Loading...
HomeMy WebLinkAboutAGENDA BACKUP 06-15-95 Ceni'ral Contra Costa Sanitary District BOARD OF DIRECTORS PAGE 1 OF 1 BOARD MEETING OF June 15, 1995 NO. 3. CONSENT CALENDAR b. SUBJECT DATE June 6, 1 995 ACCEPT GRANT OF EASEMENT FROM WELLS FARGO BANK, NATIONAL ASSOCIATION, FOR THE PLEASANT HILL RELIEF INTERCEPTOR PROJECT, DP 4985 TYPE OF ACTION ACCEPT GRANT OF EASEMENT SUBMITTED BY Ricardo Hernandez Engineering Assistant INITIATING DEPT.lDIV. Engineering Department/ Infrastructure Division ISSUE: Approval of the Board of Directors is required for acceptance of the subject easement needed for the installation of the Pleasant Hill Relief Interceptor and Recycled Waterline. BACKGROUND: At the April 6, 1995, Board meeting, a Grant of Easement from the Blair H. Walker Testamentary Trust with Kenneth R. Walker and Wells Fargo Bank as co-trustees was accepted by the Board. During acquisition of this easement, Kenneth R. Walker died, and Wells Fargo Bank became the sole successor to the land. The escrow company has requested that the Board approve a new resolution accepting the Grant of Easement solely from Wells Fargo Bank. This easement is needed for the Pleasant Hill Relief Interceptor to go through the Kmart shopping center in Pleasant Hill. The purchase amount remains $64,772, and all of the acquisition conditions are the same as presented in the April 6, 1995, position paper. RECOMMENDATION: Accept the Grant of Easement from Wells Fargo Bank, National Association, and authorize staff to record said Deed with the Contra Costa County Recorder. TJP JSM RAB RE~EWEDANDRECOMMENDEDFORBOARDAcnON (J/# f};J& Central Contra Costa Sanitary District BOARD OF DIRECTORS PAGE 1 OF 5 June 15, 1995 NO. 5. BIDS AND AWARDS a. DATE June 9 1995 TYPE OF ACTION BOARD MEETING OF SUBJECT AUTHORIZE AWARD OF A CONSTRUCTION CONTRACT FOR THE BANCROFT ROAD SEWER RENOVATION PROJECT, D.P. 5048; ALLOCATE $408,000 FROM THE COLLECTION SYSTEM. PROGRAM CONTINGENCY ACCOUNT AUTHORIZE AWARD ALLOCATE FUNDS SUBMITTED BY INITIATING DEPT.lDIV. Kent Von Aspern, Senior Engineering Asst. Engineering Dept/lnfrastructure Div. ISSUE: On June 6, 1995, sealed bids were received and opened for construction of the Bancroft Road Sewer Renovation Project, District Project No. 5048. The Board of Directors must authorize award of the contract or reject bids within 50 days of the bid opening. Board of Directors authorization is required for allocations from Capital Improvement Contingency Accounts in amounts greater than $25,000. BACKGROUND: Investigation of the 24-inch Reinforced Concrete Pipe (RCP) along Bancroft Road, from the siphon crossing the Walnut Creek Channel to the Southern Pacific right-of-way, has indicated severe hydrogen sulfide corrosion. Testing procedures included closed-circuit television inspection and corrosion analysis with a rotating sonic caliper. The sonic caliper is a new test procedure for quantifying the corrosion inside RCP sewers. In this case, significant reduction in the thickness of the pipe wall at the crown was measured. Staff determined that the extent of corrosion created the potential for imminent failure and initiated a fast-track design project to correct the damage. The Bancroft Road Sewer Renovation Project, DP 5048, involves cured-in-place pipe lining of the existing RCP sewer. In this process, a cured-in-place plastic liner is constructed inside the existing pipe to reinstate the structural integrity of the sewer. The reach of sewer to be lined consists of 1,870 linear feet of 24-inch pipe. The Bancroft Road Sewer Renovation Project was advertised on May 9 and 16, 1995. Two bids of $349,902 and $363,631 were received and publicly opened on June 6, 1995. The engineer's estimate for this project was $475,000. A summary of these bids is shown in Attachment 1 . The Infrastructure Division conducted a technical and commercial review of the bids and determined that Gelco Services, Inc. is the lowest responsible bidder, with a bid amount of $349,902. Gelco Services, Inc. uses a process for lining of pipelines under the trademark of Insituform. The Insituform process was originally developed in Great Britain in 1971 and has been used in the United States since 1 977. RE~EWEDANDRECOMMENDEDFORBOARDAcnON KVA TJP JSM RAB ./<'u-+ ~ INITIATING DEPT.lDIV. 1302A-7/91 SUBJECT AUTHORIZE AWARD OF A CONSTRUCTION CONTRACT FOR THE BANCROFT ROAD SEWER RENOVATION PROJECT, D.P. 5048; ALLOCATE $408,000 FROM THE COLLECTION SYSTEM PROGRAM CONTINGENCY ACCOUNT ::111111:11111.:::1:111111:11:: PAGE DATE 2 OF 5 June 9, 1995 The District will administer the construction contract and will provide resident engineering, inspection services, office engineering, and shop drawing review. The funds required to complete this project, as shown in Attachment 2, are $408,000. The total project cost is anticipated to be $463,000. Since the Bancroft Road Sewer Renovation Project was not included in the 1994-95 Capital Improvement Budget (CIB), an allocation from the Collection System Program Contingency Account is needed to proceed with construction. The current balance of the Sewer Construction Fund, minus unspent prior allocations, plus projected dependable revenue, will be adequate to fund this project. A funding summary is presented in Attachment 3. Staff has determined that this project is exempt from the California Environmental Ouality Act (CEOA) under District CEOA Guidelines, Section 18.2, since it involves rehabilitation of an existing sewage facility with negligible or no increase in capacity. The Board of Directors' authorization of award for this project will constitute a finding that this project is exempt from CEOA. RECOMMENDATION: Authorize award of a construction contract in the amount of $349,902 for construction pf the Bancroft Road Sewer Renovation Project, DP 5048, to Gelco Services, Inc., the lowest responsible bidder. Authorize the General Manager-Chief Engineer to allocate $408,000 from the Collection System Program Contingency Account to the Bancroft Road Sewer Renovation Project, DP 5048. 13028-7/91 ------"-"---'.---1.'.---.--."".~ Attachment 1 Central Contra Costa Sanitary District SUMMARY OF BIDS PROJECT NO. 5048 Bancroft Road Sewer Renovation DATE 6/6/95 ENGR. EST. $ 475,000 LOCATION Concord and Walnut Creek BIDDER (Name, Telephone & Address) BID PRICE 1 Gelco Services, Inc. (916) 689-1314 $ 349.902 8481 Carbide Court, Sacramento, CA 95828 2 Spiniello Construction (201) 539-6363 $ 363.631 Airport Park, 35 Airport Road, Morristown, NJ 07962 $ $ $ $ $ $ BIDS OPENED BY Jovce Murohv DATE 6/6/95 SHEET NO 1 OF ----1- ATTACHMENT 2 BANCROFT ROAD SEWER RENOVATION PROJECT DISTRICT PROJECT NO. 5048 PRECONSTRUCTION ESTIMATE Contingency at 1 5 % $ $ 349,902 53,098 1 2 Construction Contract 3 Construction Management · Project Mgmt/Contract Admin. · Inspection · Design Support $ 12,000 15,000 4,000 3.0 3.7 1.0 4 Miscellaneous . Material Testing $ 1 ,000 0.2 . Survey 500 0.1 . Legal 500 0.1 . Permit/City Inspection 2,000 0.5 . Collection System Operations 1,000 0.2 . Community Relations 2,500 0.6 . Record Drawings 1 ,000 0.2 . Field Office Support 500 0.1 5 6 7 Prebid Expenditures - Design Total Project Cost Allocations to Date $ 20,000 463,000 55,000 5.0 114.9 ID-G lie: Infra/PP/5048A war. KV A -, ATTACHMENT 3 COLLECTION SYSTEM CONTINGENCY FUND ACCOUNT STATUS FOR THE PERIOD 05/09/95 THROUGH 06/08/95 COLLECTION SYSTEM CONTINGENCY FUND BALANCE AS OF 06/08/95 823,749 MINUS CURRENT ALLOCATION REQUEST 408,000 REMAINING BALANCE 415,749 Central Contra Costa Sanitary District BOARD OF DIRECTORS PAGE 1 OF 10 POSt BOARD MEETING OF June 15, 1995 NO. 6. ENGINEERING a. SUBJECT DATE June 12, 1995 ADVISE THE BOARD OF THE CLOSE OUT OF 30 CAPITAL IMPROVEMENT PROJECTS TYPE OF ACTION INFORMATIONAL SUBMITTED BY John J. Mercurio, Administrative Analyst INITIATING DEPT.lDIV. Engineering Dept.lPlanning Division ISSUE: Work has been completed on 30 capital improvement projects, and it is now appropriate to close out these projects. BACKGROUND: The capital improvement projects listed on Attachment 1 have been completed. A description of each project follows on Attachment 2. The total authorized budget for the 30 projects is $37,185,430. The total completed project cost is $35,836,147 which is $1,349,283 less than budgeted. Staff is closing out the 30 project accounts, which will result in $75,931 being returned to the Treatment Plant Program, $597,423 being returned to the Collection System Program, and $675,929 being returned to the General Improvements Program. A Summary of the total authorized budgets and expenditures for the projects to be closed is presented by program in the following table: Underrun Program Authorized Budget Expenditures (Overruns) Treatment Plant $4,127, 140 $4,051,209 $75,931 Collection System 31,524,290 30,926,867 597,423 General Improvements 1,534,000 858,071 675,929 Totals $37,185,430 $35,836,147 $1,349,283 The total net underrun of $1,349,283 is approximately 4 percent of the total authorized budgets for these projects. RECOMMENDATION: This item is presented to the Board of Directors for information only. No action is necessary. RAB ~7,~ JAL MJfJ COMMENDED FOR BOARD AcnON PM Page 2 of 10 ATTACHMENT 1 TREATMENT PLANT PROGRAM CAPITAL PROJECTS TO BE CLOSED OUT DISTRICT PROJECT TITLE AUTHORIZED EXPENDITURES UNDERRUN PROJECT BUDGET (OVERRUN) NO. 6061 SCB Computer Reliability $50,640 $50,640 0 Improvements 6063 MUX Replacement Study 100,000 58,640 41,360 6094 Interim Odor Control 38,000 42,673 (4,673) 6099 Sludge! Ash Handling-Interim 282,000 281,013 987 6101 TP Irrigation Improvements 60,000 45,181 14,819 6102 No. 3 Water High Pressure 49,000 48,705 295 Upgrade 6105 WAS Pump Upgrade 25,000 23,279 1,721 7121 Standby Power Facility 3,507,500 3,486,593 20,907 7159 Active Harmonics Conditioner 15,000 14,485* 515 Test Totals $4,127,140 $4,051,209 $75,931 * Estimated 1'..---- Page 3 of 10 ATTACHMENT 1 (CONTINUED) COLLECTION SYSTEM PROGRAM CAPITAL PROJECTS TO BE CLOSED OUT DISTRICT PROJECT TITLE AUTHORIZED EXPENDITURES UNDERRUN PROJECT BUDGET (OVERRUN) NO. 3733 San Ramon Valley Planningl $6,017,000 $5,919,509 $97,491 Predesign 4257 Walnut Creek Downtown 4,771,000 4,758,780 12,220 Bypass - Phase 2 4610 M-2 Forcemain Parallel 2,362,100 2,258,684 1 03,41 6 4682 Clyde/Fairview IMaltby 2,775,000 2,549,436 225,564 Pumping Stations Improvements 4824 1-680/SR-24 Sewer 202,000 1 81 , 1 00 20,900 Relocations - Phase 4 4862 North Main Sewer 28,000 28,000 0 Replacement 4910 Legion Court Sewer 905,000 901,340 3,660 Replacement 4960 Burnett Offramp Sewer 15,000 7,941 7,059 Protection 4974 Miscellaneous Trench Grouting 41,000 31,630 9,370 4979 San Ramon Valley Interceptor - 12,297,1 90 12,274,900 22,290 Schedule A 4980 Developer Projects Sewers 220,000 220,000. 0 4984 Collection System Planning 145,000 141,044 3,956 4991 Via Floreado Sewer 65,000 26,335 38,665 Replacement 5012 Payless Relocation 25,000 21 ,743 3,257 5028 Keys Court Sewer 13,000 10,555 2,445 Replacement 9560 1993-94 Sewer Renovationl 1,643,000 1,595,870. 47,130 Replacement Totals 31,524,290 30,926,867 597,423 · Estimated Page 4 of 10 ATTACHMENT 1 (CONTINUED) GENERAL IMPROVEMENTS PROGRAM CAPITAL PROJECTS TO BE CLOSED OUT DISTRICT PROJECT TITLE AUTHORIZED EXPENDITURES UNDERRUN PROJECT BUDGET (OVERRUN) NO. 8096 Publicly Owned Transfer 660,000 0* 660,000 Station 8126 Property Acquisision - 4797 786,000 784,884 1,116 Imhoff Place 8149 Santa Fe Crossing 40,000 34,023 5,977 Reconstruction 8155 Heating/Cooling Control 35,000 26,270 8,730 Improvements - HOB 8161 District Property Safety 13,000 12,894 106 Improvements Totals 1,534,000 858,071 675,929 * The total project expenditures of $414, 116 have been charged back to the Running Expense (O&M) Fund over the past three years due to cancellation of the project in 1993. --T ---------. Page 5 of 1 0 ATTACHMENT 2 TREATMENT PLANT PROGRAM CAPITAL PROJECTS TO BE CLOSED OUT . The SCB Computer Reliability Improvements project, DP 6061, provided a backup programmable logic controller (PLC) for the master PLC which was installed as part of the Dewatering System Improvements project. This backup PLC was needed to improve the reliability of the control system which integrates the plant computer, sludge dewatering equipment, polymer equipment, and furnace equipment in the Solids Conditioning Building (SCB). . The MUX Replacement Study, DP 6063, included investigation of the use of Modicon programmable logic controllers (PLCs) for compatibility with the Modcomp computers as replacements for Northwest Digital Multiplexers (MUXes). Hardware and software were purchased and installed to provide a working alternative to the MUXes. This study led to the use of Modicon PLCs for the replacement of the remaining MUXes as part of the Telemetry Replacement project. . The Interim Odor Control project, DP 6094, addressed short-term odor control issues for the Primary Chemical Feed Building and Primary area, prior to the construction of the permanent Primary Odor Control Unit. The project also provided a fine mist odor control equipment for the DAF area that was not included in the original project budget. The $4,673 cost overrun provided for the purchase and installation of this additional odor control equipment at the DAF facility. . Sludge/Ash Handling-Interim, DP 6099, was a multiphase, multiple year endeavor to address the long-term improvements in processing and disposition of sludge and ash. The first phase installed a temporary emergency lime addition system to the raw sludge that would allow for landfilling of the sludge in case of a furnace failure. This became the design basis for the permanent lime addition project installed under a separate project. Disposition of ash has been limited to landfilling partially due to the requirement of wetting the ash for movement in trucks. This last phase of the project modified the existing wetted ash unloading system to incorporate a dry ash unloading facility. Providing for the loading of dry ash allows for multiple disposal options, lowering the cost and creating the potential for reuse. The ash can now be wetted and disposed of in a landfill or loaded into special trucks and handled as a dry product. · The Treatment Plant Irrigation Improvements project, DP 6101, switched the treatment plant's irrigation system from the three water high pressure system to the two water system. The two water system was selected since it will more reliably meet the standards for landscape irrigation as outline in California's Title 22 requirements. The project involved the installation of four-inch steel pipes, valves, and fittings at six locations in the treatment plant's tunnel system to Page 6 of 10 ATTACHMENT 2 (CONTINUED) TREATMENT PLANT PROGRAM CAPITAL PROJECTS TO BE CLOSED OUT complete the switch over. This project was designed and drawn by in-house staff and publicly bid to outside contractors. . No.3 Water High Pressure Upgrade, DP 6102, addressed pressure surges in the 3WHP system which were contributing to repeated and costly failures of the plastic pipe. The plastic PVC pipe was replaced with steel pipe where prudent, and surge suppressant tanks were added to the appropriate locations on the remaining plastic pipe. . The WAS Pump Upgrade project, DP 6105, replaced an undersized waste sludge pump with a pump rated at 2,000 gpm to match the size of the largest operating unit. The installation included a Westinghouse Variable Frequency Drive (VFD) to provide control of wasting grate that was identical to those installed with the Secondary Clarifier Improvements project. . The Standby Power Facility project, DP 7121, (formerly DP 20121) involved construction of an on-site facility to provide sufficient electrical power to operate all essential treatment plant facilities in the event of a PG&E power outage. The work included demolition of an unused concrete digester tank, construction of a new building sized to ultimately house three diesel-engine generators, installation of two 1,600-kilowatt, diesel-engine generators and various modifications to existing electrical systems throughout the treatment plant. Also included was a load inhibition system to sequentially disconnect nonessential plant loads from the plant electrical system under various available power scenarios. . The Active Harmonic Conditioner Test project, OP 7159, evaluated the use of active filter teChnology for controlling unwanted harmonics in the electrical distribution system. Harmonics have become more of a problem in recent years because of the variable frequency drive and other new solid state electrical equipment such as ultra violet (UV) lamps. Active filters were found to be less expensive and better able to control harmonics than passive filters which have traditionally been used to control harmonics. Consequently, the District has begun to specify active filters on projects where harmonics reduction is necessary. 1---------.---- Page 7 of 1 0 ATTACHMENT 2 (Continued) COLLECTION SYSTEM PROGRAM CAPITAL PROJECTS TO BE CLOSED OUT . Facilities planning, EIR process, and easement acquisition was accomplished for the San Ramon Valley Interceptor Sewer under the San Ramon Planning/Predesign Project, DP 3733. Route selection and other engineering studies, EIR preparation, and public participation activities were complete for the 1 2-mile long interceptor sewer and forcemain extending from larwin Pumping Station to Walnut Creek. Acquisition of 1 9-miles of easements in the former Southern Pacific Railroad right- of-way was obtained for this project and related future downstream projects. Total easement acquisition costs were approximately $5,500,000. . The Walnut Creek Downtown Bypass - Phase 2 project, DP 4257, was constructed under a Joint Exercise of Power Agreement with the Contra Costa County Flood Control District as part of the flood control bypass channel project. The project was under the management of the Army Corps of Engineers (COE). The sewer work consisted of approximately 4,600 linear feet of 60- and 66-inch diameter pipeline, a dual siphon, a junction structure, and several manhole structures. The contract work was accepted by the Board in March 1991, but project close out was delayed due to a claim of $1.7 million from the contractor. The claim was ultimately settled by the COE. The District's share of the payment was $390,000 which is within the budget authorized for this purpose by the Board in January 1991. . The M-2 Forcemain Parallel project, DP 4610, added approximately 4,200 feet of 20-inch diameter high density polyethylene (HDPE) forcemain in an alignment parallel to the existing M-2 forcemain. In addition, a 1,500 foot section of the existing M-2 forcemain located across IT property was replaced. Other improvements included new utility lines to provide for recycled water, electrical, and telemetry service from the treatment plant to the Maltby Pumping Station. . The Clyde/Fairview/Maltby Pumping Stations Improvements project, DP 4682, replaced existing pump motors with more efficient variable frequency drive (VFD) controlled motors at Fairview and Maltby stations, and replaced pumps, valves and controls at the Clyde Pumping Station. . The 1-680/SR-24 Sewer Relocation project - Phase 4, DP 4824, relocated sewers and associated manholes in order to accommodate the 1-680/SR-24 freeway widening and interchange improvements by Caltrans in Walnut Creek. All of the cost incurred by the District on this project was reimbursed by Caltrans. . The North Main Sewer Replacement project, DP 4862, was a design project only. The District designed a relocation of a sewer main along North Main street in Pleasant Hill to replace an existing sewer that required high maintenance. The construction of this sewer was included in the 1-680/SR-24 Sewer Relocation Project - Phase 3, DP 4782. Page 8 of 1 0 ATTACHMENT 2 (Continued) COLLECTION SYSTEM PROGRAM CAPITAL PROJECTS TO BE CLOSED OUT . The Legion Court Sewer Replacement project, DP 4910, in Lafayette, eliminated easement lines that were deteriorated and caused overflows or required high levels of maintenance. The project consisted of abandoning the existing sewer mains and installing 3,100 feet of 8-inch and 10-inch sewer pipe in public and private road areas. Also included were 16 new manholes and reconnection of 27 existing laterals. . The Burnett Offramp Sewer Protection project, DP 4960, is one of the Caltrans sewer relocation projects. The project consisted of installing one new trunk manhole on the existing 78-inch reinforced concrete pipe A-line Interceptor and installing a T-Iock protective cover with an 18-inch thick concrete cap over the existing pipe as it crosses under the new freeway ramps at Burnett Avenue in Concord. All costs associated with the project were paid by Caltrans. . The Miscellaneous Trench Grouting project, DP 4974, constructed trench dams by pressure grouting the pipe bedding zones around the San Ramon Valley Trunk Sewer in Alamo and Danville. The intent of this construction was to prevent fine soil from the sewer trench backfill from washing out during wet weather seasons. . Schedule A, DP 4979 (formerly 4224A), of the San Ramon Valley Interceptor project consisted of 5-1/2 miles of 60-inch and 1/2 mile of 54-inch diameter concrete pipeline, three creek crossings, and 47 manhole structures along the Iron Horse Trail from Rudgear Road to Sycamore Valley Road. The contract work was accepted by the Board in October 1988, but project closeout was delayed due to a litigation with the tunnelling subcontractor. The District finally prevailed and was awarded $130,500 for attorneys fees and costs. . The Development Project Sewerage project, DP 4980, provided oversight by District staff to insure that sanitary sewer facilities which are designed and installed by developers meet the District's standards. Activities which staff performs include the review of documents related to the proposed developments, such as tentative maps and EIRs, the review of the preparation of right-of-way documents, the review of construction plans for new sewer facilities, the inspection of the new sewer facilities, the preparation of record drawings, and television inspection of all new sewer pipelines. . Collection System Planning, DP 4984, was established in the FY 1993-94 for facility planning that provides the basis for improvements to the District's 1,300 mile sewer system. Facility planning included sewer system capacity studies to identify and define sewer system deficiencies, long-term flow monitoring, and work on the land use database. . The Via Floreado Sewer Replacement project, DP 4991, was combined with DP 4923, Crestview Sewer Replacement project for construction purposes. The Via Page 9 of 1 0 ATTACHMENT 2 (Continued) COLLECTION SYSTEM PROGRAM CAPITAL PROJECTS TO BE CLOSED OUT Floreado portion of this latter project consisted of 750 feet of 8-inch sewer construction. This new sewer redirected a portion of the flow from Via Floreado to St. Stephens Drive and also eliminated an easement sewer located in an unstable hillside area. . The Pay less Relocation project, DP 5012, relocated an existing trunk sewer at the intersection of Tice Valley Boulevard and Rossmoor Parkway which was in conflict with the new Payless Drug Store. The existing trunk sewer was located on private property over which the District had no sanitary sewer easement. The District contributed $21,743 towards the cost of the sewer relocation. . The Keys Court Sewer Replacement project, DP 5028, replaced approximately 2180 feet of deteriorated, high maintenance sewer located in Keys Court near Overlook Drive in Walnut Creek. This small project was undertaken separately to take advantage of scheduled street and utility improvements. . The 1993-94 Sewer Renovation/Replacement project, DP 9560, replaced and renovated small diameter sewer line segments in Walnut Creek and Lafayette. This project is part of a comprehensive program to systematically replace or renovate small diameter sewer line segments that require high maintenance. Page 10 of 10 ATTACHMENT 2 (Continued) GENERAL IMPROVEMENTS PROGRAM PROJECTS TO BE CLOSED OUT . The Publicly Owned Transfer Station project, DP 8096, was established in November 1989 to fund the acquisition of a publicly owner transfer station in conjunction with the CCCSWA (Small JPA). In 1993, this acquisition and therefore CCCSW A funding through this project was discontinued. Over the past three years the expenditures of $414,116 have been charged back against the O&M budget to bring the capital project expenditures to zero. . The Property Acquisition - 4797 Imhoff Place project, DP 8126, was initiated in August 1991, to purchase approximately 2.1 acres from RMC Lonestar. The principal objective of this purchase was to preclude future use of this site in a manner which may be incompatible with the possible nuisances associated with treatment plant operations. Property line fencing has been completed. . The Santa Fe Crossing Reconstruction project, DP 8149, improved the vehicular crossing of the Santa Fe Railway at the northwest corner of the District's treatment plant property. The work was performed by Santa Fe and was paid for by the users of the crossing, CCCSD, CCWD, and IT Corporation. The improvements included new rock ballast, cross ties, paved approaches, and automatic warning devices (controller, gate, and flashing lights). . The Heating/Cooling Control Improvement - HOB project, DP 8155, replaced existing pneumatic controls on AC-O 1 and AC-02 HOB with digital control units and corrected the airflow deficiencies in the accounting area. These improvements increased reliability, optimized energy savings, and provided network interface with the existing central control. . The District Property Safety Improvements project, DP 8161, constructed a new sidewalk and retaining wall located on the east side of Imhoff Place and north of the Headquarters Office Building. This sidewalk will provide safe access for visitors and employees walking between the off-site parking lots along Imhoff Place and the District offices. I" PAGE 1 OF 2 June 15 1995 NO. 10. BUDGET AND FINANCE a. DATE June 2, 1995 BOARD MEETING OF SUBJECT APPROVE A BOARD RESOLUTION TO ADOPT THE 1995-1996 TYPE OF ACTION PERSONNEL, EQUIPMENT, CAPITAL IMPROVEMENT, OPERATIONS AND MAINTENANCE, AND SELF-INSURANCE FUND BUDGETS AS BUDGET ADOPTION COMPRISING THE 1995-1996 DISTRICT BUDGET SUBMITTED BY Debbie Ratcliff, Controller INITIATING DEPT.lDIV. Administrative/Finance & Accounting ISSUE: The 1995-1996 Personnel, Equipment, Capital Improvement, Operations and Maintenance, and Self-Insurance Fund Budgets are submitted for adoption by the Board of Directors. BACKGROUND: The 1995-1996 Operations and Maintenance, Self-Insurance Fund, and Capital Improvement Budgets were approved by the Board of Directors on June 1, 1995. In its approval action, the Board is holding the residential Sewer Service Charge rate of $188 constant for the 1995- 1996 Budget. The 1995-1996 Personnel and Equipment Budgets were approved at the April 20, 1995 and May 4, 1995 Board Meetings, respectively. A copy of the Board resolution adopting the 1995-1996Personnel, Equipment, Capital Improvement, Operations and Maintenance, and Self-Insurance Fund Budgets is attached. RECOMMENDATION: Approve a Board resolution to adopt the 1995-1996 Personnel, Equipment, Capital Improvement, Operations and Maintenance, and Self-Insurance Fund Budgets, as comprising the 1995-1996 Central Contra Costa Sanitary District Budget. REVIEWED AND RECOMMENDED FOR BOARD ACTION INITIATING DEPT./DIV. d~ 1302A-7/91 DR PM I ~. RESOLUTION NO. A RESOLUTION ADOPTING THE 1995-1996 CENTRAL CONTRA COSTA SANITARY DISTRICT BUDGET The District Board of the Central Contra Costa Sanitary District does hereby resolve as follows: THAT, the 1995-1996 Central Contra Costa Sanitary District Budget, consisting of the Personnel Budget, Equipment Budget, Capital Improvement Budget, Operations and Maintenance Budget, and Self-Insurance Fund Budget, be adopted; and THAT, payment by the Running Expense Fund to provide funding for the District's Self- Insurance Fund for 1 995-1 996 would be required. PASSED AND ADOPTED this 15th day of June 1995 by the District Board of the Central Contra Costa Sanitary District by the following vote: AYES: Members: NOES: Members: ABSENT: Members: President of the Board of Directors, Central Contra Costa Sanitary District, County of Contra Costa, State of California COUNTERSIGNED: Secretary of the Central Contra Costa Sanitary District, County of Contra Costa, State of California Approved as to Form: Kenton L. Aim Counsel for the District ADS/Position Paper #2/Budadop.PP pg 2