Loading...
HomeSearchMy WebLinkAbout00. Agenda03.a. Review draft Position Paper to authorize the General Manager to execute a professional engineering services agreement in an amount not to exceed $990,000 with Stantec Consulting Services, Inc, for predesign of the Recycled Water Clearwell Project03.b. Review draft Position Paper to authorize the General Manager to amend an existing agreement with V.W. Housen and Associates under the Pump Station Upgrades Project, District Project 8436, to include final design services for the Moraga, Orinda Cros03.c. Review draft Position Paper authorizing the General Manager to execute a construction change order with W.M. Lyles Co. to replace a 900-horsepower Variable Frequency Drive at the Treatment Plant Headworks Facility, District Project 732703.d. Review draft Position Paper to award a construction contract in the amount of $3,306,370 to Cratus, Inc., the lowest responsive bidder for the North Orinda Sewer Renovations, Phase 7, District Project 8445, consider exemption from the CEQA03.e. Review draft Position Paper to authorize the General Manager to execute professional engineering services agreements with Consolidated CM, Inc. and McMillen Jacobs Associates in an amount not to exceed $350,000 each to provide construction inspecti03.f. Review draft Position Paper to award a construction contract in the amount of $748,008 to Platinum Roofing, Inc., the lowest responsive bidder for the Solids Conditioning Building Roof Replacement, District Project 7359; consider exemption from the03.g. Review draft Position Paper to authorize the General Manager to purchase natural gas through an existing service agreement with Shell Energy North America, LP, for the period January 1, 2020 through December 31, 2020, up to 1,000 decatherm per day03.h. Authorize General Manager to enter into a service agreement with Ironbrook UV to rebuild ultraviolet disinfection equipment.04.a. Receive list of Scheduled/Parking Lot items