MINUTE$ OF THE ADJOURNED REGULAR BOARD MEETING
OF THE DISTRICT BOARD OF THE
CENTRAL CONTRA COSTA SANITARY DISTRICT
HELD ON JUNE 10, 1993
The District Board of the Central Contra Costa Sanitary District convened in an adjourned
regular session at its regular place of meeting, 5019 Imhoff Place, Martinez, County of
Contra Costa, State of California, at 3:06 p.m. on June 10, 1993.
President Clausen called the meeting to order and requested that the Secretary call roll.
1. ROLL CALL
PRESENT:
Members:
Dalton, Hockett, Rainey, Clausen
ABSENT:
Members:
Menesini
Member Menesini entered the meeting at the hour of 3:15 p.m.
2. PUBLIC COMMENTS
None
a.
3. HEARINGS
CONDUCT A PUBLIC HEARING ON THE DRAFT FISCAL YEAR 19~3-1 994
CAPITAL IMPROVEMENT BUDGET (CIBHDRAFT 1 993 TEN-YEAR CAPITAL
IMPROVEMENT PLAN (CIPL APPROVE THE 1993 tiP. AND APPROVE THE CIB
FOR INCLUSION IN THE 1993-1994 BUDGET
b.
CONDUCT PUBLIC HEARINGS TO RECEIVE PUBLIC COMMENT ON THE 1 993-
1994 OPERATIONS AND MAINTENANCE BUDGET AND THE SELF-INSURANCE
FUND BUDGET AND FOR THE ESTABLISHMENT OF THE 1993-1 994 SEWER
SERVICE CHARGE RATES. AND ON PLACING CURRENT AND DELINQUENT
SEWER SERVICE CHARGES ON THE COUNTY TAX ROLL FOR COLLECTION
By way of introduction, Mr. Roger J. Dolan, General Manager-Chief Engineer, provided
background with regard to the District's budgeting process. Mr. Dolan stated that the
District has two budgets, one for operations and maintenance (O&M) and one for capital
programs. The funding sources for these two budgets historically have been different and
separate. O&M is funded primarily from Sewer Service Charge collection on the tax bill,
revenue from the Concord and Clayton contracts, and other minor sources of revenue
such as operating fees. The Capital Improvement Budget (CIB) has been funded primarily
by ad valorem tax revenue. The District has a $250 million capital improvement plan over
the next ten years. Secondary sources of revenue for the CIB are interest on accumulated
reserves and connection fees for capacity to homes connected into the District. Mr.
Dolan stated that he believes that two separate budgets will be maintained on into the
future although this year there has been a major impact on revenue that has caused
realignment of funding for the two budgets.
Mr. Dolan stated that over a year ago, the District first became aware that the State
might take all or a portion of the District's ad valorem tax revenue. In 1992-1993, the
District actually lost $3.2 million, 40 percent of the District's ad valorem tax revenue.
Aware that this was a likely possibility, staff began scaling back expenses last year, in
spite of the fact that the District is under various federal and state mandated
requirements. Although further loss of ad valorem tax revenue is anticipated this year,
the District budgets are based on the premise that the District's remaining 60 percent of
ad valorem tax revenue will be retained. Even so. drastic cuts have been made to both
the O&M and Capital Improvement Budgets.
Mr. Dolan introduced Ms. Deborah Ratcliff, Controller, who stated that this year the
budgeting mission was to develop a flat budget with no increase in net expenses over last
year's budget. The proposed 1993-1994 O&M Budget of $27,455,000 is $54,000, or
06
10
93
128
.2 percent, less than the 1992-1993 O&M Budget of $27,509,000. Ms. Ratcliff stated
that based on contractual obligations, 1993-1994 salaries will increase by 3.2 percent
and employee benefits will increase by 6.3 percent. Therefore, to accomplish the goal
of a flat budget, it was necessary to eliminate vacant staff positions and also reduce
expense categories. Budget reductions of $1.2 million were made by eliminating nine
vacant positions and reducing other expenses. Ms. Ratcliff reviewed the major expense
category reductions and highlighted the effect of budgeted increases in salaries and
employee benefits on the 1933-1994 Sewer Service Charge.
Member Menesini entered the meeting at the hour of 3: 15 p.m.
In response to a question raised by President Clausen at the last Board Meeting, Ms.
Ratcliff stated that the County Retirement Board reduced the cost-of-living contribution
in 1993-1994 for all employers in the entire County Retirement System because revenue
from investments earned more than enough to meet obligations. Ms. Ratcliff stated that
at the last Board Meeting, information was given on District memberships in outside
organizations. Approximately $101,000 is budgeted for District memberships. Of that
amount, the District's membership in the Contra Costa Solid Waste Authority of
approximately $14,000, will be recovered through the franchise fee.
Ms. Ratcliff provided an overview of the current Self-Insurance Fund Budget compared
to last year. Revenues over expenses are anticipated to be $60,000, increasing reserves
to $5.9 million in 1993-1994.
Mr. Dolan described the budgeting process, noting that all budgets begin with staff
preparation and review, proceed through Board Committee review, to review and then
approval by the full Board. This year because of the integration of the approval process
for both the O&M Budget and the Capital Improvement Budget (CIB), the CIS was not
formally submitted for approval by the full Board in May, but was held for consideration
with the O&M Budget and Sewer Service Charge.
Mr. Dolan introduced Mr. Robert A. Baker, Deputy Chief Engineer, who presented an
overview of the Capital Improvement Budget (CIS) and Ten-Year Capital Improvement
Program (CIP), stating the CIB is the program for capital spending over the next year
1993-1994, and the CIP is the program for capital spending over the next ten years. The
CIB/CIP was distributed to the Board previously and has been reviewed with the Board
Capital Projects Committee and the full Board. Mr. Baker stated that Board approval of
the CIB will authorize an additional $28,918,000 from the Sewer Construction Fund for
a total funding authorization of $76,778,000 for planning, design and construction of
capital improvement projects and will constitute approval of the projects listed in the
budget document as exempt under the California Environmental Quality Act (CECA). Mr.
Baker stated that the balance in the Sewer Construction Fund at July 1, 1993 is expected
to be $66 million. It is projected that the Sewer Construction Fund balance will be drawn
down to approximately $50 million by July 1, 1994. There is sufficient dependable
revenue to cover expenditures for the CIB during the 1993-1994 Fiscal Year regardless
of the action taken by the State Legislature with regard to ad valorem tax revenue. Mr.
Baker stated that debt financing will be required within two years to continue the capital
program. The key issue before the Board at this time deals with the CIP and spending
over the ten-year period for improvement of the collection system and treatment plant.
Mr. Baker stated that in 1991-1992, the District received $8 million in ad valorem tax
revenue. In recent years that money has been used only for capital improvements. In the
current fiscal year, $3.2 million in ad valorem tax revenue was taken by the State. In the
next fiscal year, there is a strong possibility that the District could lose all ad valorem tax
revenue, an additional $5 million. That is the major source of funding for the Capital
Improvement Program. District staff has prepared a plan for the Board's consideration
that includes a combination of program cuts and a Sewer Service Charge rate increase
to offset the $3.2 million loss of funding from ad valorem taxes. Mr. Baker recommended
that the possible loss of a further $5 million in ad valorem tax not be considered in rate
setting this year, but instead be dealt with next year. All the scenarios presented include
some amount of debt financing during the next ten years. Using Attachment 3 to the
position paper, Mr. Baker reviewed the ten major environmental goals of the" 1992
Capital Improvement Plan Extended," which provides a baseline from which the program
cuts can be evaluated. If capital funds had not been taken, these goals and the projects
06
10
93
129
to achieve them would have been recommended to the Board. Mr. Baker described the
capital improvement program reduction alternatives and the impacts of each as described
in the position paper. Mr. Baker presented the staff recommendation that Scenario A,
with a $25 million program cut and a $20 Sewer Service Charge increment, be approved.
As a backup option if the ad valorem taxes are taken by the State, the Board could later
select Scenario B. Each successive scenario would have larger capital program cuts, a
lower amount of debt issuance, a lower Sewer Service Charge replacement increment,
and a progressively more serious impact on the ability of the District to meet
environmental goals.
In response to a question from Member Dalton, Mr. Baker stated that staff plans to
recommend that connection fees be increased over a three-year period. A proposal will
be presented to the Board for consideration later this summer or fall.
Mr. Dolan directed the Board's attention to the loss of $3.2 million in ad valorem tax
revenue in 1992-1993. That amounts to $23.40 per customer. The $20 Sewer Service
Charge increase recommended in Scenario A would not be sufficient to cover that loss.
If the State takes an additional 40 percent, that would amount to $47.95 per customer;
and if the State takes all the ad valorem tax revenue, that would amount to $84.78 per
customer. Staff recommends that the Sewer Service Charge be incremented by $20. If
the State taking is greater than $3.2 million, the District would have to deal with that
next fiscal year. If additional ad valorem tax revenue is lost, staff would recommend that
- it be made up in two ways:
1 )
2)
Further Capital program cuts; and
Increasing the Sewer Service Charge to recover a portion of the loss.
Member Hockett stated that there is a vicious cycle. The State of California is in an
economic downturn. Businesses are leaving the State and taking their tax dollars with
them. This is a bureaucratic issue, but it is also an issue relating to the cost of doing
business. Member Hockett cautioned the District against becoming economically
prohibitive.
At 4: 12 p.m., President Clausen opened the public hearing to receive public comments
on the Draft Fiscal Year 1993-1994 Capital Improvement Budget and Draft 1993 Ten-
Year Capital Improvement Plant.
Mr. Parke L. Boneysteele, resident of Walnut Creek and former Member of the Board of
Directors, addressed the Board with regard to the water reclamation component of the
CIB and tiP. Mr. Boneysteele stated that the District received federal and state grants
for the construction of the District treatment plant. Under the Clean Water Act, the
District was one of the first to receive such grants conditioned on the fact that the
District is a treatment plant and a water reclamation plant, close to industry and an
abundant source of water that could be used again. At that time, the Board of Directors
considered this very carefully. Bechtel was hired and advised the District against
proceeding with a water reclamation plant. As a result of that advice, a public hearing
and study session was held. At the hearing, a representative of the State Water
Resources Control Board, Mr. John O. Nelson, Manager of the Clean Water Grant Program
for the Board, said that should the Board decline to go through with the water reclamation
plant, the grant would not be given. Consequently, the Board made a commitment to
proceed with construction of this plant which is designed as a water reclamation plant in
addition to a treatment plant. Mr. Boneysteele stated that Bechtel was correct however.
The economics were not there, conditions on quality of discharge were relaxed, there was
friction with the District's water reclamation partner Contra Costa Water District, and the
District never proceeded with full-scale water reclamation.
Mr. Boneysteele stated that the District is now coming to a point where it appears that
water reclamation will be economically feasible not only because of the increased cost of
water but the fact that water may not be available at all. Mr. Boneysteele urged the
Board to remember that the District has a commitment to proceed with water reclamation,
and Mr. Boneysteele urged that funding be provided for the water reclamation projects
that are necessary to fulfill that commitment. By eliminating that funding, the District will
have violated a fundamental commitment. Mr. Boneysteele stated that this is not just an
06
10
93
130
economic issue, it is a moral issue. The District has agreements with the federal and
state governments. The District should take no action that would prevent reclaiming
water in the future.
President Clausen thanked Mr. Boneysteele for his comments.
Mr. Baker described the water reclamation projects that would be impacted by the
cutbacks proposed in each scenario presented to the Board for consideration.
There being no further comments, President Clausen closed the public hearing at the hour
of 4:21 p.m. and returned the matter to the Board for deliberation.
President Clausen stated that he began his consideration with Scenario E but came to the
conclusion that Scenario E is totally unacceptable, Scenario D is unsatisfactory, Scenario
C is extremely risky, Scenario B is risky as well, and Scenario A is less risky and President
Clausen considers it to be safe. Extension of the 1992 CIP is too costly and in President
Clausen's opinion cannot be considered. He indicated that a $20 increase in the Sewer
Service Charge does not even recover last year's tax loss and the salary and benefit
obligation of the third year of the Memoranda of Understanding.
Member Menesini stated that he would like to respond to the letter from the Contra Costa
Taxpayers Association dated June 8, 1993. Member Menesini stated that the theme of
the letter makes sense. The O&M Budget should be essentially flat; however, this may
not be the right time to maintain a flat budget because the economic situation could get
worse. If that happens and the District is not supporting some improvements and
programs contained in Scenario A, the District would be abdicating some of its
responsibility to the public. There may be some loud cries if the Sewer Service Charge
rate is raised, and that is to be expected. The public elected the Board to make decisions
to keep prices down but also to make decisions to protect the public health and the
environment. Member Menesini stated that he believes that if the public were sitting here
considering these cutbacks and what $20 per year will buy, the public would make the
decision to protect the public and the environment. Member Menesini stated that the
Board must look to its stewardship of public safety and protection of the environment.
To that end, Member Menesini voiced support for Scenario A.
Member Rainey concurred with President Clausen's analysis of the scenarios presented
for Board consideration, noting the agony, the hard work, and the staff's professional
judgment that went into development of the various scenarios. Member Rainey expressed
concerns about cutbacks to water reclamation. Member Rainey noted that at the
workshop held on the CIB/CIP, increased costs to the District based on mandated
programs due to regulatory agencies were discussed. While the District continues to cut
back, there are additional requirements being mandated. Member Rainey stated her
preference for Scenario B; but because of her concern for water reclamation and the risk
to the East Bay Municipal Utility District watershed by cutting too severely, Member
Rainey stated that she could support Scenario A.
Member Hockett thanked Mr. Baker for the clear and informative presentation and for the
addition of the environmental goals. Member Hockett stated she believes strongly that
the District must adhere to the environmental goals and that there will likely be additional
mandates from regulatory agencies requiring additional expenditures to achieve
compliance. Member Hockett expressed support for Scenario A because the District's
primary mission, protection of the public, is very clear in Scenario A and the $20 Sewer
Service Charge increment recommended in Scenario A does not even recover the ad
valorem tax revenue taken by the State. Member Hockett underscored the importance
of water reclamation and commended staff for the prioritization and cuts made to the
CIB/CIP.
Member Dalton expressed support for water reclamation, stating that reclaimed water is
a valuable resource and could be very beneficial to the District's citizens in the future.
Member Dalton complimented Mr. Baker and District staff for the review and the financial
information provided. In the past, the District has maintained an ongoing capital
improvement program taking advantage of Federal and State grants. Member Dalton
stated his preference for maintaining funding for the program to the extent possible.
06
10
93
131
Member Menesini stated that the District is manufacturing reclaimed water and doing
what we are obligated to do. The ball is in someone else's court at this time. The
District has done an excellent job planning what we think is the future for that reclaimed
water resource. The District must impress on Contra Costa Water District that they have
a part in this with the delivery of the reclaimed water. Member Menesini agreed that the
District cannot provide reclaimed water unless the water can be transported from the
plant to the residents.
It was moved by Member Hockett and seconded by Member Menesini, that the 1993
Capital Improvement Program be approved, that the 1993-1994 Capital Improvement
Budget be approved for inclusion in the 1993-1994 District Budget, and that Capital
Program Reduction Alternative Scenario A, with a $25 million program cut and the
associated $20 Sewer Service Charge increment, be selected. Motion unanimously
approved on the following roll call vote:
AYES: Members: Hockett, Menesini, Dalton, Rainey, Clausen
NOES: Members: None
ABSENT: Members: None
b.
CONDUCT PUBLIC HEARINGS TO RECEIVE PUBLIC COMMENT ON THE 1993-
1994 OPERATIONS AND MAINTENANCE BUDGET AND SELF-INSl)RANCE FUND
BUDGET AND FOR THE ESTABLISHMENT OF THE 1993-1994 SEWER SERVICE
CHARGE RATES. AND ON PLACING CURRENT AND DELINQUENT SEWER
SERVICE CHARGES ON THE COUNTY TAX ROLL FOR COLLECTION
Mr. Dolan, General Manager-Chief Engineer, stated that staff recommends adoption of
the Operations and Maintenance (O&M) and Self-Insurance Fund Budgets as presented.
At 4:26 p.m., President Clausen opened the public hearing to receive public comments
on adoption of the 1993-1 994 O&M and Self-Insurance Fund Budgets and on
establishment of the 1993-1994 Sewer Service Charge rates.
Receipt of the following correspondence was noted:
1)
Letter dated May 25, 1993 from Dr. John N. DeBoice, 4716 Tahoe Circle,
Martinez, CA 94553, objecting to any rate increase; and
2)
Letter dated June 8, 1993 from Mr. John I. Wolfe, Jr., Executive Vice
President of the Contra Costa Taxpayers Association, Box 27, Martinez, CA
94553, commending the District for staffing and other cutbacks and for
maintaining a flat O&M Budget but objecting to a rate increase to pay for
capital improvements.
There being no other comments or correspondence, President Clausen closed the public
hearing at the hour of 4:27 p.m. and returned the matter to the Board for deliberation.
Member Rainey complimented staff for the hard work that went into presenting a flat
budget in the face of increased regulatory requirements, noting that nine vacant positions
have been eliminated and the Board has instituted a hiring freeze. Member Rainey
supported the O&M Budget as presented.
It was moved by Member Rainey and seconded by Member Hockett, that the 1993-1994
Operations and Maintenance Budget and Self-Insurance Fund Budget be approved for
inclusion in the 1993-1 994 District Budget. Motion approved on the following roll call
vote:
AYES: Members: Rainey, Hockett, Menesini, Dalton, Clausen
NOES: Members: None
ABSENT: Members: None
06
10
93
132
President Clausen suggested that the following phrase be added to the third paragraph
of the proposed ordinance establishing the Sewer Service Charge rates, "and to partially
fund the Capital Improvement Budget to replace a portion of the ad valorem taxes taken
by the State of California in 1992-1 993."
It was moved by Member Rainey and seconded by Member Hockett, that Ordinance
No. 186 establishing the Sewer Service Charges to be billed by the Central Contra Costa
Sanitary District to all served properties for 1993-1994, be adopted with the proposed
addition noted above. Motion unanimously approved on the following roll call vote:
AYES: Members: Rainey, Hockett, Menesini, Dalton, Clausen
NOES: Members: None
ABSENT: Members: None
At 4:42 p.m., President Clausen opened the public hearing to receive public comments
concerning collection of the 1993-1994 Sewer Service Charges on the County tax roll.
There being no comments, President Clausen closed the public hearing.
Following discussion of the County cost for collection of Sewer Service Charges on the
County tax roll, it was moved by Member Menesini and seconded by Member Dalton, that
Resolution No. 93-055 be adopted, authorizing collection of the 1993-1994 Sewer
Service Charges on the County tax roll. Motion unanimously approved on the following
roll call vote:
AYES: Members: Menesini, Dalton, Hockett, Rainey, Clausen
NOES: Members: None
ABSENT: Members: None
At 4:47 p.m., President Clausen opened the public hearing to receive public comments
concerning collection of delinquent Sewer Service Charges on the County tax roll. There
being no comments, President Clausen closed the public hearing.
It was moved by Member Menesini and seconded by Member Dalton, that the 1992-1993
Delinquent Sewer Service Charge Account Report dated June 1 993 be adopted pursuant
to Section 5473 of the Health and Safety Code, that collection of that delinquent Sewer
Service Charge on the County tax roll be authorized, and that Resolution No. 93-056 be
adopted to that effect. Motion unanimously approved on the following roll call vote:
AYES: Members: Menesini, Dalton, Hockett, Rainey, Clausen
NOES: Members: None
ABSENT: Members: None
4. CALL FOR REQUESTS TO CONSIDER ITEMS OUT OF ORDER
None
a.
5. CORRESPONDENCE
NOTE RECEIPT OF LETTER DATED MAY 27. 1993 FROM ASSEMBLYMAN
ROBERT J. CAMPBELL ACKNOWLEDGING CCCSD'S CORRESPONDENCE
REGARDING CALIFORNIA'S 1993-1994 BUDGET
06
10
93
b.
133
NOTE RECEIPT OF POSTCARD RECEIVED MAY 28. 1993 FROM GOVERNOR PETE
WILSON ACKNOWLEDGING CCCSD'S CORRESPONDENCE REGARDING
CALIFORNIA'S 1993-1994 BUDGET
Receipt was noted of letter dated May 27, 1993 from Assemblyman Robert J. Campbell
and postcard received May 28, 1993 from Governor Pete Wilson, both acknowledging
CCCSD's correspondence regarding California's 1993-1994 budget.
None
a.
b.
c.
d.
6. EMERGENCY SITUATIONS REQUIRING BOARD ACTION
7. REPORTS
GENERAL MANAGER-CHIEF ENGINEER
1 )
Mr. Dolan, General Manager-Chief Engineer, stated that a couple months
ago as a cost-saving measure, an analysis was done of the potential costs
and benefits of having the District offer two years service credit to
employees who may wish to retire early in 1993-1994. There were some
concerns with the first review of the economics and a more detailed review
was done by Controller Deborah Ratcliff in conjunction with the County
Retirement Office. The analysis of the options including positions that may
have to be refilled will be presented at the June 17, 1993 Board Meeting.
Member Rainey reported that this matter was reviewed with the Board
Personnel Committee. Mr. Paul Morsen, Deputy General Manager, stated
that he will contact the bargaining units to meet and confer on this issue
unless the Board objects. The Board voiced no objection.
2)
Mr. Dolan announced that staff will make a presentation to the Grand Jury
on Tuesday, June 15, 1993. The Grand Jury has an obligation to oversee
special districts. As partial fulfillment of that charge, when a new Grand
Jury is convened, the District routinely makes a presentation.
COUNSEL FOR THE DISTRICT
None
SECRETARY OF THE DISTRICT
None
BOARD MEMBERS
1 )
President Clausen congratulated Mr. David R. Williams, Planning Division
Manager, on his hiring by East Bay Municipal Utility District and indicated
that the District will miss his knowledge and expertise. Mr. Williams
thanked the Board for their good wishes.
2)
3)
Member Rainey announced that the Fiscal Unity Committee has disband.
Member Rainey, member of the Personnel Committee, reported that she and
Member Dalton met with staff on June 4, 1993. A number of key
employees, including Planning Division Manager Dave Williams, Public
Information/Graphics Coordinator Colleen Camicia, and Accounting
Technician II Gayle Turnage, have announced their resignations. The Board
of Directors has instituted a hiring freeze and requested that each position
that becomes vacant be reviewed. Because of the payroll responsibilities
of the Accounting Technician position, staff has requested that it be refilled.
Upon review, the Personnel Committee concurred and agreed to
recommended to the Board that the position be refilled.
It was moved by Member Rainey and seconded by Member Dalton, that an
Open/Promotional recruitment be authorized to refill the Accounting
06
10
93
134
Technician 1/11 position in the Accounting Office. There being no objection,
the motion was unanimously approved.
8. ANNOUNCEMENTS
Member Menesini announced that on June 5, 1993 he attended the hearing on the San
Francisco Estuary Project Comprehensive Conservation and Management Plan. Mr.
Charles W. Batts, Plant Operations Department Manager, is to be commended for his
efforts in that regard and for being one of the signatories on the Plan. .
Member Menesini announced that Mr. Ben Griffanti, a long-time community leader, passed
away recently. He will be sorely missed.
9. CLOSED SESSION
None
10. ACTIONS RESULTING FROM DISCUSSIONS IN CLOSED SESSION
None
11. ADJOURNMENT
There being no further business to be come before the Board, President Clausen adjourned
the meeting at the hour of 5:02 p.m.
si of the Board of Directors,
Central Contra Costa Sanitary District,
County of Contra Costa, State of California
COUNTERSIGNED:
(L CÞ. t .
(
Se re of the Central Con ra
Cos Sanitary District, County of
Contra Costa, State of California