MINUTES OF THE REGULAR BOARD MEETING
OF THE DISTRICT BOARD OF THE
CENTRAL CONTRA COSTA SANITARY DISTRICT
HELD ON AUGUST 5, 1993
The District Board of the Central Contra Costa Sanitary District convened in a regular
session at its regular place of meeting, 5019 Imhoff Place, Martinez, County of Contra
Costa, State of California, at 3:00 p.m. on August 5, 1993.
President Clausen called the meeting to order and requested that the Secretary call roll.
1. ROLL CALL
PRESENT:
Members:
Menesini, Dalton, Hockett, Rainey, Clausen
ABSENT:
Members:
None
2. PUBLIC COMMENTS
Mr. Clyde Vaughn, 59 Donna Maria Way, Orinda, Chairman of the Moraga Del Rey
Homeowners Association, addressed the Board relative to purchase of the abandoned
Shell pipeline for distribution of reclaimed water. Mr. Vaughn stated that a number of
people in Orinda are opposed to reclaimed water coming into the East Bay Municipal
Utility District (EBMUD) watershed that drains into San Pablo Reservoir. Additionally,
Orinda is the highest point in the distribution system and would have the highest pumping
costs and additional pipeline would be needed to get the water to Orinda. Mr. Vaughn
stated that 30 percent of the registered voters in Orinda have signed a petition opposing
the Gateway Valley development and use of reclaimed water for the proposed golf course.
When there is a closer, cheaper market, Mr. Vaughn asked why the District would expose
the ratepayers in Orinda to unnecessary liability. Mr. Vaughn asked that the Board keep
this in mind when considering the proposed reclaimed water project.
President Clausen thanked Mr. Vaughn for his comments but indicated that in compliance
with the Brown Act, the Board could not discuss the matter at this time since it was not
calendared on the agenda. President Clausen urged Mr. Vaughn to watch the District
Board agenda and to present his views and concerns if purchase of the abandoned Shell
pipeline comes before the Board for consideration.
Mr. Peter Radetic, 890 Golf Club Road, Pleasant Hill, addressed the Board relative to the
service level and billing of Pleasant Hill Bayshore Disposal. Mr. Radetic stated that he is
a resident of the unincorporated area of Pleasant Hill and as such resides in the District's
refuse collection franchise area. Mr. Radetic stated that he received a letter from Pleasant
Hill Bayshore Disposal stating that through an oversight he had been receiving the service
level and billing rate for residents in the incorporated area franchised by the City of
Pleasant Hill. Mr. Radetic stated that the letter advised that his level of service would
change and his rate would decrease from $18.40 to $15.50. Mr. Radetic requested a
refund for the amount overbilled, approximately $25 over the last 12 months.
President Clausen thanked Mr. Radetic for bringing this matter to the attention of the
Board and referred the matter to staff for review and response.
3. CONSENT CALENDAR
Following discussion of the District's boundaries and annexation of islands within the
boundaries, it was moved by Member Rainey and seconded by Member Menesini that the
Consent Calendar, consisting of Items a. through d., be approved as recommended,
resolutions adopted as appropriate, and recordings duly authorized.
a.
Resolution No. 93-072 was adopted, confirming that publication of District
. Ordinance No. 187 authorizing early retirement service credit has been
made.
Motion unanimously approved on the following vote:
08
05
93
164
AYES: Members: Rainey, Menesini, Dalton, Hockett, Clausen
NOES: Members: None
ABSENT: Members: None
b.
Resolution No. 93-073 accepting an easement at no cost to the District
from John S. Watson and Joann Larson, Martinez area, Job 1811, Parcel
72, was adopted and recording was authorized.
Motion unanimously approved on the following vote:
AYES: Members: Rainey, Menesini, Dalton, Hockett, Clausen
NOES: Members: None
ABSENT: Members: None
c.
Authorization was given for P .A. 93-13 (Alamo), P .A. 93-14 (Danville), and
P.A. 93-15 (Alamo) to be included in a future formal annexation to the
District.
Motion unanimously approved on the following vote:
AYES: Members: Rainey, Menesini, Dalton, Hockett, Clausen
NOES: Members: None
ABSENT: Members: None
d.
Notification of Management Support/Confidential Group Officers for 1 993-
1994 was received. This item was presented for the Board's information.
No action was taken.
4. CALL FOR REQUESTS TO CONSIDER ITEMS OUT OF ORDER
None
5. CORRESPONDENCE
a.
CONSIDER DRAFT RESPONSE TO ADELMAN LETTER CONCERNING COLLECTION
OF DELINQUENT SEWER SERVICE CHARGES
Following discussion, it was the consensus of the Board that the draft response to the
July 10, 1993 Adelman letter concerning collection of delinquent Sewer Service Charges
be approved as modified.
b.
NOTE RECEIPT OF LETTER FROM STATE SENATOR NICHOLAS C. PETRIS
CONCERNING THE TAKING OF AD VALOREM TAX REVENUE
Receipt of the July 16, 1993 letter from State Senator Nicholas C. Petris concerning the
taking of ad valorem tax revenue was noted.
6. APPROVAL OF MINUTES
a.
MINUTES OF JULY 1. 1993
Following discussion of a "buy-in" charge at the time of annexation and additional
capacity that may be required at some time in the future, it was moved by Member
Rainey and seconded by Member Hockett, that the minutes of July 1, 1993, be approved
as presented. There being no objection, the motion was unanimously approved.
08
05
93
165
b.
MINUTES OF JULY 15. 1993
It was moved by Member Rainey and seconded by Member Hockett, that the minutes of
July 15, 1993, be approved as presented. There being no objection, the motion was
unanimously approved.
7. APPROVAL OF EXPENDITURES
a.
EXPENDITURE LIST DATED AUGUST 5. 1993
Member Menesini thanked Mr. John Mercurio, Administrative Analyst, for the informative
presentation on capital expenditures. Member Menesini requested more information and
tours of large capital projects such as the Headworks Project. Mr. Roger J. Dolan,
General Manager-Chief Engineer, stated that a presentation on capital projects is
scheduled for later in the meeting and a tour of the Headworks Project has been
tentatively scheduled for the August 19, 1993 Board Meeting.
It was moved by Member Hockett and seconded by Member Menesini, that the
Expenditure List dated August 5, 1993, including Self-Insurance Check Nos. 100710-
100719, Running Expense Check Nos. 76498-76852, Sewer Construction Check Nos.
12771-12869, and Payroll Check Nos. 31836-32142, be approved as recommended.
There being no objection, the motion was unanimously approved.
8. BUDGET AND FINANCE
RECEIVE JUNE 1993 FINANCIAL STATEMENTS
a.
Ms. Deborah Ratcliff, Controller, provided a brief report of operations and maintenance
expenses, revenues and reserves for the fiscal year ended June 30, 1993. Ms. Ratcliff
stated that actual revenues of $27,887,000 were $630,000 less than budgeted revenues
of $28,500,000, representing a 2.2 percent revenue shortfall. Ms. Ratcliff stated that
actual expenditures of $26,462,000 were $1,047,000 less than budgeted expenditures
of $27,509,000, representing a 3.8 percent favorable variance. As a result, reserves will
increase to a balance of $2,663,000.
Self-Insurance Fund actual revenues of $327,000 were $63,000 less than budget,
representing a 16 percent shortfall. Actual expenditures of $643,000 exceeded budget
by $447,000, resulting in a decrease to reserves of $316,000. The Self-Insurance Fund
reserve at June 30, 1993 is $5,655,000.
Ms. Ratcliff stated that a more detailed report will be made when the audited financial
statements are submitted to the Board in October 1993.
Ms. Ratcliff reported that the District's temporary investments were held in Treasury bills
and Treasury notes and the District's Local Agency Investment Fund (LAIF) account, with
interest rates ranging from 2.77 percent to 6.2 percent. The latest interest rate was
3.875 percent. The average yield for the LAIF account through June 1993 was 4.55
percent. Ms. Ratcliff reported that average yield on the District's investments for the year
was 5.138 percent. Staff will be looking at other low risk investment options for
consideration in conjunction with the annual review of the Investment Policy in January
1994.
Following a brief discussion, President Clausen declared that the June 1993 Financial
Statements were duly received.
b.
RECEIVE THE FISCAL YEAR 1992-1993 CAPITAL IMPROVEMENT PROGRAM
YEAR-END REPORT
Mr. Robert A. Baker, Deputy Chief Engineer, indicated that periodic updates will be
provided during the coming months in response to the Board's request for more
information on the Capital Improvement Program. Mr. Baker reported that $23 million
was expended in the past fiscal year on 158 capital improvement projects.
08
05
93
166
Mr. Baker described three of the largest projects in the Treatment Plant Program. The
Headworks Facilities Improvements Project bid was awarded in June 1992. Humphrey
Construction was the low bidder at $18.4 million. In Fiscal Year 1992-1993, $5.4 million
was expended. Forty-five percent of the time has elapsed and 31 percent of the funds
have been expended. To date, 21 changes orders have been approved totaling
approximately 0.4 percent. Additional changes orders totaling $210,000 (1.1 percent)
are currently under review.
Mr. Baker reported that $659,000 was expended in Fiscal Year 1992-1993 on the
Disinfection Facilities Improvements Project. A pilot study and predesign has been
completed by Montgomery Engineers. It is anticipated that staff will be coming to the
Board for award of the design contract in October 1993.
The Secondary Clarifier Improvements Project bid was awarded in May 1993 to Kaweah
Construction, the low bidder at $3.2 million. The contractor has mobilized. The project
is now in the submittal review, schedule review phase.
Mr. Baker highlighted three major projects in the Collection System Program. The
Pleasant Hill/A-Line Interceptor Project is at 95 percent design level. Montgomery is
performing that work. It is anticipated that the project will be bid in September 1993.
The engineer's estimate for the construction bid is about $18 million. It has not yet been
finalized.
Mr. Baker reported that the 1680/SR24 Relocation Phase 3 Project bid was awarded in
February 1993 to Hess Construction, the low bidder at $1.7 million. To date 75 percent
of the funds have been expended and the project is ahead of schedule. Thirteen changes
orders have been approved totaling approximately 3.5 percent. Additional changes orders
totaling $91,000 (5.3 percent) are currently under discussion.
The bid for the Orchard Road Trunk Sewer was awarded in December 1992 to Gelco in
the amount of $768,000. As a result of negotiations by District staff, the contract price
was reduced by $213,000. Final change orders have resulted in a $13,000 credit. In
Fiscal Year 1992-1993, $631,000 was expended on this project.
In summary, Mr. Baker stated that Fiscal Year 1992-1993 was a very good year for the
Capital Program. No major problems occurred; the bidding climate was excellent; the
District successfully made it through the challenge period for the Pleasant Hill Relief
Interceptor Environmental Impact Report (EIR); the institutional problems relating to the
Pleasant Hill/A-Line Interceptor Project were resolved; and some innovative cost saving
ideas were generated during the Capital Improvement Budget planning process.
Mr. Baker stated that the Capital Improvement Budget is somewhat different from the
O&M Budget. In the Capital Improvement Budget revenues and expenditures are not as
predictable in the short term. Approximately $43 million in capital work is scheduled for
the coming year. While all of that work may not be done next year, the level of capital
work will be rising in coming years because of two major projects: the Headworks
Facilities Improvements Project and the Pleasant Hill Relief Interceptor Project.
Mr. Baker introduced Mr. John Mercurio, Administrative Analyst, who highlighted
information presented in the 1992-1993 Capital Improvement Program Year-End Report.
Mr. Mercurio reported that actual revenues of $16.6 million were less than budgeted
revenues of $26.2 million by $9.6 million, 36 percent of budget. Actual expenditures of
$22.9 million were less than budgeted expenditures of $39.9 million by $17 million, 43
percent less than the Capital Improvement Budget estimate. The Sewer Construction
Fund balance at the end of Fiscal Year 1992-1993 was $61.9 million.
President Clausen thanked Messrs. Baker and Mercurio for their reports and noted that
the Fiscal Year 1992-1993 Capital Improvement Program Year-end Status Report was
duly received.
08
05
93
167
a.
9. EMERGENCY SITUATIONS REQUIRING BOARD ACTION
AUTHORIZE $75.000 FROM THE TREATMENT PLANT PROGRAM CONTINGENCY
ACCOUNT OF THE SEWER CONSTRUCTION FUND FOR THE EMERGENCY
REPLACEMENT OF THE FILTER PLANT. SUBSTATION 40 "A" SIDE (12KVL
ELECTRICAL FEEDER
Mr. Kenton L. Aim, Counsel for the District, advised the Board that staff will provide
sufficient information to allow the Board to determine if an emergency exists and such
emergency arose after the agenda was published. Then, if the Board determines by 4/5
vote that such is the case, this matter can be considered pursuant to Government Code
Section 54954.2(b)(1).
Mr. Charles W. Batts, Plant Operations Department (POD) Manager, stated that yesterday,
August 4, 1993, the" A" side electrical feeder that supplies the main electrical power to
the District's Filter Plant failed. The system is a dual system and is now operating on the
"B" side feeder. It is proposed that the" A" cable be replaced on an emergency basis.
Quotes are presently being sought. The installation of the new electrical cable will take
several days and require two separate Filter Plant shutdowns. It is believed that the
impacts of these shutdowns can be minimized and operations can be maintained without
bypassing if the shutdowns are done during low flow. Some overtime will be required.
In order to prevent treatment plant effluent discharge violations and to protect the public
health and the environment, Mr. Batts requested that the Board declare that an
emergency condition exists and authorize exception to the District standard bidding
procedure to allow work to proceed to correct the situation.
It was moved by Member Rainey and seconded by Member Dalton, that in accordance
with Government Code Section 54954.2(b)(1), the Board of Directors of the Central
Contra Costa Sanitary District determines that an emergency situation exists, as defined
in Section 54956.5 of the Government Code. There being no objection, the motion was
unanimously approved.
Mr. Dolan, General Manager-Chief Engineer, stated that the electrical cable system
currently supplying power to the Filter Plant and dechlorination facility is now a point of
vulnerability because one of the legs of the dual cable system has failed. Because the
other cable system has been in service the same length of time and under the same
conditions, staff is concerned that it is in danger of failing as well. Because of the
construction project underway on the plant site, the District is at risk. If the District ran
the risk of using the "B" side cable and it failed, it is not possible to put effluent into the
ponds and a violation of the District's National Pollutant Discharge Elimination System
(NPDES) permit would occur. For that reason, an emergency situation exists and Board
authority for exception to the District standard bidding procedure is requested.
Competitive quotes are being sought.
In response to questions from Member Menesini, Mr. Batts stated that generators will be
used during the connection process; however, generators would not be effective during
a complete failure. It would take an extreme amount of time to fuel them and keep them
running and it is unlikely that sufficient power could be generated to treat all the effluent.
Mr. Aim distributed copies of the proposed resolution authorizing immediate expenditure
for emergency repair.
It was moved by Member Dalton and seconded by Member Menesini, that Resolution No.
93-074 be adopted, confirming that immediate expenditure for emergency is authorized.
Motion unanimously approved on the following roll call vote:
AYES: Members: Dalton, Menesini, Hockett, Rainey, Clausen
NOES: Members: None
ABSENT: Members: None
It was moved by Member Rainey and seconded by Member Hockett, that staff be
authorized to engage ~ contractor and that $75,000 be authorized from the Treatment
08.
05
93
168
Plant Program Contingency Account of the Capital Improvement Budget for the project
for replacement of the Filter Plant, Substation No. 40, "A" side 12KV electrical feeder.
Motion unanimously approved on the following roll call vote:
AYES: Members: Rainey, Hockett, Menesini, Dalton, Clausen
NOES: Members: None
ABSENT: Members: None
10. REPORTS
a.
GENERAL MANAGER-CHIEF ENGINEER
08
05
1)
Mr. Dolan, General Manager-Chief Engineer, stated that each year the
District considers a number of solid waste service level options to comply
with State law and/or to respond to community concerns. Because there
has been so much change in the last few years, the Board has tried to avoid
changing too many things at the same time. There are two ideas that have
been around for some time that the Board may wish to consider this year.
Mr. Dolan introduced Mr. Paul Morsen, Deputy General Manager, who
stated that the refuse collectors are required to submit rate requests by
September 15. If the Board wishes to consider different service level
options it would be appropriate to advise the collectors prior to that time so
that relevant information can be included in the rate applications. Mr.
Morsen reviewed garbage rate-setting issues relating to mini-can service and
no green waste service (townhouse service) for single family homes for the
Valley Waste Management automated and non-automated areas, for the
Orinda-Moraga Disposal area and for the Pleasant Hill Bayshore Disposal
area.
Following discussion, it was the consensus of the Board that no green
waste service (townhouse service) for single family homes be considered for
the Valley Waste Management automated service areas of Blackhawk,
Roundhill, Danville, Alamo and the unincorporated areas, that no green
waste service (townhouse service) for single family homes and mini-can
service be considered for the Valley Waste Management non-automated
service area of Lafayette; that mini-can service be considered for the
Orinda-Moraga Disposal service area; and that mini-can service be
considered for the Pleasant Hill Bayshore Disposal service area and that the
collectors be asked to submit the relevant information in their rate
applications.
Mr. Morsen announced that former District Finance Officer Walter Funasaki
will be unable to do the refuse collection rate analyses this year. The firm
of Hilton Farnkopf & Hobson will be employed to perform the analyses.
2)
Mr. Morsen, Deputy General Manager, stated that last year during the
garbage rate-setting process, the Board instructed the collectors and District
staff to find lower cost disposal alternatives. Staff is working on the
disposal issues through the Central Contra Costa Solid Waste Authority
(CCCSWA). In addition, objectives identified in the recent strategic planning
process included developing an alternative to reduce existing garbage costs
by September 30, 1993 and recommending a green waste program option
to the Board by December 1993 for implementation prior to December
1994. Long-term green waste options are being pursued through CCCSWA.
District staff has been working to identify interim options to the $55/ton
charge at the Acme composting facility. Mr. Morsen reported that he has
toured the sites and met with the staff of two sites near Modesto. The
green waste disposal costs are $18/ton and $15/ton respectively. The
green waste must be transported to the sites. The Davis Street transfer
station has a green waste transfer facility in place. The charge at that
facility is $20/ton. The total cost will be $35 to $40 per ton. It is
estimated that a savings of $.70 per household per month could be realized
93
169
if green waste were directed to these sites rather than the Acme
composting facility. Mr. Morsen stated that Valley Waste Management is
ready to begin sending green waste to these two facilities immediately
unless the Board directs otherwise. In addition, as much green waste as
possible will continue to go to the Hayward site at $9/ton. The Board
voiced no objection.
3)
Mr. Dolan, General Manager-Chief Engineer, stated that as decided at the
June 22,. 1993 strategic planning meeting, the management staff has
reviewed the action items and revised the wording and dates of some of
them. For the most part the modifications were to accelerate them. The
Board granted a delay in the approval of the District Mission Statement to
receive input from District employees. The employees' suggestions have
been provided to the Board. Discussion followed concerning the Draft
Mission Statement and employees' comments, particularly the concept of
a diversified workforce and the need to pursue the mission of the District
with the highest integrity. Following discussion, there was a consensus of
Board support for adoption of the District Mission Statement as drafted and
approval of the Goals and Objectives as revised by management staff.
4)
Mr. Dolan, General Manager-Chief Engineer, stated that this year's budget
includes funding for expansion of the District's modest public education
efforts. A lot of thought has gone into the program and staff is very
grateful to Member Hockett who provided entree into the school districts
and leadership in developing the school program, and to Members Menesini
and Rainey for their support and encouragement for the cooperative effort
with the Lindsay Museum.
Mr. Dolan introduced Mr. Paul Morsen, Deputy General Manager, who
stated that the goals of the District's public education program are to
communicate the importance of reducing problem pollutants entering the
treatment plant from both residential and nonresidential sources, and to
inform and educate the District community about Central San's role in
protecting the environment and providing quality service. Mr. Morsen
stated that four programs targeting adults and children will be implemented
to accomplish these goals.
The Lindsay Water Environment Display will provide a highly visible
graphic presentation that communicates the importance of pollution
prevention and the District's commitment to environmental
preservation. The display will reach approximately 150,000 children
and adults per year. The budget contains $50,000 for this program.
An on-site student workshop pilot program has been designed to
demonstrate the relevancy of school studies to the workplace and to
actively engage students in learning about pollution prevention and
the District. In 1993-1994, the Walnut Creek Intermediate School
will participate in the program. One four-hour program per month
during the nine-month school year will be presented. The workshops
will include bioassay, computer-aid ed-drafting (CAD), chemistry,
microbiology, and source control. The program will reach
approximately 288 seventh and eight graders per year. The cost of
staff time will be evaluated at the conclusion of the pilot program.
The Central San/Lindsay Museum Classroom Presentation Program
will actively engage students in learning about pollution prevention
to build an understanding of what happens to "dirty water," and to
teach students about Central San's critical mission of protecting the
environment. The District will produce the entire presentation and
support materials. The Lindsay Museum will handle the program
promotion and scheduling, and will train and send its people out to
give the presentations. The program will reach approximately 3,000
grade school children per year. Funding in the amount of $20,000
has been budgeted for this program.
08
93
05
170
10)
08
05
The District's Speaker's Bureau will educate and inform the
community about Central San projects, fees and levels of service in
an effort to build community understanding. Civic organizations,
clubs, associations, and classrooms within the District's service area
will be targeted. The program will initially offer two slide
presentations: 1) a basic District overview; and 2) a pollution
prevention/source control theme. The budget contains $500 for the
slide show production.
Member Menesini stated that one of the problems with slide shows is that
they are not "hands on." Member Menesini suggested that some
experimental apparatus be put together and shipped to the schools.
Member Menesini also suggested that high school students be brought in
to do "shadowing." Mr. Morsen thanked Member Menesini for the excellent
ideas and indicated that they will be considered in augmenting the programs
in future years.
5)
Mr. Dolan, General Manager-Chief Engineer, reported that the best
information available to District staff on the ad valorem tax taking is that
the basis of the District's 1993-1994 Equipment Budget was correct. The
District can expect to receive 60 percent of the tax that would be received
on the basis of the District's historical percentage of the overall tax
revenue. Absent further direction from the Board, it is staff's intention to
proceed with the Equipment Budget purchases that were approved by the
Board.
Since the adoption of the State budget, there continues to be discussion in
Sacramento about the revenue impact on enterprise and non-enterprise
districts. District staff is uncertain where this will lead, but is not too
optimistic that the District will be able to retain its ad valorem tax revenue
in the future. Mr. Dolan stated that he will keep the Board apprised of any
developments.
6)
Mr. Dolan announced that the District is considering adding an additional
fund management group for the Deferred Compensation Plan. ICMA offers
a more attractive fixed income account, the account with the largest
participation by District employees. This matter will be brought to the
Board for consideration in the near future.
7)
Mr. Dolan announced that Mr. James Kelly, Plant Operations Division
Manager, has been asked to do some consulting work in Hungary during the
week of August 23, 1993. Expenses will be paid by the World Bank. Mr.
Kelly will take a five-day leave of absence to do this work.
8)
Mr. Dolan announced that the District's new telephone system is
operational.
9)
Mr. Dolan announced that District staff is commenting on the project
Environmental Impact Report (EIR) for the Country Club Development at
Gale Ranch. The 1200 home development is in Dougherty Valley and lies
within the ultimate service boundary of East Bay Municipal Utility District.
District staff is not aware of any policy or technical reasons that would
prevent service being provided by Central San. The property can be served
by gravity through the Canyon Lakes system tributary to the Larwin
Pumping Station.
Mr. Dolan announced that the District is prequalifying tunneling
subcontractors for the Pleasant Hill/A-Line Relief Interceptor Project.
Twelve contractors submitted qualifications. Of those, seven appear to
meet the qualifications and five do not. The contractors have been advised.
The determinations regarding the prequalification of contractors will be
presented to the Board for consideration at the meeting of August 19,
1993. Mr. Dolan stated that he will not be present at that meeting, but Mr.
Robert Baker, Deputy Chief Engineer, will handle the matter.
93
b.
171
11 )
Mr. Dolan announced that staff is aware of the Board's interest in seeing
more capital projects. A tour of the Headworks Facilities Improvement
Project and the Standby Power Facility Project is planned for the August 19,
1993 Board Meeting.
12)
Mr. Dolan announced that the Negative Declaration on the reclaimed water
pipeline portion of the Pleasant Hill Relief Interceptor Project has been
distributed and copies have been provided to the Board. The Negative
Declaration covers the Shell pipeline only with regard to acquisition. It is
comprehensive with regard to construction activities relative to the Pleasant
Hill reclaimed water pipeline.
13)
Mr. Dolan announced that the District is publicly advertising bids for the
1680/SR24 Sewer Relocations Project, Phase IV-A. The engineer's estimate
is $100,000. The cost of the project will be reimbursed by Caltrans.
COUNSEL FOR THE DISTRICT
None
c.
SECRETARY OF THE DISTRICT
2)
d.
1 )
The Training/Conference Summary for the period April-June 1993 was
distributed and discussed.
Continued publication of the California Association of Sanitation Agencies
(CASA) Directory given the recent resignation of the Public
Information/Graphics Coordinator was discussed. It was the consensus of
the Board that the District can no longer publish the CAS A Directory.
BOARD MEMBERS
1 )
2)
Member Rainey reported that the Central Contra Costa Solid Waste
Authority (CCCSWA) met on July 22, 1993. A Request for Proposals for
permanent disposal facilities is being developed and should be out in mid-
Autumn. A Request for Proposals for long-term disposal of green waste is
also in the development stages. Member Rainey reported that she and Mary
Lou Oliver, CCCSWA Chair, will be meeting with Supervisors Bishop and
Smith with regard to solid waste franchising in the unincorporated areas.
Following discussion of the scope and purpose of the meeting with
Supervisors Bishop and Smith, Member Rainey indicated that she would
report back to the Board concerning the meeting.
President Clausen reported that he and Members Menesini and Hockett
attended the Contra Costa Solid Waste Authority/Contra Costa County
workshop on roles and responsibilities for solid waste management in the
County. There will be a follow-on workshop in the near future.
11. ANNOUNCEMENTS
Member Rainey announced that she recently met with a small business owner who
expressed concern about overregulation and the need for coordination of inspections
among various agencies. Member Rainey distributed a list of agencies, regulations, fees
and associated costs. Member Rainey asked that the issue of coordination of inspections
among agencies be calendared for Board consideration. Member Rainey indicated that the
business owner was very complimentary to the District and to Source Control Inspector
Roberta Peterson. Member Hockett stated that the Economic Development Task Force
of the Contra Costa Council is looking at these kInds of issues and working on monograph
economic development plan as a prototype.
None
12. CLOSED SESSION
08
05
93
172
13. ACTIONS RESULTING FROM DISCUSSIONS IN CLOSED SESSION
None
14. ADJOURNMENT
There being no further business to come before the Board, President Clausen adjourned
the meeting at the hour of 6:30 p.m.
Pr ident the Board of Directors,
C ontra Costa Sanitary District,
County of Contra Costa, State of California