HomeMy WebLinkAboutAGENDA BACKUP 11-04-93
~ Central ~g~~~ g~~~R~~~6a~~ Jistricl
PAGE 1 OF 3
POSITION
PAPER
BOARD MEETING OF
November 4, 1 993
NO.
4. CONSENT CALENDAR b.
DATbctober 25, 1993
SUBJECT
ACCEPT THE CONTRACT WORK FOR THE GLENSIDE
DRIVE/VERDE DEL CIERVO SEWER REPLACEMENT PROJECT,
DP 4925, IN LAFAYETTE AND DIABLO, AND AUTHORIZE
FILING THE NOTICE OF COMPLETION
TYPE OF ACTION
ACCEPT THE
CONTRACT WORK
INITIATING DEPT./DIV.
ngineering Department
nfrastructure Division
ISSUE: Construction has been completed on the Glenside Drive/Verde Del Ciervo Sewer
Replacement Project, DP 4925, in Lafayette and Diablo, and the work is now ready for
acceptance.
BACKGROUND: This project consisted of two locations where sewers were deficient due to
physical deterioration and limited access because of the existing terrain and property
improvements. At the first location, Glenside Drive in Lafayette, the work consisted of
approximately 300 feet of S-inch sewer pipe and 2 new manholes. At the second location in
the Diablo Country Club, the old sewer system was relocated out of the easement and into
Verde Del Ciervo. Approximately 500 feet of S-inch sewer pipe and 4 new manholes were
installed. The project locations are shown on Exhibits A and B and are described in the 1993-
94 CIB on pages CS-62 and 63.
On July 1, 1993, the Board of Directors authorized the award of a contract for construction
of the project to V and M Construction/Backhoe of Antioch. The Notice to Proceed was issued
on August 16, 1993, with a specified completion date of October 15, 1993. The Contract
work at both sites is substantially completed. The remaining work consists of minor punch list
items which do not affect the project acceptance.
The total authorized budget for the project including design, construction management and the
contract work is $115,000. A detailed accounting of the project costs will be provided to the
Board at the time of project closeout. It is appropriate to accept the contract work at this time.
RECOMMENDATION: Accept the contract work for the construction of the Glenside
Drive/Verde Del Ciervo Sewer Replacement Project, DP 4925, in Lafayette and Diablo, and
authorize the filing of the Notice of Completion.
REVIEWED AND RECOMMENDED FOR BOARD ACTION
-r~
f!/l1G
r /CI ~
INITIATING DEPT./DIV.
1302A-9/85
TAT
HT
JSM
RAB
L
I
735
,
~\
~\
cP\
'l\
~\
I
'VI
:a.
m.
I NEW MAN
\HO~
A
N
o R
ABANDON
EXIST. SEWER
\J" LOS
DEBORAH L KERLIN
236-022-010
SARA F. PAUKERT
238-110-008
Central Contra Costa
Sanitary District
.
SEWER RELOCATK>N PROJECT D.P. 4925
GLENSIDE DRIVE, LAFAYETTE
EXHIBIT
A
2523-1/87
~
-J
1U
CenualConuaC~
Sanitary District
.
SEWER RELOCATION PROJECT D.P. 4925
VERDE DEL CIERVO
DIABLO COUNT~Y CLUB
EXHIBIT
B
2523-1/87
Central Contra Costa Sanitary District
BOARD OF DIRECTORS PAGE 1 OF 1
BOARD MEETING OF
November 4, 1993
NO.
4. CONSENT CALENDAR c.
SUBJECT
DATE
SET PUBLIC HEARINGS ON DECEMBER 16, 1993 TO
CONSIDER THE APPLICATIONS FOR REFUSE
COLLECTION RATE INCREASES SUBMITTED BY
VALLEY WASTE MANAGEMENT AND ORINDA-MORAGA
DISPOSAL SERVICE, INC., EFFECTIVE JANUARY 1, 1994
TYPE OF ACTION
SET PUBLIC HEARING
DATES
SUBMITTED BY
INITIATING DEPT./DIV.
Debbie Ratcliff, Controller
Administrative/Finance & Accounting
ISSUE: Valley Waste Management and Orinda-Moraga Disposal Service, Inc. have submitted
applications for rate increases effective January 1, 1994. The rate applications and analyses
completed by Hilton, Farnkopf & Hobson will be reviewed at a Board workshop on December
2, 1993, and will be the subject of public hearings on December 16, 1993.
BACKGROUND: Valley Waste Management has submitted an application for a 16.50 percent
rate increase in its service area, excluding the City of Lafayette, and a 12.19 percent rate
increase in the City of Lafayette; and Orinda-Moraga Disposal Service, Inc. has requested a
2.30 percent rate increase. Pleasant Hill Bayshore Disposal, Inc. did not submit a rate
application.
RECOMMENDATION: Authorize a Public Notice to set a Board Workshop on December 2,
1993 and Public Hearing on December 16, 1993 to receive public comment on the requests
for an increase in refuse collection rates.
REVIEWED AND RECOMMENDED FOR BOARD ACTION
Central Contra Costa Sanitary District
BOARD OF DIRECTORS
BOARD MEETING OF
November 4, 1993
SUBJECT .
AUTHORIZE AWARD OF CONTRACT TO DALZELL CORPORATION
FOR THE DRY ASH UNLOADING FACILITY, DISTRICT PROJECT
NO. 6099 (20099)
SUBMITTED BY
Paul A. Sciuto
Assistant En ineer
INITIATING DEPT./DIV.
PAGE 1
OF 4
NO.
6. BIDS AND AWARDS a.
DATE
November 1 1993
TYPE OF ACTION
AUTHORIZE AWARD OF
CONTRACT
Plant 0 erations De artment
ISSUE: The District has received bids for District Project No. 6099, Dry Ash Unloading Facility.
The Board of Directors must award the construction contract or reject all bids within 60 days of
the opening of bids.
BACKGROUND: The District's present furnace ash unloading facility allows for the unloading of
ash that is dampened to prevent dusting. Advantageous and economical recycling alternatives
now exist but require the discharging of dry ash. The Dry Ash Unloading Facility will add a screw
conveyor, loading spout, and slide gate to the existing system. The slide gate will allow the
District to unload either dry or wet ash.
The project was advertised on October 4 and 9, 1993. Four bids were received and publicly
opened on October 20. These bids are listed on Attachment 1, Tabulation of Bids. The lowest
responsible bidder is Dalzell Corporation with a bid of $129,948 for furnishing and installing all
materials and equipment necessary to construct the Dry Ash Unloading Facility. The initial
engineer's estimate for the work was $120,000.
This project is included in the Fiscal Year 1993-94 Capital Improvement Budget on page TP-89.
The current balance of the Sewer Construction Fund, minus unspent project allocations, plus
projected dependable revenue will be adequate to fund this project. A funding summary is
presented in Attachment 3.
Staff has determined that this project is exempt from the California Environmental Quality Act
(CEOA) under District CEOA Guidelines Section 18.2, since it involves a minor alteration to an
existing facility with little or no increase in capacity. The Board of Directors' approval of this
project will constitute a finding of agreement with this determination unless otherwise indicated.
RECOMMENDATION: Authorize Award of Contract to Dalzell Corporation, the lowest responsible
bidder, for $129,948 for the Dry Ash Unloading Facility Project, District Project No. 6099.
INITIAT1.N~;IV.
~:y:-
~
1302A-7/91 PAS
~:
ROGER J. DOLAN
ATTACHMENT 1
PAGE 2 of 4
"
-
.-I
u.
0 ex:: ex>
C. u <;:t'
0)
~ ~ ~ ex>
a ClJ . 0) <;:t'
.-I U .- N 0)
ffi .- ~ ~ ~
.- 'r- ~ ~ ex> 0)
m .- s: .;:, n:! <;:t' N
:::E ClJ ~ Cl -0 ..:.! 0) ClJ .-I
::> l- N ~ .~ V> U ~ C iA-
Z w .- ClJ 2 u 0 :::l ~ ex:: 0) 0
~ w
:J: n:! E u l.f) ~ N z:
en Cl w ~ c: U .-I f- :;;; .-I
. (:)
..c ex>
uex:: ~
ClJ U <;:t' 0
::E: . C"') 0
~ .-I ex>
> -0 6 ~
ClJ C .1- ~ 0 <;:t'
~ n:! .:::.. n:! 0 C"')
ClJ .- ~ ~ Cl -0 ..:.! ex> ClJ .-I
~ ~ V> U ~ C -
I:: n:! ..... ~ u 0 :::l ~ ex:: <;:t' a
>, a 0 S u l.f) ~ C"') z:
~ ::;:: U .-I f-- :;;; 7' ......
'r- ~
.-
'r- L')
U Vlex:: ~
n:! ~u \D 0
LL ClJ . <;:t' "'"
ClJ ~ .-I l.f)
en I:: -0 6 Vl ~
C 'g ~ >- 0 \D
'0- a ~ :::! n:! ~ <;:t' <;:t'
-0 U Cl -0 ..:.! l.f) Q) ......
n:! W C V> U ~ C -
a a 2 :'\. U 0 :::l ~ ex:: \D a
.- (!J u u l.f) ~ <;:t' z:
c (/) .~ u ...... f-- Z z: .-I
:::>
.u 0
..c ~ .- 0
Vl g .- ......
.a: 'r- ~ 0
::E :r: . ex> 0
>- l.f) ......
~ .- ~ 6 Vl .-I ~
Cl n:! C >, ~ 0 ex>
u n:! .2 f- n:! 0 l.f)
...... n:! Vl "'" Cl -0 ~ ...... ClJ .-I
...... C n:! i~ 0 (/) u ~ c -
n:! ~ ClJ N U 0 :::l ~ ex:: ex> a
~ n:! .- 0 0 u l.f) ~ ClJ ......... l.f) z:
Vl o::l 0.. .-I U U .-I f-- z: z: .-I
zc ..
Q.......
I-
~~
~..c . -5
w Vl Vl
O'r- n:! I::
-'I:: ~ :2 z . a
~~ .. 0 0 >
ffi:::l a: ~ 0 z 2 ~ . 'r-
8 ~ ... Cl. !i . ~ ~
!;eLL a: ~ ai g .. -0 Cl.
z 0 0 .. a: ~
:::E ~ !:i ..: s ~ Q)
...... . u
~ ...... >, x
~ .-I n:!~ Q)
ClJ 0 ~ +> 'r-
-0 Vl ...... ......
-0 $- C'r- n:!
'r- 'r- U ',...
.D \J . n:! .u
-0 4- ~
en ClJ C Q)
Cl .- ~ , n:! en E
m .D 0\ C E
'r- . ..c 'r- a ('0' ......
u. Vl Vl -0 U C n:!
a C ',... 'r- n:! ClJ ~
a C C 0 >- ..:.! 0
Z a. n:! ~ ...... C n:l f-
a Vl ~ :::l C ex:: ~
~:= ClJ Vl LL :::l
~ ~
-J~ ex:: 1
~ ~
:J...... Vl 0
mn:! ClJ u ~, -.J
~Cl :;: ~ .
I- a lD ffi ......
0 -l
z 0'-
~ ...
~ ~ ~ ~ .
Ul
If ......
a: a:
~'
:.;
~
c
,0
.....
"
ATTACHMENT 2
PAGE 3 of 4
DRY ASH UNLOADING FACILITY. DISTRICT PROJECT NO. 6099 (20099)
POST BID PRECONSTRUCTION ESTIMATE
PERCENT OF
CONSTRUCTION
ITEM DESCRIPTION TOTAL COSTS
1. CONSTRUCTION CONTRACT $ 129,948
2. CONTINGENCY AT 15 PERCENT 19.552
SUBTOTAL: $ 149,500 100.0%
3. CONSTRUCTION MANAGEMENT 8,000
ADMINISTRATION/INSPECTION
4. ENGINEERING/AS-BUILT DRAWINGS 1 ,000
5. PLANT OPERATIONS DEPARTMENT 3.500
SUBTOTAL: $ 12,500 8.4%
6. PRE-BID EXPENDITURES - THIS PROJECT ELEMENT 49,000 32.0%
7. TOTAL PROJECT COST - THIS PROJECT ELEMENT 211,000 141.0%
8. OTHER DISTRICT PROJECT (DP) NO. 6099 71,000
EXPENDITURES TO DATE
9. TOTAL ESTIMATED DP NO. 6099 EXPENDITURES 282,000
THROUGH THIS ELEMENT
10. FUNDS AUTHORIZED TO DATE 121.000
11. TOTAL PROJECT COSTS REQUIRED TO COMPLETE
THIS PORTION OF THE PROJECT: $ 1 61 .000
A IT ACHMENT 3
PROJECT FUNDING SUMMARY
FOR THE PERIOD
10/07/93-11/06/93
SEWER CONSTRUCTION FUND BALANCE AS OF 09/30/93
MINUS UNSPENT PRIOR ALLOCATIONS
PLUS DEPENDABLE CURRENT YEAR REVENUE
$ 44,372,774 > $161,000 (Allocation Required)
PAGE 4 of 4
$ 55,273,316
< 33,121,990>
22.221.448
$ 44.372.774
~
Central Contra Costa Sanitary District
BOARD OF DIRECTORS
PAGE 1
OF 5
BOARD MEETING OF
November 4, 1993
NO.
6. BIDS AND AWARDS b.
SUBJECT
DATE
AUTHORIZE AWARD OF CONTRACT TO SPECTRE GROUP
ENGINEERS AND CONSTRUCTORS FOR LABORATORY FACILITIES
IMPROVEMENT PROJECT-GAS CYLINDER RAMP AND
ASSOCIATED PROJECTS, DISTRICT PROJECT NO. 6077 (10077)
November 1, 1993
TYPE OF ACTION
AUTHORIZE AWARD OF
CONTRACT
SUBMITTED BY
Paul A. Sciuto
. .
INITIATING DEPT./DIV.
ISSUE: The District has received bids for District Project No. 6077, the Laboratory Facilities
Improvement Project-Gas Cylinder Ramp and Associated Projects. The Board of Directors must
award the construction contract or reject all bids within 60 days of the opening of bids.
BACKGROUND: This portion of the Laboratory Facilities Improvement Project involves the
construction of an access ramp and storage pad for the gas cylinder located to the north of the
Plant Operations Department (POD) laboratory. Safety considerations mandate the storage of large
compressed gas cylinders of nitrogen and argon outside the laboratory. Cylinder leakage could
displace the air in the room and create an oxygen deficient atmosphere. In addition to a platform
to store cylinders, an access ramp to the platform is required. This project also includes stairs for
the emergency exit in the Plant Operations Department Administration area, a concrete pad north
of the guard area for bicycle racks as part of the District-mandated Trip Reduction Program, and a
"V-ditch" gutter north of the north clarifiers to facilitate cleanup and washdown of that area.
The Laboratory Facilities Improvement Project was identified as one of the projects that was to
receive further Board authorization prior to an additional allocation of funds. Since this portion of
the Laboratory Facilities Improvement Project is needed to address critical safety issues, staff
recommends that the Board now authorize proceeding with this work.
The project was advertised on October 4 and 9, 1993. Four bids were received and publicly
opened on October 19. These bids are listed on Attachment 1, Tabulation of Bids. The lowest
responsible bidder is Spectre Group Engineers and Constructors with a low bid of $30,975 for
furnishing and installing all materials and equipment necessary to construct the Laboratory
Facilities Improvement Project-Gas Cylinder Ramp and Associated Projects. The initial engineer's
estimate for the work was $30,000.
1302A-7/91
PAS
ECOMMENDED FOR BOARD AcnON
--
-,."------,------_._-------~-,-~"----'_..~-~-----.~--".---.---------.-----..-...-..--.---------------.-
AUTHORIZE AWARD OF CONTRACT TO SPECTRE GROUP
ENGINEERS AND CONSTRUCTORS FOR LABORATORY
FACILITIES IMPROVEMENT PROJECT-GAS CYLINDER RAMP
AND ASSOCIATED PROJECTS, DISTRICT PROJECT NO. 6077
110r 77}
1":1:111"1111111!lj:III:II::1:'
SUBJECT
PAGE 2 OF 5
DATE
November 1, 1993
The project is included in the Fiscal Year 1993-94 Capital Improvement Budget on page TP-68.
The current balance of the sewer construction fund, minus unspent project allocations, plus
projected dependable revenue will be adequate to fund this project. A funding summary is
presented in Attachment 3.
Staff has determined that this project is exempt from the California Environmental Quality Act
(CEQA) under District CEQA Guidelines Section 18.2, since it involves a minor alteration to an
existing facility with little or no increase in capacity. The Board" of Directors' approval of this
project will constitute a finding of agreement with this determination unless otherwise indicated.
RECOMMENDATION: Authorize Award of Contract to Spectre Group Engineers and Constructors,
the lowest responsible bidder, for $30,975 for the Laboratory Facilities Improvement Project - Gas
Cylinder Ramp and Associated Projects, District Project No. 6077.
1302B-7191
--.------. ...._-~-~"--_._-,._~.,_..,-"_.~-------,---...,_.- ~..._--,.,-,.__._,,_.._._._."-"..._.._.~-,..._--".,..- '----".""'-""-'--"--"-'- _._...._.."--,--".._-,-"._-~-~,..~"',..._._-~.,.._.,."---.--,.,-.-----
...-t -
~ 8
. ~
c:(
~UM
~...-t C '~1- g 0 ~
~ ~oen~ vl~ ..::.t:.M
z tu E...-t U "
~wvrtl""""'c s: :::l ..... c:( ~
as :;:;::, ::~;?
s~ ~
10 . ~
cX:~M
~~~ I- ~ 0 ~
.... 10 en ~ 10 ..::.t:. M : ;;.;
:::~:::: en -ou ~
...-t :::l.....c:(
~c 10 0 0 O~Q);?
cn.-t U \.OI-Z
c:( g
U
..
III (l) . ~
..... r-
U r- M
Q) r-- .~ 0) ~ g
'1'"") ~ ~~~, 0
0 rtl..::.t:.M
~ ~ ...-t en (/ -ou
a.. r-Q)............-t: :::l ..... c:( ~
~~;::8( O~Q)-
-0 \.OI-ZZ
Q) ~
..... g
10
'r- ~ ex
u :a. ~
0 rtlc:( .
III cn U
III M
c:( -0 .. en III
~Oll- :;.: 0 ~
-0 lOr-en ~ 5 rtl..::.t:.M
I:: ~.D...-tent..; -ou
10 u 10 ......... ...-t :::l ..... c:(
'r- 'r- 0 0 <: O~Q)"""'" ~
0- ~ 0...... U <: \.0 I- Z z:
z E .v
Q 10
t- ~
a..
5 Q)
en ..... . ~
w Q) 0
0 ~ .....
;;/. u ~ '2 z .
g 0
a: I:: a: ~ If ~ - ~
w 0 8 w w a.. !I .
!< U a: .... .... eD g .. 10
z ~ ~ ~ d .. a: l!\
~ ~ .., 50 I!! III
III
~ 1 Q)
~ u
Q) Q)
-0 I::
-0 ::.
'r- ~,l .....
.D . I::
en ::: Q)
-0 Q) f- E
C I::I-r- ~ ,~ rtl 0-
m rtlQ).D "'- 'r-
~'r- ~ - ~ :::l
u.. Ill..... III ..... III 0-
0 ~ U I:: 'r- 'r- Q)
~~g c c
Z 10 ~ -0
0 I::cn III ..... :::l C
- .r-I_ Q) III u.. 10
!ci c ~ ~
...I I:: III c:( ~ ~
:;:)lJ.J~ .....
III . ~
m (.!) ..... Q) U ",'
<cnu ~ >= ~ '. .
~ ,,:::l 0 ....
Cl~ ...J ~-
z.....
!g i a;
ill:: t .
w
H: ...-t
a:u a:
I
ATTACHMENT 1
PAGE 3 of 5
@
:;;
...
:
o
o
Q)
c
o
Z
LO
,.....
en
..
o
M
-tA-
o
o
1.0
CO
,.....
..
Q)
I::
o
Z
O'l
M
-tA-
0
0
0
0
O'l
CO
..
g LO
M
~ -tA-
0
0
0
0
CO
CO
..
g N
M
-tA-
Z
~
U
Q)
....., r-
0 .~
~
0- i
Q)
.....
Q)
~ 0
u U
I::
0 0
U .....
~ III
:::l I::
0 0
I+- or-
..... ~
U Q)
:::l U
~ X C'-o
..... Q) III
Vl .E
t: >,~
0 ~~
u
.
C
,0-
--
A IT ACHMENT 2
PAGE 4 of 5
LABORATORY FACILITIES IMPROVEMENT PROJECT-GAS CYLINDER RAMP
AND ASSOCIATED PROJECTS, DISTRICT PROJECT NO. 6077 (10077)
POST BID PRECONSTRUCTION ESTIMATE
ATTACHMENT 3
PROJECT FUNDING SUMMARY
FOR THE PERIOD
10/07/93-11/06/93
SEWER CONSTRUCTION FUND BALANCE AS OF 09/30/93
MINUS UNSPENT PRIOR ALLOCATIONS
PLUS DEPENDABLE CURRENT YEAR REVENUE
$ 44,372,774 > $ 41,000 (Allocation Required)
PAGE 5 of 5
$ 55,273,316
< 33,121,990>
22.221 .448
$ 44.372.774
SUBJECT
ESTABLISH NOVEMBER 18, 1993, AT 3 P.M. AS THE DATE
AND TIME FOR A PUBLIC HEARING REGARDING A
PROPOSED ORDINANCE TO AMEND CHAPTER 6.12 OF THE
DISTRICT CODE WHICH INCLUDES PROVISIONS FOR
FACILITIES CAPACITY FEES
SUBMITTED BY
INITIATING DEPT./DIV.
Engineering Department/Planning Division
Jarred Miyamoto-Mills, Principal Engineer
PAGE 1 OF
2
NO.
7. ENGINEERING a.
DATE
TYPE OF ACTION
ESTABLISH DATE AND
TIME FOR PUBLIC
HEARING
ISSUE: The District Code requires that a public hearing be held prior to the Board of Directors'
consideration of amendments to Chapter 6.12 code provisions for Facilities Capacity Fees.
BACKGROUND: Staff has studied several possible changes to the Capital Improvement Fee
System. From these studies staff has concluded that several changes to the system would be
appropriate. A summary of the proposed changes is presented in Attachment 1. In addition,
several minor corrections and editorial clarifications to the Code have been proposed, as well as
the substantive changes mentioned above.
The proposal was discussed at a meeting of the Board of Directors' Finance Committee which was
held on November 2, 1993.
A public hearing has been tentatively scheduled for November 18, 1993, at 3 p.m. to receive
comments on the proposed code amendments. The Staff Report on Proposed Changes to the
Capital Improvement Fee System, and the 1993 Capital Improvement Plan will be available for
public review, as required.
RECOMMENDATION: Establish November 18, 1993, at 3 p.m. as the date and time for a public
hearing to receive comments on a proposed ordinance to amend Chapter 6.12 of the District Code
which includes provisions for Facilities Capacity Fees.
RE~EWEDANDRECOMMENDEDFORBOARDAcnON
INITIATING DEPT./DIV.
/IJP
v
1302A-7/91
JMM
RAB
^ -,-----_._,-"-,.~_.~.~-----_._---~,-_._--_._-~"-_.~---.."--,."~._---"------~.,_.._-----"---------_.~--'--
ATTACHMENT 1
Page 2 of 2
SUMMARY OF PROPOSED CHANGES TO THE
CAPITAL IMPROVEMENT FEE SYSTEM
. Require that applicable fees be paid prior to building permit issuance, rather than
just prior to physical connection to the District's sewer system, as is currently
required.
. Determine the Facilities Capacity and Pumped Zone Fees as the sum of an "Existing
Assets" component for "buy-in" to the current capital assets of the District and a
"Future Facilities" component forthe portion of planned facilities expansion needed
to serve new customers. This method replaces the current approach wherein these
fees are determined by estimating the incremental cost of adding a unit of capacity.
. Establish a new zone (Zone 3) which includes those areas in the San Ramon Valley
that subsequently connect to the District's sewer system, but are outside of
"Growth Scenario 1" as described in the San Ramon Valley Trunk Sewer
Improvement Project EIR certified by the Board of Directors on October 16, 1986.
New customers in this zone would be subject to an additional fee, the" Interceptor
Fee," to reimburse the District for providing capacity in the San Ramon Valley
Trunk Sewer Improvement Project and the Downtown Walnut Creek Bypass
Project.
. Establish a Capacity Use Charge Program for future non-residential customers
whose flow (on a gallons-per-square-foot basis) and/or strength exceed that of
"base commercial" customers such as retail stores and business offices. Examples
of business which would benefit from the new system are restaurants, bakeries,
and laundromats. The program would require payment of the Facilities Capacity
Fee for the" base commercial" category prior to issuance of a building permit, and
subsequent payment of an annual Capacity Use Charge in proportion to actual
wastewater discharge. The Capacity Use Charge Program would be in lieu of the
current fee system which requires payment of 1 00 percent of the Facilities
Capacity Fee prior to initiation of flow from the new or expanded business.
. Require "temporary customers" served under Special Discharge Permits to pay a
Capacity Use Charge in proportion to their actual wastewater discharge.
. Set the Facilities Capacity Fee at $2,572 per Residential Unit Equivalent (RUE).
The current fee is $1,958 per RUE.
. Set the Pumped Zone Fee at $348 per RUE. The current fee is $278 per RUE.
. Set the new Interceptor Fee at $363 per RUE.
PO\poapaper\Attach1.FCF