HomeMy WebLinkAbout02-01-01 AGENDA BACKUP
Publication of Industries in
Significant Noncompliance (SN C)
Overview of Requirement for SNC Publication
=> Federal regulations require that all Pretreatment Programs
publish a list of Industrial Users in SNC for the previous
calendar year.
=> Criteria for determining SNC status are defined in Federal
regulations.
lJ
Discharge limit violations
lJ
Reporting deadlines
lJ
Compliance schedules
Publication of Industries in
Significant Noncompliance (SN C)
Publication Notice
Q Process / F onnat
Q Pretreatment Program Annual Report
Q Incentive for compliance
Significant Noncompliance for Year 2000
"
Discharge Quality Violations:
Business Name / Address
Nature of Violation
Contra Costa Radiator
2849 Willow Pass Road
Concord, CA 94520
Discharge limit violations: Copper, Lead, & Zinc
Excel Linen Supply
125 Mason Circle, Unit G
Concord, CA 94522
Discharge limit violation: Oil & Grease
Reporting Violations:
Business Name / Address
Nature of Violation
Benson's Radiator Service
1551 LaCassie Avenue
Walnut Creek, CA 94596
Failure to submit required report within 30 days
after the due date.
Varian, Inc.
2700 Mitchell Drive
Walnut Creek, CA 94598
Failure to submit required report within 30 days
after the due date.
PUBLIC NOTICE
CENTRAL CONTRA COSTA SANITARY DISTRICT
NOTICE OF SIGNIFICANT NONCOMPLIANCE FOR YEAR 2000
Notice is hereby given that pursuant to the federal regulations contained in 40 CFR 403.8.f{2)(vii), the Central Contra Costa Sanitary
District (District) is required to publish the names of any and all Industrial Users (IU) of the District's public sewer system that were
considered to be in significant noncompliance (SNC) with applicable pretreatment standards or other pretreatment requirements during
the Year 2000 calendar year. Federal regulations establish objective criteria for the District to use to detennine if an Industrial User
is in SNC.
Discharge Quality Violations
The following IUs were found to be discharging process wastewater in violation of the District's Local Discharge Limits or General
Discharge Prohibitions at levels that were significant, or were documented to be operating with a pattern of non-compliance that was
significant during the reporting period:
Industrial User
Nature of Violation
FoUow-up Action Taken
Contra Costa Radiator
2849 Willow Pass Road
Concord, CA 94520
Limit violations for zinc, copper, and
lead
The District issued NaVs for the
referenced violations. IU responded
by modifying operational practices
and providing employee training.
Resampling by IU and by the District
showed compliance with discharge
limits. IU installed additional
pretreatment equipment to enable
operation as a zero-discharge facility.
Excel Linen Supply
125 Mason Circle, Unit G
Concord, CA 94522
Limit violation for oil and grease.
The District issued an NaV for the
referenced violation. The ill's
resampling event showed the process
waste water to be in compliance with
the Local Limits.
Reporting Violations
The following IUs were found to have violated reporting requirements of the District's Source Control Program in a manner that
met the federal definition of SNc.
Industrial User
Nature of Violation
Follow-up Action Taken.
Benson's Radiator Service
1551 LaCassie Avenue
Walnut Creek, CA 94596
Failure to submit SDPC plan within
30 days of the due date.
The District issued an NaV for the
referenced violation. The required
report has been submitted.
Varian, Inc.
2700 Mitchell Drive
Walnut Creek, CA 94598
Failure to submit required reports
within 30 days of the due date.
The District issued an Nav for the
violation. The required documents
have been submitted.
..,
..
Treatment Plant Energy Model
115 KV'A'
esel 10 MW
DI ~
Standby
Power
3.2 MW
300 hr/yr max
Electric
Blower
2000hp 1.5MW
100 hr/yr
Aeration
Air Blower
Average
Treatment
Plant Load
3.5 MW
----_.J
Steam
Turbine
2500 hp
January 31, 2001 OPS Training
21 KV'B'
1.8 MW
N ~'ítíUlnl1l Gas
45%
Cogen
3.3 MW
1100
dth/day
.
.............
50
dth/day
10%
~..
Auxiliary ~. 40
Bollers (2) ...dt~~aY
Steam
90%
45% I Multiple Hearth I 50
Incinerators (2) dth/day
with -- 400
Waste Heat Boilers I dth/ day
10%
Ancillary
Steam Loads
Landfill Gas
"
y
Energy Costs
FY 2000-2001
Budget I Actual
Electrical
(PG & E Import) : $500,000
Natural Gas
Landfill Gas
Totals
$575,000
$1,429,423
~
FY 2001-2002
$660,000
$2,600,000 I $3,500,000
$440,797
$800,000
$2,370,220
$1,000,000
$3,975,000 1$5,160,000
Annual Energy Budget
Current Fiscal Year
--
$ %of
energy budget
Natural Gas $2,600,000 65%
Landfi II Gas $800,000 20%
Electrical $575,000 15%
Total $3,975,000 100%
Natural Gas Purchasing Strategies
Past
--
. 1-year fixed / index contracts
. Last Year - Month to Month Index
Natural Gas Purchasing Strategies
Present
--
5 Month Winter (33.000 dTH)
November 1 to March 31
30% @ $5.87/dTH
30% @ $5.52/dTH
15% @ $5.35/dTH
25% @ index
Natural Gas Purchasing Strategies
Future
--
. Implement Team Approach
Victoria Lamica, Jim Kelly, John Pearl,
Doug Craig, Ann Farrell, Bill Brennan, Jim
Belcher, Randy Schmidt, Kent Aim.
. Explore Long Term I Short Term Buying
Strateg ies.
. Stay Flexible To Respond To Volatile Market
Place.
Estimated Future
"Burner-Tip" NG Cost.
--
2001 2002 2003 2004 2005 2006-10
$ 8 . 45 $6. 70 $5. 70 $5.35 $5.25 $5.15
Summer Strip Apr - Oct
Citygate $8.30
Current electric rates
Customer
2000
Rate
(Ø/kWh)
Jan. 4, 2001 Ra~
Rate Increase
(Ø/kWh)
Residential 10.7 11.6 8%
Small Business 11.7 12.7 9%
Medium Business 9.6 10.6 10%
Agriculture 8.3 9.3 12%
Large Business 6.4 7.4 14%
System Average 9.4 10.4 11%
Pacific Gas and Electric Company
38
San Diego bill comparisons
July 1999
July 2000
Residential $50* $100*
Small Business $166 $334
School $4,441 $8,691
Supermarket $19,204 $41,868
Hospital $79,072 $173,048
*Figure islor May 2000
Source: San Diego Gas & Electric Co. (cited in 7//7/00 Los Angeles Times article)
Pacific Gas and Electric Company
39
E I ectri ca I Strateg i es
--
. Energy T earn Explore Alternate
Suppliers For A Long Term Contract.
. Revisit Energy Conservation / Efficiency
Measures In Light Of Higher Costs.
Mr. Reardon's Recommendations
. Have an energy team with a champion.
. Get the information you need from bill and rate
schedule; Know your Rate Schedule.
. Train your staff so that they know what to do.
. Figure out where the energy goes; monitor power
use real time.
Mr. Reardon's Recommendations
continued
--
. Analyze "how to reduce" demand, and do a "what
if" analyses; Run only the equipment you need.
. Get help from outside experts on how to reduce
HV AC, lighting, etc.
. Create an incentive program; i.e., time off or gifts
for people who have good, energy saving ideas.
. Invest in electrical technology to ensure your
equipment is cost effective.
Conclusion..
What you can do to prepare
. Understand the market and know your options
. Reduce demand - the least expensive resource is the
one you don't need
. Become more energy-efficient -- energy efficiency
may be worth more to you now than ever before
. Determine your ability to curtail load voluntarily or via a
curtailment program
. Explore purchasing options through gas and/or electric
energy service providers
Pacific Gas and Electric Company
41
----
Board Financial Planning and
Policy Workshop
February 1, 2001
. Purpose: To provide information and stimulate
dialogue on the District's rate setting process
. Outcome: For the Board to consider future rates
and provide staff direction for future actions
----------------
- - u_---~---~_u_-----_._---------~--
.._~~-----_u_--
Last Year's Scenario
2000 O&M charge rate increase
. Where did the expenses increase?
. O&M expenses
Last year
~ Utilities - $2,840
~ Repairs - $2,239
~ Outside Sers $1 ,966
This year
$5,440
$ 2,891
$ 2,150
~ Energy increase
~ Maintenance
$2.6 million
$ 0.8 million
~ Sewer Service Charge Increase - $24
.---- n_~- ---_u_- -
.- ---- ------------------~-----
--------- ---- --- - -----
Summary
The Board should consider:
. Raising Connections Fees as recommended.
. Providing ratepayer notice for a Sewer Service Charge
increase of up to $24 annually for three years.
. Raising the Sewer Service Charge between $18 and $24
annually for the next three years
(Stated goal is to bring District revenues to equal
expenses within the next five years by continuing to
control costs and enhance revenue.)
---------------------.------- ----- - -
-----------~---------_._------ - n__-
Next Steps
Future actions for setting the Sewer Service Charge
. Receive staff input on District financial position
- January 25, 2001 Workshop
. Request further information from staff
- Consult with management team
. Board presentation at future meeting on possible
Sewer Service Charge rate scenarios
- Last Board meeting in February
. Authorize staff to mail public notice on rate hearing
- Board meeting of March 15, 2001
. Board to set rates and approve budgets
- Board Workshop on May 24, 2001; Board approval at
meeting of June 21, 2001
- -----------
------------
~
Central Contra Costa Sanitary District
BOARD OF DIRECTORS
POSITION PAPER
Board Meeting Date: February 1, 2001
No.: 6.a.
ENGINEERING
Type of Action: AUTHORIZE AGREEMENT AMENDMENT
Subject: AUTHORIZE THE GENERAL MANAGER TO EXECUTE AN AMENDMENT WITH
THE FIRM OF TALAVERA AND RICHARDSON FOR MODIFICATION OF CAPITAL
PROGRAM SOFTWARE
Submitted By:
John Mercurio, Management Analyst
Initiating Dept./Div. :
Engineering/Environmental Services
REW:D AND RECOM~~þ BOARD ~;\
~ . Sohm;.' C. SWO""
~
ISSUE: Board authorization is required when a capital program consulting agreement
amendment will increase the cost ceiling beyond the next $50,000 increment ($100,000
in this case).
RECOMMENDATION: Authorize a $45,000 amendment to the current cost ceiling and a
21-month extension in the term of the Technical Consulting Services Agreement with
Talavera and Richardson for updating and improving the Capital Program Software.
FINANCIAL IMPACT: The agreement amendment would add $45,000 to the current cost
ceiling. The proposed increase would be charged to District Project 8181, Capital
Improvement Plan and Budget, through June 30, 2002.
ALTERNATIVES/CONSIDERATIONS: The alternative to this authorization would be to 1)
not update and refine the District Capital Project Software. This is not recommended
because the proposed updates are anticipated to improve the ability of project managers
to directly input schedule, expenditure and staffing information. A second alternative
would be to use District in-house staff for this effort. District staff with this capability are
committed on other projects. In addition, because Talavera and Richardson have worked
extensively with the original software, they would be most efficient in modifying it.
BACKGROUND: Contracting for software programming services will allow updates to
the District's Capital Improvement Program software. These updates are necessary to
meet changing District priorities as well as streamlining the budget process by increasing
automation.
In 1986, the District began its process of computerizing the documents used in the
preparation of its Capital Plan and Program. This has been an ongoing effort. This past
year we made the change of allowing direct input by project managers of existing and
1/25/01
H:\PPR\SMC\2001 AGRM.wPD
Page 1 of 2
POSITION PAPER
Board Meeting Date: February 1, 2001
Subject: AUTHORIZE THE GENERAL MANAGER TO EXECUTE AN AMENDMENT WITH
THE FIRM OF TALAVERA AND RICHARDSON FOR MODIFICATION OF CAPITAL
PROGRAM SOFTWARE
proposed project descriptions and expenditure estimates. This has been a manual
operation in the past where the project managers gave written information to the keeper
of the Capital Program data and that information was then input. By allowing direct input,
one step in the process was eliminated.
The purpose of the subject Technical Consulting Services Agreement is to meet existing
and anticipated demands for programming services. Through this agreement,
programming services will be provided for the current budget cycle, implementing changes
that are helping staff analyze and prioritize the projects in the 10-year Capital
Improvement Plan. This work will include tasks that have been identified but not funded
as well as unidentified software upgrades that will assist staff in Capital Improvement
Budget/Plan preparation in the next budget cycle. One initiative planned for this year is to
develop more efficient means of linking project manager detailed schedule, expenditure
and staffing projections with the Capital Program software. It is hoped this will allow
more accurate projections of future capital spending.
Talavera and Richardson was selected as the consultant for this contract based on the
experience of its staff, familiarity with the District's procedures and standards, and its
staff's ten years of experience in performing programming services for the Capital
Improvement Program database. This amendment will bring the cost ceiling of their
contract to $110,500.
RECOMMENDED BOARD ACTION: Authorize the General Manager to execute an
amendment to increase the cost ceiling to $110,500 and extend by 21 months the current
agreement with Talavera and Richardson for software programming services.
1/25/01
H:\PPR\SMC\2001 AGRM.WPD
Page 2 of 2
~
Central Contra Costa Sanitary District
BOARD OF DIRECTORS
POSITION PAPER
Board Meeting Date: February 1, 2001
No.:
6.b.
ENGINEERING
Type of Action:
Subject: ADOPT A RESOLUTION REVISING THE CONTRACTUAL ASSESSMENT DISTRICT
POLICY
Submitted By:
Curtis W. Swanson, Division Manager
Initiating Dept./Div. :
Engineering/Environmental Services Division
R~~ANO R£COMM~OARO ACTION,
c. Sw,",," A. ,..,,11 -4
ISSUE: The Board of Directors must approve any revisions to the existing Cont actual
Assessment District (CAD) Policy.
RECOMMENDATION: Adopt a resolution revising the District Policy regarding the formation
and administration of Contractual Assessment Districts.
FINANCIAL IMPACTS: Adoption of the proposed resolution commits the District to
authorize $1,000,000 per year for Contractual Assessment District Projects during fiscal
years 2001-02 and 2002-03.
AL TERNA TIVES/CONSIDERA TIONS:
1 .
2.
Direct staff to revise the proposed resolution and policy.
Withhold or delay approval of the proposed resolution and policy revisions.
BACKGROUND: The District initiated a Contractual Assessment District Program in 1997
for the purpose of assisting homeowners with failing or inadequate septic tank systems
to extend the public sewer system to serve their properties. The Board of Directors
formally adopted a policy for the formation and administration of Contractual Assessment
Districts by Resolution 99-010 on January 7, 1999. The policy included formation criteria,
procedures, and definitions related to the CAD Program.
On November 30, 2000, the Board held a workshop to evaluate the effectiveness and
discuss the continuation of the CAD Program. The Board provided guidance to staff on
improvements and changes to the CAD Program. Staff proposes to revise the existing
CAD Policy as follows:
1.
Add a statement about the purpose and intent of the CAD Program.
1/26/01
U:\PPR\SMC\CADPOLlCYCWS. WPD
Page 1 of 1 3
POSITION PAPER
Board Meeting Date: February 1, 2001
Subject: ADOPT A RESOLUTION REVISING THE CONTRACTUAL ASSESSMENT DISTRICT
POLICY
2.
Modify the CAD formation criteria to allow up to two dwellings on a
participating CAD property.
Modify the CAD assessment process to require that the same person or
persons may take advantage of the ten-year assessment option for only one
property at a time.
Continue the overall budget of $1,000,000 per year for the CAD Program
to fund individual CAD projects on a first come, first served basis for fiscal
years 2001-02 and 2002-03.
Specify a time limit of 18 months between initiation of a CAD and submittal
of all information and documents necessary to prepare the Engineer's
Report.
Specify a process for property owners to appeal staff decisions regarding
formation and administration of proposed CAD projects.
Expand the scope of CAD project public hearings to include receiving public
comments about the annexation of CAD properties to the District.
3.
4.
5.
6.
7.
The proposed, revised CAD Policy is attached as Exhibit A. Staff will make a presentation
describing the major revisions at the Board meeting. In addition to the major revisions,
staff has made several format and editorial changes to make the policy clearer and easier
to read.
When adopted, the revised CAD Policy will apply to CAD's that have not been initiated yet
or that have been initiated, but not approved. CAD's already approved will be covered
by the previous CAD Policy and, more specifically, the CAD agreement between the
District and CAD participants.
RECOMMENDED BOARD ACTION: Adopt a resolution revising the District Policy regarding
the formation and administration of Contractual Assessment Districts.
1/26/01
U :\PPR\SMC\CADPOLlCYCWS. WPD
Page 2 of 1 3
RESOLUTION NO.
RESOLUTION REVISING
CONTRACTUAL ASSESSMENT DISTRICT POLICY
WHEREAS, Central Contra Costa Sanitary District has, over the last several
years, identified a prevalent sanitation issue occurring within the District's Service
Area, that of the need to replace residential septic systems by connection to the
District system; and
WHEREAS, this sanitation issue is increasing in importance as a result of the failure
of existing septic systems due to age and the increased densification of the Service Area;
and
WHEREAS, in order to replace failing septic systems with connections to the public
sewers, extension of existing public sewer mains is frequently required; and
WHEREAS, the cost and complexity of undertaking a sewer main extension may
prevent a single homeowner from connecting to the public sewer system thus
perpetuating an ongoing health and environmental problem; and
WHEREAS, public policy, as well as legal and fiscal constraints, limit the ability of
the District to build or extend local street sewers to serve individual or small groups of
existing homes; and
WHEREAS, the use of small assessment districts can provide the structure and
financial assistance required to encourage neighbors to jointly undertake projects to
provide sewer service to their properties; and
Page 3 of 1 3
WHEREAS, since 1997 on a demonstration basis and since 1999 on a program
basis, the District has made use of the provisions of the Streets and Highways Code
Section 5898, et seQ. in order to create small Contractual Assessment Districts in order
to provide for assessment financing of main extensions for failing septic systems; and
WHEREAS, the Board of Directors established a policy for the formation of
Contractual Assessment Districts by adopting Resolution No. 99-010 on January 7, 1999;
and
WHEREAS, based on experience with individual Contractual Assessment District
Projects during the past two years, the Board of Directors believes that revisions to the
Contractual Assessment District Policy are appropriate.
NOW, THEREFORE, the Board of Directors of the Central Contra Costa Sanitary
District adopts the revised Contractual Assessment District Policy Statement, attached
as Exhibit A and incorporated herein by reference.
The Board of Directors of the Central Contra Costa Sanitary District further finds
that this policy shall remain in effect until such further order of the Board; however, the
adoption of this policy does not create any vested right or entitlement to any parcel
owners within the District's sphere of influence concerning eligibility for this program, nor
shall the District be precluded from modifying or terminating this program at any time it
deems appropriate.
Page 4 of 13
PASSED AND ADOPTED this 1 st day of February, 2001 by the Board of
Directors of the Central Contra Costa Sanitary District by the following votes:
AYES:
Members:
NOES:
Members:
ABSENT:
Members:
Barbara D. Hockett
President of the Board of Directors,
Central Contra Costa Sanitary District,
County of Contra Costa, State of California
COUNTERSIGNED:
Joyce E. Murphy
Secretary, Central Contra Costa
Sanitary District, County of Contra Costa
State of California
APPROVED AS TO FORM:
Kenton L. Aim,
District Counsel
Page 5 of 13
EXHIBIT A
CONTRACTUAL ASSESSMENT DISTRICT
POLICY STATEMENT
(REVISED FEBRUARY 1, 2001)
Introduction
This policy statement for the Contractual Assessment District (CAD) Program
establishes the criteria for formation of CAD projects, the process for the CAD
program and methodology for allocating costs and assessments among CAD
participants.
Contractual Assessment Districts (CADs) are small assessment districts formed
pursuant to Streets and Highways Code Section 5898, et seq. to extend sewer
facilities to residential areas currently served by septic tank and leachfield systems.
The District Board of Directors first approved a CAD Policy Statement in January
1999. Also, at that time, the Board authorized $1,000,000 per fiscal year for three
fiscal years beginning July 1998 and ending June 2001. The Board desired to evaluate
the effectiveness of the CAD Program toward the end of the third fiscal year. A Board
workshop regarding the CAD Program was held November 30, 2000. This revised
policy statement is an outcome of that evaluation.
CAD Program Purpose
The purpose of the CAD Program is to provide financial assistance to small groups of
homeowners with inadequate septic tank systems so that they may extend the public
sewer system to serve their properties. The intent of the CAD Program is to assist
single family homeowners with failing or inadequate septic tanks who might not
otherwise have the means to finance the cost of extending the public sewer. The CAD
Program is intended for residential properties, primarily owner-occupied, and not
commercial properties.
CAD Program Funding
The District will continue with the policy of a $1,000,000 per year budgetary ceiling
for CADs during the fiscal years 2001-02 and 2002-03. This ceiling amount is to be
calculated based on the total allocation to CAD projects receiving Board approval
during each fiscal year. The Board of Directors, in their discretion, may modify this
program, including increasing or decreasing the budgetary ceiling, at anytime. Nothing
in this policy is intended to bind the District to continue with the program for any
predetermined time period, nor does it create any right or entitlement in favor of
Page 6 of 13
potential program participants. In the absence of any intervening action of the Board
of Directors, it will review the effectiveness of the CAD Program at or near the end of
Fiscal Year 2002-03.
Definitions
. A Contractual Assessment District (CAD) is a legal entity established pursuant
to Streets and Highways Code Chapter 5898 for the purpose of financing the
construction of sewers in residential areas currently being served by septic
tanks.
. Parcel or Property denotes in this Policy a piece of residential real estate,
including land and anything permanently affixed to the land including buildings.
The terms parcel and property have the same meaning herein and shall refer to
the divisions of property as indicated on County Assessor's Parcel maps.
. Participants are owners of properties directly tributary to proposed facilities who
voluntarily agree to enter into a CAD contract.
. Non-participants are owners of properties directly tributary to the proposed
facilities who do not to enter into a CAD contract. Non-participants will not be
assessed for their share of the sewer improvement costs until the time of
connection.
. Participant Parcels are those properties to be served by the proposed facilities
owned by Participants.
. Non-participants Parcels are properties owned by non-participants, which could
directly connect to proposed facilities and are not initially connected to the
sewer improvements.
.
CAD Non-participant Reimbursement Fees are fees collected from owners of
Non-participant Parcels at the time of connection to the sewer to reimburse
current Participant Parcel owners for the Non-participant Parcel's share of the
cost of sewer improvements installed under the CAD.
Criteria for Formation
In order to be eligible for participation in the District's CAD assessment financing
program, the proposed sewer extension project must meet the CAD formation criteria.
District staff will make a threshold eligibility determination and will provide proponents
with a written determination of eligibility. The criteria are as follows:
Page 7 of 1 3
. A minimum of five properties must be directly tributary to the proposed CAD
facilities.
. A minimum of 60 percent of the properties directly tributary to the proposed
CAD facilities must have existing homes served by septic tank systems.
. A Participant Parcel may not have more than two (2) dwellings to participate in
a CAD.
Notwithstanding the above-listed criteria, the District's decision as to whether to form
a CAD will be determined on a case-by-case basis and is at the sole discretion of the
Board of Directors. The Board may consider technical, economic, staffing, budgetary,
environmental and other factors in its consideration of whether to form a CAD.
CAD Formation Process
There are several staff level actions and three Board approval steps in the CAD
process. The District Board of Directors will consider approval of individual CAD
projects which staff has determined meet the formation criteria. The following Board
actions are required.
. Initiation of a CAD
. Approval of the Engineer's Report and assessments;
improvements; and approval of the CAD election.
. Approval and levying of final assessments.
ordering
of the
1. Initial Actions
. Small groups of property owners may be eligible for a CAD if (1) they occupy
houses served by septic tanks, and (2) they seek a sewer main extension to
provide for connection to the District system. District staff will work with
the owners to explain the CAD process. If a sufficient number of property
owners and the District remain interested in proceeding with a CAD and the
criteria for CAD formation appears to be met, the District will consider
initiation of a CAD. Property owners will be requested to submit letters
indicating their interest in formation of a CAD. Property owners will also be
requested to submit annexation petitions if their properties are not already
part of the District. Staff will issue a letter setting forth its initial
determination of eligibility for the CAD program.
. If District staff determines that a proposed CAD does not meet the formation
criteria, staff will notify the property owners in the proposed CAD of the
staff decision in writing. Property owners may appeal this staff decision to
the District Board of Directors in accordance with Chapter 1.16 of the
Page 8 of 1 3
District Code except as modified by this policy. This policy allows property
owners 30 days to request an appeal of a staff decision. The Secretary of
the District will schedule the matter for a hearing before the Board of
Directors and provide written notice of the time and place of that hearing to
the affected property owners,
2. Creation of Assessment District
. Participants are required to retain an engineer to design and solicit bids for
the private work (the sewer facilities).
. An Engineer's Report estimating project costs and assessment levels will be
prepared by the District in accordance with state law. Residents will have
18 months from when the District initiates formation of a CAD to submit
sewer plans, construction bids and other information necessary for the
District to prepare an Engineer's Report.
. The District will distribute Notices of Proposed Assessment and conduct and
election in accordance with state law by which property owners may
indicate their approval of or opposition to the proposed assessment.
. The Board of Directors will conduct a public hearing to announce the
outcome of the election and receive public comment about the proposed
assessment. In addition, the public hearing will be to receive comments on
annexation of properties in a CAD if a public hearing is required as part of the
annexation process.
. Following the public hearing, the Board of Directors will determine the
election results and consider approval of the Engineer's Report, preliminary
assessments, and the CAD improvements.
. If the proponent property owners do not provide all necessary information,
including approved plans and construction bids, within 18 months of
District's initiation of CAD proceedings, the CAD process will be terminated.
3. Assessment Contract and Construction
.
Following approval by the Board of Directors of the Engineer's Report and
CAD improvements, the Participants must enter into a written contract with
the District which describes the responsibilities of the parties, the work, and
the provisions for payments.
Page 9 of 1 3
. The District will undertake the procedural requirements to form the CAD, and
will review the plans for compliance with District standards, finance the
work, and establish the assessments.
. Participants are required to hire a contractor and to supervise the
construction of the private works CAD facilities. The District will have no
contractual relationship with the contractor and will not provide construction
management or site supervision; however, the District will inspect the
project consistent with prevailing District inspection procedures.
. The District will accept the work if the work is done in accordance with
District standards.
. Participants shall be required to provide all project cost records and related
information. District staff will review project costs, evaluate eligible project
costs, and determine the proposed final assessments. The Board of
Directors will then consider approval and levying of the final assessments.
Payments and Assessments
. Unless limited by other provisions of this policy, each Participant shall have the
option to pay for his share of CAD expenses after the work is completed by
either 1) lump sum cash payment or 2) by contractually subjecting his property
to an annual assessment, including interest, over the term of the CAD.
Regardless of the payment option chosen, Participants pay all costs of the
sewer main extension and other appurtenant facilities required to bring service
to the Participants' Parcels. The existence, or non-existence of potential Non-
participant connectors shall not affect the obligation of the Participants to pay
for all costs associated with the project.
. The term of the Participant's assessment (payback period) shall be ten years.
The interest rate shall be fixed when the contract between the Participants and
the District is signed for the District by the General Manager. The annual
interest rate for assessments shall be 1 percent above the then current average
interest rate on CCCSD temporary investments.
.
Participants are limited to use of the ten-year annual assessment payment
option for a single parcel at any given time. If a person(s) owns two or more
parcels in the same CAD or different CADs, that person(s) may be a Participant
for more than one parcel, but will be eligible for the annual assessment option
for a single parcel. The shares of the CAD expenses for the other parcels must
be paid by the lump sum payment option.
Page 1 0 of 1 3
.
In the event a Participant is not eligible for the CAD assessment financing
option, the Participant shall make a full lump sum payment prior to initiation of
contract based on the preliminary assessment figures set forth in the Engineer's
Report. Return of any excess payment or additional required payment shall be
made at the time of fixing of final assessments.
. The assessments shall be equal for each Participant's Parcel unless otherwise
provided for in the contract and documents creating the CAD. If an existing
Participant's Parcel can be legally subdivided, there are two dwellings currently
existing on a single parcel, or other cost of service related factors justifying
differing assessments are present, said Parcel may be assigned more than one
assessment.
. The costs of the work associated with sanitary sewer mains, manholes, rodding
inlets and private sewer laterals within public streets or right of way may be
included as eligible costs of the CAD. Eligible CAD costs may also include costs
for other appurtenances within public streets or rights of way necessary to bring
the sewer service to the Participants. The cost of septic tank abandonment,
installation of the private sewer laterals (not within a public street or public right
of way), and District fees and charges customarily due upon connection to the
public sewer shall be excluded from CAD financing. For purposes of this
paragraph, "rights of way" shall include public or private roads providing legal
ingress and egress to multiple parcels.
. The CAD assessments will be imposed on each Participant's Parcel and recorded
as a lien against the Parcel. The assessment will include the principal and
interest and will be collected on the property tax bill as an assessment along
with taxes and other assessments and charges on the subject parcel.
CAD Non-carticicant Reimbursement Fees
. CAD Non-participant Reimbursement Fees will be established by the District
Board of Directors in accordance with District practice and the CAD contract if
District staff determines that there are Non-participant Parcels which could
connect to the CAD facility. The District will collect CAD Non-participant
Reimbursement Fees for a period of 20 years from the date of the CAD
formation. The obligation of a Non-participant Parcel owner to pay a
reimbursement fee upon connection to a CAD sewer will expire after the 20-
year period.
. CAD Non-Participant Reimbursement Fees will be established by the Board after
a public hearing and after final assessments have been established.
Page 11 of 1 3
. For purposes of calculating the amount of a CAD Non-participant
Reimbursement Fee to the applied to a subsequently connecting parcel, a Non-
participant Parcel will be treated as a Participant Parcel for the purposes of
calculation and distribution of subsequently collected Reimbursement Fees.
. CAD Non-participant Reimbursement Fees will be calculated by dividing the total
CAD cost by the current number of Participants. The number of Participants for
this purpose shall include the total of the original and subsequent connectors,
and the current Non-participant Reimbursement Fee payor. The following
example illustrates this calculation process.
Assume:
Total assessments to be paid = $80,000; there are 4 original Participants, and
there are 4 Non-participants. Each of the 4 original Participants assumes a
$20,000 assessment.
REIMBURSEMENT FEE CALCULATION
Non- Credit to each Net Cost to
Participant' Fee prior Participant Participants
Connection
First $80,000 = $16,000 $16,000 = $4,000 $20,000
- 4.000
5 4 $16,000
Second $80,000 = $13,333 $13,333 = $2,667 $16,000
- 2.667
6 5 $13,333
Third $80,000 = $11,429 $11,429 = $1,904 $13,333
- 1.904
7 6 $11,429
Fourth $80,000 = $10,000 $10.000 = $1,429 $11,429
- 1,429
8 7 $10,000
1After a Non-participant Parcel owner pays their reimbursement fee. the Non-participant Parcel
owner becomes a Participant for the purpose of further reimbursement fee calculations.
. As non-participating owners connect their homes to the sewer extension,
CCCSD staff will collect a CAD Non-participant Reimbursement Fee from each
newly connecting Non-participant Parcel owner. Each newly received CAD Non-
participant Reimbursement Fee will be divided uniformly among the current
owners of Participant Parcels. The owner(s) of the Participant Parcel at the time
of the distribution shall receive any excess amount of a reimbursement share
over that needed to extinguish any remaining CAD assessment, such amount to
Page 1 2 of 13
be limited to the total amount of CAD assessments or lump sum payment paid
by the then current parcel owner(s), reduced by other excess reimbursement
amounts previously paid to this same parcel owner(s). The District will forward
a notification of available funds and a verification form to the current Participant
Parcel owner(s) at the address reflected in the then current Assessor's records.
Upon receipt of a properly completed verification form by the District, the
District will forward a check to the then current Participant Parcel owner in the
amount of the Participant Parcel owner's share as determined herein.
. The District shall have no affirmative responsibility to locate the eligible
Participant Parcel owner(s), other than to mail notice to the Assessor's address
for the parcel owner; nor shall the District be required to attempt to contact an
eligible owner's estate, or heirs, nor to locate or protect other potential interest
holders. Any proceeds from collections of CAD Non-participant Reimbursement
Fees which are held by the District for over three years due to inaction on the
part of an eligible owner, or excess proceeds from CAD Non-participant
Reimbursement Fees accumulated pursuant to the procedures set forth herein,
will become the property of the District.
Page 13 of 13
CONTRACTUAL ASSESSMENT
DISTRICT PROGRAM
~ fQUCY CJ:IANGfS
U:\Admin\Swanson\Overheads\Board Feb2.wpd
~CAD~
INTRODUCTION
PURPOSE
FUNDING
DEFINITIONS
FORMATION CRITERIA
FORMATION PROCESS
1.
2.
3.
INITIAL ACTIONS
CREATION
CONTRACT & CONSTRUCTION
PAYMENTS & ASSESSMENTS
NON-PARTICIPANT REIMBURSEMENT FEES
U:\Admin\Swanson\Overheads\Board Feb2.wpd
CONTRACTUAL ASSESSMENT D ISTRI CTS
~ C N IDERATI
1.
KEEP SIMPLE & FLEXIBLE
2.
BENEFICIAL TO HAVE MORE PROPERTIES
3.
LIMIT PARTICIPATION OF OWNERS OF
MUL TIPLE PROPERTIES
4.
NEED TO COMPLY WITH ASSESSMENT
D ISTRI CT LAWS
U:\Admin\Swanson\Overheads\Board Feb2.wpd
CONTRACTUAL ASSESSMENT DISTRICTS
F.OLICY REVISIONS
.
PURPOSE & INTENT OF CADS
.
UP TO 2 DWELLINGS I PROPERTY
.
10-YEAR ASSESSMENTS FOR 1 PROPERTY
.
IS-MONTH TIME LIMIT FROM CAD
INITIATION
.
APPEAL PROCESS
.
ANNEXA TI 0 N HEARING
.
$1 MILLION I YEAR THROUGH 2002 - 2003
U:\Admin\Swanson\Overheads\Board Feb2.wpd
CAD EORMAIIQN CRIIERIA
.
MINIMUM OF 5 PROPERTIES
.
MINIMUM OF 60% OF PROPERTIES MUST
HAVE HOME WITH SEPTIC TANK
*** PROPERTY MA Y NOT HA VE MORE THAN 2
DWELLINGS
.
BOARD DECIDES FORMATION ON A CASE-
BY-CASE BASIS:
TECHNI CAL
ECONOMIC
***
STAFFING & BUDGETRY
ENVIRONMENTAL
OTHER
U:\Admin\Swanson\Overheads\Board Feb2.wpd
CAD~&
MENTS
.
STILL HAVE 2 PAYMENT OPTIONS:
1.
ANNUAL ASSESSMENTS OVER 10
YEARS
2.
LUMP SUM
*** PARTICIPANTS LIMITED TO USINGIO-YEAR
ASSESSMENT FORA,SINGLE PARCEL AT ANY
GIVEN"TIME
U:\Admin\Swanson\Overheads\Board Feb2,wpd
APPEAL :fROCESS
.
STAFF MAKES DETERMINATION OF CAD
ELI GIBILITY
.
OWNERS MAY APPEAL TO BOARD OF
DIRECTORS
.
FOLLOW APPEAL
DISTRICT CODE
PROCEDURE
IN
.
30-DA Y TIME LIMIT
.
BOARD CONDUCTS HEARING & DECIDES
WHETHER OR NOT, TO UPHOLD OR
MODIFY STAFF DECISION
U:\Admin\Swanson\Overheads\Board Feb2.wpd
~
Central Contra Costa Sanitary District
BOARD OF DIRECTORS
POSITION PAPER
Board Meeting Date: February 1, 2001
No.:
7.a.
TREATMENT PLANT
Type of Action: DIRECT STAFF
Subject:
REVIEW LANDFILL GAS AGREEMENT AND USE STATUS
Submitted By:
James L Belcher, Senior Engineer
Initiating Dept./Div. :
Plant Operations Department/Maintenance
REVIEWED AND RECOMMENDED FOR BOARD ACTION:
(J. ;aa / ;~
~ ... :!J-
ISSUE: Board of Directors to provide direction to staff regarding landfill gas use.
RECOMMENDATION: Consider alternatives and direct staff regarding continued landfill gas
use.
FINANCIAL IMPACTS: To be presented under a separate cover.
AL TERNATIVES/CONSIDERATIONS: Alternatives include, but are not limited to,
discontinuing use of landfill gas, continuing under the existing evergreen extensions, or
continuing negotiations; and evaluating and pursuing legal remedies.
BACKGROUND: The District has used landfill gas in its furnaces and auxiliary steam
boilers since 1983. At that time, the District received a 25 percent discount off natural
gas costs. The contract has been revised four times, primarily to adjust the discount as
natural gas prices declined. The current landfill gas contract with Acme Landfill expired
on July 1, 1999. We are currently operating under the contractual 90-day evergreen
extensions. At the Board meeting on September 7, 2000, the Board authorized the
General Manager to execute a new five-year landfill gas contract with an effective date
of August 1, 2000. The landfill gas discount was set at 30 percent (from burner tip
natural gas costs) with a floor of $2.50/decatherm. For natural gas costs above $5.00
per decatherm, the 30 percent discount would increase to 50 percent of the incremental
increase above $5.00.
As of September 7, District staff understood the contractual arrangements were to be as
follows: Acme Landfill would lease the gas rights, collection system, and compressor
package to NEO/ACME, a wholly owned subsidiary of NEO Corporation. NEO/ACME is a
50-percent controlling partner of MM Martinez Energy LLC. NEO is a wholly owned
subsidiary of Northern States Power, a utility in Minnesota. NEO needed to finalize these
1/26/01
S:\Correspondence\POSPAPR\2001 \Landfill Gas Status.JLB.wpd
Page 1 of 2
POSITION PAPER
Board Meeting Date: February 1, 2001
Subject:
REVIEW LANDFILL GAS AGREEMENT AND USE STATUS
contractual arrangements before they could sign the contract with the District. The
District had repeated assurances from NEO that NEO was completing the contractual
arrangements necessary to sign the agreement that the Board approved on September 7.
However, on January 23, 2001, in a conference telephone conversation, attorneys
representing NEO informed District staff that the existing landfill gas agreement had been
assigned to NEO and that NEO probably would not sign the agreement that was approved
by the Board on September 7, 2000. The NEO representatives asked if the District would
consider a discount that would increase NEO's income. NEO was informed by District
staff that this was a Board issue, but that from staff's perspective, NEO had not dealt
with the District in good faith, As a footnote, the District has not been billed for its landfill
gas use since August 1, 2000. Staff will provide data under separate cover on the
alternatives and other information the Board may consider when directing staff.
RECOMMENDED BOARD ACTION: Consider alternatives and direct staff on continued
landfill gas use.
1/26/01
S:\Correspondence\POSPAPR\2001 \Landfill Gas Status.JLB.wpd
Page 2 of 2