601
O.C. Jones and Sons ( ) $ 180,180
4 1520 Fourth Street, Berkeley, CA 94710
Oliver de Silva, Inc. ( ) $182,6.53.50
5 P.O. Box 4437, Hayward, CA 94540
-
E Heide and Williams, Inc. ( ) $ 182,750
P.O. Box 2007, Napa, CA 94558
, ,
Gr~de-Way Construction ( ) $ 184,539
43801 Osgood Road, Fremont, CA 94539
Bay Cities Paving and Grading ( ) $ 184,866
~
5200 Huntinqton Avenue, Richmond, CA 94804
-
Gradex Company ( ) $ 196,884
9 P.O. Box 23319, Pleasant Hill, CA 94523
Branaugh Excavating, Inc. ( ) $ 197,459
10 P.O. Box 2388, Livermore, CA 94550
Antioch Paving Co., Inc. ( ) $ 210,750
11
P.O. Box 1669, Antioch, CA 94509
Ransome Company ( ) $ 214,990
l~ P.O. Box 8506, Emeryville, CA 94662
PREPARED BY _~ -r .-eLe.../
Sa T, Than .
DATE
February 15, 1990 1
SHEET NO.
2
OF
2S0~1I/84
/[
\VI
ATTACHMENT I Page 4 of 5
ee""'al Contra Costa ~ 'tary District
10066 SUMMARY DF BIDS
and Ash Storage Basin I Improvements and
10067 - Holding Basin levee Roads Pavement DATE Februarv 15.1990
District Treatment Plant $ 225,000
ENGR. EST.
PROJECT NO.
LOCATION
BIDDER (N...; telephone & address)
I
13 Winton Jones Contractor, Inc. ( ) $
194~ Arnold Industrial Hfghway 216,290
Concord, CA 94520
-
Fanfa, Inc. ( ) $
14 2401 Grant Avenue, San Lorenzo, CA 94580 217 ,737
( ) $
-
( ) $
( ) $-
-
( ) $
, ,
( ) $
( ) $
-
( ) $
( ) $
( ) $
( ) $
~ t. L~'" ~ February 15, 1990 2 2
PREPARED BY ,. DATE SHEET NO. OF
BID PRle.
Sa T. Than
2S0J-ll/84
ATTAaiMENT II
Ash Storage Basin I lIIprovements
and
Hol di ng Basi n Levee Roads Pav_ant
District Project Nos. 10066 and 10067
Post-Bid/Pre-Construction Estimate
Item
Description
Construction Contract
1
2
Estimated Construction
Contingencies at 20 percent
3
Subtotal
4 Estimated Construction
Inci denta 1 s to Proj ect
Completion:
';'-~"
- Inspection
- Contract Management
- Plant Operations Dept.
Staff During Construction
- Testi ng
- Miscellaneous (Legal,
(Survey, and As-builts)
5
6
Subtotal
Plant Security
Item
Amount
T ota 1
S 154.000
30,800
$ 184,800
$ 9,600
3,900
4,000
2,500
2,200
$ 22,200
4,500
Total Es.tf.a1:ed Construction Cost
211.500
7
8
Pre-Bid Expenditures
Total Current Est1.a1:ed
Project Budget
9
39,000
S 250.500
Page 5 of 5
"
Percent
Construction
Contract
100
12
.
Central Contra Costa Sanitary Oistrict
BOARD OF DIRECTORS
PAGE 1 OF 2
POSITION
PAPER
BOARD MEETING OF
March 1 1990
NO.
v.
CONSENT CALENDAR 1
AUTHORIZATION FOR P.A. 90-3 (WALNUT CREEK)
TO BE INCLUDED IN A FUTURE FORMAL ANNEXATION
TO THE DISTRICT
DATE
Febru r
TYPE OF ACTION
SUBJECT
ACCEPT ANNEXATION FOR
PROCESSING
SUBMITTED BY
Dennis Hall
Associate En ineer
INITIATING DEPT/DIV
Engineering Department/
Construction Division
P a rce 1
No.
Area
Owner, Address
Parcel No. & Acrea e
Remarks
Lead
A enc
I
I
I
A.A. Affinito, etal
2980 Railroad Avenue
Pittsburg, CA 94565
139-130-016 & -017
(14 acres more or less)
Proposed subdivision
6604, containing 5 lots
for single family
I resi dences. Negati ve
I Declaration by the City
I of Wal nut Creek
I
Walnut Creek
90-3 Walnut
Creek
<76B1>
RECOMMENDATION: Authorize P.A. 90-3 to be included in a future formal annexation.
1302A-9/85
DH
JSM
RAB
REVIEWED AND RECOMMENDED FOR BOARD ACTION
INITIATING DEPT/DIV.
111(
I)(J
~~~ F':.O--Ll~..i\\ ~J. \ -;j \ 5r~'f.i~~'''~ . 10 LL--\~;q\~~ - I I J-, \~{ ~~~~~ c~1 ~ ~ '-J.....:J1~1.t:...
1~~2,4.t1 rO _ ""}' r)}-'f^_.~ ... \\ 19..>'~ f~l-I ~ \~\~ 10 \'\1 \' 32 33 ~$ .~"f : :: . .~
137 . 144 [3;.-;7 120 3' C1. ~ 3 ~ ~\l. o'l.-1--_~~--~'" " " T .':;Z; ic;.
K':"L "5 .'_ -:,'J /__ ~ ,J.:... . .. 1 ~ \~to\ - _LA.~~1" -' \ 31 B.
711fFj.. I. : ~.". h" WA L N U'T ~~ E N'UE~""'" ," ~.}: i~ ~ G\~ : ~lo'< .;;:..... . <>1 1 :~..,.. ...~~... al~ .D
1JL~ii~' ~fj "=' ... ..~~. ... .....i.:.1 C, 1~...tif;~f,~5j,~i!.. .". ·
7J~ ~.: It': -~.. ,; ".: ~imi;~"~ "..," 7~.l:rII1~~1. · l ,~.
~~l~47..1~ e.'T ~ 200AC r-T 15 iti I l:l.~ 14 ~~jff!; ..". --Z5IOM J~,
I -~ rc 4 ,I ~ ~/Ottl"'. T .) :: ~:'...:,,,,:...:...~.:...:...~....::i:;:i 51 : ff;;; ~OS LL!:- u ;~;:;
~:5~ T 27 4, 4 II ~ K:l~:':"''t$.:d t :i~'~.:;; itfA.3\ IC~. ~bl5 ~J!~IItI:.~'::::t1 OC__
1: '"""1'J F~ .::.:....;;;;;I.~. !'f...r....:.:.:.:.:.. )\ rEI n (]-:-::::.:, I A)8 C
> B ~ '~.;'. ~'1j;"SWEF! ..... I~':::::~:::::::::::::::::::::::: zo -=- 72::''::~f.'
p 53~. - 41 "0,, ,. -~: .;~~ ;~~ Ill7~ ~~:ai!~iiiiii!t.t'rit::( t- i- i\+6: VIr RO D
~~~ __ 5 3~0 'ii&J '/2~/' ~I~ : ORIVEjJ{C~IRifE21~ .'. ~ !!~i!!!!!!! q ~ 7 .f~~ oRLARolEsmls DR
::~ 1- ~1.'" 2/ ~.4" s.~.z..'..:..':"'.."..'.".'.: e B A .:~.:.:.: -:r 80 5:'~a: 1 I
,~ . ,n co -S-, 'tl NI $;1.,. " '~':::'. ~ L ":i
l2~ ~ ;;IIoN e7'~ ~ e ~~3(i :(~\ -;-~ ~ 7B 7~'~~:~' ....., .... ......................................... ..'
~..~ ~ ~.::u..el'lf~~~
~.' 0 ;~~~rL~~~r~ .~...~.~.
"'- I/> 'F -"'r] - - 17
Z ~86 ~ ~ 72,\ ~ r:r 15)
~ s'lsel B lfd"G~ION G3 ~ 65 ~ I
;! t..~ r,1'~ 5 II 14 .... ~_'" Zl m. l' C DR ~ .I:>- _ -0- 52 51 Z 42 41 ~ 32' !II 7 (
1\. __ _ ..... ,'1 50~ 40:;; 3O~ \I.
- 7 57 ~ 13 Y 1/ - .... rr u ~r:~ .... ~
r ~. ~ z~ -.:'1 . ~::.:Z :::::::::::::
po- J5(!<i ~IY :).. . _ ":..m :., :;::':"=:::'
L )4 ~ t- t 'ff71.:. ..... . ," r '1" .. {,':::':\
~ ;;"". (;,. ~ au I'. H l :1'\ -" :~~~~~tf ..
~~t'~}i'\'41 .. :;,~, ' !r~f~MI~: ~RI~-\._J\ .~ ~'"
--_ilit'J%@r"",,:- ---r--i ~ ~ :'~~".
". ....... ~
~ "
c
Me ADA
27.371
('.,.~
.,.
';
\
!1.05 AC
TYLER
54. 14 Ae
L-
Z.OIAC
4.88 AC
PROPOSED ANNEXATION
~
P .A. 90-3
I~
.
Central Contra Costa Sanitary lJistrict
BOARD OF DIRECTORS
PAGE 1 OF 2
POSITION
PAPER
BOARD MEETING OF
Ma rch 1, 1990
NO.
v. CONSENT CALENDAR 2
SUBJECT DA TE
ESTABLISH MARCH 15, 1990 AS THE DATE FOR A PUBLIC HEARING Februar 23, 1990
TO CONSIDER CHANGES TO THE DISTRICT CODE REGARDING TYPE OF ACTION
INSURANCE REQUIREMENTS FOR PRIVATE SEWER CONTRACTORS SET PUBLIC HEARING
DATE
SUBMITTED BY
Jay S. McCoy
Construction Division Mana er
INITIATING DEPT.lDIV.
Engineering Department/
Construction Division
ISSUE: Changes are requi red to the Di stri ct Code regardi ng insurance
requirements for private sewer contractors.
BACKGROUND: It is the policy of the District to require private sewer
contractors to provide certificates of insurance as a part of the registration
process for these contractors. In addition, the District takes an active role in
monitoring and ensuring that updated certificates of insurance are on file prior
to i ssui ng permi ts to regi stered contractors. The Di stri ct performs these
functions voluntarily and has no mandatory duty to perform the functions.
Staff has reviewed its role relative to insurance certificates and has determined
that if the District takes a less active role in monitoring these certificates,
the potential for the creation of a mandatory duty to monitor and maintain
updated certificates will be lessened. If the District does not impose on itself
a mandatory' duty through its policies, the liability of the District for an
injury caused by a District permitted contractor who was uninsured at the time of
injury will be lessened. It is prudent to make changes to the District Code to
clarify the role of the District and to decrease the involvement of the District
in requiring and monitoring certificates of insurance so as to prevent the
creation of a mandatory duty.
This proposed change coincides nicely with the implementation of the new
procedures for processing of irrevocable offers of dedication. The District will
reduce its liability through the use of I.O.D.s. The District can further reduce
its liability by adopting the proposed changes to insurance requirements. The
insurance changes wi II be phased in such that contractors who work on private
sewer projects where easements have been granted to the District will be required
to have insurance. District staff will continue to monitor the insurance of
these contractors as needed. Eventually al 1 easements rel ated to private sewer
projects will be conveyed to the District through LO.D.s. At that time the
District will cease all monitoring of insurance requirements for private sewer
contractors. These contractors will no longer have to submit insurance
certificates to the District. However the District will continue to require
contractors who work on District projects to submit certificates and staff will
monitor these certificates.
JSM
~ce
JC
"
i:
OMMENDED FOR BOARD ACTION
/IfJfJ
GEN. MGR/CHIEF ENG.
'r
1302A-9/85
KA
RAB
SUBJECT
ESTABLISH MARCH 15, 1990 AS THE DATE FOR A PUBLIC HEARING
TO CONSIDER CHANGES TO THE DISTRICT CODE REGARDING
INSURANCE REQUIREMENTS FOR PRIVATE SEWER CONTRACTORS
POSITION PAPER
PAGE 2 OF 2
DATE
February 23, 1990
District counsel indicates that holding a public hearing is required to process
the changes to the District Code. The changes to the Code will be publ ished
after the public hearing as required by law.
RECOtI4ENDATIONS: Establ ish March 15, 1990 as the date for a publ ic hearing to
consider changes to the District Code regarding insurance requirements for
private sewer contractors.
13028-9/85