HomeMy WebLinkAboutAGENDA BACKUP 07-15-93
~ Central ~g~~~ g~~~R~~~g-~~ Jistrict
PAGE 1 OF 2
POSITION
PAPER
BOARD MEETING OF
July 15, 1993
NO.
4.
CONSENT CALENDAR b.
June 23, 1993
SUBJECT
DATE
ACCEPT GRANT OF EASEMENT FROM CHESTER R. BENDER,
3987 RANCHO ROAD, D.P. 4785
TYPE OF ACTION
ACCEPT GRANT
OF EASEMENT
SUBMITTED BY
Ricardo Hernandez
INITIATING DEPT./DIV.
Engineering Department
ISSUE: The Board of Directors' approval is required for accepting Grants of Easements.
BACKGROUND: The subject easement is required as part of the Los Arabis Drive Sewer
Upgrade project located within the City of Lafayette. The sewers in the Los Arabis Drive
project area require improvements as the result of capacity, operation and maintenance
problems.
The plans for this project include extending the existing sewer on Rancho Road westerly about
100 feet to Upper Happy Valley Road. Rancho Road is a private road and, therefore, an
easement is required from the owner of the property underlying the private road. The owner
has executed a Grant of Easement Deed and has been paid a nominal fee of $300 for granting
the easement.
In accordance with the California Environmental Quality Act (CEQA), a Notice of Exemption for
the Los Arabis Drive Project has been filed with the Contra Costa County Clerk.
RECOMMENDATION: Accept the Grant of Easement from Mr. Chester R. Bender and authorize
staff to record said document with the Contra Costa County Recorder.
INITIA#T./DIV.
1/fi1
JSM
REVIEWED AND RECOMMENDED FOR BOARD ACTION
1302A-9/85
RH
CWS
RAB
..
EXST SEWER LINE
I
,
J
j
I
I
,
f
/
01
-.I'
-.I (
~,
!,
I
t:
'I
\1
,
\
\
\
\
\
\
,
,
\
fu\
<6.\
:J,
\
,
,"
\"'
\
\
\
\
\
40'
\
\
\
\
\
12...,D\
\
\
\
EL NIDO RANCH:
Central Contra Costa
Sanitary District
.
NEW SEWER LINE
101.33'
N890 49'30"E
__[:::~_S::ER LINE
RANCHO RD
(PRIVATE)
50 FT SEWER EASE
ENT
14370 O.R. 121
~
1
lIlN
O...,J
q~
~<...I
~Ol
<...1-
0""
- -I
f"li~
BENDER
(PaR. LOT 8)
1"s40'
3QS' I2A~CJ.-ID
SEWER
2.0AD
EASEMENT
EXH\BIT
A
2523-1/87
PAGE 1 OF 2
NO.
4. CONSENT CALENDAR c.
SUBJECT
ACCEPT CONTRACT WORK FOR THE FILTER PLANT
REHABILITATION PROJECT, DISTRICT PROJECT 20095,
AND AUTHORIZE THE FILING OF THE NOTICE OF
COMPLETION
DATE
July 7, 1993
TYPE OF ACTION
ACCEPT CONTRACT
WORK
SUBMITTED BY Munawar Husain
Associate Engineer
INITIATING DEPTIDIV. Engineering Departmentl
Plant Engineering Division
ISSUE: Construction has been completed on the Filter Plant Rehabilitation Project, District
Project No. 20095, and the work is now ready for acceptance.
BACKGROUND: The contract work included the installation of new filter effluent piping with
valves and meters, modifications of the backwash system, installation of filtered water bypass
pipe, new alum polymer tank, application of protective coating on filter walls and troughs and
placement of additional filter media. The work also included upgrading of the instrumentation
and control system using new control panels, programmable logic controllers and an operator
interface unit. See Attachment 1 for the location of the work completed under this project.
Details of the project are also included on pages TP-106 to TP-108 of the 1993-94 Capital
Improvement Budget.
The construction contract was awarded to Auburn Constructors, Inc. of Sacramento, California,
on September 16, 1992, by the District Board of Directors. The contractor was issued a Notice
to Proceed on October 8, 1992. The contract completion date was July 9, 1993. The contract
work was completed ahead of schedule, with the District taking beneficial use of the new
facilities on June 23, 1993.
It is appropriate to accept the contract work at this time. The total authorized budget for this
project was $1,936,350. A detailed accounting of project costs will be provided to the Board
at the time of project close out.
RECOMMENDATION: Accept the contract work for the Filter Plant Rehabilitation Project, District
Project No. 20095, and authorize the filing of the Notice of Completion.
REVIEWED AND RECOMMENDED FOR BOARD ACTION
MH
RSK
WEB
RAB
INITIATING DEPTJ 1/
~l
/)Jr~
00
1302A-7/91
~~~~~I!~!I!!!I~I!!I
,
i
i
\
\
\
\
\ ~
\ 'W
I
)
i
i
i
i.......
..........................
.......
-.
.i
i
i
i
i
FILTER PL~T
Project
Location
ATTACHMENT 1
/
/
//
//
/"
//
./
./
~ --i,.. --
./\
/ .
/ \
/ \
./ - \
. \
I .
. \
_.~, ~"
.,.~ .
I ',~"
~
\
\
\
\
FILTER PLANT REHABILITATION PROJECT
DP 20095
PAGE 1 OF
1
Jul 15,1993
NO.
4. CONSENT CALENDAR d.
BOARD MEETING OF
SUBJECT
DATE
TYPE OF ACTION
CONSIDER A REQUEST FOR EMERGENCY WITHDRAWAL
OF FUNDS FROM THE DEFERRED COMPENSATION PLAN
CONSIDER
EMERGENCY
WITHDRAWAL
SUBMITTED BY
INITIATING DEPT./DIV.
Debbie Ratcliff, Controller
Administrative/Finance & Accounting
ISSUE: Authorization by the Board of Directors is required for emergency withdrawal of funds
from the Deferred Compensation Plan.
BACKGROUND: Harry E. Winston, Instrument Technician, has requested an emergency
withdrawal from the Deferred Compensation Plan based on extreme financial hardship caused
by a medical disability. The Deferred Compensation Plan Advisory Committee has reviewed
the request and determined that it meets the requirements for emergency withdrawal in the
amount of $10,000.
RECOMMENDATION: Approve the request by Harry E. Winston for an emergency withdrawal
of $10,000 from the Deferred Compensation Plan, as recommended by the Deferred
Compensation Plan Advisory Committee.
d
RE~EWEDANDRECOMMENDEDFORBOARDAcnON
INITIATI,NG DEPT.lDIV.
DR
PM
ROGER J. DOLAN
ADS/Po .Paper#2/Emergwit.PP
1302A-7/91
Central Contra Costa Sanitary District
BOARD OF DIRECTORS
PAGE 1
OF 5
NO.
5. HEARINGS a.
SUBJECT
DATE
CONDUCT PUBLIC HEARING TO RECEIVE PUBLIC
COMMENT OR PROTEST ON THE COLLECTION OF
DELINQUENT 1992-1993 SEWER SERVICE
CHARGES ON THE 1 993-1994 COUNTY TAX ROLL
TYPE OF ACTION
CONDUCT PUBLIC
HEARING
SUBMITTED BY
INITIATING DEPT./DIV.
Debbie Ratcliff, Controller
Administrative/Finance & Accounting
ISSUE: The District Codes and State law require holding a Public Hearing for placing delinquent
1992-93 Sewer Service Charges on the 1993-94 County tax roll.
BACKGROUND: As approved by the District's Board of Directors on May 20, 1993, collection
letters were sent in June to owners of 760 residential parcels for the 1992-93 unbilled Sewer
Service Charge. These letters stated that if the 1992-93 Sewer Service Charge was not paid
by June 30, 1993, the charge plus interest at 6.5 percent and a ten percent processing fee
would be collected on the 1993-94 County tax roll. As a result of the initial letters, 474
owners paid, and 27 owners are being rebilled due to incorrect addresses or changes in
ownership, leaving. the 259 parcels listed in Exhibit "A" to the attached resolution with unpaid
1992-93 Sewer Service Charges. The delinquent property owners were notified of the July 15,
1 993 Public Hearing by Certified mail.
RECOMMENDATION: Conduct a Public Hearing, consider any protest and, if appropriate,
approve a resolution adopting the attached report pursuant to Section 5473, Health and Safety
Code, for collection of delinquent Sewer Service Charges on the County tax roll.
INITIATI,NG DEPT.lDIV.
REVIEWED AND RECOMMENDED FOR BOARD ACTION
1302A-7/91
PM
RESOLUTION NO.
A RESOLUTION COLLECTING CERTAIN
SEWER SERVICE CHARGE FEES
FOR 1992-1993 ON THE TAX ROLLS
AND ASSESSING PENAL TV
WHEREAS, this Board, by resolution, elected to collect unbilled sewer service charges
from parcels which had previously been connected to the District sewage system, but not
assessed or billed over the past several years; and
WHEREAS, by Resolution No. 93-041, adopted at the Board meeting of May 20, 1993,
the Board elected to promptly collect these sewer service charges for the Fiscal year 1992-
1993; and
WHEREAS, the Board finds that notice of the above charges and provision for payment
within thirty (30) days was sent to the owners of each affected parcel; and
WHEREAS, the Board herein has determined that the 1992-1993 Sewer Service Charges
are delinquent and subject to penalty as provided by District Code if not paid within thirty (30)
days; and
WHEREAS, the owners whose parcels are listed in Exhibit" A" attached hereto have
been notified of charges for 1992-1993 and billed previously therefore and are currently
delinquent for said year;
NOW, THEREFORE, BE IT RESOLVED by the Board of Directors of the Central Contra
Costa Sanitary District as follows:
1. A delinquent penalty, as authorized by Section 1.08.080 of the Central Contra
Costa Sanitary District Code, of ten (10) percent of the Fiscal Year 1992-1993 Sewer Service
Charge plus interest at the rate of 6.5 percent per annum from this date is assessed and added
to each outstanding charge for the parcels listed in Exhibit" A" if not paid within the thirty (30)
days specified in the above mentioned notice.
2. The Sewer Service Charge for those parcels listed in Exhibit" A", if not paid within
the above mentioned thirty (30) days, plus penalties and interest are to be collected on the
county tax roll.
3. The Board finds that less than a majority of the owners of the parcels listed in
Exhibit "A" have objected to collection of these charges on the tax rolls, and that all objections
have been considered and overruled.
PASSED AND ADOPTED this 15th day of July, 1993, by the District board of the Central
Contra Costa Sanitary District by the following vote.
AYES:
Members:
NOES:
Members:
ABSENT:
Members:
President of the Board of Directors
Central Contra Costa Sanitary District,
County of Contra Costa, State of California
COUNTERSIGNED:
Secretary of the Central Contra Costa
Sanitary District, County of Contra
Costa, State of California
Approved as to Form:
Kenton L. Aim
District Counsel
ADS/PosPap#1/DeISSC.PP
PROPERTIES WITH DELINQUENT
1992-1993 SEWER SERVICE CHARGES
1 00-401-024-3
-026-8
-027-6
-028-4
-031-8
-033-4
-034-2
-035-9
100-411-001-9
-003-5
-004-3
-006-8
1 25-120-109-9
135-030-017-2
139-040-029-7
139-080-050-4
140-092-022-7
140-1 50-006-9
144-270-150-2
149-080-033-9
1 50-162-048-6
152-092-030-5
152-322-008-3
152-351-046-7
152-360-045-8
154-200-026-8
154-760-038-5
154-880-018-2
-022-4
-023-2
-024-0
155-070-009-8
155-450-001-5
162-090-012-4
164-100-037-5
164-540-010-0
-039-9
166-200-038-7
166-210-011-2
166-220-075-5
167 -130-033-1
167-220-023-3
167-341-006-2
169-040-036-9
1 69-1 00-022-6
170-150-021-5
1 75-1 90-008-3
-01 9-0
175-391-004-9
177-181-017-1
177-231-051-0
178-390-019-2
179-040-029-3
182-420-002-4
183-300-017-5
-027-4
-031-6
184-162-030-3
1 84-41 0-060-0
184-520-001-1
-006-0
1 84- 540-001- 7
187-032-036-1
187-330-024-6
-028-7
187-470-014-7
188-080-050-1
-055-0
188-330-026-9
-28-5
188-370-031-0
189-531-024-9
-025-6
189-584-039-3
189-620-004-3
-012-6
189-720-153-7
192-280-015-4
192-300-016-8
192-350-002-7
193-650-029-5
193-710-014-5
193-840-027-0
1 93-850-002-0
195-400-013-7
-014-5
Exhibit A
195-400-015-2
-017-8
-022-8
196-100-019-5
196-190-032-9
196-290-023-7
196-590-022-6
197-040-027-9
197-090-012-0
197-120-021-5
197-400-008-3
198-050-042-3
198-190-032-5
198-290-041-5
199-070-020-3
199-440-015-6
201-082-016-1
201-183-025-0
202-181-004-5
203-171-033-4
203-182-030-7
-032-3
-033-1
203-421-001-9
203-422-027-3
203-471-005-9
-006- 7
203-502-005-2
203-580-067-7
206-262-006-3
206- 293-007-4
207-371-011-9
208-271-033-2
-034-0
-035- 7
-036-5
208-490-012-1
-013-9
-014- 7
-015-4
-01 6- 2
-01 7-0
-018-8
208-490-01 9-6
-020-4
-021-2
-022-0
-023-8
-024-6
-025-3
-026-1
209-750-002-5
-01 7-3
213-063-004-5
-005-2
-008-6
213-280-031-5
-032-3
-033-1
-034-9
-035-6
-036-4
213-300-009-7
-010-5
-011-3
-012-1
-013-9
-01 7-0
-018-8
-026-1
-028-7
-029-5
-031-1
-032-9
-035-2
213-440-003-1
213-480-021-4
213-490-013-9
-014- 7
-024-6
-027-9
-029-5
213-500-011-1
-012-9
-01 3- 7
213-510-023-4
-026-7
-027-5
-028-3
-031- 7
213-530-021-4
213-530-022-2
213-840-001-1
-020-1
213-630-001-5
-005-6
-007-2
-008-0
213-690-046-7
213-711-008-2
-009-0
-010-8
-011-6
215-050-005-2
-007-8
215-232-013-7
215-240-008-7
215-281-035-0
-037-6
-041-8
-042-6
-043-4
-047-5
21 5-330-01 7-9
217-081-067-1
217-200-040-4
217-210-027-9
217-260-014-6
-01 9-5
-020-3
-023-7
217-270-045-8
-046-6
-047-4
217-280-012-6
-013-4
220-280-015-3
220-342-001-9
-002-7
-003-5
-005-0
220-343-002-6
-004-2
-006- 7
220-372-011-1
-012-9
-017-8
220-381-003-7
-007-8
-008-6
220-382-001-0
-002-8
220-561-007-0
220-670-042-5
-044-1
231-050-022-4
232-200-001-5
-002-3
-004-9
-006-4
-007-2
-008-0
237-401-018-5
238-090-033-8
255-800-054-9
258-682-009-0
258-702-005-4
260-012-018-8
260-131-024-2
261-140-013-2
264-072-016-1
270-460-003-6
272-150-015-1
273-042-014-4
365-160-018-5
365-391-008-7
-009-5
365-401-002-8
-004-4
-008-5
365-402-004-3
374-171-014-3
375-053-031-7
ADSIPP' 1/DeISSC. tbl
~ Central Contra Costa Sanitary District
, BOARD OF DIRECTORS
PQllllllmAsl11 BOARD MEETJ~I~ 15, 1993
PAGE 1
OF
6
NO.
7.
BIDS AND AWARDS a.
SUBJECT
AUTHORIZE AWARD OF CONSTRUCTION CONTRACT FOR
THE PREAERATION ODOR CONTROL PROJECT, DP 20108,
TO MONTEREY MECHANICAL COMPANY
DATE
July 12, 1993
TYPE OF ACTION
AUTHORIZE AWARD
SUBMITTED BY
Donald E. Berger
Assistant Engineer
INITIATING DEPTJDIV.
Engineering Departmentl
Plant Engineering Division
ISSUE: On June 30, 1993, sealed proposals were received and opened for construction of the
Preaeration Odor Control Project, District Project No. 20108. The Board of Directors must
authorize award of the contract or reject bids within 50 days of the bid opening.
BACKGROUND: The Preaeration Odor Control Project, District Project No. 20108, will provide
odor control for the preaeration tanks and flow distribution channels. The tanks and channels
will be covered with flat aluminum covers and the foul air beneath the covers will be collected
and conveyed to an odor scrubber for treatment. The project location is shown in Attachment
I.
This project was advertised on June 10 and 16, 1993. Eight (8) bids ranging from $850,000
to $1,164,125 were received and publicly opened on June 30, 1993. A summary of these bids
is shown in Attachment II. The Plant Engineering Division conducted a technical and commercial
review of the bids and determined that Monterey Mechanical Company is the lowest responsible
bidder with an amount of $850,000. The engineer's estimate for the construction contract was
$963,000.
District staff will administer the construction contract and will provide resident engineering and
inspection services. John Carollo Engineers (JCE) prepared the project drawings and technical
specifications and has been selected to provide construction engineering services. These
services include evaluation of contractor submittals and preparation of design clarifications.
The allocation of funds required to complete the project, as shown in Attachment III, is
$1,142,000. The current total estimated project cost is $1,343,000. The project is included
in the 1993-94 Capital Improvement Budget (CIS) on pages TP-112 through TP-114. The
current balance of the sewer construction fund, less unspent allocations, plus projected
dependable revenue will be adequate to fund this project. A funding summary is presented in
Attachment IV.
The Board of Directors previously determined that the Preaeration Odor Control Project is exempt
from the California Environmental Quality Act (CEQA) under District CEQA Guidelines, Section
18.2, since the project involves a minor alteration to an existing sewer facility with negligible or
no expansion of capacity.
REVIEWED AND RECOMMENDED FOR BOARD ACTION
!ts
fjf~ WZ:B
INITIATING DEPTJDIV.
1302A- 7/91
DEB
DJC
WEB
RAB
SUBJECT
AUTHORIZE AWARD OF CONSTRUCTION CONTRACT FOR
THE PREAERATION ODOR CONTROL PROJECT, DP 20108,
TO MONTEREY MECHANICAL COMPANY
PAGE
DATE
2
OF
6
July 12, 1993
RECOMMENDATION:
Authorize award of a construction contract in the amount of $850,000 for construction of the
Preaeration Odor Control Project, DP 20108, to Monterey Mechanical Company, the lowest
responsible bidder.
1302B-7/91
Page 3 of 6
ATTACHMENT I
PROJECT LOCATION
:IllO
.
-
~-_.-
ATTACHMENT II Page 4 of 6
Central Cuntra Costa Sanitary District
SUMMARY OF BIDS
PROJECT NO. 20108 - Preaeration Odor Control Project
LOCATION Martinez. CA
DATE June 30. 1993
ENGR.EST. $ 963.000
No. BIDDER BID PRICE
(Name, telephone & address)
1 MONTEREY MECHANICAL (510) 632-3173 $ 850,000
8275 San Leandro Street, Oakland, CA 94621
2 HUMPHREY CONSTRUCTION INC. (206) 488-2400 $ 961,976
P. O. Box 907, Woodinville, WA 98072
3 ALBAY CONSTRUCTION (510) 228-5400 $ 994,700
P. O. Box 2569, Martinez. CA 94553
4 D. W. NICHOLSON (510) 887-0900 $ 999,000.
24747 Clawiter Drive, Hayward, CA 94540
5 KAWEAH CONSTRUCTION (209) 732-7944 $ 1,024,000
15019 Avenue 296, Visalia, CA 93292
6 SCRIMSHER AND MINENI CONSTRUCTION (209) 529-6121 $ 1,108,039
P. O. Box 1741, Modesto, CA 95353-1741
7 INA ENGINEERING CONSTRUCTION (209) 832-7068 $ 1,151,000
3941 Holly Drive, Ste. F, Tracy, CA 95376
8 GSE CONSTRUCTION (510) 447-0292 $ 1,164,125
2402 Research Drive, Livermore, CA 94550
$
$
$
$
$
$
$
$
$
BIDS OPENED BY /s/ Joyce E. Murohy
DATE June 30. 1993 SHEET NO. -1- OF -1-
Page 5 of 6
ATTACHMENT III
PREAERA TION ODOR CONTROL PROJECT
DISTRICT PROJECT NO. 20108
POST -BID/PRECONSTRUCTION ESTIMATE
ITEM DESCRIPTION
1 Construction Contract
2 Contingency (10 percent)
TOTAL
$ 850,000
85.000
$ 935,000
PERCENT
1 00.00
3 Construction Management
. District Forces
- Contract Administration
- Inspection
- Surveying
- Record Drawings
- Legal
CONSTRUCTION MANAGEMENT TOTAL
$ 62,000 6.6
60,000 6.4
1,000 0.1
3,000 0.3
2.000 0.2
$ 128,000 13.6
$ 39,000 4.2
2.000 0.2
$ 41 ,000 4.4
$ 1 0,000 1 .1
1 1. 000 1.2
$ 21,000 2.3
$ 190,000 20.3
$ 57,000 6.1
161.000 17.2
$ 218,000 23.3
$1,343,000 143.6
$ 201,000
$1,142,000
. Consultants
- Construction Engineering Services (JCE)
- Testing Services
. Miscellaneous
- Plant Engineering Division
- Plant Operations Department
4 Prebid Expenditures - Planning/Predesign(11
- Final Design/Bid Services
5 Total Project Cost
6 Allocations to Date
7 Additional Allocation Needed to Complete
Project
(1) Includes planning and predesign for primary clarifier odor control system.
PED/PP/201 08A T3.DEB
DEB/kg July 12, 1993
ATTACHMENT IV
PROJECT FUNDING SUMMARY
Sewer Construction Fund Balance
As Of 6/30/93
Minus Unspent Prior Allocations
Plus Remaining Dependable Revenue for Fiscal Year 1992-93
$21.170.397 > $1.142.000 (ALLOCATION REQUIRED)
PED/PP/20108At4.DEB
DEB/kg July 12, 1993
Page 6 of 6
$60,870,391
(39,699,994)
o
$21,170,397
Central Contra Costa Sanitary District
BOARD OF DIRECTORS
PAGE 1
OF 1
Jul 15, 1993
NO.
8. LEGAL/LITIGATION a.
DATE
BOARD MEETING OF
SUBJECT
TYPE OF ACTION
DENY CLAIM FOR PERSONAL INJURY FROM
ROBERT THOMPSON
DENY CLAIM
SUBMITTED BY
INITIATING DEPT./DIV.
Bonnie Allen, Risk Manager
Administrative/Risk Management
ISSUE: Robert Thompson has filed a claim for $84,000 alleging medical problems resulting
from his water supply being contaminated by sewage. Claim denials require action by the
Board of Directors.
BACKGROUND: Mr. Thompson, at 5 Buena Vista, Orinda, claims sewage has leaked into his
water supply line. He believes the water line may have been damaged when a sewer main was
installed approximately six years ago. The District's collection system maintenance records
give no indications that our sewer line has caused damage to or contamination of the water
line.
RECOMMENDATION: Deny the claim of Robert Thompson and refer to staff for further action
as required.
KLA