HomeMy WebLinkAboutAGENDA BACKUP 03-01-90 . Centra. =ontra Costa Sanitar~ .Jistrict BOARD OF DIRECTORS PAGE 1 OF 5 POSITION PAPER BOARD MEETING OF Ma rch 1, 1990 NO. IV. BIDS AND AWARDS 1 SUBJECT AUTHORIZE AWARD OF CONTRACT TO LES MCDONALD CONSTRUCTION COMPANY FOR THE CONSTRUCTION OF ASH STORAGE BASIN I IMPROVEMENTS AND HOLDING BASIN LEVEE ROADS PAVEMENT, DISTRICT PROJECT NOS. 10066 AND 10067 DATE Februa ry 23, 1990 TYPE OF ACTION AUTHORIZE AWARD SUBMrBT~Df: Th an Assistant Engineer INITIA TING DEPT./DIV. Plant Operations Department ISSUE: On February 15, 1990, sealed bids for the Ash Storage Basin I Improvements and Hol ding Basin Levee Roads Pavement Projects, District Project Nos. 10066 and 10067, respectively, were received and publicly opened. The Board of Directors must award the contract to the lowest responsible bidder or reject bids within 60 days of the opening date. BACKGROUND: The District wastewater treatment plant produces an average 12 tons per day (24 cubic yards per day) of incinerator ash and 2 tons per day (1.5 cubic yards per day) of dewatered grit. Presently, the ash is transported to both Redwood Sanitary Land Fill, Inc. and the Colusa County Landfill for disposal. Grit is transported and disposed of only at Redwood Sanitary Land Fill, Inc. The purpose of District Project No. 10066 is to provide temporary on-site storage of ash and dewatered grit in the event that off-site disposal is not available. The ash or grit stored on site will be removed after the disposal crises ends and will ultimately be disposed of off site in an approved manner. The treatment plant has three basins north of the plant that store wet weather flow. One of the levee roads is the major artery to the plant's dechlorination facility at the north end of the holding basin, and another levee road provides access to the plant's main electrical station. The levee roads will also provide access to the on-site ash and grit storage basin. During winter, these gravel roads deteriorate forming potholes and washboard ridges in the roadway. District Project No. 10067 was desi gned to 'pave these 1 evee roads with asphal t concrete to provi de safe, year-around access to maj or process facil iti es. These two proj ects have been combined for ease of bidding, cost savings, and construction coordination. Pl ans and speci f i cati ons for these proj ects were compl eted by the Pl ant Operati ons Department staff and were publ icly advertised on January 29, 1990, and February 5, 1990. A total of 14 bids were received and opened on February 15, 1990. A summary of the bids is shown in Attachment I. An evaluation of the bids, conducted by Plant Operati ons Department staff, concl uded that the lowest responsi bl e bi dder isLes McDonald Construction Company with a bid price of $154,000. The favorable bid price reflects an aggressive bidding climate. The engineer's estimate was $225,000. These projects are included in the 1989 - 1990 Capital Improvement Budget, pages TP-30, Sludge/Ash Handling Project, and TP-63, Pave Holding Basin Levee Roads. The total amount budgeted for the contracted work was $300,000. The budget to complete this project is $250.500. as shown in Attachment II. BTT RECOMMENDED FOR BOARD ACTION INITIATING DEPT./DIV. 8r1 1302A-9/85 JLB SUBJECT POSITION PAPER AUlHORIZE AWARD OF CONTRACT TO LES MCDONALD CONSTRUCTION COMPANY FOR lHE CONSTRUCTION OF ASH STORAGE BASIN I IMPROVEMENTS AND HOLDING BASIN LEVEE ROADS PAVEMENT, DISTRICT PROJECT NOS. 10066 AND 10067. PAGE 2 5 OF Dt~bruary 23, 1990 This project has been eval uated by staff and determined to be exempt fran the Cal ifornia Environmental Qual ity Act (CEQA) under District CEQA Guidelines, Section 18.2, since it involves a minor alteration to an existing facility. RECOMMENDATION: Authorize award of the constructi on contract in the amount of $154,000, for Ash Storage Basin I Improvements and Hol ding Levee Roads Pavement, District Project Nos. 10066 and 10067, to Les McDonald Construction Company as the lowest responsible bidder. ---.------.. 13028-9/85 ATTACHMENT I Page 3 of 5 Ce"'~al Contra Costa Sf 'itary District lOu66 SUMMARV DF BIDB and Ash Storage Basin I Improvements and PROJECT NO. 10067 - Holding Basin levee Roads Pavement DATE February 15.1990 LOCATION District Treatment Plant $ 225,000 ENGR. EST. II: <Vt BIDDER (Name; telephone & address) BID PRle. Les McDonald Constructlon <415 ) 785",,4844 $ 154,000 Company 1 P.O. Box 4076, Hayward, CA 94540 , W.K. McLeland Company ( ) $ 156,550 2 254 Sears Point Road, Petu1uma, CA 94954 - Gallagher and Burk, Inc. ( ) $ 176,495 3 P.O. Box 7227, Oak1 and, 'CA 94601 O.C. Jones and Sons ( ) $ 180,180 4 1520 Fourth Street, Berkeley, CA 94710 Oliver de Silva, Inc. ( ) $182,6.53.50 5 P.O. Box 4437, Hayward, CA 94540 - E Heide and Williams, Inc. ( ) $ 182,750 P.O. Box 2007, Napa, CA 94558 , , Gr~de-Way Construction ( ) $ 184,539 43801 Osgood Road, Fremont, CA 94539 Bay Cities Paving and Grading ( ) $ 184,866 ~ 5200 Huntinqton Avenue, Richmond, CA 94804 - Gradex Company ( ) $ 196,884 9 P.O. Box 23319, Pleasant Hill, CA 94523 Branaugh Excavating, Inc. ( ) $ 197,459 10 P.O. Box 2388, Livermore, CA 94550 Antioch Paving Co., Inc. ( ) $ 210,750 11 P.O. Box 1669, Antioch, CA 94509 Ransome Company ( ) $ 214,990 l~ P.O. Box 8506, Emeryville, CA 94662 PREPARED BY _~ -r .-eLe.../ Sa T, Than . DATE February 15, 1990 1 SHEET NO. 2 OF 2S0~1I/84 /[ \VI ATTACHMENT I Page 4 of 5 ee""'al Contra Costa ~ 'tary District 10066 SUMMARY DF BIDS and Ash Storage Basin I Improvements and 10067 - Holding Basin levee Roads Pavement DATE Februarv 15.1990 District Treatment Plant $ 225,000 ENGR. EST. PROJECT NO. LOCATION BIDDER (N...; telephone & address) I 13 Winton Jones Contractor, Inc. ( ) $ 194~ Arnold Industrial Hfghway 216,290 Concord, CA 94520 - Fanfa, Inc. ( ) $ 14 2401 Grant Avenue, San Lorenzo, CA 94580 217 ,737 ( ) $ - ( ) $ ( ) $- - ( ) $ , , ( ) $ ( ) $ - ( ) $ ( ) $ ( ) $ ( ) $ ~ t. L~'" ~ February 15, 1990 2 2 PREPARED BY ,. DATE SHEET NO. OF BID PRle. Sa T. Than 2S0J-ll/84 ATTAaiMENT II Ash Storage Basin I lIIprovements and Hol di ng Basi n Levee Roads Pav_ant District Project Nos. 10066 and 10067 Post-Bid/Pre-Construction Estimate Item Description Construction Contract 1 2 Estimated Construction Contingencies at 20 percent 3 Subtotal 4 Estimated Construction Inci denta 1 s to Proj ect Completion: ';'-~" - Inspection - Contract Management - Plant Operations Dept. Staff During Construction - Testi ng - Miscellaneous (Legal, (Survey, and As-builts) 5 6 Subtotal Plant Security Item Amount T ota 1 S 154.000 30,800 $ 184,800 $ 9,600 3,900 4,000 2,500 2,200 $ 22,200 4,500 Total Es.tf.a1:ed Construction Cost 211.500 7 8 Pre-Bid Expenditures Total Current Est1.a1:ed Project Budget 9 39,000 S 250.500 Page 5 of 5 " Percent Construction Contract 100 12 . Central Contra Costa Sanitary Oistrict BOARD OF DIRECTORS PAGE 1 OF 2 POSITION PAPER BOARD MEETING OF March 1 1990 NO. v. CONSENT CALENDAR 1 AUTHORIZATION FOR P.A. 90-3 (WALNUT CREEK) TO BE INCLUDED IN A FUTURE FORMAL ANNEXATION TO THE DISTRICT DATE Febru r TYPE OF ACTION SUBJECT ACCEPT ANNEXATION FOR PROCESSING SUBMITTED BY Dennis Hall Associate En ineer INITIATING DEPT/DIV Engineering Department/ Construction Division P a rce 1 No. Area Owner, Address Parcel No. & Acrea e Remarks Lead A enc I I I A.A. Affinito, etal 2980 Railroad Avenue Pittsburg, CA 94565 139-130-016 & -017 (14 acres more or less) Proposed subdivision 6604, containing 5 lots for single family I resi dences. Negati ve I Declaration by the City I of Wal nut Creek I Walnut Creek 90-3 Walnut Creek <76B1> RECOMMENDATION: Authorize P.A. 90-3 to be included in a future formal annexation. 1302A-9/85 DH JSM RAB REVIEWED AND RECOMMENDED FOR BOARD ACTION INITIATING DEPT/DIV. 111( I)(J ~~~ F':.O--Ll~..i\\ ~J. \ -;j \ 5r~'f.i~~'''~ . 10 LL--\~;q\~~ - I I J-, \~{ ~~~~~ c~1 ~ ~ '-J.....:J1~1.t:... 1~~2,4.t1 rO _ ""}' r)}-'f^_.~ ... \\ 19..>'~ f~l-I ~ \~\~ 10 \'\1 \' 32 33 ~$ .~"f : :: . .~ 137 . 144 [3;.-;7 120 3' C1. ~ 3 ~ ~\l. o'l.-1--_~~--~'" " " T .':;Z; ic;. K':"L "5 .'_ -:,'J /__ ~ ,J.:... . .. 1 ~ \~to\ - _LA.~~1" -' \ 31 B. 711fFj.. I. : ~.". h" WA L N U'T ~~ E N'UE~""'" ," ~.}: i~ ~ G\~ : ~lo'< .;;:..... . <>1 1 :~..,.. ...~~... al~ .D 1JL~ii~' ~fj "=' ... ..~~. ... .....i.:.1 C, 1~...tif;~f,~5j,~i!.. .". · 7J~ ~.: It': -~.. ,; ".: ~imi;~"~ "..," 7~.l:rII1~~1. · l ,~. ~~l~47..1~ e.'T ~ 200AC r-T 15 iti I l:l.~ 14 ~~jff!; ..". --Z5IOM J~, I -~ rc 4 ,I ~ ~/Ottl"'. T .) :: ~:'...:,,,,:...:...~.:...:...~....::i:;:i 51 : ff;;; ~OS LL!:- u ;~;:; ~:5~ T 27 4, 4 II ~ K:l~:':"''t$.:d t :i~'~.:;; itfA.3\ IC~. ~bl5 ~J!~IItI:.~'::::t1 OC__ 1: '"""1'J F~ .::.:....;;;;;I.~. !'f...r....:.:.:.:.:.. )\ rEI n (]-:-::::.:, I A)8 C > B ~ '~.;'. ~'1j;"SWEF! ..... I~':::::~:::::::::::::::::::::::: zo -=- 72::''::~f.' p 53~. - 41 "0,, ,. -~: .;~~ ;~~ Ill7~ ~~:ai!~iiiiii!t.t'rit::( t- i- i\+6: VIr RO D ~~~ __ 5 3~0 'ii&J '/2~/' ~I~ : ORIVEjJ{C~IRifE21~ .'. ~ !!~i!!!!!!! q ~ 7 .f~~ oRLARolEsmls DR ::~ 1- ~1.'" 2/ ~.4" s.~.z..'..:..':"'.."..'.".'.: e B A .:~.:.:.: -:r 80 5:'~a: 1 I ,~ . ,n co -S-, 'tl NI $;1.,. " '~':::'. ~ L ":i l2~ ~ ;;IIoN e7'~ ~ e ~~3(i :(~\ -;-~ ~ 7B 7~'~~:~' ....., .... ......................................... ..' ~..~ ~ ~.::u..el'lf~~~ ~.' 0 ;~~~rL~~~r~ .~...~.~. "'- I/> 'F -"'r] - - 17 Z ~86 ~ ~ 72,\ ~ r:r 15) ~ s'lsel B lfd"G~ION G3 ~ 65 ~ I ;! t..~ r,1'~ 5 II 14 .... ~_'" Zl m. l' C DR ~ .I:>- _ -0- 52 51 Z 42 41 ~ 32' !II 7 ( 1\. __ _ ..... ,'1 50~ 40:;; 3O~ \I. - 7 57 ~ 13 Y 1/ - .... rr u ~r:~ .... ~ r ~. ~ z~ -.:'1 . ~::.:Z ::::::::::::: po- J5(!<i ~IY :).. . _ ":..m :., :;::':"=:::' L )4 ~ t- t 'ff71.:. ..... . ," r '1" .. {,':::':\ ~ ;;"". (;,. ~ au I'. H l :1'\ -" :~~~~~tf .. ~~t'~}i'\'41 .. :;,~, ' !r~f~MI~: ~RI~-\._J\ .~ ~'" --_ilit'J%@r"",,:- ---r--i ~ ~ :'~~". ". ....... ~ ~ " c Me ADA 27.371 ('.,.~ .,. '; \ !1.05 AC TYLER 54. 14 Ae L- Z.OIAC 4.88 AC PROPOSED ANNEXATION ~ P .A. 90-3 I~ . Central Contra Costa Sanitary lJistrict BOARD OF DIRECTORS PAGE 1 OF 2 POSITION PAPER BOARD MEETING OF Ma rch 1, 1990 NO. v. CONSENT CALENDAR 2 SUBJECT DA TE ESTABLISH MARCH 15, 1990 AS THE DATE FOR A PUBLIC HEARING Februar 23, 1990 TO CONSIDER CHANGES TO THE DISTRICT CODE REGARDING TYPE OF ACTION INSURANCE REQUIREMENTS FOR PRIVATE SEWER CONTRACTORS SET PUBLIC HEARING DATE SUBMITTED BY Jay S. McCoy Construction Division Mana er INITIATING DEPT.lDIV. Engineering Department/ Construction Division ISSUE: Changes are requi red to the Di stri ct Code regardi ng insurance requirements for private sewer contractors. BACKGROUND: It is the policy of the District to require private sewer contractors to provide certificates of insurance as a part of the registration process for these contractors. In addition, the District takes an active role in monitoring and ensuring that updated certificates of insurance are on file prior to i ssui ng permi ts to regi stered contractors. The Di stri ct performs these functions voluntarily and has no mandatory duty to perform the functions. Staff has reviewed its role relative to insurance certificates and has determined that if the District takes a less active role in monitoring these certificates, the potential for the creation of a mandatory duty to monitor and maintain updated certificates will be lessened. If the District does not impose on itself a mandatory' duty through its policies, the liability of the District for an injury caused by a District permitted contractor who was uninsured at the time of injury will be lessened. It is prudent to make changes to the District Code to clarify the role of the District and to decrease the involvement of the District in requiring and monitoring certificates of insurance so as to prevent the creation of a mandatory duty. This proposed change coincides nicely with the implementation of the new procedures for processing of irrevocable offers of dedication. The District will reduce its liability through the use of I.O.D.s. The District can further reduce its liability by adopting the proposed changes to insurance requirements. The insurance changes wi II be phased in such that contractors who work on private sewer projects where easements have been granted to the District will be required to have insurance. District staff will continue to monitor the insurance of these contractors as needed. Eventually al 1 easements rel ated to private sewer projects will be conveyed to the District through LO.D.s. At that time the District will cease all monitoring of insurance requirements for private sewer contractors. These contractors will no longer have to submit insurance certificates to the District. However the District will continue to require contractors who work on District projects to submit certificates and staff will monitor these certificates. JSM ~ce JC " i: OMMENDED FOR BOARD ACTION /IfJfJ GEN. MGR/CHIEF ENG. 'r 1302A-9/85 KA RAB SUBJECT ESTABLISH MARCH 15, 1990 AS THE DATE FOR A PUBLIC HEARING TO CONSIDER CHANGES TO THE DISTRICT CODE REGARDING INSURANCE REQUIREMENTS FOR PRIVATE SEWER CONTRACTORS POSITION PAPER PAGE 2 OF 2 DATE February 23, 1990 District counsel indicates that holding a public hearing is required to process the changes to the District Code. The changes to the Code will be publ ished after the public hearing as required by law. RECOtI4ENDATIONS: Establ ish March 15, 1990 as the date for a publ ic hearing to consider changes to the District Code regarding insurance requirements for private sewer contractors. 13028-9/85