MINUTES OF THE REGULAR BOARD MEETING
OF THE DISTRICT BOARD OF THE
CENTRAL CONTRA COSTA SANITARY DISTRICT
HELD ON MAY 4, 1995
The District Board of the Central Contra Costa Sanitary District convened in a regular
session at its regular place of meeting, 5019 Imhoff Place, Martinez, County of Contra
Costa, State of California, at 3:00 p.m. on May 4, 1995.
President Hockett called the meeting to order and requested that the Secretary call roll.
1. ROLL CALL
PRESENT:
Members:
Menesini, Dalton, Rainey, Boneysteele, Hockett
ABSENT:
Members:
None
2. PUBLIC COMMENTS
None
3. AWARDS AND COMMENDATIONS
RECEIVE THE CALIFORNIA WATER ENVIRONMENT ASSOCIATION SAFETY
AWARD FOR 1994 FOR LARGE UTILITIES IN THE STATE OF CALIFORNIA
a.
Mr. Roger J. Dolan, General Manager-Chief Engineer, introduced Mr. Karl Royer,
Operations and Maintenance Supervisor for the East Bay Dischargers Authority (EBDA)
and Chair of the California Water Environment Association (CWEA) State Safety
Committee. Mr. Royer stated that he is pleased to present Central Contra Costa Sanitary
District with the CWEA State Safety Award for 1994 for the large utility category.
Specific areas in which the District excelled are as follows:
.
Safety record;
.
Reporting and record keeping proficiency;
.
Quality of safety training; and
.
Special programs such as the safety suggestion program, wellness program,
emergency preparedness, and contractor safety.
Mr. Royer stated that a Safety Program of this caliber does not occur automatically. It
takes the commitment and participation of all levels within the organization. Mr. Royer
stated that the CWEA Safety Committee has recommended the CCCSD Safety Program
for the National Water Environment Federation Burke Award. This award will be
presented to the District at the 1996 Annual Conference. Mr. Royer congratulated the
District and presented the CWEA State Safety Award for 1994 to President Hockett. Mr.
Dolan introduced the District's safety professionals Dave Albinus, Bonnie Allen, Tamara
Davidson, and Kirby Narcisse. President Hockett commended the District's safety
professionals and all District employees for their conscientious attention to safety.
4. CONSENT CALENDAR
Following discussion of the 1-680/SR-24 Sewer Relocations Project, Phase 3B, and
delinquent Sewer Service Charges, it was moved by Merr.ber Menesmi and seconded by
Member Dalton, that the Consent Calendar, consisting 0: 1'F:.msa. through J., be approved
as recommended.
05
04
95
69
The contract work for construction of the 1-680/SR-24 Sewer Relocations
Project, Phase 3B, DP 4956, was accepted and the filing of the Notice of
Completion was authorized.
a.
Motion unanimously approved on the following vote:
AYES: Members:
NOES: Members:
ABSENT: Members:
Menesini, Dalton, Rainey, Boneysteele, Hockett
None
None
A public notice was authorized to set public hearings on June 1, 1995 to
receive public comment on the establishment of the 1995-1996 Sewer
Service Charge rates and the collection of such charges, and prior year
delinquent charges, on the County tax rolls.
b.
Motion unanimously approved on the following vote:
AYES: Members:
NOES: Members:
ABSENT: Members:
Menesini, Dalton, Rainey, Boneysteele, Hockett
None
None
The draft Fiscal Year 1995-1996 Capital Improvement Budget/1995 Capital
Improvement Plan (CIB/CIP) was received for review and June 1, 1995 was
established as the date for a public hearing to receive comments on the
draft CIB/CIP.
c.
Motion unanimously approved on the following vote:
AYES: Members:
NOES: Members:
ABSENT: Members:
d.
Menesini, Dalton, Rainey, Boneysteele, Hockett
None
None
The 1995-1996 Equipment Budget was approved for inclusion in the 1995-
1996 District Budget to be adopted on June 15, 1995.
Motion unanimously approved on the following vote:
AYES: Members:
NOES: Members:
ABSENT: Members:
Menesini, Dalton, Rainey, Boneysteele, Hockett
None
None
5. HEARINGS
CONDUCT A PUBLIC HEARING ON THE PROPOSED SCHEDULE OF RATES AND
CHARGES AND ADOPT AN ORDINANCE APPROVING THE FEE SCHEDULE
EFFECTIVE JULY 1. 1995
a.
Mr. Dolan, General Manager-Chief Engineer, stated that the schedule of rates and charges
is reviewed annually, alternating between a detailed analysis of each fee and adjusting the
rates for the effect of any across-the-board salary increase for that year. Last year a
detailed analysis of each fee was done. This year it is proposed that the fees be adjusted
to reflect the 2.1 percent salary increase for District employees.
At 3: 17 p.m., President Hockett opened the public hearing to receive public comments
on the proposed schedule of rates and charges. There being no comments, President
Hockett closed the public hearing.
05
04
95
----------.--..----.-.------- -. - - -.-------..----..
70
It was moved by Member Boneysteele and seconded by Member Dalton, that Ordinance
No. 194, approving a revised schedule of rates and charges effective July 1, 1995, be
adopted. Motion unanimously approved on the following roll call vote:
AYES: Members:
NOES: Members:
ABSENT: Members:
Boneysteele, Dalton, Menesini, Rainey, Hockett
None
None
6. CALL FOR REQUESTS TO CONSIDER ITEMS OUT OF ORDER
Mr. Dolan, General Manager-Chief Engineer, requested that Item 9.a., Engineering, be
taken out of order to accommodate interested persons in the audience. President Hockett
proceeded to Item 9.a.
a.
9. ENGINEERING
ADVISE THE BOARD OF STAFF ACTIONS RELATED TO ALLEGED PAYROLL
DEFICIENCIES ON THE HEADWORKS FACILITIES IMPROVEMENT PROGRAM. DP
20069
Mr. Dolan, General Manager-Chief Engineer, stated that this issue was raised by the
Carpenters Union at the last Board Meeting. Mr. Dolan stated that he does not believe
this is an issue that the Board has a need to deal with at this time; but rather, it is
appropriate for the project staff to continue to work with the matter. These issues arise
from time to time and, using a process established under state law, they can generally be
resolved without an action of our Board. Mr. Ronald S. Klimczak, the District's Project
Manager, and Mr. Fred King, of CH2M Hill, working with District Counsel, have taken the
appropriate actions from the District's perspective. The issue is being adjudicated by the
State Labor Commissioner's Office.
Mr. Dolan introduced Mr. Ronald S. Klimczak, Senior Engineer and Project Manager forthe
Headworks Facilities Improvement Project. Mr. Klimczak stated that the Carpenters Union
representatives allege that Humphrey Construction, Inc., a non-union contractor, has
underpaid employees' wages and fringe benefits in an amount up to $200,000 during the
term of the Headworks Project. The contractor maintains that all required wage and fringe
benefit payments have been made and no underpayments have occurred. Agencies such
as the District usually defer these matters to the State Labor Commissioner's Office, and
documents have been provided for their review. There are two issues.
1 )
Names, addresses and social security numbers cannot be released to third
parties. State statute appears to be very restrictive on providing that
information so all documents provided have had this information deleted.
2)
The second issue concerns the amount of monies the District is required to
hold from the retention. During the 30-day lien period, no requests were
received to withhold any monies; but during that time, District staff felt
there was sufficient information to indicate that the issue of payment of the
step increase of $.44 per hour for journeymen carpenters in July 1994 was
specific enough to justify withholding funds from the planned retention
release.
Mr. Klimczak stated that he understands that the State Labor Commissioner's Office
expects to file a Notice to Withhold with the County Recorder's Office. The amount is
unknown to District staff at this time. Once the Notice to Withhold is received, staff will
act accordingly. Staff believes that the amount of monies due to Humphrey Construction
would be sufficient to cover any State determination.
Discussion followed with regard to the complaint filed with the State Labor Commissioner
in June 1993. Mr. Klimczak stated that the allegation made in 1993 was investigated by
the State Labor Commissioner's Office and they rendered a decision that there was
insufficient information to pursue the matter.
05
04
95
71
Further discussion followed concerning the payroll and benefit records, and audit of the
payroll and benefit payment records by the District or CH2M Hill.
Mr. Rick Harrington, of Carpenters Local 152, distributed copies of statements from
former workers of Humphrey Construction who could not be present today. Mr.
Harrington stated that to his knowledge there was no interview of the workers to
determine if they were being paid for the work they were doing. Mr. Harrington stated
that there was misclassification of workers that was not being reflected on the payroll
records. Workers were not paid for the work they were doing. Supervisors were
threatened with their jobs if they did not keep quiet. Adequate health and safety
precautions were not taken. The records provided are unclear and do not have enough
information to allow a complete audit to be performed.
Discussion followed relative to the medical insurance plan provided to workers and review
of the payroll records.
Mr. Dan Rico, of Carpenters Local 152, stated that there was a push to complete the
project and safety was overlooked. Mr. Rico stated that he complained about the unsafe
conditions but no action was taken. Mr. Rico stated that initially he was paid at a higher
rate but the salary level was dropped. No overtime or holiday time was paid. In response
to a question from the Board, Mr. Rico stated that he did not complain when the wages
went down. In response to further questions from the Board, Mr. Rico stated that there
was an independent safety officer on the project. Mr. Rico stated that he talked to the
safety officer and to OSHA representatives at the beginning of the project. At that time
there were no problems on the project.
Mr. Donn Martin, of Carpenters Local 152, stated that he has been a contractor and is
now a union carpenter. The Board of Directors can influence the distribution of money
on this project. Mr. Martin stated that he was not paid correctly. He received a check
from Humphrey Construction with a letter saying that they had done an internal audit and
found that his IRA had been underpaid. In response to questions from the Board, Mr. Rico
stated that he and other workers received similar checks.
Mr. Martin stated further that there were safety problems on the job although there was
a safety officer on the job.
Mr. Leonard Baggett, of Labors Local 73, stated that he first worked as a laborer and then
on equipment. Mr. Baggett stated that there were safety and health problems on the
project so he quit the job.
Mr. Dennis Cook, representing Humphrey Construction, stated that he and Ms. Lori Dorn
would be happy to answer any questions on wages, benefits, or related items. There
seems to be some question that Humphrey Construction is not a union contractor. At the
time the contract was awarded, a collective bargaining agreement was negotiated and
signed. Workers were members of Local 159 in Martinez. There was no activity from
Local 152 to organize the employees or approach Humphrey Construction for a collective
bargaining agreement. During the course of the project, there was no union activity. It
was only after construction was completed that union activity began. No complaints were
made until after the job was completed. There were a couple of times when questions
were raised during the course of the work and they were addressed and no action was
taken against the employees. Employees continued to work after they made the inquiries.
Mr. Cook stated that there are several issues that the Carpenters Union raised today and
previously.
1 )
The Carpenters Union alleges that Humphrey Construction did not use the
right wage determination published by the Division of Labor Statistics and
Research (DLSR). The Carpenters allege that the DLSR determination made
in 1994 should apply to this job. The job was awarded in 1 992 and the
1992 determination is the correct one to be used in this case. During the
course of construction, Humphrey Construction tried to pay predetermined
wage rates and tried to correct any discrepancies at the end of the contract.
Those are the checks that some employees indicate they received.
05
04
95
72
2)
The Carpenters Union alleges that Humphrey Construction did not pay
benefits. Humphrey Construction has a full benefit package.
In response to questions from the Board, Mr. Cook stated that plumbers were hired from
the union hall but carpenters were not. Employees are expected to be multicraft. When
accidents did occur they were handled swiftly by the company. An OSHA inspector came
to the project, but no citation was ever issued on this job.
Mr. Mel Sakata, of the Central California District Council of Carpenters, stated that with
regard to Mr. Klimczak's statement that many agencies such as the District defer to the
State Labor Commissioner's Office on these matters, many times agencies such as the
District are not aware of their responsibilities. Labor Code Section 1776 requires that the
awarding body be cognizant of the prevailing wage responsibility. These complaints are
coming from the workers not the Carpenters Union. It is a fact of construction that
workers will often not complain in the course of employment because of the fear of
retaliation. They usually wait until the project is finished. With respect to the prevailing
wage violations, the State Labor Commissioner's Office does intend to issue a Notice to
Withhold. The awarding body cannot shirk its responsibilities. This is not a union versus
non-union issue.
Mr. Dolan, General Manager-Chief Engineer, stated that if the Board feels after deliberation
that the course of action that staff is taking is appropriate, no further action is necessary
on the part of the Board, and staff will continue to work with the State Labor
Commissioner's Office.
It was moved by Member Dalton and seconded by Member Rainey, that the issue of
possible payroll deficiencies on the Headworks Project be referred to staff for further
coordination with the State of California Labor Commissioner's Office for resolution.
In response to a question from the Board, Mr. Kenton L. Aim, Counsel for the District,
stated that he has been involved with advising staff on this matter. Mr. Aim agreed with
the conclusion that staff should actively and in full cognizance get this issue resolved as
soon as possible but not duplicate the actions of the State Labor Commissioner's Office.
Member Menesini voiced concern that there be fairness on both sides of this question and
that the workers get a fair shake. Member Menesini indicated that he wants to be
actively involved and informed. All work performed for the District should be fair, safe
and honest.
Discussion followed concerning the retention being held and the District's responsibility
in that regard.
in response to a question from the Board, Mr. Fred King, of CH2M Hill, stated that CH2M
Hill is supporting District staff on this matter. CH2M Hill reviewed and monitored the
payrolls, complied with requests from the Carpenters Union, and will continue to do so.
CH2M Hill and the District are not responsible for direct safety. That is the responsibility
of the contractor. The District and CH2M Hill have a direct responsibility for their own
workers. Mr. King stated that as far as he is aware, all safety complaints were responded
to. Mr. Robert A. Baker, Deputy Chief Engineer, stated that on this particular job, the
District specifications required that Humphrey Construction hire a safety specialist. The
District is dependent on the contractor and the contractor's relationship with OSHA for
safety enforcement.
There being no further discussion, President Hockett called for a vote on the above motion
to refer the issue of possible payroll deficiencies on the Headworks Project to staff for
further coordination with the State of California Labor Commissioner's Office for
resolution. Motion approved on the following vote:
AYES: Members: Dalton, Rainey, Boneysteele, Hockett
NOES: Members: None
ABSENT: Members: None
ABSTAIN: Members: Menesini
05 04 95
73
Mr. Dolan stated that in the normal course of business he would not expect this matter
to come back to the Board for a decision, but that the Board will be informed of the
resolution of the matter.
President Hockett thanked all those present for their input.
At this time, President Hockett reverted to the order of the agenda.
7. BIDS AND AWARDS
a.
AUTHORIZE AWARD OF A CONSTRUCTION CONTRACT TO McGUIRE AND
HESTER AND AUTHORIZE CONSULTING AGREEMENTS WITH MONTGOMERY
WATSON AND WOODWARD CLYDE CONSULTANTS FOR THE PLEASANT HILL
RELIEF INTERCEPTOR PHASE 3. DP 5031
Mr. Dolan, General Manager-Chief Engineer, recommended that award of construction
contract be authorized to the low bidder, McGuire and Hester.
Following discussion, it was moved by Member Rainey and seconded by Member
Boneysteele, that award of contract for construction of the Pleasant Hill Relief Interceptor
Phase 3, DP 5031, in the amount of $5,746,666 be authorized to McGuire and Hester as
the lowest responsible bidder; and that the General Manager-Chief Engineer be authorized
to execute Professional Service Agreements with Montgomery Watson ($101,000 and
$151,500) and Woodward Clyde Consultants ($60,000). There being no objection, the
motion was unanimously approved.
8. ADMINISTRATION
a.
APPROVE EMPLOYEE COMPUTER HARDWARE PURCHASE ASSISTANCE
PROGRAM
Mr. Dolan, General Manager-Chief Engineer, stated that because of the increasing
presence and importance of personal computers in the workplace, the concept of an
Employee Computer Hardware Purchase Assistance Program has taken hold in a number
of agencies in the Bay Area. The details of the proposed program are set forth in the
position paper. The program will be beneficial to the District by increasing employee
computer literacy.
It was moved by Member Menesini and seconded by Member Boneysteele, that the
Employee Computer Purchase Assistance Program be approved as recommended effective
July 1, 1995. There being no objection, the motion was unanimously approved.
9. ENGINEERING
a.
ADVISE THE BOARD OF STAFF ACTIONS RELATED TO ALLEGED PAYROLL
DEFICIENCIES ON THE HEADWORKS FACILITIES IMPROVEMENT PROJECT. DP
20069
This item was taken out of order earlier in the agenda.
b.
REVIEW STAFF PROPOSAL FOR A POLLUTION PREVENTION COMPONENT OF
THE SEWER SERVICE CHARGE
Mr. Dolan, General Manager-Chief Engineer, stated that at the last Board Meeting, the
Board was given a preview of the proposal for a Pollution Prevention component of the
Sewer Service Charge. This would shift part of the cost of funding for the Commercial
Pollution Prevention Program from residential customers to commercial customers. Mr.
Dolan introduced Mr. Timothy Potter, Supervising Source Control Inspector, who stated
that additional information has been provided as requested by the Board at the last Board
Meeting. Mr. Potter reviewed four options for implementation of a Pollution Prevention
component of the Commercial Sewer Service Charge as set forth in Attachment 1 to the
position paper and the impact analysis set forth in Attachment 2.
05
04
95
74
Discussion followed with respect to the staff work involved in implementation, the impact
on residential and commercial customers, and calculation of the charge for multiple use
parcels based on water consumption data received from the water districts. Mr. Dolan
stated that all of our customers could be considered to be beneficiaries of the Pollution
Prevention Program. As a result of the program, the costs for additional treatment
facilities to remove pollutants at the Plant should be avoided. The issue of implementing
a Pollution Prevention component of the Commercial Sewer Service Charge is very much
a Board policy issue. The way the cost of the Pollution Prevention Program should be
allocated depends on which rate setting approach the Board uses: 1) which user group
is the focus of the District effort? or 2) who are the beneficiaries? Because these two
approaches would result in different rate setting decisions, the Board can rationalize a
decision to continue to carry these expenses on the broad customer base or change
commercial rates to recover the Pollution Prevention Program expenses from the
commercial sector. Also, a partial shift could be justified. If a shift in funding is
approved, revenue would be available to offset a possible residential Sewer Service
Charge rate increase. Mr. Dolan requested guidance from the Board for use in preparing
the O&M Budget and Sewer Service Charge rate recommendation scheduled to be
considered by the Board on May 18, 1995.
Following discussion, it was moved by Member Menesini and seconded by Member
Rainey, that Scenario 4, a two-year, phase-in period of a 40 percent shift in direct cost
for the Pollution Prevention Program be used in preparation of the O&M Budget and Sewer
Service Charge rate recommendation for consideration by the Board on May 18, 1995.
There being no objection, the motion was unanimously approved.
10. CORRESPONDENCE
a.
NOTE RECEIPT OF LETTER DATED APRIL 13. 1995 FROM MR. STANLEY F.
DANN. OF LAFAYETTE. CONCERNING THE DRAINAGE SYSTEM. MID-HILL SEWER
PROJECT. MACIAS MINOR SUBDIVISION: REFER TO STAFF FOR ACTION
Mr. Dolan, General Manager-Chief Engineer, stated that staff is negotiating with Mr. Dann
and hopes to achieve an acceptable resolution of this issue.
Following description and discussion of the drainage system and minor subdivision, receipt
of the letter dated April 13, 1995 from Mr. Stanley F. Dann, of Lafayette, concerning the
drainage system, Mid-Hill Sewer Program, and Macias Minor Subdivision was noted and
referred to staff for action.
11. APPROVAL OF EXPENDITURES
a.
EXPENDITURE LIST DATED MAY 4. 1995
Member Menesini, Chair of the Budget and Finance Committee, stated that he and
Member Boneysteele reviewed the expenditures and found them to be satisfactory.
It was moved by Member Menesini and seconded by Member Boneysteele, that the
Expenditure List dated May 4, 1995, including Running Expense Check Nos. 88889-
89199, Sewer Construction Check Nos. 15574-15635, and Payroll Check Nos. 38279-
38561, be approved as recommended. There being no objection, the motion was
unanimously approved.
12. BUDGET AND FINANCE
a.
THIRD QUARTER CAPITAL IMPROVEMENT BUDGET STATUS REPORT
Mr. Dolan, General Manager-Chief Engineer, introduced Mr. John Mercurio, Administrative
Analyst, who presented the 1994-1995 Capital Improvement Program Third Quarter
Status Report. Mr. Mercurio reported that Capital Improvement Budget (CIB) revenues are
projected to be $3.9 million underrealized and CIB expenditures are projected to be $9.4
million underrealized as of June 30, 1995. Mr. Mercurio summarized the major project
expenditures noting that total expenditures through the third quarter were $25.7 million.
Mr. Mercurio summarized revenue and actual and projected expenditures for the current
fiscal year, noting that the Sewer Construction Fund balance as of June 30, 1995 is
05
04
95
75
projected to be $30,328,000. Included in Mr. Mercurio's report was a project status
report for the period ending March 31, 1995.
President Hockett declared that the Third Quarter Capital Improvement Budget Status
Report was duly received.
b.
REVIEW THE FINANCIAL STATUS AND BUDGET OF THE SELF-INSURANCE FUND
AND APPROVE THE ALLOCATION OF $150.000 TO THE FUND FROM THE 1995-
1996 O&M BUDGET
Mr. Dolan, General Manager-Chief Engineer, stated that the financial status and budget
of the Self-Insurance Fund was presented in general concept at the last Board Meeting.
Mr. Dolan introduced Ms. Bonnie Allen, Risk Manager, who provided an overview of the
financial history of the Self-Insurance Fund since its creation in July 1986 in response to
the unfavorable insurance market. Ms. Allen stated that total reserves are projected to
be $5,151,600 at June 30, 1995. This is $848,000 less than the $6 million target set
in 1986. Ms. Allen stated that there are two issues that may impact the District's Self-
Insurance Fund.
.
Governmental Accounting Standards Board Statement No.1 0 (GASB 10),
which became effective late in 1994, requires that public agencies risk
financing be actuarially based and soundly funded.
.
The improved insurance market has allowed the District to gain competitive
price quotations for excess liability coverages.
Ms. Allen stated that an actuarial study was done and three major recommendations came
out of that work:
1 )
That an excess liability policy in the amount of $10,000,000 excess of
$500,000 self-insured retention be purchased at a cost of $174,958 annual
premium;
2)
That the Self-Insurance Fund be restructured into three sub-funds for the
1995-1996 Fiscal Year:
.
Establish Sub-Fund A in the amount of $500,000 for GASB 10
actuarially based risks for general liability and automobile liability;
.
Establish Sub-Fund B in the amount of $2,450,000 for GASB 10 non-
actuarially based risks such as employment-related risks and pollution
risks; and
.
Establish Sub-Fund C in the amount of $2,201,599 for non-GASB 10
risks, insurance premiums and costs of initiating claims/lawsuits
against others; and
3)
That the allocation of $150,000 be approved from the 1995-1996 O&M
Budget.
Discussion followed with regard to the sources of the initial $1 million and $2 million
amounts which contributed to the establishment the Self-Insurance Fund. The adequacy
of the current reserves and excess liability insurance coverage were discussed, and
Member Rainey expressed opposition to transferring an additional $150,000 from the
O&M Budget to the Self-Insurance Fund because it would impact on Sewer Service
Charge rates. Potential risks and the benefit to the ratepayers of adequately insuring and
funding the Self-Insurance Fund were discussed.
Following discussion, it was moved by Member Boneysteele and seconded by Member
Menesini, that the purchase of a $10,000,000 Excess Liability-General Liability policy be
approved, including automobile and Errors and Omissions for losses above a self-insurance
retention of $500,000 at the annual premium of $174,958; and that the Self-Insurance
Fund be restructured into three sub-funds as described above for the 1995-1996 Fiscal
Year. There being no objection, the motion was unanimously approved.
05
04
95
76
it was moved by Member Boneysteele and seconded by Member Menesini, that $150,000
be allocated to the Self-Insurance Fund from the 1995-1996 O&M Budget. Motion
approved with Member Rainey voting no.
13. EMERGENCY SITUATIONS REQUIRING BOARD ACTION
None
14. REPORTS
a.
GENERAL MANAGER-CHIEF ENGINEER
1 )
Mr. Dolan, General Manager-Chief Engineer, reported that the District
continues to make progress on a permanent drop off facility for Household
Hazardous Waste for Central County. Between now and the time the drop
off facility begins operations there will be a need to continue with the mobile
collection function. After the drop off facility is in place, it is hoped that the
mobile collection function will drop off entirely but currently there is
something of a constituency for it. Staff has a plan to accommodate it in
the future to the extent necessary.
Mr. Dolan introduced Ms. Elaine Jacobs, Assistant Engineer, who provided
an update on the proposed permanent Household Hazardous Waste (HHW)
drop off facility. Staff expects to receive formal endorsements from the
Central County Cities and has met with County representatives to advise
them of our plans and to coordinate with the County Mobile Collection
Program. Staff also met with Pittsburg staff, Delta Diablo Sanitation
District, and Mt. View Sanitary District staff because they have indicated an
interest in participating at some level in the District's proposed program. All
have expressed a strong indication of support for the proposed program.
Staff will return to the Board next month when formal responses have been
received.
With regard to the County Mobile Collection Program, Ms. Jacobs stated
that the County Department of Health Services is asking all jurisdictions to
continue funding the County program through the next fiscal year by
contract. A model contract is being circulated for all franchisers
consideration. The County Mobile Collection Program is currently operating
with a surplus in revenues. County Household Hazardous Waste Manager
Robin Bedell-Waite estimates that the surplus will be about $700,00 by
June 1995. With that in mind, the program can continue into the next fiscal
year with no further funding from franchising agencies. That is still being
worked out with the County. After the surplus is expended, franchising
agencies can consider resuming the $2.12 per ton fee for the program or
consider other options.
Ms. Jacobs reported that the Cities of Pittsburg and Concord issued a
Request for Proposals (RFP) for household hazardous waste mobile
collection services. A proposal for $65 per car was received and is being
offered to other cities as well. It is hoped that the District could participate
in the County Mobile Collection Program until the surplus is expended.
Perhaps at that time the County could issue an RFP to get more competitive
proposals.
At 6:28 p.m., Member Dalton left the meeting.
Discussion followed with regard to the County Mobile Collection Program,
surplus funds, and local drop off facilities and/or mobile collection to
supplement the permanent drop off facility. President Hockett thanked Ms.
Jacobs for the update.
2)
Mr. Dolan, General Manager-Chief Engineer, stated that Central Contra
Costa Solid Waste Authority's (CCCSWA) consultant Hilton Farnkopf &
Hobson (HFH) produced a summary report and comparison of the proposals
05
04
95
77
submitted in response to CCCSWA's Request for Proposals for Solid Waste
Collection and Disposal Services. Browning Ferris Industries (BFI) proposed
the lowest cost for garbage collection service and Valley Waste
Management (VWM) proposed the lowest cost for green waste and
recycling services. An overview was provided by HFH at the April 27, 1995
CCCSWA meeting. At 8:30 a.m. on May 15, 1995 a workshop session will
be held at the Walnut Creek City Council Chambers. Some issues include:
.
Proposer's assumption relative to workers' productivity;
.
The number and types of materials that can be recycled beyond the
minimum specified;
.
Capacity of the proposer to handle customer complaints; and
.
The basis for assumptions on the volume of waste generated and
amounts diverted from the landfill.
Discussion followed concerning past experience with both BFI and VWM,
and the need for assurances on potential future performance. Member
Menesini suggested that a discussion of the proposals be calendared to
allow for Board input to the District representatives on CCCSWA.
3)
Mr. Dolan introduced Mr. Russ Leavitt, Planning Assistant, who reported on
the April 24, 1995 public hearing conducted by the Contra Costa County
Community Development Department on the Draft Environmental Impact
Report (EIR) for Tosco's proposed closure of a portion of Solano Way. Mr.
Leavitt reported that the EIR considers a number of options for mitigating
the loss of Solano Way and other roads that will be closing in the future and
considers the environmental impacts of the various alternatives, one of
which is extension of Waterbird Way. Mr. Dolan stated that with the
Board's concurrence, staff will not object to the closure of Solano Way but
will oppose extension of Waterbird Way; and in addition, will recommend
that the Waterbird Way extension be removed from the County General
Plan. The Board agreed.
4)
Mr. Dolan, General Manager-Chief Engineer, stated that for the past year or
two the Central California Water Recycling Project has been studied. This
project would send Bay Area secondary effluent to the San Joaquin Valley
in return for agricultural drainage which could be discharged to the ocean
via the San Francisco Southwest Outfall. The project faces several major
hurdles: political, economic, environmental, and water rights, to name a
few. The District has been asked to contribute $27,000 to the $2.3 million
study, half of which will be funded by the U.S. Bureau of Reclamation and
half by agencies like the District. Mr. Dolan stated that while we have
contributed to this project in the past, he has been reluctant to recommend
that the District contribute more money at this time since it appears unlikely
that the feasibility of Central San participating in this project would be far
lower than the feasibility of the other recycling options the District is now
pursuing. Therefore, the budget does not include the requested
contribution.
Mr. Dolan reported that a related project is proceeding. A Federal Court
Judge has ordered the Bureau of Reclamation to complete the San Luis
Drain. As a result, it is expected that significant opposition to the proposed
discharge near Antioch will surface. This could increase the attractiveness
of the large scale recycling project.
5)
Discussion of the High School Education Program was deferred until May
18, 1995 because of the lateness of the hour.
6)
Mr. Dolan, General Manager-Chief Engineer, reported that the District
participated in the Earth Day celebration on April 23, 1995. Mr. Dolan
commended Central San volunteers Source Control Inspector I Bev Baclig,
05
04
95
78
7)
8)
9)
10)
11 )
b.
District Temporary Clerical Kate Borman, Construction Equipment Operator
Rich Boylan, Source Control Program Superintendent Bart Brandenburg,
Administrative Secretary Jan Frost, Public Information and Graphics
Coordinator Ken Grubbs, Source Control Coordinator II Earlene Millier,
Maintenance Crew Member II Devin Nichols, Personnel Assistant Judy
Rivers, Training and Resource Technician Jane Parker, and Public
Information and Production Assistant Tim Tullis. The event was very
successful.
Mr. Dolan announced that the District is advertising for the Bancroft Road
Sewer Replacement Project. The engineer's estimate for the work is
$475,000.
Mr. Dolan announced that the City of Orinda has requested an easement for
a trail along District property. The trail has been somewhat controversial
but appears to be nearing approval. Staff is working with the City on
granting the easement on this request and will keep the Board informed.
Mr. Dolan announced that the Contra Costa Times news story on the Zone
1 Recycled Water Business Plan provoked further media attention and Mr.
Paul Morsen, Deputy General Manager, did a KCBS radio interview.
Mr. Dolan announced that the District's participation in Take Your Daughter
and Son to Work Day was a great success and much positive feedback was
received.
Mr. Dolan announced that the District's senior managers will be participating
in a management team building two-day event in June 1995. Team building
issues, interdepartmental issues, and communications will be among the
topics discussed. The event will be held at the Mansion at Lakewood in
Walnut Creek.
COUNSEL FOR THE DISTRICT
None
c.
SECRETARY OF THE DISTRICT
None
d.
BOARD MEMBERS
None
1 5. ANNOUNCEMENTS/SUGGESTIONS FOR FUTURE AGENDA ITEMS
Member Menesini suggested that a report of the State Task Force meetings be calendared
on the May 18, 1995 Board Agenda.
16. CLOSED SESSION
a.
INITIATION OF LITIGATION
Pursuant to Government Code Section 54956.9(c), on the advice of Counsel based on
existing facts and circumstances, the Board of Directors of the Central Contra Costa
Sanitary District has decided to initiate or is deciding whether to initiate litigation.
At 7:30 p.m., President Hockett declared the closed session to discuss litigation pursuant
to Government Code Section 54956.9(c). At 7:56 p.m., President Hockett concluded the
closed session and reconvened the meeting into open session.
05
04
95
79
17. REPORT OF DISCUSSION IN CLOSED SESSION
Mr. Kenton L. Aim, Counsel for the District, stated that no action was taken in closed
session which requires a report at this time.
18. ADJOURNMENT
There being no further business to come before the Board, President Hockett adjourned
the meeting at the hour of 7:57 p.m. Because of the lateness of the hour, there was no
tour of the Cogeneration Project.
ðb/t~
President of the Board of Directors,
Central Contra Costa Sanitary District,
County of Contra Costa, State of California
COUNTERSIGNED:
S c et ry of the Central ontra
C ta Sanitary District, ounty of
Contra Costa, State of California
05
04
95