HomeMy WebLinkAbout01-25-01 AGENDA BACKUP .At Central Contra Costa Sárjitary District BOARD OF DIRECTORS POSITION PAPER Board Meeting Date: January 25, 2001 No.: 4.a. TREATMENT PLANT Type of Action: ACCEPTANCE OF REPORTS Subject: BOARD ACCEPTANCE OF THE YEAR 2000 NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM, COLLECTION SYSTEM OVERFLOW MONITORING PROGRAM, AND THE RECYCLED WATER QUALITY AND DISTRIBUTION REPORTS Submitted By: Bhupinder S. Dhaliwal Initiating Dept./Div.: Plant Operations/Operations ~5]) B. Dhaliwal r ~f::g tú- J. Kelly REVIEWED AND RECOMMENDED FOR BOARD ACTION: ISSUE: The Central Contra Costa Sanitary District's (CCCSD) Year 2000 National Pollutant Discharge Elimination System (NPDES), Collection System Overflow Monitoring Program, and the Recycled Water Quality and Distribution Reports have been prepared for submission to the California Regional Water Quality Control Board (RWQCB), San Francisco Bay Section. These annual reports are presented for Board of Directors' information and acceptance. RECOMMENDATION: Accept the Year 2000 National Pollutant Discharge Elimination System, Collection System Overflow Monitoring Program, and Recycled Water Quality and Distribution Reports. FINANCIAL IMPACTS: None AL TERNA TIVES/CONSIDERA TIONS: None BACKGROUND: Treatment Plant -- During the year 2000, the treatment plant received a total of 16,754 million gallons of wastewater, which equated to an average flow of 45.9 million gallons per day. This average flow is the same as for 1999. The treatment plant produced an effluent with an annual average biochemical oxygen demand (BOD) and total-suspended solids (TSS) concentrations of 6 and 9 mg/L each, respectively. These concentrations are markedly lower than our NPDES permit standards of 25 and 30 mg/L each. BOD and TSS removal efficiency for the treatment plant averaged 95 and 96 percent, respectively. Solids disposal during the year involved the incineration of dewatered sludge in the 1/16/01 S :\LAB\AnnuaIRpt\PosnPpr .00. wpd Page 1 of 3 POSITION PAPER Board Meeting Date: January 25, 2001 Subject: BOARD ACCEPTANCE OF THE YEAR 2000 NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM, COLLECTION SYSTEM OVERFLOW MONITORING PROGRAM, AND THE RECYCLED WATER QUALITY AND DISTRIBUTION REPORTS District's multiple-hearth furnaces. Approximately 5,127 tons of furnace ash was produced. The ash met regulatory requirements for final disposal throughout the year. More than 15,000 NPDES permit-required tests were completed to comply with the NPDES permit requirements. The treatment plant effluent met all (100 percent) of the permit requirements throughout the year. Effective January 1, 2000, the District started to submit its monthly self-monitoring report to the RWQCB electronically, as required. Because of the District's participation in the electronic data submittal program, the RWQCB has exempted the District from tabular and graphical reporting in the annual report. Consequently, this year's annual report does not contain any graphical presentations of data. All of the pertinent data is shown in the appropriate tables within the report. The District's NPDES permit also requires an annual update of the District's operation and maintenance procedures. A description of the updates is also included in the annual report. Collection System -- There were 34 reportable collection system overflows (overflows exceeding 100 gallons in volume), compared to 22 for the previous year. Only 3 of the 34 overflows exceeded 1,000 gallons in volume and were the subject of written reports submitted to the RWQCB. The causes of these three overflows were wet-weather surcharge, sewer pipe failure, and root blockage in the sewer pipe. The rest of the overflows were mainly due to root growth, grease deposition, and other blockages in the pipes. Further details on the overflows can be found in the attached reports. Recycled Water Oualitv and Distribution -- CCCSD distributed more than 175 million gallons of tertiary recycled water to various customers in the District's service area, compared to 89 MG for 1999. Recycled water quality met all applicable RWQCB reuse water-quality requirements and limitations. CCCSD plans to add another ten users in 2001. Submittal to the RWQCB -- Upon acceptance of these reports by the District Board of Directors, the reports will be submitted to the RWOCB. 1/16/01 5 :\LAB\AnnuaIRpt\PosnPpr .00. wpd Page 2 of 3 POSITION PAPER Board Meeting Date: January 25, 2001 Subject: BOARD ACCEPTANCE OF THE YEAR 2000 NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM, COLLECTION SYSTEM OVERFLOW MONITORING PROGRAM, AND THE RECYCLED WATER QUALITY AND DISTRIBUTION REPORTS RECOMMENDED BOARD ACTION: Accept the Year 2000 National Pollutant Discharge Elimination System, Collection System Overflow Monitoring Program, and Recycled Water Quality Distribution Reports. 1/16/01 S:\LAB\AnnuaIRpt\PosnPpr .00. wpd Page 3 of 3 RWQCB ANNUAL REPORT Purpose Summary of Calendar Year Performance Compiles Data for Twelve Monthly Reports In Essence "Our Report Card" to RWQCB RWQCB ANNUAL REPORT Contents Treatment Plant Waste Characteristics and Loading Waste Characteristics Into Plant Waste Characteristics In Treated Effluent Receiving Water Characteristics Suisun Bay Around Our Outfall Sewer System Overflows Recycled Water Report Usage Water Quality Annual Customer Inspections RWQCB ANNUAL REPORT Treatment Plant I Receiving Water Completed 15,000 Analytical Tests Approximately 11,000 Hours of Laboratory Work 100 Percent Compliance With NPDES Permit Requirements RWQCB ANNUAL REPORT Flow Information Total Flow Treated = 1999 16.7 Billion Gallons 2000 16.7 Billion Gallons Average Daily - 45.8 Million Gallons 45.9 Million Gallons Peak Hourly Flow = 168 Million Gallons/Day 200 Million Gallons/Day RWQCB ANNUAL REPORT Collection System Oveñlows Total Sewer Overflows 1999 22 2000 34 Overflows greater than 1,000 gallons 6 3 Causes: Pipe Failure Root Intrusion Wet Weather Surcharge Grease Debris RWQCB ANNUAL REPORT Recycled Water 1999 Recycled Water Customers 13 Million Gallons Recycled Water Delivered 93.4 Peak Month Usage 16.6 / (July) 100 Percent Compliance With Title 22 Requirements No Customer Complaints 2000 15 175.5 33.4 / (June) RWQCB ANNUAL REPORT Changes In Year 2000 Electronic Reporting Starting January, 2000 LIMS Implementation Complete New NPDES Permit With Additional Challenges More Stringent Requirements Fines For Violations (AB 709) RWQCB ANNUAL REPORT Acknowledgements Operations Staff Laboratory Plant Operators Maintenance Staff Buildings and Grounds Mechanical Maintenance Electrical & Instrumentation Shops Process Cantrall Maintenance Engineering Collection System Crews Engineering Staff Source Control Pollution Prevention Water Recycling Desig n/Construction Administrative Public Information Human Resources Pu rchasinglWarehouse Board of Directors RWQCB ANNUAL REPORT Recommend,atioo'....nH ... Accept the 2000 Regional Water Quality Control Board Annual Report Board Financial Planning and Policy Workshop r January 25, 2001 . Purpose: To provide information and stimulate dialogue on the District's rate setting process . Outcome: For the Board to consider future rates and provide staff direction for future actions . Action: To have the information and confidence to set future Sewer Service Charge rates to meet the goals of the District in future years . Next: Provide Board feedback for future Board meetings and budget presentations Board Financial Planning and Policy Workshop January 25, 2001 . "Maintaining The Balance" ~ Focus on District Goals and Costs - Exceptional Customer Service - Full Regulatory Compliance - Responsible Rates - High Performance Organization ~ Continued Focus on Effectiveness and Efficiency - District Positions - Energy usage - Maintenance and Repair Getting to Break Even Looking at the Long-term Stability of District Finances . Revenue vs. Expense - Eight years without an O&M increase - $12 sse increase in the year 2000 - 11 of the last 12 years in deficit cash flow - Drop in District cash reserves since 1986 . Funds Available vs. Funds Required - Getting past the definitions - TRANS Financing not the best method - No cushion against future impacts Definition of "Funds Required" How do they figure that? . Funds Required @ 30 June = 5+ months of total District expenses (300/0 of expenses before payment), plus 15% contingency (cash flow), and 1 00% of Bond principal ~ For 2001 - 2002 $19 million + $9 million + $1.3 = $29.3 million Definition of "Funds Available" Where does the money come from? . Funds Available @ 30 June = Total unrestricted cash and total investments for O&M and Capital funds ~ For 2001 - 2002 ($18 sse increase) $2 million cash + $ 36.3 million investments + $0.6 owed from self- insurance = $ 38.9 million CD W -. CD .þ.. to .þ.. -. CD 01 to 01 -. CD 0> to 0> -. CD -. to -. -. CD ex> to ex> -. CD to to to -. 0 0 0 ~ 0 ..... ..... 0 0 0 0 0 0 0 ~ .0 0 0 0 0 0 0 w 0 0 0 0 0 0 0 .þ.. 01 0> -. ex> 0 0 .0 0 .0 0 0 0 0 0 0 0 0 0 0 .0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 I + + -; -; 0 0 0-+ 0-+ Q!.Q!. m::u x CD "C < CD CD :::I :::I en c: CD CD CD 0 0 0 .0 0 0 0 ..... 0 .0 0 0 0 0 0 0 r--- C) ~ 5' tQ ru "'" ~ (þ :::J § t)- (þ èi1 ::c CD < (1) ~ c:: CD < tn . m >< -c CD ~ tn CD Looking at the "No Increase" Scenario What would happen if we did nothing Funds Available $60,000 -. $50,000 ~ $30,000 c to '" g $20,000 .c ~ c f $10,000 .!! Õ Q - - - ..----"'" $40,000 $- -. 1999/00 2000/01 2001/02 2002103 2003/04 $(10,000) - $(20,000) $(30,000) Year I-Total Funds Available - ... Total Funds Required I Generating a "Soft Landing" Getting to "break even" and retaining "funds required~~ 00/01 02/03 03/04 04/05 05/06 O&M $ 185 208 216 225 235 Capital 15 28 32 47 61 Total 200 236 248 272 296 Increase each year 12 12 24 24 Funds Available $ 45,309 36,964 33,865 32,653 33,441 Funds Available $60,000 $50,000 ~ $40,000 c .. ., :J 0 .c I- $30,000 .5 f .!! ;g $20,000 .. ... ... .. ..--"""- .. .. $10,000 . $- 1999/00 2000/01 2001/02 2002103 Year 2003/04 2005/06 2004/05 I-Total Funds Available .. .. Total Funds Required I Generating a "Soft Landing" Getting to "break even" and retaining "funds required" 00/01 02/03 03/04 04/05 05/06 O&M $ 185 212 216 225 235 Capital 1Q 24 38 47 61 Total 200 236 254 272 296 Increase each year 18 18 18 24 Funds Available $ 36,000 33.774 32.558 33,340 Funds Available $60,000 $50,000 ~ $40,000 . c .. .. ::J 0 .c I- $30,000 .:: I!! .!! ;3 $20,000 ... ...'" ... .. ... ... - - $10,000 $- .. 1999/00 2000/01 2001/02 2002103 Year 2003/04 2004/05 2005/06 -Total Funds Available ... .. Total Funds Required Generating a "Soft Landing" Getting to "break even" and retaining "funds required" $100,000,000 $90,000,000 $80,000,000 $70,000,000 $60,000,000 $50,000,000 $40,000,000 $30,000,000 $20,000,000 $10,000,000 $- This graph projects out to 2005-06 using the $24 sse increase scenario Revenue defined per audited financial statements Expense defined per audited financial statements, less depreciation expense, plus capital expenditures 93/94 94/95 95/96 96/97 97/98 98/99 99/00 00/01 01/02 02/03 03/04 04/05 05/06 -.- Total Revenue ---- Total Expense Generating a "Soft Landing" Getting to "break even" and retaining "funds required" This graph projects out to 2005-06 using the $18 sse increase scenario $100,000,000 $90,000,000 $80,000,000 $70,000,000 $60,000,000 $50,000,000 -+- Total Revenue - Total Expense $40,000,000 $30,000,000 Revenue defined per audited financial statements $20,000,000 Expense defined per audited financial statements, less depreciation expense, plus capital expenditures $10,000,000 $- 93/94 94/95 95/96 96/97 97/98 98/99 99/00 00/01 01/02 02/03 03/04 04/05 05/06 Last Year's Scenario 2000 O&M charge rate increase $12 Scenario [In $000'5] Adjust O&M sse to achieve "Funds Required" & maintain minimum "O&M Funds Available" at 1 0% of Total Operating Expenditures at beginning of each year; increase sse to $200 in 2000-2001. Actual Budget Proj. Proj. Proj. Proj. Proj. 98/99 99/00 00/01 01/02 02/03 03/04 04/05 Annual SSC O&M Capital Upgrade/Replace. Total Increase this year % Increase Total Operating & CIP Rev. 51,239 53,147 68,980 62,512 63,401 59,540 61,268 Total Operating & CIP Exp. 59,239 52,959 74,030 74,630 69,118 57,273 62,178 Shortfall (8,000) 188 (5,050) (12,118) (5,718) 2,268 (909) Funds Avail. On June 30 49,236 49,424 44,374 32,256 26,539 28,806 27,897 Funds Required 24,002 28,958 32,333 31,835 26,529 28,766 27,859 Over/(Under) Funds Req'd. 25,234 20,466 12,041 421 10 40 39 Last Year's Scenario 2000 O&M charge rate increase - $28 . Did not assume: ~ Increase in staffing - customer service ~ Increase in labor and Benefits ~ Increase in energy costs . Capital Projects ~ less Connection Fee revenue ~ Capital Project delay Proposed Scenarios Creating a "soft landing" 02/03 30,270 03/04 31,407 04/05 32,487 05/06 33,472 00/01 $ 29,757 00/01 02/03 03/04 04/05 05/06 O&M $ 185 212 216 225 235 Capital 15 24 38 47 61 Total 200 236 254 272 296 Increase each year 18 18 18 24 Funds Available $ 45,309 36,000 33,774 32,558 33,340 00/01 02/03 03/04 04/05 05/06 O&M $ 185 208 216 225 235 Capital .1§ 28 32 47 61 Total 200 236 248 272 296 Increase each year 12 12 24 24 Funds Available $ 45,309 36,964 33,865 32,653 33,441 00/01 02/03 03/04 04/05 05/06 O&M $ 185 208 216 225 235 Capital 15 34 38 41 43 Total 200 242 254 266 278 Increase each year 6 12 12 12 Funds Available $ 45,309 39,813 37,816 35,899 34,019 i ,I '", - -, -..- -----_,_",1 Connection Fee Increase Buying into the District's Capacity . Recent legislation prompted review . Fees are 5 to 1 0% of total District revenue . Revenue is dependent of number of connections . Connection Fee - Current fee $2,572 per connection (gravity) - Proposed fee $3,360 per connection (gravity) . Increased Revenue potential - $1 million (Based on 1,830 new units) . Consider "Main Fee" in future years COMPARISON OF CONNECTION FEES Agency Connection Fee Dublin San Ramon Services District Pleasanton Livermore Benicia Mountain View Sanitary District Napa Sanitation District Rodeo Sanitary District Brentwood Pittsburg (Delta Diablo S. D. for Treatment) CCCSD Pumped Zone (Proposed) Oro Loma Sanitary District Antioch (Delta Diablo S. D. for Treatment) Berkeley (EBMUD for Treatment) CCCSD Gravity Zone (Proposed) CCCSD Pumped Zone (Current) Union Sanitary District CCCSD Gravity Zone (Current) West County Wastewater District Crockett-Valona Sanitary District Oakland (EBMUD for Treatment) Vallejo Sanitation District) Concord Stege Sanitary District (EBMUD for Treatment) $11,050 $10,400 $9,002 $7,500 $6,997 $5,660 $5,000 $4,881 $4,21 3 $4,070 $3,852 $3,600 $3,375 $3,360 $2,920 $2,618 $2,572 $1,854 $1,764 $1,760 $1 ,755 $1,750 $1,690 Source: Wastewater User Charge Survey Report, FY 1999-2000 CalEPA - State Water Resources Control Board (May 2000), and Staff Contacts (January 2001) Recommended Scenario Creating a "soft landing" over time; $18 Scenario . Looking into the future ~ Does not allow for: - Moderate energy increases after this year - No major economic slowdown - No drop in unit connections - General 3% inflation adjustments - Minor energy related increases in other areas - No major staffing increase - Future benefits and retirement - Limited regulatory impacts - Capital Program projections - No loss of Ad Valorem Tax The "What If" Scenario The Cost of considering "What Ifs 11 . Event Costs Effect on SSC - 50% Increase in energy -$2.5 million -$17 - 50% Drop in connections -$1 million -$7 - 30% Increase in chemicals -$0.3 million -$2 - 60/0 Generallnflation -$0.5 million -$4 . Total costs on SSC ~$30 . Future concerns - Loss of Ad Valorem - Retirement - Other energy related increases - Salary and benefits (Avoided costs this year was $800,000) -$45 -$4 ? . ? . Actual Projections Increases over the five-year period $5,000 8% Avg Increase per year 2% Avg. Increase $25,000 $20,000 $15,000 ~- $10,000 ~- 14.5% Avg. Increase 8% Ava Inr.rPRC:;p $- I I I I Labor Benefits Utilities Repairs & All Other O&M Capital Maintenance . Budget 00-01 $16,174 $6,357 $3,026 $2,387 $7,916 $26,120 . Proj. 05-06 $19,448 $9,260 $5,901 $3,438 $8,776 $25,121 Total % Inc 20% 46% 95% 44% 11% -4% Summary The Board should consider: . Raising Connections Fees as recommended. . Providing ratepayer notice for a Sewer Service Charge increase of up to $24 annually for three years. . Raising the Sewer Service Charge between $18 and $24 annually for the next three years (Stated goal is to bring District revenues to equal expenses within the next five years by continuing to control costs and enhance revenue.) SEWER SERVICE CHARGE COMPARISON Agency Annual Service Charge Berkeley (EBMUD for Treatment) Livermore Oakland (EBMUD for Treatment) Benicia Pleasanton Crockett-Valona Sanitary District Stege Sanitary District (EBMUD for Treatment) Dublin San Ramon Services District Napa Sanitation District Rodeo Sanitary District Vallejo Sanitation District Pittsburg (Delta Diablo S.D.) Mt. View Sanitary District Central Contra Costa San. District ($36 increase) Brentwood Central Contra Costa San. District ($24 increase) Central Contra Costa San. District ($18 increase) Central Contra Costa San. District (Current) Antioch (Delta Diablo S. D.) Union Sanitary District Concord (CCCSD) Oro Loma Sanitary District West County Wastewater District Source: Wastewater User Charge Survey Report, FY 1999-2000 CalEPA - State Water Resources Control Board (May 2000), and Staff Contacts (January 2001) $481 $391 $391 $360 $360 $332 $319 $310 $274 $265 $257 $256 $240 $236 $227 $224 $218 $200 $192 $191 $180 $113 $109 Next Steps Future actions for setting the Sewer Service Charge . Receive staff input on District financial position - January 25, 2001 Workshop . Request further information from staff - Consult with management team . Board presentation at future meeting on possible Sewer Service Charge rate scenarios - Last Board meeting in February . Authorize staff to mail public notice on rate hearing - Board meeting of March 15, 2001 . Board to set rates and approve budgets - Board Workshop on May 24~ 2001~. Board approval at meeting of June 21~ 2001 POWER ASSUMPTIONS PROJECTED COST VS. 2000-01 BUDGET POWER SOURCE PROJECT CONSUMPTION % INCREASE UNIT COST (+) 10% YEAR 1 ELECTRICITY NO CHANGE THEREAFTER (+) 30% YEAR 1 $.08- $.09/ KWH NATURAL GAS NO CHANGE 250 $8.00/ dTH $6.20/ dTH (EXISTING) LANDFILL GAS NO CHANGE 250 $5.00/ dTH (PROPOSED) Consum ption Cost FY 2000-2001 FYO1-02 FY 2000-2001 FYO1-02 FY03-4 Budget Actual To 05-06 Budget Actual To 02-03 To 05-06 Electrical (PGE Import KWH) 2,700,000 2,700,000 3,000,000 $500,000 $575,000 $660,000 $726,000 Natural Gas (dTH) 435,000 435,000 440,000 $1,429,423 $2,600,000 $3,500,000 $3,500,000 Landfill Gas (dTH) 160,000 160,000 160,000 $440,797 $700,000 $800,000 $800,000 (Sept. 7 NEO Contract) Totals: $2,370,220 $3,875,000 $4,960,000 $5,026,000 j I r...::i.IC aSti[!r \" E ~ L l \.1"'" '^' E o, ...--;::; r> \/ . - ~! Electric Company \. ,..: I r! tt'~ ~~ t.il] t.. ., -.'. .. "."."."'."-".'.""'~ CENTRAl CONTRA rosT A SANITARY DISTRICT BJG T" 77003-0 . - @.l~~~if~ TI7i~Jf~. ,,~.: ,"';:-; ."",.:~.. r-:",'~:j-~':':::~ê';"':':;~':--":'::::$-F:7:i~:;::f] Ra&8 Sc:h8dute: SE20P Secvioe Type: Bundled Secvioe SeMce: From 1U>1A)() To 01A)U>1 Bilrcng Days: 32 Electric Meter II: .c.t62T6 Prior Meter Read EIedric 00000 RKV A 00000 «>%Power Factor - No Ad;ustment Current Meter Read 00000 00000 Difference 0 0 Constant 7200 7200 Usaae 823885 Kwh 53798 Kvarh ( Total Charges Minimum Charge $20.00 $63584.94 I The net charges shown above include the following component(s). Please see definitions on Page 2 of the bill. EIedrié Energy Charge Transmission Distnbt.aOOn Public Purpose Programs Nuclear Oeoommèssionéog (;ompetitioo Transition Œtarge(CTC) $269417.47 8424. 04 15017.10 1796.07 238.92 . . This rale is based on the weighted average costs for purchases through the Power Exchange. This service is subject to conpetition. You may purchase electricity from another supplier. (Call 1-800-743-0040 for a supplier list.) . DEMAND DETAil Billing Demand Created Demand Previous High Demand Previous High Demand Month 3377 3377 3967 May Usane Com~rison Davs Billed Electric Kwh Kwh oer Dav This Year 32 823885 25746 last Year 32 154116 4816 $14.00 $12.00 $10.00 ~ t1 $8.00 ~ ~ 0:: w c.. $6.00 Eß- $4.00 $2.00 $0.00 8/2/00 ONE YEAR PRICES NATURAL GAS 8/22/00 9/11/00 10/1/00 1 0/21/00 11/10/00 11/30/00 12/20/00 DATE 1/9/01 1/29/01 2/18/01 2001 $8.15 COREL 5 YEAR NATURAL GAS PRICE MODEL: (PRICE PER dTH) 2002 2003 2004 $6.40 $5.40 $5.05 2005 2006-2010 $4.95 $4.85