HomeMy WebLinkAbout28. Update on emergency situation declared 11-15-18 (splice repair on electrical feeder) Page 1 of 7 Item 28. CENTRALSAN CENTRAL CONTRA COSTA SANITARY DISTRICT December 6, 2018 TO: HONORABLE BOARD OF DIRECTORS FROM: EDGAR J. LOPEZ, CAPITAL PROJECTS DIVISION MANAGER REVIEWED BY: JEAN-MARC PETIT, DIRECTOR OF ENGINEERING AND TECHNICAL SERVICES ROGER S. BAILEY, GENERAL MANAGER SUBJECT: RECEIVE UPDATE ON EMERGENCY DECLARED ON NOVEMBER 15, 2018 AUTHORIZING REPAIRS TOA SPLICE ON THE HIGH VOLTAGE 12KV ELECTRICAL FEEDER FROM SUBSTATION 82 TO SUBSTATION 40; AND TERMINATE THE EMERGENCY SITUATION I N ACCORDANCE WITH PUBLIC CONTRACT CODE 22050(C)(3) Attached is the presentation that will be reviewed at the meeting. ATTACHMENTS: 1. Presentation December 6, 2018 Regular Board Meeting Agenda Packet- Page 196 of 202 !� I EMERGENCY UPDATE - HIGH VOLTAGE ELECTRICAL FEEDER REPAIR December 6, 2018 Board Meeting CIA Edgar J . Lopez, PE Capital Projects Division Manager December 6, rBoard All CENTRALSANr CABLE SPLICE FAILURE f . a � I pQ E I L ' • 12kV electrical feeder cable failed on Tuesday, November 13 , 2018 at approximately 2 AM � z . . . NEW CABLE AND BOXES NEEDED w-VF dr f � ` 3 .. . 18 CENTRALSAN ;. it � 'y ";�i_ i �� rf• �� - _ - _ � �r _ ;` •res 7 -4 E, CENTRAL SAN 4 b Y CENTRAL SAN WORK COMPLETED • Repair tested and accepted • Electrical system back in operation • General Contractor: Aztec Consultants Inc. • Subcontractor: High Voltage Splicing Co. • Completed on Tuesday, November 27 , 2018 • Approximate costs for repair $90 ,000 • Change order to Recycled Water Clearwell Repairs, District Project 7365