HomeMy WebLinkAboutAGENDA BACKUP 09-19-96
Central Contra Costa Sanitary District
BOARD OF DIRECTORS
i:i'i..jS''''I''''.I:::::iiil_I_:i'i':'::::::: BOARD MEE1lS~ OpFtember 19, 1996
ji~~~IW~.rI!~~~!~j~[::::.::::~~~~~:::::~t[lWi::i~\::;m~~::::;;;;;;;;;gr~rr
~
Page 1 of 2
NO.
3.
CONSENT CALENDAR a.
DATE
lYPE OF ACTION
September 11, 1996
ACCEPT GRANT OF EASEMENT
SUBJ ECT
ACCEPT A GRANT OF EASEMENT FROM THE EAST BAY REGIONAL PARK DISTRICT FOR THE SHELL
PIPELINE
SUBMITTED BY
Jade A. Sullivan, Assistant Engineer
INITIATING DEPTIt>IV
Engineering Department/Planning Division
ISSUE: The Board of Directors' approval is required to formally accept Grants of Easements from other
public agencies.
BACKGROUND: The District purchased approximately 15 miles of 1 G-inch diameter steel pipeline from the
Shell Pipeline Corporation (Shell) in December of 1994. The District plans to utilize the pipeline as a future
recycled water transmission main.
The District previously accepted the transfer and assignment of all available right-of-way documents from
Shell. A section of the pipeline did not have a valid easement within the East Bay Regional Park District
property located near Skyline Blvd. at the Alameda County line (Exhibit 1). District staff has negotiated a
new easement for the cost of one dollar with East Bay Regional Park District.
With the acceptance of this Grant of Easement all easements related to the Shell Pipeline have been
acquired.
RECOMMENDATION: Accept a grant of Easement from East Bay Regional Park District and authorize staff
to record appropriate documents with the Contra Costa County Recorder.
i~1>>
RAB
1
.
.....
i
"
Co
.
.....
'"
L
~
Central Contra Costa
Sanitary District
MILES
CON1b .
- _':"''V\ CO(',>o
AI A, ~ _ "',)\
. ~DA--\
\
\
,/
EXHIBIT ONE
1
~
BOARD OF DIRECTORS
.1.1.11_111111111:111:1111::111'1:::1: BOARD MErnS~;tember 19, 1996
Central Contra Costa Sanitary District
Page 1 of 2
NO.
5.
BIDS AND AWARDS
a.
DATE
TYPE OF ACTION
September 13, 1996
AUTHORIZE AWARD OF CONTRACT
SUBJECT
AUTHORIZE AWARD OF CONTRACT TO W. G. THOMPSON, INC. FOR CLEANING, PAINTING, AND
DRYVIT RECOATING OF HOB AND BOARD MEETING ROOM BUILDINGS, D. P. NO. 8163
SUBMITTED BY
Ken F. Laverty, Purchasing & Materials Mgr.
INITtA TlNG DEPT IOIV
Administrative/Purchasing and Materials Control
ISSUE: The District has received bids for ceaning, painting, and Dryvit recoating of the exterior of the HOB and
Board Meeting Room buildings. The Board of Directors must authorize award of the construction contract or
reject all bids within sixty (60) days of the opening of bids.
BACKGROUND: The Headquarters Office Building (HOB) and the Board Meeting Room were originally built in
1982. The exterior surfaces of the buildings are coated with a finish manufactured by Dryvit Systems, Inc.,
which is very similar to a stucco finish, but is a commercial coating that reduces cracking. This finish has
served the District well for the past 14 years. The building now has minor surface cracking, rust stains, and
color fading, and it is now prudent to reseal'and recoat it.
The Bid Request was advertised on August 26 and 31, 1 996. Five bids were received and publicly opened
on September 9, 1996. These bids are listed on Attachment 1, Tabulation of Bids. The lowest responsible
bidder is W. G. Thompson, Inc. with a bid of $21,105. The initial engineer's estimate for the work was
$30,000. The large range in the bid prices is caused by how each contractor determined the scaffolding
costs. The highest bid included complete ground-up scaffolding of the buildings; however, W. G. Thompson's
bid was based on a roof cantilever hoist system that is less expensive. Furthermore, W. G. Thompson was
the original subcontractor that coated both buildings back in 1 982 and completely understands what is
involved in the recoating work.
This recoating work is a portion of District Project No. 8163, HOB Improvements Project, included in the Fiscal
year 1996-97 Capital Improvement Budget on page GI-23. Staff has conducted a cash flow analysis and has
determined that adequate funds are available to fund the project.
Staff has determined that this project is exempt from the California Environmental Quality Act (CEQA) under
District Guidelines Section 18.2, since it involves a minor alteration to an existing facility with little or no
increase in capacity. The Board of Directors' approval of this project will constitute an independent finding that
the project is exempt from CEQA.
RECOMMENDATION: Authorize award of a contract to W. G. Thompson, Inc., the lowest responsible bidder,
for $21,105, for the cleaning, painting, and Dryvit recoating of HOB and Board Meeting Room buildings.
KFl
H:\FORMS\PPAPER.DRY
8/6/96
~ ~ N ~
: M
Lt) C
.
Iv ;: - N N
10<: H' I~ 00 M
<<l Lt)
.; .;- ~ 'I Cl ,I e ..
........ U ,I lo() 1 I Q) 0' N
UN ...... ~ I U I I~ : ~ I 00
+J ::..::: ~ e u ~ ltl " ---
e ...-l i.~ Q) ~ u z: +J
Q) M eo
E o:;t ~
.c C'I
u 0 ~ ~ ~
ltl 0 ~ .
+J
+J .;.. ....
ct:: .~ N . ~ ;;:
'N Q) ~ Cl
~ e Vl 10 OJ "
...... 1 U 1 ~
+J I U I 1M ~
~ tii ~ ~ ~ 1 U 1 I+J : ltl
z ltl ~ +J -b<
i ~ r ::E ai ~
t ~ . ;: ~
.
0) .... r- C
C I~ E ~ ;:
...... -0 .
+J
ltl ::I ~ Cl 0 a: r-
0 ..0 I Vl I 1 M ~
U III I U 1 :~
Q) +J ~ I U I : ~
~ +J U ~ ~
C ...... ~ z: .j.:;
+J 0-
......
> ~
~ ~
~ ~ ~ :
-0 C
0) ~ ~
-OC ltl . ~
C...... ~ -0
ltl-o .c (J 0
r- V U u:> Cl 0 C .
........ 0 C'I Vl M >< Q) N
0)::1 ~ ...... ........ I U I I : Q) ~ ~
ceo +J C'I 1 U I 1 +J ltl
...... e ........ I U I I Q) 0 +J
+JE ct:: C'I z: z:
CO
...... 0
ltlO::: Lt) III
C- . 0 e
0) -0 g! ...-l 0
..e e . ...... Lt)
0)...... 0 ltl . ........ ~ 0
e+J E -0 N ........
...... Q) .c
C Q) ~ uu:> 0 u e ........
ltl::E ...... C'I 1 I I M >< Q) ~
Q) 0::: ........ 1 Cl I 1 Q) ~
r- -0 c..!: C'I I Vl I I +J ltl
U~ . ........ U Q) 0 +J
ltl :3 +J C'I U z: z:
z 0 0- U
Q eo ~
t- -0 .
a..
5 e ....
ltl ~
en .
UJ eo ....
a
;;/. 0 ~ :z: . ::
::I: g 2 0 -0 ..0
a: 8 81 ~ 3 - e ~
UJ 4- ... ... ... ~ . ltl
tc cr ~ ..... al ~
0 :z: ~ ~ ci ~ ~ cr ~
2 ~ ..: S l!! ~
~ e Q)
...... u
+J ......
e ~
...... ~ 0-
. :g -0
en Q) ~ l- . g ......
r- C;; eo
O. ..0 ~ ~ III
mC.!J ...... Q) - e .,... Q) r-
U--.3 III > \J) ...... U ltl
e ltl I)... e ltl +J
0 g .....J ~ ltl 4- 0
Z.s. "'- Q) t ~ I-
III . ~ r- ::I
.d. 0 u Q) u.. U III
~ I~
~ ~~.s e .
-I ltl +J Q)
~II~ ~ i III ~ +J
Q) 0
~ .....J
\ i! "9 0 ~ .
.....J Q) r;; ...-l
~ I~ -0 .;;;
"-0 ffi
~:o ~ E . ...-l
cr If
@'
:;;
~
o
, C'I
........
N
~
Central Contra Costa Sanitary District
BOARD OF DIRECTORS Page 1 of 5
BOARO MEETING OF
September 19, 1996
NO.
5. BIDS AND AWARDS b.
DATE
TYPE OF ACTION
September 13, 1996
AUTHORIZE AWARD
SUBJECT
AUTHORIZE AWARD OF CONSTRUCTION CONTRACT TO ARB INC. FOR THE REPAIR M4-A FORCE MAIN
PROJECT, DP 9588
SUBMITTED BY
Ba T. Than, Associate Engineer
INITIATING DEPT/DIV
Engineering Department/Plant Engineering Division
ISSUE: On August 28, 1996, sealed proposals were received and opened for construction of the Repair M4-
A Force Main Project, District Project No. 9588. The Board of Directors must authorize award of the
contract or reject bids within 50 days of the bid opening.
BACKGROUND: Pumping stations and force mains to serve the city of Martinez were put into service in
1970. The original force main (M4-A), which conveys the wastewater from the Fairview Pumping Station
to Maltby Pumping Station, was constructed north of Marina Vista RoadlFrontage Road in a marsh area (see
Attachment 1 for location). A portion of this force main is above ground and is supported by concrete piers.
Another portion of the force main is located within the Southern Pacific Transportation Company (SPTC)
right of way.
In 1994, corrosion problems were detected along the welded joints of the M4-A force main. Furthermore,
two sections of M4-A force main, which are located within the SPTC right of way, were damaged during
the construction work performed by SPTC. Temporary repairs were made by District staff to keep the M4-A
force main in service. Staff also discovered that the soil along the force main alignment located within the
SPTC right of way was contaminated with hydrocarbon products believed to be largely diesel fuel.
This project will repair the corroded and damaged pipe sections and install access openings. These access
openings will allow the District to perform closed-circuit television inspections of the force main. Staff has
negotiated an agreement with SPTC for access, and SPTC will dispose of contaminated materials at no cost
to the District.
The plans and specifications for this project were prepared by District staff. The Engineer's Estimate for
construction was $115,000. The project was advertised on July 29 and August 5, 1996. Two bids of
$119,391 and $143,622 were received on August 28, 1996. A summary of these bids is shown in
Attachment 2. The Plant Engineering Division conducted a technical and commercial evaluation of these
bids and has determined that ARB Inc. is the lowest responsible bidder with a bid amount of $119,391.
REVIEWED AND RECOMIfI/ENDED FOR BOARD AC110N
BTT
WEB
RAB
INITIATING DEPARTMENT/DIVISION
STT
~
t;'~
h1f
H:\PP\9588ACPT.BTT
8/6/96
DATE
September 13, 1996
Page 2 of 5
SUBJECT
AUTHORIZE AWARD OF CONSTRUCTION CONTRACT TO ARB INC. FOR THE REPAIR M4-A FORCE
MAIN PROJECT, DP 9588
The District will administer the construction contract and provide resident engineering, inspection, survey,
office engineering, and shop drawing review. The allocation of funds required to complete this project,
as shown in Attachment 3, is $212,000. This project is included in the Fiscal Year 1996-97 Capital
Improvement Budget (CIB) on pages C8-75 through CS-76. Staff has conducted a cash flow analysis of
the Sewer Construction Fund and concluded that adequate funds are available for this project
Staff has concluded that this project is exempt from the California Environmental Quality Act (CECA)
under District CECA Guidelines Section 18.2, since it involves repairs and minor alterations to an existing
sewage facility with no increase in capacity. The Board of Directors' approval of this project will
constitute an independent finding that this project is exempt from CECA.
RECOMMENDATIONS: Authorize award of a construction contract in the amount of $119,391 for
construction of the Repair M4-A Force Main Project, DP 9588, to ARB Inc., the lowest responsible bidder.
PAGE 3 of 5
JUNCTION
STRUCTURE
~M3
GRAVITY
~ LINE
~~
11
~~
'7 '\
./ \
<:
\ /y--,,\,\ \
. '/';, '\ \ ......-y---
\. -,~, \ '\ \~ \ ,
\ '>J, ,,\ '=11- \ ~ .
\ L:\~\ ~ 0, to. \ ~ '"
o \ ~ \~\./Y=-"_ _~'"
/ ~ '\ \.( ,( /:=""",-
I (.~." - . \. ~~ '0' ~
/ "(':\ \. \.!<~(! MALTBY
/ i' .:\; ~~~. PUMPIN~
I,,! .-, .~~ STATION.
'-, / 'I Ij 'I ~II .
--"" If 1_- "'i/' '"
-- '---.:~_I ~ II i ~~
--z.; ~~f ~-
I
J
~
N
,
o
I
2000
4000
J
FEET
c
'"
'!
;::;
'0
co
co
of)
~
co
<Xl
of)
C>
....
..
,..,
~
~
j Central Contr~ C:osta
Sanitary District
LOCATION MAP
t;::
:=
....
0>
S!
~
ATTACHMENT
1
,PAGE 4 of 5
Attachment 2
Central Contra Costa Sanitary District
SUMMARY OF BIDS
PROJECT NO./NAME 9588 - Repair M4-A Force Main
DATE August 28,1996
LOCATION Martine~ California
ENGINEER EST. $ 115,000
No BIDDER BID PRICE
(Name, telephone & address)
1 ARB Inc. $ 119,391
1875 Loveridge Road
Pittsburg, CA 94565
Phone (510) 432-3563
2 Clarke Construction $ 143,622
311 Arballo Drive
San Francisco, CA 94132
Phone (415) 333-3099
BIDS OPENED BY /s/ Paul Morsen
DATE August 28, 96
SHEET NO. ..L OF ..L.
-,-----,-,-_.-_._._-----~..__._-_._..._..._,~.,--~--~----_.-
PAGE 5 of 5
ATTACHMENT 3
REPAIR M4-A FORCE MAIN PROJECT
DISTRICT PROJECT NO. 9588
POST -BID/PRECONSTRUCTION ESTIMATE
PERCENT OF ESTIMATED
No. ITEM DESCRIPTION TOTAL ($) CONSTRUCTION COST
1 . Construction Contract 119,391
Contingency at 20 percent 23,609
SUBTOT AL CONSTRUCTION 143,000 100.0
2. Construction Management
Project Management 8,000
Inspection 1 2,000
SUBTOT AL CONSTRUCTION MANAGEMENT 20,000 13.99
3. Other Expenses
Plant Engineering Division 6,000
Collection System Operations Department 2,500
Plan~ Operations Department/Pumping Stations 2,500
Section
Surveying 2,000
Permit/Inspection 1,000
Legal 4,000
Record Drawings 3,000
SUBTOT AL OTHER EXPENSES 21,000 14.69
TOT AL CONSTRUCTION PHASE COST 184,000 128.67
(ITEMS 1, 2, AND 3)
4. Pre bid Expenditures
Design 27,000 18.88
Repair/Construction during Design phase 26,000 18.18
TOT AL PREBID EXPENDITURES 53,000 37.06
5. TOTAL ESTIMATED PROJECT COST 237,000 165.73
6. FUNDS AUTHORIZED TO DATE 25,000
7. ADDITIONAL ALLOCATION NEEDED TO 212,000
COMPLETE PROJECT
~
l,entral Contra Costa Sanitary District
BOARD OF DIRECTORS
:::!:i!.J.!i.~I:.:..i,ti::!:i:I!:;Ji:::i!i.!:~:::::::i:::::i BOARD MEETSGeOpFtember 19, 1 996
~tE1~~.fill~~~I~j~\::::R~!I~~~j~~ID.fi~~fii.?~~~r~~
Page 1 of 9
NO.
5.
BIDS AND AWARDS
c.
DATE
TYPE OF ACTION
September 16, 1996
APPROVE RELIEF OF BID, AUTHORIZE AWARD,
AUTHORIZE AGREEMENT
SUBJ ECT
APPROVE REQUEST OF RELIEF OF BID FROM ALBAY CONSTRUCTION COMPANY, AUTHORIZE AWARD
OF A CONSTRUCTION CONTRACT TO MONTEREY MECHANICAL COMPANY, AND AUTHORIZE
AGREEMENT WITH CAROLLO ENGINEERS FOR THE ORINDA CROSSROADS, MORAGA, AND LOWER
ORINDA PUMPING STATION IMPROVEMENTS, PHASE II, DISTRICT PROJECT 4898
SUBMITTED BY
Tad J. Pilecki, Senior Engineer
INITIATING DEPTIUIV
Engineering Department/Infrastructure Division
ISSUE: On August 29, 1996, sealed bids were received and opened for the construction of the Orinda
Crossroads, Moraga, and Lower Orinda Pumping Station Improvements, Phase II, District Project 4898. The
Board of Directors should authorize award of the contract or reject bids within 50 days of the bid opening.
The Board of Directors should decide whether or not to grant a request of relief of bid. Board of Directors'
authorization is required for the General Manager-Chief Engineer to execute professional services agreements
in amounts greater than $50,000.
BACKGROUND: The Pumping Station Master Plan prepared in 1989 identified a need to renovate the
Orinda Crossroads and Moraga Pumping Stations. Both pumping stations are over 36 years old and do not
have reliable pumping capacity. In addition, based on a growing public awareness about safety and the
need to maintain service after a major earthquake, seismic retrofit of the Orinda Crossroads, Moraga, and
Lower Orinda Pumping Stations is needed. Adequate pumping capacity and reliability are major concerns
because these pumping stations are located in East Bay Municipal Utility District (EBMUD) drinking water
watershed areas. This Phase II project is part of a comprehensive program which has been implemented
to address meeting increasingly stringent regulations.
At the Orinda Crossroads and Moraga Pumping Station Improvements, this project includes installation of
new diesel engine-driven pumps, new self-sufficient radiator cooling systems, new emergency generators,
rebuilding the existing diesel engine-driven pumps, upgrading of controls, new sump pumps, piping
modifications, and landscaping. The force mains will also be modified to address the recent failure at Orinda
Crossroads. Seismic retrofit of the mechanical and electrical equipment will occur at all three stations. The
Moraga Pumping Station will also undergo seismic strengthening. A new emergency standby generator will
be provided at the Lower Orinda Pumping Station.
This Phase II project is part of a phased, long term program to rehabilitate the District's existing pumping
station in the East Bay Municipal Utility District's watershed areas. A phased approach is being utilized to
spread the costs of the improvements proposed in the entire program over a 10 to 12 year period while
still meeting regulatory, reliability, and capacity requirements. Construction of Phase I, which improved dry
RfV8\fl) AMJ RECOAWENDED FOR SOAPD ACTION
Ifi)
f//Jf
J M
RAB
ID-G L \C:\INFRA \PP\4898A WAR. T JP
11'11"II'I'I!'II~'I:.II.IIII!II!I!'II.I!!!!!lil!!!111:!I!lill DATE September 16, 1996 I
Page 2 of 9
SUBJECT
APPROVE REQUEST OF RELIEF OF BID FROM ALBAY CONSTRUCTION COMPANY, AUTHORIZE
AWARD OF A CONSTRUCTION CONTRACT TO MONTEREY MECHANICAL COMPANY, AND
AUTHORIZE AGREEMENT WITH CAROLLO ENGINEERS FOR THE ORINDA CROSSROADS, MORAGA,
AND LOWER ORINDA PUMPING STATION IMPROVEMENTS, PHASE II, DISTRICT PROJECT 4898
weather capacity and safety, was completed in 1992. Construction of Phase II is expected to be
completed by December 1997. The subsequent phases of the program will consist of upgrading the
electrical system, replacing the existing dry weather pumps with new, high efficiency pumps,
replacement/rehabilitation of existing force mains, and additional seismic upgrades.
The plans and specifications for the addition of the diesel engine-driven pump, ancillary equipment, and
seismic retrofit of the electrical and mechanical equipment was prepared by Carollo Engineers. The
seismic strengthening design was prepared by Ruth and Going, Inc. of San Jose, a firm specializing in this
kind of work. Landscaping plans were prepared by Gates and Associates. The Engineers Estimate for
construction was $3,850,000. This project was advertised on July 26 and August 5, 1996. Five sealed
bids ranging from $2,976,259 to $4, 248,000 were received on August 29, 1996. A summary of bids
received is presented in Attachment 1. The apparent low bid is from Albay Construction Company (AI bay)
in the amount of $2,976,259.
The bids were opened at 2:00 p.m., August 29, 1996, and Albay was notified that it was the apparent
low bidder shortly thereafter. By 4:00 p.m., August 29, 1996, a representative of Albay telephoned
District staff to advise that Albay had made a substantial clerical error in preparing its bid. Albay met with
District staff at 5:00 p.m. on August 29, 1996, to explain and document the claimed clerical error. In
addition, A1bay handed District staff a letter stating that they had made an inadvertent clerical error with
respect to its bid and requested that it be withdrawn (Attachment 2).
Albay representatives explained on August 29, 1996, that as part of its practice, it would enter tentative
equipment bids on one sheet, and have a separate sheet showing add-ons or subtractions from said
tentative equipment bids as information was obtained. In submitting the final bid on August 29, 1996,
Albay explained that it inadvertently entered an add-on amount as the total equipment bid for one bid item,
instead of combining the tentative equipment dollar amount with the add-on amount on the other page.
This mistake was made for two separate contract items under mechanical equipment. The total dollar
amount of the bid error, as explained by Albay, was $730,674 for mechanical equipment. Albay
submitted spreadsheets prepared and time dated August 29, 1996, at 12:46 p.m., showing the tentative
equipment bids for mechanical equipment, and submitted a second spreadsheet prepared at the time of
bid submittal August 28, 1996, at 2:00 p.m., showing what appears to be the add-on amounts for the
two mechanical equipment entries. Separate documents submitted by Albay including the
add-on/equipment sheets for revisions to equipment bids appear to support Albay's explanation that the
add-on amounts were included as part of the bid total, instead of adding them to the tentative equipment
amounts and then including this amount as part of the bid total.
On September 3, 1996, within five (5) days of the bid opening, Albay delivered a letter to the District
setting forth the above explanation (Attachment 3).
ID-GL\C:\INFRA\PP\4898A WAR. T JP
ii.lllil..llllil',i.'Bli.llli\iiiiiIIIBI'\I.llii'i.iillIllliil DATE September 16, 1996 I
Page 3 of 9
SUBJECT
APPROVE REQUEST OF RELIEF OF BID FROM ALBA Y CONSTRUCTION COMPANY, AUTHORIZE
AWARD OF A CONSTRUCTION CONTRACT TO MONTEREY MECHANICAL COMPANY, AND
AUTHORIZE AGREEMENT WITH CAROLLO ENGINEERS FOR THE ORINDA CROSSROADS, MORAGA,
AND LOWER ORINDA PUMPING STATION IMPROVEMENTS, PHASE II, DISTRICT PROJECT 4898
Under California Public Contract Code Section 5103, a bidder may request relief of bid within five (5) days
of bid opening in the event of a clerical or arithmetical error in preparing the bid proposal. The law is
stringent with regard to relief from bids and allows relief to be granted by the awarding authority only
under specific circumstances. Specifically, the law states that:
"The bidder shall establish to the satisfaction of the court that:
a. A mistake was made.
b. He or she gave the public entity written notice within five (5) days after the opening of the
bids of the mistake, specifying in the notice in detail how the mistake occurred.
c. The mistake made the bid materially different than he or she intended it to be.
d. The mistake was made in filling out the bid, and not due to error in judgment or to
carelessness in inspecting the site of the work, or in reading the plans or specifications."
The clerical error cited by Albay is the failure to combine the original tentative mechanical equipment figure
with the add-on figure for the same mechanical equipment item, with said error being repeated in two
separate lines for the same line item mechanical equipment entry. The documents submitted by Albay
within a few hours of the opening of the bids tends to substantiate their explanation. The total error is
in excess of $700,000 on a $3 million project. Albay would not have been the low bidder if this
mechanical equipment bid item had been entered in the amount contended by Albay as the correct
amount. Under the above Public Contract Code provisions, it appears to staff and District Counsel that
the error, as explained by Albay, is indeed a clerical error, and that Albay is entitled to relief under the
above provision.
The Engineering Department conducted a technical and commercial evaluation of the bids and concluded
that, in the event that Albay is granted relief from its bid, the second low bidder, Monterey Mechanical
Company, is the lowest responsible bidder for the bid amount of $3,280,000.
District staff will administer the construction contract and will provide resident engineering, inspection,
survey, and office engineering. Shop drawing review and office engineering for the addition of the diesel
engine pump, ancillary equipment, and seismic retrofit of electrical and mechanical equipment will be
provided by Carollo Engineers based on their satisfactory performance during project design. A cost
reimbursement agreement with a cost ceiling of $187,000 has been negotiated with Carollo Engineers.
Ruth and Going, Inc. will provide shop drawing and office engineering services for the seismic
strengthening of the Moraga Station based on their satisfactory design performance.
ID-GL\C:\INFRA \PP\4898A WAR. T JP
.~...:~::1::::::::.~.:.I.II.~::~i:.III.II:iiil.i.lli.1lillllll DATE September 16, 1996 I
Page 4 of 9
SUBJECT
APPROVE REQUEST OF RELIEF OF BID FROM ALBA Y CONSTRUCTION COMPANY, AUTHORIZE
AWARD OF A CONSTRUCTION CONTRACT TO MONTEREY MECHANICAL COMPANY, AND
AUTHORIZE AGREEMENT WITH CAROLLO ENGINEERS FOR THE ORINDA CROSSROADS, MORAGA,
AND LOWER ORINDA PUMPING STATION IMPROVEMENTS, PHASE II, DISTRICT PROJECT 4898
The Orinda Crossroads, Moraga, and Lower Orinda Pumping Station Improvements, Phase II, is included
in the 1996-97 CIB on pages CS-83 through CS-87. A post bid/preconstruction cost estimate is
presented in Attachment 4. An allocation of $4,377,000 from the Collection System Program is needed
to complete the project. Staff has conducted a cash flow analysis of the Sewer Construction Fund and
concluded that adequate funds are available for this project.
Staff has determined that the project is exempt from the California Environmental Quality Act (CECA)
under District CECA Guidelines Section 18.2, since it involves minor alterations to existing sewer facilities
with no increase in dry weather capacity. The Board of Directors approval of this project will constitute
an independent finding that this project is exempt from CECA.
RECOMMENDAll0N: Approve the request for relief of bid from Albay Construction Company, and direct
staff to return Albay Construction Company's bid bond. Authorize award of contract to Monterey
Mechanical Company, the lowest responsible bidder, in the amount of $3,280,000 for the construction
of the Orinda Crossroads, Moraga, and Lower Orinda Pumping Station Improvements, Phase II, District
Project 4898. Authorize the General Manager-Chief Engineer to execute a $187,000 cost reimbursement
agreement with Carollo Engineers.
ID-GL \C:\INFRA \PP\4898A WAR. T JP
Attachment 1
Central Contra Costa Sanitary District
SUMMARY OF BIDS
PROJECT NO. 4898
Orinda Crossroads. Moraga & Lower DATE: Auaust 29. 1996
Orinda Pumoina Stations - Phase II
LOCATION EBMUD Watershed Pumo Stations
ENGR. EST. $ 3.850.000.00
BIDDER (Name. Telephone & Address) BID PRICE
1 Albay Construction Co. (510) 228-5400 $ 2.976.259.00
P.O. Box 2569
865 Howe Road. Martinez. CA 94553
2 Monterey Mechanical Co. (510) 632-3173 $ 3.280.000.00
8275 San Leandro St.. Oakland. CA 94621
3 Kaweah Construction Co. (510) 228-6950 $3.675.739.00
P.O. Box 7780
1911 Fine Avenue. Fresno. CA 93747
4 C.W. Roen Construction Co. (510) 837-5501 $ 3.748.000.00
P.O. Box 4
40 Oak Ct. Danville. CA 94526
5 Pacific Mechanical Corporation (510) 827-4940 $ 4.248.000.00
P.O. Box 4041
2501 Annalisa Drive. Concord. CA 94524
BIDS OPENED BY
Paul Morsen
DATE 08/29/96
SHEET NO 1
OF 1
ATTACHMENT 2
~
Construction Co.
General/MechanIcal/Building Contractors Since 1961
~
AII~ ";' \996
t\UO f_ ~
i
I il !
I U l ~
Ul
p, O. Box 2569 . 865 Howe Rd
Martinez, CA 94553-0142
(510) 228-5400. FAX (510) 228-0821
....~,.....-~.._.~..
rn~rnow~
August 29, 1996
CCCSDINFRASTRUCTURE
Central Contra Costa Sanitary District
5019 Imhoff Place
Martinez, California 94553
Attention:
Tad Pilecki
Subject:
Bid Proposal of August 29, 1996
Orinda Cross Roads, Moraga & Lower
Orinda Pump Station Phase IT
Project #4898
Gentlemen:
Albay Construction Co. has made an inadvertent clerical error in the referenced proposal and
respectfully requests that our bid proposal be withdrawn.
We are very sorry for any inconvenience this may cause.
Very truly yours,
ALBA Y CONSTRUCTION CO.
~~,
'\ \:l---r- ~_
Tom Little
Vice President - Marketing
TL:rlg
cc: Chron File
State License No. 202703
ATTACHMENT 3
~
Construction Co.
General/MechanIcal/Building Contractors Since 1961
P.O. Box 2569.865 Howe Rd
Martinez, CA 94553-0142
(510) 228-5400. FAX (510) 228-0821
September 3, 1996
Central Contra Costa Sanitary District
5019 Imhoff PI.
Martinez, CA 94553
Attention:
Tad J. Pilecki, Senior Engineer.
Reference:
Orinda Crossroads, Moraga and Lower Orinda Station Phase II
DP 4898
Subject:
Request for Bid Relief
Gentlemen:
As a follow up to our letter dated August 29, 1996 requesting bid relief due to an inadvertent clerical error.
As was explained to you by Mr. Little on August 29, 1996, the clerical error occurred in the taking of
mechanical equipment bids by our purchasing agent on bid day. As you can see by our bid summary
date and time, 8/29/96, 12:46pm, Line 21 Mechanical Equipment - Hogan, the material cost was
$379,474.00 for Bid Item NO.4 and Line 47 Mechanical Equipment - Hogan, material cost was
$354,200.00 for Bid Item NO.5. Both of the above costs were "plugged" at that time. As the day
progressed and we started to receive bids on the mechanical equipment for bid items 4 and 5 you can
see by the 1 :38 pm print out of our bid summary the numbers had changed for bid items 4 and 5
mechanical equipment from $379,474.00 on Line 21 to $255,805.00 and from $354,200.00 on Line 4/ to
$252,805.00. The actual cost for line 21 should have been $632,362.00 in lieu of the $255,805.00. The
add/deduct work sheet for Bid Item NO.4 shows an add of $252,805.00. The add was given as the
revised cost for this bid item and should have been given as an add to the "plug" of $379,474.00 by net
adding the two numbers together our bid for this item was off by $379,474.00. As you can see by the
enclosed paper work the same thing happened on Line 47, Bid Item NO.5. The "plug" number and the
add/deduct were not added together as they should have been which made our bid off by $351,200.0C f'J!
this item. Our total bid was off by $730,674.00 for mechanical equipment. I have enclosed complete
backup with this letter. If you require any further information, please do not hesitate to call.
-
Very truly yours,
ALBAY CONSTR~CTION C~
/ ~~_.-'" ~ ~
Denis Welch for Tom Little
Vice President Marketing
DW877:BL
cc: Estimate File
Chron File
State License No. 202703
ATTACHMENT 4
ORINDA CROSSROADS, MORAGA, AND LOWER ORINDA
PUMP STATIONS, PHASE 2
DISTRICT PROJECT NO. 4898
POST-BID/PRECONSTRUCTION ESTIMATE
PERCENT OF
ESTIMATED
CONSTRUCTION
ITEM DESCRIPTION TOTAL COST
1 . Construction Contract $ 3,280,000
2. Asbestos Removal/Force Main Work 44,000
3. Telemetry 4,000
4. Contingency at 10% 333,000
Subtotal $ 3,661,000 100
5. Construction Management
. Construction Project Management $ 30,000
. Contract Administration 110,000
. Construction Inspection 140,000
. Surveying 5,000
. Legal 5,000
Subtotal $ 290,000 7.9
6. Consultant/Professional Services
. Engineering Services $ 187,000
(Carollo Engineers)
. Structural Services 22,000
(Ruth and Going)
. Landscaping 1 0,000
(Gates & Associates)
. Noise Testing 9,000
(Klaveness)
. Record Drawings 1 50,000
(Carollo Engineers)
. Materials Testing 10,000
. Vibration Testing 10,000
. Partnering Facilitator 5,000
. Corrosion Testing 3,000
Subtotal $ 306,000 8.4
1 May be done by District staff.
ID-G L/C: Infra/Spec/4898/PreConst. Est
PERCENT OF
ESTIMA TED
CONSTRUCTION
ITEM DESCRIPTION TOTAL COST
7. District staff and Miscellaneous
. Engineering Department $ 40,000
. Plant Operation Department 50,000
. Collection System Operation 5,000
Department
. Community Relations 5,000
. Preconstruction Damage 3,000
Assessment
. Agency Fees 5,000
. Computer Hardware and Software 10,000
. Field Office Support 1 5,000
Subtotal $ 133,000 3.6
8. Construction Subtotal $ 4,390,000 119.9
9. Pre bid Expenditure
. Wet Weather Diesel Design $ 577,000 15.8
. Electrical/Mechanical Equipment 112,000 3.1
Seismic Retrofit Design
. Moraga Station Seismic 93,000 2.5
Strengthening Design
Subtotal $ 782,000 21.4
10. Total Project Cost $ 5,172,000 141.3
11. Funds Authorized to Date $ 795,000
12. Total Allocation of Funds Needed to $ 4,377,000
Complete Project
ID-GUC: Infra/Spec/4898/PreConst. Est
~,
Central Contra Costa Sanitary District
BOARD OF DIRECTORS
:lllllllillilfliiiiiilllllliliiiii.:i:ili: BOARD MEETIS~;tember 19, 1996
Page 1 of 2
NO.
7.
ADMINISTRATIVE
a.
DATE
TYPE OF ACTION
September 4, 1996
AUTHORIZE PROJECT WORK
SUBJECT
REQUEST APPROVAL TO INCLUDE ADMINISTRATIVE DEPARTMENT SPACE PLAN WORK IN THE HOB
IMPROVEMENTS PROJECT, DP 8163
SUBMITTED BY
Paul Morsen, Deputy General Manager
INITIATING DEPTIDIV
Administrative/Central Services
ISSUE: Board approval is required to include a significant project description change (additional related work)
to an existing Board approved Capital Project.
BACKGROUND: The 1996-1997 Capital Improvements Budget/1996 Capital Improvement Plan included the
HOB Improvements Project, DP 8163. The Project's purpose is to perform major renovation and long-term
improvements on the District's Headquarters Office Building (HOB) and the Board Meeting Room. The Project's
scope of work included roof reconditioning, re-coating the exterior of HOB and Board Meeting Room
(recommended under an item earlier in the Agenda), replacement of the outside lighting with energy-efficient
and non-corrosive fixtures, reconditioning of the carpet walls in the Board meeting area, and a study of
replacing the Halon fire system and the inside zone controllers on the HV/AC system.
The estimated budget for the HOB Improvements Project was $122,000, with approximately $60,000 for re-
roofing the building. A technical roof specialist was hired to evaluate the HOB roof and to make
recommendations on repairs, replacement, and continuous maintenance activities. As a result of the
consultant's study, the recommended repairs were made by District staff at minor expense and a scheduled
maintenance calender has been implemented. These repairs and subsequent maintenance will add
approximately six to eight years of life to the roof, therefore currently eliminating the need to expend major
funds from the HOB Improvements Project for roof replacement.
Concurrent with the timing of the HOB Improvements Project, the Administrative Department has been
working to develop an office space plan that will address the overcrowding in Accounting, provide office
space for the two new MIS positions, improve the overall efficiency of employees' work spaces, and complete
the work area for the Reprographics Service Center. Once the estimated costs of the plan were obtained it
was the intent to request the Board to approve separate project funding. Fortunately, by including this work
in the HOB Improvement Project, no additional funding will be required. A space consultant was hired to
interview all affected employees, inventory the office equipment and modular wall panels, and then make
recommendations for both an efficient office layout and what equipment/panels would be required. The
consultant's work was discussed at an Administrative Department wide meeting and a space plan was
selected.
H:\FORMS\PPAPER.HOB
8/6/96
DATE
September 13, 1996
Page 2 of 2
SUBJECT
REQUEST APPROVAL TO INCLUDE ADMINISTRATIVE DEPARTMENT SPACE REORGANIZATION
EXPENSES IN THE HOB IMPROVEMENTS PROJECT, DP 8163.
The total cost for this space plan should not exceed $60,000 to complete. The plan includes:
o Additions of modular panels and work surfaces to work in conjunction with the existing
modular panels and fixtures.
o Reconfigure the Reprographics SeNice Center to obtain a permanent work area for the seNice
provider and their equipment and modular spaces for four Communication SeNices Section
staff.
o Reconfigure Accounting by adding one modular work station to their existing area and
installing three modular work stations in the adjacent informal conference room area.
o Add additional modular work stations for the two new MIS staff on the third floor.
o Reconfigure the other work areas on the third floor for work efficient reasons.
We are recommending that the Administrative space improvement plan be included in the HOB
Improvements project description, replacing the major roof repair work that is no longer necessary.
Consequently no additional capital funding is requested.
RECOMMENDATION: Approve inclusion of the Administrative Department's space plan into the HOB
Improvement Project, DP 8163.
~
Central Contra Costa Sanitary District
BOARD OF DIRECTORS
"11111111111:.:1::1111111.111.1:11.1 ~MEETI~;ember 19, 1996
Page 1 of 2
NO.
8.
HUMAN RESOURCES a.
DATE
September 13, 1996
TYPE OF ACTlON
APPROVE SALARY RANGE CHANGE
SUBJECT
CHANGE SALARY RANGE FOR PROGRAMMER/ANALYST POSITION FROM ~. $3817-$4620, to G-72,
$4201-$5086
SUBMITTED BY
Paul Morsen, Deputy General Manager
INlTlAllNG DEPTIDIV
Administrativell-luman Resources
ISSUE: Changes to salary ranges require the approval of the Board of Directors.
BACKGROUND: The Programmer/Analyst position was created and approved in the 1996/97 Personnel Budget
to support the District's primary business applications that run in our AS/400 mid-range computer environment Many
of the District's aitieal business functions depend upon the AS/400 induding Payroll, Accounting, Purchasing, Sewer
Billing and the Permit Counter. In addition to these existing systems, a significant new application is being
implemented to automate the maintenance of plant equipment (the MAlNSAVER Application). The
Programmer/Analyst will maintain these systems, work dosely with software vendors to install updates and implement
enhancements, troubleshoot and resolve problems and write custom reports and modifications.
The salary for this new position was initially established at the ~ level ($3817-$4620). This was based primarily
on an intemal analysis of the District's current related positions. Recruitment for the position started in micl-July and
dosed approximately one month later. Advertisements were placed in the San Francisco Chronide, the San Jose
Mercury News, the Contra Costa Times, and the Sacramento Bee , as well as in a national AS/400 magazine, News
3X1400 which reaches over 70,000 AS/4oo professionals each month, and the Internet Finally, over 300 directed
letters of solicitation accompanied by promotional brochures prepared by Graphics staff were sent state wide to
select public agencies, universities, community-based organizations and MIS professionals.
Twenty-six inquiries were made regarding the position, but only nine applications were received. Of the nine
applications, only one was marginally qualified. The majority of the applicants had experience in large Mainframe
environments where their experience was limited to working with large teams of programmers and analysts coding
a small portion of a large project. This type of environment does not reflect the District's needs. As a small
organization we must recruit an individual experienced and skilled at all levels of application developmen~ from
working with users to developing specifications to the actual coding of programs through testing and finally
documentation and implementation. Several of the other applicants had significant experience in the AS/400
environment but at an operations level (completing backups, running reports, adding users) with little, if any, true
programming experience.
..~
ENGINEER
G:\SALARYUPWPD
8/6/96
September 13, 1996
Page 2 of 2
SUBJECT
CHANGE SAlARY RANGE FOR PROGRAMMER/ANALYST POSITION FROM G-68, $3817-$4620 to G-72,
$4201-$5086
In examining the advertising done by other corporations and agencies, staff found the market for applicants to be
extremely competitive, particularly in the Silicon Valley. Five full pages of dassified advertising in the major
newspapers were dedicated to computer positions alone. Moreover, the media has been reporting on the real
estate market in the Silicon Valley lately because of the "hor' job market The private sector has been forced to
offer incentive bonuses such as car leases, relocation financing, vacations and attractive salaries.
Acrordingly, demand for PS/400 professionals has dramatically increased recently. This has resulted in a scarcity
of qualified applicants and increased salary levels. The popularity of the AS/400 platfonn is driving these changes -
AS/400 installations doubled from 1994 to 1995. According to a recent artide in Computerworld. salaries for
N31400 Programmer/Analysts with 1-2 years experience has risen 13.3% from 1995 to 1996. The Contra Costa
Water District recently filled a similar position. While they initially listed their position at a comparable level to the
District (approximately $3850-$4700/month), they were forced to raise it an additional $650/month to attract
qualified candidates.
Many individuals in the computer field might feel that the District cannot compete with the glamour of employment
\Mth a high-tech Silicon Valley finn specializing in computer hardware or software; however, staff believes we can
attract an individual for whom stability, regular hours, a better commute, excellent benefits and broad
responsibilities will be appealing. If the Board approves this recommendation, staff will advertise the higher salary
in the next phase of recruiting. We are also considering contracting with a recruitment finn specializing in computer
personnel placement or a temporary placement agency to assist our HR office with the recruitment
The change in salary has been met and conferred upon with Local One. The Personnel Committee has
discussed this matter and recommends it for your approval.
RECOMMENDATION: Change the Programmer/Analyst salary range from G-68, $3817-$4620 to G-72, $4201-
$5086.