Loading...
HomeMy WebLinkAboutAGENDA BACKUP 07-16-92 ~ Centrai ~ontra Costa Sanitary Jistrict Mo.~.1k BOARD OF DIRECTORS PAGE 1 OF 2 POSITION PAPER BOARD MEETING OF SUBJECT 2 NO. 3. CONSENT CALENDAR e. DATE July 7, 1992 APPROVE AGREEMENT RELATING TO REAL PROPERTY WITH ROBERT T. REIMER AND KAREN E. REIMER, JOB 3651 WALNUT CREEK AREA TYPE OF ACTION APPROVE REAL PROPERTY AGREEMENT SUBMITTED BY Dennis Hall, Associate Engineer INITIATING DEPT./DIV. Engineering Dept.llnfrastructure Div. ISSUE: The property owners have requested the District's approval to allow the encroachment of a redwood deck and a hot tub over a District easement. BACKGROUND: The proposed deck and hot tub will be constructed within a portion of an existing easement on Mr. and Mrs. Reimer's property. An a-inch ductile iron sewer pipe was installed within the easement at a depth of about 10 feet in 1982. The property owner has cooperated with District staff by providing construction drawings of the deck and has paid the District's fee for processing the subject agreement. Staff has determined that the improvements will not interfere with the present use of our sewer. However, if the need should arise, the agreement requires the property owner to move the deck at his/her expense within 30 days of notice to do so. This project (the proposed agreement) has been evaluated by staff and determined to be exempt from the California Environmental Quality Act (CEOA) under District CEQA Guidelines Section 18.6, since it involves a minor alteration in land use limitations. RECOMMENDATION: Approve the Agreement relating to Real Property with Robert T. Reimer et ux, Job 3651, .and authorize the President of the Board of Directors and the Secretary of the District to execute the said agreement, and authorize the agreement to be recorded. REVIEWED AND RECOMMENDED FOR BOARD ACTION INITIATING DEPT./DIV ~~ 1302A-9/85 DH 1 -y 8" OJ.P. LAWN I c o o 3: I I 10' S.S.E. I HOUSE ..... ~ ELEVATION VIEW LOOKING NORTH 0 ... 18" OJ.P. o REAL PROPERTY AGREEMENT JOB 3651 WALNUT CREEK AREA ,-- ~ Central ~g~~~ ~~~~R~~~ba~~ .Jistrict PAGE 1 OF 2 POSITION PAPER BOARD MEETING OF SUBJECT NO. 3. CONSENT CALENDAR f. DATE July 6, 1992 AUTHORIZATION FOR P.A. 92-5 (DANVILLE AREA) TO BE INCLUDED IN A FUTURE FORMAL ANNEXATION TO THE DISTRICT TYPE OF ACTION ACCEPT ANNEXATION FOR PROCESSING SUBMITTED BY Dennis Hall, Associate Engineer INITIATING DEPT.lDIV. Engineering Dept.llnfrastructure Div. Parcel No. 92-5 Area Danville Owner Address Parcel No. & Acreage Allen E. Nugent, etux 708 Danville Blvd. Danville, CA 94526 200-100-005 (O.78Ac.) Remarks Lead Agency CCCSD Existing house with a failing septic system; must connect to the public sewer system. Project is exempt from CEQA. RECOMMENDATION: Authorize P.A. 92-5 to be included in a future formal annexation. REVIEWED AND RECOMMENDED FOR BOARD ACTION JX( 11'/i/ ~ INITIATING DEPT.lDIV. 1302A-9/85 DH JSM RAB ....-...-....r... PROPOSED ANNEXATION P .A. 92-5 ....T. ~ Central ~g~~~ g~~~R~~~ba~~ Jistricl PAGE 1 OF 1 POSITION PAPER BOARD MEETING OF NO_ SUBJECT 3. CONSENT CALENDAR DATE July 6, 1992 ESTABLISH AUGUST 6, 1992, AT 3:00 P.M. AS THE DATE AND TIME FOR A PUBLIC HEARING ON ANNEXATION 120 AS AMENDED BY THE LOCAL AGENCY FORMATION COMMISSION (LAFCO) TYPE OF ACTION SET PUBLIC HEARING SUBMITTED BY Dennis Hall, Associate Engineer INITIATING DEPT.lDIV Engineering Dept./lnfrastructure Div. ISSUE: LAFCO has added properties to several of the parcels which are a part of District Annexation 120. A public hearing must be held before this District can order the annexation of these amended parcels. BACKGROUND: The above-referenced annexation was sent to LAFCO as required for the formal annexation process. LAFCO has amended the boundaries of several of the parcels as submitted by the District. The amended parcels are designated as D.A. 120, Parcels 6, 7 and 8. As required by law, staff will notify all affected property owners 1 5 days prior to the public hearing. RECOMMENDATION: Set a public hearing date on August 6, 1992, at 3:00 P.M. for the annexation of the above-referenced territories as amended by LAFCO. REVIEWED AND RECOMMENDED FOR BOARD ACTION RAB 4)1{ 1302A-9/85 DH 0/ JSM JII(J INITIATING DEPT/DIV_ ---.-------------------- -T-- ~ Central ~g~~~ g~~~R~~~::~~ &.Iistrict PAGE 1 OF 2 POSITION PAPER BOARD MEETING OF SUBJECT NO. 4. HEARINGS a. DJU'fy 13, 1992 TEOj([df:j~ PUBLIC HEARING TO ADOPT REVISED ORDINANCE CONDUCT A PUBLIC HEARING ON THE REVISED SOURCE CONTROL ORDINANCE SUBMITTED BY Bart Brandenburg, Source Control Su erintendent INITIATING DEPT./DIV. Engineering/Planning ISSUE: A public hearing is required prior to the adoption of a revised Source Control Ordinance. BACKGROUND: Updates to the Source Control Ordinance were adopted on March 19, 1992. Additional revisions now need to be made to reflect review comments by the Regional Water Quality Control Board (RWQCB). These additional revisions were anticipated by staff and were mentioned at the March 19, 1992, meeting. The RWQCB reviewed the Source Control Ordinance to determine whether the District authorities were adequate to ensure compliance with the Federal Pretreatment Regulations. Most of the ordinance revisions are minor technical corrections. The two more important issues are summarized below. 10.08.060 National Pretreatment Standards The RWQCB required the District to incorporate by reference the National Categorical Pretreatment Standards. Although this revised paragraph reflects the requirements included in the attachment, it is a cumbersome process because the District's ordinance as well as the Concord and Clayton ordinances will have to be amended as pretreatment standards are revised. It is anticipated that revisions will be infrequent. Therefore, staff considers this requirement to be acceptable. Permit Contracts The RWQCB recommended deleting the permit contract provisions of the ordinance and instead wishes permits to be the controlling document. Staff believes that it is better to issue permit contracts where the discharger may have wastewater with unique characteristics such as from a hazardous waste site or a refinery. Staff views a permit contract as a more stringent document than a permit and thus protects the rights of the District. Accordingly the permit contract provisions are not deleted in the attachment. This has received tentative approval from the RWQCB. Staff has also taken the opportunity to (1) revise the waste hauler sections of the ordinance to include conditions under which a waste hauler permit may be denied, revoked, or suspended, and (2) revised the monitoring section of the ordinance to clarify the sampling protocols. INITIATING DEPT/DIV. fJk'cu ACTION ~t;! 1302A-9/85 BLB DRW RAB KLA SUBJECT 11111'llllel! CONDUCT A PUBLIC HEARING ON THE REVISED SOURCE CONTROL ORDINANCE PAGE DATE 2 OF 2 ~uly 13, 1992 Recent enforcement issues with septage haulers have been dealt with under the language of Section B, page 68. The proposed language in Section C provides additional clarity to the District's authority when compliance issues arise. The ordinance revisions presented in the position paper have been transmitted to the RWQCB for their approval. Staff believes these revisions will be approved by the RWQCB. However, the possibility of future minor changes cannot be ruled out. The proposed ordinance has been sent to 58 existing and potentially new permitted industries. In addition, an article was published in the Contra Costa Times which summarized the major changes. No comments have been received to date. Staff will make a brief presentation on the proposed changes to the Source Control Ordinance at the public hearing. As required by law, the ordinance revisions have been on file for 15 days in the office of the District Secretary. Copies of the ordinance revisions were previously provided to the Board with the position paper setting the public hearing date. RECOMMENDATION: Conduct a public hearing on the revised Source Control Ordinance. Consider, revise as appropriate, and adopt the proposed changes to the Source Control Ordinance. 13028-7/91 -- - -------------.... ---- -- ---- - -- ------T ---------------------------- - ---- -- - ORDINANCE NO. 92___ AN ORDINANCE OF THE CENTRAL CONTRA COSTA SANITARY DISTRICT AMENDING TITLE 10 OF THE DISTRICT CODE (SOURCE CONTROL/PRETREATMENT) WHEREAS, the existing Source Control (Pretreatment) Ordinance found in Title 10 of the existing District Code was adopted on April 19, 1991 and amended on March 19, 1992, which amendment primarily implemented enforcement provisions made available to the District through recent amendments to the California Government Code; and WHEREAS, the Regional Water Quality Control Board has required and/or recommended further amendments to the Source Control Ordinance to achieve technical compliance with its uniform standards; and WHEREAS, the Sections of existing Title 10 which will be amended by this Ordinance are: Sections 10.04.020, 10.08.020, 10.08.040, 10.08.060, 10.08.070, 10.12.030, 10.12.040, 10.12.050, 10.12.060, 10.12.080, 10.12.100, 10.12.110, 10.12.120, 10.16.060, 10.16.110, 10.28.020 and 10.28.030; and WHEREAS, the California Environmental Quality Act requires guidelines be adopted, said guidelines to include a list of exempt classes of proj ects which have been determined not to have a significant effect on the environment; and said exempt classes -1- F:\DMS\MC.DIR\0048765.01 -----..-..--------r-- include actions taken by regulatory agencies, pursuant to state or local ordinances, to assure the maintenance, restoration, enhancement, or protection of the environment where the regulatory process involves procedures for protection of the environment; and WHEREAS, these amendments have been evaluated and the Board finds that said amendments are a regulatory action necessary to assure the maintenance, restoration, enhancement and protection of the environment; and WHEREAS, legal notice of a public hearing on the proposed amended Source Control Ordinance has been published in the Contra Costa Times, and copies of the proposed amended Ordinance were mailed to fifty-eight (58) existing and potentially permitted industrial users; and WHEREAS, the proposed amended Source Control Ordinance has been available at the Office of the Secretary of the District for the public to review for a period of fifteen (15) days or longer; and WHEREAS, a properly noticed public hearing was held on July 6, 1992 to receive comments on the proposed amended Source Control Ordinance; NOW, THEREFORE, the Board of Directors of the Central Contra Costa Sanitary District does hereby ordain and enact the amendments to Title 10 as are set forth in full text of Amended Title 10 attached as Exhibit "A" hereto, and further accordingly amends the District Code. This Ordinance shall be a general regulation of the -2- F:\DMS\MC.DIR\0048765.01 -.-----r------- District, shall be published once in the Contra Costa Times, a newspaper of general circulation, and shall be effective as of , 1992. PASSED AND ADOPTED by the Board of Directors of the Central Contra Costa sanitary District on the day of , 1992 by the following vote: AYES: Members: NOES: Members: ABSENT: Members: PARKE L. BONEYSTEELE, President Board of Directors Central Contra Costs Sanitary District County of Contra Costa, State of California JOYCE MURPHY, Secretary Board of Directors Central Contra Costa Sanitary District County of Contra Costa, State of California APPROVED AS TO FORM: KENTON L. ALM District Counsel -3- F:\DMS\MC.DIR\0048765.01 -------------,--.-.--...--.----------.------------------ Central Contra Costa Sanitary District BOARD OF DIRECTORS PAGE 1 OF 10 Jul 16 1992 NO. 4. HEARINGS b. DATE July 8, 1992 BOARD MEETING OF SUBJECT CONDUCT A PUBLIC HEARING TO CONSIDER A MID-YEAR ADJUSTMENT TO THE REFUSE COLLECTION RATES OF VALLEY WASTE MANAGEMENT AND ORINDA-MORAGA DISPOSAL SERVICE, INC. BASED ON AN INCREASE IN THE ACME TRANSFER STATION FEE FROM $65.69 TO TYPE OF ACTION CONDUCT PUBLIC HEARING TO ADJUST COLLECTION RATES INITIATING DEPT.lDIV. SUBMITTED BY Walter Funasaki, Finance Officer Administrative/Finance & Accounting ISSUE: A public hearing is to be conducted to consider adjustments to the refuse collection rates of Valley Waste Management and Orinda-Moraga Disposal Service, Inc. due to an increase in the Acme Transfer Station fee. BACKGROUND: The refuse collection rates of Valley Waste Management and Orinda- Moraga Disposal Service, Inc. were last established by the District's Board of Directors effective January 1, 1992 for the calendar year 1992. During the rate-setting process, the Board of Directors was advised that the Acme Interim Transfer Station fee, which had last been increased by the County Board of Supervisors on December 9, 1991, was likely to be increased again during 1992. In the event an increase in the transfer station fee did occur during 1992, the Board of Directors indicated that it would consider a mid-year adjustment to collection rates to offset the resultant increase in the refuse collectors' disposal expense. In the continuing escalation of disposal fees in the County, the Board of Supervisors approved an increase in the Acme Interim Transfer Station fee from $59.68 to $65.69 per ton effective December 9, 1991. During the fee-setting process, the Board of Supervisors was advised by the County Solid Waste Manager that a rate application should be obtained for the Acme Interim Transfer Station by March 1, 1992, which would enable a "very necessary" rate review to incorporate major changes in transfer station operations and the impending opening of the Keller Canyon landfill. However, an interim landfill fee was established by the Board of Supervisors for the Keller Canyon landfill to allow for its opening in early May 1992, with a final landfill fee to be established within 90 days. Without performing a rate review of the transfer station fee to include the effect of such operational changes as the discontinuance of the use of the Altamont landfill in December 1 991, and diverting such refuse to the Potrero Hills landfill and available capacity in the supposedly full Acme landfill, the County approved an increase in the transfer station fee effective May 18, 1992. The new fee was derived by re'placing the disposal fee component in the existing transfer station fee with the interim Keller Canyon landfill fee. The Acme Interim Transfer Station fee was thereby increased by 17 percent from $65.69 to $77.07 per ton. The components of the Acme Interim Transfer Station fee as of December 9, 1991 and May 18, 1992 are summarized On Attachment I. The County Solid Waste Manager has now advised the Board of Supervisors that the transfer station rate review which will address operational changes, as well as include the RE~EWEDANDRECOMMENDEDFORBOARDAcnON INITlATI.N. G. DEPT.lDIV. IC ~IE/G. e!- ~~~v~__j ( ~ 1302A-7/91 WNF PM R GER J. DOLAN ADS/Position Paper #2/AdjColRt.PP .-------..-.------..---r---.---.- SUBJECCONDUCT A PUBLIC HEARING TO CONSIDER A MID-YEAR ADJUSTMENT TO THE REFUSE COLLECTION RATES OF VALLEY WASTE MANAGEMENT AND ORINDA-MORAGA DISPOSAL SERVICE, INC. BASED ON AN INCREASE IN THE ACME TRANSFER STATION FEE FROM $65.69 TO $77.07 PER TON PAGE DATE 2 OF 10 July 8, 1992 final Keller Canyon landfill fee, will occur in August 1992. Valley Waste Management and Orinda-Moraga Disposal Service have requested a mid-year adjustment to collection rates based on the May 18, 1992 increase in the transfer station fee. The computation of the collection rate increase effective July 1, 1992 and the resulting rate schedule are presented for Valley Waste Management on Attachments II and III, and for Orinda-Moraga Disposal Service on Attachments IV and V. Further increases or decreases in the transfer station fee in 1 992 which may be determined by the Board of Supervisors will be adjusted in the normal January 1, 1 993 refuse collection rate- setting process through the workings of the refuse collectors' Balancing Account. Notice of the public hearing was published in the Contra Costa Times on July 6, 1992. RECOMMENDATION: Conduct a public hearing to consider adjusting the refuse collection rates of Valley Waste Management and Orinda-Moraga Disposal Service, Inc. effective July 1, 1992, in accordance with the new collection rate schedules shown on Attachments III and V. 1302B-7/91 .--.--'--------..-."..,-~"----_r-"----.--.---...-.-~.."""-'--'---'-'---'.--'--_._-~'-"-'-- -.-.---..-...-.---.-.---. I- Z w :E %: CJ e cr Z 0 Q w i Q w I- CJ w w w a "" Z a: 0 ~ t= ~ U) a: w ^ "" U) Z v ~ I- :E a: w I- !: w :E CJ cr ^ a:Z::l! wo- ....>"" ....zi ~~~ 01 ~~ _CJ 0::1 ....0 WI- Q 111 ell cr~ ~ ~ a~;:::~:;~~ ~ N.nN.n OM (") - (") * Ol'O-~COO) 0) co N co GlBO ~ CO(,,)O)I'-N- LD .,,: .,,:~ * Q) Q) '" (J c c Q)Q) -IV We- l!!... .~ ~ Q) c ~g ClIQ.Q) ucr .~ ~ S - .t:! l!~! 0'0 ~ 8:;l:a' g It .c 0 ~ c( ~';l CD IV "'Q)Q)IVc .... .!!.!!! '" E.!:::I';l t;i.5 c o.~ IV Q)'- E 8,'- 0 ~ ... .l:: la ~ )( 5- E 0. Q><(wwcro ^^^^ IV IV.c (J vvvv I ~OlnO I~ ~(,,)NCO . . ~cO ^ ~U ~ co V I' co In NOO~ COo)-OIn~ I ~ I' (")00 COlnOCO-- (") I' .nNN .nO-iCO . 0 (") ~ --- Q) ~ ^ I~ <( v I' 0) In COOO~ 3 ~O)co In~ ~ In r-: ~C!C!. . NNI' -- (") cxi ~NN .nON (") (") --- * * I' ~ (") (") In In en I' N M ~ - (") N ~ ;;: ~ c- ~~ o~ ~~ ~c If~ ';:3c CIV oU i.. ~.!i J::!- <(~ ^^^ ~~~ vvv OOO~ Cl'!C!C! MNN ^ (") V ~: ,I ~ Q) CI ... IV .c (JQ)Q) "'Q)Q) ~"""" (I) ... >5(J ....- IV c ... Q. ~IVE 0.21_ Q) U.t:! C Q) IV:E 0"" t) >';l B o .t:! ~ <<I UCoo. .. <<I ~ 0.(1) ~~g~i JUU>-O ~ C Q)O (J'+:; c.- IV.!! c~ Q)r::f "'(J ... .5 cr ~IVQ) E :E .t:! 0. ~ (I) OC- Q) cGi<<l> 5 o>cJ::! ';lQ)O<<l ~ 'iij Q'+:; ~ Q) - .- IV a: 5 U ~Q)... "'... r::f.t:! Q) Q) 0 '" (J (I) 0.25 - 0 <(-oIOU~ Q)'!!! Q)'~ Q) Q) ... .t:! ... - .. ... cnScn:>cncn ... c ... Q) c E Q) ... .5 E '" ... ~ ~ '" :a' Q) :g. <( ~ IV .2 #- "G E #- ii N .5 ~ In a: co .. ~NCI -g ... . C III - "'.- > ~ o>ii~olll Q) ~ ... r = .t:! ...rQ)OgJ'O 10 N 0.0) ._ ... a:NO ,OQ. ^ ^ ^ 10 .c CJ V V V - en - 0) - N ~~ CC 10 IV 5..n ...en - . tj~ 8* c- OO .~ ~ ... - IIlE ....- Q) Q)'" Q) (;j ~ ~ ;.5 .g := ~ IV Q)~ tj EC ... IV j Q) III - C III co C 0> l! c ... ~ IV o ~U - IV'" C .co!! o NGi t:: en~ 1n oa-s <3 :;:'j . In ~.!Q c C==~O IV~~t:: iii ~ '" ~ ~ 1Ii.9l c~ -Q)'" Q)IIlEMQ)3 0.- Q) - 0 )(=="Q.Nc w%: E* oU 0 - 0._ _'+:; 0 ~ ~iQ)o~;c c ... Q) Q).- - ~ c ~ _ Q).t:! 0 UO <(0 -E(I) c~'2g::~~c:! o .-- c '" .+:; IVii'2 10<<10 :! ... uL!! & ~ U (l)5...~...Q)~ ~E~Q)~E~ - 10 '" '2 (J _<(10 0 l!!J::!;Q)5 U 10<("'25"'-- .=_1- >00 oE'O"''''''' E Q)1Il'- ... 3 ~ : .~ ~ ... c 0 - - ~c~Q)ucc c 0- e".2.2 -;~Q)B~1;1; .. E ~ E .!! ~ .21.21 III CJ 10 (J 0. o..t:! .t:! ~<(.c<(e~:E:E s^ ^ ^^ 0... N M~ (l,v V vv ~ Q) ... c Q) E Q) "Q. .s ---.-.---...,...------..----...... .. ..--......-...-----.-....-. -.-.....-----..-.... ..-..-.--...... VALLEY WASTE MANAGEMENT MID-YEAR RATE ADJUSTMENT CALCULATION YEAR ENDING DECEMBER 31, 1992 < 000 OMITTt;D> Allowable Expenses: Per Staff Analysis, including inter-company charges and excluding closure and post-closure costs Bi-monthly billing expense Capital Use Charge Total Allowable Expenses Per January 1, 1992 Rate- Setting Increase in Disposal Expense Total Allowable Expenses Per Mid-Year Rate Setting Allowable Profit Revenue and Expense Balancing Account Total Revenue Required Total Revenue Provided Required Revenue Increase Percent Increase to obtain Revenue Required Over Six- Month Period July 1, 1992 - December 31, 1992 ATTACHMENT II $13,619 51 260 13,930 547 < A > 14,477 643 <118 > 15,002 14.455 $ 547 7.56% <A> Disposal expense increase for the period May 18 through December 31,1992. ADS/PP #lNaIWaste.Att -----r---------- VALLEY WASTE MANAGEMENT ATTACHMENT III FRANCHISE ZONES 2, 4 AND 5 SCHEDULE OF CURRENT AND COMPUTED COLLECTION RATES EFFECTIVE JULY 1, 1992 Current Adjusted ------------------ ------------------ Regular Automated Regular Automated ---------- --------- --------- --------- RESIDENTIAL SERVICE: 1 32-gal. can weekly * $ 17.00 15.15 18.30 16.45 2 32-gal. can weekly * 34.00 32.15 36.60 34.75 3 32-gal. can weekly * 51.00 49.15 54.90 53.05 4 32-gal. can weekly * 68.00 66.15 73.20 71.35 5 32-gal. can weekly * 85.00 83.15 91.50 89.65 6 32-gal. can weekly * 102.00 100.15 109.80 107.95 7 32-gal. can weekly * 119.00 117.15 128.10 126.25 8 32-gal. can weekly * 136.00 134.15 146.40 144.55 Each additional can--non-regular 4.85 5.20 (rr pick-up) 20.40 22.00 1 can weekly - Specia service (hilly) areas 2 can weekly - Special service 37.40 40.25 3 can weekly - Special service 54.40 58.55 4 can weekly - Special service 71.40 76.85 1 45 ga l. can 25.50 27.45 2 can 51.00 54.90 1 supercart 51.00 49.15 54.90 53.05 1 supercart-Danville 48.00 46.15 51.90 50.05 Townhouse: 1 can 15.55 13.70 16.85 15.00 2 can 32.55 30.70 35.15 33.30 3 can 49.55 47.70 53.45 51.60 MULTI-APARTMENT SERVICE: Each apartment weekly 17.35 18.65 Each additional can weekly 11.65 12.55 Each additional can - non re~ular 6.40 6.90 (per pic -up) COMMERCIAL SERVICE: One can weekly 23.95 25.75 Each editiona can weekly 9.45 10.15 Each additional can -- 6.05 6.50 non-regular One Cubic Yard: One time per week 90.25 97.05 Two times per week 154.25 165.90 Three times per week 218.30 234.80 Four times per week 282.30 303.65 Five times per week 344.70 370.75 Two Cubic Yards: One time per week 154.25 165.90 Two times per week 282.30 303.65 Three times per week 410.35 441.35 Four times per week 538.55 579.25 Five times per week 666.50 716.90 Three Cubic Yards: One time per week 212.85 228.95 Two times per week 409.05 439.95 Three times per week 615.55 662. 10 Four times per week 820.75 882.80 Five times per week 1,012.80 1,089.35 Four Cubic Yards: One time per week 282.30 303.65 Two times per week 537.55 578.20 Three times per week 768.20 826.30 Four times per week 998.60 1,074.10 Five times per week 1,229.95 1,322.95 Six Cubic Yards: One time per week 402.45 432.90 Two times per week 804.75 865.60 Three times per week 1,180.30 1,269.55 Four times per week 1,569.25 1,687.90 Five times per week 1,958.20 2,106.25 COMPACTED REFUSE SERVICE: Per cubic yard 31.35 33.70 DROP BOX SERVICE: Seven cubic yards 293.00 315.15 (dirt and rocks) Fourteen cubic yards 204.95 220.45 Twenty cubic yards 293.00 315.15 Thirty cubic yards 439.50 4n.75 Forty cubic yards 586.15 630.45 * Includes two 32-gallon cans of garden trimmings per week and three refuse cleanups per year. -----,---------------------------------------- ORINDA-MORAGA DISPOSAL SERVICE, INC. MID-YEAR RATE ADJUSTMENT CALCULATION YEAR ENDING DECEMBER 31, 1992 <000 OMITTED> Allowable Expenses: Per Staff Analysis, including inter-company charges and excluding closure and post-closure costs Bi-monthly billing expense Capital Use Charge Total Allowable Expenses Per January 1, 1992 Rate-Setting Increase in Disposal Expense Total Allowable Expenses Per Mid-Year Rate Setting Allowable Profit Revenue and Expense Balancing Account Total Revenue Required Total Revenue Provided Required Revenue Increase Percent Increase to obtain Revenue Required Over Six- Month Period July 1, 1992 - December 31, 1992 ATTACHMENT IV $ 5,319 18 78 5,415 193 <A> $ 5,608 202 <38 > 5,772 5,579 193 6.92% <A> Disposal expense increase for the period May 18 through December 31,1992. ADS/PP #1/0rin-Mor.Att .-....,--- ORINDA-MORAGA DISPOSAL SERVICE, INC. ATTACHMENT V FRANCHISE ZONE NO. 1 Page 1 of 4 SCHEDULE OF CURRENT AND COMPUTED COLLECTION RATES EFFECTIVE JULY 1, 1992 Current Adjusted Rates Rates -...------.....-.. ............-...-..--.. ORINDA . FULL SERVICE -----...----------------------------- REGULAR SERVICE:. 1 can $ 20.35 21. 70 2 can 40.70 43.40 3 can 61.05 65.10 4 can 81.40 86.80 5 can 101. 75 108.50 6 can 122.10 130.20 One can - Senior Citizen 17.35 18.70 Extra can on route 4.95 5.30 Special pick-up - 1 can 13.95 14.90 Special pick-up - each add'l can 4.95 5.30 MINIPACKER SERVICE: 1 can 27.05 28.20 2 can 47.40 49.90 3 can 67.75 71.60 4 can 88.10 93.30 ODD SERVICE: 1-45 gal. can 30.55 32.55 1-45 gal. can and 1-32 gal. 50.90 54.25 1-45 gal. can and 2-32 gal. 71. 25 75.95 4-45 gal. can 122.20 130.20 COMMERCIAL SERVICE: One can weekly 28.15 30.10 Each additional can weekly 11.80 12.60 MULTI-APARTMENT SERVICE: Per lM"li t ~r week 17.75 19.00 Each additional pick-up per week 2.85 3.05 COMPACTED REFUSE SERVICE: Per cubic yard 34.55 36.95 BULK SERVICE: ONE YARD: Once per week 103.85 111.05 Twice ~r week 181.90 194.50 Three times per week 259.25 277.20 Four times per week 336.65 359.95 Five times per week 414.70 443.40 TWO YARD: Once per week 181.90 194.50 Twice ~r week 336.65 359.95 Three times per week 492.15 526.20 Four times per week 647.40 692.20 Five times per week 803.15 858.75 THREE YARD:... Once per week 246.81 263.90 Twice ~r week 493.62 527.80 Three times per week 740.43 791.65 Four times per week 987.24 1,055.55 Five times per week 1,234.05 1,319.45 FOUR YARD: Once per week 311. 76 333.35 Twice ~r week 623.52 666.65 Three times per week 935.28 1,000.00 Four times per week 1,247.04 1,333.35 Five times per week 1,558.80 1,666.65 SIX YARD: Once per week 444.91 475.70 Twice ~r week 889.82 951.40 Three times per week 1,334.n 1,427.10 Four times per week 1,779.63 1,902.80 Five times per week 2,224.54 2,378.50 EIGHT YARD: Once per week 593.21 634.25 Twice ~r week 1,186.42 1 ,268.~.lJ Three times per week 1,779.63 1,902.80 Four times per week 2,3n.84 2,537.05 Five times per week 2,996.05 3,203.40 SPECIAL: One yard 20.70 22.15 Two yards 41.55 44.45 ------~-__r___--'---...-.------~4-----.-'_....--------------_.~.- .----.--.~~...---.-------- ORINDA-MORAGA DISPOSAL SERVICE, INC. ATTACHMENT V FRANCHISE ZONE NO. 1 Page 2 of 4 SCHEDULE OF CURRENT AND COMPUTED COLLECTION RATES EFFECTIVE JULY 1, 1992 Current New Rates Rates DROP BOX SERVICE: Twenty cubic yards Thirty cubic yards Forty cubic yards Five yards - dirt and concrete Sixteen yard school box ** $ 342.50 513.60 684.80 342.50 273.95 366.20 549.15 732.20 366.20 292.90 ORINDA - NO BRUSH SERVICE REGULAR SERVICE: 1 can 2 can 3 can 1 can-Senior Citizen MINI PACKER SERVICE: 1 can 2 can 3 can 4 can 1-45 gal. can 1-45 and 1-32 gal. can 17.65 19.00 38.00 40.70 58.35 62.40 16.15 17.50 24.35 25.50 44.70 47.20 65.05 68.90 85.40 90.60 36.55 38.30 60.90 63.80 * Includes one 32-gallon can of garden trimmings per week and three refuse cleanups per year A charge of $27.35 per week applies for each week not serviced RENT-A-BIN service to be available on the following terms: three cubic yard container delivery and pickup, one dump, and three-day rent, for $90. ** *** ...,--- ORINDA-MORAGA DISPOSAL SERVICE, INC. ATTACHMENT V FRANCHISE ZONE NO. 1A Page 3 of 4 SCHEDULE OF CURRENT AND COMPUTED COLLECTION RATES EFFECTIVE JULY 1, 1992 Current New Rates Rates ------------ ----------- MORAGA - FULL SERVICE ----------------------------------- REGULAR SERVICE:* 1 can $ 18.20 19.45 2 can 36.40 38.90 3 can 54.60 58.35 4 can 72.80 n.80 5 can 91.00 97.25 6 can 109.20 116.70 Extra can on route 4.95 5.30 special pick-up - 1 can 13.95 14.90 Special pick-up - each add' l can 4.95 5.30 MINI PACKER SERVICE: 1 can 26.45 27.45 2 can 44.65 46.90 3 can 62.85 66.35 4 can 81.05 85.80 5 can 99.25 105.25 ODD SERVICE: One can - 45 ~al. 27.30 29.20 One can - 1/4 and 1/32 gal. cans 45.50 48.65 One can - 1/45 and 2/32 gal. cans 63.70 68.05 COMMERCIAL SERVICE: One can weekly 28.15 30.10 Each additional can weekly 11.80 12.60 MULTI-APARTMENT SERVICE: Per uni t ~r week 17.75 19.00 Each additional pick-up per week 2.85 3.05 COMPACTED REFUSE SERVICE: Per cubic yard 34.55 36.95 BULK SERVICE: ONE YARD: once per week 103.85 111.05 Twice ~r week 181.90 194.50 Three times per week 259.25 2n.20 Four times per week 336.65 359.95 Five times per week 414.70 443.40 TWO YARD: once per week 181.90 194.50 Twi ce ~r week 336.65 359.95 Three times per week 492.10 526.15 Four times per week 647.40 692.20 Five times per week 803.15 858.75 THREE YARD:*** once per week 246.81 263.90 Twice ~r week 493.62 527.80 Three times per week 740.43 791.65 Four times per week 987.24 1,055.55 Five times per week 1,234.05 1,319.45 FOUR YARD: once per week 311. 76 333.35 Twi ce ~r week 623.52 666.65 Three times per week 935.28 1,000.00 Four times per week 1,247.04 1,333.35 Five times per week 1,558.80 1,666.65 SIX YARD: Once per week 444.91 475.70 Twice ~r week 889.82 951.40 Three times per week 1,334.72 1,427.10 Four times per week 1,779.63 1,902.80 Five times per week 2,224.54 2,378.50 EIGHT YARD: Once per week 593.21 634 . 25 Twice ~r week 1,186.42 1,268.50 Three times per week 1,779.63 1,902.80 Four times per week 2,372.84 2,537.05 Five times per week 2,996.05 3,203.40 SPECIAL One yard 20.70 22.15 Two yards 41.55 44.45 ORINDA-MORAGA DISPOSAL SERVICE, INC. FRANCHISE ZONE NO. 1A SCHEDULE OF CURRENT AND COMPUTED COLLECTION RATES EFFECTIVE JULY 1, 1992 ATTACHMENT V Page 4 of 4 Current New Rates Rates ------------ ----------- DROP BOX SERVICE: Twenty cubi c yards $ 342.50 366.20 Thirty cubic yards 513.60 549.15 Forty cubic yards 684.80 732.20 Five yards - dirt and concrete 342.50 366.20 Sixteen yard school box ** 273.95 292.90 MORAGA - NO BRUSH SERVICE ----------------------------------- REGULAR SERVICE: 1 can 15.85 15.85 2 can 34.05 34.05 3 can 52.25 52.25 Extra can on route 4.95 4.95 Special pick-up - 1 can 13.95 13.95 Special pick-up - each add'l can 4.95 4.95 ODD SERVICE: One can - 45 ~al. 21.70 21.70 One can - 1/4 and 1/32 ~al. cans 36.45 36.45 2-45 gal. can-small truc 43.40 43.40 Current New Rates Rates ------------ ......-----.....- LAFAYETTE SERVICE ----------------------------------- REGULAR SERVICE:* 1 can $ 17.00 18.30 2 can 34.00 36.60 3 can 51.00 54.90 Extra can on route 4.85 5.20 1-45 gal. can 25.50 27.45 HINIPACKER SERVICE: 1 can 20.50 22.00 2 can 37.50 40.25 3 can 54.50 58.55 Extra can on route 4.85 5.20 1-45 gal. can and 1-32 gal. can 47.00 50.25 * ** Includes one 32-gallon can of garden trimmings per week and three refuse cleanups per year A charge of $27.35 per week applies for each week not serviced RENT-A-BIN service to be available on the following terms: three cubic yard container delivery and pickup, one dump, and three-day rent, for $90. *** Valley Waste Management . 1990 N. California Blvd., Suite 20 P.O. Box 4007 Walnut Creek, California 94596 510/935-8900 ~ 'eJ A Waste Management Company June 26, 1992 President Parke Boneysteele and Members of the Board of Directors Central Contra Costa Sanitary District 5019 Imhoff Place Martinez, CA 94553-4392 fRl~~~O\'t'~lQ) JUN 26 1992 e,,~ CCCSD ~IAAY OFllE DISTRICT ij Dear Members, On January 30, 1992 the Central Contra Costa Sanitary District Board approved a 3.43% rate decrease effective January 1, 1992. The Board also approved that in the event the Acme transfer station fee was changed in 1992, the Board would consider a mid-year collection rate adjustment. On May 13, 1992, Valley Waste Management 0JWM) received a letter from Bart Bisio, Secretary of the Acme Fill Corporation, notifying VWM of an increase in rates at the Acme Transfer Station from $65.69 to $77.07 per ton, effective May 18, 1992 (see attached). VWM is requesting an increase in rates of 8.11 % effective July 1, 1992 to recover increased transfer and disposal costs of $585,000. These costs are projected to be recovered over the six-month period of July 1 through December 31, 1992. This will raise the single can rate from $17.00 per month to $18.40. Attached to this letter is supporting documentation. Should you or your staff have additional questions, we will be pleased to be of assistance. Sincerely, ~::ft~JV General Manager (James E. Landa Controller sl enc cc: Roger Dolan Paul Morsen Walter Funasaki Joe Moore Sandy Skaggs a division of SAWDCO PAGE , OF 5 NO. 6. BIDS AND AWARDS q. DATE AUTHORIZE AWARD OF CONTRACT TO CAL-NEV A ENVIRONMENTAL SYSTEMS INCORPORATED FOR THE LABORATORY FACILITIES IMPROVEMENT, DISTRICT PROJECT NO. 10077 July 14, 1992 TYPE OF ACTION AUTHORIZE AWARD SUBMITTED BY Paul A. Sciuto n E ineer INITIATING DEPTJOIV. Plant Operations Department ISSUE: Central Contra Costa Sanitary District has advertised and received bids for District Project No. 10077, Laboratory Facilities Improvement. The District must award the construction contract or reject all bids within 60 days of the opening of bids. When the CIB was considered for approval, the Board directed staff to obtain an additional Board Authorization for a number of budgeted projects prior to proceeding. The Laboratory Facilities Improvement Project is one of those projects. BACKGROUND: The Laboratory Facilities Improvement Project, DP No. 10077, includes many segments. One section includes the modification of three existing laboratory fume hoods. Because it is a safety issue, the changes to the fume hoods should be addressed now while the remaining portion of the work can be deferred. The three laboratory hoods were installed as part of the Stage 5A construction nearly twenty years ago. These fume hoods were adequate at the time of installation, . but do not meet present Occupational Safety and Health Administration (OSHA) regulatory requirements. The discharge system from the hoods also fails to meet the latest OSHA requirements for exhaust stack height. To meet these new and more stringent requirements, the exhaust fans will be replaced so that the hoods provide a higher air flow rate, new exhaust stacks will be installed that properly discharge into the atmosphere, and new velocity meters and alarms will be installed as needed to conform with OSHA specifications. The Laboratory Facilities Improvement Project was identified as one of the projects which was to receive further Board authorization prior to an additional allocation of funds. Since this portion of the Laboratory Facilities Improvement Project is needed to address a critical safety issue, staff recommend that the Board authorize proceeding with this work now. The project was advertised on June 16 and 22, 1992. Five bids were received and publicly opened on July 1. These bids are listed on Attachment 1 - Tabulation of Bids. The lowest responsible bidder is Cal-Neva Environmental Systems Incorporated with a bid of $20,400 for furnishing and installing three laboratory hood fans including exhaust stacks, duct work, and velocity meters. The initial engineer's estimate for the work was $15,000. The reason for the variance between the engineer's estimate and the low bid is that one hood must be active at all times. This is essential for laboratory operations and will require a significant coordination effort between the Contractor and the District. To ensure the safety of laboratory personnel during construction~E~/~~bEl Mw.ee,QD~rb~B'b~,95iJTfJY than originally anticipated. INITIAT DE TJOIV. J HIEF ENG. (~ PAS JLB SUBJECT AUTHORIZE AWARD OF CONTRACT TO CAL-NEVA ENVIRONMENTAL SYSTEMS INCORPORATED FOR THE LABORATORY FACILITIES IMPROVEMENT, DISTRICT PROJECT NO. 10077 :::IIII."IIII:i:llilllllllllli PAGE 2 OF 5 DATE July 14, 1992 This project is included in the fiscal year 1992-93 Capital Improvements Budget on page TP-52. The current balance of the sewer construction fund, minus unspent project allocations, plus projected dependable revenue will be adequate to fund this project. A funding summary is presented in Attachment 3. Staff has determined that this project is exempt from the California Environmental Quality Act (CEQA) under District CEQA Guidelines Section 18.2, since it involves a minor alteration to an existing facility involving negligible or no expansion of use beyond that previously existing. The Board of Directors' approval of this project will constitute a finding of agreement with this determination unless otherwise indicated. RECOMMENDATION: Authorize Award of Contract to Cal-Neva Environmental Systems Incorporated, the lowest responsible bidder, for $20,400 for the Laboratory Facilities Improvement Project, DP 10077. 13028-7/91 ---.--......-.-..-.....---.-.--.--..--,------..-.-- ATTACHMENT 1 PAGE 3 of 5 ~ g V) ~ z: a r--: ....... ::E 23 - I-- ........ CL >- N ~~ l.1.J g . U N N I-- z: ~ x- LL.c:t: ~ N ....... ~ l.1.J I- ---l <::t I-- Vi ~~ ........ I"- 0:: - a I-- ~;:!5 ....... a c:t: z: N u. <::t 0 l"- V) a z: ~ a z: co 0:: a a I~ . ....... g . C") I-- I-- l.O CL !M ........ c:t: N U l.1.J Cl l.1.J ~ I z: N I-- z: r-- x ~ c:t: ~ N ....... ~ l.1.J ::> tii . ---l <::t I-- ~ :z: ~ w > ~ ~ I"- 0:: a Vj ;:!5 0 :% z: I?" . Vl CL a z: >- 0:: V- a a 0:: a l.1.J >- . ....... a u ---l c:::( . 0 I-- I-- ---l N Cl <::t CL c:::( ---l ....... l.1.J '-'; ~ . 0:: V) ---l > N I-- z: ~ u a 0:: l.1.J >- 0"1 N ....... C") X co l.1.J N 0:: ....... <::t I-- N l.1.J c:t:1-- ---l l.1.J ........ I"- 0:: tJ Q9 ---l l.1.J c:t: ::E ....... 0 c:t: a ::E Cl l.1.J I"- co ::E z: z: .--.. C") >- ---l ----- I-- c:t: V) ....... I-- 0 z: l.1.JU l.1.J 0 a l.1.J a ::E V1 . ....... 0:: ---l >- . L{) I-- I l.1.J I-- c:t: C") CL 1--> I N N Cl U V) l.1.J l.1.J . ---l Cl z: N I-- z: g a x ---l z: N ....... ~ N ....... : N l.1.J c:t:c:t: z: I-- <::t I-- ~ ~ I-- I-- 0:: ~ I"- 0:: a . V) ~ 0:: c:t: 0 c:t: z: z: 0:: ::E ::E. I"- co I:::E z: ....... a :3: V) Cl 0 z: z: I-- ~ 0 a c:t:U . ....... => - a I-- I Cl g 0 CL V) c:t: N N H<.!J > l.1.J l.1.J . U :z: :z: l.1.J :z: N I-- :z: ~ a x 0:: ....... :z: ....... ~ N ....... ~ l.1.J => Cl I I-- <::t I-- lJ.... => ---l 0:: ........ I"- 0:: ~ a ---l c:t: c:t: ;::: 0 c:t: z: :z: U U ::E co ::E Q :z: -I-- t- ....... CL 5 ~ U V) l.1.J en :z: . 'J w 0 c:t: a -' lJ.... ~ :z: - 0:: < d :i 0 CL a: Cl a:: 3l 0 :z: ~ 3 - w 8 w w ~ - !< a a:: I-- I-- .,; 0.. -< :z: 0 :z: 0 g ~ c:j rd 0( a:: ~ a ~ I ~ ~ 0 u: 0 s l!! ....... ffi ~ I-- c:t: Cl 0 > Cl a ....... z: co l.1.J - 0:: l.1.J en ---l - >- a co w 0:: ....... !;( a CD V) 0 - I-- U. z: c:::( 0 a 0:: CL a 5~ V) co l.1.J c:t: 0:: ---l ~=<f I-- ~ ..J-l V) I-- ~5 I..LJ ~ a :3: ---l a Cl ~ ---l .. ~ . ........ 0 >- :z: CD w z 5l- 'j ~ ~ ~ ~ - . w a:: a:: IE ........ ~. :b ~ a 0"1 ....... N --'.--'-'-'- --...-.-.--.-.---.......................--...-T-.---.-.-..--........-- ATTACHMENT 2 LABORATORY FACILITIES IMPROVEMENT PROJECT (DP 10077) POST BID PRECONSTRUCTION ESTIMATE PAGE 4 OF 5 % OF CONSTRUCTION ITEM DESCRIPTION TOTAL COSTS 1 CONSTRUCTION CONTRACT $ 20,400.00 2 CONTINGENCY AT 20 PERCENT 4,080.00 SUBTOTAL $ 24,480.00 100% 3 CONSTRUCTION MANAGEMENT $ 5,000.00 ADMINISTRATION/INSPECTION ENGINEERING/AS-BUILT DRAWINGS 500.00 PLANT OPERATIONS DEPARTMENT 2.438.00 SUBTOTAL $ 7,938.00 32.4% 4 PRE-BID PROJECT EXPENDITURES NOT $187,582.00 ASSOCIATED WITH THIS PORTION OF THE PROJECT 5 TOTAL PROJECTED COSTS FOR THIS $220,000.00 PORTION OF THE WORK 6 FUNDS AUTHORIZED TO DATE $195,000.00 7 TOTAL PROJECT COSTS REQUIRED TO $ 25,000.00 COMPLETE THIS PORTION OF THE PROJECT -----------------.------r------------------.--------. ATTACHMENT 3 PAGE 5 OF 5 PROJECT FUNDING SUMMARY SEWER CONSTRUCTION FUND BALANCE AS OF JUNE 30, 1992 (ESTIMATED) $67,984,000 - UNSPENT PRIOR ALLOCATIONS (37,522,000) + DEPENDABLE REVENUE. 10.534.000 $40.996.000 $40,996,000 > $25,000 (ALLOCATION REQUIRED) .Doe5 not include ad valorem tax. ------- -------------- ------------------,-- Central Contra Costa Sanitary District BOARD OF DIRECTORS PAGE 1 OF 9 BOARD MEETING OF July 16, 1992 NO. 6. BIDS AND AWARDS b. SUBJECT CONSIDER THE RESPONSIVENESS OF ALLIED CRANE, INCORPORATED, BID TO INSTALL THE SOLIDS CONDITIONING BUILDING CRANE, DISTRICT PROJECT NO. 10083, AND AUTHORIZE AWARD TO THE LOWEST RESPONSIVE AND RESPONSIBLE BIDDER DATE July 14, 1992 TYPE OF ACTION CONDUCT RESPONSIVENESS HEARING SUBMITTED BY Paul A. Sciuto, Assistant Engineer INITIATING DEPT./DIV. Plant Operations Department ISSUE: The bid by Allied Crane Incorporated for District Project No. 10083, the Solids Conditioning Building Crane Installation, included six irregularities. The District must award the construction contract, or reject all bids within 60 days of the opening of bids. BACKGROUND: Present access to areas of the Solids Conditioning Building (SCB) is limited by access to the basement and to the north side of the building; such access will be necessary for the construction of the Cogeneration Project. Furthermore, when this and other upcoming projects are installed, Maintenance and Operations personnel will need the ability to move material and equipment to the basement on the north side of SCB. To accomplish this requirement, the District proposes to install a crane above the bay on the north side of the SCB. District Project No. 10083, the Solids Conditioning Building Crane Installation, includes demolition of the existing light, construction rails and trolley, and installation of a new double girder underhung 1 5-ton crane with operation by remote control. Plans and Specifications for the project were prepared by Beyaz and Patel, Inc. The Engineer's estimate for construction was $264,500. The project was advertised on June 8 and June 15, 1992. A Summary of the Bids is shown in Attachment I. The Plant Operations Department conducted a technical and commercial evaluation of all bids. It was found that the bid of Allied Crane, Incorporated, the apparent low bidder, contained the following irregularities (see Attachment 2): . Allied Crane holds a 'C-61' (Limited Specialty) contractor's license; an 'A' (General Engineering Contractor) or 'B' (General Building Contractor) license classification was required, INITIATltj DEPT.lDIV. ~~. JLB ~NG ROGER J. DOLAN 1302A-7/91 PAS --------.---.--.---.-.---,-----.-----------.----.---.......--.......-----. SUBJECT CONSIDER THE RESPONSIVENESS OF ALLIED CRANE, INCORPORATED, BID TO INSTALL THE SOLIDS CONDITIONING BUILDING CRANE, DISTRICT PROJECT NO. 10083, AND AUTHORIZE AWARD TO THE LOWEST RESPONSIVE AND RESPONSIBLE BIDDER PAGE DATE 2 OF 9 July 14, 1992 . Allied Crane added three (3) paragraphs of text to the Schedule of bid, thereby substantially changing the specifications. The intent of the wording appears to limit the Contractor's liability and shift the responsibility for performance to the District (see Attachment 3), . the bid specification addendum was not noted as required by the Contract Documents, . the Contractor's Safety Manual was not noted as required by the Contract Documents, . the non-collusion affidavit was not included in the bid as required by the specifications, and . the "Certificate Regarding Inspection of Contract Documents, Site, and Reference Drawings" was not included in the bid. It is the staff's opinion that these items taken as a whole, or in part, comprise a material variance from the proposal requirements. Bid proposals may be rejected by the Board of Directors if there are any variances from the Contract Documents, which are determined by the Board to be material variances. Prior to considering what action to take, it is appropriate for the Board to conduct a responsiveness hearing to receive information from interested parties. If the Board determines that the Allied Crane, Incorporated bid is non-responsive and it is rejected, staff has evaluated the remaining bids and determined that the second low bidder, Rigging International of Alameda, CA, is the lowest, responsive, and responsible bidder. The Board of Directors has the following three options to consider: 1. Declare the bid of Allied Crane, Incorporated to be non-responsive and award the construction contract to Rigging International as the lowest responsive and responsible bidder, 2. Declare the bid of Allied Crane, Incorporated to be responsive, and authorize award of the construction contract to Allied Crane, Incorporated as the lowest responsive and responsible bidder, or 3. Reject all bids. 1302B-7/91 ,..----.----...-.- ---~---.-.--'_..-.----..t-.,~~.-.---. CONSIDER THE RESPONSIVENESS OF ALLIED CRANE, INCORPORATED, BID TO INSTALL THE SOLIDS CONDITIONING BUILDING CRANE, DISTRICT PROJECT NO. 10083, AND AUTHORIZE AWARD TO THE LOWEST RESPONSIVE AND RESPONSIBLE BIDDER SUBJECT PAGE DATE 3 OF 9 July 14, 1992 The total project cost for this project was estimated in the 1992-93 Capital Improvement Budget to be $374,000 (pages TP-66 to TP-67). The total cost of this project is estimated to be $350,000 (see Attachment 4). The current balance of the sewer construction fund, minus unspent project allocations, plus projected dependable revenue will be adequate to fund this project. A funding summary is presented in Attachment 5. Staff has determined that this project is exempt from the California Environmental Quality Act (CEOA) under District CEOA Guidelines, Section 18.2, since it involves a minor alteration to an existing facility involving negligible or no expansion of use beyond that previously existing. The Board of Director's approval of this project will constitute a finding of agreement with this determination unless otherwise indicated. District staff will inspect the work and administer the construction contract. RECOMMENDATION: 1. Conduct a responsiveness hearing on the bid proposal submitted by Allied Crane, Incorporated; and 2. Reject the bid of Allied Crane, Incorporated, as being non- responsive; and 3. Authorize Award of Contract for construction of District Project No. 10083, Solids Conditioning Building Crane Installation Project, to Rigging International in the amount of $233,353, as the lowest responsive and responsible bidder. 1302B-7/91 ---..........--.-. ..---------,--.....-------....--------------...---......-.---------_.. PROJECT NO. Attachment 1 Page 4 of 9 Central .Jontra Costa Sanit....'y District SUMMARY DF BIDS Solids Conditioning Building Crane Installation 10083 DATE June 30, 1992 ENGR. EST.~ 264,500 LOCA TI ON Martinez, California oc W BIDDER (Name, telephone & address) BID PRICE All i ed Crane, Inc. ( 510 ) 430-0543 $ 1 9131 San Leandro Street, Oakland, CA 94603 195,350 Rigging International ( 510 ) 865-2400 $ _233,353 2 ,).0. Box 4013, Alameda, CA 94501 Dalzell Corporation ( 510 ) 835-0732 $ 3 264,226 2434 Chestnut Street, Oakland, CA 94607 - ( ) $ ~ ( ) $ - ~ ( ) $ - -- ---.---- -------. ~ ( ) $ _______n - .----- - _._.._---_._-_..._-~-_._~ - ( ) -_.._.._-_._---~ $ --------- ---------- ~---- -..--. ----~~ ~ --------- --_.'.-..- ---------~~ l_~______ $ ~--_..---- --------_.~-----_._-~--- ---- ----- ---------..-.----- - ----- --- L~_ -----.--.---.- $-- - - - - ----..-----..--------------.. ---- -- -------- --...------ ( ) --------- $ -----_._-- - L_ ) $ ----------.-- .. -- .n_ ------------ --- PREPARED BY Joyce Murphy DATE 06/30/92 SHEET NO. 1 OF 1 2503-9/84 0'1 , 4- N 0 0'1 0'1 L.l") .... Q) 0 en M ItS Q) 0... c:: ~ OJ III iU 0 ... (1) (1) ~ ....... fA c N 0 .- +> ... s:: CO Q) E = ..s:: u - ItS CO +> > +> c:( W ""C .- m M co 0 0 .... C- O ~ +-> u Q) ...., 0 ~ Cl.. c:: 0 ..... +-> 10 ..... ..... 10 +-> Vl c:: ce ..... u Q) ~ c:: N 10 CIJ ~ c:: u ..... +-> a:l ~ U 10 Vl ~ III E '" c: z .2 "" iU 0 u 0 Z -l () () CIl CIl '0 '0 ... ct ~ "' Vl Vl VlO 0 UJ UJ c.... :z: >- >- 0 ..... +-> u QJ 0 Vl Vl VlO'l Z UJ UJ >- >- i is z >- 0 Vl Vl i z UJ UJ >- >- ~ 'O C dl Vl Vl Vl 'O UJ UJ UJ m >- >- >- ~"ii ~c '02 't;~ ::;C1. I r; Q) c.. C Q) Vl Vl Vl UJ UJ UJ EOE >- >- >- 0.,....,... U +>I- ~" -.- u 'Q:E ~ Vl Vl Vl c C'':; ~~ G.I UJ UJ UJ q:~ >- >- >- ....w .. ~ .bu UJ Vl Vl ~l! z UJ UJ tIl- 0 >- >- c z 8 ~f .! .!? Vl Vl Vl 1i'C. UJ UJ UJ -0. >- >- >- .. ~ ~tIl ,,- .... _to ~- i~ Vl Vl Vl J:oe tA.. UJ UJ UJ >- >- >- 'OE .- " al~ II>m ~c71 Vl Vl Vl iiioe UJ UJ UJ &" >- >- >- (ii1O 0 ig M ....N ~ &Ii! ....0'1 ......... a:l.... ....... .... q- u.... ol:l~ ~'Q.O 1.0 0'1 M " " I ...... ~...... N :JW U In ceco ce.... 0 E N ~'O 0 Vl Vl 'O", c_ Z UJ UJ '" 0 >- >- :gz <( ..... 10 C c:: 0 0 0 0 u ..... ..... c +-> +-> () ..... 10 10 ~ c:: ~ ~ 0 'E Q) Q) 0- 0 c:: +-> l- t) 10 c:: 0 ~ ..... U U C> ..... -c c ~ Q) ..... ..... C> N ..... C> ..... ~ ..... 10 0:: 0 0: "- '" '" '" 0 +-> ~ N ..... 0'1 U 0'1 Vl .... 0 ce .... ..... >, ~ ..... 10 ~ Cl.. OJ >- CD ~ CIl ;0 Q. CIl CIl iU ct 0 Q) ..... ~ -c Q) .s= u Vl~ Q) -0.0 ..... E-C .o~Q) c+-> CIJ 0 -CItlC +>-0 c+> OQ)O +>-cc -c -cItlVl ~Q)~ -c +> -c 100 c::..... Vl 0 Itl+-> ~o~ C::Q) +> .c x -c E QJ.,... :5 t-oz ....NM ..~.._~_._~~.,._..._._-~..,_._---_.__._--------'-'-_..----.--.,---- ---.-.--------- Attachment 3 PART III PROPOSAL FORMS Page 6 of 9 SECTION Z - SCHEDULE OF BID ~ su. Schedule of Prices for Construction of Solids Conditioning Crane Installation Project in accordance with the Contract Documents. It.. Unit ~ DescriDtion Ouantity ~ Price 1 Demolition of existing facilities, I LS furnish and install one IS-ton crane in working order Building Mount $195,350.00 Price includes shoring of the concrete access ramp to support loads imposed by the bridge crane system components rolled in on carts, and to support a mobile crane to facilitate installation of the system. Shoring methods and materials used shall be reviewed and approved by the District. The District shall inspeet completed shoring and provide approval to use the ramp as necessary, to bring system components into the crane bay and position the mobile crane for lifting them into place safely. With the District1s approval of all phases of the shoring, it assumes all responsi- bility for the structural integrity of the concrete ramp, upon completion of the project.. ,; Total Bid: (Enter Bid Numerically) $195.350.00 Total Bid 1n Words: One Hundred Ninety-Five Thousand Three Hundred Fifty dollars and no cents In case of discrepancy between words and figures, the words shall prevail. Signed: f?c4 IuJ~z-' Bidder DPIl0083- II 1-4 Attachment 4 Page 7 of 9 SCB CRANE INSTAllATION PROJECT (D.P. 10083) POST BID PRECONSTRUCTION ESTIMATE ITEM DESCRIPTION TOTAL 1 Construction Contract $233,353.00 2 Contingency @ 20% $ 46.700.00 Subtotal $280,053.00 3 Construction Management Ad m i nistration/l nspection $ 18,000.00 legal $ 1,000.00 Engineeringl As-Built Drawings $ 500.00 Plant Operations Department $ 5.147.00 Subtotal $ 24,647.00 4 Consulta nts/Contractors Weld Inspection $ 2,500.00 Construction Support Service $ 6.800.00 Subtotal $ 9,300.00 5 Prebid Expenditures $ 36,000.00 6 Total Project Costs $350,000.00 7 Funds Authorized to Date $ 25,000.00 8 Total Project Costs Required to Complete Project $325.000.00 % OF CONSTRUCTION COSTS 100.00% 8.80% 3.32% 12.8% 124.98% ---"---"-"---"--"----""-----"----------"------r-"""-----------------"----------------"------------ ----- Attachment 5 PROJECT FUNDING SUMMARY SEWER CONSTRUCTION FUND BALANCE AS OF JUNE 30, 1992 (ESTIMATED) - UNSPENT PRIOR ALLOCATIONS + DEPENDABLE REVENUE * $67,984,000 (37,522,000) 10.534.000 $40.996.000 $40,996,000 > $25,000 (ALLOCATION REQUIRED) * Does not include ad valorem tax -.----.-------------........--......-...------------....-,....-'-'---' Page 8 of 9 rigging intet~ national . P. O. Box 4013 . 965 Atlantic Avenue . Alameda, CA 94501 . U.S.A. July 1, 1992 ~~c~nv~1Q) JUN 6 1992 Mr. Parke L. Boneysteele President, Board of Directors Central Contra Costa Sanitary District 5019 Imhoff Place Martinez, CA 94553 CCCSD SEORETARY OF ThE ClSTRICT Subj: District Project No. 10083, Solids Conditioning Building Crane Installation Project, Letter of Protest RI File No. A92-137 Dear Mr. Boneysteele: Rigging International, as one of three bidders on the above referenced project, herewith formally tenders this letter of ) protest in opposition to any proposed award of this work to the apparent low bidder, Allied Crane Company. Our protest is rendered on the basis of Allied Crane Company's non-compliance with the bid documents, Volume 1 of 3, Project Manual Bidding Conditions and Requirements, wherein on page DP#10083-I-2, paragraph 1, it states that "The valid licensees) required for the work are as follows 'A' and 'B'." It is our contention that Allied Crane Company's contractors license No. 456362 as stated in their bid submitted is in fact a C-61 classification, not the 'A' or 'B' as required by the bid document. Therefore, we contend that Rigging International, as the lowest responsive and responsible bidder, should be awarded this work. Your consideration of these facts is greatly appreciated. Very truly yours, ~-~~~ R. W. Wheeler District Manager RWW/lv Telephone (510) 865-2400 . Telefax (510) 865-9450 PAGE 1 OF 2 July 16, 1992 NO. 7. ENGINEERING a. SUBJECT AUTHORIZE THE GENERAL MANAGER-CHIEF ENGINEER TO EXECUTE AN AGREEMENT WITH G.S. DODSON AND ASSOCIATES, INC. FOR DESIGN OF THE SECONDARY CLARIFIER IMPROVEMENTS PROJECT, DISTRICT PROJECT NO. 20089 DATE July 13, 1992 TYPE OF ACTION AUTHORIZE AGREEMENT Assistant INITIATING DEPT./DIV. Engineering Department/ Plant Engineering Division ISSUE: Authorization by the Board of Directors is required for the General Manager-Chief Engineer to execute a professional services agreement in an amount greater than $50,000. BACKGROUND: Proper performance of the treatment plant's eight secondary clarifiers is critical to meet effluent permit requirements. Although the clarifiers perform adequately during normal, dry weather operations, wet weather events or operating in the nitrification mode stresses the capacity of the units. The key deficiencies of the secondary clarifiers include inadequate structural bracing and inefficient scum removal. Floating sludge is not removed by the clarifiers, degrading effluent quality and restricting the capacity of the secondary clarifiers. The structural bracing does not properly support the weirs in the clarifiers; this condition causes irregular performance of the weirs, makes maintenance difficult, and could result in complete structural failure. A predesign report was recently completed by G. S. Dodson and Associates, Inc. that recommends improvements to the secondary clarifiers. The recommended improvements will replace the weirs, launders, and structural supports; increase the capacity and effectiveness of the scum handling system; and upgrade the return sludge pumping system to improve operational control. These improvements are necessary to maximize the existing clarifier capacity for current and future wet weather flows. The estimated construction cost of these improvements to the existing eight secondary clarifiers is $5,344,000. A cost-reimbursement agreement with a cost ceiling of $498,000 has been negotiated with G. S. Dodson and Associates, Inc. to provide the necessary design services and prepare contract documents. Staff recommends that the Secondary Clarifier Improvements Project be completed by G. S. Dodson and Associates, Inc. due to their previous successful performance on this and other District projects. The Secondary Clarifier Improvements Project is included in the 1992-93 Capital Improvement Budget (CIB) on pages TP-21 and TP-22. The estimated total project cost, as listed in the CIB, is $7,094,000. RE~EWEDANDRECOMMENDEDFORBOARDAcnON 1302A-7/91 KVA DJC WEB RAB KvA- J)f~ Wl.~ INITIATING DEPT./DIV. --------T--...---------------..----....----..----.------------ -----....--.-------. SUBJECT AUTHORIZE THE GENERAL MANAGER-CHIEF ENGINEER TO EXECUTE AN AGREEMENT WITH G.S. DODSON AND ASSOCIATES, INC. FOR DESIGN OF THE SECONDARY CLARIFIER IMPROVEMENTS PROJECT, DISTRICT PROJECT NO. 20089 BI_ililllllliB PAGE DATE 2 OF 2 July 13, 1992 The Environmental Impact Report for the Stage 58 Project, prepared in 1982, considered improvements to the secondary clarifiers. This document, prepared in accordance with District California Environmental Quality Act (CEQA) Guidelines, was previously certified. RECOMMENDATION: Authorize the General Manager-Chief Engineer to execute a Cost Reimbursement Agreement with a cost ceiling of $498,000 with G. S. Dodson and Associates, Inc. for design of the Secondary Clarifier Improvements Project, District Project 20089. 13028-7/91 ----~----r---..._-.-.-..---------.-.--.--..------------ Central Contra Costa Sanitary District BOARD OF DIRECTORS PAGE 1 OF 1 Jul 16, 1992 NO. 8. LEGAL/LITIGATION a. BOARD MEETING OF SUBJECT DATE DENY CLAIM FROM VALLEY DISPOSAL SERVICE, INC., AND FRANCISE FIORENTINO CONCERNING THE ACME LANDFILL LAWSUIT CROSS-CLAIMS TYPE OF ACTION DENY CLAIM SUBMITTED BY INITIATING DEPT.IDIV. Bonnie Allen, Risk Manager Administrative/Risk Management ISSUE: A claim has been presented by Valley Disposal Service, Inc., and Francise Fiorentino, herein referred to as Claimants, for damages in an unspecified amount. Claim denials require action by the Board of Directors. BACKGROUND: Acme Fill Corporation filed a Complaint in Federal Court, under the name Acme Landfill Corporation, against Claimants, and others including the District, seeking damages for response and clean-up costs related to alleged hazardous waste releases. Several of the defendants have subsequently filed cross-claims naming, among others, Claimants as cross- defendants. Claimants allege that the District is obligated to reimburse them for any costs incurred in defending the lawsuit filed by Acme and for any liability that may result from the lawsuit. The District has been named as a cross-defendant by Claimants and contests all liability to all parties including the Claimants. The filing of this claim is a legal prerequisite to these Claimants pursuing contribution from the District. For this reason Valley Disposal Service, Inc., a dissolved California corporation and Francise Fiorentino have submitted this claim. Due to the District's denial of responsibility, staff recommends this claim be denied. RECOMMENDATION: Deny the claim by Valley Disposal Service, Inc. and Francise Fiorentino associated with the Acme Landfill lawsuit and refer it to District counsel for further action as needed. REVIEWED AND RECOMMENDED FOR BOARD ACTION R7:G ROGER J. DOLAN INITIATI,NG DEPT.lDIV. 1302A-7/91 BA PM KLA -----.----.-.---------......1-....