POSITION
PAPER
BOARD MEETING OF
April 16, 1992
NO_
3. CONSENT CALENDAR b.
DAT'April 3, 1992
SUBJECT
APPROVE AGREEMENT RELATING TO REAL PROPERTY
WITH STEVEN J. WHITGOB, ET UX, JOB NO. 3295,
ORINDA AREA
TYPE OF ACTION
APPROVE REAL
PROPERTY AGREEMENT
SUBMITTED BY
Jay S McCoy
Infr tru ure Division Mana er
INITIATING DEPT./DIV_
Engineering Department!
Infrastructure Division
ISSUE: A portion of a garage and a retaining wall at 11 Alice Place, Orinda, encroaches over an
existing Central Contra Costa Sanitary District easement.
BACKGROUND: The District's 8-inch diameter sanitary sewer at 11 Alice Place was installed
in 1981 along with other improvements for Subdivision 4912. A 10-foot wide sanitary sewer
easement was granted to the District when the sewer was installed.
In the late 1980's, a developer started construction of a house at 11 Alice Place. This developer
went bankrupt and the ownership of the lot and partially completed house reverted to the
developer's lender, the Civic Bank of Commerce. The bank hired a contractor to finish the house
so that the house could be sold. The contractor, while drilling piers for a retaining wall in front
of the house, broke the District's sewer, but did not realize that the damage had occurred. As
the contractor poured concrete in the pier hole, the concrete ran down the District's sanitary
sewer and caused a stoppage. The concrete was removed from the existing sewer, the sewer
w~s cleaned, and the damage was repaired at the expense of the bank including reimbursing the
District for its cost related to correcting the damage in an amount of $44,055.79.
Immediately after the District was notified that the sewer had been damaged, the District's
Survey Section checked the location of the existing sewer, the sewer easement, the house, and
the retaining wall. A corner of the attached garage and the retaining wall were found to be
located within the District's easement. The encroachment of the wall of the garage is less than
one foot and does not eliminate future access to the sewer if a need arises to excavate near the
garage to repair the sewer. At the time the damage to the sewer was corrected, the existing
sewer was repaired at the retaining wall. Hence, the sewer is accessible at the retaining wall.
Staff has determined that the corner of the garage and the retaining wall will not interfere with
the present use of the District's sewer and that the sewer is accessible if a need arises in the
future to excavate to repair the sewer. An agreement relating to real property between the
present owner of 11 Alice Place, Mr. and Mrs. Whitgob, who purchased the property from the
bank, and the District has been prepared which will document the encroachment and protect the
1302A-9/85
JSM
REVIEWED AND RECOMMENDED FOR BOARD ACTION
~
RAB
_ ______n ...U"___,._ ________.. ._.__.__u.. _
SUBJECT
111111111111:1:1::11111:1
APPROVE AGREEMENT RELATING TO REAL PROPERTY
WITH STEVEN J. WHITGOB, ET UX, JOB NO. 3295,
ORINDA AREA
PAGE
DATE
2
OF 3
April 3, 1992
District's rights. The agreement provides that the owner is liable for costs of future damage to
the District's sewer facilities, that the owner is liable for additional costs of the District due to
the encroachment of the corner of the garage and the retaining wall, and that the owner holds
the District free and harmless from claims and actions brought as a result of the encroachment
of the garage and retaining wall.
This project (the proposed agreement) has been evaluated by staff and determined to be exempt
from the California Environmental Quality Act (CEQA) under District CEQA Guidelines Section
18.6, since it involves a minor alteration in land use limitations.
RECOMMENDATION: Approve the Agreement relating to Real Property with Steven J. Whitgob,
et ux, Job No. 3295, and authorize the President of the Board of Directors and the Secretary of
~he District to execute said agreement, and authorize the agreement to be recorded.
13028-7/91
"....II....
. .
. ....1> :;tj
""
~70'S
............... . S. €
........ r ............... ~ ~TILITY SERVICE RISER PIPES
............... 1'-<. ~
~.8.~
. 8~W~~
'- R PIP/:'
~ ,-,
HOUSE
# 11 ALICE PLACE
I
4' HIGH CONCRETE
RETAINING WALL
~
)>
r-
-
()
m
...............
~
LOT 8
SUB. 4912
-0
r
)>
o
m
~
,
.
,
'-,
to-',
"L__ .ORI
......, ::t
- -~... ~. ~
, ~ ~
"''..'''- 'h.... ~~.
-~
. z..
~.
REAL PROPERTY AGREEMENT
JOB 3295.
ORINDA AREA
~ Central ~~~~~ g~~fR~~~~R1 .listricl
PAGE 1 OF 2
POSITION
PAPER
BOARD MEETING OF
April 16, 1992
NO.
3. CONSENT CALENDAR c.
DATE April 6, 1992
SUBJECT
APPROVE AGREEMENT RELATING TO REAL PROPERTY
WITH DANIEL J. SEVILLA AND MICHELE SEVILLA,
JOB 3449, WALNUT CREEK AREA
TYPE OF ACTION
APPROVE REAL
PROPERTY AGREEMENT
INITIATING DEPT./DIV.
Engineering Department!
Infrastructure Division
ISSUE: The property owners have requested the District's approval to allow the encroachment
of a portion of their house over a District easement.
BACKGROUND: The encroachment was first recognized after the Sevillas had signed a contract
to purchase the property. The edge of the house is about 3 feet horizontally from the District's
15-inch sanitary sewer which is about 9 feet deep. The Sevillas agreed to cooperate with the
District and paid our fee for processing the subject agreement.
Staff has determined that the improvements will not interfere with the present use of our sewer.
The existing sewer is nine years old and is in very good condition. If a need arises to excavate
and repair this sewer, the excavation can be accomplished with little effect on the existing
house. The agreement limits what may be installed in the easement in the future. The property
owner accepts the liability for any damages to District's facilities and for additional costs to the
District for maintenance and replacement of the sewer in the area of the encroachment. The
property owner holds the District free from all claims and liability for injury to persons or to their
property within the easement area. The property owner agrees not to impede the District's
access to the property. The agreement provides for the District's emergency access.
This project (the proposed agreement) has been evaluated by staff and determined to be exempt
from the California Environmental Quality Act (CEQA) under District CEQA Guidelines Section
18.6, since it involves a minor alteration in land use limitations.
RECOMMENDATION: Approve the Agreement Relating to Real Property with Daniel J. Sevilla,
et ux, Job No. 3449, and authorize the President of the Board of Directors and the Secretary of
the District to execute said agreement, and authorize the agreement to be recorded.
REVIEWED AND RECOMMENDED FOR BOARD ACTION
1302A-9/85
DH
JSM
RAB
/~
ROGER J. DOLAN
INITIA TING DEPT./DIV.
lOt
fbt
)%jJ
......_.......-~-.T--
LOT 9
SUB 5553
~
.;/
.;/
.;/
./
.;/
.;/
.;/
MELISSA
COURT
. .\ ", ..
; ~
o
~
v
- I>
LAWN AREA
. "\:
:. "
.\
HOUSE
15" A.B.S. SEWER PIPE
~..
d\
"d\
"~
REAL PROPERTY AGREEMENT
JOB 3449
WALNUT CREEK AREA
~-- - - --,---
PAGE 1 OF
1
NO.
3. CONSENT CALENDAR d.
DATE
AUTHORIZE ATTENDANCE OF H. DAVID ALBIN US, OPERATIONS SAFETY
SPECIALIST, AT THE ANNUAL CONFERENCE OF THE AMERICAN
INDUSTRIAL HYGIENE ASSOCIATION IN BOSTON, MASSACHUSETTS,
FROM MAY 30 TO JUNE 5,1992, AT A COST OF $1,835.
TYPE OF ACTION
AUTHORIZE
ATTENDANCE
SUBMITTED BY
John C. Pearl,
M in n nce Division Mana er
INITIATING DEPTJOIV.
Plant Operations Department
ISSUE: Approval by the Board of Directors is required for unbudgeted travel outside of California
and/or if the expenses will exceed $500.
BACKGROUND: H. David Albinus, Operations Safety Specialist for the Plant Operations
Department (POD), is a member of the American Industrial Hygiene Association (AIHA). His
professional training before recently being hired by the District emphasized this part of the
industrial health and safety field.
During recruitment for this position, Mr. Albinus emphasized his commitment to continue
professional development including an Industrial Hygiene Certification. This part of his
development was to include attendance at the annual international AIHA Conference and
Exposition. Management agreed to try to honor his request.
The AIHA Conference and Exposition will be held from May 30 to June 5 in Boston,
Massachusetts. The topics to be covered include the evaluation and control of exposures to
chemicals and hazardous materials that might endanger employee health. The focus is on areas
that are relevant to the District's safety and industrial hygiene programs. This information will be
shared throughout the District and with others responsible for the District's safety program. Also,
the resources afforded through interaction with other AIHA members are an added benefit to the
District.
The cost of attendance at this conference would be $1,835 for travel, lodging, meals, and
registration. While the cost for this conference was not included in the 1991-92 Plant Operations
Department training budget, the Plant Operations Department will meet its year-end objective with
this cost included.
RECOMMENDATION: Authorize the attendance of H. David Albinus, Operations Safety Specialist
for the Plant Operations Department, at the American Industrial Hygiene Association Conference
in Boston, from May 30 to. J ne 5, 1992, at a cost of $1,835.
\ REVIEWED AND RECOMMENDED FOR BOARD ACTION
INITIATlN~IV.
1302A-7/91
JCP
CWB
._"--"-'--"-'-_.-r---""-'~'---~--"-_.'-~~~-'-"'~-"..~_._~,.._..,.."--,---,,_...,--.,.,,-_....",,
PAGE 1 OF 1
BOARD MEETING OF
A ril 16, 1992
NO.
3. CONSENT CALENDAR e.
SUBJECT
AUTHORIZE THE ATTENDANCE OF GAIL CHESLER, ASSOCIATE
ENGINEER, AT THE APRIL 30-MAY 1, 1992, "USING
EFFLUENT TOXICITY IDENTIFICATION EVALUATIONS"
WORKSHOP IN BERKELEY, CALIFORNIA, AT A COST OF $695
DATE
A ril 10, 1992
TYPE OF ACTION
AUTHORIZE
ATTENDANCE
SUBMITTED BY INITIATING DEPTJDIV.
David R. Williams, Planning Division Manager Engineering Department/Planning Division
ISSUE: Approval by the Board of Directors is required for unbudgeted travel outside of California
and/or if the expense will exceed $500.
BACKGROUND: Gail Chesler, Associate Engineer, is responsible for Treatment Plant Planning
Projects involving the outfall diffuser and toxicity of District effluent. Toxicity Identification
Evaluations (TIE) have recently become a priority for the District. In July 1992, the San Francisco
Bay Regional Water Quality Control Board will include a new requirement in the District's NPDES
permit for acute and chronic toxicity testing. Preliminary tests indicate that the District may have
difficulty in meeting the chronic test limits. The San Francisco Bay Basin Plan states that if
persistent toxicity is exhibited, then a toxicity identification evaluation (TIE) will be required. This
workshop will focus on the technical details associated with the use of acute and chronic TIEs.
The registration cost for this seminar is $695. Since the seminar is at a local site, no travel or
hotel expenses will be incurred. Funds are available in the Planning Division Education and
Training Budget to cover the cost of this training.
RECOMMENDATION: Authorize the attendance of Gail Chesler, Associate Engineer for the
Planning Division, at the April 30-May 1, 1992, "Using Effluent Toxicity Evaluations" workshop
in Berkeley, California, at a cost of $695.
REVIEWED AND RECOMMENDED FOR BOARD ACTION
IN;o~rV
MJJ
1302A-7/91
DRW
RAB
.._-.~-----r-------_._---------._-._--.-...._---_.--_._----..---------.------. --.----
PAGE 1 OF 2
BOARD MEETING OF
April 16, 1992
NO.
3. CONSENT CALENDAR f.
DATE
April 10, 1992
TYPE OF ACTION
SUBJECT
AUTHORIZE ATTENDANCE OF R. WAYNE GRIFFITHS,
ENGINEERING ASSISTANT, AT COMPUTER SOFTWARE
TRAINING WORKSHOP TO BE HELD MAY 4 THROUGH 6,
1992, AT A COST OF $750
AUTHORIZE
ATTENDANCE
SUBMITTED BY
William E. Brennan
Plant Engineering Division Manager
INITIATING DEPTJDIV.
Engineering Department/
Plant Engineering Division
ISSUE: Approval by the Board of Directors is required for unbudgeted travel outside of
California and/or if the expense will exceed $500.
BACKGROUND: R. Wayne Griffiths has been designated as the person responsible for
developing a computer-generated workload allocation and scheduling system for use by the
Engineering Department. The computer program used as the basis for this system will be
Time Line 5.0, which is produced by the software firm Symantec Corporation. The District
already owns this program, and the development of its use has already begun.
Symantec Corporation regularly presents hands-on training for the Time Line 5.0 computer
project management program. One of these workshops will be held from May 4 through
May 6, 1992, in San Francisco, California. This workshop, which is known as the Time Line
Symantec Training Workshop, offers tutorial sessions, training classes, computer labs, and
technical presentations. Topics to be covered include creating project outlines, setting
durations and dependencies, assigning resources and costs, managing resources, refining
the schedule, tracking progress, generating reports and graphics, managing multiple projects,
writing subroutines for faster programming, and importing and exporting data to
spreadsheets and word processing programs.
Representatives from Symantec Corporation will describe the most recent developments for
this program and will offer insights into future developments.
Attendance at this seminar will enhance R. Wayne Griffiths's technical knowledge and
enable him to more quickly and effiCiently develop the computer-generated workload
allocation and scheduling system. In addition, these learned skills will become a permanent
resource for the District's personnel to more adequately plan short- and long-term projects
by more effectively leveling resources and maximizing use of the District's manpower and
monies.
REVIEWED AND RECOMMENDED FOR BOARD ACTION
1302A-7/91
fJ1$
INITIATING DEPTJDIV.
WEB RAB
--------------------..--.----.......---.-..--..-,--..-..-.....-....-----...--...-.-..-....-....-..--.-----.---...-..--.---..-..---..
SUBJECT
:11111,11111::11111_
AUTHORIZE ATTENDANCE OF R. WAYNE GRIFFITHS,
ENGINEERING ASSISTANT, AT COMPUTER SOFTWARE
TRAINING WORKSHOP TO BE HELD MAY 4 THROUGH 6,
1992, AT A COST OF $750
PAGE
DATE
2
OF
2
April 10, 1992
The cost of the workshop is approximately $750. There are sufficient funds in the 1991-92
Plant Engineering Division Training Budget to cover the cost of attending this training
workshop.
RECOMMENDATION: Authorize attendance of R. Wayne Griffiths, Engineering Assistant,
at the Symantec Time Line Workshop for a cost of $750.
13028-7/91
.-.-------,. ...----...---.-----..--.---------...-------.-.-....----..-----.--.--.
PAGE 1 OF 7
SUBJECT
AUTHORIZE AWARD OF CONSTRUCTION CONTRACT FOR
THE ORINDA/MORAGA PUMPING STATIONS IMPROVE-
MENTS-NEAR TERM PROJECT, DP NO. 4667, TO PACIFIC
MECHANICAL CORPORATION; CONSIDER RELIEF OF BID
REQUEST FROM DALZELL CORPORATION
NO.
5. BIDS AND AWARDS a.
DATE
April 13, 1992
TYPE OF ACTION
AUTHORIZE AWARD
SUBMITTED BY
Andrew J. Antkowiak
Assistant Engineer
INITIATING DEPT JDIV.
Engineering Department/
Infrastructure Division
ISSUE: The Board of Directors must decide whether or not to grant a relief of bid request.
The Board of Directors must authorize award of the contract or reject bids within 50 days
of the opening of bids.
BACKGROUND: The Orinda Moraga/Pumping Stations Improvements-Near Term Project
consists of improvements to three existing pumping stations: Orinda Crossroads, Moraga,
and Lower Orinda. The project location map is shown in Attachment 1. The work at the
Orinda Crossroads Pumping Station includes installation of a new double-wall, underground
fuel tank and construction of a new fence and building parapet to improve the station
security. The work at the Moraga Pumping Station includes modifications to the ventilation
systems and installation of a new odor control unit similar to the unit installed at the Orinda
Crossroads Pumping Station in 1989. The work at this station will also include replacement
of an existing two-stage pump with a new larger capacity, one-stage pump controlled by
variable-frequency drive (VFD). Installation of the new pump will minimize excessive starting
of existing pumps and provide for better efficiency. The pump, motor, and VFD were
prepurchased by the District with a purchase order awarded in December 1991. The work
at the Lower Orinda Pumping Station includes replacement of existing single-wall, above-
ground fuel tanks with new double-wall tanks with a containment and leak detection system.
This project was unique in its complexity and the need for extensive coordination and
accommodation with cities and regulatory agencies.
The Near Term Improvements Project is a part of a phased long term program to rehabilitate
the District's existing pumping stations in East Bay Municipal Water District watershed
areas. A phased approach is being utilized to defer much of the costs of the improvements
over a ten to twelve year period while still meeting regulatory, reliability and capacity
requirements. Subsequent phases of this program will improve wet weather reliability by
adding diesel engine driven pumps, upgrading the existing electrical systems, replacing the
existing dry weather pumps with new, higher efficiency pumps and include the replacement/
rehabilitation of the force mains.
Plans and specifications for the project were prepared by John Carollo Engineers, and the
project was advertised for bids on March 16 and 23, 1992. The engineer's pre-bid
AJA
REVIEWED AND RECOMMENDED FOR BOARD ACTION
TJP
JSM
RAB
KLA
,"
SUBJECT
IIIIIJII:IIIII
AUTHORIZE AWARD OF CONSTRUCTION CONTRACT FOR
THE ORINDA/MORAGA PUMPING STATIONS IMPROVE-
MENTS-NEAR TERM PROJECT, DP NO. 4667, TO PACIFIC
MECHANICAL CORPORATION; CONSIDER RELIEF OF BID
REQUEST FROM DALZELL CORPORATION
PAGE
DATE
2
OF
7
April 13, 1992
construction cost estimate was $680,000. Nine bids ranging from $42,900 to $554,000
were received on April 7, 1992. A summary of bids is presented in Attachment 2.
As noted on Attachment 2, a clerical error existed in the Dalzell Corporation bid. A mistake
was made in writing the bid amount in words; the written amount was forty-two thousand
nine hundred dollars rather than $462,900. Specifications provide that "in case of
discrepancy between words and figures, the words shall prevail." Dalzell Corporation has
requested, pursuant to the Public Contracts Code Section 5103, to be relieved of their bid
based on a clerical error (Atachment 3).
Staff has reviewed this request and agrees that a clerical error was made. Pursuant to
Section 5103, staff recommends that Dalzell Corporation be relieved from their bid.
The Engineering Department conducted a technical and commercial evaluation of bids and
concluded that Pacific Mechanical Corporation is the lowest responsible bidder with a bid
price of $409,800. The additional funds required to complete the Near-Term Improvements
phase of this project are shown in Attachment 4. Prebid expenditures include the
development of an overall predesign for the subsequent deferred upgrades of the Orinda
Crossroads, Moraga and Lower Orinda Pumping Stations. These future projects have a total
project cost of $22.5 million.
District staff will administer the contract and provide inspection services. Shop drawing
review, construction support services, and preparation of as-built drawings will be provided
by John Carollo Engineers.
The Orinda/Moraga Pumping Station Improvements-Near Term Project is included in the
1991-1992 Capital Improvements Budget beginning on Page CS-74. Staff has determined
that this project is exempt from the California Environmental Quality Act (CEQA) under
District CEOA Guidelines Section 18.2, since it involves minor alterations to an existing
sewer facility with negligible or no expansion of capacity. Board of Directors' approval of
this project will constitute a finding of agreement with this determination unless otherwise
indicated.
RECOMMENDATION:
1 . Grant relief of bid request from Dalzell Corporation including return of the bid bond.
2. Authorize award of contract for the construction of the Orinda/Moraga Pumping
Stations Improvements-Near Term Project, District Project No. 4667, in the amount
of $409,800 to Pacific Mechanical Corporation as the lowest responsible bidder.
13026-7/91
.....--..-.---------,--.. ..-----.-.-------.-.--.--.------.--------..----------------------.---.-----.
PAGE 3 of 7
Alamo
MORAGA
ptJMPIIfG STATION
(i)
.
I . - Project Location(s} I
Central Contra Costa
Sanitary District ORINDA/MORAGA Pumping Stations
Improvements--Near Term
ATTACM'4ENT
1
__ - '._ ___"'-'-" .,._~,.u __u_n_
PAGE 4 of 7
Central Contra Costa Sanitary District
ATTACHMENT 2
SUMMARY OF BIDS
PROJECT NO. 4667
Orinda/Moraga Pumping Station
Imorovements-Near Term Project
DATE Aoril 7. 1992
ENGR. EST. $ 680.000
LOCATION Orinda and Moraqa
Order BIDDER (Name, telephone & address)
BID PRICE
1 Dalzell Corp.
$ 42,900 words *
($462,900 numerical)
$409,800
$414,120
$439,000
$447,361
$475,652
$507,607
$530,000
$554,000
2 Pacific Mechanical Corp.
3 D. W. Nicholson
4 Albay Construction
5 Performance Mechanical Inc.
6 R. W. Johnston & Son
7 Monterey Mechanical
8 Unicon Construction Corp.
9 Hamilton Construction Inc.
BIDS OPENED BY Joyce E. Murohy
DATE 417/92
SHEET NO. 1 OF 1
* clerical error
- PJl.GE 5 of 7
emerJvllle,
canfornJ.
946&2
p.o. box 8284
tel.phone 835-0732
DALZ E LI;ORPORATIO
enaineerina contractor for Industry
c:-..... Ll.
.... -~
April 8, 1992
ATTACHMENT 3
Central Contra Costa Sanitary District
5019 Imhoff Place
Martinez, CA 94553
Attention: Andrew Antkowiak
Subject: Proposal for Orinda/Moraga Pumping Stations
Dear Mr. Antkowiak:
In accordance with Section 15 of the General Conditions of the
bid documents for the subject project, we hereby request RELIEF
from our hid proposal due to an error 1n writing out our total
bid in words. Our numerical total for all of the bid items
is FOUR HUNDRED SIXTY-TWO THOUSAND NINE HUNDRED DOLLARS
($462,900.00) not the FORTY-TWO THOUSAND NINE HUNDRED DOLLARS
written in the bid form.
As you can see each of our unit price extensions total up to
the correct bid amount shown numerically $ 462,900.00 and not
to the erroneous written amount. The mistake was obviously
due to haste in transposing the numerical total to writing.
The mistake was not intentional nor was $42,900.00 the total
amount we wanted to complete all the work on the project.
Therefore since your interpretation of the total bid amount
of our proposal is the lesser of the two figures, we request
that relief be granted.
If you have any questions regarding this request please give
me a call. We very much regret any inconvenience we
inadvertently caused the district.
Very truly yours,
Dalzell Corporation
Bruce L. Hammon
Vice President
PAGE 6 of 7
ATTACHMENT 4
ORINDA/MORAGA PUMPING STATIONS IMPROVEMENTS - NEAR TERM PROJECT
DISTRICT PROJECT NO. 4667
POST -BID/PRECONSTRUCTION ESTIMATE
PERCENT OF
ESTIMATED
ITEM DESCRIPTION TOTAL CONSTRUCTION
COST
1 . Construction Contract $409,800
. Equipment Prepurchase 53,000
2 Contingency @ 20% 1 92,200
SUBTOTAL $555,000 100
3 Construction Management (District
Forces)
. Project Management/Administration 1 5,000
. Inspection 35,000
. Legal 500
. Agency Fees 500
. Engineering 4,000
. Plant Operations Department 4,000
. Survey 2,000
SUBTOTAL $ 61,000 11.0
4 Consultant Contractors
. Geotechnical (DCM Joyal) 2,000
. Construction Support (JCE)2 35,600
. Startup Assistance (JCE) 3,400
. Record Drawings (JCE) 7,600
. Testing Services 3,400
SUBTOTAL $ 52,000 9.4
5 Pre-bid Expenditures
. Super Station Evaluation3 65,000 11.7
. Predesign4 194,500 35.1
. Air Permit 10,000 1.8
PAGE 7 of 7
ATTACHMENT 4 (continued)
. Design of Near Term Improvements5 207,500 37.4
SUBTOTAL $ 477,000 86.0
6 Total Project Cost Estimate $1,145,000 206.3
7 Funds Authorized to Date $576,000
8 TOTAL ALLOCATION OF FUNDS TO
COMPLETE PROJECT $569,000
1 A 20 percent construction contingency was utilized due to the low dollar value of the
bids received and because the project involves construction inside an operating facility.
2 Includes shop drawing review, design clarifications, meetings and site observations.
3 A preliminary study was conducted to determine the feasibility of consolidating the
Orinda Crossroads, Lower Orinda, Flush Kleen, Acacia, and Wagner Pump Station into one
large station. While it is infeasible to replace all of these pump stations with one, the
option appears feasible for the Lower Orinda, Flush Kleen, and Acacia Pump Stations and
will be further evaluated.
4 Predesign of phased upgrades for the next ten years for Orinda Crossroads, Lower
Orinda, and Moraga Pump Stations. The total project cost for these projects is $22.5
million.
5 Included in the design of the near term improvements are costs for a geotechnical
investigation, sound surveys, tree evaluations, preparation/bid of prepurchased equipment,
updating of District as builts, easement negotiation and acquisition, architectural
upgrades, coordination with the County Health Services on the fuel tank replacements,
and obtaining an Air Board Permit for the odor control unit.
ED/PP/Orinda .AJA
AJA/kg April 13, 1992
.- ..... ....... .. ~.-T-.. .. ..... .. .._- .--.....-.. . ........ ....... --
SUBJECT
AUTHORIZE EXECUTION OF AN AGREEMENT WITH
J. M. MONTGOMERY CONSULTING ENGINEERS FOR
DESIGN OF THE LOS ARABIS DRIVE SEWER
REPLACEMENT PROJECT, DP 4785
PAGE 1 OF 2
NO.
6. ENGINEERING a.
DATE
April 10, 1992
TYPE OF ACTION
AUTHORIZE
AGREEMENT
SUBMITTED BY
Curtis W. Swanson
Principal Engineer
INITIATING DEPTJDIV.
Engineering Department
Infrastructure Division
ISSUE: Authorization by the Board of Directors is required for the General Manager-Chief
Engineer to execute a consulting engineering agreement in an amount greater than $50,000.
BACKGROUND: Some sewers in the Los Arabis Drive area of Lafayette are old and in poor
condition. Dry weather overflows occur due to root intrusion and damaged pipes. Several
manhole overflows have occurred in the Los Arabis Drive project area during the past periods
of light to heavy rain fall. The wastewater collection system master plan, completed in
October 1986, identifies these sewers as deficient under existing conditions and a five year
storm. This project has been given a high priority designation for sewer repair and/or
replacement.
Facilities planning for the Los Arabis Drive of the project has been completed. The
recommended alternative is to replace approximately 3,700 feet of deteriorated eight and ten
inch sewers with new sewers ranging in size from eight to eighteen inches. The new sewers
will be installed, generally, along the same alignment which is primarily within public roads and
private streets. The estimated construction cost for the Los Arabis sewer replacement is $1.2
million.
District staff has negotiated a cost reimbursement agreement with J. M. Montgomery
Engineers with a cost ceiling of $112,300. The scope of the agreement provides for
preliminary and final design of the Los Arabis Drive sewer, construction cost estimating traffic
control planning, and assistance with the public participation program. The proposed
agreement includes a task to evaluate a creek crossing or siphon for the Woodland Way sewer
project which is also in Lafayette. Initially, the Woodland Way and Los Arabis Drive Sewers
were combined under the same project. However, these two projects have been separated
because facilities planning for Los Arabis Drive has proceeded more Quickly than for Woodland
Way. JMM was selected to perform the design because of their satisfactory performance on
the preparation of the Los Arabis/Woodland Way facilities plan and because of satisfactory
performance in designing other small and large diameter sewer projects throughout the District.
The project has been evaluated by staff and determined to be exempt from the California
Environmental Quality Act (CEOA) under District CEOA guidelines, Section 18.3 paragraph,
REVIEWED AND RECOMMENDED FOR BOARD ACTION
IINITIA7~TJDIV.
h-~~
1302A-7/91
11#
~
----------.-..------.----.------. ..-- .-....-..---.-------,-----..---------..------...-...-..---....----.--..---.--.---.---.----- .---......
AUTHORIZE EXECUTION OF AN AGREEMENT WITH
J. M. MONTGOMERY CONSULTING ENGINEERS FOR
DESIGN OF THE LOS ARABIS DRIVE SEWER
REPLACEMENT PROJECT, DP 4785
!:IIIIIIII!IIIIII
SUBJECT
PAGE 2
DATE
OF
2
April 1 0, 1992
since it involves replacement or reconstruction of existing facilities involving negligible or no
expansion of capacity, except to accommodate wet weather flows. A Notice of Exemption
will be filed with the County Clerk~
Nearby sewers, which have been the subject of prior District litigation, are not in the area of
this project and remain unaffected. More detailed information regarding the Los Arabis Drive
and the Woodland Way sewer projects can be found in the 1991-92 Capital Improvement
Budget (Pages CS-29 through CS-31).
RECOMMENDATION: Authorize the General Manager-Chief Engineer to execute a cost
reimbursement agreement with a cost ceiling of $112,300 for design of the Los Arabis sewer
replacement Project, DP 4785.
13028-7/91
- .......__..---r-.._._-_.._-~..._..-._._-...-............--.........--.----.-..-..-.-....
Central Contra Costa Sanitary District
BOARD OF DIRECTORS
PAGE 1
OF 10
BOARD MEETING OF
April 16, 1992
NO.
7. PERSONNEL a.
SUBJECT
DATE
April 7, 1 992
APPROVE PERSONNEL BUDGET REQUESTS FOR
FISCAL YEAR 1992 - 1993
TYPE OF ACTION
APPROVE BUDGET
SUBMITTED BY
Darlene Ross, Acting Personnel Officer
INITIATING DEPT./DIV.
Ad m i nistrative/Personne I
ISSUE: Staff has analyzed its personnel needs for Fiscal Year 1992-1993 and is submitting
its requests for final Board consideration and approval at the April 16, 1992 Board Meeting.
BACKGROUND: Each department has reviewed its staffing requirements for Fiscal Year 1992-
1 993. The Personnel Budget includes an executive summary of proposed modifications to
each department, a departmental overview providing summary information, request
justification pages with detailed explanations on the effect of these recommended staffing
changes, organizational charts reflecting current staffing and proposed changes, and job
classifications for proposed positions.
The attached summary sheet highlights each department's staffing requests, their effect on
the number of total authorized positions in the District, and the additional cost in salaries,
benefits, and Sewer Service Charge. As shown in the summary, the total number of
authorized regular positions in the District would remain identical to last year. The Collection
System Operations Department is requesting one less Co-op position from last year. The
Engineering Department, during their planning for the 0 & M Budget for the coming fiscal
year, has dropped one Co-op position as well. The total Co-op positions would decrease to
nine (9).
Although the number of regular positions remain unchanged, the salaries and wages in the
1992-1993 0 & M Departmental Budgets will increase from the previous year due to the
following:
. Any cost-of-living salary adjustments resulting from the negotiated Memoranda of
Understanding;
. Merit and longevity increases scheduled in 1992-1993;
. Filling authorized positions which were vacant in 1991-1992;
. Positions authorized in 1991-1992 which were budgeted for a partial year because
of the time required to fill positions.
On Tuesday, March 24, 1992, the Personnel Committee met to review the proposed budget.
The following Board authorizations and modifications to the District staffing charts were
discussed at that meeting. Staff presentations on the Personnel Budget were given at the April
2, 1992 Board Meeting.
REVIEWED AND RECOMMENDED FOR BOARD ACTION
1302A-7/91
SUBJECT
POSITION PAPER
APPROVE PERSONNEL BUDGET REQUESTS FOR
FISCAL YEAR 1992 - 1993
PAGE
DATE
2
OF
10
April 7, 1 992
The details for the Departmental requests follow:
District-Wide
1. Change title of Junior Engineer to Staff Engineer, G-67, $3273 - $3961, with no change
in class description or salary level.
Administrative
2. Reinstate an Accounting Technician III, G-56, $2521 - $3048, to provide advancement
opportunity to Accounting Technician II, G-52, $2292 - $2769, with no increase in staff
positions.
Plant ODerations
No personnel request.
Enaineerina
3. Add one Engineering Assistant, G-69, $3434 - $4152, and approve updated class
description.
4. Delete one Senior Survey Technician, G-68, $3318 - $4017. Add one Engineering
Assistant, G-69, $3434 - $4152. Reclassify James Ruetenik to the position of
Engineering Assistant.
5. Delete one Construction Inspector, G-67, $3273 - $3961.
6. Add one Systems Analyst, G-67, $3273 - $3961, and adopt new class description.
7. Delete one Associate Engineer, S-77, $4210 - $5100.
8. Delete one Associate Engineer, S-77, $4210 - $5100. Add one Source Control Program
Superintendent, S-77, $4210 - $5100, and adopt new class description. Reclassify Bart
Brandenburg to the position of Source Control Program Superintendent.
C.S.O.
No personnel request.
1302B-7/91
SUBJECT
POSITION PAPER
APPROVE PERSONNEL BUDGET REQUESTS FOR
FISCAL YEAR 1992 - 1993
PAGE 3
DATE
OF
10
April 7, 1992
Secretary of the District
No personnel request.
CO-OD
9. Authorize the hiring of students to fill 9 positions in the Co-op Program.
Subsequent to submitting the Personnel Budget for the Personnel Committee's review on
March 24, 1992 and for Board consideration on April 2, 1992, an amendment to the class
description of Engineering Assistant is requested. A new position of Engineering Assistant was
approved by the Board of Directors in the 1991-1992 Personnel Budget. This new position
was originally part of the old Engineering Division and is now a part of the Infrastructure
Division. This position has remained vacant during the current fiscal year in order to minimize
expenses. It is now planned to fill this position in July 1992. It is appropriate to include
revisions in this class description in order to address the duties and abilities related to the
right-of-way activities which the Engineering Assistant in the Infrastructure Division will
perform. Duties and abilities related to these activities are highlighted in the attached class
description. The request for approval of an updated class description for Engineering Assistant
is included in Item 3 above.
RECOMMENDATION: Approve the Personnel Budget for 1992 - 1993 herein identified by
items 1 - 9.
13028-7/91
----------------.-----------,----
~
I
00.
~
C"'l
0'1
0'1
......
I
N
0'1
~~
~tI)
~~
~U
~~
~C)
~Z
~~
~tI)
~
U
Z
-
00.
~
~
~
@
~
~
o
00.
~
~
Ti~ ..... 0 0\
~ ..... ~
<I> <I> V!-
a
>4 ., 0
lIQ I ~ 0 0 0
0 0 0
~ 0 0 ,
.; I"
"I .....
E-4 .....
l:I V!-
jlq <I> V!-
-
^ ^
..... I" ID
I t 0 0 0
l"l V
C7I V
C7I III 41 <I> V!-
... III
I III ^ ^
.. 0 0 0
I'll ..~ 0 0 0
C7I ..ol 0 0 0
C7I .ol.... ~ ,
... \.4 . "I 0\
. a:l .....
.-lU V V
.lQ <I> <I> <I>
III
Il"l I" ID ID III III III
Q NO\ l"l 0 I" III ,
lIQc" 0\0\ ..... "I ID
t'l1Il =..... I"
1-11-1 "I
~jlq
== IN I" ID ID III III III
.-l0\ l"l 0 I" III N .D
tE-4 0\0\ .....
llllfoO =.-l I"
"I
Il"l
NO\ ., 0\
0\0\ 0 l"l "I 0
=...
Po
0 IN
I "'0\
0 0\0\ 0 l"l III l"l 0 ...
U =... ...
^ ^ ^ ^ ^
O\CXl 0 "I ID ... ... 0 0
ID., 0 III III ID ID 0 0
8\ 1"0 ..... ... 0 0\ 0\ ... ..... .-l
Nl"l III ., ., l"l l"l III III
<I> <I> V!- <I> <I> <I> <I> <I> <I> i
~ I I I I I I I I I
"I'" 0 ., ... l"l l"l 0 0
0\"1 ... l"l III I" I" ... ...
t' "I III "I ., l"l "I "I "I "I
"IN ., l"l l"l l"l l"l ., .,
. <I> <I> <I> <I> <I> V!- V!- <I> V!-
.-l , , , , , ,
.
III "lID I" 01 CXl I" I" I" I"
III III I" ID ID ID ID I" I"
I I I I I I I I I
t!lt!l III t!l t!l t!l t!l III III
V V V V V
\.4 H I~
. H o c::
.-l H I-< QI
6... ~- - 1l<'O
.c:: III > ~ > c::
:! a:l u Ill.... Ill.... ...QI-
0 QI 0(0 >00 O~>
.-l.ol E-< ... I-< c::....
~ OIl-< III I-< ~''''O
~.... 01 C::OI ~8' c:: I-<
c:: .... c:: 88.8'
0" .... I-<fz1 fz1
.... 0 -IJ QI III ::s....
~1Io c:: QI~ e~ QlIIlC::
.... ::s c:: c:: QI c:: ~ m ~
! 0 .... III ~Ill
U 01... Ill'" ::s ...
u C::1l< >Oil< Ol-<Il<
0( fz1- 1Il- III 01-
... "I ..... ...
- - 1-<-
\.4 H > .c::.~ o QI
III H 1-<.... -IJI-< 1-<-
.-l ....... 010 uo u ::s 01>
6.~ H c:: QI 8.t c::....
fz11-< E-<I-< fz10
.0 .c:: 01 01 III ::s
llIl.ol u QI c:: >OC:: c:: \.4 QlOI
~ QI ~fz1 Qlfz1 H~ ~c::
'2'= E-< III > III Ill....
....~ I-<~ I-< III .... c::
~o u c:: ::s c:: -IJI-< U c::
.110 ~ o III III III Ill.... o III
.-l U Ill'" ... c::c:: m...
! u mil< I-<Il< OH mil<
0( 0(- lil- t)- 0(-
... ... ... ... ...
~ I 01
a:l III m c::
I-< c:: .... .
~ ~ 0 I-< ....~
III .... CP o u
.... -IJ CP ....
8. c:: -IJ1ll c:: 0 . I-<
.... CP c:: I-< .... >O~
c! .fl.~ ~~ 01 III U m
c:: QI ....
o(~ fz1 t.l III 0
."-"<~"""~-~._-~-"__"'_4---r--"__""'-'----"-_._""--..
m
~
::s
~
m
~
....
....
CP
c::
11
'11
c::
III
III
~
III
)
m
CP
....
I-<
.
...
III
m
" ,
me.
~~
...m
...
0"
'110
"I"
01,
~~
.st:
III "
CPO
I-< "
G,+I
....111
....
>0'11
.-lQl
I-<~
1IIe.
~B
QI U
I-< QI
::s I-<
~~
...
...
-
III
,
ID
III I"
III "I
ID
1""
Nl"l
01
01
.....
N
OIl
01
.-IN
01
101
...
.-I
0\'11
O\QI
.-1+1
m
III tllQl
.sg.
....QI
.. 'W ~
mill
c:: +I 01
"OlllC::
Ill.... ....
t'g~al~
I....m II III
+10....+1
....I1o\.llll
m 0
1Il~-;1ial
~ C::::S1l
.~al.sllC~
\.1+1+1"'0
~CP""Ill.c::
.....'11+1+1
.ol QI'O 0 ::s
RQIlCE-<o(
...
Ala
..
CENTRAL CONTRA COSTA
SANITARY DISTRICT
Effective:. 3/9/92
Range: G-69
Respirator Class: 2/3
ENGINEERING ASSISTANT
DEFINITION
Perform specialized, technical field, and/or office engineering work which may, as
assigned, involve survey services reviewing plans using established review criteria,
performing moderately complex design work, i~entifying and obtaining real property
rights, monitoring and administering outside engineering or construction contracts, and
conducting a variety of special engineering and/or planning studies; inspect construction
work performed on District structures, materials, instruments, and appurtenances as
assigned.
DISTINGUISHING CHARACTERISTICS
This is a specialized, advanced engineering class which recognizes work requIring
significant technical skills and knowledge. Positions assigned to the class of Engineering
Assistant work with a minimum degree of supervision, using established procedures,
guidelines" and District policies. Work may involve moderately complex design work,
research on a variety of District projects, right of way .identification and acquisition,
contract administration, and/or development plan review and comment, using established
review criteria, operation of various survey instruments, use of computers with Coordinate
Geometry (C.O.G.O.) and Computer Aided Design Drafting (C.A.D.D.), and analyzing field
information developed by a survey crew.
The use of respiratory equipment (including S.C.B.A.) may be required for this position.
Therefore, the Engineering Assistant in Contract Management will be required to be clean
shaven for annual fit tests and for any occasion which requires the use of respiratory
equipment to comply with the District's respiratory program and Cal/OSHA standards.
Engineering Assistants in permit, right-of-way, plan review, and watershed/planning are
exempt from the shave on demand requirement.
SUPERVISION RECEIVED AND EXERCISED
Receive direction from higher level professional or management staff.
May exercise technical or functional supervision over less experienced engineering
personnel as assigned.
EXAMPLES OF DUTIES - Duties may include, but are not limited to, the following:
As assigned, conduct inspections of new public sewer mains and private sewer lateral
construction and repairs made by contractors or other agencies.
CENTRAL CONTRA COSTA SANITARY DISTRICT
Engineering Assistant (Continued)
Conduct watershed capacity studies and local capacity studies.
Retrieve and collate data, back up materials, and engineering files in conjunction with
grant requirements.
Develop planning alternatives on collection system projects.
Assist project engineer in the areas of cost tracking and control, preparation of
correspondence, monitoring schedules, project status, and completion of as-built
drawings.
May serve in a contract review and monitoring capacity as assigned. Provide attorneys
and department heads with pertinent contract documents. May assist in project
engineering and/or contract administration. Maintain records of contract work performed
on behalf of the District as assigned; ensure that progress payments are made and that
work percentages are in accordance with contracts.
As assigned, perform civil, structural, mechanical, and electrical inspections on a variety
of facilities and construction projects.
Assist in short and long range facilities and financial planning.
_ Review plans and specifications submitted by engineers for construction or modification
of facilities; determine if plans and specifications are in compliance with District
requirements and policies.
Prepare, assemble, and correlate plans and specifications for District projects with project
engineering staff; prepare sketches and diagrams; design sewer collection system
pipelines and other types of projects and construction; prepare cost estimates schedules.
Prepare clear and concise data summaries and written reports.
May provide lead guidance to less experienced technical engineering personnel as
assigned.
Contact other agencies, developers, and contractors regarding construction in the service
area.
Act as, or assist the project engineer in the areas of cost tracking and control, preparation
of correspondence, monitoring schedules, project status, and completion of as-built
drawings; negotiate contract changes with outside contractors; may serve in contract
review and monitoring capacity as assigned.
May provide project engineering and/or act as contract administrator on smaller District
projects; participate in the District's bidding process; provide attorneys and department
----.---..----.---.--.-.-.-----------......-.......--...--.------.,-.---....
CENTRAL CONTRA COSTA SANITARY DISTRICT
Engineering Assistant (Continued)
heads with pertinent contract documents.
Maintain records of contract work performed on behalf of the District as assigned; ensure
that progress payments are made and that work percentages are in accordance with
contracts; maintain a variety of related files.
()
Catalog, review, and route contract proposals, submittals, drawings, and plans for review,
changes, and subsequent approval.
Perform a variety of data collection and research requiring office and field investigations.
Review and identify defects in sewer construction; assist in the determination of District
course of action.
Respond to inquiries and requests; prepare letters and other forms of correspondence.
Process and route plans submitted by engineers for the construction and modification of
facilities.
Research, compile, and relay information regarding inspection activities to outside
contractors and other District staff.
Perform a variety of special projects as assigned; collect and organize data and back-up
materials in conjunction with inspection studies and reports.
Respond to a variety of technical and routine inquiries and requests from the general
public including outside contractors regarding construction plans, specifications, and
inspection requirements.
May provide guidance to inspection personnel as assigned.
Contact other agencies, developers, and contractors regarding construction in the service
area.
Schedule and coordinate inspection of private sewer projects.
Participate in coordinating inspection activities with other District staff.
Maintain and process records of contract work on behalf of the District as assigned.
Investigate properties regarding ownership, restrictions, zoning, easements, etc.
Order and review title reports.
Prepare and handle execution of instruments pertaining to property rights.
m . ". . ...... _._ ... . r- .- u........__..__ ...~. ....... . ........ ..... ...--..-...-.--..- . _.......___._.._..m .. . -..--............
CENTRAL CONTRA COSTA SANITARY DISTRICT
Engineering Assistant (Continued)
. Gather and analyze data. prepare reports. legal descriptions. and documents relating to
and negotiating for easements. rights-of-way . licenses. permits. leases. and other property
. rights.
Perform a variety of survey office work, for example: Prepare easement drawings and
descriptions, perform C.O.G.O., and traverse calculations using office computer and/or
programmable calculator, prepare boundary and topographic maps using C.A.D.D.
software and plotter.
Act as an instrument person on a field survey crew operating electronic theodolite,
E.D.M.. data collector, and engineers' level.
Act as Survey Party Chief in his/her absence.
Perform related duties as required.
QUALIFICATIONS
Knowledae of:
Construction practices, procedures, methods, materials, tools, equipment, and
supplies, as applicable to the area of assignment.
Principles and practices of engineering.
Mathematics as it applies to assigned responsibilities.
Methods and materials in the construction of sewer collection facilities.
Contract purposes and terminology as they apply to assigned administrative
responsibilities.
Policies and regulations governing the construction, extensions, easement
requirements and maintenance of District sewer systems and facilities.
Surveying methods. practices, techniques, equipment, and instruments and their
proper use, maintenance, and application.
Use of computers for survey applications, C.O.G.O. and C.A.D.D. software as well
as MS-DOS.
Property deeds and legal descriptions of property.
Methods and techniques of engineering, drafting, and estimating.
.-----..- -----, .....-.-..----..----..----,-.-..........------...--....-.....--.-.....---.--..-.-.-..
CENTRAL CONTRA COSTA SANITARY DISTRICT
Engineering Assistant (Continued)
Research and data collection methods and applications to assigned duties.
Safety hazards and appropriate precautions applicable to work assignments.
Abilitv to:
Conduct detailed and accurate inspections of District construction projects.
Perform technical research and provide reliable advice on engineering problems.
Read and interpret engineering and construction plans, blueprints, and drawings.
Perform a variety of contract monitoring and administration functions, as assigned.
Enforce District policies and appropriate state and federal laws, codes, and
regulations.
Use a variety of graphics tools and materials.
Perform engineering calculations with speed and accuracy.
Maintain a variety of reports, files, and engineering records.
Perform difficult survey related office work using an MS-DOS computer with
C.O.G.O. and C.A.D.D. software and difficult calculations, computations related
to survey work and the preparation of plats and plans, and a variety of property
related research and analysis including writing and checking of legal descriptions.
Operate electronic survey instruments with data collectors and engineers' level.
Serve as Survey Party Chief in his/her absence.
Use and care for engineering and drafting instruments and equipment.
Perform assigned duties with a significant degree of independence.
Respond effectively to engineering questions and inquiries.
Provide training and lead guidance to less experienced technical engineering staff
as assigned.
Learn and observe all appropriate safety precautions as required by the District
including, but not limited to, Cal/OSHA General Industry Safety Orders and the
District's Respiratory Protection Program.
Use computers to compile and retrieve data.
--.--------,----.....-------.--..--------.--
'.
CENTRAL CONTRA COSTA SANITARY DISTRICT
Engineering Assistant (Continued)
EXPERIENCE AND EDUCATION
Any combination equivalent to experience and education that could likely provide the
required knowledge and abilities would be qualifying. A typical way to obtain the
knowledge and abilities would be:
EXDerience:
Five years of experience in technical engineering work.
Education:
Equivalent to possession of an A.S. degree in engineering or closely related
field.
LICENSES AND CERTIFICATES
Possession of a valid California Driver's License.
A Land Surveyor in Training (L.S.I.T.) certificate is desirable for those people working
prindpally in the area of survey services.
--------,------ ------------- ----
PAGE 1 OF 1
NO.
10. BUDGET AND FINANCE a.
DATE
SUBJECT
RECEIVE THE 1992-1993 EQUIPMENT BUDGET FOR REVIEW
TYPE OF ACTION
RECEIVE EQUIPMENT
BUDGET
SUBMITTE;l;l ElY .
walter N. Funasakl
Finance Officer
INITIATI~G. DEpT.IDIV.
Administrative/Finance and
Accounting
ISSUE: The 1992-1993 Equipment Budget is submitted for Board review.
BACKGROUND: The 1992-1993 Equipment Budget is transmitted herewith. A list of all
equipment items requested by each department, categorized by functional classification, is
supported by a descriptive sheet which provides justification for each item. A comparative
summary of the Equipment Budget by department for the 1992-1993 and four prior fiscal years
is provided.
The Equipment Budget was reviewed by the Board Capital Projects Committee on April 7, 1992.
As a result of discussion between the Committee and District staff, changes were made to the
description and/or justification for a number of equipment items.
The 1992-1993 Equipment Budget is submitted for initial review by the full Board at this time,
and is scheduled for approval at the next Board Meeting on May 7, 1992.
RECOMMENDATION: Receive the 1992-1993 Equipment Budget for review, and provide District
staff with comments and guidance.
RE~EWEDANDRECOMMENDEDFORBOARDAcnON
WNF
PM
ADS/Po. Paper' 2/EqBudRev.pp
______..__~____.._~,_,.___._.___._._____._._"._,._._..___..m__.~__._,_.._...__,_.,.--u'''''________~_._______'_'_____.._.____.______.....____...______.._..__.__...__...___________
PAGE 1 OF 2
A ril 16, 1992
NO.
10. BUDGET AND FINANCE b.
SUBJECT
DATE
REVIEW THE FINANCIAL STATUS AND BUDGET OF THE SELF-
INSURANCE FUND AND APPROVE OMITTING AN O&M BUDGET
CONTRIBUTION FOR FY 1992-93
TYPE OF ACTION
REVIEW SELF-INSURANCE
FUND BUDGET FOR
FY 1992-1993
SUBMITTED BY
INITIATING DEPT./DIV.
Bonnie Allen, Risk Manager
Administrative/Risk Management
ISSUE: The Self-Insurance Fund (SIF) is to be reviewed each year by the Board of Directors with
the staff presenting re-funding recommendations for the up-coming fiscal year.
BACKGROUND: The 1992-93 fiscal year will be the seventh year of operation for the self-
insurance program, established in July 1986. In the first four years, $500,000 or more was
annually transferred to the SIF from O&M funds to augment the interest income earned from the
invested fund reserves. Beginning with FY 1990-91 this funding was omitted because the
favorable loss experience enabled the fund reserve to grow sufficiently without a contribution.
The staff is making the same recommendation for FY 1992-93 based on the continuing favorable
experience and because the insurance reserve exceeds the $6 million dollar target set in 1986.
Exhibit "A" presents a seven-year history of the Self-Insurance Fund and shows that the reserve
level is projected to reach $6,062,035 by June 30, 1992; this is $203,500 more than at the
beginning of the 1991-92 budget year and reflects the positive experience for the year in terms
of budget. The SIF reserve level is projected to grow to $6,257,535 by June 30, 1993.
Additions to the fund will be recommended in future years if warranted by high inflation rates
and/or an adverse loss experience trend.
The District's loss experience has been favorable with the amount needed to cover open claims
and expenses anticipated to total $188,500 by June 30, 1992. There were no major losses due
to sewer overflows or landslide claims to date in FY 91-92. Property loss claims included
replacement of a District vehicle damaged by an uninsured motorist and replacement of the fire
alarm panel in the Headquarters Office Building which was damaged by water.
Expenses have been budgeted at $195,500 for the FY 1992-93 as compared to $186,000
budgeted for FY 1991-92. The proposed budget increase of $9,500 reflects that legal costs will
be maintained at the current level which have been higher than anticipated during last year's
budget planning.
Should a major case arise, any resulting overexpenditure of the budget would result in reducing
the SIF uncommitted reserves. Based on the above, the staff recommends omitting O&M
funding for the SIF again in 1992-93.
RECOMMENDATION: Review the seven-year financial history/projection for the Self-Insurance
Fund and approve omitting an increment for the fund from the O&M Budget again in 1992-93.
RE~EWEDANDRECOMMENDEDFORBOARDAcnON
INITIATING DEPT./DIV.
1302A-7/91
BA
PM
- ----...-.------.--- .--..----- ----.-.-.......-.--- .-.........----.,--...--..
N
II-l
o
N
Ql
0'1
III
p.,
I(
.jJ
..-1
..Q
..-1
.c::
X
I">:l
Z
80
UH
H8M
p::UlJ'
81">:llJ'
Ull-)r-l
H~
Op.,O
>t~M
~ H Ql
8 U !::
H ~ ~
~Zl-)
UlHg'
I( "" ..-1
80'0
Ul Z !::
0::J1">:l
U "" lD
~ I">:l ~
8UQl
~~>t
U 0 !::
Ul Ql
~ Z >
H Ql
I Ul
8""
Z~
I">:ll">:l
UUl
M
0\
.jJ0\
Glr-l
tJ\1
'ON
::10\
IQO\
r-l
~N
GI 0\
.jJ0\
U r-l
Gl I
-n r-l
o 0\
$.4 0\
p.,r-l
r-l
0\
r-l0\
III r-l
::I I
.jJO
U 0\
1Ill0\
r-l
o
0\
r-l0\
Illr-l
::I I
.jJ0\
UCO
1Ill0\
r-l
0\
CO
r-l0\
1lIr-l
::I I
.jJCO
UCO
1Ill0\
r-l
CO
CO
r-l0\
1lIr-l
::I I
.jJr-.
UCO
1Ill0\
r-l
r-.
r-lCO
III 0\
::Ir-l
.jJ1
U\D
IIllco
0\
r-l
!::
o
..-1
.jJ
III
U
o
r-l
r-l
I(
Q)
U '0
!:: !::
III ~
\..l ""
~
lD lD ~
Ql !:: c<l
::3 H 0
!:: I
Ql II-l e
>r-l0
Ql Q) \..l
P::UlIl-l
o
o
o 0
o
o
o
..
o
o
Ltl
o
o
o
..
o
o
Ltl
o
o
o
..
o
o
Ltl
qo
N
r-l
r-.
1.0
Ltl
(/)
o
~ ~
0'1
I:
-.-I
.jJ
lD
~
on
~~
Q)
1II lD
!:: e
Q) .~
>: ......
I">:l U
000
000
Ltl 0 0
.. ..
1.0 qo N
qo
o 0 CXl
o qo
M M
..
1.0 r-l
qo
1.0
lJ'
M
Ltl
lJ'
r-.
1.0
Ltl
1.0
r-l
M
M
qo
r-.
Ltl
Ltl
N
N
lJ'
lJ'
o lJ'
M
N
lJ'
qo
o
o
o
o
o
o
..
r-l
0'1
I:
..-1
.jJ
......
~
lD
I:
o
U
Ql
U
I:
III
\..l
~
1II
!::
H
o
qo
N
..
r-l
r-l
lJ'
qo
o
Ltl
M
N
r-.
CXl
lJ'
N
r-l
o
CXl
N
N
M
lD
.jJ
I:
Ql
~
III
p.,
1II
1II
o
~
o 0
o 0
o 0
.. ..
o 0
r-. r-.
N 0
Ltl 0
lJ' lJ'
..
r-l CXl
r-. 1.0
o lJ' CXl
qo lJ' CXl
N lJ' Ltl
.. ..
CXl CXl
1.0 1.0
r-.
Ltl
o
r-l
r-.
lJ'
CXl
lJ'
lJ'
qo
M
CXl
r-.
..
CXl
qo
1.0
lJ'
N
..
1.0
r-l
r-l
lD
Ql
U
..-1
>
\..l
Q)
Ul
r-l
III
0'1
Q)
~
~ ~ ~~
o
.
~ ~
1II
Ql
lD
I:
~
X
I">:l
\..l
Ql
>
o
1II
Ql Ql
> ::3
\..l !::
Ql Ql
1II >
Q) Q)
p::p::
o
o
Ltl
Ltl
0'\
r-l
; ~
o
~ ~
~ ~
lJ'
1.0
1.0
r-.
r-.
o
~ i~
o
o
Ltl
M
o
N
; ;j
~ ~
o
~ ~
r-l
CXl
M
Ltl
r-.
~ ~~
Ltl
N
qo
r-.
M
N
; ;
o
:1 ~
qo
N
CXl
CXl
N
qo
M
Ltl
~1 ~j i~
o
Ltl
N
; ;
o
~ ~
N
r-l
CXl
~ ~ ~j
(/) V)-
..
1.0
1.0
r-.
Ltl
M
qo
r-.
r-l
r-.
; ;
o
o
o
o
o
o
r-l
~ ;
V)-
Ltl
lD
e
~
-.-I
e
Ql
\..l
p.,
Ql
U
!::
III
\..l
::3
1II
!::
H
1II
Ql
lD lD
lD Ql !::
Ql lD Ql
U !:: PI
..-1 Ql X
> PI I">:l
\..l X
Ql I">:l \..l
Ul Ql
...... >
...... III 0
III .jJ
U 0 Ql
..-1 8 ::3
!:: !::
.c:: Ql
u >
Q) Q)
8 p::
Ltl
r-.
r-.
..
CXl
qo
Ltl
; ~
Ql
::3
I:
Ql
>
Ql
p::
X
III
8
e
Ql
\..l
o
......
III
:>
'0
~
1II
Ql
~
!::
Ql Ql
e >
o Ql
U p::
I:
H ......
III
.jJ .jJ
lD 0
Q) 8
\..l
Q)
.jJ
s::
H
o
Ltl
1.0
; ~
V)-
..
CXl
CXl
Ltl
..
r-l
V)-
lD
Ql
>
\..l
Q)
lD
Ql
p::
r-l
III
lD .jJ
Ql 0
> 8
\..l
Ql
1II
Ql
p::
____0___________________0__0__________.,0 ________________.00______________________0_________.
o
o
o
..
1.0
CXl
r-l
(/)
1II
..-1
N
0'\
I
r-l
lJ'
lJ'
r-l
\..l
o
II-l
.jJ
Ql
0'1
'0
::3
IQ
Ql
1II
s::
Q)
PI
X
I">:l
Q)
.c::
8
r-l
~
"l
~ i
~ ~
g ~
u
April 16, 1992
12. REPORTS a.1)
Page 1 of 7
Consider issues and concerns raised by Valley Waste Management in
connection with the full-scale implementation of the automated collection
program
•
19.40 M. $,Ei Kunkel '�;v���. } 5vlte
. BON 40,
Nal
kInfalmatt Creek, (.; iii1nrrii 45
510/93540.100
April 2, 1992
Walter Funasaki
Finance Officer
Central Contra Costa Sanitary District
5019 Imhoff Place
Martinez, CA 94553-4392
A Waste Management Company
Re: Valley Waste Management's Automated Pickup and Separate Yard Waste Program
Dear Walter,
This letter is in response to your request for a proposal for Valley Waste Management
(VWM) to implement its Automated Pickup and Separate Yard Waste Program (the
Program). This program was included as part of the review of VWM's rates, effective
January 1, 1992. At the time of the review, we agreed in principle to proceed with the
Program provided that an approach for including the program costs in the rates could be
agreed to. The present method of cost recovery is inadequate. Although we do not wish
to belabor this point, enclosed for your information is a brief analysis that compares the
operating ratios of VWM's operations regulated by the Central Contra Costa Sanitary
District (CCCSD) with those of other waste companies in the Bay Area and across the
United States (Exhibit No.1). The proposed 5 year depreciation method is the lowest of
the four alternatives. VWM should receive a higher level of return, as shown in Exhibit 2-
3, but in the interests of proceeding with this Program, VWM is willing to accept the
current level of return. Thus, under current rate setting methods, VWM simply cannot
afford to invest additional capital.
Although VWM requires an adequate method to obtain capital recovery, VWM also
recognizes that the CCCSD desires to implement the Program in the near future and that,
as a practical matter, CCCSD may not be able to change rates immediately to
accommodate VWM's requirements for a modified cost recovery mechanism. With these
factors in mind, we have developed an overall approach that meets the needs of both
VWM and CCCSD. We recommend that CCCSD adopt the proposal discussed below.
Our proposal is a follows:
1. No immediate rate increase. VWM is willing to postpone a rate increase until
January 1, 1993 to cover the costs of the Program, provided that CCCSD adopt the
cost recovery and other principles described below.
a division of SAKI DCO
A Waste Management Company
Walter Funasaki
April 2, 1992
Page 2
2. Capital recovery. The additional equipment that VWM must purchase for the
Program will be depreciated over a five-year period. In 1987, assets were
depreciated using the Accelerated Cost Recovery System (ACRS) over 5 years. In
1988, Price Waterhouse recommended a change from the accelerated method to
a straight-line 5 year method in computing depreciation for rate purposes. Since
then, VWM has consistently depreciated its equipment, for rate purposes, using the
straight-line 5 year method. By the time the Program is implemented, the current
franchise agreement will have only 3' years remaining. So the equipment will not
be fully depreciated at the end of the franchise term. Depreciating the equipment
over an eight-year period is a change from the current method, and does not allow
VWM to recover its investment.
The capital use charged for all existing and new equipment will be set annually at the
High Quality Corporate Cost of Funds Index, published in the Wall Street Journal.
The index is currently at 7.73%
Attached is an analysis which compares the cost of the equipment depreciated over
5 years, as proposed, to three alternate capital recovery methods (see Exhibit 2-1):
A) with the cost of the equipment depreciated over the remaining Th years
of the franchise (see Exhibit 2-2).
B) with the cost of the equipment when the full cost of capital (including the
cost of equity and debt) is used (see Exhibit 2-3).
C) with the cost of leasing the equipment (see Exhibit 2-4).
3. Incentive mechanism. Regulators of solid waste companies and other utilities are
increasingly aware that it is appropriate to share the savings associated with
recycling and conservation programs between the ratepayer and the companies
providing the savings. For example, the California Public Utilities Commission has
recently approved a program in which Pacific Gas & Electric Company will receive
a portion of the savings that it realizes in a conservation program. Similarly, many
cities and counties include incentives in their rate making procedures for recycling.
Such a procedure is an appropriate sharing of the savings from recycling and
provides an incentive for a solid waste company to maximize savings. Thus, we
propose that VWM and the ratepayers share the disposal cost savings associated
with the diversion of yard waste on a 50/50 basis.
A Waste Management Company
Walter Funasaki
April 2, 1992
Page 3
4. Deferred cost recovery. The adoption of the above cost recovery procedures will
increase the costs that VWM uses in determining its rates. VWM will agree to
implement the Program without an immediate rate increase provided that CCCSD
gives VWM reasonable assurances that the additional costs that are reasonably
incurred in conjunction with the Program and described above will be included in
future rates. Specifically, we propose that all costs not currently included in rates
will accumulate in a balancing account with interest based upon the High Quality
Corporate Cost of Funds Index. Ideally, VWM would prefer to have the details of
such a balancing account specified before committing to the Program. However,
VWM recognizes that this balancing account cannot be developed in a short period
of time. VWM is willing to implement the Program provided that the CCCSD adopt
the following general principles:
1) The balancing account will allow for a profit margin of $612,000 above all
reasonably incurred costs.
2) Reasonably incurred costs will include
A) Capital Use (Interest) Charge at the High Quality Corporate
Cost of Funds Index
B) Capital equipment depreciated over a five-year period
3) The balancing account will include the disposal cost savings associated
with the diversion of yard waste on a 50/50 basis.
4) The balancing account balance will earn interest based upon the High
Quality Corporate Cost of Funds Index.
5) CCCSD will provide assurance of full recovery of the balancing account
balance at date of franchise expiration.
6) CCCSD Board directs VWM and the CCCSD staff to cooperate in
developing the details of the balancing account. These details should
reflect the concepts as discussed in this proposal, follow accepted
practices for such balancing accounts, and be fair and equitable to both
VWM and its ratepayers.
Walter Funasaki
April 2, 1992
Page 4
A Waste Management Company
Waste Management's policy is usually to require an adequate increase in rates before
investing in additional capital. However, in light of the need to implement the Program in
a timely manner, VWM will proceed with the Program provided that CCCSD can formally
adopt the policies outlined in this proposal.
We look forward to your review and response to this proposal. If you require additional
information, please do not hesitate to contact us.
Sincerely,
Ronald J. P ■ to
General Manager
sl
enc
cc: Paul Morsen
Kent Alm
Sanford M. Skaggs
17-214.3.1
va2i,
dames E. Landa
Controller
paiDAz cJ iic, paluud
EXHIBIT 1
Comparative Operating Ratios
Valley Waste Management CCCSD Regulated Operations
Current Operating Ratio Calculation
Capital Use Charge Allowance $ 26O,O
Allowable Profit _ _ _
Profit and Interest $ 872,
Revenues $14,820,0
Operating Ratio 94.1%
CITY AUTHORIZED OPERATING RATIO
County of Napa 89%
City of Napa 90%
El Cerrito 92%
Fairfield
Redwood City 86%
Richmond 86-90%
San Brno 90%
San Francisco 91%n
Sunnyvale 91%
Vacaville 90.5%
COMPANY OPERATING RATIO
Browning Ferris Industries 82.1%
Chambers 75.4%
Laidlaw 8L6%
Western Waste 87,8%
Average 1989-1990 opera ratio earned on waste segment operations only.
ENERGY UTILITIF.S OPERATING RATIO
San Diego Gas and Electric 74.8%
Pacific Gas and Electric Co. 72.9%
Southern California Edison 87396
Weighted Average 78.7%
WATER UTILITIES
So. California Water 77.8%
Cal Water Service 742%
Weighted Averagc 76.0%
TELEPHONE UTILI TIES
Pacific Telesis 77.1%
Roseville Telephone 63.0%
Weighted Average 76.6°
Ail operating ratios aro before interest and taffies.
2 rs S as co
>` cp ya3 a3 i
h° 0) E � �
�r_ r
a
2 co
Ivo T
0o63 1a1Da 10
�. v cc c+�
vlcico m 44 m�rrlui
› a 0
cp 9- N-60 403.
vo�n10 co conk 0o1nto
ao
443.
o co av 0 Q aD ca a a
N 03
d �: rlt 17%7 m4.
co 'Ott ti Go
D
Q' 03 03
0) IO 10 Q D
4) i0 _
10 r 43 r 0 io 109- 0. 1;-41711 at co a)
0000
Co cm (' r
L13 v O O
CCD v.
COgo CO C14 CO
r ps CO N.
_ w
OA
co co cm
cS
63
coCe N 03
Cb 0 C41 AI
CI c0 vt
;::
o co crJ
4, V CD r_ 01 Ir 417- CO
g co 0� r0 10 0
crtb cm 77; 9cia"1 a) ira Ca N C
Cr)6i 3 1 r
Or
CO
* * la 5
0 03
E
CC i. 1•
(.47)
Q
CIU ii
E CC.) 0 0 a
o 0
o v _. m O
rCOti c *' `.' om
�u�7[� 0.
aa) a m
re - c 0a r4) D 6a $g•.
.� as Vs
C a - ,� m 2
C7 Ts e do o - 0
W err J �0r.a rr
c00 cg as 500 0mF=
l3 Q s 4 • �� d. S�
CV �, p .803 =8 a _ sl� =0 ._
0 t a g4 is. Ts a) 2.. •2 Ts 76.
= te. acm ..... - ... Si 81
:.- S. R
Q a
.0 ait. Ca E < U C3 a c� C3 0Q °.
= E ecCO TO
o
N0COD
O CO
10 Y/ csib
icp Bio
N r
Ef3
0
10
r
L
4)
ci
ca
o
rED o
oCO 0
rs r=
Is. cra
Ts
3
gA5i-
›.
in 0 0
(1) Weighted Average Cost includes the cost of equity capital and debt capital.
v
:14
9C1)
Lease Analysis
E. i
E..
.b a
C%1
tit gr.
S 3
63
0) ca
ct al
10 VI
40 49.
0) CO
CI co -
co In 01
CO 44 0'3
v 10
co co
La
r)
co co
iia '3
CD 03
03 4D
Cif Csil
lb 103
4, 6,
0 eam
('3 CN1
iin co
co 0)
ca 44,
* $
v 0
CO 1 Ca
N c1
AAA Quality Company
cis 2
E
a �
o
cn <
k
0
N
3
0o
o
co
w 0r
I
n
�
r
N0ou
N
lA 1
RCOr o
40
I-
0
OD N
�o r
40 •t
IDIS] r
co 013
in
el
co
N
st
gt
r
CI
r -
o m
4
CD
Co
LC)
v
ND
r
Cli
03
1
I
qt
M
el
r
(D I
ID
Ll
00
03 a
N n
r
N
a
1)
N
�"?
r
0 I Lit
co L!7
' . o
r 00
r
00
N'
o
N
r
o
n
rr:
n
N
0)Q0)
Oo 0
Lt! o
Ln
Nc+�co
00
ID
N
QQQ
c. o
LA o
0d eici
NMo
iii
LA
c+7r40
j
cla
0)
,� o.,
se i-
a
0) st
Cl n
CD N
LA N
N Niv
N r
4, 14j
(
CO
!+a
c�7
.-•
�-
to
n
r
c+)
o
4a
o
n�
r
L°
ra
r-
M
4
0) 0o
o
o Oo
LA �
r c'
e•
Ln
00
Q7
st o
000
o) Si1
in �
r M
4* ,
1
Q Q
4
vcvnnn
nLNrfc
.� r
40.
..
r
+in
},
m 0
E cn
��
W
Q
Rt
ra
44
.
W
c
...%
L
m
D
i mm..°>
i
2
3 @
g O V =
it Q m o
° ° o o
Y c m)-
Lt! 00 6'
Z
Q
w`
=
a�
LCI 0o W
v
O
•
0
° c
v °C
•� x
�c
z Li
N
oom
mcD
o
>
as
m
L...
3
a °
F-
41
c
...
Q 4.0)
Ea Ea
> >
L�
iEr
t ccm
2 0 g
° Ea °
= a
aW aW
co to im
� 13 E
y� �-y
in L co i
Notes: (1) Notification on exercise of five-year option beyond February 29, 1996 base term of franchise agreement required to be provided by the District by March 1,1994.
c
CD o el
v) m
7
N a Q)
2 o c
m
L40
i • L▪ a)
o)
m as
W ift
W
ho°
0 OD
00
N
ADS/Budget#3NWMAuto.cht
Z
W
..I
W
W cc
Q
< O
cn
W ml
�V
toJ
Q
a
W W.
JD
• W
CCLU
CL
F-
LT.
O
cc
LL
� xgr-
N
0-
0
ca0:CC Z
V t• ai
■ LOTr a
C r�
0
!ti
rRT.—
riftft N
C:■
■
I -
0
W
H
W
N
✓
Ce)
00 'iii %-
ill % Cy7
o
LU
CCQ
W 0
O 83
co 1
�
00)..
7 • `� 0
U
1::>a w
O m �
O ' w O
Tr) I- a-
u im z,—esi 2
cc Lu ocz 2�� v
aJ ��r- �
� V CO
— >
z CI
u.
�d
aw
COMPUTATION OF ALLOWABLE PROFIT:
0
CO C)
C�i
O r ce;
w
cn
� Z
ZD
W �
OZ
Va
LiE0: <
• >
UJ
cj
CC
LU
W
CC
O o
LLCn
07 V
ADS/Funasaki#1 /VWMProf.Cht
D
W W
1-
0
o
CCO
a. cc
a
0)-
ujIU)
u.
Q�a
y
QQ�
W
ILI <
0 cc
ce
baa
v�
Jo
0 C5
,40 U1 CC
0 Cf)
caILI >z
<C1)
0C)
I—o
c)
0) 0 0)
Co c7
Li; ovii LC)
co LC)
44.
4
0>.
I—CI:
>
ZDV
0 cc W
U.
CC Cn CC
UJ z UJ
CO
W
CC LT.
LU
CZ
OQ>
a.y
REDUCTION
0
0
0
co
0
0
0
PROJECTED ANNUAL YARD WASTE TONNAGE
0
0
0
cc;
cc!.
0
0
c
0)
013
1
< 25,000 >
o
0
0
■
0
0
0
OP)
44.
Lal
1—
Z CI
W W
W
� W � LI)
ZCCZ LIU
W
°` z �
1C _
� `p W OC cc
CC <
y I—Z pS
o W.� v�
I:4
CD
Cel
ADS/Funasaki# 11VWM .OH
VALLEY WASTE MANAGEMENT
PROJECTED 1992 BALANCING ACCOUNT EFFECT
DEPRECIATION EXPENSE $103,365
CAPITAL USE CHARGE 49,857
ALLOWABLE PROFIT DECREASE:
ALLOWED $643,000
ADJUSTED 631,000 < 120M0>
141,222
SHARE OF DISPOSAL EXPENSE REDUCTION 6_1E000
$207,222
Valley Waste Management requests the foliowing:
a) Balancing Account to earn interest based on the High
Quality Corporate Cost of Funds Index.
b) District to provide assurance of full recovery of the
Balancing Account balance by date of franchise
expiration.
ADS/Funasaki#3/1/WIVi bal.oh
April 16. 1992
12. REPORTS a.2)
Page 1 of 9
Martinez Easements
•
ilL311H
April 14, 1992
Mr. Ron Peterson, City Manager
City of Martinez
525 Henrietta Street
Martinez CA 94553
Dear Mr. Peterson:
MARTINEZ SEWER EASEMENTS
This letter will summarize the status of the discussions between the City and the District
regarding the acquisition of sanitary sewer easements by the City of Martinez. As you
are aware, the City and the Sanitary District entered into an agreement in 1967 which
transferred the ownership of the Martinez sewers to Central Contra Costa Sanitary District
(CCCSD). The City is required, by paragraph 8 of the agreement, to pay for the
acquisition of easements which did not exist at the time of execution of the agreement.
The District has identified 169 of these missing easements which are needed to operate
and maintain the sewer pipelines within these easements. The City and the District have
agreed in principal through previous correspondence that the City will acquire these 169
easements. (See the attached letter dated August 18, 1986, from
Mayor Michael Menesini to Mr. Nels Carlson.) The City has attempted to mobilize an
effort to obtain the easements in the past, but has not been successful in conveying any
substantial number of easements to CCCSD to date.
The acquisition of these easements is a most important matter to CCCSD. Without
easement rights, CCCSD is unable to gain access to repair or clean sewers and could be
subject to demands to relocate sewers by property owners. This has happened in the
past and will undoubtedly occur again in the future. This represents a significant liability
to the City of Martinez and a serious impediment to good service for the citizens of
Martinez by CCCSD..
In order to provide the appropriate level of service and to remove any impediments to
sewer repair and construction, CCCSD is anxious to conclude this matter. To this end the
District has proposed a program to acquire the needed easements. This program is
attached to this letter. CCCSD will initially attempt to obtain Grants of Easements from
property owners. If the owners will not sign Grants of Easements, CCCSD will record
easement declarations. As we have discussed, easement declarations are not as good
as formal Grants of Easements, but, as a practical matter, should serve the same purpose
in most cases at substantially lower cost and difficulty.
The completion of the acquisition of the 169 missing easements is needed to fulfill the
city's long standing contractual obligation to CCCSD. Since Martinez has been unable to
acquire the easements and since Martinez seems unlikely to be able to do so in the
foreseeable future, CCCSD is compelled to proceed independently with the program.
Accordingly, CCCSD will proceed to perform the staff and legal work necessary to obtain
the easements or record the declarations.
We understand that the Martinez City Council is not willing to endorse a sewer service
charge "override" to fund the program as was proposed by you previously. Accordingly,
we are billing you directly for the expenses which CCCSD has incurred. We are interested
in continuing discussions on the "override" method of funding in the future when you are
ready. We are also most interested in the participation of Martinez in the process of
communication with affected property owners.
The following is CCCSD's intended level of work which hopefully will complete the
easement acquisition program in six years from June 1992.
FISCAL YEAR COST
1990-91 $ 4,677 (actual)
1991-92 5,323 (estimated)
1992-93 15,000 (estimated)
1993-94 20,000 (estimated)
1994-95 30,000 (estimated)
1995-96 34,000 (estimated)
1996-97 34,000 (estimated)
1997-98 34,000 (estimated)
TOTAL $177,000
It is expected that the $177,000 will be enough to pay the costs of acquisition provided
that no legal action is taken by any of the owners of the 169 properties. If the District
is sued or if condemnation must be filed, the estimated costs could increase. while the
easement declaration approach is easier and Tess expensive than purchasing easements
through a property acquisition process, the easement declarations may not result in full
equivalent property rights for CCCSD. However, in the interest of solving the problem
with the lack of easements over Martinez sewers, CCCSD is willing to include the
easement declarations as a part of the proposed program. Should complications occur,
the cost to procure the necessary property rights will increase beyond the estimates
provided above.
Attached is an invoice in the amount of $9,380 which includes expenses incurred through
March 1992. Please forward a check in that amount to my attention by May 15, 1992.
1 will contact you this winter for the purpose of pursuing the easement acquisition
program to its conclusion.
Sincerely,
Roger J. Dolan
General Manager -Chief Engineer
RJD/JSM/gv
Attachments
bc: K, Alm watt.
R. Baker
J McCoy
MARTINEZ EASEMENT PROGRAM
Martinez Council passes a resolution requesting CCCSD to undertake easement
acquisition program, supporting an added sewer service charge increment to
finance the program and quitclaiming all right, title, and interest that Martinez may
have in the easements which will be acquired.
CCCSD adds a $2 sewer service charge increment to properties in Martinez.
CCCSD staff surveys the first 30 properties and prepares Grants of Easements and
easement declarations.
Letter is sent to the first group of 30 property owners explaining the program.
CCCSD contacts property owners and arranges individual meetings.
CCCSD offers to pay the property owners a $150 transfer fee in exchange for the
property owners' signing a Grants of Easements.
If the property owners will not sign a Grants of Easements, the owners will be told
that CCCSD will file easement declarations. No money will be paid to the owners.
Grants of Easements are processed through the Board of Directors and recorded.
For easement declarations, CCCSD will notify the property owners that a hearing
will be held.
CCCSD Board and Martinez Council hold a joint easement declaration hearing.
CCCSD has the easement declarations recorded.
The above process is repeated for six years.
0 CCCSD files quiet title action five years after the last easement declaration is
recorded.
Central Contra Costa Sanitary District
INVOICE
City of Martinez
525 Henrietta Street
Matinez CA 94553
ATTENTION; MR. RON PETERSON
ASSISTANT CITY MANAGER
Expenses for the Martinez Easement Program
as itemized on the following page: $ 9,380.48
Charges for the Mare- Easement Program:
MONTH
DESCRIPTION CHARGE
November 1990 Labor $ 215.30
December 1990 Labor 1,694.25
December 1990 Documents 6.50
December 1990 Vehicle and 92.00
Equipment
February 1991 Legal 37.00
March 1991 Legal 1,252.24
May 1991 Legal 1,380.00
Subtotal Fiscal Year 1990-91 $4,677.29
July 1991 Labor $ 391.03
August 1991 Labor 704.71
September 1991 Labor 155.90
Legal 302.50
October 1991 Labor 200.60
November 1991 Labor 155.90
Legal 138.00
December 1991 Labor 77.95
Legal 89.00
January 1992 Labor 233.85
February 1992 Labor 233.85
Legal 120.00
March 1992 Labor 155.90
Legal , 1,744.00
Subtotal Fiscal Year 1991-92 $4,703.19
(to date)
TOTAL $9,380.48
City of Martinez
Mr. Nels Carlson, President
Board of Directors
Central Contra Costa Sanitary District
5019 Imhoff Place
Martinez, CA 94553
Dear Mr. Carlson:
SUBJECT: SANITARY SEWERS
525 HENRIETTA STREET ° MARTINEZ
CALIFORNIA 94553 0 (415) 372-3501
August 18, 1986
t I !1
•
f; 1986
•
Thank you very much for your letter of August 5, 1986 advising the City of your
efforts for upgrading the sewer services in Martinez. As we all know the trunk
sewers in the older sections of Martinez have been in need of renovation and
capacity improvements for some time. We also appreciate that it is a major
undertaking requiring extensive efforts from both the District and the
community. The easement problem has existed for many years and the agreement
with Central San has existed since 1967. In recent years the City has pursued
obtaining the easements but has not been too successful to date. The City of
Martinez will obtain easements needed for any specific project in time to avoid
any delay on the project.
There are approximately 170 parcels where the public sewers have been in
existence without documentary easements. During the last two years the City's
consultant has surveyed and prepared legal descriptions for more than 120
easements. Preliminary deed descriptions for these were prepared, reviewed and
approved by District staff. The City staff sent requests to more than 50
property owners, but received only 4 signatures on the deeds.
The City Council has appropriated $30,000 in the 1986-87 F.Y. budget for more
expeditious completion of easement acquisitions. The City has recently
retained Ross Realty Co. to discuss the deeds with individual property owners
and to assist in whatever way necessary to augment the City's efforts in
meeting its obligation. We will be contacting your staff shortly to establish
priorities for easement acquisition complimentary to your improvement plans.
Once again, we thank you for your efforts and will extend our fullest
cooperation and assistance in obtaining the easements.
Si cerely, ,
I� r
4ichael Menesini
Mayor
c: Roger J. Dolan, General Manager, Central San
Jack Garner, City Manager
City Council
MICHAEL M. M E ESINI, MAYOR