HomeMy WebLinkAboutAGENDA BACKUP 06-09-98
~
\"entral Contra Costa Sanitaa '/ District
BOARD OF DIRECTORS
111...111.11111.1:1'1111111:111.111...1.1 BOARD MErn~~~e 9, 1998
Page 1 of 2
NO.
4. CONSENT CALENDAR d
DATE
TYPE OF ACTION
May 18,1998
ACCEPT CONTRACT/AUTHORIZE NOTICE OF
SUBJECT
ACCEPT CONTRACT WORK FOR THE PAVEMENT REFURBISHMENT - PHASE I, DISTRICT PROJECT
6074, AND AUTHORIZE THE FILING OF THE NOTICE OF COMPLETION
SUBMITTED BY
James L. Belcher, Senior Engineer
INITIATING DEPTiOtV
Plant Operations/Operations
ISSUE: Construction has been completed on the Pavement Refurbishment Phase I Project, District
Project 6074, and the work is now ready for acceptance.
BACKGROUND: The employee's north parking lot was installed in 1982 and was at the end of its
expected lifespan. In recent years, numerous areas of pavement had failed (approximately 3,500
square feet), and the remaining area (approximately ~ acre) showed signs of severe fatigue. This
project replaced the failures with deep lift paving sections and installed a petromat fabric with a 1-1/2-
inch asphaltic concrete overlay over the entire parking lot (see Attachment I for project location).
Additional information can be found in the 1997-98 Capital Improvement Budget (CIB) on pages TP69
through TP70.
The Board of Directors authorized the award of a construction contract for this phase in the amount
of $38,591 to B&B Grading and Paving on April 2, 1998. The contractor was issued a Notice to
Proceed, which was effective May 4, 1998, with a required contract completion date of May 19,
1998. The District took beneficial use of Phase I on May 11, 1998, with all work for Phase I being
completed on May 18, 1998.
It is appropriate to accept the contract work at this time. The total authorized budget for Phase I of
this project is $102,550. An accounting of this phase of the project will be provided to the Board of
Directors at close out.
RECOMMENDATION: Accept contract work for construction of the Pavement Refurbishment Phase
I Project, District Project 6074, and authorize the filing of the Notice of Completion.
JM<
ROGER J. DOLAN
~Mt-
s:X ids\ 1998\607 4\NtcComplnPPr5 :\8105\ 1998\607 4\NtcComplnPPr. wpd
4/8/98
c
:3
o
...
....
o
<0
'"
..
~
<
'"
~ Central Contra Costa
~ Sanitary District
...
~
MAIN GATE
I
II
II
II
II
II
II
II
II
II
;,'/
o
t1
II
II
II
II
II
II
II
II
(,7
II
/
/
/
/
II
;I
;I
II
/
,I
..,
en
~
9i
::E
.;.,
...
PAVEMENT REFURBISHMENT - PHASE I
DISTRICT PROJECT 6074
PROJECT LOCATION
ATTACHMENT
1
-_.-----~---_.,,-_..~._---------~.~--'_._..._--"'-~>^.,--_._-~"-,.-'''', ....--...-.... ...-.., ......- .~.._--~--_._,--_.._-_._--,_....,..._..~.__._._.._---".~---.- .-.------........."-
~
Central Contra Costa Sanitary District
BOARD OF DIRECTORS
J'i.111111!lllliiili:lll.mlll:l.i:..:!J!i:1 BOARD MEETIJ~~e 9, 1998
Page 1 of 1
NO.
4. CONSENT CALENDAR e
DATE
TYPE OF ACTION
June 1, 1998
AUTHORIZE ATTENDANCE
SUBJ ECT
AUTHORIZE THE ATTENDANCE OF JONALEA OSTLUND, CHEMIST II, AT THE JUNE 18 AND 19,
1998, NORTHWESTERN ANALYTICAL INC., (f'NVA) TRAINING SEMINAR IN PORTLAND, OREGON,
AT A COST OF $1,300
SUBMITTED BY
Bhupinder Dhaliwal, Laboratory Superintendent
INITIATING DEPTIDIV
Plant Operations/Operations
iSSUE: Specific approval by the Board of Directors is required for travel outside of California if the expense
will exceed $500 and if the activity was not included in the current year Operations and Maintenance
Budget.
BACKGROUND: In 1992, the District Laboratory purchased a Ouality Assurance/Ouality Control (QA/OC)
software package from Northwestem Analytical Inc. (NWA). This software has been used to maintain and
process the District Laboratory's QA/OC data. With the help of this system, the Laboratory routinely
monitors the QA/OC program. The Laboratory prepares statistical QA/OC charts and reports. This system
was upgraded approximately two years ago.
Currently, the Laboratory is in the process of linking NWA with Laboratory Information Management System
(L1MS). Once that project is completed, the District Laboratory will use the NWA system through L1MS.
The NW A system has a lot of QA/OC data storage and processing potential that we have never fully
exploited. NWA has recently announced a training program on managing and use of an NWA system. The
training is scheduled for June 18 and 19, 1998, in Portland, Oregon.
Jonalea Ostlund is the District's QA/OC Coordinator. In this position, she handles, interprets, and prepares
OA/OC reports using the NWA system. This training will be beneficial to maximize the use of the NWA
system and will enable us to link NWA with L1MS.
There are sufficient funds in the L1MS Project budget (DP 6107) to cover the cost of her attendance at
this seminar.
RECOMMENDATION: Authorize the attendance of Jonalea Ostlund, Chemist II, at the f'NVA Training
Seminar in Portland, Oregon, on June 18 and 19, 1998, at a cost of $1,300.
BSO
DJC
JMK
INITIATING DEPARTMENTIDIVlSION
!SSP
7Jf~ 8~
S:\POSPAPR\ 1998-99\Ostlund.wpd
4/8/98
_.~--,----~---.~_._--'-_._-^_.-._.,-_._'-_..._._--'_..-_.._"."._-------------,------'~----
~
Central Contra Costa Sanitary District
BOARD OF DIRECTORS
Page 1 of 6
BOARD MEETING OF
June 9, 1998
NO.
5. HEARINGS a.
DATE
June 1, 1998
TYPE OF ACTION
CONDUCT HEARING
SUBJECT
CONDUCT A PUBLIC HEARING TO ESTABLISH REIMBURSEMENT FEES FOR THE LEONA COURT
CONTRACTUAL ASSESSMENT DISTRICT NO. 97-2
SUBMITTED BY
Jay S. McCoy, Environmental Services Division
Manager
INITIATING DEPT/DIV
Engineering Department/Environmental Services
Division
ISSUE: A public hearing is needed to establish fees.
BACKGROUND: The work to install sewer improvements in Leona Court through the Leona Court
Contractual Assessment District (C.A.D.) No. 97-2 has been completed. The final assessments for the
four participating property owners were established by the Board on May 7, 1998. There are four other
property owners on Leona Court who may connect their homes to the sewer built under Leona Court
C.A.D. No. 97-2. These owners have not participated in paying for the sewer improvements. They are
categorized as nonparticipants. If and when these nonparticipants connect their homes to the sewer in
Leona Court, a reimbursement fee will be collected from each of them. The reimbursement fees will
equalize the investment in, and fairly and equitably distribute the cost of, the sewer improvements in
Leona Court between the participating and nonparticipating owners.
Establishment of the reimbursement fees must be done by the Board in conjunction with a public
hearing. At its meeting on May 7, 1998, the Board established June 9, 1998, as the date for such a
public hearing. As the four nonparticipants connect their homes, each nonparticipant will be required to
pay standard "connection fees" consisting of capital improvement and connection fees. In addition a
reimbursement fee will be collected from each nonparticipant and will be used to equalize the
assessments for the participants and the subsequent connectors. At any point in time, the
reimbursement fee will equal the resultant assessments (prior assessment less a portion of the
reimbursement fee). As illustrated on the attached table, each participant's assessment (if paid over ten
years) is $18,648. These assessments were established by the Board on May 7 for the four participants.
When the first nonparticipant connects their home, a reimbursement fee of $14,918 will be collected and
divided equally between the four participants such that all four participants' assessments will be reduced
to $14,918. At that time the four participants and the new connector will have the same financial
obligation.
H:\JAY\LEONACD2\Hearing Reimb Chg.PP.wpd
4/8/98
DATE
June 1, 1998
Page 2 of 6
SUBJECT
CONDUCT A PUBLIC HEARING TO ESTABLISH REIMBURSEMENT FEES FOR THE LEONA COURT
CONTRACTUAL ASSESSMENT DISTRICT NO. 97-2
The reimbursement fees are summarized below:
Nonparticipant
Connection
Reimbursement
Fee
First
Second
Third
Fourth
$14,918
$12,432
$10,656
$ 9,324
These reimbursement fees are fixed for a 30-year period. The 30-year period was established in the
agreement between the participants and the District. The reimbursement fees will not be collected after
the year 2028.
RECOMMENDATION: Adopt a resolution establishing reimbursement fees for Leona Court C.A.D.
No. 97-2.
H:\JAY\LEONACD2\Hearing Reimb Chg.PP.wpd
4/8/98
tJ)
w
W
LL
I-
Z
w
~
w
tJ)
e::
:J
D3
~
W
a:
N
I
.......
0)
.
o
z
.
c
.
<I;
U
l-
e::
:J
o
u
<t
z
o
W
...I
c
~
w
aJ
o
I-
~
Z
w
::!:
U)
U)
w
U)
U)
<t
...I
;:
o
l-
II
N
en
it)
~
.....
0-
U)
0::
~
>
Z
w
I-
0::
w
>
o
c
~
~
I-
Z
w
::!:
U)
U)
W
U)
U)
<t
II
~
ai
~
0-
... "C
~ ~ Iii III
iil ~ J!l al
c!<t~LL
!~ ~
C, Gl
ci'scn
€'i~~J!
~c,i~'"
Ol:c,t:5i
LL 0 ,- 'ai E
Z a:
... "C
j ~ : ~
j<t~LL
J!~
~il
~u:
Cf's
,;611l~al
'E . LL
,- c, i ~ ...
j!: l5 ,9- 'ai 5i
Z a: E
... "C
j ~ Iii III
iil !8 J!l al
c!~~LL
J!t:
If ~
tSU:
]'~~ ~J!
c,i~'"
l5 ,9- 'ai 5i
z a: E
jii~
j~1
J! ~
~sil
ci' u:
III ...
~ ~
il :~ ~ al
U:i~LL
l5 'ai
za:
~iJ!l
:f ~ ~
11.
'<t
C'.I
M
a)
^
C'.I
M
~
....
v
<<>
LD
<<>
o
....
^
<<>
"
"
v
C'.I
M
'<t
N
....
^
<<>
CO
'<t
N
V
CO
....
m
..t
....
^
o
M
"
M
V
CO
<b
cO
....
<I>
'<t
C'.I
M
a)
^
C'.I
M
~
....
V
<<>
LD
<<>
o
....
^
<<>
"
I':.
....
V
C'.I
M
'<t
N
....
^
<<>
CO
'<t
N
V
CO
....
m
..t
....
^
o
M
"
M
V
CO
<b
cO
....
'<t
C'.I
M
a)
^
C'.I
M
~
....
V
<<>
LD
<<>
o
....
^
<<>
"
I':.
V
C'.I
M
'<t
N
....
^
<<>
CO
'<t
N
V
co
....
m
..t
....
^
o
M
"
M
V
CO
<b
cO
....
'<t
C'.I
M
a)
^
C'.I
M
~
V
<<>
LD
<<>
o
....
^
<<>
"
I':.
V
C'.I
M
'<t
N
....
^
<<>
CO
'<t
N
V
co
....
m
..t
....
^
o
M
"
M
V
co
<b
cO
....
'<t
C'.I
M
a)
^
C'.I
M
~
V
<<>
LD
<<>
o
....
^
<<>
"
I':.
....
V
C'.I
M
'<t
N
....
^
<<>
CO
'<t
N
V
CO
....
m
..t
CO
....
m
..t
....
'<t
C'.I
M
a)
^
C'.I
M
~
V
<<>
LD
<<>
o
....
^
<<>
"
I':.
....
V
C'.I
M
'<t
N
....
C'.I
M
'<t
N
....
CO
....
m
..t
....
<I>
II
LD
+
C'.I
m
LD
..t
"
<I>
'<t
C'.I
M
a)
'<t
C'.I
M
a)
<I>
II
CO
+
C'.I
m
LD
'<t ..t
C'.I "
M <I>
a)
^
C'.I
M
~
V
<<>
LD
<<>
o
....
<<>
LD
<<>
~Io-
<I>
co
OJ
00
~
<<>
LD
<<>
o
....
II
"
+
C'.I
ffilo-
..t
"
<I>
C'.I
M
'<t
N
....
<I>
II
<<>
+
C'.I
m
LD
..t
"
<I>
"0
Co
~
a.:
a.
Cl
.r::
U
.c
E
OQi
cr:
Cl
o~
Co
Q)
:c
N
o
u
<l:
z
o
UJ
....J
>=
<l:
~
:c
.... C'.I M '<t LD <<> " CO m
RESOLUTION NO. 98-
RESOLUTION ESTABLISHING REIMBURSEMENT FEES
DEMONSTRATION PROJECT -- LEONA COURT CONTRACTUAL ASSESSMENT DISTRICT
NO. 97-2
The Board of Directors of the Central Contra Costa Sanitary District resolves:
This Board established final assessments for the Demonstration Project -- Leona Court
Contractual Assessment District No. 97-2, Central Contra Costa Sanitary District, Contra Costa
County, California, on May 7, 1998, and now makes the following findings and orders.
1 . The Board found that the owners of four properties on Leona Court (addresses 109, 117,
132, and 140) have not participated in paying for the sewer improvements installed in
Leona Court through the Leona Court Contractual Assessment District
No. 97-2.
2. The Board determined that the collection of reimbursement fees from the owners who did
not participate in paying for the sewer improvements will equalize the investment in, and
fairly and equitably distribute the cost of, said seyver improvements among all owners on
Leona Court.
3. The Board established June 9, 1998, as the date for a public hearing to establish
reimbursement fees for Leona Court Contractual Assessment District No. 97-2.
4. Notice of the public hearing was provided to the affected property owners.
U:\Admin\McCoy\RESREIMB. WPD
Resolution No. 98-_
Page 2
5. At the time and place for which notice was given, the Board conducted a public hearing
and gave every person present an opportunity to comment on and object to the proposed
reimbursement fees.
6. The Board finds that no written or oral protests against the proposed reimbursement fees
were made.
7. The Board further finds that the following reimbursement fees, when collected, will equalize
the investment on and fairly and equitably distribute the cost of, the Leona Court sewer
improvements among all eight owners on Leona Court.
Connection by Owner Who Did Not
Participate
Reimbursement Fee
Rrst $14,918
Second $1 2,432
Third $10,656
Fourth $ 9,324
8. This Board orders the establishment of the reimbursement fees described in paragraph 7 and
the collection of said fees as a condition of sewer connections for 109, 117, 132, and 140
Leona Court. These fees will be in effect until June 9, 2028, after which time the fees will
be void. If a sewer connection from 109, 117, 132, or 140 Leona Court is made after
June 9, 2028, no reimbursement fee will be collected.
U :\Admin\McCoy\RESREIMB. WPD
Resolution No. 98-_
Page 3
PASSED AND ADOPTED this 9th day of June, 1998, by the Board of Directors of the
Central Contra Costa Sanitary District by the following vote:
AYES:
Members:
NOES:
Members:
ABSENT:
Members:
COUNTERSIGNED:
Joyce E. Murphy
Secretary, Central Contra Costa
Sanitary District, County of Contra Costa
State of California
APPROVED AS TO FORM:
U :\Admin\McCoy\RESREIMB. WPD
James A. Nejedly
President of the Board of Directors
Central Contra Costa Sanitary District
County of Contra Costa, State of California
Kenton L. Aim
District Counsel
~
C
"0
~
o
c
o
..
~
a.
..
u
..,;;
o
100
FEET
..
(5
u
'"
· Central Contra Costa
Sanitary District
/
Reimbursement
Fee
$14,918
$12,432
$10,656
$ 9,324
;
PLAN OF IMPROVEMENT
LEONA COURT
CONTRACTUAL ASSESSMENT DISTRICT
C.A.D. NO. 97-2
....
'"
l!!
~
~
Central Contra Costa Sanitary District
BOARD OF DIRECTORS
........ .. ... .. .. . .........
.. ............ ... ............ ............ .................
::rnleS'es'lml"'.a;:.::rn:Kmrscn:::::mm BOARD MEETING OF
~\?~!~~~::::~~~~~~~~~L).~~:~I~~f~m.f0~~~:~~t~r~ June 9, 1 998
Page 1 of 1 7
NO.
5.
HEARINGS b.
DATE
TYPE OF ACTION
June 1, 1 998
CONDUCT PUBLIC HEARING
SUBJ ECT
CONDUCT PUBLIC HEARINGS TO RECEIVE PUBLIC COMMENT ON THE 1998-1999 OPERATIONS AND
MAINTENANCE BUDGET AND THE SELF-INSURANCE FUND BUDGET AND ON PLACING THE SEWER
SERVICE CHARGES ON THE COUNTY TAX ROLL FOR COLLECTION
SUBMITTED BY
Debbie Ratcliff, Controller
INITIATING DEPTJDIV
Administrative/Finance & Accounting
.ISSUE: The District Codes and State law require holding Public Hearings to place the Sewer Service Charges
on the County tax roll for collection.
BACKGROUND: The 1998-1999 Operations and Maintenance (O&M) Budget was submitted for review at
the May 21,1998 Board Meeting. A detailed presentation was made to the Board at that meeting, and a
copy of the overheads that were used is attached. (See Attachment I.) Staff received guidance from the
Board at the February 19, 1998 Board Meeting to calculate the budget revenue on the basis of holding the
Sewer Service Charge constant at the current rate of $188 for the 1998-1999 Budget, allocating $157 to
fund O&M expenses, and $31 to the Sewer Construction Fund to help defray capital expenditures.
Notice of the June 9, 1998 Public Hearing to consider collection of the 1998-1999 Sewer Service Charges
on the County tax roll was duly given. It is recommended that two separate hearings be held to consider
the matters described.
Hearing to receive public comment on the 1998-1999 Operations and Maintenance (O&M) Budget and Self-
Insurance Fund Budget:
The 1 998-1999 O&M Budget and Self-Insurance Fund Budget were submitted to the Board of
Directors for initial review at the May 21, 1998 Board Meeting and the April 16, 1998 Board Meeting
respectively and are scheduled for approval at the June 9, 1998 Board Meeting. The Board
established the Sewer Service Charge to remain at $188 at the February 19, 1998 meeting.
Hearing to consider collection of the 1998-1999 Sewer Service Charges on the County tax roll:
The law requires that a Public Hearing be held each year before the Sewer Service Charge can be
placed on the County tax roll. The Sewer Service Charge has been collected on the County tax roll
since inception of the service charge in 1976. Collection on the tax roll provides the most
economical and efficient means for the District to collect the charges for approximately 98,000
accounts.
INITIATING DEP~SION
PM
DR
5 :\ADMIN\POS P APER\O&MSELF. PP
9/16/96
DATE
June 1, 1998
Page 2 of 17
SUBJECT
CONDUCT PUBLIC HEARING S TO RECEIVE PUBLIC COMMENT ON THE 1998-1999 OPERATIONS AND
MAINTENANCE BUDGET AND THE SELF-INSURANCE FUND BUDGET AND ON PLACING THE SEWER
SERVICE CHARGES ON THE COUNTY TAX ROLL FOR COLLECTION
Effective with the 1982-1983 fiscal year, Contra Costa County imposed a fee for collecting the Sewer
Service Charge on the tax roll. The County fee, which approximates $80,500 annually, is still more
economical than the alternative of direct billing by the District.
RECOMMENDATION: Conduct two separate Public Hearings and upon their respective conclusions, take the
following actions, if considered appropriate:
. Approve the 1998-1999 Operations and Maintenance Budget and Self-Insurance Fund Budget.
. Approve a resolution authorizing collection of the 1998-1999 Sewer Service Charges on the County
tax roll.
Attachment I
Page 3 of 17
Central Contra Costa Sanitary District
o & M REVENUES, EXPENSES, AND RESERVES
FISCAL YEARS 1996-97 THROUGH 1998-99
(000 Omitted)
1996-97
Actual
Current
1997 -98
Projected
Revenues:
Sewer Service Charge
$22,046
$22,611
City of Concord
4,828
4,700
Other
1, 130
2,371
Total Revenues
$28.004
$29.682
Expenses:
Total Net Expenses
$ 27 . 1 50
$29.645
Fund Balance-Beginning of
Year
$ 6,697
$ 7,551
.--
Revenues Over Expenses
854
37
Fund Balance - End of Year
$ 7.551
$ 7.588
Sewer Service Charge Rate
$ 188
$ 188
Sewer Service Equivalent
S:\BUOGffi 1998-99\O&MRERES.OH.wpd
1998-99
Budget
$22,770
5,100
3,298
$31,168
$32.827. .
$ 7,588
(1,659)
$ 5.929
$ 188
145,000
Page 4 of 17
Central Contra Costa Sanitary District
KEY LABOR COSTS
(000 Omitted)
1997-98
Budget
1998-99
.Budget
Increase
{Decrease 1
Salaries & Wages $14,289 $14,748
459
Retirement 2,650 2,999
349
Medical Insurance 1,405 1,465
60
Workers' Compo
Insurance 60 122
62
Capitalized Adm.
Overhead (899) (1, 164)
(265)
All Other 1,951 2.018
67
TOTAL LABOR
COSTS $19,456 $20,188
$732
ADS\S:\BUDGET\ 1 998-99\Keylabor.OH.wpd
KEY INCREASES
1997-1998 BUDGET
TO
1998-1999 BUDGET
1997-1998 BUDGET
COP INTEREST
SALARIES AND BENEFITS
HHW
TECHNICAL SERVICES
RECYCLED WATER
MATERIALS AND SUPPLIES
ELECTION EXPENSE
ALL OTHER
1998-1999 BUDGET
S:\BUDGET\ 1998-99\98&99BUDGETBREAKDOWN. wpd
Page 5 of 17
$29,280,000
1,389,000
731,000
565,000
276,000
213,000
104,000
65,000
204.,000
$32.827.000
Page 6 of 17
SJelloa -
w-
-
0 0 0 0 0 (1)
0 0 II) II) 0 C)
~
ll::t M N ..... ..... ca
W- W- W- W- W- J:
CI.) ! (.)
0)
UJ ~ (1)
(.)
co "S:
s::: 0) ~
G)
CI.) en
co "-
C. ~---------------------~~~- -~ C1)
I ...... 3:
>< 0) (1)
i en
I
W ...... ,
I 0)
I
----r -- ......
co
~ , 0)
i
I
I
I CD
CI.) 0)
_____.__1 ---~----~- .....
Lt)
:::::I 0) -
0
0
s::: Lt) 0
~ n
O)CtS 0
CI.) ~CI) 0
0
> 0)> W-
-
-
CtS C1)
CI.) ll::to en
O)U) c:
a: M"- G)
0)L1. Co
><
w
:E M I
~
.
~ 0) I
0 N
~
.....
.... 0) -
0
(.) 0
..... 0
n
-- ~ 0
l- e 0
0) 0
.... W-
UJ -
0 (1)
~
-- 0) c:
C -- -.......
I 0) G)
I Q) >
I
i C1)
a:
ll::t N 0 co CD ll::t N
M M M N N N N I
W- W- W- W- W- W- W-
(SUO!lI!W) sJelloa .
I
Page 7 of 17
Central Contra Costa Sanitary District
Comparison of Budgeted O&M Expenses
Fiscal Year 1997-98 and 1998-99
(000 Omitted)
Department
1997 -98
Budget
1998-99
Budget
Increase
< Decrease>
Amount %
Administrative
$ 5,746
$ 6,467 $ 721 12.5
Engineering
4,676
6,810 2,134 45.6
Collection Systems Ops.
4,519
4,519 0 0
Plant Operations
13,141
13,713 572 4.4
Pumping Stations
-L198
1,318 ---.12!L 10.0
Total
$29.280
$32.827 $3.547 12.1 %
S:\BUDGm 1998-99\O&MCOMP.OH.wpd
Page 8 of 17
Proposed O&M Budget
ADMINISTRATIVE DEPARTMENT 1998-1999
97/98
Budget
98/99
Proposed
Budget
Increase
%
$5,746,179
$6,466,621
$720,442
12.54
Program Savings
Page 9 of 17
ADMINISTRATIVE DEPARTMENT 1998-1999
Budget Reductions/Cuts
· General repairs and maintenance for HOB
· Major real property repairs, such as:
painting and asphalt resurfacing completed
· Public information for the Pollution
Prevention Program
· All other accounts
TOTAL
Savings
($ 6,000)
($ 23,000)
($ 35,900)
[$ 4.700).
{$ 69.6001
Page 10 of 17
Special Program Changes
ADMINISTRATIVE DEPARTMENT 1998-1999
Transfer of Safety Unit Responsibilities
· 1998-1999 O&M Budget transfers Safety
Expenditures to the Safety and Risk Management
Division of the Administrative Department
- 1998-1999 O&M Budget reflects the transfer of
Salaries & Benefits, Safety-related items and services
from POD and CSO.
- Salaries, Wages, Benefits
- Safety Program Costs
$213,400
58.900
TOTAL
$272.300
O&M Programs
Page 11 of 17
ADMINISTRATIVE DEPARTMENT 1998-1999
Proposed
Budget 98/99 to
Budget 97/98
Program
· Salaries, Wages and Benefits:
- Safety staff consolidation
- Classification changes, MOU and benefits
cost increases, including all Retirees
Total
· Safety Program Costs
· Election Expenses
$213,400
307,000
$520.400
58.900
65.000
Page 12 of 17
O&M Programs (continued)
ADMINISTRATIVE DEPARTMENT 1998-1999
· Utilities:
- Telephone, new lines and increased usage $ 12.000
· Professional and Legal Services:
- Legal fees in Human Resources,
Central Services and Finance areas 20.000
· Outside Services:
- Contractual cost increase for
Reprographic Services contractor
- Consulting services, including strategic
planning, supply management program,
AS/400 Year 2000 compliance, and
sexual harassment training
- Recruitment advertisement costs, and
services otsearch firm(s)
· All Other Expenses:
12.000
51.600
18.000
35.300
TOTAL $793~200
Page 13 of 17
Proposed O&M Budget
ENGINEERING DEPARTMENT 1998-1999
1997-98
Budget
1998-99
Proposed
Budget Increase
%
$4,676,067
$6,810,366 $2,134,299
45.64
Page 14 of 17
Cost Comparison Budget to Budget
ENGINEERING DEPARTMENT 1998-1999
Salaries & Wages - MGT. & Non MGT.
· HHW Staff
· Lower number of Co-ops/SS
· Eliminate MGT. Position
· Changes in orr and Capital charges
Proposed
98/99 Budget to
97/98 Budget
<$19,011 >
Benefits
· Changes to Capital Overhead
Utilities/Hauling & Disposal
· Utilities
· Janitorial Service for HHW Facility
· Hazarduos Waste Disposal
Outside services
· Mapping Services
Materials and Supplies
· HHW Supplies
Interest Expense
· Interest on COP/Recycled Water loan
<144,956>
590,525
154,190
90,454
1,451,951
All Other
11 .146
$2.134.299
Page 15 of 17
Proposed O&M Budget
COLLECTION SYSTEM OPERATIONS DEPARTMENT 1998-1999
1997-98
Budget
1998-99
Proposed
Decrease
%
$4,518,862
$4,518,126
$736
0.02
Page 16 of 17
O&M Programs
PLANT OPERATIONS DEPARTMENT 1998-1999
Program
Proposed
98/99 Budget to
97/98 Budget
General and Inflationary Increases:
· Salary and Wages
· Benefits
Chemicals
Utilities
· Natural Gas
· Landfill Gas
· Electrical
Maintenance
· General & Computer Repairs
· Outside Repairs
Outside Services
· Technical Services
· Other
$ 176,925
130,519
74,220
264,324
44,625
(207,991 )
19,280
103,400
80,780
6,707
$692,789
Page 17 of 17
Program Savings or Deferred
PLANT OPERATIONS DEPARTMENT 1998-1999
Budget Reduction/Cuts
Savings
Utilities
· Electrical
$ 207,911
~
BOARD OF DIRECTORS
:1:11.111~11111111111111:.III.III~I.::II..I.I:.:111111.!.:.!.:\ BOARD MEETING OF
Central Contra Costa Sanitary District
Page 1 of 3
NO.
MAY 19,1998
5.
HEARINGS c.
DATE
TYPE OF ACTION
CONDUCT PUBLIC HEARING, APPROVE CIB/CIP
SUBJECT
CONDUCT A PUBLIC HEARING ON THE DRAFT FISCAL YEAR 1998-99 CAPITAL IMPROVEMENT
BUDGET (CIB) DRAFT 1998 TEN-YEAR CAPITAL IMPROVEMENT PLAN (CIP), APPROVE THE 1998 CIP,
AND APPROVE THE CIB FOR INCLUSION IN THE 1998-99 DISTRICT BUDGET
SUBMITTED BY
John J. Mercurio, Management Analyst
INITIATING DEPTIDIV
Engineering/Environmental Services
ISSUE: The Board of Directors has established June 9, 1998, as the date for a public hearing on the
draft Fiscal Year 1998-99 CIB/1998 Ten-Year CIP. Separate Board approval of the CIP and the CIB for
inclusion in the 1998-99 District Budget is requested.
BACKGROUND: The CIP provides the basis for project prioritizing and scheduling, staffing, and long-range
financial planning. The CIP also serves as the framework for capital fee decisions. The draft 1998 CIP
covers the ten-year period from 1998-99 through 2007-08. The draft plan includes expenditures totaling
$199.9 million (1998 dollars) over ten years.
The CIB provides a detailed presentation of the schedules and cost estimates for projects proposed for
the first year of the ten-year planning period. It also provides for the Board's authorization of funds from
the Sewer Construction Fund to the Treatment Plant, Collection System, General Improvements and
Recycled Water Programs.
A review draft CIB/CIP was submitted to the Board of Directors on April 2, 1998. A Board Workshop
to discuss the review draft was held on April 13, 1998. It is appropriate for the Board to receive
comments from the public prior to considering approval of the CIB/CIP. June 9, 1998, was established
by the Board as the date for a public hearing to receive these comments, and appropriate notices have
been posted and published. A revised draft incorporating corrections and changes discussed at the
workshop was prepared and distributed to the Board under separate cover.
Capital Budget Authorization
Adoption of the CIB with the 1998-99 District Budget will authorize an additional $25,952,000 from the
Sewer Construction Fund for planning, design, and construction of capital improvement projects in the
Treatment Plant, Collection System, General Improvements and Recycled Water Programs. In addition
to the new funding authorization, a carry-over of approximately $32,118,000 from Board authorizations
in previous years is anticipated, resulting in a total Fiscal Year 1998-99 authorized funding level of
$58,070,000. The distribution of the funding authorization to the four capital improvement programs is
shown on Attachment 1.
JJM
Y4~
INITIATING DEPARTMENTIDIVlSlON
k
JSM
H:\DA T A \POSPAPER\CIPCIB98-99 .PPR. wpd
9/16/96
_______M_______,..__.____~___~._~____..___,."_.._..._--.---.----.-..,.-..--...-...--,,-+.---....-...-~.---.....-,-.-..~,..-, ..---.-,..-,-.,.----~._---_..-_._'->-
DATE
May 19, 1998
Page 2 of 3
SUBJECT
CONDUCT A PUBLIC HEARING ON THE DRAFT FISCAL YEAR 1998-99 CAPITAL IMPROVEMENT
BUDGET (CIB) DRAFT 1998 TEN-YEAR CAPITAL IMPROVEMENT PlAN (CIP), APPROVE THE 1998
CIP, AND APPROVE THE CIB FOR INCLUSION IN THE 1998-99 DISTRICT BUDGET
Ten-YearCap~aIPmn
In order to accommodate the cash-flow needs resulting from the timing of required expenditures
versus the receipt of revenues, the Sewer Construction Fund is currently managed to have a prudent
reserve of 75 percent of the following year's anticipated project expenditures plus 100 percent of
debt retirement service at the end of each fiscal year (June 30).
The draft 1998 CIP includes $63.7 million (1998 dollars) for Treatment Plant projects (32% of total
expenditures), $123.0 million for Collection System projects (62% of total expenditures), $6.8 million
for General Improvements projects (3% of total expenditures), and $6.4 million for Recycled Water
projects (3 % of total expenditures) over the next 10 years.
The District's practice of allocating a portion of the annual Sewer Service Charge for capital facilities
upwade and replacement was first instituted in 1992-93 at $5 per Residential Unit Equivalent (RUE).
This component was increased to $25/RUE in 1993-94, to $28/RUE in 1994-95, and to $31/RUE
in FY 1995-96. This component amount has remained stable since FY 1996-97, and is proposed to
be continued without an adjustment in FY 1998-99.
Staff has evaluated the CIB/CIP and concluded that they are exempt from the California
Environmental Quality Act (CEOA) under District CEOA Guidelines Section 17.3, since they are
planning studies. Board of Directors' approval of the budget and plan will establish their independent
finding that these documents are exempt from CEOA.
RECOMMENDAll0N: Conduct a public hearing to receive comments on the CIB/CIP. Approve the
draft 1998 CIP. Approve the CIB for inclusion in the 1998-99 District Budget.
ATTACHMENT 1
Page 3 of 3
CAPITAL IMPROVEMENT BUDGET SUMMARY FY 1998-99
Carry Over Additional Total
Program From Authorization Proposed
FY 1997-98 Requested Authorization
Treatment Plant 6,323,000 9,119,000 15,442,000
Collection System 25,320,000 15,299,000 40,619,000
General Improvements 258,000 954,000 1,212,000
Recycled Water 217,000 580,000 797,000
Total FY 1998-99 32,118,000 25,952,000 58,070,000
----_.,--_._~~------------"---'--_. ..-.------.--
I---l
\0 ~
n \0
~ ~ 00 ~
n
Io-ol . Q.. to
f""+ ~
a ~ ~
Io-ol . Io-ol .
~ (fl f""+ ~
~ (j a n
a
g ~ ::r=
~.g
0
(D < tIj
\0 (I) ~
'" (I) ~ 0
~ 3
\0 <
\0 (I) I---l (I)
00 a \0 s
\0
to 00 (I)
I a
= \0 0
Q.. \0 ~
(JQ ~
(I) ~
f""+
. .
:> ~
0..
0 ~
~ ""'1
f"""'I'o. 0
~. -<
0 a
t;j
0 0 ~
~ ~ \C
(l (l \C
~ ~ oc
OJ ~
. Ro n
.
.
. (l ~
. ~
. ~ rJ1
. to "-
.
. . ~ ~
. . =r
. . ~
.
. tD
. .
. . Q.
. . ~
. .
~ ~ = \C
S t;j ... \C
("1) ("1) tD oc
~ \0 I
00 -.. \C
-.. ~ \C
~ \0
\0 \0 n
\0 00
00 ~
=
~
~
\0
\0
.
00
3
~.
~
~
~.
o
:::s
I
~
(()
(j
~
(j
~
(()
0..
~
a.
(()
1-1
.
I--ol
o
I
~
\0
\0
00
n
~
..... .
~
~
Ot
< ~
~ S
~.~
(t) ~
~ ~
(t)
S
(t)
~
~
~
I '
~
~
I I I
o (J ::;3
(() 0 (() (D
~ == a. e;
1-1 (() ~
~ g. ~ ~
~ ~. (() l.J...J
~ S a ~
s ~ ~
~ rJJ. ~ (D
~ ~ ~ 5-
~ ~ f"'"+- ...... .
(() (() ~
sse;
(() (D
a rJJ
00
~
.........
tv 0\
W W
. .
o .......:J
S 3
~. ~. ~. ~.
~ ~ ~ ~
~ ~ ~ ~
~. ~. ~. ~.
o 0 0 0
:::s :::s :::s :::s
0\ 0\
. .
w 00
3 S
.
I I I I > n
~ 0 (J ~ ~
~
(1) (1) 0 (1) 0
() = ....... g
~ ....... ~
(1) (1) I--' · ~.
() ~ () N ~
....... ~
(1) t-+- (1) ~ ~
....... ..... .
Q.. ~ 0 a t .
I--' ·
~ .g = ~ 0 ~
rLJ. ....... t::1 S
a ~ ~ ~ 0
(1) 0 00
< t-+- t-+- Hj ~
~ (1)
(1) >
s s ~
(1) 0.. 0
a 0- -<
I--' ·
00 f'""+- (D
I--' ·
0 S
t::1
~ CD
I--'
~ t:i
S ~
~ OJ
{t; 0..
N ~ V'J ~
Ul Ul \0 . .
.... .... .... ~
\0 Ul \0 N ~
Ul 00 Ul \0 ~ (JQ
~ 0 ~ \0 \0 (D
.... .... .... .... ....
0 0 0 0 0 ~
0 0 0 0 0
0 0 0 0 0
GOALS
Ye{(:Y:t:.:.sr{.:~-:<<:""{.:.:~..:trL~.sra:::::.:-:Y"-:m.:.~&<<:::~.:::::::::t::~:W-~....::=.w%X:::W:.w~..x::-:$::"~*~~:::t="${~:$":=:r&::r::::::-::"~:~~{~::"::r-:::::~{~~:~ii:LEi~::'
· Protect Public Health and Environment
· Accommodate Planned Future Growth
· Respond to Community Concern
MAJOR GOALS COST SUMMARY 1998 TEN-
YEAR CAPITAL IMPROVEMENT PLAN
COLLECTION SYSTEM PROGRAM
~.<<@~--*?::::-{f.:"{x:rRmf..W@;.:::{{f%:#"W.<<::?::;:-{::::-~;-:::::&~h?S*f.:X:f:::::::'::3X::::::*:::::?"X:::::'"::::::::::ff;;::;:;::"f.:"1@::::::::::;:::X:::::;::::;"::~W;::'-::({~::::@.<<:w:W.4r.-:::f::::::::::-{:::::f{::::-:?::::*,g~W'"ff..:e:::-..x:::::r..wGW&f.:"~::X
MA.fOR GOALS PRO.fRCT GOAT,S
COSTS (199R$)
$ 80,549,000
PROTECT PUBLIC . ELIMINATE SEWER OVERFLOW FROM A FIVE-
HEALTH AND YEAR RETURN STORM EVENT BY 2005
ENVIRONMENT
. ELIMINATE SEWER OVERFLOW FROM A 20-
YEAR RETURN FREQUENCY EVENT BY 2015
ACCOMMODATE
FUTURE
GROWTH
. PUMPING STATION IMPROVEMENTS
- IMPROVE RELIABILITY; AVOID OVERFLOWS
TO EBMUD WATERSHEDS
- EXPAND CAPACITY TO ELIMINATE SEWAGE
BYPASSES
. INCLUDE CAPACITY TO ELIMINATE WET
WEATHER SEWAGE OVERFLOWS TO
ACCOMMODATE FUTURE GROWTH PROJECTED
TO "BUILD OUT" IN EACH SEWER'S TRIBUTARY
AREA
29,644,000
RESPOND TO
COMMUNITY
CONCERNS
. REPAIR OR REPLACE FACILITIES WHICH
CURRENTL Y REQUIRE EXCESSIVE
MAINTEN ANCE
. REDUCE O&M CO STS
. CONTROL ODOR EMISSIONS
12,777,000
TEN- YEAR TOTAL
$17.7. 970000
MAJOR GOALS COST SUMMARY 1998 TEN-
YEAR CAPITAL IMPROVEMENT PLAN
TREATMENT PLANT PROGRAM
m:::::,::,:iW([awX&,::::::::-::::""-m*,::I::::~,,;-:ml",E:::i:1lilEl mm::m:mlc::o:m iiiim ::I:m: -IIi!! 1iC111I1 lie,,, lilllI mil ljE1EI Iii !jiii :elll -iiill II:m !Ii; me;: mr:iElil::::,illl iiii:: "*'*'
MAJOR ("-.OAT S PRfiTFrT (,,-.OATS ("l)S1S (1~$)
PROlECT PUBUC . REDU::EHEADWORKS RAW SEWAGE BYPASSES 10 $ 47,831,000
lEALlHAND BEN) MOOEFREQUENT 1HAN OM:E IN 20 YEARS
ENVIRONMENT . IMPROVE PlANT WEfWEAlliERFLOW HANDLING
CAPAOlY
. UPGRADEEMISSICNS CCNfROL SYSIEMS ill MEET
AIRPCllUIICN REQUIREMENTS
ACCU\1MODA1E . EXPAND PRIMARY; SECUIDARY, AND SCUDS 9,175,000
RJIlJRE GROWIH 1REA1MINfFACIUIlES
RESPONDID . CDNSIROCf (]X)RCONIRCL FACILITIES 6,703,000
COMMUNITY . REIllCE <:m1 cnSfS
CO~
1EN- YEAR JUrAL $ 63,700,000
MAJOR GOALS COST SUMMARY
1998 TEN- YEAR CAPITAL IMPROVEMENT PLAN
RECYCLED WATER PROGRAM
"im::!'" "m,:e ..,:T:;;:!i .,e-:':"[--"",?'W'-;=T',::m!C:, ",i!:ui:c;":::i:'!'r((&:<<::<]i""":":::,i2!f1l ;;,'!!;,;mor':!!-l!m:m?'l:: :li:es: :ei!!!ilmme:m:e:!l?-m:e ::mm: mi ilIm mil!!!: imrm:l':m,!:mm
MA.TOR GOALS
PROTECT PUBLIC
HEALTH AND
ENVIRONMENT
RESPOND TO
COMMUNITY
CONCERNS
PRO.fRCT GO AT,S
. MEET STATE DEPARTMENT OF HEALTH
SER VICES TITLE 22 REQUIREMENTS FOR
RECYCLED WATER
. PRODUCE RECYCLED WATER QUALITY
SUITABLE FOR INDUSTRIAL USES
. REDUCE DEMAND FOR FRESH WATER
DIVERSIONS FROM THE DELTA BY SUPPLYING
RECYCLED WATER
· MAXIMIZE USE OF EXISTING DISTRICT
RECYCLED WATER F ACIUTIES
. COORDINATE WITH WCAL WATER DISTRICTS
. MINIMIZE DROUGHT IMPACTS ON LOCAL
ECONOMY
. INCREASE SUPPLY AND RELIABILITY OF
RECYCLED WATER FOR IRRIGATION USES
TEN- YEAR TOTAL
COS TS (199R$)
$ 4,819,000
1,570,000
$6 3&9 000
MAJOR GOALS COST SUMMARY
1998 TEN- YEAR CAPITAL IMPROVEMENT PLAN
GENERAL IMPROVEMENTS PROGRAM
~:wY$>>"'::~*~~.&:?5!' ::.;;::: "~r. ::: n~~~~-:-~~-:-:-:-;-:.::*".::;::;:~~*"~:=:=:=~~~::-.::=:;:=:::;:;:;:::;::==:;:;.;::==:::::::;:;:x*=:::ili::::::::W&--*t.r&r4it?-&-"&;:::::?::"~ff$';::::~~~"'::;:;-;'i.?'.?''''::;::=*"/..::::::::~<<.w~:::
M A.TOR r.OA T.S PRO.TRCT r.OAT.S
COS TS (199R$)
PROTECT PUBLIC · PROVIDE SAFETY IMPROVEMENTS AND
HEALTH AND TECHNICAL EQUIPMENT
ENVIRONMENT
$2,063,000
RESPOND TO . INCREASE EFFECTIVENESS OF MAP
COMMUNITY PRODUCTION AND DATA MANAGEMENT
CONCERNS
4 77() 000
· REDUCE O&M COSTS
TEN-YEAR TOTAL
$() R19 000
--'---'---'--"-'.~~'-""'-"'---'---_._._------_..,_.-.--.----.- .-.----.--------..-------.--
FISCAL YEAR 1998-99
MAJOR PROJECTS
i>Sii.mm:w.lC:m.,"" EO""" ~<<:lW=)"..; ,",,",:em Im!""l" ,,;m>.;;::iJ:..::iiUt3::,,::a.:::,~ ::: Em; i ::,,, ~!lL::: ':::lS>~~~Al
· South Orinda Sewers Improvements ($4,630,000) -These
improvements will provide additional wet weather relief
capacity for the existing sewers in Moraga Way and Glorietta
Boulevard. It will also eliminate numerous structural
deficiencies and maintenance problems.
· Martinez Eastside Trunk Sewer ($3,805,000) - An existing
trunk sewer will be enlarged to provide wet weather capacity
and eliminate overflows. Tributary main sewers will be
replaced or rehabilitated.
· Pleasant Hill Interceptor-Phase 4 ($2,985,000) -These
improvements will provide additional peak wet-weather relief
capacity for the Contra Costa Boulevard interceptor and reduce
the potential for overflows.
FISCAL YEAR 1998-99
MAJOR PROJECTS
~)X)) . (~~ ::~:x.::r.(~~~r-:J.'b>>Z<<q/"":<<-W<-::~~~4;~I~r~~~:::~w$":f{::r@':;~-:;:;:;:~~x::r{==-;;:$.:$.:==rx;:!*::::~~~;:;:~::::::~m~rn-~~ef"~-<<<<f~:-:=r~~~
· Dougherty Tunnel and Trunk Sewers ($2,523,000) -A tunnel
approximately 4,800 feet in length and a trunk sewer 3,000 feet
in length will be constructed to convey wastewater from the
proposed 1 0,000 unit Dougherty Valley development to the San
Ramon Pumping Station.
· Treatment Plant Seismic Upgrade ($2,148,000) -This project
will modify treatment plant processes, equipment, and structures
to maintain predetermined levels of service after an earthquake.
· 1997-98 Cured-In-Place Pipe ($1,050,000) -This project will
rehabilitate existing deteriorated sewers, reduce the amount of
rainfall entering the collection system, and control future
maintenance requirements.
FISCAL YEAR 1998-99
MAJOR PROJECTS
W-)ID"{:$-::::W-&:~~{{{w.&:.:m:.~;.;:w.w.&W#.4'.w-{{{:@"~{>>l1<J':":u:J..;r.:::::m,:ew~-er~:ffi,ffz>>>*,)~A"'':;::'::)~~>>:@.&~<<.~%~%~~~.&I!!e!:$.w-#$~.w.
· Treatment Plant Soil Remediation ($807,000) -This project
will implement a program to remediate soil contamination at the
treatment plant due to petroleum sludge deposits.
· Ash Handling Improvements ($771,000) - The operation of
the ash system will be improved by replacing and upgrading
much of it.
~'-_._-------------~-----_.__._._-_._,----_.. _._..,_._.__._-.,....._,-~---~-_._---
~
Central Contra Costa Sanitary District
BOARD OF DIRECTORS Page 1 of 6
BOARD MEETING OF NO.
June 9, 1998 7. BIDS AND AWARDS a.
DATE TYPE OF ACTION
June 2,1998 AUTHORIZE AWARD, APPROVE AGREEMENT
SUBJECT
AUTHORIZE AWARD OF CONSTRUCTION CONTRACT TO McGUIRE AND HESTER AND AUTHORIZE
AN AGREEMENT WITH DCM/JOYAL ENGINEERS FOR THE MARTINEZ EASTSIDE TRUNK SEWER
IMPROVEMENTS PROJECT, DISTRICT PROJECT NO. 4950
SUBMITTED BY
Curtis W. Swanson, Principal Engineer
INITIATING DEPT/DIV
Engineering/Environmental Services
ISSUE: On May 20, 1998, sealed bids were received and opened for construction of the Martinez East
Side Trunk Sewer Improvements Project, District Project No. 4950. The Board of Directors must
authorize award of the contract or reject bids within 50 days of bid opening. Board of Directors
authorization is required for the General Manager-Chief Engineer to execute professional services
agreements for amounts greater than $50,000.
BACKGROUND: The Martinez East Side Trunk Sewer Improvements Project is a joint project between the
District and the City of Martinez (City). A joint project agreement was approved by the Board of Directors
on April 16, 1998. The District's portion of the project will replace 19,000 feet of deteriorated sewers in
downtown Martinez with new sewers ranging in size from 8 inches to 24 inches in diameter. The City's
portion of the joint project will be street and storm drain improvements along Pine Street. The joint project
location is shown in Attachment 1. The estimated cost of the joint project is $6,750,000, which consists
of $6,640,000 for the District's sewer improvements and $110,000 for the City's street improvements.
Construction will begin in July 1998 and extend for 14 months.
District staff has met with City staff, Chamber of Commerce representatives, and local merchants to
discuss the joint project and the related construction impacts. Concerns centered on traffic control,
business disruption, and effects on planned special events. The project specifications have incorporated
mitigation measures to address these concerns. To be able to be responsive to merchants' and residents'
concerns during project construction, a construction field office is proposed for the downtown area.
District construction administration and community liaison staff plan to work out of this field office.
The plans and specifications for the District portion of the joint project were prepared by District staff.
Plans for the City's portion were prepared by Zumwalt Engineering. This project was advertised on
April 16 and 22,1998. Four (4) sealed bids ranging from $5,540,261 to $7,189,129 were received and
publicly opened on May 20, 1998. A summary of bids received is shown in Attachment 2. Engineering
Department staff conducted a technical and commercial review of the bids and determined that the bid
submitted by McGuire and Hester is the lowest, responsible bidder. The City has authorized the District
to award the street improvements portion of the work to McGuire and Hester.
INITIATING DEPARTME
/1#
JSM
9/16/96
H :\PP\AUTH4950 .CWS. wpd
DATE June 2, 1998
Page 2 of 6
SUBJECT
AUTHORIZE AWARD OF CONSTRUCTION CONTRACT TO McGUIRE AND HESTER AND AUTHORIZE
AN AGREEMENT WITH DCM/JOY AL ENGINEERS FOR THE MARTINEZ EASTSIDE TRUNK SEWER
IMPROVEMENTS PROJECT, DISTRICT PROJECT NO. 4950
The District will administer the construction contract and will perform contract administration, inspection,
survey, office engineering and shop drawing review. The funds required to complete this project, as shown
in Attachment 3, are $7,525,000. The total cost of the Martinez East Side Trunk Sewer Improvements
Project, including the Pacheco Boulevard Street and Sewer Improvement Project being constructed by the
City, is anticipated to be $9,008,000. Construction of these improvement projects is included in the fiscal
year 1997-98 Capital Improvement Budget (CIB) on pages CS-40 through CS-42. Staff has conducted a
cash flow analysis of the Sewer Construction Fund and concluded that adequate funds are available for
this project. The City will reimburse the District for the cost of the street improvements.
Geotechnical engineering and inspection services are recommended to be provided by DCM/Joyal Engineers.
Staff has negotiated a cost reimbursement agreement with a cost ceiling of $65,000 for these services.
DCM/Joyal provided geotechnical and microtunneling engineering services during design of the Martinez
East Side Trunk Sewer Improvements Project.
Staff has concluded that the District's portion of the joint project is exempt from the California
Environmental Quality Act (CEOA) under District CEOA Guidelines, Section 18.2, since it involves only
minor alterations of existing facilities with negligible or no expansion of capacity. Staff further concluded
that the joint project is exempt from CEOA because no significant cumulative impacts would occur from
combining the City's and District's project elements. On April 16, 1998, the Board of Directors
independently determined that the joint project is exempt.
RECOMMENDATION: Authorize award of a construction contract in the amount of $5,540,761 for
construction of the Martinez East Side Trunk Sewer Improvements Project, DP 4950, to McGuire and
Hester, the lowest, responsible bidder. Authorize the General Manager-Chief Engineer to execute an
agreement for $65,000 with DCM/Joyal to provide geotechnical engineering and inspection services during
construction.
9/16/96
H :\PP\AUTH4950 .cws. wpd
-'"-_._--_..._---,---_.,_.._~-,--_.>_.-_._.._'_._-----_. _._--_.__._."-~'-
___ _ ______.._._______.~._w,__,___--.-~----,.-.--
-
-1
-
r--
-t
~ T--
~\ i~
I \ \l!\ 11 I; . ~aIY smEEf
~~...~ ~
"" -,~./
, ; . , - ----=:;::..
~.. ~ \ f' ~ · iiTiW' ,!;;~
\~, j,~l:i _-~ -, .~.~
~.. ~~."". : lo--
,~ ~- ~
__- \e . . --- 1 ~ ---,
~\r ~ ." ~_......
'r .". ~ <\~ TI ,.,",-
.. _ :r, .' 'Ili1'" ......, \ l:>-
~~e J ~ \, .1::: h
~ c:... .0< - , . iU
r::::~ --~\W; ~ ~ _\
\rn-
c~ \ -~
~ ~~ < '
'; ~t'-- ?iii ~ ~~
./. ~ ~\I \.In .~
_".. \ <l~\::H~W~
\\\ \~WI~~\'~~
~\~;<< ~"",x'~
~~~~"
~~~~~~~
\ ~~~O~~\~.
~\l _ "(,J'f5~~ '~1 ~
. ~~~\,~ -;;~~~~~
~~ ~~rri\'\ t '1;"~~ ~I(,.,~/n.~
lRJf&EIJ~ '~~~~1~; ~~?0' "/~"':oo.;s",~~.
I\/; "'~~ '-' 'ti' .~-:;Q-'fh.<7 ,,','
~\ S' _ -',~ ~ \ ~M;<U, '!z o..v h.~:' .
~;:;;:.~ ..~ _ ;~\=\..}\ ~~~~~'<0~ /', ~
i~!tl? j ~~~~~~~~~. ~
~ I~" "\\:J::I;:::a"\--..... ~ ~ ~~I
f~'jsr . I Y C::L \ .- ~.:~~S/&-:~-t 0
! ~ ~Wi .-<'I~~~~~ IIt!AJ~
~ Fm ~ ;: r I.!l\~~~\~t"'l..,~~~
.. ~I Contra Cost ,,:1 ~ ~ ~! ~ \::1 r:\ '<7 :\'0'
; Sanitary O' . a 't...:l:::1 ~ ~ ~ ~ ~ y
~ ~ct MARTINEZ ' k)-A1
t ~ TRUNK SEW EASTSIDE '"""" -
. ER PROJECT
. .op 4950
LEGEND:
EXIS1lNG SEWER
PROPOSED SEWER
SEWER TO BE
ABANDONED
1
ATTACHMENT 2
Central Contra Costa Sanitary District
SUMMARY OF BIDS
Project: Martinez East Side Trunk Sewer Improvements Date: May 20. 1998
Location: Martinez. California
Engr. Est. $6.640.000/$110.000
BIDDER (Name, Address, Telephone) BID PRICE (1)
1 McGuire and Hester $5,452,761
9009 Railroad Avenue 87 .500
Oakland, CA 94603 $5,540,261
(510) 632-7676 FAX: (510) 562-5210
2 Mountain Cascade, Inc. $ 6,189,275
P. O. Box 5050 1 05 .960
Livermore, CA 94551 $ 6,295,235
(925) 373-8370 FAX: (925) 373-0940
3 Ranger Pipelines, Inc./D' Arcy & Harty $ 6,894,979
Construction, Inc. (A Joint Venture) $ 153.650
1296 Armstrong Avenue $ 7,048,629
San Francisco, CA 94124
(41 5) 822-3700 FAX: (415) 822-3703
4 Ghilotti Construction $ 7,040,889
246 Ghilotti Avenue $ 148.240
Santa Rosa, CA 95407 $ 7, 189, 1 29
(707) 585-1221 FAX: (707) 585-1601
(1) First bid price listed is for the District portion.
Second bid price is for the City portion.
Bids Opened by: Joyce E. Murohy /s/
Date: May 20. 1998
H :\PP\AUTH4950.CWS. wpd
9/16/96
ATTACHMENT 3
MARTINEZ EAST SIDE TRUNK SEWER IMPROVEMENTS PROJECT,
DISTRICT PROJECT NO. 4950
POST -BID/PRECONSTRUCTION ESTIMATE
ITEM DESCRIPTION
TOTAL
$5,540,261
40,000
50,000
844,739
$6.475.000
PERCENT OF
ESTIMATED
CONSTRUCTION
1 . Construction Contract
2. Utility Relocation
3. Staging Area Lease{s)
4. Contingency at 15.0 percent
CONSTRUCTION TOTAL
100
5. Construction Management
. District Forces
SUBTOTAL CONSTRUCTION MANAGEMENT
$ 41 ,000
397.000
$ 438,000
6.8
- Construction Management
- Contract Administration/Inspection
6. Consultant/Professional Services
. Material Testing
. Contaminated Soils
$ 65,000
35,000
30.000
. Geotechnical Consultant
SUBTOTAL CONSULTANT/PROFESSIONAL
SERVICES
$ 130,000
2.0
7. Engineering and Other Services During Construction
. District Forces
- Community Relations
- Surveying
- Field Office Rental/Furnishings
$ 109,000
12,000
65,000
60,000
19,000
- Office Engineering Services
- Record Drawings
H:\PP\AUTH4950.CWS. wpd
PERCENT OF
ESTIMATED
ITEM DESCRIPTION TOTAL CONSTRUCTION
_ Field Office Clerical Support 1 20,000
- Collection System Operations 2,000
. Other Services
- Disputes Review Board $ 10,000
- Permit/Inspection Fees 33,000
- Legal 15.000
SUBTOTAL CONSTRUCTION ENGINEERING $ 345,000 5.3
CONSTRUCTION MANAGEMENT & $ 913,000 14.1
ENGINEERING TOTAL (ITEMS 5, 6, & 7)
8. Prebid Expenditures (Planning and Design) $ 840,000
9. Pacheco Blvd. Sewer Replacement & $ 780,000
Directional Drilling Demonstration Project
(construction)
1 O. Total Project Cost $9,008,000
11. Funds Allocated to Date $1,483,000
12. Allocation Required to Complete Project $7,525,000
'Temporary secretary is proposed for up to 14 months to assist with construction
management and public relations activities. The temporary secretary would work at the
proposed downtown Martinez field office.
H :\PP\AUTH4950. CWS. wpd
~.
t,;entral Contra Costa Sanitary District
BOARD OF DIRECTORS
.. .........
............ . ..... ... . ........ .....
::::::1111'11111111:::::::11111111:::::::::::::::: BOARD MEETING OF
),:")))"""""""""""",",::;,)"""",,,,"""""""")"\"",\\",/""",."",\.,.,.,:",,,,":.:.:.:.:.:.:.:.:"",:.:.::":,:,:"",,,,, June 9, 1 998
Page 1 of 5
NO.
7. BIDS AND AWARDS b.
DATE
TYPE OF ACTION
May 27, 1998
AUTHORIZE AWARD
SUBJ ECT
AUTHORIZE AWARD OF A CONSTRUCTION CONTRACT TO SPARKS ROOFING COMPANY FOR
TREATMENT PLANT ROOF REPLACEMENT PHASE II PROJECT, DISTRICT PROJECT 6120
SUBMITTED BY
James L. Belcher, Senior Engineer
INITIATING DEPTIOIV
Plant Operations/Operations
ISSUE: On May 19, 1998, sealed bids were received for construction of the Treatment Plant Roof
Replacement Phase II Project, District Project 6120. The Board of Directors must authorize award of
the contract or reject bids within 60 days of the bid opening.
BACKGROUND: The current phase of this project will replace the roof over the Machine Shop and the
Pump and Blower Building. The 5A treatment plant structures were built in the mid-1970s. The 20-
year roof life has expired; replacement or rehabilitation is now prudent to prevent damage and reduce
maintenance costs.
Plans and specifications were prepared by Plant Operations Department. The Engineer's Estimate for
the construction cost was $180,000. The project was advertised on April 26 and May 8, 1998. Six
bids, ranging from a low of $145,610 to a high of $196,922, were received and publicly opened on
May 9, 1998. A summary of these bids is shown in Attachment 2. The Purchasing Section
conducted a commercial evaluation, and the Plant Operations Department conducted a technical
evaluation of these bids. They have determined that Sparks Roofing Company is the lowest responsible
bidder with a bid amount of $145,610.
The allocation of funds required to complete this project, as shown in Attachment 3, is $167,000. The
current total estimated project cost is $192,000. This project is included in the Fiscal Year 1998-99
Capital Improvement Budget (CIB) on pages TP 88 through TP 89. Staff has conducted a cash flow
evaluation of the Sewer Construction Fund and concluded that adequate funds are available for this
project.
MJL-
JMK
S:\MAINTENG\ 1998\Selcher\Pos PprDP6120. wpd
4/8/98
DATE
May 27, 1998
Page 2 of 5
SUBJECT
AUTHORIZE AWARD OF A CONSTRUCTION CONTRACT TO SPARKS ROOFING COMPANY FOR
TREATMENT PLANT ROOF REPLACEMENT PHASE II PROJECT, DISTRICT PROJECT 6120
Staff has also concluded that this project is exempt from the California Environmental Quality Act
(CEOA) under District CEOA Guidelines, Section 18.2, since it involves repair and maintenance of an
existing public facility with no increase in capacity. Approval of this project will establish the Board
of Directors' independent finding that this project is exempt from CEOA.
RECOMMENDATlON: Authorize award of a construction contract in the amount of $145,610 for the
construction of the Treatment Plant Roof Replacement Phase II Project, to Sparks Roofing Company,
the lowest responsive bidder.
S:\MAINTENG\ 1998\Belcher\Pos PprDP6120. wpd
4/8/98
,-
c
c::r>
"'0
~
o
/
II
II
II
II
II
II
II
o
c;
o
'"
;;;
/'
o
'"
;;;
:;:: Central Contra Costa
Sanitary District
rJ
II
II
II
II
II
II
II
II
/;7
II
II
II
;I
II
;I
II
;I
;I
II
I I
co
a>
III
ic
=2
o .
~l!;l
TREATMENT PLANT ROOF REPLACEMENT,
PHASE II
DISTRICT PROJECT 6120
PROJECT LOCATION
ATTACHMENT
o
oJ")
:t
1
---------."--".-----_._--,_._----'--_.~..--'_..."--,._-~----,._..._.."~-_..--_._-_.~---_.,--"---_.,--_._..._-"--,.",-"._.~",-",,_._.._--,.._-'-'''--
Central Contra Costa Sanitary District
ATTACHMENT 2
SUMMARY OF BIDS
Project: TREATMENT PLANT ROOF
REPLACEMENT PHASE II PROJECT
DP No. 6120
Date: May 19. 1998
Location: Martinez. California
Engr. Est. $180.000
1 Sparks Roofing Company, Inc. $145,610
PO Box 21563
Concord, CA 94521
2 Alcal Roofing $167,693
115 Ryan Industrial Court # 107
San Ramon, CA 94583
3 Enterprise Roofing Service, Inc. $173,808
PO Box 27368
Concord, CA 94527
4 Pioneer Roofing Organization $178,910
1485 Armstrong Avenue
San Francisco, CA 94124
5 Western Roofing Service $184,945
2594 Oakdale Avenue
San Francisco, CA 94124
6 Solano County Roofing, Inc. $196,922
PO Box 476
Suisun, CA 94585
Bids Opened by:/s/ Joyce Murphy
Date: May 19. 1998
G:\SWG\REROOF\SUMBIDRA.WPD
5/19/98
. ~,_...-,._._-_."-,...,,---_..__._..",.-~---_..,..,.. -"_._,-,-~--_.-
ATTACHMENT 3
TREATMENT PLANT ROOF REPLACEMENT PHASE II PROJECT
DISTRICT PROJECT NO. 6120
POST -BID/PRECONSTRUCTION ESTIMATE
Item Description
Total
Percent of
Estimated
Construction
Cost
CONSTRUCTION
Total Construction
$145,610
$24,390
$170,000
100.00
Construction Contract
Contingency at 17%
2 CONSTRUCTION MANAGEMENT
District Forces
-Construction Management
-Record Drawings
$3,000
$ 1,000
$4,000
2.35
Sub-Total
Consultant
Sub-Total
$9,000
$9,000 5.29
$13,000 7.64
$183,000 107.64
9,000 5.29
$192,000 112.94
$25,000
$167,000
-Construction inspection and support-
Total Construction Management
3 TOTAL CONSTRUCTION PHASE COST
4 TOTAL PREBID EXPENDITURES
5 TOT AL ESTIMATED PROJECT COST
6 FUNDS AUTHORIZED TO DATE
7 ADDITIONAL ALLOCATION NEEDED TO
COMPLETE PROJECT
~
Central Contra Costa Sanitary District
BOARD OF DIRECTORS
......................... ........ .. . .... ....... ... ... ... .
1111.1.11::1:::1.1111::1111111111:1 BOARDMEETJ~~e 9,1998
Page 1 of 14
NO.
DATE
TYPE OF ACTION
June 8, 1998
HUMAN RESOURCES
SUBJECT
ADOPT THE CLASS DESCRIPTION OF CAPITAL PROJECTS DIVISION MANAGER AND
ENVIRONMENTAL SERVICES DIVISION MANAGER AND DELETE THE CLASS DESCRIPTION OF
ENGINEERING DIVISION MANAGER AND INFRASTRUCTURE DIVISION MANAGER
SUBMITTED BY
Charles W. Batts, Director of Engineering
INITIATING DEPTIDIV
Engineering Department
ISSUE: The Engineering Department has been working on organizational changes within the
Department to reduce the organization from three divisions to two divisions. Board authorization is
required to create new class descriptions which would change the division managers' titles to reflect
their new divisions.
BACKGROUND: The Engineering Department has gone through several periods of transformation
within the last two decades that mirror the needs of the District. In the late 1970s the District's
Engineering Department consisted of a "Special Projects Division" to deal with the projects, records, and
grant requirements of the treatment plant construction known as the "5A" project, and a "Construction
Services Division" to deal with the growth and development in the area, and the ongoing District
construction activities. By the early 1980s the functions of these divisions were consolidated into the
"Engineering Division" that handled project management, and the "Construction Division" that consisted
of services such as survey and permits, and construction activities. In 1984 the Engineering
Department established a third division that became the "Planning Division." The intent was to create
a special division to deal with District planning issues as they related to growth, finance, and the impact
of State and Federal regulation. To this end, several long-term "master planning studies" have been
completed to verify the future direction of treatment plant, collection system and pumping stations
construction and institute those projects as part of the District's Ten Year Capital Improvement Plan
(CIP). In 1992 the Engineering Department reorganized to facilitate design - construction coordination
and to develop the capability to do substantial sewer design in-house. The two major divisions of the
Department were organized along the requirements of treatment plant design and construction, now
the" Plant Engineering Division" and sewer design and construction, known now as the "Infrastructure
Division." The "Planning Division" remained as the third division. (See Exhibit A.)
The Engineering Department is now facing the continuing challenges of project planning, design, and
construction, along with the new demands of providing customer services in the form of permitting
sewers in hard to service areas and for developers, supplying recycled water for irrigation and industry,
assisting in the Clean Water Inspection Program (Illicit Discharge Elimination Program), Pollution
A:\REORG.PP.wpd
DATE
June 5, 1998
Page 2 of 14
SUBJECT
ADOPT THE CLASS DESCRIPTIONS OF CAPITAL PROJECTS DIVISION MANAGER AND
ENVIRONMENTAL SERVICES DIVISION MANAGER AND DELETE THE CLASS DESCRIPTIONS OF
ENGINEERING DIVISION MANAGER AND INFRASTRUCTURE DIVISION MANAGER
Prevention activities, and Household Hazardous Waste Collection Program, as well as the District's
extensive Source Control activities and service charge programs. To meet these challenges the
Engineering Department must remain flexible in its ability to plan, design, and construct projects, to
emphasize responsiveness and customer service, and to participate in partnerships with other
agencies to the advantage of the common customers.
At the January 20, 1998 Board meeting, General Manager-Chief Engineer Roger Dolan asked the
Board to approve staffing changes that appointed Mr. Charles W. Batts as Director of Engineering
based on a competitive process to address the future challenges of the District, and more specifically
the Engineering Department. In that Position Paper it was stated that:
''These staffing changes provide the opportunity to reorganize the Engineering Department. It
is appropriate to consider consolidation of the three divisions into two. Therefore, I recommend
appointing Planning Division Manager Douglas J. Craig to the position of Plant Operations
Division Manager. The effective date of this transition will be when the reorganization planning
is further developed this Spring or early Summer."
A Department-wide effort began immediately to reorganize the Engineering Department into two
divisions that reflect both its continuing responsibility for District capital projects and its growing
responsibility in the area of customer services. The process of change in the Engineering Department
considered the factors of both the function of the existing institutionalized groups within the
Department, and individual knowledge and skill requirements. After a series of meetings with the
Division Managers, the retiring Department Manager (Robert Baker) and me, a strategy was developed
to facilitate the reorganization:
* To seek input from stakeholders at every level in the organization
* To organize around the work and locate functions where they are best preformed
* To maintain work groups and reporting responsibilities where possible
* To maintain project and program continuity where critical through the transition
* To emphasize to the employees that this is the "first" step in an evolutionary process as the
Department grows and develops over time
Throughout this period, meetings were held with key staff and small work groups to discuss the
working assumptions, strategy, and goals of the reorganization and to seek their input. On February
4, 1998, a presentation was made to the Board's Personnel Committee on both the goals and
process of the reorganization. Their concurrence led to the next step of establishing the actual
DATE
June 5, 1998
Page 3 of 14
SUBJECT
ADOPT THE CLASS DESCRIPTIONS OF CAPITAL PROJECTS DIVISION MANAGER AND
ENVIRONMENTAL SERVICES DIVISION MANAGER AND DELETE THE CLASS DESCRIPTIONS OF
ENGINEERING DIVISION MANAGER AND INFRASTRUCTURE DIVISION MANAGER
institutional arrangements, supervisory relationships, and organizational structure. The reorganization
process involved the major stakeholders, Division Managers, and the General Manager-Chief Engineer.
During this period input was sought and considered from all affected employees, and on March 24,
1998 a second presentation was made to the Board's Personnel Committee which outlined in detail
the reorganization of the Department. The Board subcommittee voiced no objections to the proposed
organization and endorsed the reorganization in concept for presentation to the entire District Board
of Directors. This information was presented to the Board as part of the District's Personnel Budget
for the year 1998 - 1999, which was approved on April 2, 1998.
On March 25, 1998, a meeting was held with all of the Engineering Department employees to receive
information on the reorganization from the Department Managers; proposed organizational charts were
prepared and distributed in each division. After the announcement of the reorganization a second
series of sectional meetings was scheduled throughout the Engineering Department to address any
concerns or questions relative to small workgroup situations. Since there were no significant changes
in employee salaries, working conditions or other contractual issues, 'meet and confer' was not
required with any of the District's bargaining units. The proposed organizational charts were modified
slightly based on employee input. The new reporting arrangements started on May 1, 1998.
(Organizational charts attached as Exhibit B.) The actual use of new employee codes and cost
centers will start on July 1, 1998 with the change in budget year. The budgetary impact of the
reorganization for the 1998 - 1999 fiscal year will be a decrease of approximately $100,000 with the
attrition of one management position.
Attached are the class descriptions for the Capital Projects Division Manager, formerly the Plant
Engineering Division Manager (Exhibit C), and the Environmental Services Division Manager, formerly
the Infrastructure Division Manager (Exhibit D). Also these changes are shown on the attached
proposed organizational chart (Exhibit B) reflecting the organizational changes.
RECOMMENDATION: Adopt the revised class descriptions of Capital Projects Division Manager and
Environmental Services Manager reflecting their new divisions and delete the class descriptions of
Engineering Division Manager and Infrastructure Division Manager.
C?
'5
b
a:
~
o
>-
a:
~
z
<(
CI)
~
CI)
o
()
<(
a:
I-
z
o
()
....J
<(
a:
I-
z
W
()
c
o
"0
"S;
c
C)
c
".:
CD
CD
c
"m
c
UJ
CD
a..
:s
t)
:s
a..
...
U)
co
a..
..-
C
o.~
~I 0
L~
~'"
OLD
.
...
c
Q)
E
t::
co
c.
Q)
C
en
c
".:
Q)
Q)
c
"m
c
UJ
a;
~lil'
jhl
,,::E
o
'f!1il
-2
c~
EXHlbL' A
i
"
'6>> .....
" ...
W en
.;
o
~
I
.g. ~
W en
~
2'
IC~
".l! Cl
.~~
w.:2
cii ~
O~
!i.~
10"
>-a.
en cil ;:!:
l5 ,g en
l8-
~..~
.!;
'"
'"
.~J!
hm
.g..:l! Cl
w
c
"
~~18
r~ Cl
::E
"
o~
tjO
~'Uto
~KCl
g~
o
CD
~
- ,...
i;' '" :E:
'"
a; Cl 0
~ IX:
w <t
~
'"
'"
"
li~
o
'"
i1i~
l5.~
~:c
~~ lO
cl Cl
8..
.!;~
im
II
"
w
,,~
~:~
.2:"
".c: 18
~~ Cl
""
~[i
en.c:
o~
.~i <Xl
" m '"
... ~1il Cl
... .2'~ ~
w .c:
W :S
~
" '"
" "
.6> 0
" ... '" E
w <Xl .. '"
! w 0 " 0
h 11.
.0 a; a; ~1il "0
.!; ~ " ~il1l Jl:g i3 ~
CL .6> ... .~~ oll.E Cl u:
" ... iljw 11. (!l ~~ 0
w w mw '"
0 ~ :f '" ~
0 a:
..
.:l! '"
"
0
E
:g
11.
rJ!'" "0
'"
.!:!
!.!I111 c;
.g.~ ;;
w ~
(\')
'0
C\I
t5
a:
I-
en
o
fi:
~
z....
c:5 ~
~a::
en
8
~
z
o
o
....J
~
I-
Z
W
o
c
o
"0
"S:
is
C)
C
"i:
CD
CD
c
"6>>
c
w
.
....
c
CD
E
1::
CO
0-
CD
C
C)
c
o.~
l5~ 0
1l.! ~
~O>
OJj
"i:
CD
CD
C
"s,
C
W
5
.in
~~
0>0>",
c!!l '"
."lU~
h
c
.0.
c
w
--=... -.
iii :
t ~~:
I =CL. I
:~&:
: 8~ :
, ..,
I 0 I
, .
,-
~t~
J: 8. en
.il
f .,
.il In
..,
.5
o
j
.0.
c '"
w ....
en
i
.in
~
!'i-
f6~
"
en
~
8~
~im
~IC)
s
.c
:g
,----.-:
, -.
:e= :
:~i;:
I 8!. :
I,-CD I
:~.5 :
,en ,
, ,
, -,
1_____-
'"
0_
t!~ 18
80 ,
l'lllil
~..C)
~.5
'"
im
~
.,
os
hlil
Q)U",
'~f<B
,jj~
.,
co
~
....
::E:
o
a:
:i
o
s
~.~ i
J:.~
J:ij
{!
'6"
CI>
..,
c
a
:>.
E
"
o
Q.
~
e
. D-
c CI>
.2 EJ
o 'li CI
(\')~"'j
~ii~b
~ Q)'Qi.t=
~.~~~
5W~!!
~.2.~ ~
~ ~.s;; E
~ g>~~
ii:~o~
~ ~ '2 ~
.. c c1J 0
i?=-.c:CD
~il=
~.5.., '0
o CDJ!t::
;eili'Ell
l!ls~..
D- !!I c co
~Ji~
~CI>~~
~88~
. : i
C")
..... m
0
C")
....
:I:
0
a:
- ct
~ lil :E
! "
~
Q;
CD
e
'0
e
W
~
8
~
i
e
'0
e
W N
1: Iii
I
CD
~
c:
0
.- '"
en
I- .S; 0; 0; N
U .- CD
C CD e
c: e '0
~~ e
I- en w .....
(f) CD Iii
0 c: 0 OJ
.- "2 g
c: CD
~ en ~
c: N
~ ~
Z a..
<( . e ~
(f) - _Cl ,2
~ III
c: 0.5 :2:0; 1:
CI) ~io o ClU) CD_
(f) eN g>~~ ~~lll
0 E ,- ::;:
u 5~ 'g~ ~~ "
<( 1:: .!9 III
11. :::!:
a: cc:s
l- e..
Z CI)
0
U C
....J en i
<(
a: c: e
I- .~ '0
e N
Z CI) w .....
W 1: en
U CI) .!
c: ,!II
.- ~
en
c:
w
0; Q; ~
CD CD
e e Cl
.~ '0
..... e e-
W CXl W ~ 'C: SOl
! en !l en ~,!II ~
III 'g>~
U 'g
e
~ ~ W
11.
1:
CD_
~~lll
li!'1lI"
a~
:::!:
C\I
'0
T'-
t:
o
.Ci)
.S;
c
=
(,)
.~
CD
en
t;(ij
- ....
II: t:
~ CD
- E
C t:
fi: e
~ .-
Z e:
C}jw
~"C
en CD
o II)
o 0
~c.
I- e
Za..
8
....I....
~ t:
I- CD
Z E
Wt::
() co
e-
CD
c
0)
t:
.i:
CD
CD
C
.i;)
t:
W
~
~f~ J
L '"
(/)
Cii ~
I
I
: I.
l_
. .
. .
-;
EXHIBIT B
- 0
16 'I:
E~l81
g,1il Cl
c:i
~ -;
:----f:
I ~,
10_, :_
: 3~i;: g
I Ie
8 I 52
~.5 i'"
--~:
5j !!
~ ~18 ~
li'1i Cl .
lij< II:
:::;
6>
S'iI! ~
~~r;; =
liitiCl ..
8 K a:
~
!
.....
w
z
;:)
...,
i
-g
:0
~
:0
2-
~
8'
a:
Q)
~I
i~
~ ~
:~ j
'" E
&. 5
alUi
lr~
.... :0
~8
~~
"''0
is t::
~[
&. gJ
~~
Ii
C\I ~
a -
>- So
~ '" .....
C\I It) e. w
~ (!l
.J Z
00 ::)
"")
co ..
'E~ (7) ,g
~]i ~ 'i5
'g>~ C)
w ~
I-
U
a:
I-
en
Cl
>-
a:
~
z
<(
en
~
en
o
u
<(
a:
I-
z
o
U
-I
~
I-
Z
w
U
c
.2
U)
.S:
is
U)
...
()
CD
.-
o
...
a.
m
...
.50
co
o
'C
CD
U)
o
c.
e
a.
'l5,~ ..
(; $ ~ i
h,::; al
iSJj U
.
...
c
CD
E
t:
co
c.
CD
C
m
c
.i:
CD
CD
C
.-
m
c
w
III &
~'"
,_e::
.t~ le
Ole::::;
",2
~,!Il
U5
$
~ ~ ~
.~ :t
/R
$
'g, 1
~ m it
,Q ..,:
~
m ...
j ~ j
,2 ll:
~ a:
~
Q)
,S;
~ ~ E
~ i
/R
o
~ It) i
~ lIi .c
." C)
e:: W
j
II
'~ ~ ~
w 00 ~
ci
8
~
i
e:: ...
'eD as
Ji t-- )
Q) .... -
OJ 00 ~
'8 oil:
~ ci
i
e::
'c;, c
Ji ~ i
Q) .... ::I
OJ 00 J:
'8 :Ii
~
i ~
,S; ~ 3!
g> .. e:: E
w ~ i!-F.
-m (/J ........c7i
'8 o iii a:
~ '"
8-
~~ i
co'~ ~ ~
-U~oo u
e::OO iii
'6>
e::
w
$ ..
e:: i
"c;, C\I c::
Ji In II
1ii U
.'2
co
e::
ij", 8
'g,.sa f5 iE
Jj~ --=
cli
'"
$
e::
'OJ C\I
e:: ....
w 00
~
01>-
ie::
..,i
C)Q.
..,:::i
'"
fj ~ i
.~ en C!:J c(
~~ ~
cli II!
Is
uOj '"
~.i~ ii
8,~(!l 3
~
t
i
.~ ..
e:: i!
~ ~ !E
cG en l;
]i ~
~
3l
.~ ~
,n '" Iii
~ !ii ~u
1;; -;;!:
~ '"
>- ...
t:: C
~Qj - ~
>0'-" .
~c3 (!l ~
~ -)
~i5 ....
'8:~ ..
"''E ..
::; 8 18 I
~u 00 Q
~~ 0
o~
:i~ -
Sl
,~~ -g
,U~ j
W a:
~ U
i~<D ~
~~ ~ ~
<<1<( -)
::;
'" 8.
~E
~f
~~
uici
0):
e::
Ueb
,5'" (!l
~~
'"
e::
o~
tio
22 !;;
1ii~(!l
e::lIl
8.5
'"
It)
=
r !
lli i::
~Gi~;
It) c:i.Jllicf:i
~
e::
'i,~ ~
,,,.~ f)j
co.., (!l
,n~
..
e::
i~
clJ
c;~
~ C\I ~
~ (3 !
/R ;:.:
c:::
o
E
~ ~ '
.. ~
Elil-m
.2' ~ '0
-; 'g> ~
5 ~ go
E 0 .~
'" '2 3l
& c1l ,S
al go go
= ,- LU
iLiEa
t:; ~.~
;j?Scn
.91lil€
;;~~
6 '6> al
~.niE
&~~
al .!!! C
N 8 ;.
't:: !Z ~
~~~
~88
<< :
EXHIBIT C
CENTRAL CONTRA COSTA
SANITARY DISTRICT
Effective:
Range:
Respirator Class:
Page 1 of 3
2/20/987/1/98
M-26
3
ENGINEERING DIVISION MANAGER
CAPITAL PROJECTS DIVISION MANAGER
DEFINITION
Manage the Plant Engineering Capital Projects Division of the Engineering Department of
the District; perform special managerial duties as required; and do all related work as
required.
SUPERVISION RECEIVED AND EXERCISED
Receive general direction from the Director of Engineering.
Exercise direct and general supervision over professional, technical, and clerical positions
in the Plant Engineering Capital Projects Division.
EXAMPLES OF ESSENTIAL DUTIES - Duties may include, but are not limited to, the
following:
Provide professional engineering expertise in planning, organizing, directing, and managing
the Plant Engineering Capital Projects Division of the Engineering Department, making
independent decisions as necessary in the management of the division.
Coordinate with all departments and divisions in the scheduling and/or development of
District projects, including assignment of projects and activities.
Coordinate and participate in the hiring and direction of outside consultants.
Attend to division personnel management matters, including safety and training programs,
evaluations, promotions, transfers, and disciplinary actions.
Coordinate work of the division with that of other divisions and departments.
Review and appraise division project and work reports.
Review and approve designs, plans, and specifications.
Confer with state and federal agencies.
Represent the District at professional meetings and conferences in regard to present and
future projects and various District matters.
Page 2 of 3
CENTRAL CONTRA COSTA SANITARY DISTRICT
Engineering Capital Projects Division Manager (Continued)
EXAMPLES OF ESSENTIAL DUTIES
Prepare reports and position papers and submit appropriate materials to management
and/or the Board of Directors for necessary action.
Oversee the investigations of new techniques and products for approval for use in the
District.
Coordinate and direct through subordinate supervisors all investigations, studies, research,
analyses, programs, projects, operations, and maintenance assigned to or being a
responsibility of the division.
Act on behalf of the Director of Engineering as required.
Perform related duties as required.
MINIMUM QUALIFICATIONS
Knowledae of:
Engineering principles and practices as related and applied to the design,
construction, and operation of wastewater collection, treatment, and disposal
systems and facilities.
Materials, procedures, and equipment used in construction, operation, and
maintenance of wastewater facilities and equipment.
Principles and techniques of organization, management, personnel administration,
budgeting, and staff development.
Local, regional, and state related programs including state and federal grants.
Abilitv to:
On a continuous basis analyze and provide direction and/or guidance to staff;
identify technical and managerial problems; interpret specifications, plans, memos,
and technical documents; know engineering and managerial methods; observe
employee work skills; problem solve technical and managerial and/or personnel
problems; remember District procedures and technical information; understand
people and technical problems and issues concerning customers; and explain
District needs.
Page 3 of 3
CENTRAL CONTRA COSTA SANITARY DISTRICT
Engineering Capital Projects Division Manager (Continued)
Abilitv to:
Sit at desk and in meetings for long periods of time on a continuous basis; use
telephone and write or use a keyboard to communicate through written means.
Plan, organize, direct, and control the work of others.
Apply engineering principles and techniques in the solution of difficult and complex
engineering problems.
Prepare complete and concise technical reports, grants, and letters.
Perceive and analyze problems and take effective corrective action.
Establish and maintain cooperative working relationships.
EXPERIENCE AND EDUCATION
Any combination equivalent to experience and education that could likely provide
the required knowledge and abilities would be Qualifying. A typical way to obtain
the knowledge and abilities would be:
Exoerience:
Ten years of progressively responsible professional engineering experience
including four years of experience in supervising professional, technical, and
trade personnel.
Education:
Equivalent to a bachelor's degree from an accredited college or university
with major work in civil, mechanical, chemical engineering, or a closely
related field. A master's degree in sanitary or chemical engineering is
desirable.
LICENSES AND CERTIFICATES
Possession of a valid Certificate of Registration as a professional engineer in civil,
mechanical, or chemical engineering as issued by the State of California.
Possession of a valid California Driver's License.
EXHIBIT 0
Page 1 of 3
CENTRAL CONTRA COSTA
SANITARY DISTRICT
Effective:
Range:
Respirator Class:
10/7/937/1198
M-26
3
INFRASTRUCTURE DIVISION MANAGER
ENVIRONMENTAL SERVICES DIVISION MANAGER
DEFINITION
Manage the Infrastructure Environmental Services Division of the Engineering Department
of the District; perform special managerial duties as required; and do all related work as
required.
SUPERVISION RECEIVED AND EXERCISED
Receive general direction from the Director of Engineering.
Exercise direct and general supervision over professional, technical, and clerical personnel
in the Infrastructure Environmental Services Division.
EXAMPLES OF ESSENTIAL DUTIES - Duties may include, but are not limited to, the
following:
Manage the Infrastructure Environmental Services Division of the Engineering Department
making independent decisions as necessary in the management of the division.
Attend to division personnel management matters including safety and training programs,
evaluations, promotions, transfers, and disciplinary actions.
Coordinate work of the division with that of other divisions and departments.
Review and appraise division project and work reports.
Review and approve designs, plans, and specifications.
Make decisions regarding proper sewer service for existing properties and new
developments.
Confer with the public and representatives of other agencies.
Represent the District at public and professional meetings and conferences in regard to
present and future projects and various District matters.
Prepare reports and position papers and submit appropriate materials to management
and/or the Board of Directors for necessary action.
Page 2 of 3
CENTRAL CONTRA COSTA SANITARY DISTRICT
Infrastructure Environmental Services Division Manager (Continued)
EXAMPLES OF ESSENTIAL DUTIES
Coordinate and direct through subordinate supervisors all construction management,
investigations, studies, research, analyses, programs, projects, operations, and
maintenance assigned to or being a responsibility of the division.
Act on behalf of the Director of Engineering as required.
Perform related duties as required.
MINIMUM QUALIFICATIONS
Knowledae of:
Engineering principles and practices as related and applied to the design,
construction, and operation of wastewater collection, treatment, and disposal
systems and facilities.
Materials, procedures, and equipment used in construction, operation, and
maintenance of wastewater facilities and equipment.
Principles and techniques of organization, management, personnel administration,
budgeting, and staff development.
Local, regional, state, and federal-related organizations and programs.
Abilitv to:
On a continuous basis analyze data and determine appropriate actions, identify
problems and develop solutions, interpret specifications and give opinions, observe
reading documents, problem solve sewer problems for the public and personnel
problems, and explain to employees how to talk to the public regarding sewers.
Sit at desk and in meetings for long periods of time on a continuous basis.
Intermittently twist to reach equipment surrounding desk, and perform simple
grasping and fine manipulation; use telephone, and write or use a keyboard to
communicate through written means.
Plan, organize, direct, and control the work of others.
Apply engineering principles and techniques in the solution of difficult and complex
engineering problems.
Prepare clear, complete, and concise reports and letters.
Page 3 of 3
CENTRAL CONTRA COSTA SANITARY DISTRICT
Infrastructure Environmental Services Division Manager (Continued)
Abilitv to:
Perceive and analyze problems and take effective corrective action.
Establish and maintain cooperative working relationships.
EXPERIENCE AND EDUCATION
Any combination equivalent to experience and education that could likely provide
the required knowledge and abilities would be qualifying. A typical way to obtain
the knowledge and abilities would be:
Exoerience:
Ten years of progressively responsible professional engineering experience
including four years of experience in supervising professional, technical, and
trade personnel.
Education:
Equivalent to a bachelor's degree from an accredited college or university
with major work in civil or sanitary engineering or a closely related field.
LICENSES AND CERTIFICATES
Possession of a valid Certificate of Registration as a professional engineer in civil
engineering issued by the State of California.
Possession of a valid California Driver's License.
~-
Central Contra Costa Sanitary District
BOARD OF DIRECTORS
:::::1111_11'::1:1811'::':11111:1:1 BOARD MErn~~e 9, 1998
:::;:;:::;:;:;:;:;:;:;:;:;:;:;:;:;:;:;:;:;:;:;:;:;:;:;:;:;:;:;:;:;:;:;:::;:;:;:;:;:;:;:;:;:;:;:;:;:;:;:;:;:;:;:;:;:;:;:;:;:;:;:;:;:;:;:;:;:;:;:;:;:;:;:;:;:;:;:;:;:;:::::;:;:;:;:;:;:;:;:
Page 1 of 1
NO,
10. LEGAL/LITIGATION a.
DATE
TYPE OF ACTlON
June 2, 1998
DENY CLAIM
SUBJECT
DENY CLAIM OF BETH MAPLES FOR ALLEGED DAMAGES
SUBMI1TED BY
Paul Morsen, Director of Administration
INmATlNG DEPTIDIV
Administrative/Risk Management
ISSUE: Beth Maples has filed a claim against the District for damages she alleges she suffered due to receiving
a discussion record dated April 6, 1998.
BACKGROUND: This claim was presented to the District by attorney Meredith Bradford on behalf of Ms.
Maples. The claim alleges that an April 6, 1998 discussion record from her supervisor caused her damages
and was a breach of a previous settlement agreement with the District dated January 10, 1994. She seeks
$2,000,000 in damages.
RECOMMENDATION: Deny the claim by Ms. Maples and refer to District labor counsel for further action.
INEER
RM&S/C:\ WPWIN\MORSEN\MAPLES.PP
9/16/96
---,-_... ,.."~~~,,,--_.._,._,-,----_._-,,----_..,-,,--~._-------,._._.~----~-_._--"-''''~---_.,._-_.._--~_._.*--_._.._-_........
~
Central Contra Costa Sanitary District
BOARD OF DIRECTORS
::::,111_1::.:1:1.111.:1:::1.1::::. BOARDMEEnNG OF
"""""""":,::::::,:,:,::"::,:,,,,,,:,,:,::::,:,:,:""""",:::::::::::::,:",:""""",:::::::,::::::::::::,:::,:,:,}::::::::,::::,,::,:,::\,,:,,:,:::::::::::,,::::::: June 9, 1998
Page 1 of 1
NO.
10.
LEGAL/LITIGATION b.
DATE
TYPE OF ACTION
May 15, 1998
DENY CLAIM
SUBJECT
DENY CLAIM FOR UNSPECIFIED DAMAGES FROM ROBERT M. AND CECILIA E. SLlEPKA
SUBMITTED BY
Paul Morsen, Director of Administration
INITIAllNG DEPTJDIV
Administrative/Risk Management
ISSUE: Robert M. and Cecilia E. Sliepka, through their attorneys have filed claims against the District citing
unspecified damages for legal expenses, indemnification against their damages, fees and expenses, legal fees
and punitive damages.
BACKGROUND: This claim alleges that the District has abrogated the Orinda-Moraga Disposal Service (OMDS)
settlement agreement with Mr. Sliepka by demanding payment of the OMDS performance guarantee bond in
pursuit of OMDS assets owing to the District as a result of the OMDS civil litigation. The District has made
a claim of Frontier Pacific Insurance Company for a bond purchased by OMDS in favor of the District to help
satisfy the civil judgement obtained by the District against OMDS. Apparently the Sliepkas are guarantors of
the bond and could therefore owe the amount of the bond ($50,000) to Frontier Pacific if Frontier paid the
District. The Sliepkas feel that the existing settlement made with them precludes the District from making a
demand on Frontier. District legal staff does not agree, in part because the Sliepkas are not mentioned on the
bond, and the settlement agreement does not specifically address this issue
RECOMMENDATION: Deny claim by Robert M. and Cecilia E. Sliepka for damages. Refer to staff for further
action.
INEER
RM&S/C:\ WPWIN\MORSEN\SLlEPKA.PP
9/16/96