3. CONSENT CALENDAR b.
DATE
SUBJECT
ADOPT A RESOLUTION ESTABLISHING THE 1992-1993
APPROPRIATIONS LIMIT IN ACCORDANCE WITH ARTICLE
XIII B OF THE CALIFORNIA CONSTITUTION
A
TYPE OF ACTION
ADOPT APPROPRIATIONS
LIMIT
SUBMITTED BY
INITIATING DEPT.lDIV
Walter N. Funasaki, Finance Officer
Administrative/Finance & Accounting
ISSUE: The Central Contra Costa Sanitary District is required to establish its appropriations limit
in accordance with Article XIII B of the California Constitution.
BACKGROUND: On August 20, 1992, the Board of Directors authorized posting a public notice
of the availability of documentation in support of the District's appropriations limit. As statutorily
required, the public notice was made at least 15 days prior to the September 16, 1992 Board
Meeting at which the adoption of the appropriations limit is recommended.
Formerly, the appropriations limit was increased annually by a factor comprised of the change
in population combined with either the change in California per capita personal income or the
Consumer Price Index, whichever is lower. As amended by Proposition 111 in 1990, the
Consumer Price Index was replaced by the percentage change in the local assessment roll from
the preceding year due to local nonresidential construction. The Board is to select between the
per capita personal income, or the change in the local assessment roll due to local nonresidential
construction, by a recorded vote. The 1990-1991 appropriations limit was to be computed
based upon the 1986-1987 appropriations limit adjusted from that year forward by the new
growth factors. However, the change in the local assessment roll, which is intended to be
obtainable from the County Assessor, was not available for use for the 1990-1991 fiscal year
and, therefore, the per capita personal income factor was used. The County Assessor was able
to provide the nonresidential construction index beginning with the appropriations limit for the
1991-1992 fiscal year.
The County Assessor has determined the nonresidential construction index for 1992-1993 to
be 5.1 percent. The California per capita personal income change for use in computing the
1992-1993 appropriations limit is a negative .64 percent. Therefore, the change in the local
assessment roll of 5.1 percent is used in the calculation of the 1992-1993 appropriations limit.
The computation of the 1992-1993 appropriations limit by application of the California per capita
personal income and population percentage change factors to the 1986-1987 appropriations limit
adjusted from that year forward to 1990-1991, and the nonresidential construction index for
1991-1992 and 1992-1993, was provided at the August 20, 1992 Board Meeting. The Sewer
Construction Fund (Capital Fund) appropriations limit so computed is $14,559,079 for the 1992-
1 993 fiscal year.
INITIATI,NG DEPT.lDIV.
REVIEWED AND RECOMMENDED FOR BOARD ACTION
WNF PM
" "T-.
SUBJECT
ADOPT A RESOLUTION ESTABLISHING THE 1992-1993
APPROPRIATIONS LIMIT IN ACCORDANCE WITH ARTICLE
XIII B OF THE CALIFORNIA CONSTITUTION
PAGE 2
DATE
OF 3
August 25, 1992
RECOMMENDATION: Adopt a resolution establishing the Sewer Construction Fund
appropriations limit in the amount of $14,559,079 for the 1992-1993 fiscal year, in accordance
with Article XIII B of the California Constitution; select the change in the local assessment roll
due to local nonresidential construction, instead of the change in California per capita personal
income, for use in computing the appropriations limit.
1302B-7/91
--------------.------------------ -----------.- r--------------------------------------------.--------------- ---
RESOLUTION NO. 92-
A RESOLUTION ESTABLISHING THE APPROPRIATIONS
LIMIT FOR FISCAL YEAR 1992-1993
WHEREAS, the Central Contra Costa Sanitary District is required under Article XIII B of
the State of California Constitution to establish and adopt an Appropriations Limit for each fiscal
year; and
WHEREAS, the District has determined the Appropriations Limit of its Sewer Construction
Fund (Capital Fund) for fiscal year 1992-1993 to be $14,559,079; and
WHEREAS, the selection of the alternative growth factor between the per capita personal
income or the change in the local assessment roll due to local nonresidential construction must
be made by recorded vote;
NOW, THEREFORE, BE IT RESOLVED that the Board of Directors of the Central Contra
Costa Sanitary District does hereby adopt the Appropriations Limit for said Fund in the amount
of $14,559,079 for the fiscal year ending June 30, 1993, based upon the selection of the
change in the local assessment roll due to local nonresidential construction.
PASSED AND ADOPTED this 16th day of September 1992, by the District Board of the
Central Contra Costa Sanitary District by the following vote:
AYES:
NOES:
ABSENT:
Members:
Members:
Members:
COUNTERSIGNED:
President of the Board of Directors
Central Contra Costa Sanitary District
County of Contra Costa, State of California
Secretary of Central Contra Costa
Sanitary District, County of Contra
Costa, State of California
Approved as to Form:
Kenton L. Aim
District Counsel
ADS/PosPap# 1 /Approp.PP
----------------------------------------------r-- -
Central Contra Costa Sanitary District
BOARD OF DIRECTORS
PAGE 1
OF 1
BOARD MEETING OF
September 16, 1992
NO.
3. CONSENT CALENDAR c.
DATE
September 11, 1992
SUBJECT
AUTHORIZE THE PURCHASE OF AN EXPLOSION-PROOF
REFRIGERATOR AND AUTHORIZE THE EXPENDITURE OF $2,200
FROM THE 1992-93 EQUIPMENT BUDGET CONTINGENCY
TYPE OF ACTION
AUTHORIZE EQUIPMENT
PURCHASE
SUBMITTED BY
Bhupinder S. Dhaliwal
laborator Superintendent
INITIATING DEPT./DIV.
Plant Operations Department
ISSUE: Board authorization is needed to purchase equipment items from the Equipment Budget
Contingency when the cost exceeds $2,000.
BACKGROUND: The laboratory uses an explosion-proof sample refrigerator to store laboratory
samples preserved in different types of solvents. An explosion-proof refrigerator is needed to meet
laboratory safety requirements. The existing sample refrigerator has failed. This refrigerator is
over 15 years old and appears to have passed its useful lifespan. According to a commercial
refrigerator repair company, the existing refrigerator cannot economically be repaired. They
recommend replacement with a new unit at a cost of $2,200.
RECOMMENDATION: Authorize the purchase of an explosion-proof sample refrigerator from the
1 992-93 Equipment Budget Contingency.
S7)
REVIEWED AND RECOMMENDED FOR BOARD ACTION
INITIATI,NG DEPT.lDIV.
1302A-7/91
BSD
--'-"-'r- .' ,,,,,-,.. ..-....,
~ Central ;g~~~ g~~~R~~~~a~~ District
PAGE 1 OF 7
POSITION PAPER BOARD MEETING OF September 16, 1992
NO.
5. BIDS AND AWARDS a.
DATE August 31, 1992
SUBJECT
AUTHORIZE AWARD OF CONSTRUCTION CONTRACT FOR THE
FILTER PLANT REHABILITATION PROJECT, DP 20095, TO
AUBURN CONSTRUCTORS, INC; AUTHORIZE GENERAL MANAGER
-CHIEF ENGINEER TO EXECUTE AGREEMENT WITH CH2M HILL
TYPE OF ACTION
AUTHORIZE AWARD
AUTHOR~EAGREEMENT
SUBMITTED BY
Andrew J. Antkowiak, Assistant Engineer
INITIATING DEPT./DIV.
Engineering Department/Infrastructure Division
ISSUE: On September 2, 1992, sealed proposals were received and opened for the construction
of the Filter Plant Rehabilitation Project, District Project 20095. The Board of Directors must
authorize award of the contract or reject bids within 50 days of the bid opening. Authorization
by the Board is required to execute consulting engineering agreements for amounts greater than
$50,000.
BACKGROUND: During a reclaimed water demonstration project in 1988 it was found that
various improvements to the filter plant are necessary in order to meet the Department of Health
Services' requirements and to ensure reliable operation. The necessary improvements were
identified in a predesign report completed by CH2M Hill in 1989, and included in the Filter Plant
Rehabilitation Project.
These improvements include new piping with control valves and meters, a new alum polymer
tank, a protective coating system for the filter walls and troughs, a modified backwash system,
and addition of filter media pre purchased by the District. The upgrading of the instrumentation
and control system includes the installation of new control panels, modifications of existing
panels, wiring, programmable logic controllers and an operator interface unit. The project site
is shown in Attachment 1.
The plans and specifications for this project were prepared by CH2M Hill and the project was
advertised on August 3 and 10, 1992. The adjusted engineer's pre-bid construction cost
estimate was $1,040,000. This estimate was reduced by District staff from $1,300,000 to
reflect the favorable bidding climate. Eight sealed bids ranging from $ 812,300 to $ 1,012,000
were received and publicly opened on September 2, 1992. A summary of the bids received is
shown in Attachment 2.
The Engineering Department conducted a technical and commercial review of the bids and
concluded that the lowest responsible bidder is AUBURN CONSTRUCTORS, Inc., with a bid of
$ 812,300. The additional funds required to complete this project are $1,311,000, as shown
in Attachment 3. The total estimated project cost is $1,936,350. The project funding summary
is shown in Attachment 4. The project is included in the 1992-93 Capital Improvement Budget
on pages TP-72 through TP-73.
AJA
T JP/HT
~JSM
RAB
~
ECOMMENDEDFORBOARDAcnON
1302A-9/B5
..-.----...-.. -r'"
SUBJECT
AUTHORIZE AWARD OF CONSTRUCTION CONTRACT FOR THE
FILTER PLANT REHABILITATION PROJECT, DP 20095, TO
AUBURN CONSTRUCTORS, INC.; AUTHORIZE GENERAL
MANAGER-CHIEF ENGINEER TO EXECUTE AGREEMENT WITH
CH2M HILL
.........
:IIIIIII1111111!1:1111111
2
7
PAGE
OF
DATE AUTHORIZE AWARD
6.UTHORIZE AGREEMENT
District staff will administer the contract and provide inspection services. The construction
engineering services and filter plant control systems software programming will be provided by
CH2M Hill. The construction engineering services will include evaluation of contractors
submittals, preparation of design clarifications, system start-up assistance and preparation of
record drawings. The software programming will include development of display screens for
the Filter Plant control system and programming of the logic controllers. A cost reimbursement
agreement has been negotiated with CH2M Hill with a cost ceiling of $57,000 for the
construction services, and $70,300 for the software programming.
This project has been evaluated by staff and has been determined to be exempt from the
California Environmental Quality Act (CEOA) under District CEOA Guidelines Section 18.2 since
it involves the maintenance of an existing public facility with negligible or no expansion of
capacity. Board of Directors' approval of this project will constitute agreement with this
determination unless otherwise indicated.
RECOMMENDATION: 1. Authorize award of contract for the construction of the Filter Plant
Rehabilitation Project, District Project No. 20095, in the amount of $ 812,300 to AUBURN
CONSTRUCTORS, Inc. as the lowest responsible bidder.
2. Authorize the General Manager- Chief Engineer to execute a cost-reimbursement agreement
with a cost ceiling of $127,300 with CH2M Hill for construction engineering services and
software programming.
13028-7/91
.-.--... ............--.., ......---r''--.. ..-....-......--.---.-.-..---------".---...- --....--- ..-.-..---...----...-----.- ------------.-------.
ATTACHMENT 1
PAGE 3 OF 7
.i
i
i
i
i
FILTER PL~T
--
r-'-'-
I
i
\
\
\
\
\ Q
\
\
i
i
i
i
i
i.
..........................
...........................
//
./'
//
//
/
/
/
//
/
/
/.
, \
/ .
/ \
/ \
/ .
, \
\
, \
--.,', \
":'. ~
"~=--'
--\..-.\
\.
\
\
\
_...:
--
------
.-..-
'.............. Project
...............
.............................
:;:;:;:::;:;:;:;:;:;:;:;:;:;: "
:.:.:.:.:.:.:.:.:.:.:.:.:.:.: Locat". on.
.:.:.:.:.:.:.................
FILTER PlANT REHABILITATION PROJECT
OP 20095
.._~--_.,..,-------r----
PAGE 4 OF 7
ATTACHMENT 2
Central Contra Costa Sanitary District
SUMMARY OF BIDS
PROJECT NO. 20095 - FILTER PLANT REHABILITATION DATE SEPTEMBER 2.1992
LOCATION CCCSD TREATMENT PLANT ENGR. EST. $ 1.040.000
Order BIDDER (Name, telephone & address) BID PRICE
1 Auburn Constructors, Inc. (916) 387-0344 $812,300
5580-F Power Inn Road, Sacramento, CA 95820
2 Pacific Mechanical Corp. (510) 827-4940 $839,000
P.O. Box 4041, Concord, CA 94526
3 Alan A. Bradford, Inc. (707) 437-5484 $860,000
4970 Peabody Rd., Fairfield, CA 94533
4 Monterey Mechanical Co. (510) 632-3173 $864,000
8275 San Leandro St., Oakland, CA 94621
5/6 Albay Construction Co. (510) 228-5400 $888,000
P.O. Box 2569, Martinez, CA 94553
5/6 C. OVERAA & Company (510) 234-0926 $888,000
200 Parr Blvd., Richmond, CA 94801
7 Scott Co. (510) 834-2333 $969,000
1919 Market St., Oakland, CA 94044
8 DALZELL Corp. (510) 835-0732 $1,012,000
P.O. Box 8284, Emeryville, CA 94622
BIDS OPENED BY Jovce E. Murohv
DATE Seotember 2. 1992 SHEET NO.1 OF 1
-------------------..---------r--..------------....
PAGE 5 OF 7
ATTACHMENT 3
FILTER PLANT REHABILITATION PROJECT
DISTRICT PROJECT NO. 20095
POST-BID/PRECONSTRUCTION ESTIMATE
ITEM DESCRIPTION SUBTOTAL TOTAL PERCENT OF
ESTIMATED
CONSTRUCTION
COST
1 . Construction Contract $ 812,300
. Material Prepurchase (pre-bid $ 87,350
expenditure)
. Filter Plant wiring verification and 71 ,000
record drawings (pre-bid
expenditure) 1
Subtotal Pre-bid expenditures 158,350
. Software Programing (CH2M Hill) 70,300
2 Contingency @ 20%2 208,400
SUBTOTAL $1,249,350 100
3 Construction Management (District
Forces)
. Project Management $ 72,500
IAdministration
. Inspection 68,500
. Legal 1 ,000
. Engineering 4,000
. Plant Operations Department 6,000
. Survey 2,000
SUBTOTAL $ 154,000 12.3
4 Consultant Contractors
. Geotechnical (DCM Joyal) $ 1,000
. Construction Support (CH2M Hill) 40,000
. Startup Assistance (CH2M Hill) 5,000
. Record Drawings (CH2M Hill) 12,000
. Testing Services 8,000
SUBTOTAL $ 66,000 5.3
----------.--.-----------;-.----.-..----.-.-.--------------------.-- -------------
PAGE 6 OF 7
ATTACHMENT 3
ITEM DESCRIPTION SUBTOTAL TOTAL PERCENT OF
ESTIMATED
CONSTRUCTION
COST
5 Construction Services Subtotal Items $ 220,000 17.6
3&4
6 Pre-bid Engineering Expenditures
. Planning (Includes Demonstration $ 129,000 10.3
Project)
. Design of Filter Plant 338,000 27.1
Rehabilitation
SUBTOTAL $ 467,000 37.4
7 Pre-bid Construction Expenditures $ 158,350
(From Item 1 above)
TOTAL Pre-bid Expenditures $ 625,350
Items 6 & 7
8 Total Project Cost Estimate $1,936,350
9 Funds Authorized to Date $ 625,350
10 ADDITIONAL ALLOCATION OF $1,311 ,000
FUNDS TO COMPLETE PROJECT
1 The preparation of accurate as-builts for the filter plant reduced the Engineer's construction cost
estimate by 2 to 3 hundred thousand dollars.
2 20 percent construction contingency was utilized because the project involves construction inside an
operating facility, and requires complicated instrumentation coordination.
~'--,--'~.."._._.~--'-'-,-""-"---------_._---'
PAGE 7 OF 7
ATTACHMENT 4
PROJECT FUNDING SUMMARY
Sewer Construction Fund Balance as of
August 6, 1992 (Estimated)
$ 68,473,000
- Unspent Prior Allocations
$ < 52,812,000>
+ Dependable Revenue *
$ 9.815.000
$ 25.476.000
$25,476,000 > $1,311,000 (Allocation Required)
* Does not include ad valorem tax